ML120470482: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML120470482
| number = ML120470482
| issue date = 01/18/2012
| issue date = 01/18/2012
| title = Wolf Creek-2012-01-Draft Outlines
| title = 2012-01-Draft Outlines
| author name =  
| author name =  
| author affiliation = NRC/RGN-IV/DRS
| author affiliation = NRC/RGN-IV/DRS
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:DRAFT 4 for NRC 1 of 2 ES-301 Administrative Topics Outline Form ES-301-1 Facility: Wolf Creek Date of Examination:   January 2012 Examination Level:   RO         SRO   Operating Test Number:       Administrative Topic (see Note) Type Code* Describe activity to be performed A1 Conduct of Operations D, R Review completed boration requirement calculation for a downpower evolution.
{{#Wiki_filter:ES-301                                     Administrative Topics Outline                               Form ES-301-1 Facility: Wolf Creek                                                     Date of Examination:     January 2012 Examination Level: RO             SRO                               Operating Test Number:
2.1.37 Knowledge of procedures, guidelines, or limitations associated with reactivity management (CFR 41.1 / 43.6 / 45.6) (SRO: 4.6)
Administrative Topic (see Note)         Type                       Describe activity to be performed Code*
A2 Conduct of Operations D, R Using a supplied data (STS SF-002, Core Axial Flux Difference), complete and evaluate the acceptance criteria.  
Review completed boration requirement calculation for a A1                                        D, R      downpower evolution.
Conduct of Operations                                2.1.37 Knowledge of procedures, guidelines, or limitations associated with reactivity management (CFR 41.1 / 43.6 /
45.6) (SRO: 4.6)
Using a supplied data (STS SF-002, Core Axial Flux A2                                        D, R      Difference), complete and evaluate the acceptance criteria.
Conduct of Operations                                2.1.20 Ability to interpret and execute procedure step. (CFR 41.10 / 43.5 / 45.12) (SRO: 4.6) 2.1.43 Ability to use procedures to determine the effects on reactivity of plant changes, such as reactor coolant system temperature, secondary plant, fuel depletion, etc. (CFR 41.10
                                                      / 43.6 / 45.6) (SRO: 4.3)
Evaluate plant conditions and determine if a mode change can A3                                        N, R      occur.
Equipment Control                                    2.2.35 Ability to determine Technical Specification Mode of Operation (CFR: 41.7 / 41.10 / 43.2 / 45.13) (SRO: 4.5) 2.2.40 Ability to apply Technical Specifications for a system.
(CFR: 41.10 / 43.2 / 43.5 / 45.3) (SRO: 4.7)
Evaluate an Emergency Authorization Exposure (EPF 06-A4                                        N, R      013-02) for correctness and approval.
Radiation Control                                    2.3.4 Knowledge of radiation exposure limits under normal or emergency conditions. (CFR 41.12 / 43.4 / 45.10) (SRO: 3.7)
In the simulator setting, perform an Emergency Plan A5                                        N, S      classification, completing an Emergency Notification form (EPF 06-007-01) within fifteen minutes.
Emergency Procedures/Plan Time Critical 2.4.41 Knowledge of the emergency action level thresholds and classification. (CFR 41.10 / 43.5 / 45.11) (SRO: 4.6)
NOTE: All items (5 total) are required for SROs. RO applicants require only 4 items unless they are retaking only the administrative topics, when all 5 are required.
DRAFT 4 for NRC                                    1 of 2
* Type Codes & Criteria: (C)ontrol room, (S)imulator, or Class(R)oom (D)irect from bank ( 3 for ROs;  4 for SROs & RO retakes)
(N)ew or (M)odified from bank ( 1)
(P)revious 2 exams ( 1; randomly selected)
DRAFT 4 for NRC                      2 of 2


2.1.20 Ability to interpret and execute procedure step. (CFR 41.10 / 43.5 / 45.12) (SRO:  4.6)
ES-301                               Control Room/In-Plant Systems Outline                       Form ES-301-2 Facility: Wolf Creek                                                 Date of Examination: January 2012 Examination Level: RO             SRO                           Operating Test Number:
 
