ML12111A202

From kanterella
Jump to navigation Jump to search

Draft Operating Exam (Sections a, B, and C) (Folder 2)
ML12111A202
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 01/23/2012
From:
Operations Branch I
To:
Public Service Enterprise Group
Jackson D
Shared Package
ML113070699 List:
References
TAC U01845
Download: ML12111A202 (389)


Text

JOB PERFORMANCE MEASURE STATION: Hope Creek SYSTEM: Administrative TASK: Conduct Weekly Power Distribution Lineup TASK NUM BER: 2630010201 JPM NUMBER: 30SH-JPM.ZZ024 REV #: 01 SAP BI:T: NOH05JPZZ24E ALTERNATE PATH: D APPLICABILITY:

EO RO 00 STA D SRO DEVELOPED BY: Archie E. Faulkner DATE: 1/12/12 Instructor REVIEWED BY: DATE:

APPROVED BY: qy-qJL Training Department DATE: }/)1 Q

TQ*AA*106*0303 STATION: Hope Creek JPM NUMBER: ZZ024 REV: 01 SYSTEM: Administrative TASK NUMBER: 2630010201 TASK: Conduct Weekly Power Distribution Lineup ALTERNATE PATH: D KIA NUMBER: 2.1.31 IMPORTANCE FACTOR: 4.2 3.9 APPLICABILITY: RO SRO EO D RO [KJ STA D SRO D EVALUATION SETTING/METHOD: Simulator/Perform

REFERENCES:

HC.OP-ST.ZZ-0001, Revision 33 TOOLS, EQUIPMENT AND PROCEDURES:

Partially completed HC.OP-ST.ZZ-0001 ESTIMATED COMPLETION TIME: 27 Minutes TIME PERIOD IDENTIFIED FOR TIME CRITICAL STEPS: N/A Minutes JPM PERFORMED BY: GRADE: D SAT D UNSAT ACTUAL COMPLETION TIME: Minutes ACTUAL TIME CRITICAL COMPLETION TIME: N/A Minutes REASON, IF JPM UNSATISFACTORY:

EVALUATOR'S SIGNATURE: DATE:

Page 2 of 23

NAME:

DATE:

SYSTEM: Administrative TASK: Conduct Weekly Power Distribution Lineup TASK NUMBER: 2630010201 INITIAL CONDITIONS:

1. Emergency Diesel Generator AG400 has a mechanical problem and is declared inoperable. It is expected to return in 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> and is determined to be a short term outage.
2. Station Power Transformer 1T-60 was removed from service due to cooling fan malfunctions. The switchyard was re-aligned to support tagging.
3. HC.OP-ST.ZZ-0001, Power Distribution Lineup-Weekly, is due.
4. Salem Unit 3 Gas Turbine Generator is available.
5. This procedure is being performed to satisfy Technical Specification Surveillance requirement 4.8.1.1.1.a.

INITIATING CUE:

Perform HC.OP-STZZ-0001, POWER DISTRIBUTION LINEUP - WEEKLY to satisfy Technical Specification 4.8.1.1.1.a only.

Page 3 of 23

TQ-I-\A-106-0303 JPM: ZZ024 OPERATOR TRAINING PROGRAM NAME:

Rev: 01 JOB PERFORMANCE MEASURE DATE: ___________________

SYSTEM: Administrative TASK: Conduct Weekly Power Distribution Lineup

(*Denotes a Critical Step) COMMENTS STEP

  • ELEMENT (#Denotes a Sequential Step) EVAL (Required for UNSAT NO. #

STANDARD S/U evaluation CUE PROVIDE the operator the initiating cue. Operator repeats back initiating cue.

CUE ENTER START TIME AFTER Operator repeats back the Initiating Cue: I N/A START TIME:

CUE Provide the operator with a copy of the partially completed procedure HC.OP-ST.ZZ-0001(Q).

Operator reviews precautions and Operator reviews precautions and limitations. limitations.

CUE IE excessive time is taken reviewing precautions and limitations, THEN INFORM operator that all are N/A satisfied.

Operator determines beginning step Operator determines correct beginning of the procedure. step to be 5.1.

Page 4 of 23

TQ-MA-106-0303 JPM: ZZ024 OPERATOR TRAINING PROGRAM NAME:

Rev: 01 JOB PERFORMANCE MEASURE DATE: ___________________

SYSTEM: Administrative TASK: Conduct Weekly Power Distribution Lineup

(*Denotes a Critical Step) COMMENTS STEP

  • ELEMENT (#Denotes a Sequential Step) EVAL (Required for UNSAT NO. #

STANDARD S/U evaluati 5.0 Power Distribution Lineup N/A 5.1 LOG test start time in the Control Operator requests that the start time be Room log(s). logged in the Control Room log.

CUE The test start time has been logged in the Control Room log.

Operator initials the step.

Page 5 of 23

TQ-l-'l.A-106-0303 JPM: ZZ024 OPERATOR TRAINING PROGRAM NAME:

Rev: 01 JOB PERFORMANCE MEASURE DATE: ___________________

SYSTEM: Administrative T,L\.SK: Conduct Weekly Power Distribution Lineup

(*Denotes a Critical Step) COMMENTS STEP

  • ELEMENT (#Denotes a Sequential Step) EVAL (Required for UNSAT NO. #

STANDARD S/U evaluation) 5.2 ENSURE that all prerequisites have Operator ensures that the prerequisites been satisfied lAW Section 2.0 of this are satisfied:

procedure.

  • Observes that permission to complete the test has been given by the OSIeRS.
  • Operator completes Att. 1. Section 3.
  • Ensures no other testing or maintenance is in progress that will adversely affect the performance of this test.

Operator initials the step.

CUE IF asked. "No other testing or maintenance is in progress that will NA adversely affect the performance of this test."

Page 6 of 23

TQ-kA-106-0303 JPM: ZZ024 OPERATOR TRAINING PROGRAM NAME:

Rev: 01 JOB PERFORMANCE MEASURE DATE: ___________________

SYSTEM: Administrative TASK: Conduct Weekly Power Distribution Lineup

(*Denotes a Critical Step) COMMENTS STEP

  • ELEMENT (#Denotes a Sequential Step) EVAL (Required for UNSAT NO. #

STANDARD StU evaluation) 5.3 ENSURE Attachment 1, Section 1.0 Operator observes that Attachment 1 ,

of the SM/CRS Data and Signature Section 1.0 of the SM/CRS Data and Sheet has been completed and Signature Sheet has been completed Regular Surveillance or Retest is and Regular Surveillance is indicated.

indicated.

Operator initials the step.

5.4 lE performing this procedure to satisfy Operator determines that these TIS Surveillance 4.8.1.1.1.a ONLY, sections only are to be completed and PERFORM the following sections: initials step.

[TIS 4.B.1.1.1.a]

  • OFFSITE TO ONSITE DISTRIBUTION Page 7 of 23

TQ-.kA-106-0303 JPM: ZZ024 OPERATOR TRAINING PROGRAM NAME:

DATE: ___________________

Rev: 01 JOB PERFORMANCE MEASURE SYSTEM: Administrative TASK: Conduct Weekly Power Distribution Lineup

(*Denotes a Critical Step) COMMENTS STEP

  • ELEMENT (#Denotes a Sequential Step) EVAL (Required for UNSAT NO. #

STANDARD Stu evaluation) 5.4.1 When in an extended outage for A or Operator determines the outage of A B EDG, VERIFY, through Salem EDG is not an extended outage.

operations, that Salem Unit 3 Gas Turbine Generator is available to supply Hope Creek #2 Station Power Examiner Note: The field on Transformer AND LOG ON OFFSITE Attachment 2 for the Salem Unit 3 Gas TO ONSITE DISTRIBUTION. Turbine is not required but may be filled in by the operator since the status is listed on the Initial Conditions sheet.

5.5 RECORD M& TE identification Operator determines that this step is numbers and calibration due dates for not required and marks step as N/A.

test equipment utilized for this test on Attachment 3 and the PSEG Nuclear Home Page.

L-- ~~~~

Page 8 of 23

TQ-hA-106-0303 JPM: ZZ024 OPERATOR TRAINING PROGRAM NAME:

Rev: 01 JOB PERFORMANCE MEASURE DATE: ___________________

SYSTEM: Administrative TASK: Conduct Weekly Power Distribution Lineup

(*Denotes a Critical Step) COMMENTS STEP

  • ELEMENT (#Denotes a Sequential Step) EVAL (Required for UNSAT NO. #

STANDARD StU evaluation) 5.6 PERFORM Power Distribution Lineup Operator observes the breaker by completing Attachment 2. positions, (and bus Voltage for the 4.16KV busses) of those breakers listed in Attachment 2 for:

  • OFFSITE TO ONSITE DISTRIBUTION The operator notes the positions/voltages on the attachment, enters SAT, and initials as the performer.

Page 9 of 23

TQ-hl""\-106-0303 JPM: ZZ024 OPERATOR TRAINING PROGRAM NAME:

DATE: __________________

Rev: 01 JOB PERFORMANCE MEASURE SYSTEM: Administrative TASK: Conduct Weekly Power Distribution Lineup

(*Denotes a Critical Step)

  • COMMENTS STEP ELEMENT (#Denotes a Sequential Step) EVAL (Required for UNSAT NO. #

STANDARD StU evaluation) 5.7 IF any indication not specified in Operator determines that the lineup

  • Attachment 2 was used to satisfy this specified in Attachment 2 was not in the surveillance THEN DOCUMENT AND REQUIRED positions used to satisfy JUSTIFY its use in Section 2.1.4 of this surveillance, marks those as Attachment 1 . UNSAT and informs the CRS.

Examiner Note: See attached grading key.

Operator initials the step.

5.8 LOG test end time in Control Room log(s).

CUE Log entry completed. Operator initials the step.

5.9 SUBMIT this procedure to the SM/CRS for review AND completion of Attachment 1.


~ ,._--

Page 10 of 23

TQ-kA-106-0303 JPM: ZZ024 OPERATOR TRAINING PROGRAM NAME:

Rev: 01 JOB PERFORMANCE MEASURE DATE: ___________________

SYSTEM: Administrative TASK: Conduct Weekly Power Distribution Lineup

(*Denotes a Critical Step)

  • COMMENTS STEP ELEMENT (#Denotes a Sequential Step) EVAL (Required for UNSAT NO. #

STANDARD S/U evaluation CUE WHEN operator informs you the task is complete, OR the JPM has been terminated for other reasons,

...!...:....:.=.:...::. RECORD the STOP TIME.

N/A REPEAT BACK any message from the operator on the status of the JPM, and state "This JPM is complete",

STOP TIME:

Page 11 of 23

TQ-AA-106-0303 JOB PERFORMANCE MEASURE OPERATOR TRAINING PROGRAM EVALUATOR FOLLOWUP QUESTION DOCUMENTATION NAME:

DATE:

JPM Number: ZZ024 TASK: Conduct Weekly Power Distribution Lineup TASK NUMBER: 2630010201 QUESTION:

RESPONSE

RESULT: SAT UNSAT QUESTION:

RESPONSE

RESULT: SAT UNSAT

TQ*AA*106*0303 JOB PERFORMANCE MEASURE INITIAL CONDITIONS:

1. Emergency Diesel Generator AG400 has a mechanical problem and is declared inoperable. It is expected to return in 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> and is determined to be a short term outage.
2. Station Power Transformer 1T-60 was removed from service due to cooling fan malfunctions. The switchyard was re-aligned to support tagging.
3. HC.OP-ST.ZZ-0001, Power Distribution Lineup-Weekly, is due.
4. Salem Unit 3 Gas Turbine Generator is available.
5. This procedure is being performed to satisfy Technical Specification Surveillance requirement 4.8.1.1.1.a.

INITIATING CUE:

Perform HC.OP-ST.zZ-0001, POWER DISTRIBUTION LINEUP WEEKLY to satisfy Technical Specification 4.8.1.1.1.a only.

Paae 13 of 23

TQ-AA-106-0303 JOB PERFORMANCE MEASURE SIMULATOR SETUP INSTRUCTIONS (OPTIONAL)

INITIALIZE the simulator to 100% power, MOL.

ENSURE associated Schedule file open and running.

ENSURE associated Events file open.

Complete Section 1 for Regular Surveillance and 4.8.1.1.1.a ONLY.

Setup Electrical Distribution System as noted on page 24 of Attachment 2.

COMPLETE "Simulator Ready-for-Training/Examination Checklist".

Event code: *

Description:

Event code:

Description:

Event code:

Description:

Page 14 of23

TQ-AA-106-0303 JOB PERFORMANCE MEASURE SIMULATOR SETUP INSTRUCTIONS (OPTIONAL)

. Event Action Page 15 of 23

TQ-AA-106-0303 JOB PERFORMANCE MEASURE REVISION HISTORY JPM NUMBER: ZZ024 Date Description Validation Required?

1/12/12 Modified Malfunction, Remote, Override, and Event list sections Y for TREX event syntax. Updated Reference procedure revision numbers and step numbers. Validated with 2 ROs 1/3/12. Avg completion time is 27 minutes.

PSEG Internal Use Only HC.OP-ST.ZZ-0001 (0)

ATTACHMENT 2 Page 6 of 33 INPLANT DATA SHEET POWER DISTRIBUTION LINEUP - WEEKLY 1.0 Power Distribution Lineup (Continued)

SATI EQUIPMENT NOMENCLATURE REQUIRED ACTUAL UNSAT PERF CHANNEL A 4.16KV SWGR 10A401 40101 ALTERNATE FEEDER BKR TO 10A401 OPEN OPEN SAT Initials 40103 10A401 FEED TO 10B450 CLOSED CLOSED SAT Initials

  • 40107 EDG AG400 OUTPUT BKR TO 10A401 OPEN SAT Initials 40108 NORMAL FEEDER BKR TO BUS 1 D SAT Initials 40110 10A401 FEED TO 10B410 CLOSED SAT Initials
  • IF IN A NORMAL 2 BUS ALIGNMENT [(2) 4.16 1E BUSES AND (1) 4.16 KV NON-1E BUS ON EACH STATI()N SERVICE TRANSFORME 01, 1 BX501)] WITH TAP CHANGER IN AUTO, RECORD THE: FOLLOWING REAe!>NG AS PRIMARY INDICATION (FLUKE SECONDARY))

(NOTES 2,3,4,&6) .

4.16 KV Bus CIR 4173 - 4370 4272 SAT Initials

  • 10A401 Voltage IF IN AN ABNORM ON (1) SST' (NOTES 2, 4.16 KV Bus CIRCLE ONE: CRIDS (A7061) 4245 - 4370 10A401 Voltaqe Fluke Model 45) 121.14 - 125.0
  • The asteris"\ indicates Acceptance Criteria - in order to satisfy the requirements of the acceptance criteria, the SAT/UNSAT block must be marked SAT.

(2) Voltage outside MINIMAX may be indicative of a malfunctioning Transformer Load Tap Changer when in automatic.

COMPARE Bus Voltage with Station Service Transformer Sec. Voltage. IF Bus Voltage is outside the MINIMAX take Manual control of Load Tap Changer and ADJUST until voltage is within range. Voltage> MAX with Load Tap Changer on 1 position is normal during certain conditions (Le., HI grid voltage andlor no loads on bus.) (NOTE: If in a normal 2 bus alignment with tap changer in manual and voltage remains within established limits, tap changer should be returned to AUTO. (RefElr to the appropriate CRIDS point for the Station Service Transformer Sec. Voltage). [70038637]

(3) Instructions on the use of a Fluke (Model 45) to obtain Bus Voltage Values can be found in HC.OP-SO.MC-0001(Z), Fluke (Model 45) Hookup and Voltage Readings at PT Secondary.

(4) IF Bus Volta!Je cannot be adjusted> MIN, DECLARE the respective offsite circuit of the A.C. electrical power source INOP AND ENTER TIS 3.8.1.1.a Action Statement.

IF Bus Volta!~e cannot be adjusted < MAX, GENERATE notification to Hope Creek Electrical / I&C, System Engineering documenting each voltage operating limit violation (start & stop times), so that 4.16 KV System Engineer can track and analyze voltage levels, lAW Notification 20184742. [70038770]

(6) 4.16 KV Bus3s supplied from a common Station Service Transformer (1AX501, 1BX501) have the same voltage and associated GRIDS points should read the same discounting instrument loop inaccuracies. If in normal 2 bus (or less) alignment, any of the following CRIDS points are considered equivalent and may be substituted for any other if one or more is a failed in:licator: (For 1AX501: A3209, A3484, A7061 , A7066) (For 1 BX501: A3210, A3487, A7076, A7071 Rev.15

PSEG Internal Use Only HC.O P-ST.ZZ-0001 (Q)

ATTACHMENT 2 Page 9 of 33 INPLANT DATA SHEET POWER DISTRIBUTION LINEUP - WEEKLY 1.0 PowHr Distribution Lineup (Continued)

SATI EQUIPMENT NOMENCLATURE REQUIRED ACTUAL UNSAT PERF CHANNEL C 4.16KV SWGR 10A403 40301 ALTERNATE FEEDER BKR TO 10A403 OPEN OPEN SA T Initials 40303 10A403 FEED TO 10B470 CLOSED CLOSED SAT Initials

  • 40307 EDG CG400 OUTPUT BKR TO 10A403 OPEN OPEN SA T Initials 40308 NORMAL FEEDER BKR TO BUS 10A403 SA T Initials 40310 10A403 FEED TO 10B430 SED SAT Initials
  • IF IN A NORMAL 2 BUS ALIGNMENT [(2) 4.16 KV CLASS 1E BU 4. KV NON-1E BUS ON EACH STATION SERVICE TRANSFORMER (SST) (1AX501.. X50 H TAP CHANGER IN AUTO, RECORD THE FOLLOWING READING (USE CRIDS A S
  • INDICATION (FLUKE SECONDARY))

(NOTES 2,3,4,&6) 4.16 KVBus 4173-4370 4272 SAT Initials

  • 1OA403 Voltage ) 119.09 - 125.0 IF IN AN ABNORMAL BUS ALiGNM CLASS 1E BUSES AND (1) 4.16 KV NON-1E BUS ON (1) SST; OR, (4) 4.16 KV CL :1 AND (2) 4.16 KV NON-1E BUS ON (1) SST)

(NOTES 2, 3, 4, & 6) 4.16 KVBus 4245 - 4370 10A403 Voltage Fluke (Model 45) 121.14 -125.0

  • The asterisk indicate cceptance Criteria - in order to satisfy the requirements of the acceptance criteria, the SAT/UNSAT block must be marked SAT.

(2) Voltage outs de MINIMAX may be indicative of a malfunctioning Transformer Load Tap Changer when in automatic.

COMPARE Bus Voltage with Station Service Transformer Sec. Voltage. IF Bus Voltage is outside the MINIMAX take Manual cont*ol of Load Tap Changer and ADJUST until voltage is within range. Voltage> MAX with Load Tap Changer on 1 pOSition is normal during certain conditions (i.e., HI grid voltage andlor no loads on bus.) (NOTE: If in a normal 2 bus alignment with tap changer in manual and voltage remains within established limits, tap changer should be returned to AUTO. (Refer to the appropriate CRIDS point for the Station Service Transformer Sec. Voltage). [70038637]

(3) Instructions on the use of a Fluke (Model 45) to obtain Bus Voltage Values can be found in HC.OP-SO.MC-0001 (Z), Fluke (Model 45) Hookup and Voltage Readings at PT Secondary.

(4) IF Bus Voltage cannot be adjusted> MIN, DECLARE the respective offsite circuit of the A.C. electrical power source INOP AND ENTEf;: TIS 3.8.1.1.a Action Statement.

