|
|
(One intermediate revision by the same user not shown) |
Line 3: |
Line 3: |
| | issue date = 01/24/2012 | | | issue date = 01/24/2012 |
| | title = Acceptance Review Email, Relief Requests GG-ISI-014, GG-ISI-015, and GG-ISI-016, Pressure Retaining Welds in Control Rod Housings, Pumps and Valves, and Supports, 2nd 10-Year Inservice Inspection Interval (TAC Nos. ME7592-ME7594) | | | title = Acceptance Review Email, Relief Requests GG-ISI-014, GG-ISI-015, and GG-ISI-016, Pressure Retaining Welds in Control Rod Housings, Pumps and Valves, and Supports, 2nd 10-Year Inservice Inspection Interval (TAC Nos. ME7592-ME7594) |
| | author name = Wang A B | | | author name = Wang A |
| | author affiliation = NRC/NRR/DORL | | | author affiliation = NRC/NRR/DORL |
| | addressee name = Coulter D M, Jackson R R, Perino C L | | | addressee name = Coulter D, Jackson R, Perino C |
| | addressee affiliation = Entergy Operations, Inc | | | addressee affiliation = Entergy Operations, Inc |
| | docket = 05000316 | | | docket = 05000316 |
Line 18: |
Line 18: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:From: Wang, Alan Sent: Tuesday, January 24, 2012 11:32 AM To: 'Perino, Christina'; 'COULTER, DENNIS M'; 'JACKSON, RITA R' Cc: Lent, Susan; Burkhardt, Janet | | {{#Wiki_filter:From: Wang, Alan Sent: Tuesday, January 24, 2012 11:32 AM To: 'Perino, Christina'; 'COULTER, DENNIS M'; 'JACKSON, RITA R' Cc: Lent, Susan; Burkhardt, Janet |
|
| |
|
| ==Subject:== | | ==Subject:== |
| Acceptance of Proposed Request for Relief GG-ISI-014, GG-ISI-015 and GG-ISI-016 (ME7592, ME7593 and ME7594 ) | | Acceptance of Proposed Request for Relief GG-ISI-014, GG-ISI-015 and GG-ISI-016 (ME7592, ME7593 and ME7594 ) |
| Christina, Dennis, and Rita, By letter dated November 15, 201 1 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML113200448), Entergy Operations, Inc. (Entergy, the licensee) submitt ed relief request GG-ISI-014, GG-ISI-015 and GG-ISI-016for the Grand Gulf Nuclear Station, Unit 1 (GGNS). The proposed requests for relief are from certain American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code (BPV), Section XI, Sub Article IWB-2500 Inservice Inspection (lSI) requirements for Examination Category B-O, Pressure Retaining Welds in Control Rod Housings, ASME Section XI 1992 Edition, 1993 Addenda, Table IWC-2500-1 Inservice Inspection (lSI) requirements for Examination Category C-G, Pressure Retaining Welds in Pumps and Valves Inspection Program Band ASME Section XI 1992 Edition, 1993 Addenda, Table IWF-2500-1 Valves and Examination Category F-A, Supports - Inspection Program B. These relief requests are requested for the second 1O-year interval of the Inservice Inspection Program for the GGNS. The purpose of this letter is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of th ese relief request | | Christina, Dennis, and Rita, By letter dated November 15, 2011 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML113200448), Entergy Operations, Inc. (Entergy, the licensee) submitted relief request GG-ISI-014, GG-ISI-015 and GG-ISI-016for the Grand Gulf Nuclear Station, Unit 1 (GGNS). The proposed requests for relief are from certain American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code (BPV), Section XI, Sub Article IWB-2500 Inservice Inspection (lSI) requirements for Examination Category B-O, Pressure Retaining Welds in Control Rod Housings, ASME Section XI 1992 Edition, 1993 Addenda, Table IWC-2500-1 Inservice Inspection (lSI) requirements for Examination Category C-G, Pressure Retaining Welds in Pumps and Valves Inspection Program Band ASME Section XI 1992 Edition, 1993 Addenda, Table IWF-2500-1 Valves and Examination Category F-A, Supports - Inspection Program B. These relief requests are requested for the second 1O-year interval of the Inservice Inspection Program for the GGNS. The purpose of this letter is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of these relief requests. |
| : s. The licensee has informed the NRC staff that these requests for relief were submitted beyond the 12 month timeframe following the second 120 month interval as specified under 10 CFR 50.55a(g)(5)(iv). This condition has been addressed in Entergy's Corrective Action Process.