Control Room Systems@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)
2.1.43 Ability to use procedures to determine the effects on reactivity of plant changes, such as reactor coolant system temperature, secondary plant, fuel depletion, etc. (CFR 41.10 / 43.6 / 45.6)  (SRO:  4.3)
Alternate Success Path JPMs are Bolded.
A3 Equipment Control N, R Evaluate plant conditions and determine if a mode change can occur.
System / JPM Title                                 Type Code*       Safety Function S1 004 CVCS: Perform manual makeup to the Volume Control Tank                     D, S              2 A4 Ability to manually operate and/or monitor in the Control Room: (CFR 41.7 / 45.5 to 45.8)
2.2.35 Ability to determine Technical Specification Mode of Operation (CFR: 41.7 / 41.10 / 43.2 / 45.13)  (SRO: 4.5)
A4.12 Boration/Dilution batch control (SRO: 3.3)
 
2.2.40 Ability to apply Technical Specifications for a system.  (CFR: 41.10 / 43.2 / 43.5 / 45.3) (SRO: 4.7)
A4 Radiation Control N, R Evaluate an Emergency Authorization Exposure (EPF 06-013-02) for correctness and approval.
 
====2.3.4 Knowledge====
of radiation exposure limits under normal or emergency conditions. (CFR 41.12 / 43.4 / 45.10)  (SRO: 3.7)
A5 Emergency Procedures/Plan N, S In the simulator setting, perform an Emergency Plan classification, completing an Emergency Notification form (EPF 06-007-01) within fifteen minutes.
 
Time Critical 2.4.41 Knowledge of the emergency action level thresholds and classification. (CFR 41.10 / 43.5 / 45.11) (SRO: 4.6) NOTE: All items (5 total) are required for SROs. RO applicants require only 4 items unless they are retaking only the administrative topics, when all 5 are required.
 
DRAFT 4 for NRC 2 of 2
* Type Codes & Criteria: (C)ontrol room, (S)imulator, or Class(R)oom (D)irect from bank ( 3 for ROs;  4 for SROs & RO retakes) (N)ew or (M)odified from bank ( 1) (P)revious 2 exams ( 1; randomly selected)
 
DRAFT 4 for NRC 1 of 4 ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: Wolf Creek Date of Examination:   January 2012 Examination Level:   RO         SRO   Operating Test Number:       Control Room Systems
@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF) Alternate Success Path JPM's are Bolded. System / JPM Title Type Code*
Safety Function S1 004 CVCS: Perform manual makeup to the Volume Control Tank A4 Ability to manually operate and/or monitor in the Control Room: (CFR 41.7 / 45.5 to 45.8) A4.12 Boration/Dilution batch control (SRO: 3.3)
A4.13 VCT level control and pressure control (SRO: 2.9)
A4.13 VCT level control and pressure control (SRO: 2.9)
A4.15 Boron concentration (SRO: 3.7) D, S 2 S2 010 Pressurizer Pressure Control System (PZR PCS): Depressurize the RCS to 1920 psig A1 Ability to predict and /or monitor changes in parameters (to prevent exceeding design limits) associated with operating the PZR PCS controls including: (CFR 41.5 / 45.5) A1.07 RCS pressure (SRO: 3.7)
A4.15 Boron concentration (SRO: 3.7)
A4 Ability to manually operate and / or monitor in the Control Room: (CFR 41.7 / 45.5 to 45.8) A4.01 PZR spray valve (SRO: 3.5)  
S2 010 Pressurizer Pressure Control System (PZR PCS): Depressurize the           N, S, L            3 RCS to 1920 psig A1 Ability to predict and /or monitor changes in parameters (to prevent exceeding design limits) associated with operating the PZR PCS controls including: (CFR 41.5 / 45.5)
 
A1.07 RCS pressure (SRO: 3.7)
PSA - Top Risk Significant System by PSA (BB - Reactor Coolant System) N, S, L 3 S3 041 Steam Dump System and Turbine Bypass Control (SDS): move steam load from Turbine to steam dumps A3 Ability to monitor automatic operation of the SDS, including: (CFR 41.7 / 45.5): A3.02 RCS pressure, RCS temperature, and reactor power (SRO: 3.4) A3.03 Steam flow (SRO: 2.8)  
A4 Ability to manually operate and / or monitor in the Control Room: (CFR 41.7 / 45.5 to 45.8)
 