IF Bus VoltWle cannot be adjusted < MAX, GENERATE notification to Hope Creek Electrical I I&C, System Engineering documenting each voltage operating limit violation (start & stop times), so that 4.16 KV System Engineer can track and analyze voltage levels, lAW Notification 20184742. [70038770]

(6) 4.16 KV BUS3S supplied from a common Station Service Transformer (1 AX501, 1BX501) have the same voltage and associated CRIDS points should read the Same discounting instrument loop inaccuracies. If in normal 2 bus (or less) alignment, any of the following CRIDS points are considered equivalent and may be substituted for any other if one or more is a failed in:licator: (For 1 AX501: A3209, A3484, A7061 , A7066) (For 1 BX501: A321 0, A3487, A7076, A7071 Rev.15

PSEG Internal Use Only HC.OP-ST.ZZ-0001 (Q)

ATTACHMENT 2 Page 12 of 33 INPLANT DATA SHEET POWER DISTRIBUTION LINEUP - WEEKLY 1.0 Pow~!r Distribution Lineup (Continued)

SATI EQUIPMENT NOMENCLATURE REQUIRED ACTUAL PERF UNSAT CHANNEL B 4.16KV SWGR 10A402 40201 NORMAL FEEDER BKR TO 10A402 CLOSED CLOSED SAT Initials 40203 10A402 FEED TO 10B460 CLOSED CLOSED SAT Initials

  • 40207 EDG BG400 OUTPUT BKR TO 10A402 OPEN SAT Initials 40208 ALTERNATE FEEDER BKR TO BUS OPEN SAT Initials 10A402 40210 10A402 FEED TO 108420 CLOSED SAT Initials
  • IIF IN A NORMAL 2 BUS ALIGNMENT [(2) 4.16 K BUSES AND (1) 4.16 KV NON-1E BUS ON EACH STATION SERVICE TRANSFORMER ( ", 1 BX501}] WITH TAP CHANGER IN AUTO, RECORD THE FOLLOWING READI~ ( PRIMARY INDICATION (FLUKE SECONDARY))

(NOTES 2,3,4,&6) 14.16 KV Bus CIRC 4173-4370 4253 SAT Initials

  • 10A402 Voltaqe IF IN AN ABNOR ON (1) SST; a NOTES 2, 3, 4, 4.16 KV Bus 4245 - 4370 10A402 Voltaqe Fluke (Model 45) 121.14 - 125.0
  • The asterisk indicates Acceptance Criteria - in order to satisfy the requirements of the acceptance criteria. the SAT/UNSAT block must be marked SAT.

(2) Voltage outside MINIMAX may be indicative of a malfunctioning Transformer Load Tap Changer when in automatic.

COMPARE Bus Voltage with Station Service Transformer Sec. Voltage. IF Bus Voltage is outside the MIN/MAX take Manual control of Load Tap Changer and ADJUST until voltage is within range. Voltage> MAX with Load Tap Changer on 1 position is normal during certain conditions (i.e., HI grid voltage and/or no loads on bus.) (NOTE: If in a normal 2 bus alignment wi~h tap changer in manual and voltage remains within established limits, tap changer should be returned to AUTO. (RefEr to the appropriate CRIDS point for the Station Service Transformer Sec. Voltage). [70038637]

(3) Instructions on the use of a Fluke (Model 45) to obtain Bus Voltage Values can be found in HC.OP-SO.MC-0001(Z), Fluke (Model 45) I-ookup and Voltage Readings at PT Secondary.

(4) IF Bus Voltage cannot be adjusted> MI N, DECLARE the respective offsite circuit of the A.C. electrical power source INOP AND ENTER TIS 3.8.1.1.a Action Statement.

IF Bus Voltage cannot be adjusted < MAX, GENERATE notification to Hope Creek Electrical/l&C, System Engineering documenting each voltage operating limit violation (start & stop times), so that 4.16 KV System Engineer can track and analyze voltage levels, lAW Notification 20184742. [70038770]

(6) 4.16 KV BUS(lS supplied from a common Station Service Transformer (1AX501, 1BX501) have the same voltage and associated CRIDS points should read the same discounting instrument loop inaccuracies. If in normal 2 bus (or less) alignment, Giny of the following CRIDS points are considered equivalent and may be substituted for any other if one or more is a failed indicator: (For 1AX501: A3209, A3484, A7061, A7066) (For 1BX501: A3210, A3487, A7076, A7071 Rev.15

PSEG Internal Use Only HC.OP-ST.ZZ-0001 (Q)

ATTACHMENT 2 Page 15 of 33 INPLANT DATA SHEET POWER DISTRIBUTION LINEUP - WEEKLY 1.0 POWEU Distribution Lineup (Continued)

IEQUIP ME'_JT-!-_ _ _ _N_O_IVI_E_N_C_L_A_T_U_R_E_ _ _~_R_EQ_U_IR_E_D~*A_C_T_U_A_L....L...._SA_T_I UNSAT! ......_P_ER_F-.,

, CHANNEL 4.16KV SWGR 10A404 40401 NORMAL FEEDER BKR TO 10A404 CLOSED CLOSED Initials 40403 10A401 FEED TO 10B480 CLOSED CLOSED SAT Initials

  • 40407 EDG AG400 OUTPUT BKR TO 10A404 OPEN OPEN SAT Initials

~_~A_L_T_E_RN_A_T_E_F_E_E_D_E_R_B_K_R_T_O_B_U_S

~ 10A404

_ _-!--'I OPEN SAT Initials I 40410 10A401 FEED TO 10B440 SAT Initials. *

,IF IN A NORMAL 2 BUS ALIGNMENT [(2) 4.16 KV CLAS (1) 4.16 KV NON-1E BUS ON lEACH STATION SERVICE TRANSFORMER (SST) 50 501)] WITH TAP CHANGER IN AUTO, RECORD THE FOLLOWING READING (USE C RI ARY INDICATION (FLUKE SECONDARY))

(NOTES 2,3,4,&6) 4.16 KV Bus 4173-4370 4253 SAT Initials

  • 10A404 Voltage IF IN AN ABNORMAL ON (1) SST; OR, (4) 4.

4245 - 4370 Fluke (Model 45 121.14 125.0

  • The asterisk Icates Acceptance Criteria - in order to satisfy the requirements of the acceptance criteria, the SAT/UNSAT block must be marked SAT.

(2) Voltage outside MINIMAX may be indicative of a malfunctioning Transformer Load Tap Changer when in automatic.

COMPARE Bus Voltage with Station Service Transformer Sec. Voltage. IF Bus Voltage is outside the MINIMAX take Manual control of Load Tap Changer and ADJUST until voltage is within range. Voltage> MAX with Load Tap Changer on 1 position is normal during certain conditions (Le., HI grid voltage andlor no loads on bus.) (NOTE: If in a normal 2 bus alignment with tap changer in manual and voltage remains within established limits, tap changer should be returned to AUTO. (Refer to the appropriate CRIDS point for the Station Service Transformer Sec. Voltage). [70038637J (3) Instructions on the use of a Fluke (ModeI4S) to obtain Bus Voltage Values can be found in HC.OP-SO.MC-0001 (Z), Fluke (Model 4S) Hookup and Voltage Readings at PT Secondary.

(4) IF Bus Voltage cannot be adjusted> MIN, DECLARE the respective offsite circuit of the A.C. electrical power source INOP AND ENTER TIS 3.8.1.1.a Action Statement.

IF Bus Voltage cannot be adjusted < MAX, GENERATE notification to Hope Creek Electrical/l&C, System Engineering documentin!~ each voltage operating limit violation (start & stop times), so that 4.16 KV System Engineer can track and analyze voltE.ge levels, lAW Notification 20184742. [70038770]

(6) 4.16 KV Buses supplied from a common Station Service Transformer (1AXS01, 1BXS01) have the same voltage and associated CRIDS pOints should read the same discounting instrument loop inaccuracies. If in normal 2 bus (or less) alignment, any of the following CRIDS points are considered equivalent and may be substituted for any other if one or more is a failed indicator: (For 1AX501: A3209, A3484, A7061 , A7066) (For 1BX501: A3210, A3487, A7076, A7071 Rev.15

PSEG Internal Use Only HC.OP-ST.ZZ-0001 (Q)

ATTACHMENT 2 Page 24 of 33 INPLANT DATA SHEET POWER DISTRIBUTION LINEUP - WEEKLY 1.0 Power Distribution Lineu~ (Continued}

SATI EQUIPMENT NOMENCLATURE REQUIRED ACTUAL PERF UNSAT OFFSITE TO ONSITE DISTRIBUTION +

BS4-5 13KV BUS SECTION 4-5 BKR CLOSED CLOSED SAT Initials

  • OPEN Initials *

~

13KV BUS SECTION 6-7 BKR CLOSED i STAXFMR T2 CIRCUIT SWITCHER CLOSED CLOSED SAT Initials

  • 4T60 STA XFMR T4 CIRCUIT SWITCHER CLOSED CLOSED SAT Initials
  • BS3-4 500KV BUS SECTION 3-4 BKR CLOSED CLOSED SAT
  • Initials
  • I i 500KV BUS SECTION 6-5 BKR CLOSED CLOSED BS7-8 13KV BUS SECTION 7-8 BKR OPEN BS2-3 13KV BUS SECTION 2-3 BKR BS1-2 13KV BUS SECTION 1-2 BKR BS9-0 13KV BUS SECTION 9-10 BKR

~ 3T60 BS1-3 CLOSED CLOSED CLOSED CLOSED SAT SAT Initials.

  • Initials *

. BS5-1 CLOSED CLOSED SAT Initials

  • i 85#2-6 5 CLOSED CLOSED SA T Initials
  • AVAILABLE

+ NOTE:: The above alignment represents the normal lineup of the 500KvJ13.8Kv Switchyards.

Deviations may exist while still maintaining two independent offsite power source separation.

IF actual alignment deviates from the above, CONSULT Electrical Drawing E-0001-0 to determine if proper separation exists, and lAW the following criteria: 500Kv Bus Sections 1 & 2 energized by two offsite sources (Red Lion 5015, New Freedom 5023, or Salem X-Tie 5037).

Two fl:;eds (1 OX and 20X) into a split 13.8Kv Yard, with each feed supplying power to an energized separate Station Service Transformer (AX501 and BX501). An independent offsite feed is considered available to the safety related distribution system IF all four of the 1E infeed breakers are OPERABLE. IF less than 4 breakers are OPERABLE, CONSIDER the offsite feed inoperable and comply with ACTION 3.8.1.1 as appropriate.

  1. Salem Unit 3 Turbine Generator is only required when in an extended A or B EDG outage.

Rev.15

PSEG Internal Use Only HC.OP-ST.ZZ-0001 (Q)

ATTACHMENT 1 Page 2 of 3 SM/CRS DATA AND SIGNATURE SHEET POWER DISTRIBUTION LINEUP - WEEKLY 2.0 POST TEST INFORMATION 2.1 The data acquired during the performance of this test has been reviewed for completeness and compliance with Technical Specification 4.8.3.1, 4.8.3.2, 4.8.1.1.1.a and the test is considered:

2.1.1 SATISFACTORY (All acceptance criteri DATE-TIME 2.1.2 DATE-TIME Rev.15

JOB PERFORMANCE MEASURE STATION: Hope Creek SYSTEM: Administrative TASK: Complete The Daily Surveillance Logs TASK NUMBER: 4010010201

..IPM NUMBER: 305H-JPM.ZZ016 REV#: 01 SAP BET: NOH05JPZZ16E ALTERNATE PATH:

D APPLICABILITY:

EO RO [KJ STA SRO DEVELOPED BY: Archie E. Faulkner DATE: 1/14/12 Instructor REVIEWED BY: <<K -CtitJl DATE: ~;;v/;:2-APPROVED BY:

cnt0lL::

Training Department DATE: )J?D)})

I

TQ-AA-106-0303 STATION: Hope Creek JPM NUMBER: ZZ016 REV: 01 SYSTEM: Administrative TASK NUMBER: 4010010201 TASK: Complete The Daily Surveillance Logs ALTERNATE PATH: D KIA NUMBER: 2.1.18 IMPORTANCE FACTOR: 3.6 3.8 APPLICABILITY: RO SRO EOD ROCK] S TAD SROD EVALUATION SETTING/METHOD: Simulator/Perform

REFERENCES:

HC.OP-DL.ZZ-0026 Rev. 129 TOOLS, EQUIPMENT AND PROCEDURES:

ESTIMATED COMPLETION TIME: 16 Minutes TIME PERIOD IDENTIFIED FOR TIME CRITICAL STEPS: ___I'J_/A _ _ Minutes JPM PERFORMED BY: GRADE: D SAT D UNSAT ACTUAL COMPLETION TIME: Minutes ACTUAL TIME CRITICAL COMPLETION TIME: N/A Minutes REASON, IF JPM UNSATISFACTORY:

~ALUATOR'S SIGNATURE: ____________ DATE:

Page 2 of 18

TQ-AA-106-0303 NAME:

DATE: ______________________

SYSTEM: Administrative TASK: Complete The Daily Surveillance Logs TASK NUMBER: 4010010201 INITIAL CONDITIONS:

1. The Plant has been in OPCON 1 at 100% power, steady state, for 7 days.

INITIATING CUE:

Complete the Day Shift Daily Surveillance Logs for 10C609, 1OC611 AND MSL Radiation (Items (31-74 of Attachment 1a) lAW HC.OP-DL.ZZ-0026.

Page 3 of 18

TO-I"\A-106-0303 JPM: ZZ016 OPERATOR TRAINING PROGRAM NAME:

Rev: 01 JOB PERFORMANCE MEASURE DATE: __________________

SYSTEM: Administrative TASK: Complete The Daily Surveillance Logs

(*Denotes a Critical Step)

  • COMMENTS STEP ELEMENT (#Denotes a Sequential Step) EVAL (Required for UNSAT NO. #

STANDARD StU evaluation)

CUE PROVIDE the operator the initiating cue. Operator repeats back initiating cue.

I _

CUE ENTER START TIME AFTER Operator repeats back the Initiating Cue: N/A START TIME: ~-l Operator obtains the correct Operator obtains procedure procedure. HC.OP-DL.ZZ-0026 3.1 COMPLETE Attachment 1 (all Operator records readings for Items

  • subsections) daily. 61-74 of Attachment 1a for the Day Shift.

Examiner Note: lAW the Initiating Cue, only Items 61-74 of Attachment 1a are required. Refer to Exhibit 1 for expected values. Values are typical and may not exactly match observed values. Readings are SAT if they are within +/-1 meter division of actual reading.

Page 4 of 18

TQ-.....""'-106-0303 JPM: ZZ016 OPERATOR TRAINING PROGRAM NAME:

Rev: 01 JOB PERFORMANCE MEASURE DATE: ___________________

SYSTEM: Administrative TASK: Complete The Daily Surveillance Logs

(*Denotes a Critical Step) COMMENTS STEP

  • ELEMENT (#Denotes a Sequential Step) (Required for UNSAT NO. #

STANDARD evaluation 3.2 IF in OP CON 4 or 5, THEN Operator determines this step does not COMPLETE Attachment 2 as follows apply.

daily:

3.3 COMPLETE Attachment 4 to perform Operator determines this step does not surveillances required by Special Test apply.

Exceptions as necessary. Examiner Note: lAW the Initiating Cue, only Items 61-74 of Attachment 1a are required.

3.4 ENTER the Operational Condition Operator enters the Operational and date on each page of the log Condition and date in the blanks the blanks provided. provided.

3.5 COMPLETE the applicable Operator determines this step does not subsections of Attachment 3 as apply.

directed by the SM/CRS to satisfy Examiner Note: lAW the Initiating Cue, Surveillance Requirements which only Items 61-74 of Attachment 1a are require accelerated surveillances due required.

to off-normal conditions.

Page 5 of 18

TQ-J'"\A-106-0303 JPM: ZZ016 OPERATOR TRAINING PROGRAM NAME:

Rev: 01 JOB PERFORMANCE MEASURE DATE: ------------------

SYSTEM: Administrative TASK: Complete The Daily Surveillance Logs

(*Denotes a Critical Step) COMMENTS STEP

  • ELEMENT (#Denotes a Sequential Step) EVAL (Required for UNSAT NO. #

STANDARD S/U eval 3.6 COMPLETE all surveillances as WHEN the deviation for Item 65 (RPV

  • indicated in each log. LEVEL 3) is recognized to exceed the IF a Technical Specification MAX DEVIATION of 4, Surveillance cannot be successfully THEN Operator notifies CRS of the completed OR is out-of-spec, unsatisfactory reading.

THEN IMMEDIATELY NOTIFY the SM/CRS AND the Duty RO AND corrective action initiated shall be noted in the comments section.

CUE Repeat back message from N/A Operator on Item 65 deviation.

3.6.1 IF a work order is issued to repair an Examiner Note: Since no work order abnormal reading, THEN NOTE the number will be provided to the operator, work order number in the comment this step will not apply.

section.

3.6.2 IE an Action Statement Log Sheet is Examiner Note: Since no Action issued due to a failed surveillance, Statement Log Sheet Index Number will OR one is already issued that covers be provided to the operator, this step the failed surveillance, THEN NOTE will not apply.

the Action Statement Log Sheet Index Number in the comments section.

Page 6 of 18

TQ-nA-106-0303 JPM: ZZ016 OPERATOR TRAINING PROGRAM NAME: ___________________

Rev: 01 JOB PERFORMANCE MEASURE DATE: ___________________

SYSTEM: Administrative TASK: Complete The Daily Surveillance Logs

(*Denotes a Critical Step) COMMENTS STEP

  • ELEMENT (#Denotes a Sequential Step) EVAL (Required for UNSAT NO. #

STANDARD StU evaluatio 3.6.3 IF a surveillance item is out-of-spec or WHEN the deviation for Item 65 (RPV not successfully completed, LEVEL 3) is recognized to exceed the THEN REFER to step 3.11 for TIS MAX DEVIATION of 4, reference numbers and notes. THEN Operator refers to Step 3.11 for Item 65 TIS reference numbers and notes.

3.7 IF performing a channel check that Operator performs channels checks on

  • requires a comparison between Attachment 1a Items 61-74, record ing channels, the difference between the high and low THEN RECORD the difference value and trip status, and recognizes between the high and low value and the value for Item 65 exceeds the MAX trip status. DEVIATION of 4.

Examiner Note: Critical portion is recognizing the Item 65 deviation exceeds the MAX DEVIATION.

Note: The trip status is indicated by the following:

  • The trip light for instruments supplied with trip lights
  • The alarm(s) ANDIOR automatic actions for instruments not supplied by trip lights.

Page 7 of 18

TQ-,....A-106-0303 JPM: ZZ016 OPERATOR TRAINING PROGRAM NAME:

Rev: 01 JOB PERFORMANCE MEASURE DATE: ___________________

SYSTEM: Administrative TASK: Complete The Daily Surveillance Logs

(*Denotes a Critical Step) COMMENTS STEP

  • ELEMENT (#Denotes a Sequential Step) EVAL (Required for UNSAT NO. #

STANDARD Stu evaluation) 3.8 For checks which are performed after Operator determines this step does not the logs have been taken for the time apply.

period, or, when a check is performed more than once during an 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> period:

OBTAIN a blank copy of the respective sheet, COMPLETE surveillance, (including time and date)

AN NOT ATE on the sheet and in comments section, as necessary, why the additional check was performed ATTACH sheetto existing daily log package.

Page 8 of 18

TQ-I'-<I"\-106-0303 JPM: ZZ016 OPERATOR TRAINING PROGRAM NAME:

DATE: ___________________

Rev: 01 JOB PERFORMANCE MEASURE SYSTEM: Administrative TASK: Complete The Daily Surveillance Logs

(*Denotes a Critical Step) COMMENTS STEP

  • ELEMENT (#Denotes a Sequential Step) EVAL (Required for UNSAT NO. #

STANDARD S/U evaluatL __ ,

3.9 COMPLY with the following requirements regarding log item numbers followed by an "at sign" (@):

3.9.1 lE a surveillance log item number DOES

  • NOT have an "at sign" (@) following it, THEN, instrument(s) or methods other than that designated in the log item may be used to satisfy that surveillance requirement as long as an assessment of Operator takes all readings from the the eq uivalency of the alternative identified instrument.

instrument/method has been made and the results have been noted in the comments section. An example of what constitutes an "acceptable" equivalency review can be found under Activity 0140 of Order 70023885.

