| | number = ML12111A179 | | | number = ML12111A179 |
| | issue date = 02/27/2012 | | | issue date = 02/27/2012 |
| | title = Hope Creek - NRC Comments on Draft Licensee-Developed Exam (Operating)(Folder 2) | | | title = NRC Comments on Draft Licensee-Developed Exam (Operating)(Folder 2) |
| | author name = | | | author name = |
| | author affiliation = NRC/RGN-I/DRS/OB | | | author affiliation = NRC/RGN-I/DRS/OB |
Line 9: |
Line 9: |
| | docket = 05000354 | | | docket = 05000354 |
| | license number = NPF-057 | | | license number = NPF-057 |
| | contact person = Jackson D E | | | contact person = Jackson D |
| | case reference number = TAC U01845 | | | case reference number = TAC U01845 |
| | package number = ML113070699 | | | package number = ML113070699 |
| | document type = License-Operator, Part 55 Examination Related Material | | | document type = License-Operator, Part 55 Examination Related Material |
| | page count = 3 | | | page count = 3 |
| | | project = TAC:U01845 |
| | | stage = Draft Other |
| }} | | }} |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:2012 ILOT NRC Exam -Operating Exam Revisions | | {{#Wiki_filter:2012 ILOT NRC Exam - Operating Exam Revisions - Post NRC Validation Scenario #1 Revised start time of trigger ET-5 (LOCA). This is to ensure sufficient evaluation time exists for operation of RCIC in level control following reset of its overspeed trip. |
| -Post NRC Validation Scenario #1 Revised start time of trigger ET-5 (LOCA). This is to ensure sufficient evaluation time exists for operation of RCIC in level control following reset of its overspeed trip. Scenario #2 Added a malfunction to trip the RFPT that is operating for level control following the A TWS. Revalidated event. Scenario #3 No comments Scenario #4 Removed Recirc PP runaway and high vibration malfunction and replaced with multiple seal failure on 'B' Recirc PP. Revalidated event. | | Scenario #2 Added a malfunction to trip the RFPT that is operating for level control following the ATWS. Revalidated event. |
| Added ADS valve fails to open malfunction during the Emergency Depressurization. | | Scenario #3 No comments Scenario #4 Removed Recirc PP runaway and high vibration malfunction and replaced with multiple seal failure on 'B' Recirc PP. Revalidated event. |
| Revalidated event. "IPM#1 Steps 5.18.5.C and D. changed to critical steps. Revalidated JPM#2 Steps 5.3.5.0 changed to critical step. Revalidated Added malfunction to trip the RHR pump 2 minute after the F015 valve INCREASE PB is depressed. | | Added ADS valve fails to open malfunction during the Emergency Depressurization. Revalidated event. |
| Revalidated. | | "IPM#1 Steps 5.18.5.C and D. changed to critical steps. Revalidated JPM#2 Steps 5.3.5.0 changed to critical step. Revalidated Added malfunction to trip the RHR pump 2 minute after the F015 valve INCREASE PB is depressed. Revalidated. |
| JPM #3 Step #14 changed to a critical step. Re validated JPM#4 No comments JPM#5 Ensure a pre-brief is done to review SO.SF-0001 procedure (for moving control rods). | | JPM #3 Step #14 changed to a critical step. Re validated JPM#4 No comments JPM#5 Ensure a pre-brief is done to review SO.SF-0001 procedure (for moving control rods). |
| ..I PM No Step 5.3.4 changed to critical. | | |
| Added setup step to open Non-1 E pump bkr. | | ..IPM #6 No comments JPM#7 Step 5.3.4 changed to critical. Added setup step to open Non-1 E pump bkr. Re validated JPM #8 No comments JPM#9 No comments |
| JPM No No | | ..IPM #10 Updated panel label to show actual label in the field for each step. |
| ..IPM Updated panel label to show actual label in the field for each JPM No ADMIN Revised initiating cue with more specific guidance that the tagging performed lAW ESO ADMIN Corrected math error on exam answer key (instrument deviation for item ADMIN No ADMIN No ADMIN SRO#1 Changed initiating cue and conditions. | | JPM #11 No comments ADMIN RO#1 Revised initiating cue with more specific guidance that the tagging was performed lAW ESO guidance. |
| Changed isolation points referenced on the print. Re-validated. | | ADMIN RO#2 Corrected math error on exam answer key (instrument deviation for item #65) |
| ADMIN SRO#2 Added non-critical step on answer key -attachment 3z may also be checked off. ADMIN SRO #3 Clarified initiating cue ADMIN SRO#4 Clarified initiating cue ADMIN SRO#5 No comments}} | | ADMIN RO#3 No Comments ADMIN RO#4 No Comments |