A4.01 PZR spray valve (SRO: 3.5)
A4 Ability to manually operate and/ or monitor in the Control Room: (CFR 41.7 / 45.5 to 45.8) A4.08 Steam dump valves (SRO: 3.1) N, S 4S DRAFT 4 for NRC 2 of 4 S4 003 Reactor Coolant Pumps (RCP): RCP seal injection high: seal injection too high when at 100%, must trip reactor (first) and then trip RCP and close valve etc. A2 Ability to (a) predict the impacts of the following malfunctions or operations on the RCPs; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: (CFR 41.5 / 43.5 / 45.3 / 45.13) A2.01 Problems with RCP seals, especially rates of seal leak-off (SRO: 3.9) A2.02 Conditions which exist for an abnormal shutdown of an RCP in comparison to a normal shutdown of an RCP (SRO: 3.9)
PSA - Top Risk Significant System by PSA (BB - Reactor Coolant System)
PSA - Top Risk Significant System by PSA (BB - Reactor Coolant System) N, A, S 4P S5 103 Containment System: Phase A not completed - must "make it so" A2 Ability to (a) predict the impacts of the following malfunctions or operations on the Containment Systems; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: (CFR 41.5 / 43.5 / 45.3 / 45.13) A2.03 Phase A and Phase B isolation (SRO: 3.8)
S3 041 Steam Dump System and Turbine Bypass Control (SDS): move                   N, S            4S steam load from Turbine to steam dumps A3 Ability to monitor automatic operation of the SDS, including: (CFR 41.7 / 45.5):
A3.02 RCS pressure, RCS temperature, and reactor power (SRO: 3.4)
A3.03 Steam flow (SRO: 2.8)
A4 Ability to manually operate and/ or monitor in the Control Room: (CFR 41.7 / 45.5 to 45.8)
A4.08 Steam dump valves (SRO: 3.1)
DRAFT 4 for NRC                                   1 of 4


S4 003 Reactor Coolant Pumps (RCP): RCP seal injection high: seal        N, A, S  4P injection too high when at 100%, must trip reactor (first) and then trip RCP and close valve etc.
A2 Ability to (a) predict the impacts of the following malfunctions or operations on the RCPs; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: (CFR 41.5 / 43.5 / 45.3 / 45.13)
A2.01 Problems with RCP seals, especially rates of seal leak-off (SRO:
3.9)
A2.02 Conditions which exist for an abnormal shutdown of an RCP in comparison to a normal shutdown of an RCP (SRO: 3.9)
PSA - Top Risk Significant System by PSA (BB - Reactor Coolant System)
S5 103 Containment System: Phase A not completed - must make it        M, A, S, L  5 so A2 Ability to (a) predict the impacts of the following malfunctions or operations on the Containment Systems; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: (CFR 41.5 / 43.5 /
45.3 / 45.13)
A2.03 Phase A and Phase B isolation (SRO: 3.8)
PSA - Top Risk Significant System by PSA (SA - Engineered Safeguards Features Actuation System)
PSA - Top Risk Significant System by PSA (SA - Engineered Safeguards Features Actuation System)
M, A, S, L 5 S6 062 A.C. Electrical Distribution: align alternate power to bus A2 Ability to (a) predict the impacts of the following malfunctions or operations on the AC distribution system; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: (CFR 41.5 / 43.5 / 45.3 / 45.13)
S6 062 A.C. Electrical Distribution: align alternate power to bus       M, A, S, L  6 A2 Ability to (a) predict the impacts of the following malfunctions or operations on the AC distribution system; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: (CFR 41.5 / 43.5 /
A2.05 Methods for energizing a dead bus (SRO: 3.3)  
45.3 / 45.13)
A2.05 Methods for energizing a dead bus (SRO: 3.3) 055 Loss of Offsite and Onsite Power (Station Blackout)
EA2 Ability to determine or interpret the following as they apply to a Station Blackout (CFR 43.5 / 45.13)
EA2.03 Actions necessary to restore power (SRO: 4.7)
PSA - Station Blackout - Core Damage Frequency by Initiating Event
& Event tree DRAFT 4 for NRC                                  2 of 4