3.9.2 lE a surveillance log item number has an *

"at sign" (@) following it THEN, ONLY the instrument(s) specified in the log item may be used to satisfy that surveillance requirement, except that I&C Operator takes all readings from the can take voltage readings on the identified instrument.

instrument(s) and the results compared before declaring the system inoperable.

Page 9 of 18

TQ-hA-106-0303 JPM: ZZ016 OPERATOR TRAINING PROGRAM NAME:

Rev: 01 JOB PERFORMANCE MEASURE DATE:

SYSTEM: Administrative TASK: Complete The Daily Surveillance Logs

(*Denotes a Critical Step)

  • COMMENTS STEP ELEMENT (#Denotes a Sequential Step) EVAL (Required for UNSAT NO. #

STANDARD S/~~ evaluati CUE WHEN operator informs you the task is complete, OR the JPM has been terminated for other reasons, THEN RECORD STOP TIME.

N/A REPEAT BACK any message from the operator on the status of the JPM, and then state "This JPM is complete".

STOP TIME:

Page 10 of 18

HC.OP-DL.ZZ-t J(Q)

Surveillance Log - Control Room -Day Shift Operational Condition 1 Date Today's Date OPER PANEL 10C609 PANEL 10C611 INST I MAX ACCEPTABLE LIMITS INST ITEM SURVEILLANCE COND INST VALUE I INST VALUE INST VALUE I INST VALUE DEVIATION DEVIATION MIN INORM I MAX TRIPPED YES/NO a:-1.ee..

Uj~ RPV rRESSUR[ 1,2 No7SA 1010 i'>i678C iOiO N678ts 980 N678D 81:lU 30 +___+1_. - : NO 62@ DRYWELL PRESSURE 11.2,3 I N650A 0.5 N650C 0.4 N650B 0.3 N650D 0.4 0.2 NO NOTE 29.

63@ 1 CONDENSER VACUUM 1,2,3 N675A 27.0 N675C 26.5 N675B I 26.5 N675D 0 64@ 1 MSL PRESSURE N676A 950 N676C 950 N676S I 940 N676D ..2 1

65~ RPV L[VEL 3 66 @ I NORTH SDV LEVEL 1,2,5 N680A N/A 42 N/A N68QC N60iC 34 o

N680B I N/A TN/A 34 N680D N60iD Ie i (NOTE 61) --

67@ I SOUTH SDV LEVEL 1,2,5 N60iA o N/A N/A N601B 1 0 N/A N/A 0 (NOTE61) 68@ I MSL A FLOW 1,2,3 N686A 79 N686C 80 69@ MSL B FLOW 1,2,3 N687A 79 N687C 75 70@ MSL C FLOW 1,2,3 N688A 72 N688C 78 N61 NO

@ RPV LEVEL 1 1,2,3 N684A N/A N684C N/A NO 73@ RWCU dF (NOTE 56., 57.) 1,2,3 XR1i497 o N/A N/A N/A 1 N/A IXR114991 01 0 NO I 74@ MSL RADIATION (NOTES 53.., 54..)

NOTE: FOR ANY INSTRUMENT FOUND TRIPPED, PLACE A 'T' IN FOR NON-INDICATING TRIP UNITS, CIRCLE THE TRIP UNIT DESIGNATOR IN RED AND RECORD THE INST TRIPPED COLUMN.

NOTE 61 WHEN IN OPER COND 5 - WITH ANY CONTROL ROD WITHDRAWN. NOT APPLICABLE TO CONTROL RODS REMOVED PER SPECIFICATION 3.9.10.1 OR 3.9.10.2.

NOTE 27 (*) - WHEN HANDLING RECENTLY IRRADIATED FUEL IN THE SECONDARY CONTAINMENT AND DURIN<JOPEr-<ATlOr,s WITH A POTENTIAL FOR DRAINING THE REACTOR VESSEL.

NOTE 29 ALSO REQUIRED WHEN SECONDARY CONTAINMENT REQUIRED TO BE IN EFFECT lAW TIS; [70 NOTE 53. RM-11 10 MINUTE AVERAGE SHOULD BE USED TO OBTAIN CHANNEL VALUES. MSL oAn,Afl"" "",\if"j'iON WITH THE H2 INJECTION SYS OUT OF SERVICE IS 20. WITH THE H2 INJECTION SYS IN SERVICE, MAX DEVIATION CALCULATED!3Y ADDING OPERABLE CHANNEL VALUES, DIVIDING OPERABLE CHANNELS, THEN MULTIPLYING RESULT BY (0.4). IF RM-11 UNAVAILABLE, K610A, K610B, K610C, OR K610D (NUMAC) SHOULD BE USED AT PANEL 10C635/10C636. NUMAC BE TAKEN 3 - 4 SECONDS INTO THE CPU SELF-TEST (PRESS ANY ~ KEY; PRESS "ETC" A KEY; PRESS "DISPLAY TEST STATUS" A. KEY) WI-lEN BEEN AT THE "CPU MODULE" LOCATION FOR 3 - 4 SECONDS. TO RESTORE NUMAC DISPLAY (PRESS EXIT A KEY; PRESS ETC ~ KEY; PRESS DISPLAY OFF A KEY). [700012301" NOTE 54.: IF RM*11 IS AVAILABLE, AND, WHENEVER RX POWER IS ABOVE 94% RTP ANDHAS !3EEN CONSTANT FOR THE PREVIOUS 2 HOURS (NO TRANSIENT IN PROGRESS), PERFORM MSL AVERAGE FULL POWER BACKGROUND CHECK BELOW. FOR ANY VAKUE OF c < 0.834, DECLARE THE COR(~ESPONDING MSLRMS INOPERABLE. IF ANY VALUE FOR ciS < 0.85 OR > 1.2 (2: 20%) THEN A RE-EVALUATION OF THE 3X NORMAL SET POINT MAY BE DESIRED USING HC.SE-GP.SP-0001 (0). NOTIFY RMS SYSTEM ENGINEER FOR SUPPORT IN RE-EVALUATION. KEEP IN MIND THAT THIS CHECK IS ONLY VALID WHEN RX POWER IS ABOVE 94%, AND CONSTANT FOR THE PREVIOUS 2 HOURS (NO TRMJSICNT IN Pf\OGRESS).

NOTE 55.: DURING OPERATIONAL CONDITIONS 1 AND 2 WITH MECHANICAtVACUUM PUMP(S) IN-SERVICE AND ANY MAIN STEAM LINE NOT ISOLATED, THE MSL RADIATION CHANNEL CHECK BETWEEN THE ALPHA AND BRAVO CHANNELS (9RX509/9RX51 0, K61 OAlK61 OB) ALSO SATISFIES A MECHANICAL VACUUM PUMP TRIP INSTRUMENTATION CHANNEL CHECK lAW TIS 4.3.10.a.

NOTE 56.: INITIATE NOTIFICATION WHEN DEVIATION BETWEEN CHANNELS 'A AND 0 REACHES 9 GPM TO ENSURE THAT THE PROBLEM CAUSING THE DEVIATION IS CORRECTED.

NOTE 57.: ._............ ......................... 'H ....... '~.'_ . . . . *................ , ** L- ..... -

."'-"." ..... ... ,' ......... ~.-.-.'"'".,""""" .. ~"-- ~-,

... _.. .. . .. -~- ........ "- -'.~".""'- .* ---_. (

MSLAVERAGE FULL POWER BACKGROUND CHECK ,-_ MIN MSLRMS A MSLRMS B MSLRMS C MSLRMS 0 a RM-11 LAST HOURLY AVERAGE 37.5 38.5 35.8 36.8 b RM-11 HI SETPOINT 130 125 121 129 c c a / b x 3 (RATIO OF ACTUAL TO BASELINE AFPB) 0.850 .865 .924 .887 .856 Page 11 of 18

TQ-AA-106-0303 JOB PERFORMANCE MEASURE OPERATOR TRAINING PROGRAM EVALUATOR FOLLOWUP QUESTION DOCUMENTATION NAME:

DATE:

JPM Number: ZZ016 TASK: Complete The Daily Surveillance Logs TASK NUMBER: 4010010201 QUESTION:

RESPONSE

RESULT: SAT UNSAT QUESTION:

RESPONSE

RESULT: SAT , - - I_---I UNSAT Page 120f 18

TQ-AA-106-0303 JOB PERFORMANCE MEASURE INITIAL CONDITIONS:

1. The Plant has been in OPCON 1 at 100% power, steady state, for 7 days.

INITIATING CUE:

Complete the Day Shift Daily Surveillance Logs for 10C609, 10C611 AND MSL Radiation (Items (>1-74 of Attachment 1a) lAW HC.OP-DL.ZZ-0026.

Page 13 of 18

HC.OP-DL.ZZ-0026(Q)

JOB PERFORMANCE MEASURE Surveillance Log - Control Room -Day Shift Operational Condition Date SUR\JEILLl\NCE I O~~ ,......r'\r-..ln VVI~I...J

lC'T II'Cvl I \VI"'\L-uL PANEL 10C609

'" I I 1, I INST I 'fA I V!-\LUC I ,,. I iNST I

VALUE PANEL 10C611 I

iNST I

VALUE I __ INS! _ ..

Ut:VIAIIUN 1 MAXIACCE~TABLE ,LIMITS Ut:VIAIIUN MIN NORM MAX I INST TRIPPED YES/NO

~1@ RPV PRESSURE 1,2 N678A N678C N678B N678D 100 -- 1037 NO 62@ DRYWELL PRESSURE 1,2,3 N650A N650C N650B N650D 1 -- -- 1.68 NO NOTE 29.

--- r - - . - ~.

i ---

63@ CONDENSER VACUUM 1,2,3 N675A N675C N675B N67SD 2.S 8.5

-- -- NO 64@ MSL PRESSURE 1 N676A N676C N676B N676D 80 756 -- NO 65@ RPV LEVEL 3 1,2,3 N680A N680C N680B N680D 4 12.5 -- -- NO 66@ NORTH SDV LEVEL 1,2,5 N/A N/A N601C N/A N/A N601D 10 -- 72 NO (NOTE 61) 67@ SOUTH SDV LEVEL (NOTE61) 1,2,5 N601A N/A N/A N601B N/A N/A 10 -- -- 72 NO 68@ MSL A FLOW 1,2,3 N686A N686C N686B N686D 18 - -- 162.8 NO 69@ MSL B FLOW 1,2,3 N687A N687C N687S N687D 18 -- -- .162.8

_ NO 70@ MSLC FLOW 1,2,3 N688A N688C N688B N688D 18 -- -- 162.8 NO 71@ MSL D FLOW 1,2,3 N689A N689C N689B N689D 18 -- -- 162.8 NO 72@ RPV LEVEL 2 (NOTE 27) 1,2,3: N681A N681B N681D 15 -38 -- -- NO NOTE 29.

@ RPV LEVEL 1 1.2,3 N684A N/A N684C N/A N684B N/A N684D N/A N/A N/A -129 -- NO 73@ RWCU dF (NOTE 56., 57.) 1.2.3 XR11497 .N/A N/A N/A N/A XR11499 20 -- -- .56

_ NO u RM-11

~..

hlr rI::*

MSL RADIATION (NOTES 53..,54.. ) NOTE 55**

1.2,3 9RXS09 ___

u_ PRX510 [m c,",o AI\IV II\ICTDIIUC:fl.IT Cl'llll\ln TCIDDcn DI Arc A IT' ltd TUC: \ll\IIIC QI f"If""1.(" AI (')f\If::: \J\JITU Tl-Il: !I\ICTRf U ..U::t\.IT \IAI lit:" Ahln r:n::rnOfl hVa::Q"

---j9RX511 1*- 19RX51~J

. ----- - _. ----- -:-=.. ------ --_..

,1\, Tl..U= Ihl<':.T

.1~:(

i_~')J L--Jr FOR NON-INDICATING TRIP UNITS, CIRCLE THE TRIP UNIT DESIGNATOR IN RED AND RECORD "YES" IN THE INST TRIPPED COLUMN.

NOTE 61 WHEN IN OPER COND 5-WITH ANY CONTROL ROD WITHDRAWN. NOT APPLICABLE TO CONTROL RODS REMOVED PER SPECIFICATION 3.9.10.1 OR 3.9.10.2.

NOTE 27 (*) - WHEN HANDLING RECENTLY IRRADIATED FUEL IN THE SECONDARY CONTAINMENT AND DURING OPERATIONS WITH A POTENTIAL FOR DRAINING THE REACTOR VESSEL.

NOTE 29 ALSO REQUIRED WHEN SECONDARY CONTAINMENT REQUIRED TO BE IN EFFECT lAW TIS. [70021778J NOTE 53. RM-11 10 MINUTE AVERAGE SHOULD BE USED TO OBTAIN CHANNEL VALUES. MSL RADIATION MAX DEVIATION WITH THE H21NJECTION SYS OUT OF SERVICE IS 20. WITH THE H2 INJECTION SYS IN SERVICE, MAX DEVIATION CALCULATED BY ADDING OPERABLE CHANNEL VALUES, DIVIDING RESULT BY NUMBER OF OPERABLE CHANNELS, THEN MULTIPLYING RESULT BY (0.4). IF RM-11 UNAVAILABl.E, K610A, K610B, K610C, OR K610D (NUMAC) SHOULD BE USED AT PANEL10C635110C636. NUMAC READINGS SHOULD BE TAKEN 3 - -I SECONDS INTO THE CPU SELF-TEST ANY A KEY; PRESS "ETC" A KEY; PRESS "DISPLAY TEST STATUS" A KEY) WHEN ARROW HAS BEEN ATTHE "CPU MODULE" LOCATION FOR 3 - 4 SECONDS. TO RESTORE NUMAC DISPLAY (PRESS A KEY; PRESS ETC A KEY; PRESS DISPLAY OFF A [700012301 NOTE 54.. IF RM-11 IS AVAILABLE, AND, WHENEVER RX POWER IS 94% RTP AND HAS BEEN CONSTANT FOR THE PREVIOUS 2 HOURS (NO TRANSIENT IN PROGRESS), PERFORM MSL AVERAGE FULL POWER BACKGROUND CHECK BELOW. FOR ANYVAKUE OF c < 0.834, DECLARE THE CORRESPONDING MSLRMS INOPERABLE. IF ANY VALUE FOR c IS < 0.85 OR > 1.2 (+. 20%) THEN A RE-EVAl.UATION OF THE 3X NORMAL SETPOINT MAY BE DESIRED USING HC.SE-GPBP-0001(Q). NOTIFY RMS SYSTEM ENGINEER FOR SUPPORT IN RE-EVALUATION. KEEP IN MIND THAT THIS CHECK IS ONLY VALID WHEN RX POWER IS ABOVE 94%, AND CONSTANT FOR THE PREVIOUS 2 HOURS (NO TRANSIENT IN PROGRESS).

NOTE 55.: DURING OPERATIONAL CONDITIONS 1 AND 2 WITH MECHANICAL VACUUM PUMP(S) IN-SERVICE AND ANY MAIN STEAM LINE NOT ISOLATED, THE MSL RADIATION CHANNEL CHECK BETWEEN THE Al.PHA AND BRAVO CHANNELS (9RX50919RX510, K610AIK610B) ALSO SATISFIES A MECHANICAL VACUUM PUMP TRIP INSTRUMENTATION CHANNEL CHECK lAW TIS 4.3.10.a.

NOTE 56.:INITIATE NOTIFICATION WHEN DEVIATION BETWEEN CHANNELS A AND 0 REACHES 9 GPM TO ENSURE THAT THE PROBLEM CAUSING THE DEVIATION IS CORRECTED.

NOTE 57.: * "::-~'::::"rH" ........... I '-"-' , , ...... , ..."' ........ ,, ** ""'" '" ..... ......,' ...... ,..,\ I l -.............. __ I.....,' '" , ............ "., '".~''

  • _ ...... ' .... _....,. .. ~ .. , ............................. , .......... __ ......................................... .. ........................ , ..... , ................... .....,.. ........
~ ~ '0. .....................

MSL AVERAGE FULL POWER BACKGROUND CHECK MIN MSLRMSA MSLRMS B MSLRMS C MSLRMS 0 a RM-11 LAST HOURLY AVERAGE b RM-11 HI SETPOINT c c'" a I b x 3 (RATIO OF ACTUAL TO BASELINE AFPB) 0.850

-- ----~--- --- -----

TQ-AA-106-0303 JOB PERFORMANCE MEASURE SIMULATOR SETUP INSTRUCTIONS (OPTIONAL)

INITIALIZE the simulator to 100% power, MOL.

Put Simulator in FREEZE.

COMPLETE "Simulator Ready-for-Training/Examination Checklist".

Page 15 of 18

TQ-AA-106-0303 JOB PERFORMANCE MEASURE SIMULATOR SETUP INSTRUCTIONS (OPTIONAL)

Event None None Insert malfunction RP18A to 43.00 RPS Level Xmitter LT-N080A Failure Insert malfunction RM9509 to 9RX509, MSL 'A' - Main Steam Line None None 37.50000 ChanA Insert malfunction RM9510 to 9RX510, MSL '8' - Main Steam Line None None 38.50000 Chan 8 Insert malfunction RM9511 to 9RX511, MSL 'C' - Main Steam Line None None 35.80000 Chan C Insert malfunction RM9512 to 9RX512, MSL 'D' - Main Steam Line None 36.80000 Chan D Page 16 of 18

TQ-AA-106-0303 JOB PERFORMANCE MEASURE REVISION HISTORY JPM "'UMBER: ZZ016 I Rev# Date Description Validation I Required?

1 1/14/12 Reference procedure change only. No changes to operator N I

I

JOB PERFORMANCE MEASURE STATION: Hope Creek SYSTEM: Reactor Recirculation TASK:: Perform a Reactor Recirculation Pump Quick Restart TASK: NUM BER: 2020160101 JPM NUMBER: 30SH-JPM.ZZ011 REV #: 01 SAP BET: NOH05JPZZ11 E ALTERNATE PATH: D APPLIGABILlTY:

EO D RO [IJ STA D SRO D DEVELOPED BY: Archie E. Faulkner DATE: 1/14/12 Instructor REVIEWED BY:

~

<"12--() "')rOtc DATE: 1;;g-~2 lOR rations Representative APPROVED BY:

1r~

Training Department DATE: 1//8' /J '2

TQ-AA*106*0303 STATION: Hope Creek JPM NUMBER: ZZ011 REV: 01 SYSTEM: Reactor Recirculation TASK NUMBER: 2020160101 TASK: Perform a Reactor Recirculation Pump Quick Restart ALTERNATE PATH: D KJA NUMBER: 2.2.40 IMPORTANCE FACTOR: 3.4 4.7 APPLICABILITY: RO SRO EOD ROOO STAD SROD EVALUATION SETTING/METHOD: Simulator/Perform

REFERENCES:

HC.OP*AB.RPV-0003 Rev 23 TOOLS, EQUIPMENT AND PROCEDURES:

Steam Tables/Calculator ESTIMATED COMPLETION TIME: 8 Minutes TIME PERIOD IDENTIFIED FOR TIME CRITICAL STEPS: I\I/A Minutes JPM PERFORMED BY: GRADE: D SAT D UNSAT ACTUAL COMPLETION TIME: Minutes ACTUAL TIME CRITICAL COMPLETION TIME: N/A Minutes REASON, IF JPM UNSATISFACTORY:

EVALUATOR'S SIGNATURE: DATE:

Page 2 of 16

TQ-AA-106*0303 NAME:

DATE:

SYSTEM: Reactor Recirculation TASK: Perform a Reactor Recirculation Pump Quick Restart TASK NUMBER: 2020160101 INITIAIL CONDITIONS:

1. The Reactor was scrammed when both Reactor Recirculation Pumps tripped.
2. Evidence of thermal stratification is present.
3. Actions have been taken in accordance with HC.OP-AB.RPV-0003 through step G.11.