| | |
| | ADMIN SRO#1 Changed initiating cue and conditions. Changed isolation points referenced on the print. Re-validated. |
| | ADMIN SRO#2 Added non-critical step on answer key - attachment 3z may also be checked off. |
| | ADMIN SRO #3 Clarified initiating cue ADMIN SRO#4 Clarified initiating cue ADMIN SRO#5 No comments}} |
Letter Sequence Draft Other |
---|
|
|
|
|
---|
Category:License-Operator
MONTHYEARML24197A0552024-07-15015 July 2024 Requalification Program Inspection NTD-24-027, Response to RIS 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-05-20020 May 2024 Response to RIS 2024-01, Preparation and Scheduling of Operator Licensing Examinations NTD-23-038, Response to RIS 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-05-11011 May 2023 Response to RIS 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23121A1412023-05-0101 May 2023 Senior Reactor and Reactor Operator Initial License Examinations ML22312A4352022-10-0303 October 2022 Exam Form 1.3-1 ML23055A3812022-07-31031 July 2022 Exam Forms 2.3-1, 2.3-2, 3.4-1 ML22003A0042022-01-0303 January 2022 Senior Reactor and Reactor Operator Initial License Examinations ML21117A0842021-04-0909 April 2021 Final Q/A Related - Forms (Folder 1) ML21076A0622021-03-0909 March 2021 Draft Operating Test (Section a, Section B, Section C)(Folder 2) ML21076A0662021-03-0909 March 2021 Final Operating Test (Section a, B, and C) (Folder 3) ML21075A1052021-03-0909 March 2021 Draft Written Examination (Folder 2) ML21075A1032021-03-0909 March 2021 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML21075A1022021-03-0909 March 2021 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) ML21075A1042021-03-0909 March 2021 Draft Written Examination and Operating Test Outlines (Folder 2) ML21076A0632021-03-0909 March 2021 Final Written Examination and Operating Test Outlines (Folder 3) ML21076A0642021-03-0909 March 2021 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML21032A1022021-02-0101 February 2021 Operator Licensing Examination Approval ML21117A0832021-01-28028 January 2021 Final Q/A Related Form ES-401-6 (Folder 1) ML21012A2692021-01-12012 January 2021 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2021 NTD-20-014, Response to RIS 2020-01, Preparation and Scheduling of Operator Licensing Examinations2020-03-18018 March 2020 Response to RIS 2020-01, Preparation and Scheduling of Operator Licensing Examinations ML19352D6572019-12-16016 December 2019 Announcement 0f Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2020 ML21041A1732019-10-0101 October 2019 Original Question for Modified Question 80 ML19219A1022019-08-0606 August 2019 Operator Licensing Examination Approval ML19302F9902019-01-0808 January 2019 NRC Corporate Notification Letter (Folder 1) ML18311A1572018-07-24024 July 2018 Operating Test Retake - Examination Approval Letter (Folder 1) ML18311A1562018-07-14014 July 2018 NRC Corporate Notification Letter (Folder 1) NTD-18-044, Response to RIS 2018-02, Preparation and Scheduling of Operator Licensing Examinations2018-04-26026 April 2018 Response to RIS 2018-02, Preparation and Scheduling of Operator Licensing Examinations IR 05000354/20183012018-04-0303 April 2018 Initial Operator Licensing Examination Report 05000354/2018301 ML18086B0252018-02-16016 February 2018 Facility Cover Letter - Ri - March 2018 - GFE ML18005A4202018-01-0303 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML17178A3092017-06-22022 June 2017 Senior Reactor and Reactor Operator Initial License Examinations LR-N17-0098, Response to RIS-2017-03, Preparation and Scheduling of Operator Licensing Examinations2017-05-0505 May 2017 Response to RIS-2017-03, Preparation and Scheduling of Operator Licensing Examinations ML17034A1062017-02-0202 February 2017 December 7, 2016, NRC Generic Fundamentals Examination Results for Hope Creek Generating Station (Cover Letter Publicly Available, Enclosures Withheld from Public) ML17018A2822017-01-17017 January 2017 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2017 ML16293A1232016-10-18018 October 2016 September 7, 2016, NRC Generic Fundamentals Examination Results for Hope Creek Generating Station (Cover Letter Publicly Available, Enclosures