| | The licensee has informed the NRC staff that these requests for relief were submitted beyond the 12 month timeframe following the second 120 month interval as specified under 10 CFR 50.55a(g)(5)(iv). This condition has been addressed in Entergy's Corrective Action Process. |
| Pursuant to Section10 CFR 50.55a(g)(6)(i), the applicant shall demonstrate the examination coverage requirements are impractical for the subject welds and that imposition of these ASME Code requirements would create a burden on the licensee. | | Pursuant to Section10 CFR 50.55a(g)(6)(i), the applicant shall demonstrate the examination coverage requirements are impractical for the subject welds and that imposition of these ASME Code requirements would create a burden on the licensee. |
| | | The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the proposed requests for relief in terms of regulatory requirements and the protection of public health and safety and the environment. If additional information is needed for the staff to complete its technical review, you will be advised by separate correspondence. |
| The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the proposed requests for relief in terms of regulatory requirements and the protection of public health and safety and the environment. If additional information is needed for the staff to complete its technical review, you will be advised by separate correspondence. | |
| | |
| If you have any questions, please contact me at (301) 415-1445. | | If you have any questions, please contact me at (301) 415-1445. |
| Alan Wang Project Manager (Grand Gulf Nuclear Station) Nuclear Regulatory Commission Division of Operating Reactor Licensing Alan.Wang@NRC.gov Tel: (301) 415-1445 Fax: (301) 415-1222}} | | Alan Wang Project Manager (Grand Gulf Nuclear Station) |
| | Nuclear Regulatory Commission Division of Operating Reactor Licensing Alan.Wang@NRC.gov Tel: (301) 415-1445 Fax: (301) 415-1222}} |
Letter Sequence Acceptance Review |
---|
|
|
MONTHYEARGNRO-2011/00084, Request for Relief GG-ISI-014, GG-ISI-015 and GG-ISI-016, Requests for Relief from ASME Code Section Xl Lnservice Inspection Requirements for Pressure Retaining Welds in Control Rod Housings, Pressure Retaining Welds in Pumps..2011-11-15015 November 2011 Request for Relief GG-ISI-014, GG-ISI-015 and GG-ISI-016, Requests for Relief from ASME Code Section Xl Lnservice Inspection Requirements for Pressure Retaining Welds in Control Rod Housings, Pressure Retaining Welds in Pumps.. Project stage: Request ML1202404302012-01-24024 January 2012 Acceptance Review Email, Relief Requests GG-ISI-014, GG-ISI-015, and GG-ISI-016, Pressure Retaining Welds in Control Rod Housings, Pumps and Valves, and Supports, 2nd 10-Year Inservice Inspection Interval (TAC Nos. ME7592-ME7594) Project stage: Acceptance Review ML12237A0062012-08-23023 August 2012 Request for Additional Information Email Regarding Relief Request ISI-14,15,16 Project stage: RAI GNRO-2012/00119, Response to Request for Additional Information Regarding Relief Requests ISI-014, 015 and 0162012-10-0404 October 2012 Response to Request for Additional Information Regarding Relief Requests ISI-014, 015 and 016 Project stage: Response to RAI ML12331A0932012-11-19019 November 2012 Email Relief Request GG-ISI-014 Project stage: Request GNRO-2012/00143, Inservice Inspection Relief Request GG-ISI-014 Commitment2012-11-26026 November 2012 Inservice Inspection Relief Request GG-ISI-014 Commitment Project stage: Request ML12326A3312012-11-30030 November 2012 Relief Requests GG-ISI-014, GG-ISI-015, and GG-ISI-016, Pressure Retaining Welds in Control Rod Housings, Pumps and Valves, and Supports, 2nd 10-Year Inservice Inspection Interval Project stage: Other 2012-11-19
[Table View] |
Acceptance Review Email, Relief Requests GG-ISI-014, GG-ISI-015, and GG-ISI-016, Pressure Retaining Welds in Control Rod Housings, Pumps and Valves, and Supports, 2nd 10-Year Inservice Inspection Interval (TAC Nos. ME7592-ME7594)ML120240430 |
Person / Time |
---|
Site: |
Cook |
---|
Issue date: |
01/24/2012 |
---|
From: |
Wang A Division of Operating Reactor Licensing |
---|
To: |
Coulter D, Rolonda Jackson, Perino C Entergy Operations |
---|
Wang, A B, NRR/DORL/LPLIV, 415-1445 |