INITIATING CUE:

ComplBte HC.OP-AB.RPV-0003 step G.12 as necessary for restart of A Reactor Recirc Pump.

Page 3 of 16

TQ".MA-106-0303 JPM: 22011 OPERATOR TRAINING PROGRAM NAME:

Rev: 01 JOB PERFORMANCE MEASURE DATE: ___________________

SYSTEM: Reactor Recirculation TASK: Perform a Reactor Recirculation Pump Quick Restart

(*Denotes a Critical Step) COMMENTS STEP

  • ELEMENT (#Denotes a Sequential Step) EVAL (Required for UNSAT NO. #

STANDARD S/U evaluation)

CUE PROVIDE the operator the initiating cue. Operator repeats back initiating cue.

CUE ENTER START TIME AFTER Operator repeats back the Initiating Cue: I N/A START TIME:

Operator obtains the correct Operator obtains procedure procedure. HC.OP-AB.RPV-0003.

Operator determines beginning step . Operator determines correct beginning of the procedure. step to be G.12.

G.12 ENSURE Differential Temperature Operator obtains HC.OP-AB.RPV-0003 requirements are met by completing Attachment 2.

Attachment 2. [TIS 4.4.1.4]

Page 4 of 16

TQ-MA-106-0303 JPM: ZZ011 OPERATOR TRAINING PROGRAM NAME:

Rev: 01 JOB PERFORMANCE MEASURE DATE: ___________________

SYSTEM: Reactor Recirculation TASK: Perform a Reactor Recirculation Pump Quick Restart

(*Denotes a Critical Step) COMMENTS STEP

  • ELEMENT (#Denotes a Sequential Step) EVAL (Required for UNSAT NO. #

STANDARD StU evaluation)

HC.OP-AB-RPV-0003 Attachment 2

-~

1.0 REACTOR VESSEL TO BOTTOM HEAD DRAIN LINE DIFFERENTIAL TEMPERATURE CRITERIA NA

-~~-~

~-~

1.1 Rx Pressure Vessel Steam Space Coolant Saturation Temperature. (Rx Pressure and Steam Tables) (Note 1) Operator reads Note 1.

f----~~~

Operator determines RPV pressure 885 psig. (900 psia)

I I

Operator determines Steam space

  • Coolant Saturation Temperature to be 900 psia 532 degF (Steam Tables)

~-~

Operator records value in space provided on Attachment 1.

~-~

Page 5 of 16

TQ-AA-106-0303 JPM: ZZ011 OPERATOR TRAINING PROGRAM NAME:

Rev: 01 JOB PERFORMANCE MEASURE DATE: __________________

SYSTEM: Reactor Recirculation TASK: Perform a Reactor Recirculation Pumo - Quick Restart

(*Denotes a Critical Step)

  • COMMENTS STEP ELEMENT (#Denotes a Sequential Step) EVAL (Required for UNSAT NO. #

STANDARD S/U evaluation)

Note 1 Steam Table as part of this attachment may be utilized to determine temperature rounding the numbers in a conservative fashion.

For a more accurate conversion from NA pressure to temperature a more detailed set of steam tables should be utilized.

1.2 Bottom Head Drain Coolant Temperature. (Note 2) (Computer Point A2942) Operator accesses CRI DS terminal.

Note 2 RWCU Flow required for accurate Bottom Head Drain Coolant Temperature indication. Operator reads Note 2.

Operator determines RWCU is in service and the Bottom Head Drain Coolant Temperature is valid.

Operator obtains value of 467 degF

  • from CRIDS point A2942.

Page 6 of 16

TQ-MA-106-0303 JPM: ZZ011 OPERATOR TRAINING PROGRAM NAME:

Rev: 01 JOB PERFORMANCE MEASURE DATE: ___________________

SYSTEM: Reactor Recirculation TASK: Perform a Reactor Recirculation Pump Quick Restart

(*Denotes a Critical Step)

  • COMMENTS STEP ELEMENT (#Denotes a Sequential Step) EVAL (Required for UNSAT NO. #

STANDARD S/U evaluation) 1.3 < 145°F between Rx Pressure Vessel

  • Steam Space Coolant AND Bottom Operator subtracts value of step 1 Head Drain Line Coolant (A - B). [TIS from value of step 1.1. and determines 4.4.1.4] value of 65 degF + 1 F.

Operator records value in space provided.

r-~~ ~- -----

1.4 Time Readings taken: Operator records current time in space

  • provided.

2.0 REACTOR VESSEL TO RECIRCULATION LOOP DIFFERENTIAL TEMPERATURE NA CRITERIA.

Page 7 of 16

TQ-AA-106-0303 JPM: ZZ011 OPERATOR TRAINING PROGRAM NAME:

Rev: 01 JOB PERFORMANCE MEASURE DATE: ___________________

SYSTEM: Reactor Recirculation TASK: Perform a Reactor Recirculation Pump Quick Restart

(*Denotes a Critical Step)

  • COMMENTS STEP ELEMENT (#Denotes a Sequential Step) EVAL (Required for UNSAT NO. #

STANDARD S/U evaluation) 2.1 Temperature of the Rx Coolant within the idle loop to be started up.

Operator reads Note 3.

(Note 3)

Note 3 Use TR-650-831 Recirc Pump Suction Loop A(8) (if available) OR if above 400° F - CRIDS paints A221 and A222 for A loop (A223 and A224 for B loop). IF below 400°F AND TR 650-831 not available, THEN have NA I&C obtain temperatures using RTD ohm values (reference RTD ohm values to calibration data in TDR using HC.OP-GP.ZZ-0008(Q))

~~~~

Page 8 of 16

TQ-.kA-106-0303 JPM: ZZ011 OPERATOR TRAINING PROGRAM NAME:

Rev: 01 JOB PERFORMANCE MEASURE DATE: -------------------

SYSTEM: Reactor Recirculation TASK: Perform a Reactor Recirculation Pump Quick Restart

(*Denotes a Critical Step)

  • COMMENTS STEP ELEMENT (#Denotes a Sequential Step) EVAL (Required for UNSAT NO. #

STANDARD Stu evaluation)

Operator determines Idle Recirc Loop Temp for A Loop is above 400 F.

Operator obtains value of 510 degF from CRIOS point A221 or A222.

r~~-~

2.2 Temperature of coolant in the Rx Pressure Vessel. (RX Pressure and Steam Tables) (Note 1) Operator reads Note 1.

I--~~ ~-

Operator determines RPV pressure is

  • 885 psig. (900 psia)

~---~ ~- f~~ ~--~~

Operator determines Steam space Coolant Saturation Temperature to be:

900 psia = 532 degF (Steam Tables)

Operator records value in space provided on Attachment 1.

Page 9 of 16

TQ-",1\-106-0303 JPM: ZZ011 OPERATOR TRAINING PROGRAM NAME:

Rev: 01 JOB PERFORMANCE MEASURE DATE: ___________________

SYSTEM: Reactor Recirculation TASK: Perform a Reactor Recirculation Pump Quick Restart

(*Denotes a Critical Step)

  • COMMENTS STEP ELEMENT (#Denotes a Sequential Step) EVAL {Required for UNSAT NO. #

STANDARD S/U evaluati 2.3 < 50°F between the Rx Coolant within

  • Operator determines differential temp is the loop not in operation AND the

< 50 F.

Coolant in the Rx Pressure Vessel (A B). [TIS 4.4.1.4] Examiner Note:

Actual value is 22 degF + 1F.

2.4 Time Readings taken: _ _ _ _ __ Operator records current time in space

  • provided.

HC.OP-AB-RPV-0003 ENSURE Differential Temperature

  • G.12 requirements are met by completing Operator initials step G.12.

Attachment 2. [TIS 4.4.1.4]

CUE WHEN operator informs you the task is complete, OR the JPM has been terminated for other reasons, THEN RECORD the STOP TIME.

N/A REPEAT BACK any message from the operator on the status of the JPM, and then state "This JPM is complete".

STOP TIME:

Page 10 of 16

TQ*AA*106*0303 JOB PERFORMANCE MEASURE OPERATOR TRAINING PROGRAM EVALUATOR FOLLOWUP QUESTION DOCUMENTATION NAME:

DATE:

..IPM Number: ZZ011 TASK: Perform a Reactor Recirculation Pump Quick Restart TASK NUMBER: 2020160101 QUESTION:

RESPONSE

RESULT: SAT UNSAT QUESTION:

RESPONSE

RESULT: SAT UNSAT Page 11 of 16

TQ-AA-106-0303 JOB PERFORMANCE MEASURE INITIAL CONDITIONS:

1. The Reactor was scrammed when both Reactor Recirculation Pumps tripped.
2. Evidence of thermal stratification is present.
3. Actions have been taken in accordance with HC.OP-AB.RPV-0003 through step G.11.

INITIATING CUE:

Complete HC.OP-AB.RPV-0003 step G.12 as necessary for restart of A Reactor Recirc Pump.

Page 12 of 16

TQ*AA-106-0303 JOB PERFORMAI\JCE MEASURE SIMULATOR SETUP INSTRUCTIONS (OPTIONAL)

INITIALIZE the simulator to 100% power, MOL.

Trip both Reactor Recirc Pump Drive Motor Breakers.

Take appropriate Scram actions lAW HC.OP-AB.ZZ-0001.

IMPLEMENT EOP-101 to stabilize plant at 885 psig RPV pressure on DEHC.

IMPLEMENT HC.OP-AB.RPV-0003 up to and including step G.11.

Acknowledge alarms.

Put Simulator in FREEZE.

MARKUP a copy of HC.OP-AB.RPV-0003 up to and including step G.11.

ENSURE Mode Switch key is removed.

COMPLETE "Simulator Ready-for-Training/Examination Checklist".

Event code:

Description:

Event code:

Description:

Event code:

Description:

Page 13 of 16

TQ-AA-106-0303 JOB PERFORMANCE MEASURE SIMULATOR SETUP INSTRUCTIONS (OPTIONAL)

I i I

I I

i I

i I

i I Page 14 of 16

TQ-AA-106-0303 JOB PERFORMANCE MEASURE REVISION HISTORY JPM NUMBER: ZZ011 Date I Description I Validation Required?

1/14/12 Converted JPM ZZ011 to new JPM format. Modified all Y temperature values, Since Critical JPM actions are now uniquely identified by the format, all statements identifying critical portion of action were redundant and deleted, JPM completely re-written to to changes in the procedure, Validated with 2 ROs on 1/3/12, Avg completion time was 8 minutes.

i I i

i I I

JOB PERFORMANCE MEASURE STATION: Hope Creek SYSTEM: Administrative TASK: Respond To An Abnormal Release Of Gaseous Radioactivity - Calculate Noble Gas Release Release Rates TASK NUM BER: 4000270401 JPM NUMBER: 305H-JPM.ZZ019 REV#: 01 SAP BET: NOH05JPZZ19E ALTERNATE PATH: D APPLICABILITY:

EO D RO [KJ STA SRO D DEVELOPED BY: Archie E. Faulkner DATE: 1/14/12 Instructor REVIEWED BY: }<iz-.cl1'Ck DATE: 11d,~

APPROVED BY: CWuw---

Training Department DATE:

. /}~

J//O

TQ-AA-106-0303 STATION: Hope Creek JPM NUMBER: ZZ019 REV: 01 SYSTEM: Ad ministrative TASK NUMBER: 4000270401 TASK: Respond To An Abnormal Release Of Gaseous Radioactivity - Calculate Noble Gas Release Release Rates ALTERNATE PATH: KJA NUMBER: 295938 EA1.01 IMPORTANCE FACTOR: 3.9 4.2 APPLICABILITY: RO SRO EoD ROW STAD SROD EVALUATION SETTING/METHOD: Simulator/Perform

REFERENCES:

HC.OP-AB.CONT-0004 Rev. 5 HC.OP-DL.ZZ-0026 Rev. 128 TOOLS, EQUIPMENT AND PROCEDURES: Calculator ESTIMATED COMPLETION TIME: 10 Minutes TIME PERIOD IDENTIFIED FOR TIME CRITICAL STEPS: N/A Minutes JPM PERFORMED BY: GRADE: SAT D UNSAT ACTUAL COMPLETION TIME: Minutes ACTUAL TIME CRITICAL COMPLETION TIME: N/A Minutes REASON, IF JPM UNSATISFACTORY:

EVALUATOR'S SIGNATURE: DATE:

Page 2 of 13

TQ*AA*106*0303 NAME:

DATE:

SYSTEM: Administrative TASK: Respond To An Abnormal Release Of Gaseous Radioactivity - Calculate Noble Gas Release Release Rates TASK NUMBER: 4000270401 INITIAL CONDITIONS:

1. North Plant Vent (NPV) Stack radiation monitoring activity was rising on RM-11 point 9RX590.
2. SPDS is unavailable.
3. Abnormal HC.OP-AB.CONT-0004 is being executed to determine and stop the release of activity.
4. NPV Exh Flow instrumentation channel 9AX300 is inoperable. Flow is being estimated in accordance with HC.OP-DL.lZ-0026(Q), Attachment 3u (Provided).

INITIATING CUE:

Determine the Release Rate of NOBLE GAS from the NPV in accordance with HC.OP AB.CONT-0004, Action A.4.

Page 3 of 13

TQ-MA-106-0303 ZZ019 OPERATOR PROGRAM NAME:

Rev: 01 JOB PERFORMANCE MEASURE DATE: ___________________

SYSTEM: Administrative TASK: Respond To An Abnormal Release Of Gaseous Radioactivity - Calculate Noble Gas Release Release Rates

(*Denotes a Critical Step) COMMENTS STEP

  • ELEMENT (#Denotes a Sequential Step) EVAL (Required for UNSAT NO. #

STANDARD StU evaluation)

CUE PROVIDE the operator the initiating cue. Operator repeats back initiating cue.

CUE ENTER START TIME AFTER Operator repeats back the Initiating Cue: N/A START TIME:

Operator obtains the correct Operator obtains procedure procedure. HC.OP-AB.CONT-0004.

Operator determines beginning step Operator determines correct beginning of the procedure. step to be A.4 AA DETERMINE the Total Release Rates Operator determines that to calculate of Noble Gas and Iodine as follows: the Noble Gas release from the NPV USE the SPDS Noble Gas Total. the formulas in Table "A" must be used.

OR USE one of the Formulas in Table "A".

Page 4 of 13

TQ-kA-106-0303 JPM: ZZ019 OPERATOR TRAINING PROGRAM NAME:

Rev: JOB PERFORMANCE MEASURE DATE:

SYSTEM: Administrative TASK: Respond To An Abnormal Release Of Gaseous Radioactivity - Calculate Noble Gas Release Release Rates

(*Denotes a Critical Step)

  • COMMENTS STEP ELEMENT (#Denotes a Sequential Step) EVAL (Required for UNSAT NO. #

STANDARD S/U evaluation)

IF the effluent (IJCi/sec) channel on the RM-11 is NOT operating for a specific plant vent, THEN CALCULATE the Noble Gas release rate for that vent using the following:

  • 472 =

Plant Vent Exh lCi/sl (I .)

IJCilcc (n.g.)

Flow in cfm Where:

IJCi/sec (n.g.) - the calculated release rate from the specified plant vent (Noble Gas)

IJCi/cc (n.g.) - The concentration of Noble Gas obtained from the RM-11 (the operable channel will be highlighted in GREEN) OR from an actual sample of the plant vent 472 - The conversion factor in units of cc/sec/cfm Operator manipulates the RM-11

  • terminal to obtain the value of NPV Noble Gas release from the 9RX602 Low Range detector and enters the value into the formula.

3.65E-7 uCi/cc.


-~

Operator transfers the Plant Vent Exh

  • Flow value from Attachment 3u of HC.OP-OL.ZZ-0026 (provided).

49613.9 CFM


... ~ ~~~.... -- ~~~-~~-- ----------

Page 5 of 13

TQ-AA-106-0303 JPM: ZZ019 OPERATOR TRAINING PROGRAM NAME:

Rev: 01 JOB PERFORMANCE MEASURE DATE: ___________________

SYSTEM: Administrative TASK: Respond To An Abnormal Release Of Gaseous Radioactivity - Calculate Noble Gas Release Release Rates

(*Denotes a Critical Step) I

  • COMMENTS STEP ELEMENT (#Denotes a Sequential Step) EVAL {Required for UNSAT NO. #

STANDARD S/U evaluation Operator calculates the NPV Noble Gas

  • release rate.

Calculated Value =

3.65E-7 ~Ci/cc

  • 472

= 8.547 uCi/sec (+/- 0.5)

CUE WHEN operator informs you the task is complete, OR the JPM has been terminated for other reasons,

..!...:....!.=..:...;. RECORD the STOP TIME.

N/A REPEAT BACK any message from the operator on the status of the JPM, and then state "This JPM is complete".

STOP TIME:

Page 6 of 13

TQ-AA-106-0303 JOB PERFORMANCE MEASURE OPERATOR TRAINING PROGRAM EVALUATOR FOLLOWUP QUESTION DOCUMENTATION NAME:

DATE:

JPM Number: ZZ019 TASK: Respond To An Abnormal Release Of Gaseous Radioactivity - Calculate Noble Gas Release Release Rates TASK NUMBER: 4000270401 QUESTION:

RESPONSE

RESULT: SAT UNSAT QUESTION:

RESPONSE

RESULT; SAT UNSAT Page 7 of 13

TQ-AA-106-0303 JOB PERFORMANCE MEASURE INITIAL CONDITIONS:

1. North Plant Vent (NPV) Stack radiation monitoring activity was rising on RM-11 point 9RX590.
2. SPDS is unavailable.
3. Abnormal HC.OP-AB.CONT-0004 is being executed to determine and stop the release of activity.
4. NPV Exh Flow instrumentation channel 9AX300 is inoperable. Flow is being estimated in accordance with HC.OP-DL.zZ-0026(Q), Attachment 3u (Provided).

INITIATING CUE:

Determine the Release Rate of NOBLE GAS from the NPV in accordance with HC.OP AB.CONT-0004, Action A.4.

Page 8 of 13

H c.o P-DL.ZZ-0026( Q)

JOB PERFORMANCE MEASURE ATTACHMENT 3u Page 1 of 1 Radioactive Gaseous Effluent Monitoring (North Plant Vent)

TIS 6.8.4.g ODCM TABLE 3.3.7.11-1 ACTION 122 if the North Plant Vent Flow Rate Monitor is Inoperable, then Effluent Releases via this pathway may continue for up to 30 days provided flow rate is estimated at least once per 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.

Readings are taken every 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> to ensure that the 4 hour4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> Tech Spec Action limit is not exceeded per administrative requirements and after a change in the ventilation line-up.

If flow indication(s) become unavailable, then the "NORM" flow value may be logged for the specific fan alignment.

RCGS DATE: Today's Date Location Anxffnrh/Radwastc ENTER TIME or EACH READING BELOW PARAMETER NORM NOW COMMENTS SOLID RADWASTE EXH rAN A318 17,000 17358 SOLID RADWASTE EXH FAN B318 17,000 17163 " ,ex' tl -_ -, '

7528 "i~~-f!)'"'-I--+-----+----~

CHEM LAB EXH A307 7,500 CHEM LAB EXH B307 7,500 7519 OFFGAS DISCHARGE HA-XR 10022 OR HA 45:9 F15665 , :, " I TOTAL FLOW 49613.9 ESTIMATED TOTAL FLOW REPORTED TO RAD PRO '- (YES) Yes

TQ-AA-106-0303 JOB PERFORMANCE MEASURE SIMULATOR SETUP INSTRUCTIONS (OPTIONAL)

INITIALIZE the simulator to 100% power, MOL.

INSERT Malfunctions:

  • RM9590 @ O.OE+OO
  • RM9591 @ O.OE+OO
  • RM9602 @ 3.65E-7
  • RM9603 @ O.OE+OO
  • CC03 SPDS CRT Failure Acknowledge alarms.

Put Simulator in FREEZE.

ENSURE SPDS and CRIDS Displays are off.

ENSURE MARKUP copy of HC.OP-DL.ZZ-0026 Attachment 3u available.

COMPLETE "Simulator Ready-for-Training/Examination Checklist".

Description:

Event code:

Description:

Page 10 of 13

TQ*AA*106*0303 JOB PERFORMANCE MEASURE SIMULATORSETUP INSTRUCTIONS (OPTIONAL) 9RX590, NPV EFF - North Plant Vent None None Insert malfunction RM9590 to 0.00000 Noble Gas Effluent 9RX591 , NPV HIGH - North Plant None None Insert malfunction RM9591 to 0.00000 Vent High Range Noble Gas 9RX602, NPV LOW - North Plant None None Insert malfunction RM9602 to 3.65E-7 Vent Range Noble Gas 9RX603, NPV MID - North Plant Vent Insert malfunction RM9603 to 0.00000 Mid Range Noble Gas None None Insert malfunction CC03 SPOS CRT failure Page 11 of 13

TQ-AA-106-0303 JOB PERFORMANCE MEASURE REVISION HISTORY JPM NUMBER: ZZ019 Rev # Date Description Validation Required?

1 1/14/12 Converted JPM ZZ019 to new JPM format. Since Critical JPM Y actions are now uniquely identified by the format, all statements identifying critical portion of action were redundant and deleted.

JPM Modified values for new res'ults. Validation performed with 2 ROs on 1/3/12. Avg completion time was 10 minutes.

JOB PERFORMANCE MEASURE STATION: Hope Creek SYSTEM: Administrative TASK: Perform On-Line Risk Controls Evaluation TASK NUMBER: H303000015 JPM NUMBER: 305H-JPM.ZZ045 REV#: 01 SAP BET: NOH05J PZZ45E ALTERNATE PATH:

D APPLICABILITY:

EO RoD STA D SRO [KJ DEVELOPED BY: Archie E. Faulkner DATE: 1/16/12 Instructor REVIEWED BY: ~<o.-n-q~ DATE:

. C/~..<.

I /;

rations Representative APPROVED BY:

91Jr~

Training Department DATE: l/lg Lll

TQ*AA*106*0303 STATION: Hope Creek JPM NUMBER: ZZ045 REV: 01 SYSTEM: Administrative TASK NUMBER: H303000015 TASK: Perform On-Line Risk Controls Evaluation ALTERNATE PATH: D KIA NUMBER: 2.1.25 IMPORTANCE FACTOR: 4.2 APPLICABILITY: RO SRO EoD ROD STAD SROW EVALUATION SETTING/METHOD: Classroom/Perform

REFERENCES:

WC-HC-105 Rev. 0 M-103-1 TOOLS, EQUIPMENT AND PROCEDURES: WC-HC-105 Rev. 0 Marked up copy of M-103-1 ESTIMATED COMPLETION TIME: 20 Minutes TIME PERIOD IDENTIFIED FOR TIME CRITICAL STEPS: N/A

-- - - Minutes JPM PERFORMED BY: GRADE: D SAT D UNSAT ACTUAL COMPLETION TIME: Minutes ACTUAL TIME CRITICAL COMPLETION TIME: N/A Minutes REASON, IF JPM UNSATISFACTORY:

EVALUATOR'S SIGNATURE: DATE:

Page 2 of 15

TQ-AA-106-0303 NAME:

DATE:

SYSTEM: Adm inistrative TASK: Perform On-Line Risk Controls Evaluation TASK NUMBER: H30300001S INITIAL CONDITIONS:

1. The plant is at 100 percent power.
2. Channel D Work week.
3. On-line risk color is Green.
4. Stator Water Cooling System CE-FISL-3597 is reading erratically in the field.
5. The 12 Hour Maintenance Supervisor wants Operations to manipulate the following valves:
a. 1-CE-V9955 - close
b. 1-CE-V9956 - close
c. 1-CE-V9950 - open
6. EOOS is not available.
7. The Site Risk Management Engineer (SRME) is not available.
8. All other equipment is operable.
9. No other work is scheduled.
10. The "Description of Task" is: "Isolate CE-FISL-3597"
11. The WO number is "12345678" INITIATING CUE:

The SM has directed you to:

1) Review the activity against the pre-defined Medium, High, and Very High risk activities listed in Exhibit 1, Prescreened Work Activities lAW WC-HC-1 05 Step 4.2.3.2, AND
2) State the Production Risk Level here: _ _ _ _ __

AND

3) 2) Complete the Production Risk Evaluation Data Sheet Exhibit 5 Page 1.

Page 3 of 1S

TQ-M.A-106-0303 JPM: ZZ045 OPERATOR TRAINING PROGRAM NAME:

Rev: 01 JOB PERFORMANCE MEASURE DATE:

SYSTEM: Administrative TASK: Perform On-Line Risk Controls Evaluation

(*Denotes a Critical Step)

  • COMMENTS STEP ELEMENT (#Denotes a Sequential Step) EVAL (Required for UNSAT NO. #

STANDARD S/U evaluation CUE PROVIDE the operator the initiating cue. Operator repeats back initiating cue.

CUE ENTER START TIME AFTER Operator repeats back the Initiating Cue: I N/A START TIME:

Operator obtains the correct Operator obtains procedure WC-HC procedure. 105.

Operator determines beginning step Operator determines correct beginning of the procedure. step to be 4.2.

WC-HC~105 WORKACTIVITY RISK MANAGEMENT 4.2.3 Classify the risk (Work Activity Owner)

Page 4 of 15

TQ-"...1"\-106-0303 JPM: ZZ045 OPERATOR TRAINING PROGRAM NAME:

Rev: 01 JOB PERFORMANCE MEASURE DATE:

SYSTEM: Administrative TASK* Perform On-Line Risk Controls Evaluation

(*Denotes a Critical Step)

  • COMMENTS STEP ELEMENT (#Denotes a Sequential Step) EVAL (Required for UNSAT NO. #

STANDARD Stu evaluation) 4.2.3.2 Review the activity against the pre defined Medium, High and Very High Operator reviews Exhibit 1 Pre-risk activities listed in Exhibit 1, Screened Work Activities for Regulatory Prescreened Work Activities. Compliance and Production Risk.

Operator recognizes:

"An activity that has been screened as a Production Risk activity by Operations". System "CE" is listed in Exhibit 5 (Production Risk)