Withheld from Public) ML16295A0562016-10-11011 October 2016 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML16295A0552016-10-10010 October 2016 Post Exam Comments and Resolution (Folder 1) ML16295A0572016-10-0101 October 2016 Final Operating Exam (Sections a, B, and C) (Folder 3) ML17186A1212016-08-16016 August 2016 Final Qa/Related Forms (Folder 1) ML17186A1452016-08-14014 August 2016 Final Outlines (Folder 3) ML17186A2442016-07-28028 July 2016 Draft - Outlines (Folder 2) ML17186A2372016-07-28028 July 2016 Facility Comments on Draft Facility-Developed Exam (Written) (Folder 2) LR-N16-0125, Response to RIS 2016-09, Preparation of Scheduling of Operator Licensing Examination2016-07-0808 July 2016 Response to RIS 2016-09, Preparation of Scheduling of Operator Licensing Examination ML16053A1032016-02-22022 February 2016 Senior Reactor and Reactor Operator Initial License Examinations - Hope Creek Generating Station ML15163A2462015-12-17017 December 2015 Draft Operating Exam (Sections a, B, and C) (Folder 2) ML15163A2452015-12-17017 December 2015 Draft Written Exam (Folder 2) ML15198A2332015-07-14014 July 2015 June 10, 2015, NRC Generic Fundamentals Examination Results for Hope Creek Generating Station (Cover Letter Publicly Available, Enclosures Withheld from Public) ML15163A2412015-06-10010 June 2015 Final Outlines (Folder 3) ML16145A2442015-03-31031 March 2015 Final Qa/Related Forms (Folder 1) ML15091A2402015-03-30030 March 2015 March 4, 2015, NRC Generic Fundamentals Examination Results for Hope Creek, (Cover Letter Publicly Available, Enclosures Withheld from Public) 2024-07-15
[Table view] Category:Part 55 Examination Related Material
MONTHYEARNTD-24-027, Response to RIS 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-05-20020 May 2024 Response to RIS 2024-01, Preparation and Scheduling of Operator Licensing Examinations NTD-23-038, Response to RIS 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-05-11011 May 2023 Response to RIS 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23121A1412023-05-0101 May 2023 Senior Reactor and Reactor Operator Initial License Examinations ML22312A4352022-10-0303 October 2022 Exam Form 1.3-1 ML23055A3812022-07-31031 July 2022 Exam Forms 2.3-1, 2.3-2, 3.4-1 ML22003A0042022-01-0303 January 2022 Senior Reactor and Reactor Operator Initial License Examinations ML21117A0842021-04-0909 April 2021 Final Q/A Related - Forms (Folder 1) ML21075A1032021-03-0909 March 2021 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML21075A1022021-03-0909 March 2021 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) ML21075A1042021-03-0909 March 2021 Draft Written Examination and Operating Test Outlines (Folder 2) ML21076A0632021-03-0909 March 2021 Final Written Examination and Operating Test Outlines (Folder 3) ML21076A0642021-03-0909 March 2021 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML21076A0622021-03-0909 March 2021 Draft Operating Test (Section a, Section B, Section C)(Folder 2) ML21075A1052021-03-0909 March 2021 Draft Written Examination (Folder 2) ML21076A0662021-03-0909 March 2021 Final Operating Test (Section a, B, and C) (Folder 3) ML21032A1022021-02-0101 February 2021 Operator Licensing Examination Approval ML21117A0832021-01-28028 January 2021 Final Q/A Related Form ES-401-6 (Folder 1) ML21012A2692021-01-12012 January 2021 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2021 NTD-20-014, Response to RIS 2020-01, Preparation and Scheduling of Operator Licensing Examinations2020-03-18018 March 2020 Response to RIS 2020-01, Preparation and Scheduling of Operator Licensing Examinations ML19352D6572019-12-16016 December 2019 Announcement 0f Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2020 ML21041A1732019-10-0101 October 2019 Original Question for Modified Question 80 ML19219A1022019-08-0606 August 2019 Operator Licensing Examination Approval ML19302F9902019-01-0808 January 2019 NRC Corporate Notification Letter (Folder 1) ML18311A1572018-07-24024 July 2018 Operating Test Retake - Examination Approval Letter (Folder 1) ML18311A1562018-07-14014 July 2018 NRC Corporate Notification Letter (Folder 1) NTD-18-044, Response to RIS 2018-02, Preparation and Scheduling of Operator Licensing Examinations2018-04-26026 April 2018 Response to RIS 2018-02, Preparation and Scheduling of