References |
---|
TAC ME7592, TAC ME7593, TAC ME7594 |
Download: ML120240430 (1) |
|
Similar Documents at Cook |
---|
Category:Acceptance Review Letter
MONTHYEARML24115A2152024-05-0707 May 2024 LTR: CNP Non-Acceptance with Opportunity TS 3-8-1 ML21082A0262021-03-22022 March 2021 Acceptance of Relief Request ISIR-4-11, Impractical Examinations for the Fourth 10-Year ISI Interval ML15259A0222015-09-17017 September 2015 Acceptance of Requested Licensing Action Relief Request REL-PP1 ML15056A1632015-03-0303 March 2015 DC Cook, Units 1 & 2 - Acceptance of Requested Licensing Action to Adopt TSTF-490, REV.0, Deletion of E-Bar Definition & Revision to Reactor Coolant System Specific Activity Technical Specification & Implement Full-Scope Alternative Source ML1202404302012-01-24024 January 2012 Acceptance Review Email, Relief Requests GG-ISI-014, GG-ISI-015, and GG-ISI-016, Pressure Retaining Welds in Control Rod Housings, Pumps and Valves, and Supports, 2nd 10-Year Inservice Inspection Interval (TAC Nos. ME7592-ME7594) ML1102100382011-01-19019 January 2011 Acceptance for Review, 12/16/2011 Application for Exemption and Amendment Re. Optimized Zirlo Fuel Rod Cladding ML1021702492010-08-0505 August 2010 Finds 7/19/10 Application for Cyber Security Amendment Acceptable for Review ML1020407692010-07-23023 July 2010 the NRC Staff Finds the 6/22/10 Application for Amendment Regarding Containment Spray System Nozzle SR Acceptable for Review 2024-05-07
[Table view] Category:E-Mail
MONTHYEARML24221A4172024-08-0101 August 2024 DC Cook 2024 PI&R Inspection Request for Information ML24178A0432024-06-26026 June 2024 NRR E-mail Capture - Final RAI - D.C. Cook 1 & 2 - License Amendment Request Regarding Neutron Flux Instrumentation ML24156A0072024-05-30030 May 2024 NRR E-mail Capture - Final RAI - D.C. Cook Nuclear Plant, Unit Nos. 1 and 2 - License Amendment Request Regarding Reserve Feed Enclosure ML24156A0052024-05-22022 May 2024 NRR E-mail Capture - D.C. Cook Nuclear Plant, Unit Nos. 1 and 2 - Acceptance of License Amendment Request Regarding Reserve Feed Enclosure ML24103A1392024-04-12012 April 2024 NRR E-mail Capture - D.C. Cook Nuclear Plant, Unit Nos. 1 and 2 - Acceptance of License Amendment Request Regarding Adoption of 10 CFR 50.69 ML24096A1132024-04-0505 April 2024 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 and 2 - Delay in Issuance of License Amendment Regarding Neutron Flux Instrumentation ML24093A0582024-04-0202 April 2024 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit No. 1 - Acceptance of License Amendment Request Regarding Technical Specification 3.4.12, Low Temperature Overpressure Protection (LTOP) System, ML23361A1022023-12-21021 December 2023 Security Rule Exemption Request - ISFSI Docket No. Reference ML23321A1222023-11-17017 November 2023 NRR E-mail Capture - Final RAI - D.C. Cook 1 & 2 - License Amendment Request Regarding Neutron Flux Instrumentation ML23052A1502023-02-21021 February 2023 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 and 2 - Acceptance of License Amendment Request Regarding Neutron Flux Instrumentation ML22307A2532022-11-0303 November 2022 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit No. 2 - Verbal Authorization of Relief Request ISIR-5-06 Regarding Alternative to N-729-6 for RPV Head Visual Examination ML22122A0902022-04-29029 April 2022 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 and 2 - Acceptance of License Amendment Request to Revise Technical Specifications Consistent with TSTF-554, Revision 1 ML22250A6712022-02-16016 February 2022 Outline Submittal Notification Email DC-Cook 2022 ML21341A6252021-12-0707 December 2021 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 and 2 - Acceptance of License Amendment Request to Revise Technical Specifications Consistent with TSTF-577, Revision 1 ML21307A3352021-11-0303 November 2021 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 and 2 - Final RAI - License Amendment Request Regarding Containment Water Level Instrumentation ML21236A0262021-08-23023 August 2021 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit No. 2 - Acceptance of License Amendment Regarding Changes to Reactor Vessel Heatup and Cooldown Curves and Low Temperature Overpressure Protection System