~~~~~~~~

Operator determines the Risk is High

  • Exhibit 5 Page 1 of 4 Production Risk Evaluation Data Description of Task: Operator obtains task description from Initial Conditions sheet.

Operator fills in "Isolate CE-FISL-3597."

WONo: Operator obtains WO number from Initial Conditions sheet.

Operator fills in "12345678" Page 5 of 15

TQ-kM-106-0303 JPM: ZZ045 OPERATOR TRAINING PROGRAM NAME:

Rev: 01 JOB PERFORMANCE MEASURE DATE: ___________________

SYSTEM: Administrative TASK: Perform On-Line Risk Controls Evaluation

(*Denotes a Critical Step) COMMENTS STEP

  • ELEMENT (#Denotes a Sequential Step) EVAL (Required for UNSAT NO. #

STANDARD S/U evaluation)

Work activities that are entirely bounded and contained within a Work Clearance Document (WCD) boundary including Worker Blocking Tags and are not in the same or adjacent panel or near systems on the Station Production Risk System Matrix are not a production risk. This Operator determines this work is NOT means that work activities cannot within a WCD boundry.

cause relay or component actuation, in systems or components outside of the WCD boundary other than control room alarms or position indication changes.

Production Risk Activity Screening:

1. Is the work activity on a system that is
  • on the Station Production Risk System Matrix (attached) or near production sensitive equipment? Operator checks YES.

Y N Page 6 of 15

TQ-kA-106-0303 JPM: ZZ045 OPERATOR TRAINING PROGRAM NAME:

Rev: 01 JOB PERFORMANCE MEASURE DATE: ___________________

SYSTEM: Administrative TASK" Perform On-Line Risk Controls Evaluation

(*Denotes a Critical Step) COMMENTS STEP

  • ELEMENT (#Denotes a Sequential Step) EVAL (Required for UNSAT NO. #

STANDARD S/U evaluation)

If question 1 above is answered Yes, then continue at Question 2.

2. Could the activity cause equipment
  • actuations that could cause a loss of planned generation? Operator checks YES.

Y N

3. Does the activity involve instrument, fuse, circuit board removallinstallations that could cause a loss of planned generation? Operator checks NO.

Y N

4. Will the activity cause a 1/2 scram or 1/2 trip that could cause a loss of planned generation? Operator checks NO.

Y N Page 7 of 15

TQ-,...A-106-0303 JPM: ZZ045 OPERATOR TRAINING PROGRAM NAME:

Rev: 01 JOB PERFORMANCE MEASURE DATE: ------------------

SYSTEM: Administrative TASK: Perform On-Line Risk Controls Evaluation

(*Denotes a Critical Step) COMMENTS STEP

  • ELEMENT (#Denotes a Sequential Step) EVAL (Required for UNSAT NO. #

STANDARD stU evaluation)

5. Does the activity involve pressurization of common sensing lines that could cause a loss of planned generation? Operator checks YES.

Y N

6. Does the activity involve placing of jumpers or disconnection of "daisy chains" that could cause a loss of planned generation? Operator checks NO.

Y N Could the activity cause vibration near 7.

vibration sensitive equipment that could cause a loss of planned generation? Operator checks NO.

Y N Is a special procedure or JIT training 8.

required to mitigate the threat to generation?

Operator checks NO.

Y N Page 8 of 15

TQ-MA-106-0303 JPM: ZZ045 OPERATOR TRAINING PROGRAM NAME:

Rev: 01 JOB PERFORMANCE MEASURE DATE: __________________

SYSTEM: Administrative TASK: Perform On-Line Risk Controls Evaluation

(*Denotes a Critical Step) COMMENTS STEP

  • ELEMENT (#Denotes a Sequential Step) EVAL (Required for UNSAT NO. #

STANDARD S/U evaluation)

During the activity, could a single

9.
  • human error or omission cause a loss of planned generation?

Operator checks YES.

Y N

10. Is the activity a non-routine activity in the switchyard? Y N Operator checks NO.

If any question 2 through 10 is answered YES, then include this completed form in a sub operation in Operator determines the activity is a the work order. The activity is a prod uction risk.

Production Risk activity.

Performed By:

Operator signs in Performed By: space.

Production Risk? Y N

  • Operator checks YES.

Page 9 of 15

TQ-I'\A-106-0303 JPM: ZZ045 OPERATOR TRAINING PROGRAM NAME:

Rev: JOB PERFORMANCE MEASURE DATE: ___________________

SYSTEM: Administrative TASK: Perform On-Line Risk Controls Evaluation

(*Denotes a Critical Step) COMMENTS STEP

  • ELEMENT (#Denotes a Sequential Step) EVAL (Required for UNSAT NO. #

STANDARD S/U evaluation CUE WHEN operator informs you the task is complete.

OR the JPM has been terminated for other reasons, THEN RECORD the STOP TIME.

N/A REPEAT BACK any message from the operator on the status of the JPM, and then state "This JPM is complete".

STOP TIME:

Page 10 of 15

TQ*AA*106*0303 JOB PERFORMANCE MEASURE Exhibit 5 Page 1 of 4 Production Risk Evaluation Data Dt;S':'riptioo of Task Isolate CE-FISL-3597 No.: _ _ 12345678 Work activities that <:Ire enUrel]' oounded and <:onbinedwit.nin a Work Oearan,;:;e oorumeni! {WeD}

boul"lda ludIng Worker Blocking Tags and are not in the same or j:KJnlE!! or near systEms on the Production Risk System Matrix art! not a mJeal1:5 that work actiltities cannot cause or com pon.erIt acru.ation, in system"> WeD bOLln~.3J"i oth'f than centrol room al.3fIDS or position indicaliQ.l1) <;"...,'" """"

Production Risk ActiYity Screening:

1. Is !he worK ac.tiil1ty on a system that is o~e Station PfI)d!"C':jOfl; lat1!3che,j)or near production sensitive equipment? Y -!!:~ ___

IF question 1 is NO, THENt!1[s'!!s NOT PrOOU;::t~:rA1 Ris.k Activity.

If Question 1 above is a!1s"'!?fedJ~0~i~~then continue at Que<;.tion 2.

a loss of plaMed generation?

lines tf.j,3t could cause a Ilos'S of "U"n...."',..;

Pl~.e._.*.>~~iof jumpers or riiSOO,r=-ctkm of gdaisy ch3ins' that could cause a m..~mn>"'d ~rleratjcn? N cause vibration near vt:or"uol'1 s.ensElivE e QUiP me:nt-\j3t couJd catJse " loss of

<;~'pts~nt'~ ""~n... ,r;,,"'? Y N or J!T training required ~::r~te the threat to generation?

, could a sing]' human error Of omission cause a 1055 of planne-d at non-routine acthtii:j inY N --""'-. _ _ _ N ~

If any question 2 through 1[j is answered' YES. then inc/ude !his completed form in a sub operation in

!ll", work order. The aCltP/i:t'f is a Production Risk activit)'.

Perlormed Sy: Operator Name Production Risk? Y L N _ __

Page 11 of 15

TQ-AA-106-0303 JOB PERFORMANCE MEASURE OPERATOR TRAINING PROGRAM EVALUATOR FOLLOWUP QUESTION DOCUMENTATION NAME:

DATE:

JPM Number: ZZ045 TASK: Perform On-Line Risk Controls Evaluation TASK NUMBER: H303000015 QUESTION:

RESPONSE

RESULT: SAT UNSAT QUESTION:

RESPONSE

RESULT: SAT UNSAT Page 12 of 15

TQ-AA-106-0303 JOB PERFORMANCE MEASURE INITIAL CONDITIONS:

1. The plant is at 100 percent power.
2. Channel D Work week.
3. On-line risk color is Green.
4. Stator Water Cooling System CE-FISL-3S97 is reading erratically in the field.
5. The 12 Hour Maintenance Supervisor wants Operations to manipulate the following valves:
a. 1-CE-V99S5 - close
b. 1-CE-V99S6 - close
c. 1-CE-V99SO - open
6. EOOS is not available.
7. The Site Risk Management Engineer (SRME) is not available.
8. All other equipment is operable.
9. No other work is scheduled.
10. The "Description of Task" is: "Isolate CE-FISL-3597"
11. The WO number is "12345678" INITIATING CUE:

The SM has directed you to:

1) Review the activity against the pre-defined Medium, High, and Very High risk activities listed in Exhibit 1, Prescreened Work Activities lAW WC-HC-1 05 Step 4.2.3.2, AND
2) State the Production Risk Level here: _ _ _ _ __

AND

3) Complete the Production Risk Evaluation Data Sheet Exhibit 5 Page 1.

Page 13 of 15

TQ-AA-106-0303 JOB PERFORMANCE MEASURE REVISION HISTORY

..IPM NUMBER: 22045 Rev# i Date Description Validation Required?

0 I 11/7/11 New Admin JPM. Validation required. Validated with 2 SROs. Y I i

Validated avg time 20 minutes.

I

JOB PERFORMANCE MEASURE STATION: Hope Creek SYSTEM: Conduct of Operations TASK: Complete The Daily Surveillance Logs TASK NUMBER: 4010010201 JPM NUMBER: 305H-JPM.ZZ017 REV#: 02

SAP BET: NOH05JPZZ17E ALTERNATE PATH: D APPLICABILITY:

EO D RO D STA D SRO [KJ DEVELOPED BY: Archie Faulkner DATE: 1/14/12 Instructor REVIEWED BY:  :(j£-'-C-G-cK..- DATE: II! ;r/;2 APPROVED BY:

~~

Training Department DATE: fllr (/z

TQ-AA-106-0303 STATION: Hope Creek

..IPM NUMBER: ZZ017 REV: 02 SYSTEM: Conduct of Operations TASK NUMBER: 4010010201 TASK: Complete The Daily Surveillance Logs ALTERNATE PATH: D KIA NUMBER:

IMPORTANCE FACTOR: 3.6 2.1.18

3.8 APPLICABILITY

RO SRO EOD ROO STAD SRO [KJ EVALUATION SETTING/METHOD: Classroom/Perform

REFERENCES:

HC.OP-DL.ZZ-0026 Rev 129 TOOLS, EQUIPMENT AND PROCEDURES:

Paper copies of HC.OP-DL.ZZ-0026 Attachment 1 Page 1 of 1 ESTIMATED COMPLETION TIME: 7 lVlinutes TIME PERIOD IDENTIFIED FOR TIME CRITICAL STEPS: N/A Minutes

..IPM PERFORMED BY: GRADE: D SAT D UNSAT ACTUAL COMPLETION TIME: Minutes ACTUAL TIME CRITICAL COMPLETION TIME: I\J/A Minutes REASON, IF JPM UNSATISFACTORY:

EVALUATOR'S SIGNATURE: DATE:

Page 2 of 12

TQ-AA-106-0303 NAME:

DATE:

SYSTEM: Conduct of Operations TASK: Complete The Daily Surveillance Logs TASK NUMBER: 4010010201 INITIAL CONDITIONS:

1. The Plant is in OPCON 1 at 35% power
2. A plant startup from a forced outage is in progress lAW HC.OP-IO.ZZ-0003.
3. RCIC 1ST is in progress and being turned over.
4. River level is at 95.1 feet due to recent heavy rains.
5. River temperature is 83 degF but is NOT expected to exceed 85 degF.
6. All EDGs, SACS, and SSW pumps are operable.
7. The SPV Effluent RMS is inoperable and has been CIT for repairs.

INITIATING CUE:

You are the Control Room Supervisor.

IMPLEMENT the Daily Surveillance Logs for today lAW HC.OP-DL.ZZ-0026 AND IDENTIFY all required Attachments for current plant conditions.

Page 3 of 12

TQ-AA-106-0303 JPM: ZZ017 OPERATOR TRAINING PROGRAM NAME:

Rev: 02 JOB PERFORMANCE MEASURE DATE: ------------------

SYSTEM: Conduct of Operations TASK: Complete The Daily Surveillance Logs

(*Denotes a Critical Step) COMMENTS STEP

  • ELEMENT (#Denotes a Sequential Step) EVAL (Required for UNSAT NO. #

STANDARD StU eval CUE PROVIDE the operator the initiating cue AND a paper copy of Operator repeats back initiating cue.

HC.OP-DL.ZZ-0026(Q).

