ML12111A179: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(3 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML12111A179
| number = ML12111A179
| issue date = 02/27/2012
| issue date = 02/27/2012
| title = Hope Creek - NRC Comments on Draft Licensee-Developed Exam (Operating)(Folder 2)
| title = NRC Comments on Draft Licensee-Developed Exam (Operating)(Folder 2)
| author name =  
| author name =  
| author affiliation = NRC/RGN-I/DRS/OB
| author affiliation = NRC/RGN-I/DRS/OB
Line 9: Line 9:
| docket = 05000354
| docket = 05000354
| license number = NPF-057
| license number = NPF-057
| contact person = Jackson D E
| contact person = Jackson D
| case reference number = TAC U01845
| case reference number = TAC U01845
| package number = ML113070699
| package number = ML113070699
| document type = License-Operator, Part 55 Examination Related Material
| document type = License-Operator, Part 55 Examination Related Material
| page count = 3
| page count = 3
| project = TAC:U01845
| stage = Draft Other
}}
}}


=Text=
=Text=
{{#Wiki_filter:2012 ILOT NRC Exam -Operating Exam Revisions  
{{#Wiki_filter:2012 ILOT NRC Exam - Operating Exam Revisions - Post NRC Validation Scenario #1 Revised start time of trigger ET-5 (LOCA). This is to ensure sufficient evaluation time exists for operation of RCIC in level control following reset of its overspeed trip.
-Post NRC Validation Scenario #1 Revised start time of trigger ET-5 (LOCA). This is to ensure sufficient evaluation time exists for operation of RCIC in level control following reset of its overspeed trip. Scenario #2 Added a malfunction to trip the RFPT that is operating for level control following the A TWS. Revalidated event. Scenario #3 No comments Scenario #4 Removed Recirc PP runaway and high vibration malfunction and replaced with multiple seal failure on 'B' Recirc PP. Revalidated event.
Scenario #2 Added a malfunction to trip the RFPT that is operating for level control following the ATWS. Revalidated event.
Added ADS valve fails to open malfunction during the Emergency Depressurization.
Scenario #3 No comments Scenario #4 Removed Recirc PP runaway and high vibration malfunction and replaced with multiple seal failure on 'B' Recirc PP. Revalidated event.
Revalidated event. "IPM#1 Steps 5.18.5.C and D. changed to critical steps. Revalidated JPM#2 Steps 5.3.5.0 changed to critical step. Revalidated Added malfunction to trip the RHR pump 2 minute after the F015 valve INCREASE PB is depressed.
Added ADS valve fails to open malfunction during the Emergency Depressurization. Revalidated event.
Revalidated.
"IPM#1 Steps 5.18.5.C and D. changed to critical steps. Revalidated JPM#2 Steps 5.3.5.0 changed to critical step. Revalidated Added malfunction to trip the RHR pump 2 minute after the F015 valve INCREASE PB is depressed. Revalidated.
JPM #3 Step #14 changed to a critical step. Re validated JPM#4 No comments JPM#5 Ensure a pre-brief is done to review SO.SF-0001 procedure (for moving control rods).
JPM #3 Step #14 changed to a critical step. Re validated JPM#4 No comments JPM#5 Ensure a pre-brief is done to review SO.SF-0001 procedure (for moving control rods).
..I PM No Step 5.3.4 changed to critical.
 
Added setup step to open Non-1 E pump bkr.
..IPM #6 No comments JPM#7 Step 5.3.4 changed to critical. Added setup step to open Non-1 E pump bkr. Re validated JPM #8 No comments JPM#9 No comments
JPM No No  
..IPM #10 Updated panel label to show actual label in the field for each step.
..IPM Updated panel label to show actual label in the field for each JPM No ADMIN Revised initiating cue with more specific guidance that the tagging performed lAW ESO ADMIN Corrected math error on exam answer key (instrument deviation for item ADMIN No ADMIN No ADMIN SRO#1 Changed initiating cue and conditions.
JPM #11 No comments ADMIN RO#1 Revised initiating cue with more specific guidance that the tagging was performed lAW ESO guidance.
Changed isolation points referenced on the print. Re-validated.
ADMIN RO#2 Corrected math error on exam answer key (instrument deviation for item #65)
ADMIN SRO#2 Added non-critical step on answer key -attachment 3z may also be checked off. ADMIN SRO #3 Clarified initiating cue ADMIN SRO#4 Clarified initiating cue ADMIN SRO#5 No comments}}
ADMIN RO#3 No Comments ADMIN RO#4 No Comments
 
ADMIN SRO#1 Changed initiating cue and conditions. Changed isolation points referenced on the print. Re-validated.
ADMIN SRO#2 Added non-critical step on answer key - attachment 3z may also be checked off.
ADMIN SRO #3 Clarified initiating cue ADMIN SRO#4 Clarified initiating cue ADMIN SRO#5 No comments}}

Latest revision as of 04:39, 12 November 2019

NRC Comments on Draft Licensee-Developed Exam (Operating)(Folder 2)
ML12111A179
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 02/27/2012
From:
Operations Branch I
To:
Public Service Enterprise Group
Jackson D
Shared Package
ML113070699 List:
References
TAC U01845
Download: ML12111A179 (3)


Text

2012 ILOT NRC Exam - Operating Exam Revisions - Post NRC Validation Scenario #1 Revised start time of trigger ET-5 (LOCA). This is to ensure sufficient evaluation time exists for operation of RCIC in level control following reset of its overspeed trip.

Scenario #2 Added a malfunction to trip the RFPT that is operating for level control following the ATWS. Revalidated event.

Scenario #3 No comments Scenario #4 Removed Recirc PP runaway and high vibration malfunction and replaced with multiple seal failure on 'B' Recirc PP. Revalidated event.

Added ADS valve fails to open malfunction during the Emergency Depressurization. Revalidated event.

"IPM#1 Steps 5.18.5.C and D. changed to critical steps. Revalidated JPM#2 Steps 5.3.5.0 changed to critical step. Revalidated Added malfunction to trip the RHR pump 2 minute after the F015 valve INCREASE PB is depressed. Revalidated.

JPM #3 Step #14 changed to a critical step. Re validated JPM#4 No comments JPM#5 Ensure a pre-brief is done to review SO.SF-0001 procedure (for moving control rods).

..IPM #6 No comments JPM#7 Step 5.3.4 changed to critical. Added setup step to open Non-1 E pump bkr. Re validated JPM #8 No comments JPM#9 No comments

..IPM #10 Updated panel label to show actual label in the field for each step.

JPM #11 No comments ADMIN RO#1 Revised initiating cue with more specific guidance that the tagging was performed lAW ESO guidance.

ADMIN RO#2 Corrected math error on exam answer key (instrument deviation for item #65)

ADMIN RO#3 No Comments ADMIN RO#4 No Comments

ADMIN SRO#1 Changed initiating cue and conditions. Changed isolation points referenced on the print. Re-validated.

ADMIN SRO#2 Added non-critical step on answer key - attachment 3z may also be checked off.

ADMIN SRO #3 Clarified initiating cue ADMIN SRO#4 Clarified initiating cue ADMIN SRO#5 No comments