Requirements ML21140A3052021-05-20020 May 2021 NRR E-mail Capture - Final RAI - D.C. Cook 1 & 2 - Relief Request ISIR-4-11, Impractical Examinations for the Fourth 10-Year ISI Interval ML21113A2812021-04-23023 April 2021 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 and 2 - Acceptance of License Amendment Request Regarding Containment Water Level Instrumentation ML21089A0222021-03-24024 March 2021 DC Cook Power Operated Valves (POV) Preliminary Request for Information ML21082A0262021-03-22022 March 2021 Acceptance of Relief Request ISIR-4-11, Impractical Examinations for the Fourth 10-Year ISI Interval ML21049A2682021-02-16016 February 2021 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit No. 2 - Final RAI - License Amendment Request for One-Time Extension Containment Type a ILRT ML21026A3472021-01-26026 January 2021 NRR E-mail Capture - Final RAI - D.C. Cook 1 & 2 - Relief Request REL-PP2 for Pump and Valve IST Fifth 10-year Interval ML21008A4742021-01-0808 January 2021 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit No. 2 - Acceptance of License Amendment Request for One-Time Extension Containment Type a ILRT ML20366A1012020-12-31031 December 2020 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit No. 2 - Acceptance of License Amendment Request for One-Time Deferral of Steam Generator Inspection ML20316A0152020-11-0606 November 2020 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 and 2 - Acceptance of Relief Request REL-PP2 for Pump and Valve IST Fifth 10-year Interval ML20318A0202020-10-16016 October 2020 NRR E-mail Capture - Regarding Public Comment on D.C. Cook, Unit 1 Request for Relief from Nozzle Inspections, Code Case N-729 ML20289A7122020-10-15015 October 2020 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit No. 1 - Verbal Authorization of Relief Request ISIR-5-04 Regarding Alternative to N-729-6 for RPV Head Visual Examination ML20290A4252020-10-15015 October 2020 Verbal Authorization of Relief Request ISIR-5-04 Regarding Alternative to N-729-6 for RPV Head Visual Examination ML20318A0192020-10-15015 October 2020 NRR E-mail Capture - (External_Sender) Supplemental Public Comment on D.C. Cook, Unit 1 Request for Relief from Nozzle Inspections, Code Case N-729 ML20289A1192020-10-0909 October 2020 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 and 2 - Acceptance of Relief Request for Alternative to N-729-4 for RPV Head Visual Examination ML20318A0182020-10-0909 October 2020 NRR E-mail Capture - (External_Sender) Public Comment on D.C. Cook, Unit 1 Request for Relief from Nozzle Inspections, Code Case N-729 ML20181A4122020-06-29029 June 2020 NRR E-mail Capture - Final RAI - D.C. Cook 1 - One-Time Extension, Containment Type a ILRT Frequency ML20149K6272020-05-28028 May 2020 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 and 2 - Acceptance of License Amendment and Exemptions Regarding UFSAR 10 CFR 50.71(e)(4) Update Schedule (Epids: L-2020-LLA-0100, L-2020-LLE-0052, L-2020-LLE-0053) ML20149K4332020-05-26026 May 2020 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 and 2 - Acceptance of License Amendment Request to Revise Technical Specifications Consistent with TSTF-567, Revision 1 ML20141L6062020-05-20020 May 2020 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 and 2 - Acceptance of License Amendment Request to Revise Technical Specifications Consistent with TSTF-541, Revision 2 ML20141L8112020-05-20020 May 2020 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 and 2 - Acceptance of Relief Request Regarding Impracticality for Inservice Inspection for Certain Welds ML20136A5162020-05-15015 May 2020 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 and 2 - Acceptance of License Amendment Request to Revise Technical Specifications Consistent with TSTF-412, Revision 3 ML20133J9662020-05-11011 May 2020 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit No. 1 - Acceptance of License Amendment Regarding Changes to Reactor Vessel Heatup and Cooldown Curves and Low Temperature Overpressure Protection System Requirements ML20232B4562020-04-27027 April 2020 Request for Supporting Information for the D.C. Cook SPRA Audit Review - Fragility Questions ML20232B4432020-03-25025 March 2020 Request for Supporting Information