CUE I ENTER START TIME AFTER Operator repeats back the Initiating Cue: I N/A START TIME:

Operator determines beginning step Operator determines correct beginning of the procedure.

~~~~~~~~~~~~~~ ____________

step to be 2.1. _ _ _ _ _ _ _ _ _ _

---'_~_~~~~~~~~~~ -'-----_~'---- _ _ _'----_____________________ ~~~~J Page 4 of 12

TO-I"\",-106-0303 JPM: ZZ017 OPERATOR TRAINING PROGRAM NAME:

Rev: JOB PERFORMANCE MEASURE DATE:

SYSTEM: Conduct of Operations TASK: Complete The Daily Surveillance Logs

(*Denotes a Critical Step)

  • COMMENTS STEP ELEMENT (#Denotes a Sequential Step) EVAL (Required for UNSAT NO. #

STANDARD S/U evaluation) 2.1 Shift Manager/Control Room Examiner Note: Examiner Copy Supervisor - the SM/CRS is Exhibit 1 is provided for reference.

responsible to implement, review, and ensure completion of the log including Operator determines Attachment 1 is (CRS has primary responsibility for all required due to current Operational log reviews and documentation): Condition.

1.1 The SM/CRS shall implement Operator checks Attachment 1 on

  • the log at the beginning of each day Attachment 1 Section A Log Initiation.

by completing Attachment 1, Section A; Log Initiation, listing those Attachments that require performance Operator determined Attachment 3m is due to present conditions. Also, the required due to RCIC 1ST adding heat present Operational Condition shall to the Suppression Pool.

be listed.

Operator checks Attachment 3m on

  • Attachment 1 Section A Log Initiation.

Operator determines Attachment 3k is required lAW Item 1 and T/S 4.7.3 due to current River Water level.

Operator checks Attachment 3k on

  • Attachment 1 Section A Log Initiation.

Page 5 of 12

TQ-M.A-106-0303 JPM: 7 OPERATOR TRAINING PROGRAM NAME:

Rev: 02 JOB PERFORMANCE MEASURE DATE: ____________________

SYSTEM: Conduct of Operations TASK: Complete The Daily Surveillance Logs

(*Denotes a Critical Step) COMMENTS STEP

  • ELEMENT (#Denotes a Sequential Step) EVAL (Required for UNSAT NO. #

STANDARD Stu evaluation)

Operator determines Attachment 3h is required lAW Item 1 and TIS 4.7.1.3.b.1 due to current River Water temperature.

Operator checks Attachment 3h on

  • Attachment 1 Section A Log Initiation.

Operator determines Attachment 3t is required lAW Item 42 due to SPV RMS Inoperable.

Operator checks Attachment 3t on

  • Attachment 1 Section A Log Initiation.

Operator places a "1" in the Operational Condition blank.

Page 6 of 12

TQ-AA-106-0303 JPM: ZZ017 OPERATOR TRAINING PROGRAM NAME: --------------------

Rev: 02 JOB PERFORMANCE MEASURE DATE: ____________________

SYSTEM: Conduct of Operations TASK: Complete The Daily Surveillance Logs

(*Denotes a Critical Step) COMMENTS STEP

  • ELEMENT (#Denotes a Sequential Step) EVAL (Required for UNSAT NO. #

STANDARD S/U evaluation) 2.1 2.1.1 The SM/CRS shall implement Operator checks Attachment 5 on the log at the beginning of each Attachment 1 Section A Log Initiation.

day by completing Attachment Examiner Note: Although not 1, Section A; Log Initiation, specifically required by the current listing those Attachments that conditions, Attachment 5 is typically require performance due to used each day to track surveillance procedures and would be needed the present conditions. Also, the first time a surveillance procedure with present Operational Condition an action time is actually logged on.

shall be listed.

CUE WHEN operator informs you the task is complete, OR the JPM has been terminated for other reasons, THEN RECORD the STOP TIME.

REPEAT BACK any message from N/A the operator on the status of the JPM, and then state "This JPM is complete".

STOP TIME:

Page 7 of 12

TQ-AA-106-0303 JOB PERFORMANCE MEASURE OPERATOR TRAINING PROGRAM EVALUATOR FOLLOWUP QUESTION DOCUMENTATION NAME:

DATE:

JPM Number: ZZ017 TASK: Complete The Daily Surveillance Logs TASK NUMBER: 4010010201 QUESTION:

RESPONSE

RESULT: SAT UNSAT QUESTION:

RESPONSE

RESULT: SAT UNSAT Page 8 of 12

TQ-AA-106*0303 JOB PERFORMANCE MEASURE ATTACHMENT 1 Page 1 of 1 Surveillance Log Date T odays Date A. LOG INITIATION 1.0perational Condition 1 2.Check (./) Attachments to be performed 1 ./ 3c 3g 3m./ 3s 3w 4a 2 3d 3h./ 3p 3t./ 3x 4b 3e 3j 3q 3u 3y 4c B.

LOG PE:fFORMAN~: v" 3r 3v 3Zrr=\"\(c))~ v"

1. Ensure compliance with TIS by using procedurer21\2,{~ .15 TIS reference numbers and surveillance item note(s), as \1lic~r any log item(s) requiring additional action. ~\). ~
2. Operators signature below in~M~riate~Ub ctio ttachment 1 and any Attac1unent checked ~~ebeen comp Attachment1a ~~~\)V *~O()

Control Room~ ~~ _ ~_ _ _ __

Attachment 1 ~

Auxiliary Bldg Attachment 1c -------- --------

Reactor Bldg _

Attachment 1d Turbine Bldg DAY EVE MID

3. Signature below indicates review of all required attachments checked (./) above has been completed, and approved for compliance with TIS requirements.

Day (Review Before 1300) Eve (Review Before 2100) Mid (Review Before 0500)

SM/eRS SM/eRS SM/eRS C. LOG COMPLETION 1.Operational Condition

2. Check (./) Attachments that have been performed 1 3c 3g 3m 3s 3w 4a 2 3d 3h 3p 3t 3x 4b 3e 3j 3q 3u 3y 4c 3f 3k 3r 3v 3z 5 Page 9 of 12

TQ-AA-106-0303 JOB PERFORMANCE MEASURE INITIAL CONDITIONS:

1. The Plant is in OPCON 1 at 35% power
2. A plant startup from a forced outage is in progress lAW HC.OP-IO.ZZ-0003.
3. RCIC 1ST is in progress and being turned over.
4. River level is at 95.1 feet due to recent heavy rains.
5. River temperature is 83 degF but is NOT expected to exceed 85 degF.
6. All EDGs, SACS, and SSW pumps are operable.
7. The SPV Effluent RMS is inoperable and has been CIT for repairs.

INITIATING CUE:

You are the Control Room Supervisor.

IMPLEMENT the Daily Surveillance Logs for today lAW HC.OP-DL.ZZ-0026 AND IDENTIFY all required Attachments for current plant conditions.

TQ-AA-106-0303 JOB PERFORMANCE MEASURE REVISION HISTORY JPM NUMBER: ZZ017 Rev # Date Description Validation Required?

01 11/8/08 Converted ZZ017 to new JPM format. Since Critical JPM Y actions are now uniquely identified by the format, all statements identifying critical portion of action were redundant and deleted.

Removed reference to T-Factor and Attachment 3b due to deletion of T-Factor from Tech Specs. Replaced with Severe Storm Warning and Attachment 3j.

02 1/3/12 Updated reference procedure revision numbers. Deleted Storm Y Warning and added River Level and RCIC 1ST Attachments 3k and 3m. Validated with 2 SROs on 1/3/12. Avg completion time is 7 minutes.

JOB PERFORMANCE MEASURE STATION: Hope Creek SYSTEM: Administrative TASK: Review Operations Department Tests for Completeness and Compliance with Acceptance Criteria TASK NUMBER: 2990060302 JPM NUMBER: 30SH-JPM.ZZ027 REV #: 02 SAP BET: NOH05JPZZ27E ALTERNATE PATH: D APPLICABILITY:

EO D RO D STA SRO DEVELOPED BY: Archie E. Faulkner DATE: 1/14/12 Instructor

,- /<~eh-d<: /r;-;;2 REVIEWED BY: V DATE:  !

APPROVED BY:

9lJ031 <

Training Department DATE: )/11 III

TQ-AA-106-0303 STATION: Hope Creek JPM NUMBER: ZZ027 REV: 02 SYSTEM: Administrative TASK NUMBER: 2990060302 TASK: Review Operations Department Tests for Completeness and Compliance with Acceptance Criteria ALTERNATE PATH: D KIA NUMBER:

2.2.12 IMPORTANCE FACTOR: 3.4 APPLICABILITY: RO SRO EoD ROD STAD SROCK]

EVALUATION SETTING/METHOD: Classroom/Perform

REFERENCES:

HC.OP-IS.BC-0003 Rev. 43 ER-AA-321 Rev. 11 TOOLS, EQUIPMENT AND PROCEDURES: Marked up copy of HC.OP-IS.BC-0003 Rev. 43 Calculator ESTIMATED COMPLETION TIME: 27 Minutes TIME PERIOD IDENTIFIED FOR TIME CRITICAL STEPS: ---

N/A Minutes JPM PERFORMED BY: GRADE: D SAT D UNSAT ACTUAL COMPLETION TIME: Minutes ACTUAL TIME CRITICAL COMPLETION TIME: N/A Minutes REASON, IF JPM UNSATISFACTORY:

EVALUATOR'S SIGNATURE: DATE:

Page 2 of 13

TQ-AA-106-0303 NAME:

DATE:

SYSTEM: Administrative TASK: Review Operations Department Tests for Completeness and Compliance with Acceptance Criteria TASK NUMBER: 2990060302 INITIAL CONDITIONS:

1. The Plant is at 100 percent power with all equipment operable.
2. HC.OP-IS.BC-0003, BP202, B Residual Heat Removal Pump In-Service Test, has just been completed.

INITIATING CUE:

Perform the CRS review of the completed HC.OP-IS.BC-0003.

Page 3 of 13

TQ-AA-106-0303 JOB PERFORMANCE MEASURE JPM: ZZ027 OPERATOR TRAINING PROGRAM NAME:

Rev: 02 JOB PERFORMANCE MEASURE DATE: __________________

SYSTEM: Administrative TASK:

STEP NO.

ELEMENT

(*Denotes a Critical Step)

(#Denotes a Sequential Step)

I Review Operations Department Tests for Completeness and Compliance with Acceptance Criteria EVAL COMMENTS (Required for UNSAT STANDARD # StU evaluati CUE PROVIDE the operator the initiating cue. Operator repeats back cue.

CUE PROVIDE marked up copy of HC.OP IS.BC-0003 and Vibration data sheet. NIA CUE ENTER START TIME AFTER Operator repeats back the Initiating Cue: I NIA START TIME:

5.43 SUBMIT the procedure to the Operator commences the review.

OS/CRS for review AND completion of Attachment 1.

2.0 Operator determines correct beginning Operator determines beginning step step to be 2.0.

of the procedure.

Page 4 of 13

TQ-AA-106-0303 JOB PERFORMANCE MEASURE JPM: ZZ027 OPERATOR TRAINING PROGRAM NAME: __________________

Rev: 02 JOB PERFORMANCE MEASURE DATE: __________________

SYSTEM: Administrative TASK: Review Operations Department Tests for Completeness and Compliance with Acceptance Criteria STEP ELEMENT

(*Denotes a Critical Step)

(#Denotes a Sequential Step)

I

  • EVAL COMMENTS (Required for UNSAT NO.

STANDARD # S/U evaluati Operator determines that the Discharge Pressure recorded on Attachment 3, Steps 5.23.3.8, for the pump is incorrect:

  • The wrong Discharge Pressure was used. It should be 146.6 psig.

CUE Make the necessary corrections N/A and continue with the review.

Operator corrects the error

  • Operator determines that the Delta Pressure recorded on Attachment 3, Steps 5.23.4.8 and C, for the pump is incorrect:
  • A math error was made. It should be 140.1 psig.

CUE Make the necessary corrections N/A and continue with the review.

Operator corrects the error.

Page 5 of 13

TQ-AA-106-0303 JOB PERFORMANCE MEASURE JPM: ZZ027 OPERATOR TRAINING PROGRAM NAME:

Rev: 02 JOB PERFORMANCE MEASURE DATE: - - - - - - - - - - - - - - - - - - -

SYSTEM: Administrative TASK: Review Operations Department Tests for Completeness and Compliance with Acceptance Criteria

(*Denotes a Critical Step)

  • COMMENTS STEP ELEMENT (#Denotes a Sequential Step) EVAL (Required for UNSAT NO. #

STANDARD S/U evaluation)

Operator determines that the differential pressure is within the REQUIRED ACTION range.

CUE Make the necessary corrections N/A and continue with the review.

RS1QS Operator changes the SAT to UNSAT.

  • 2.1 The data acquired during the Operator reviews the data entered for performance of this test has been completeness and compliance with reviewed for completeness and Technical Specifications.

compliance with Technical Specification 6.8.4.i, 4.5.1.b.2, 4.6.2.3.b, 4.6.2.2.b, and 4.3.7.4 and the test is considered:

Page 6 of 13

TQ-AA-106-0303 JOB PERFORMANCE MEASURE JPM: ZZ027 OPERATOR TRAINING PROGRAM NAME:

Rev: 02 JOB PERFORMANCE MEASURE DATE: ___________________

SYSTEM: Administrative TASK: Review Operations Department Tests for Completeness and Compliance with Acceptance Criteria

(*Denotes a Critical Step) COMMENTS I STEP

  • ELEMENT (#Denotes a Sequential Step) EVAL (Required for UNSAT NO. #

STANDARD S/U evaluation) i 2.1.2 UNSATISFACTORY (Any test Operator completes the review.

evaluations are marked UNSAT).

TAKE action lAW Technical Specifications and GENERATE a i

Notification.

--- ----- r-~ ~---~~ ~--- -----

Operator notes that data flagged as ACCEPTANCE CRITERIA was marked UNSAT.

Operator signs in Step 2.1.2.

  • 1--- ~-~ ------ ,------~ ~

Operator determines B RHR Pump is

i r-~ ~. ~ ----~ ----- ------ ,---~ ~ ~ ----~ ~

Operator determines the most limiting

  • Tech Spec is 3.6.2.3 Action a.

(Suppression Pool Cooling 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />)

~~~. ~----~~ ~~---~~ ~~. ~---~~

Page 7 of 13

TQ-AA-106-0303 JOB PERFORMANCE MEASURE JPM: ZZ027 OPERATOR TRAINING PROGRAM NAME: -------------------

Rev: 02 JOB PERFORMANCE MEASURE DATE: -------------------

SYSTEM: Administrative TASK: Review Operations Department Tests for Completeness and Compliance with Acceptance Criteria STEP ELEMENT

(*Denotes a Critical Step)

(#Denotes a Sequential Step)

I

  • EVAL COMMENTS (Required for UNSAT NO.

STANDARD # S/U evaluati Operator determines that a

  • NOTIFICATION must be generated.

CUE A Notification will be written by N/A another operator.

CUE WHEN operator informs you the task is complete, OR the JPM has been terminated for other reasons, THEN RECORD the STOP TIME.

N/A REPEAT BACK any message from the operator on the status of the JPM, and then state "This JPM is complete".

STOP TIME:

Page 8 of 13

TQ-AA-106-0303 JOB PERFORMANCE MEASURE OPERATOR TRAINING PROGRAM EVALUATOR FOLLOWUP QUESTION DOCUMENTATION NAME:

DATE:

..IPM Number: ZZ027 TASK: Review Operations Department Tests for Completeness and Compliance with Acceptance Criteria TASK NUMBER: 2990060302 QUESTION:

RESPONSE

RESUL T: SAT UNSAT QUESTION:

RESPONSE

RESULT: SAT Page 9 of 13

TQ-AA-106-0303 JOB PERFORMANCE MEASURE INITIAL CONDITIONS:

1. The Plant is at 100 percent power with all equipment operable.
2. HC.OP-IS.BC-0003, BP202, B Residual Heat Removal Pump In-Service Test, has just been completed.

INITIATING CUE:

Perform the CRS review of the completed HC.OP-IS.BC-0003.

Page 10 of 13

TQ-AA-106-0303 JOB PERFORMANCE MEASURE 1.0 IBP-202 RHR PUMP Report printed on: TODAY 2.0 Vibration monitoring systen1 results:

Report generated on: TODAY 09:00 AM Acquired: TODAY 07: 10 AM 1xM = 1187 RPM Averages: 14 A. Maximum level: 0.2182 in/s at M1V RECOMMENDATIONS:

2.2 THERE ARE NO RECOMMENDATIONS DIAGNOSES:

2.3 NO FAULTS HAVE BEEN DETECTED POSITION LEGE:-JD:

POSITION Ml IS: MOTOR TOP POSITION M2 IS: MOTOR BOTTOYI POSITION PI IS: PUMP ~

2.3.1 OVERALL LEVEL READ~~;'C OK: 0.119 in/s atM1H Alarm level: 0.213 in/s OK: 0.218 in/s at MI V Alarm level: 0.240 in/s OK: 0.076 in/s at MIA Alarm level: 0.110 in/s OK: 0.193 in/s at M2H Alarm level: OAOO in/s OK: 0.211 in/s at M2V Alarm level: OAOO in/s OK: 0.114 in/s at M2A Alarm level: OAOO in/s OK: 0.108 in/s at PI H Alarm level: 0.300 in/s OK: 0.126 in/s at PI V Alarm level: 0.300 in/s OK: 0.081 in/s at PIA Alarm level: 0.300 in/s Page 11 of 13

TQ-AA-106-0303 JOB PERFORMANCE MEASURE REVISION HISTORY JPM NUMBER: ZZ027 Description Validation I Required?

  • 11/7/11 Modified Admin JPM due to changes in reference procedure. y Validation required. Validated with 2SROs on 1/3/12. Avg completion time 27 minutes.

JOB PERFORMANCE MEASURE STATION: Hope Creek SYSTEM: Radiation Control TASK: Verify Compliance with Gaseous Release Permit TAsK NUM BER: 2990420302 JPM NUMBER: 305H-JPM.zZ003 REV #: 02 SAP BET: NOH05JPZZ03E ALTERNATE PATH: D APPLICABILITY:

EO RO STA D SRO [KJ DEVELOPED BY: Archie Faulkner DATE: 1/14/12 Instructor REVIEWED BY: _.-J f<R.. -e 1-1"C1( DATE: I/; 8-!:(

APPROVED BY: 91r~/

Training Department DATE: J/lrIt)

TQ-AA-106-0303 STATION: Hope Creek JPM NUMBER: ZZ003 REV: 02 SYSTEM: Radiation Control TASK NUMBER: 2990420302 TASK: Verify Compliance with Gaseous Release Permit ALTERNATE PATH: D KIA NUMBER: --------

2.3.6 IMPORTANCE FACTOR: 2.0 3.8 APPLICABILITY: RO SRO EOD ROO EVALUATION SETTING/METHOD: Classroom/Perform

REFERENCES:

OP-HC-1 03-1 05 Rev 1 TOOLS, EQUIPMENT AND PROCEDURES:

Prepared OP-HC-1 03-1 05 Form 2, Calculator ESTIMATED COMPLETION TIME: 9 Minutes TIME PERIOD IDENTIFIED FOR TIME CRITICAL STEPS: ----

N/A Minutes JPM PERFORMED BY: GRADE: D SAT D UNSAT ACTUAL COMPLETION TIME: Minutes ACTUAL TIME CRITICAL COMPLETION TIME: N/A Minutes REASON, IF JPM UNSATISFACTORY:

EVALUATOR'S SIGNATURE: DATE:

Page 2 of 13

TQ-AA-1 06-0303 NAME:

DATE:

SYSTEM: Radiation Control TASK: Verify Compliance with Gaseous Release Permit TASK NUMBER: 2990420302 INITIAL CONDITIONS:

1. A plant shutdown is in progress for a Refueling outage.
2. The Reactor is shutdown.
3. At 0200 today Purging of the Primary Containment commenced.
4. At 0436, the Purge lineup was secured in accordance with HC.OP-SO.GS-0001, Containment Atmosphere Control System Operation, due to a damper problem.
5. At 0800, Purging of Primary Containment re-commenced.
6. At 1252 today Operational Condition 4 was entered.
7. At 1548 today the purge lineup was secured in accordance with HC.OP-SO.GS-0001, Containment Atmosphere Control System Operation.

INITIATING CUE:

Review AND Close Out today's Containment Prepurge Cleanup, Inerting, Or Pressure Control Valve Permit and Log in accordance with OP-HC-103-105.

Page 3 of 13

TQ~.M.A~1 06-0303 JPM: ZZ003 OPERATOR TRAINING PROGRAM NAME:

Rev: 02 JOB PERFORMANCE MEASURE DATE: ___________________

SYSTEM: Radiation Control TASK: Verify Compliance with Gaseous Release Permit

(*Denotes a Critical Step) COMMENTS STEP

  • ELEMENT (#Denotes a Sequential Step) EVAL (Required for UNSAT NO. #

STANDARD S/U evaluatio CUE PROVIDE the operator cue AND:

o Prepared OP-HC-1 03-1 05 log Operator repeats back initiating cue.

Forms 1 & 2 (Attached) o Copy of OP-HC-103-105 CUE I ENTER START TIME!....!.!.-!:...=.:....!

Operator repeats back the Initiating Cue: I N/A START TIME:

Operator determines beginning step Operator determines correct beginning of the procedure. step to be 4.4.6.