055 Loss of Offsite and Onsite Power (Station Blackout) EA2 Ability to determine or interpret the following as they apply to a Station Blackout (CFR 43.5 / 45.13) EA2.03 Actions necessary to restore power (SRO: 4.7)
S7 015 Nuclear Instrumentation System (NIS): IR under compensation,         N, A, L, S  7 correct energize SR NIs K6. Knowledge of the effect of a loss or malfunction on the following will have on the NIS: (CFR 41.7 / 45.7)
PSA - Station Blackout - Core Damage Frequency by Initiating Event & Event tree M, A, S, L 6 DRAFT 4 for NRC 3 of 4 S7 015 Nuclear Instrumentation System (NIS): IR under compensation, correct energize SR NI's K6. Knowledge of the effect of a loss or malfunction on the following will have on the NIS: (CFR 41.7 / 45.7) K6.02 Discriminator / compensation circuits (SRO: 2.9)  
K6.02 Discriminator / compensation circuits (SRO: 2.9)
A2 Ability to (a) predict the impacts of the following malfunctions or operations on the NIS; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: (CFR 41.5 / 43.5 / 45.3 / 45.13)
A2.02 Faulty or erratic operation of detectors or compensating components (SRO: 3.5)
LER 2009-011, Intermediate Range detector NI36 inoperable
: h. NA In-Plant Systems@ (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)
P1 001 Control Rod Drive System (CRDM): Start a rod drive motor                D, R    1 generator set 2.2.1 Ability to perform pre-startup procedures for the facility, including operating those controls associated with plant equipment that could affect reactivity. (CFR 41.5 / 41.10 / 43.5 / 45.1) (SRO: 4.4)
LER 2003-001, Manipulation of component outside of procedural guidance causes reactor trip P2 061 Auxiliary Feedwater System (AFW): align AFW alternate suction        D, L, E  4S from fire protection standpipe A2 Ability to (a) predict the impacts of the following malfunctions or operations on the AFW; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: (CFR 41.5 / 43.5 / 45.3 / 45.13)
A2.04 Pump failure or improper operation (SRO: 3.8)
PSA - Top Risk Significant System by PSA (AL - Auxiliary Feedwater System)
DRAFT 4 for NRC                                    3 of 4


A2 Ability to (a) predict the impacts of the following malfunctions or operations on the NIS; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: (CFR 41.5 / 43.5 / 45.3 / 45.13) A2.02 Faulty or erratic operation of detectors or compensating components (SRO: 3.5)
P3 033 Spent Fuel Pool Cooling System (SFPCS)                                       N, A, R              8 A2 Ability to (a) predict the impacts of the following malfunctions or operations on the Spent Fuel Pool Cooling System; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: (CFR 41.5 / 43.5 /
LER 2009-011, Intermediate Range detector NI36 inoperable N, A, L, S 7 h. NA            In-Plant Systems
45.3 / 45.13)
@ (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U) P1 001 Control Rod Drive System (CRDM): Start a rod drive motor generator set 2.2.1 Ability to perform pre-startup procedures for the facility, including operating those controls associated with plant equipment that could affect reactivity.  (CFR 41.5 / 41.10 / 43.5 / 45.1)  (SRO: 4.4)
A2.03 Abnormal spent fuel pool water level or loss of water level (SRO:
LER 2003-001, Manipulation of component outside of procedural guidance causes reactor trip D, R 1 P2 061 Auxiliary Feedwater System (AFW): align AFW alternate suction from fire protection standpipe A2 Ability to (a) predict the impacts of the following malfunctions or operations on the AFW; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: (CFR 41.5 / 43.5 / 45.3 / 45.13) A2.04 Pump failure or improper operation (SRO: 3.8)
3.5
PSA - Top Risk Significant System by PSA (AL - Auxiliary Feedwater System) D, L, E 4S DRAFT 4 for NRC 4 of 4 P3 033 Spent Fuel Pool Cooling System (SFPCS) A2 Ability to (a) predict the impacts of the following malfunctions or operations on the Spent Fuel Pool Cooling System; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: (CFR 41.5 / 43.5 / 45.3 / 45.13) A2.03 Abnormal spent fuel pool water level or loss of water level (SRO: 3.5 N, A, R 8 @ All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
@         All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
* Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path (C)ontrol room (D)irect from bank (E)mergency or abnormal in-plant (EN)gineered safety feature (L)ow-Power / Shutdown (N)ew or (M)odified from bank including 1(A) (P)revious 2 exams (R)CA (S)imulator 4-6 / 4-6 / 2-3 9 /  8 /  4  1 /  1 / 1  -  /  -  /  1 (control room system)     1 /  1 /  1  2 /  2 /  1  3 /  3 /  2 (randomly selected) 1 / 1 / 1}}
* Type Codes                                   Criteria for RO / SRO-I / SRO-U (A)lternate path                                                               4-6 / 4-6 / 2-3 (C)ontrol room (D)irect from bank                                                             9/8/4 (E)mergency or abnormal in-plant                                               1/1/1 (EN)gineered safety feature                                                     - / - / 1 (control room system)
(L)ow-Power / Shutdown                                                         1/1/1 (N)ew or (M)odified from bank including 1(A)                                   2/2/1 (P)revious 2 exams                                                              3 /  3 /  2 (randomly selected)
(R)CA                                                                          1/1/1 (S)imulator DRAFT 4 for NRC                                    4 of 4}}