Operator Licensing Examinations IR 05000354/20183012018-04-0303 April 2018 Initial Operator Licensing Examination Report 05000354/2018301 ML18005A4202018-01-0303 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML17178A3092017-06-22022 June 2017 Senior Reactor and Reactor Operator Initial License Examinations LR-N17-0098, Response to RIS-2017-03, Preparation and Scheduling of Operator Licensing Examinations2017-05-0505 May 2017 Response to RIS-2017-03, Preparation and Scheduling of Operator Licensing Examinations ML17018A2822017-01-17017 January 2017 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2017 ML16293A1232016-10-18018 October 2016 September 7, 2016, NRC Generic Fundamentals Examination Results for Hope Creek Generating Station (Cover Letter Publicly Available, Enclosures Withheld from Public) ML16295A0562016-10-11011 October 2016 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML16295A0552016-10-10010 October 2016 Post Exam Comments and Resolution (Folder 1) ML16295A0572016-10-0101 October 2016 Final Operating Exam (Sections a, B, and C) (Folder 3) ML17186A1212016-08-16016 August 2016 Final Qa/Related Forms (Folder 1) ML17186A1452016-08-14014 August 2016 Final Outlines (Folder 3) ML17186A2442016-07-28028 July 2016 Draft - Outlines (Folder 2) ML17186A2372016-07-28028 July 2016 Facility Comments on Draft Facility-Developed Exam (Written) (Folder 2) ML16053A1032016-02-22022 February 2016 Senior Reactor and Reactor Operator Initial License Examinations - Hope Creek Generating Station ML15163A2452015-12-17017 December 2015 Draft Written Exam (Folder 2) ML15163A2462015-12-17017 December 2015 Draft Operating Exam (Sections a, B, and C) (Folder 2) ML15198A2332015-07-14014 July 2015 June 10, 2015, NRC Generic Fundamentals Examination Results for Hope Creek Generating Station (Cover Letter Publicly Available, Enclosures Withheld from Public) ML15163A2412015-06-10010 June 2015 Final Outlines (Folder 3) ML16145A2442015-03-31031 March 2015 Final Qa/Related Forms (Folder 1) ML15100A0422015-03-0606 March 2015 Final Operating Exam (Sections a, B, and C) (Folder 3) ML15100A0412015-03-0606 March 2015 Handouts to Applicants (Folder 3) ML15100A0402015-03-0303 March 2015 Final Written Examination with Answer Key (401-5 Format) (Folder 2) ML15163A2442015-02-17017 February 2015 Draft - Outlines (Folder 2) ML15163A2432015-02-17017 February 2015 NRC Comments on Draft Licensee-Developed Exam (Written) (Folder 2) 2024-05-20
[Table view] |
Text
2012 ILOT NRC Exam - Operating Exam Revisions - Post NRC Validation Scenario #1 Revised start time of trigger ET-5 (LOCA). This is to ensure sufficient evaluation time exists for operation of RCIC in level control following reset of its overspeed trip.
Scenario #2 Added a malfunction to trip the RFPT that is operating for level control following the ATWS. Revalidated event.
Scenario #3 No comments Scenario #4 Removed Recirc PP runaway and high vibration malfunction and replaced with multiple seal failure on 'B' Recirc PP. Revalidated event.
Added ADS valve fails to open malfunction during the Emergency Depressurization. Revalidated event.
"IPM#1 Steps 5.18.5.C and D. changed to critical steps. Revalidated JPM#2 Steps 5.3.5.0 changed to critical step. Revalidated Added malfunction to trip the RHR pump 2 minute after the F015 valve INCREASE PB is depressed. Revalidated.
JPM #3 Step #14 changed to a critical step. Re validated JPM#4 No comments JPM#5 Ensure a pre-brief is done to review SO.SF-0001 procedure (for moving control rods).
..IPM #6 No comments JPM#7 Step 5.3.4 changed to critical. Added setup step to open Non-1 E pump bkr. Re validated JPM #8 No comments JPM#9 No comments
..IPM #10 Updated panel label to show actual label in the field for each step.
JPM #11 No comments ADMIN RO#1 Revised initiating cue with more specific guidance that the tagging was performed lAW ESO guidance.
ADMIN RO#2 Corrected math error on exam answer key (instrument deviation for item #65)
ADMIN RO#3 No Comments ADMIN RO#4 No Comments
ADMIN SRO#1 Changed initiating cue and conditions. Changed isolation points referenced on the print. Re-validated.
ADMIN SRO#2 Added non-critical step on answer key - attachment 3z may also be checked off.
ADMIN SRO #3 Clarified initiating cue ADMIN SRO#4 Clarified initiating cue ADMIN SRO#5 No comments