Page 4 of 13

TQ-kl"\-106-0303 JPM: ZZ003 OPERATOR TRAINING PROGRAM NAME: ___________________

Rev: 02 JOB PERFORMANCE MEASURE DATE: ___________________

SYSTEM: Radiation Control TASK: Verify Compliance with Gaseous Release Permit

(*Denotes a Critical Step) COMMENTS STEP

  • ELEMENT (#Denotes a Sequential Step) EVAL (Required for UNSAT NO. #

STANDARD S/U evaluatio 4.4.6 The SM/CRS should verify the calculations, sign in the appropriate Operator reviews Form 2.

space for verification and close out and enter the time and date.

Operator recognizes NCO incorrectly

  • rounded down from 2.6 to 2.5 instead of rounding up to 3.0 lAW 4.4.3 during calculation of first purge period.

Operator recognizes NCO incorrectly

  • used securing of purge lineup for end time of second purge period instead of using entry into OPCON 4 time lAW step 4.4.2.

CUE IF the operator requests the NCO to make changes, THEN DIRECT the operator to make N/A any required changes.

Page 5 of 13

TQ-AA-106-0303 JPM: ZZ003 OPERATOR TRAINING PROGRAM NAME:

DATE: ___________________

Rev: 02 JOB PERFORMANCE MEASURE SYSTEM: Radiation Control TASK: Verify Compliance with Gaseous Release Permit

(*Denotes a Critical Step) COMMENTS STEP

  • ELEMENT (#Denotes a Sequential Step) EVAL (Required for UNSAT NO. #

STANDARD stU evaluatio 4.4.6 The SM/CRS should verify the Operator makes corrections to Form 2

  • calculations, sign in the appropriate Stop times and Total Hours.

space for verification and close out Examiner Note: Refer to Examiners and enter the time and date. Copy for appropriate corrections.

CUE WHEN operator informs you the task is complete, OR the JPM has been terminated for other reasons, THEN RECORD the STOP TIME.

N/A REPEAT BACK any message from operator on the status of the JPM, and then state "This JPM is complete".

STOP TIME:

Page 6 of 13

TQ-AA-106-0303 JOB PERFORMANCE MEASURE OPERATOR TRAINING PROGRAM EVALUATOR FOLLOWUP QUESTION DOCUMENTATION NAME:

DATE:

JPM Number: ZZ003 TASK: Verify Compliance with Gaseous Release Permit TASK NUMBER: 2990420302 QUESTION:

RESPONSE

RESULT: SAT UNSAT QUESTION:

RESPONSE

RESULT: SAT UNSAT

TQ-AA-106-0303 JOB PERFORMANCE MEASURE FORM 2 CONTAINMENT PREPURGE CLEANUP, INERTING, OR PRESSURE CONTROL VALVE PERMIT SECTION A Date: Today NOTE: This permit is valid only until 2400 of this date Gaseous Effluent Permit #: 020020001 Calculate Total Hours Open During Previous Year (Note 1) 452 hrs NUMBER OF HOURS

(-) 35.5 line 1 minus line 2 1 s) 4/3/11 6/25/11 8/30/11 8/31/11 2.5 DatefTime Jofin Smitfi TodayJ0100 SM/CRS verification and authorization DatefTime

)Indrew Jones TodayJ0130 SECTION C VALVE/LINE OPEN TIME (Note 2)

START TIME STOP TIME TOTAL HOURS Time at which valve/line was open or Time at which valvelline was closed or Total number of hours valve/line Condition 1, 2, or 3 was entered with valvelline Condition 4 or 5 was entered with valve/line opened this cycle open opened (NOTE 3) 6.a 3.0 Total number of hours valves/line open this permit: .w.,a 8.0 NCO perform ing calcu lations ______---'-Jl_mF~ry_'q<-t1_l:l_na_t_e{fi_t_______ DatefTime rJod"ay/Now SM/CRS Closing permit _ _ _()_~ _ _ _S,_~ _ _ _ __ DatefTime "Date/7i1He Note 1: The previous year includes the period from 2400 on today's date back to 0001 on the same date one year earlier.

Note 2: Completed Form 2 should be filed in the AP-104 binder in the control room.

Note 3: When computing the total hours (round up to the nearest 0.5 or to the nearest 1.0 hr.)

TQ*AA*106*0303 JOB PERFORMANCE MEASURE INITIAL CONDITIONS:

1. A plant shutdown is in progress for a Refueling outage.
2. The Reactor is shutdown.
3. At 0200 today Purging of the Primary Containment commenced.
4. At 0436, the Purge lineup was secured in accordance with HC.OP-SO.GS-0001, Containment Atmosphere Control System Operation, due to a damper problem.
5. At 0800, Purging of Primary Containment re-commenced.
6. At 1252 today Operational Condition 4 was entered.
7. At 1548 today the purge lineup was secured in accordance with HC.OP-SO.GS-0001, Containment Atmosphere Control System Operation.

INITIATING CUE:

Review AND Close Out today's Containment Prepurge Cleanup, Inerting, Or Pressure Control Valve Permit and Log in accordance with OP-HC-103-105.

LF~O [?[]O [?[] @[?[](1)J OP-HC*1 03-1 05 Revision 0

@[P@~LF@~ @@[P)J Page 7 of 8 FORM 1 Page of_ _

CONTAINMENT PREPURGE CLEANUP, INERTING, OR PRESSURE CONTROL VALVE PERMIT LOG DATE HOURS HOURS NAME OF SM/CRS NCO HOURS TOTAL NAME OF SM/CRS NCO PREVo AUTH. AUTHORIZING THIS INITIAL USED THIS HOURS CLOSING THIS PERMIT INITIAL YEAR THIS PERMIT PERMIT PREVIOUS (Note 1) PERMIT YEAR (Note 1) 4/3/11 22.5 24 H. David S(}) 5.5 28.0 S. West S(})

6/25/11 18.5 24 G. Williams cT'1(W ------

3.5 22.0 G. Cloon crgzW 8/30/11 22.0 24 W. Holmes '1( 24.00 46.0 P. Price CJ(

i 8/31/11 46.0 24 B. Lee CE 2.5 48.5 V. Bonovan CE ,

Today 35.5 24


.... _...... A. Jones JS r*** -------


f--- -------

r-- ------

Note1:The previous year includes the period from 2400 on today's date back to 0001 on the same date one year earlier.

OP-HC-1 03-1 05 LF~D~D~@ @~[SW Revision 0

@[P~~LF@oo. @@[PW Page 8 of 8 FORM 2 CONTAINMENT PREPURGE CLEANUP, INERTING, OR PRESSURE CONTROL VALVE PERMIT SECTION A Date: Today NOTE: This permit is valid only until 2400 of this date Gaseous Effluent Permit #: 020020001 SECTION B HOURS VALVES/LINES OPEN PREVIOUS YEAR (Note 1)

Calculate Total Hours Open During Previous Year (Note 1) (1) Max. allowed for 365 days (Admin Limit) 452 hrs (2) Total previous year (NOTE 1) H 35.5 DATE NUMBER OF HOURS Hours available this date (line 1 minus line 2 {=} 24 4/3/11 5.5 OR 24, whichever is less)

\;S;'\..

6/25/11 3.5 Hours authorized this date (max 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />) 24. '.,

8/30/11 24.0 8/31/11 2.5 NCO performing calculation Date/Time Jolin Smitli Toda~/0100 SM/CRS verification and authorization Date/Time flndrew Jones Toda~/0130 SECTION C VALVE/LINE OPEN TIME (Note 2)

START TIME STOP TIME TOTAL HOURS Time at which valve/line was open or Time at which valve/line was closed or Total number of hours valve/line Condition 1, 2, or 3 was entered with valve/line Condition 4 or 5 was entered with valve/line opened this cycle open opened (NOTE 3) 0200 0436 2.5 0800 1548 8.0 Total number of hours valves/line open this permit: 10.5 NCO performing calculations JI1ufy qranate{[i Date/Time %day/:Now SM/CRS Closing permit Date/Time Note 1: The previous year includes the period from 2400 on today's date back to 0001 on the same date one year earlier.

Note 2: Completed Form 2 should be filed in the AP-104 binder in the control room.

Note 3: When computing the total hours (round up to the nearest 0.5 or to the nearest 1.0 hr.)

OP-HC-103-105 Revision 0 Page 8 of 8 REVISION HISTORY JPM NUMBER: ZZ003 Rev # Date Description Validation Required?

01 12/6/08 Converted JPM ZZ003 to new JPM format. Since Critical JPM Y actions are now uniquely identified by the format, all statements identifying critical portion of action were redundant and deleted.

This change is editorial, validation not required.

Removed references to checking off/initialing steps in procedure. This is a generic work practice and adds unnecessary clutter to the Standard section. This change is editorial, validation not required.

Governing procedure changed methodology for calculating hours. Requires validation.

02 1/14/12 Updated reference procedure revision. Changed names on Y Attachments. Updated dates to be relevant to current year.

Validated with 2 SROs on 1/3/12. Average completion time was 19 minutes.

JOB PERFORMANCE MEASURE STATION: Hope Creek SYSTEM: Administrative Duties/Reporting Requirements TASK: Utilize The ECG To Determine The Emergency Classification And/Or Reportability Of An Event And/Or Plant Condition TASK NUMBER: 2000500302/2000020505 JPM NUMBER: 305H-JPM.ECG003 REV #: 05 SAP BET: NOH05JPCL03E ALTERNATE PATH: D APPLICABILITY:

EO D RO D STA [KJ SRO [KJ DEVELOPED BY: Archie E. Faulkner DATE: 1/14/12 Instructor REVIEWED BY: <p--e~( DATE: Ijrlt2 APPROVED BY: cnr~l u ~

Training Department DATE: V16/11

TQ-AA-106-0303 STATION: Hope Creek JPM NUMBER: ECG003 SYSTEM: Administrative Duties/Reporting Requirements TASK NUMBER: 2000500302/2000020505 TASK: Utilize The ECG To Determine The Emergency Classification And/Or Reportability Of An Event And/Or Plant Condition ALTERNATE PATH: D KIA NUMBER:

IMPORTANCE FACTOR: 2.2 2.4.38

4.0 APPLICABILITY

RO SRO EOD RO S TA((] SRO((]

EVALUATION SETTING/METHOD: Simulator/Perform or In Plant/Simulate

REFERENCES:

Hope Creek Event Classification Guide, TOC Rev 98 TOOLS, EQUIPMENT AND PROCEDURES:

ESTIMATED COMPLETION TIME: 13 Minutes TIME PERIOD IDENTIFIED FOR TIME CRITICAL STEPS: 15/13 Minutes JPM PERFORMED BY:

GRADE: D SAT D UNSAT ACTUAL COMPLETION TIME: Minutes ACTUAL TIME CRITICAL COMPLETION TIME: / Minutes REASON, IF UNSATISFACTORY:

EVALUATOR'S SIGNATURE: DATE:

Page 2 of 19

TQ-AA-106-0303 NAME:

DATE:

SYSTEM: Administrative Duties/Reporting Requirements TASK: Utilize The ECG To Determine The Emergency Classification And/Or Reportabilitv Of An Event And/Or Plant Condition TASK NUMBER: 2000500302/2000020505 INITIAL CONDITIONS:

1. With the plant operating at 100% power, Hope Creek experiences an earthquake which indicates a magnitude of> 0.1 g.
2. Control Room Annunciator C6-C4 is in.
3. ON Panel 10C673:
  • The SMA-3 Event Indicator is White.
  • The Strong Motion Accelerograph Tape Machines have advanced but are not currently running.
  • The AMBER alarm light on the Seismic Switch Power Supply Drawer is lit.
4. Numerous amber lights and 3 red lights are lit on the response spectrum analyzer.
5. A LOCA results. The Reactor is successfully scrammed, with RPV level dropping rapidly to -180"; then stabilizing between -150" and -180", being maintained using all available ECCS.
6. Drywell Pressure peaked at 44 psig, then dropped to < 2 psig over the next 90 seconds, and continues to slowly drop.
7. The current 33 ft. elevation wind direction is from 224 0 at 21 mph.
8. Plant Effluent activity is 1.S9E+04 !-ICi/sec Noble Gas and 1.S9E+01 !-ICi/sec 1-131.

INITIATING CUE:

Based on this information, classify this event and make the initial notifications.

This is a Time Critical Task, and has two Time Critical elements.

Time zero for this event is now.

Page 3 of 19

TQ-Af\-106-0303 ECG003 OPERATOR TRAINING PROGRAM NAME: __________________

JOB PERFORMANCE MEASURE DATE: __________________

SYSTEM: Administrative Duties/Reporting Requirements TASK:

STEP NO.

ELEMENT

(*Denotes a Critical Step)

(#Denotes a Sequential Step)

II Utilize The ECG To Determine The Emergency Classification And/Or Reportability Of An Event And/Or Plant Condition EVAL COMMENTS (Required for UNSAT STANDARD # StU evaluation CUE PROVIDE the operator the initiating cue. Operator repeats back initiating cue.

CUE ENTER START TIME~:...=..c....:

OPERATOR REPEATS BACK INITIATING CUE: N/A START TIME:

Operator obtains correct Operator obtains Hope Creek Event procedure. Classification Guide.

ECG Classification: To use this ECG Section volume, follow this sequence: Operator assesses the initial conditions, LIV.C 1. ASSESS the event and/or plant and determines that Table 3, Fission Product Barriers, 6.1 Radiological conditions and DETERMINE Releases/Occurances, and 9.0, which ECG section(s) is most Hazards-Internal/External, are the appropriate. appropriate ECG sections.

ECG 2. REFER to Section EAL Flowchart diagram(s), and identify the Operator refers to Table 3.0 and Section Flowchart Diagrams and identifies that LlV.C Initiating Conditions that are the Initial Conditions for Table 3.0, related to the event/condition EALs 6.1.2.d and 9.5.2 are related to has occurred or is ongoing. the event that has occurred.

Page 4 of 19

TQ-kA-106-0303 ECG003 OPERATOR TRAINING PROGRAM NAME: ___________________

JOB PERFORMANCE MEASURE DATE: ___________________

SYSTEM: Administrative Duties/Reporting Requirements TASK: Utilize The ECG To Determine The Emergency Classification And/Or Reportability Of An Event AndlOr Plant Condition

(*Denotes a Critical Step) COMMENTS STEP

  • ELEMENT (#Denotes a Sequential Step) EVAL (Required for UNSAT NO. #

STANDARD SIU evaluation)

ECG 3. REVI EW the associated EALs as Section compared to the event and i.IV.C SELECT the highest appropriate emergency or reportable action level. If identification of an EAL is questionable, refer to paragraph IV.A above. Operator reviews the EALs in section If there is any doubt with regard to 6.1 and 9.5, and determines that EAL #

assessment of a particular EAL, 6.1.2.d and 9.5.2 is the highest the ECG Technical Basis emergency action level met or Document should be reviewed. exceeded (ALERT).

Words contained in an EAL that are bold face are either threshold values associated with that action level or are words that are defined in the basis for that specific EAL.

ECG 4. If an EAL has been entered, then Section equal level EALs or lower level LlV.C EALs and RALs are not required to be reported as long as the Examiner Note: Filling out the NRC Data Sheet is beyond the scope of this applicable information is JPM.

communicated to the NRC using Attachment 5, NRC Data Sheet.

Page 5 of 19

TQ-#'\1-\-106-0303 ECG003 OPERATOR TRAINING PROGRAM NAME:

DATE: __________________

JOB PERFORMANCE MEASURE SYSTEM: Administrative Duties/Reporting Requirements TASK: Utilize The ECG To Determine The Emergency Classification And/Or Reportability Of An Event And/Or Plant Condition

(*Denotes a Critical Step) COMMENTS STEP

  • ELEMENT (#Denotes a Sequential Step) EVAL (Required for UNSAT NO.

STANDARD # stu evaluation)

Table If the Loss or Potential Loss is Operator reads NOTE.

3.0 considered IMMINENT (may occur NOTE within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />), USE judgement and classify as if the threshold is exceeded.

Table In the table review the Emergency Operator reviews the EALs of all 3.0 Action Levels of all columns and columns, and determines that all 1.