Latest revision as of 08:09, 12 November 2019

2012-01-Draft Outlines
ML120470482
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 01/18/2012
From:
Division of Reactor Safety IV
To:
Wolf Creek
References
50-482/12-301
Download: ML120470482 (6)


Text

ES-301 Administrative Topics Outline Form ES-301-1 Facility: Wolf Creek Date of Examination: January 2012 Examination Level: RO SRO Operating Test Number:

Administrative Topic (see Note) Type Describe activity to be performed Code*

Review completed boration requirement calculation for a A1 D, R downpower evolution.

Conduct of Operations 2.1.37 Knowledge of procedures, guidelines, or limitations associated with reactivity management (CFR 41.1 / 43.6 /

45.6) (SRO: 4.6)

Using a supplied data (STS SF-002, Core Axial Flux A2 D, R Difference), complete and evaluate the acceptance criteria.

Conduct of Operations 2.1.20 Ability to interpret and execute procedure step. (CFR 41.10 / 43.5 / 45.12) (SRO: 4.6) 2.1.43 Ability to use procedures to determine the effects on reactivity of plant changes, such as reactor coolant system temperature, secondary plant, fuel depletion, etc. (CFR 41.10

/ 43.6 / 45.6) (SRO: 4.3)

Evaluate plant conditions and determine if a mode change can A3 N, R occur.

Equipment Control 2.2.35 Ability to determine Technical Specification Mode of Operation (CFR: 41.7 / 41.10 / 43.2 / 45.13) (SRO: 4.5) 2.2.40 Ability to apply Technical Specifications for a system.

(CFR: 41.10 / 43.2 / 43.5 / 45.3) (SRO: 4.7)

Evaluate an Emergency Authorization Exposure (EPF 06-A4 N, R 013-02) for correctness and approval.

Radiation Control 2.3.4 Knowledge of radiation exposure limits under normal or emergency conditions. (CFR 41.12 / 43.4 / 45.10) (SRO: 3.7)

In the simulator setting, perform an Emergency Plan A5 N, S classification, completing an Emergency Notification form (EPF 06-007-01) within fifteen minutes.

Emergency Procedures/Plan Time Critical 2.4.41 Knowledge of the emergency action level thresholds and classification. (CFR 41.10 / 43.5 / 45.11) (SRO: 4.6)

NOTE: All items (5 total) are required for SROs. RO applicants require only 4 items unless they are retaking only the administrative topics, when all 5 are required.

DRAFT 4 for NRC 1 of 2

  • Type Codes & Criteria: (C)ontrol room, (S)imulator, or Class(R)oom (D)irect from bank ( 3 for ROs; 4 for SROs & RO retakes)

(N)ew or (M)odified from bank ( 1)

(P)revious 2 exams ( 1; randomly selected)

DRAFT 4 for NRC 2 of 2

ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: Wolf Creek Date of Examination: January 2012 Examination Level: RO SRO Operating Test Number:

Control Room Systems@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)

Alternate Success Path JPMs are Bolded.

System / JPM Title Type Code* Safety Function S1 004 CVCS: Perform manual makeup to the Volume Control Tank D, S 2 A4 Ability to manually operate and/or monitor in the Control Room: (CFR 41.7 / 45.5 to 45.8)

A4.12 Boration/Dilution batch control (SRO: 3.3)

A4.13 VCT level control and pressure control (SRO: 2.9)

A4.15 Boron concentration (SRO: 3.7)

S2 010 Pressurizer Pressure Control System (PZR PCS): Depressurize the N, S, L 3 RCS to 1920 psig A1 Ability to predict and /or monitor changes in parameters (to prevent exceeding design limits) associated with operating the PZR PCS controls including: (CFR 41.5 / 45.5)

A1.07 RCS pressure (SRO: 3.7)

A4 Ability to manually operate and / or monitor in the Control Room: (CFR 41.7 / 45.5 to 45.8)

A4.01 PZR spray valve (SRO: 3.5)

PSA - Top Risk Significant System by PSA (BB - Reactor Coolant System)

S3 041 Steam Dump System and Turbine Bypass Control (SDS): move N, S 4S steam load from Turbine to steam dumps A3 Ability to monitor automatic operation of the SDS, including: (CFR 41.7 / 45.5):

A3.02 RCS pressure, RCS temperature, and reactor power (SRO: 3.4)

A3.03 Steam flow (SRO: 2.8)

A4 Ability to manually operate and/ or monitor in the Control Room: (CFR 41.7 / 45.5 to 45.8)

A4.08 Steam dump valves (SRO: 3.1)

DRAFT 4 for NRC 1 of 4

S4 003 Reactor Coolant Pumps (RCP): RCP seal injection high: seal N, A, S 4P injection too high when at 100%, must trip reactor (first) and then trip RCP and close valve etc.