for the D.C. Cook SPRA Audit Review - Plant Response Model Questions ML19345F9382019-12-0909 December 2019 D.C. Cook 50.54(f) SPRA Submittal - Completeness Review Done and Path Forward ML19333B8042019-11-29029 November 2019 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 and 2 - Acceptance Review for LAR to Adopt TSTF-569 (L-2019-LLA-0248) ML19309F9212019-11-0505 November 2019 Request for Eportal Access for Audit Review of the DC Cook SPRA Supporting Documents ML19270E7372019-09-26026 September 2019 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 and 2 - Acceptance Review for LAR to Adopt TSTF-421, Reactor Coolant Pump Flywheel Inspection Program ML19207A4642019-07-26026 July 2019 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 and 2 - Acceptance Review for LAR to Delete Diesel Generator Load Test Resistor Banks ML19204A0962019-07-23023 July 2019 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 and 2 - Request for Additional Information Related to Unit 2 Leak Before Break Analysis and Deletion of Containment Humidity Monitors for Unit Nos. 1 and 2 ML19211C3032019-07-0303 July 2019 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 & 2 - Request for Additional Information Related to LAR to Address NSAL-15-1 ML19175A3032019-06-24024 June 2019 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit No. 2 - Acceptance Review for LAR to Revise Battery Monitoring and Maintenance TS ML19092A4802019-04-0202 April 2019 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 and 2 - Acceptance Review for LAR to Adopt TSTF-563 ML19092A4792019-04-0202 April 2019 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 and 2 - Acceptance Review for LAR to Address Issues Identified in Westinghouse Document NSAL-15-1 2024-08-01
[Table view] |
Text
From: Wang, Alan Sent: Tuesday, January 24, 2012 11:32 AM To: 'Perino, Christina'; 'COULTER, DENNIS M'; 'JACKSON, RITA R' Cc: Lent, Susan; Burkhardt, Janet
Subject:
Acceptance of Proposed Request for Relief GG-ISI-014, GG-ISI-015 and GG-ISI-016 (ME7592, ME7593 and ME7594 )
Christina, Dennis, and Rita, By letter dated November 15, 2011 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML113200448), Entergy Operations, Inc. (Entergy, the licensee) submitted relief request GG-ISI-014, GG-ISI-015 and GG-ISI-016for the Grand Gulf Nuclear Station, Unit 1 (GGNS). The proposed requests for relief are from certain American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code (BPV),Section XI, Sub Article IWB-2500 Inservice Inspection (lSI) requirements for Examination Category B-O, Pressure Retaining Welds in Control Rod Housings, ASME Section XI 1992 Edition, 1993 Addenda, Table IWC-2500-1 Inservice Inspection (lSI) requirements for Examination Category C-G, Pressure Retaining Welds in Pumps and Valves Inspection Program Band ASME Section XI 1992 Edition, 1993 Addenda, Table IWF-2500-1 Valves and Examination Category F-A, Supports - Inspection Program B. These relief requests are requested for the second 1O-year interval of the Inservice Inspection Program for the GGNS. The purpose of this letter is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of these relief requests.
The licensee has informed the NRC staff that these requests for relief were submitted beyond the 12 month timeframe following the second 120 month interval as specified under 10 CFR 50.55a(g)(5)(iv). This condition has been addressed in Entergy's Corrective Action Process.
Pursuant to Section10 CFR 50.55a(g)(6)(i), the applicant shall demonstrate the examination coverage requirements are impractical for the subject welds and that imposition of these ASME Code requirements would create a burden on the licensee.
The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the proposed requests for relief in terms of regulatory requirements and the protection of public health and safety and the environment. If additional information is needed for the staff to complete its technical review, you will be advised by separate correspondence.
If you have any questions, please contact me at (301) 415-1445.
Alan Wang Project Manager (Grand Gulf Nuclear Station)
Nuclear Regulatory Commission Division of Operating Reactor Licensing Alan.Wang@NRC.gov Tel: (301) 415-1445 Fax: (301) 415-1222