A2 Ability to (a) predict the impacts of the following malfunctions or operations on the RCPs; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: (CFR 41.5 / 43.5 / 45.3 / 45.13)

A2.01 Problems with RCP seals, especially rates of seal leak-off (SRO:

3.9)

A2.02 Conditions which exist for an abnormal shutdown of an RCP in comparison to a normal shutdown of an RCP (SRO: 3.9)

PSA - Top Risk Significant System by PSA (BB - Reactor Coolant System)

S5 103 Containment System: Phase A not completed - must make it M, A, S, L 5 so A2 Ability to (a) predict the impacts of the following malfunctions or operations on the Containment Systems; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: (CFR 41.5 / 43.5 /

45.3 / 45.13)

A2.03 Phase A and Phase B isolation (SRO: 3.8)

PSA - Top Risk Significant System by PSA (SA - Engineered Safeguards Features Actuation System)

S6 062 A.C. Electrical Distribution: align alternate power to bus M, A, S, L 6 A2 Ability to (a) predict the impacts of the following malfunctions or operations on the AC distribution system; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: (CFR 41.5 / 43.5 /

45.3 / 45.13)

A2.05 Methods for energizing a dead bus (SRO: 3.3) 055 Loss of Offsite and Onsite Power (Station Blackout)

EA2 Ability to determine or interpret the following as they apply to a Station Blackout (CFR 43.5 / 45.13)

EA2.03 Actions necessary to restore power (SRO: 4.7)

PSA - Station Blackout - Core Damage Frequency by Initiating Event

& Event tree DRAFT 4 for NRC 2 of 4

S7 015 Nuclear Instrumentation System (NIS): IR under compensation, N, A, L, S 7 correct energize SR NIs K6. Knowledge of the effect of a loss or malfunction on the following will have on the NIS: (CFR 41.7 / 45.7)

K6.02 Discriminator / compensation circuits (SRO: 2.9)

A2 Ability to (a) predict the impacts of the following malfunctions or operations on the NIS; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: (CFR 41.5 / 43.5 / 45.3 / 45.13)

A2.02 Faulty or erratic operation of detectors or compensating components (SRO: 3.5)

LER 2009-011, Intermediate Range detector NI36 inoperable

h. NA In-Plant Systems@ (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)

P1 001 Control Rod Drive System (CRDM): Start a rod drive motor D, R 1 generator set 2.2.1 Ability to perform pre-startup procedures for the facility, including operating those controls associated with plant equipment that could affect reactivity. (CFR 41.5 / 41.10 / 43.5 / 45.1) (SRO: 4.4)

LER 2003-001, Manipulation of component outside of procedural guidance causes reactor trip P2 061 Auxiliary Feedwater System (AFW): align AFW alternate suction D, L, E 4S from fire protection standpipe A2 Ability to (a) predict the impacts of the following malfunctions or operations on the AFW; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: (CFR 41.5 / 43.5 / 45.3 / 45.13)

A2.04 Pump failure or improper operation (SRO: 3.8)

PSA - Top Risk Significant System by PSA (AL - Auxiliary Feedwater System)

DRAFT 4 for NRC 3 of 4

P3 033 Spent Fuel Pool Cooling System (SFPCS) N, A, R 8 A2 Ability to (a) predict the impacts of the following malfunctions or operations on the Spent Fuel Pool Cooling System; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: (CFR 41.5 / 43.5 /

45.3 / 45.13)

A2.03 Abnormal spent fuel pool water level or loss of water level (SRO:

3.5

@ All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.

  • Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path 4-6 / 4-6 / 2-3 (C)ontrol room (D)irect from bank 9/8/4 (E)mergency or abnormal in-plant 1/1/1 (EN)gineered safety feature - / - / 1 (control room system)

(L)ow-Power / Shutdown 1/1/1 (N)ew or (M)odified from bank including 1(A) 2/2/1 (P)revious 2 exams 3 / 3 / 2 (randomly selected)

(R)CA 1/1/1 (S)imulator DRAFT 4 for NRC 4 of 4