identify which need further review. columns need further review.

~~~~

-~- ~

Table For each of the three barriers, Operator determines that the following 3.0 determine the EAL with the highest EALs have been exceeded and

2. represent the highest value met or point value. No more than one EAL should be selected for each barrier. exceeded for the respective column:

3.1.1.a; 3.2.2.b or 3.2.1.b; and 3.3.2.b or 3.3.2.d.

Table Add the point values for the three Operator adds the values, and enters 3.0 barriers and enter the total below: the value 9 in the appropriate space.

3.

Examiners Note: Determining this value for future use is critical; marking it on Table 3.0 is not.

Page 6 of 19

TQ-hrl-106-0303 ECG003 OPERATOR TRAINING PROGRAM NAME:

JOB PERFORMANCE MEASURE DATE: __________________

SYSTEM: Administrative Duties/Reporting Requirements TASK: Utilize The ECG To Determine The Emergency Classification And/Or Reportability Of An Event And/Or Plant Condition

(*Denotes a Critical Step)

  • COMMENTS STEP ELEMENT (#Denotes a Sequential Step) EVAL (Required for UNSAT NO. #

STANDARD StU evaluation)

Table Classify based on the point value sum Operator determines that this 3.0 as follows: classification is higher than the

4. -- classification on EALs 6.1.2.d or 9.5.2

~- Ifthe sum is:

1,2 Classify as:

UNUSUAL E\IENf Referto:

An. 1 and classifies the event as a General Emergency based on Table 3.0.

I 3,4 ALERT An. 2 t;:;- ~:=

An. 3 AnA I

Page 7 of 19

TQ-k.A-106-0303 ECG003 OPERATOR TRAINING PROGRAM NAME: ___________________

JOB PERFORMANCE MEASURE DATE: ___________________

SYSTEM: Administrative Duties/Reporting Requirements TASK:

STEP NO.

ELEMENT

(*Denotes a Critical Step)

(#Denotes a Sequential Step)

II Utilize The ECG To Determine The Emergency Classification And/Or Reportability Of An Event And/Or Plant Condition EVAL COMMENTS (Required for UNSAT STANDARD # S/U evaluatio ECG The STA is responsible to Section perform an independent LIV.C verification of the EAL classification. The STA IE time permits, THEN Operator requests STAIIA verification does not alleviate the verification of classification.

requirement of the SM to make a timely classification. Should the Examiner Note: Due to time spent SM fill the STA role, independent assessing andlor nature of JPM verification of the EAL administration, Operator may not classification will be delegated to request a verification.

another on-shift SRO.

CUE IE the Operator requests the STAliA to independently verify the EAL Classification, THEN INFORM the Operator the N/A STAIIA is not available.

Page 8 of 19

TQ-AA.-106-0303 ECG003 OPERATOR TRAINING PROGRAM NAME:

JOB PERFORMANCE MEASURE DATE: __________________

SYSTEM: Administrative Duties/Reporting Requirements TASK: Utilize The ECG To Determine The Emergency Classification And/Or Reportability Of An Event And/Or Plant Condition

(*Denotes a Critical Step)

  • COMMENTS STEP ELEMENT (#Denotes a Sequential Step) EVAL (Required for UNSAT NO. #

STANDARD StU evaluation)

ECG 6. IDENTIFY and IMPLEMENT the Section referenced Attachment under LlV.C Action Required. Refer to Section iv, HC Emergency Classification Description Table, which is a Operator identifies and implements guide for correct description ECG Attachment 4.

wording for entry on the ICMF for all EALs.

ECG I. EMERGENCY COORDINATOR Att. 4 (EC) LOG SHEET A. If a security event is in progress, THEN, IMPLEMENT Operator determines this step is not the prompt actions of NC.EP applicable.

EP.zZ-0102, EC Response, Attachment 10, prior to classification.

Page 9 of 19

TQ-AA-106-0303 ECG003 OPERATOR TRAINING PROGRAM NAME: __________________

JOB PERFORMANCE MEASURE DATE: __________________

SYSTEM: Administrative Duties/Reporting Requirements TASK: Utilize The ECG To Determine The Emergency Classification And/Or Reportability Of An Event And/Or Plant Condition

(*Denotes a Critical Step) COMMENTS STEP

  • ELEMENT (#Denotes a Sequential Step) EVAL (Required for UNSAT NO. #

STANDARD StU evaluation)

ECG B. DECLARE A GENERAL Operator declares a General

  • AtL 4 EMERGENCY AT HOPE Emergency, places the EAL # s 3.1.1.a; CREEK and 3.2.1.b or 3.2.2.b; and 3.3.2.b or EAL #(s) , , 3.3.2.d, time and date in the appropriate spots in attachment 4, and DECLARED AT hrs on initials the step as the EC.

time date Examiners Note: ENTER the declaration time that the operator entered on Att. 4. The difference between the START TIME and the "DECLARED AT" TIME is the first critical timej15 min.) Initialing the step is not critical.

ECG C. NOTIFICATIONS Operator calls the communicator using Att.4 the plant page.

1. CALL the communicators to the Control Room CUE After 2 minutes, report as the N/A communicators and give your name as CM1 and CM2.

Page 10 of 19

TQ-kA-106*0303 ECG003 OPERATOR TRAINING PROGRAM NAME:

JOB PERFORMANCE MEASURE DATE:

SYSTEM: Administrative Duties/Reporting Requirements TASK: Utilize The ECG To Determine The Emergency Classification And/Or Reportability Of An Event And/Or Plant Condition

(*Denotes a Critical Step) COMMENTS STEP

  • ELEMENT (#Denotes a Sequential Step) EVAL (Required for UNSAT NO. #

STANDARD stu evaluation)

ECG 2. ACTIVATE "ERO Emergency Operator activates the ERO per posted Att. 4 Callout" per posted instructions instructions titled Training Use titled: "Emergency Callout Emergency Callout Activation.

Activation" (EP96-003) Examiner Note: ENSURE the operator is using the Simulator Training Activation instructions.

Caution A Protective Action Operator reads CAUTION.

Recommendation (PAR) SHALL be made on the Initial Contact Message Form (ICMF).

- - - - - - - - - - - ~-- -------- -------

ECG 3. MAKE A PAR as follows: Operator Refers to APPENDIX 1,

  • Att. 4 determines that a GE Based 9 Points
a. REFER to Predetermined PAR Flowchart on Pg. 3 and PAR is appropriate DETERMINE the appropriate [EVACUATE ALL SECTORS 0-5 PAR. MILES].
b. LE a Radiologically Based PAR is IMMEDIATELY Examiner Note:

available, THEN COMPARE Shelter Sectors and Distance is left the two PARs and choose blank for a 9 point GE.

the most appropriate for inclusion on the ICMF.

Page 11 of 19

TQ-HA-106-0303 ECG003 OPERATOR TRAINING PROGRAM NAME:

JOB PERFORMANCE MEASURE DATE: __________________

SYSTEM: Administrative Duties/Reporting Requirements TASK: Utilize The ECG To Determine The Emergency Classification And/Or Reportability Of An Event AndlOr Plant Condition

(*Denotes a Critical Step) COMMENTS STEP

  • ELEMENT (#Denotes a Sequential Step) EVAL (Required for UNSAT NO. #

STANDARD SIU evaluation)

CUE If asked, a Radiologically Based N/A PAR is not available.

ECG 4. COMPLETE the INITIAL Operator Completes the ICMF.

  • Att. 4 CONTACT MESSAGE FORM Examiners Note: See the attached (ICMF) (last page of this ICMF for an example of what the form attachment). should look like when filled out properly.

Note that the exact words do not have to be in the "DESCRIPTION OF EVENT', but the description must convey the sense of the Initiating Condition for EALs 3.1.1.a; and 3.2.1.b or 3.2.2.b; and 3.3.2.b or 3.3.2.d. The operator may place the Examiner's name as the Communicator or tell the Examiner to place his/her name as the Communicator.

5. IF time allows, OBTAIN an accuracy peer check of the Operator requests a Peer Check of the completed ICMF. completed leMF.

Page 12 of 19

TQ-AA-106-0303 ECG003 OPERATOR TRAINING PROGRAM NAME: ------------------

JOB PERFORMANCE MEASURE DATE: ___________________

SYSTEM: Administrative Duties/Reporting Requirements TASK: Utilize The ECG To Determine The Emergency Classification And/Or Reportability Of An Event And/Or Plant Condition

(*Denotes a Critical Step)

  • COMMENTS STEP ELEMENT (#Denotes a Sequential Step) EVAL (Required for UNSAT NO. #

STANDARD StU evaluation)

CUE IF the Operator requests a Peer Check, THEN INFORM the Operator a Peer Check has been performed as N/A requested.

6. PROVIDE the ICMF to the
  • Primary Communicator (CM1) Operator provides the ICMF to CM1 and DIRECT the Communicator and directs implementation of Att.6.

to implement ECG Attachment 6.

CUE LOG the time the ICMF is provided to CM1.

Examiners Note: The difference LOG TIME: between the "DECLARED AT" TIME Role-playas CM1 and repeat back and this LOG TIME is the second the direction as given. critical time (13 min.)

Page 13 of 19

TQ-I'\#"\-106-0303 ECG003 OPERATOR TRAINING PROGRAM NAME: __________________

JOB PERFORMANCE MEASURE DATE: __________________

SYSTEM: Administrative Duties/Reporting Requirements TASK:

STEP NO.

ELEMENT

(*Denotes a Critical Step)

(#Denotes a Sequential Step)

II Utilize The ECG To Determine The Emergency Classification AndlOr Reportability Of An Event AndlOr Plant Condition EVAL COMMENTS (Required for UNSAT STANDARD # SIU evaluatio ECG 7. DIRECT the Secondary Operator directs CM2 to implement AU.

Att.4 8 for a GENERAL EMERGENCY.

Communicator (CM2) to implement ECG Attachment 8 for a GENERAL EMERGENCY.

CUE ROLE-PLAYas CM2 and REPEAT BACK the direction as given. N/A CUE WHEN operator informs you the task is complete, OR the JPM has been terminated for other reasons,

-'-'-..:.=.:...::. RECORD the STOP time.

N/A REPEAT BACK any message from the operator on the status of the JPM, and then state "This JPM is complete".

STOP TIME:

Page 14 of 19

TQ-AA-106-0303 JOB PERFORMANCE MEASURE OPERATOR TRAINING PROGRAM EVALUATOR FOLLOWUP QUESTION DOCUMENTATION NAME:

DATE:

JPM Number: ECG003 TASK: Utilize The ECG To Determine The Emergency Classification AndlOr Reportability Of An Event AndlOr Plant Condition TASK NUMBER: 2000500302/2000020505 QUESTION:

RESPONSE

RESULT: SAT UNSAT QUESTION:

RESPONSE

RESULT: SAT UNSAT Page1Sof19

JOB PERFORMANCE MEASURE ECG ATT4 Pg. 50f5 INITIAL CONTACT .MESSAGE FOR.'I

1. THIS IS (Not Required) , C01vllvfUNICATOR IN THE l:J CONTROL ROm..!

(NAlvlE) DTSC DEOF AT THE HOPE CREEK NUCLEAR GENERATING STATION.

ITa. ~ THIS IS NOTIFICATION OF A GENER4..L El\IERGENCY \VHICH WAS DECLARED AT Todays Time ON Todays Date (TL>vIE - 24 HOUR CLOCK) (DATE)

EAL 3.1.1.a , 3.2.1.b or 3.2.2.b , 3.3.2.b or 3.3.2.d DESCRIPTION OF EVEl';'T: Potential Loss of Fuel Clad Barrier.

Loss of Reactor Coolant System Barrier,and LOSSJJf Containment Barrier.

ITb. D Reason for PAR Upgrade: - - - - - -.. .: .-..-.-=-,.c~--..-.-.-..-~_:_~+__~-..- ..

ill.

of 1.20E+04 !lCi/sec Noble see NOTE

} for release definition IV. ~ . (From): 224 \\ThD SPEED: .........2'-.!.1__

Computer lSPDS) (DEGREES) (tvfPH)

Dist.- Miles oI \VE RECOM1I.:EEl'lTI EVACUATION AS FOLLOWS 0-5 D \v'E RECOM1I.'lEl'llJ SHELTERING AS FOLLOWS o \VE REC01\llv1END lliE USE OF KI IN ACCORDAJ.'fCE \\1TH PROCEDURES Performer's Initials EC Initials (Approval to Transmit ICl\IF)

HCGS Rev. 09 Page 16 of 19

TQ*AA*106*0303 JOB PERFORMANCE MEASURE INITIAL CONDITIONS:

1. With the plant operating at 100% power, Hope Creek experiences an earthquake which indicates a magnitude of> 0.1 g.
2. Control Room Annunciator C6-C4 is in.
3. ON Panel 10C673:
  • The SMA-3 Event Indicator is White.
  • The Strong Motion Accelerograph Tape Machines have advanced but are not currently running.
  • The AMBER alarm light on the Seismic Switch Power Supply Drawer is lit.
4. Numerous amber lights and 3 red lights are lit on the response spectrum analyzer.
5. A LOCA results. The Reactor is successfully scrammed, with RPV level dropping rapidly to -180"; then stabilizing between -150" and -180", being maintained using all available ECCS.
6. Orywell Pressure peaked at 44 psig, then dropped to < 2 psig over the next 90 seconds, and continues to slowly drop.
7. The current 33 ft. elevation wind direction is from 224 0 at 21 mph.
8. Plant Effluent activity is 1.59E+04 J,JCi/sec Noble Gas and 1.59E+01 J,JCi/sec 1-131.

INITIATING CUE:

Based on this information, classify this event and make the initial notifications.

This is a Time Critical Task, and has two Time Critical elements.

Time zero for this event is now.

Page 17 of 19

TQ-AA-106-0303 JOB PERFORMANCE MEASURE REVISION HISTORY JPM NUMBER: ECG003

~

1:),

Date Description Validation Required?

05

  • 1/14/12 Updated Reference procedure revision number. This change is Y editorial.

Converted JPM ECG003 to new JPM format. Since Critical JPM actions are now uniquely identified by the format, all statements identifying critical portion of action were redundant and deleted. This change is editorial.

Removed references to checking off/initialing steps in procedure. This is a generic work practice and adds unnecessary clutter to the Standard section. This change is editorial.

Modified conditions to change PAR to 9 point.

Modified MET data for wind speed and direction Modified ICMF release rate data to indicate a release is in progress, but at an ALERT level. Validated with 2 SROs on 1/3/12. Avg completion time was 13 minutes.

JOB PERFORMANCE MEASURE STATION: Hope Creek SYSTEM: Feedwater TASK: Respond To Rising Drywell Pressure TASK NUMBER: 4000510401

,"'PM NUM BER: 305H-JPM.AE004 REV #: 05 SAP BET: NOH05JPAE04E ALTERNATE PATH: [KJ APPLICABI LlTY:

EO D RO STA D SRO [ ] ]

DEVELOPED BY: Archie E. Faulkner DATE: 1/14/12 Instructor REVIEWED B y : a /'(K ?:- IStic DATE: d&z APPROVED BY:

~

Training Department DATE: I))t/I~

TQ-AA-106-0303 STATION: Hope Creek JPIVI NUIVIBER: AE004 REV: 05 SYSTEM: Feedwater TASK NUMBER: 4000510401 TASK: Respond To Rising Orywell Pressure ALTERNATE PATH: [KJ KIA NUMBER: _ _2_23_0_0_1_A_2._0_1__

IMPORTANCE FACTOR: 4.3 4.4 APPLICABILITY: RO SRO EOD RO[)) STAD SRO[))

EVALUATION SETTING/METHOD: Simulator/Perform

REFERENCES:

HC.OP-AB.CONT-0001 Rev 2 HC.OP-SO.AE-0001 Rev 66 TOOLS, EQUIPMENT AND PROCEDURES:

Keys for RCIC HV-F013, HPCI HV-8278, FW Cross-Tie HV-4144 ESTIMATED COMPLETION TIME: 12 Minutes TIME PERIOD IDENTIFIED FOR TIME CRITICAL STEPS: N/A Minutes JPM PERFORMED BY: GRADE: D SAT D UNSAT ACTUAL COMPLETION TIME: Minutes ACTUAL TIME CRITICAL COMPLETION TIME: N/A Minutes REASON, IF JPM UNSATISFACTORY:

EVALUATOR'S SIGNATURE: DATE:

Page 2 of 18

TQ-AA-106-0303 NAME:

DATE:

SYSTEM: Feedwater TASK: Respond To Rising Orywell Pressure TASK NUMBER: 4000510401 INITIAL CONDITIONS:

1. The plant was at 100% power when a LOCA with indications of major fuel failure occurred.
2. The plant is depressurized.
3. The HPCI and RCIC jockey purnps are available.
4. RPV water level is being maintained with Core Spray pumps by another operator.
5. HC.OP-AB.CONT-0001 Condition D is being implemented.

INITIATING CUE:

You are the Plant Operator.

Place a water seal on both the 'A' AND 'B' feedwater headers lAW HC.OP-SO.AE-0001.

Page 3 of 18

TQ-J-\A-106-0303 JPM: AE004 OPERATOR TRAINING PROGRAM NAME:

DATE: ___________________

Rev: 05 JOB PERFORMANCE MEASURE SYSTEM: Feedwater TASK: Respond To Rising Drywell Pressure

(*Denotes a Critical Step)

  • COMMENTS STEP ELEMENT (#Denotes a Sequential Step) EVAL (Required for UNSAT NO. #

STANDARD S/U evaluati CUE PROVIDE the operator the initiating cue. Operator repeats back initiating cue.

CUE ENTER START TIME AFTER Operator repeats back the Initiating Cue: I N/A START TIME:

Operator obtains procedure Operator obtains the correct HC.OP-SO.AE-0001.

procedure.

Operator reviews precautions and Operator reviews precautions and limitations. limitations.

CUE IE excessive time is taken reviewing precautions and limitations, N/A THEN INFORM operator that all are satisfied.

Operator determines beginning step Operator determines correct beginning of the procedure. step to be 5.17.1.

Page 4 of 18

TQ-kA-106-0303 JPM: AE004 OPERATOR TRAINING PROGRAM NAME: __________________

Rev: 05 JOB PERFORMANCE MEASURE DATE: __________________

SYSTEM: Feedwater TASK: Respond To Rising Drywell Pressure

(*Denotes a Critical Step) COMMENTS STEP

  • ELEMENT (#Denotes a Sequential Step) EVAL (Required for UNSAT NO. #

STANDARD S/U evaluatio NOTE The HPCI AND the RCIC Jockey Pump Loops are used to maintain a water seal in the Feedwater lines N/A between the inboard AND outboard containment isolation valves following a LOCA.

5.17.1 ENSURE all prerequisites of Section Operator ensures that all prerequisites 2.17 are satisfied. have been satisfied.

Examiner Note: The Initial Conditions state that the HPCI and RCIC jockey pumps are available.

CUE IE excessive time is taken reviewing prerequisites, N/A THEN INFORM operator that all are satisfied.

5.17.2 ENSURE the following valves are closed:

  • 8J-HV-8278, HPCI DSCH THRU Operator observes the HPCI DSCH FW ISLN MOV THRU FW ISLN MOV HV8278 OPEN light is illuminated and CLSD light is extinguished.

Page 5 of 18

TQ-kA-106-0303 JPM: AE004 OPERATOR TRAINING PROGRAM NAME:

Rev: 05 JOB PERFORMANCE MEASURE DATE: -------------------

SYSTEM: Feedwater TASK: Respond To Rising Drywell Pressure

(*Denotes a Critical Step) COMMENTS STEP

  • ELEMENT (#Denotes a Sequential Step) EVAL (Required for UNSAT NO. #

STANDARD S/U evaluation Operator presses the HV8278 CLOSE

  • Y N Flagging pushbutton.

Examiner note: 30 seconds after pressing the HV8278 CLOSE pb, the AP228 HPCI Jockey Pump will trip.

Operator observes the HV8278 CLSD light illuminates and the OPEN light extinguishes.

Operator recognizes HPCI Jockey Pump trip by OHAs and OVLD/PWR FAIL indication.

Operator informs CRS of HPCI Jockey pump trip.

CUE INFORM the Operator the trip of the HPCI Jockey pump will be investigated by another operator.

N/A DIRECT the Operator to place a water seal on the 'A' & 'B' Feedwater lines using the RCIC jockey pump.

Page 6 of 18

TQ-MA-106-0303 JPM: AE004 OPERATOR TRAINING PROGRAM NAME: __________________

Rev: 05 JOB PERFORMANCE MEASURE DATE: __________________

SYSTEM: Feedwater TASK: Respond To Rising Drywell Pressure

(*Denotes a Critical Step)

  • COMMENTS STEP ELEMENT (#Denotes a Sequential Step) EVAL (Required for UNSAT NO. #

STANDARD S/U eval Operator determines step 5.17.3 of Operator continues to complete step the procedure is now applicable. 5.17.2.

  • BD-HV-F013, RCIC PUMP DSCH Operator observes the F013 CLSD light TOFW illuminated and the OPEN light extinguished .
  • HV-F032A, FW INLET CHK VLV Operator observes the FW INLET CHK VL V HVF032A OPEN light is illuminated and the CLOSE light is extinguished.

Operator presses the HVF032A CLOSE

  • Y N Flagging pushbutton.

Operator observes the HVF032A CLOSE light illuminates and the OPEN light extinguishes.

I

  • HV-F032B, FW INLET CHK VLV Operator observes the FW INLET CHK VL V HV-F032B OPEN light is illuminated and CLOSE light is extinguished.

Page 7 of 18

TQ-.kA-106-0303 JPM: AE004 OPERATOR TRAINING PROGRAM NAME:

Rev: 05 JOB PERFORMANCE MEASURE DATE: __________________

SYSTEM: Feedwater TASK: Respond To Rising Drywell Pressure

(*Denotes a Critical Step) COMMENTS STEP

  • ELEMENT (#Denotes a Sequential Step) EVAL (Required for UNSAT NO. #

STANDARD S/U evaluatio Operator presses the HVF032B CLOSE

  • Y N Flagging pushbutton.

Operator observes the HVF032B CLOSE light illuminates and the OPEN light extinguishes.

  • HV-4144, FW LINE CROSS-TIE ISL Operator observes the HV-4144, FW VLV LINE CROSS-TIE ISL VLV CLOSE light is illuminated and OPEN light is extinguished.

IF AP228, HPCI JOCKEY PUMP 5.17.3 be used to seal the B Feedwater Line, OR BP228, RCIC JOCKEY PUMP will Based on current conditions, Operator be used to seal the A Feedwater Line, determines that this step now applies.

THEN PERFORM the following:

Page 8 of 18

TQ-I-'\A-106-0303 JPM: AE004 OPERATOR TRAINING PROGRAM NAME:

DATE: ___________________

Rev: 05 JOB PERFORMANCE MEASURE SYSTEM: Feedwater TASK: Respond To Rising Drywell Pressure

(*Denotes a Critical Step) COMMENTS STEP

  • ELEMENT (#Denotes a Sequential Step) EVAL (Required for UNSAT NO. #

STANDARD S/U evaluation) 5.17.3. Operator inserts key and places the

  • PLACE the keylock switch for HV Keylock switch for the HV-4144, FW A. 4144, FW LINE CROSS-TIE ISLN CROSS TIE LINE ISLN, in the ON #

VLV, in the ON position to arm the position control switch. Examiner Note: OHA 83-02 FEEDWATER LINE FILLALT MODE will alarm.

5.17.3. OPEN HV-4144, FW LINE CROSS Operator observes the HV-4144, FW LINE CROSS-TIE ISL VLV CLOSE light 8 TIE ISL VLV.

is illuminated and OPEN light is extinguished.

Operator presses the FW CROSS TIE

  • Y N Flagging LINE ISLN HV-4144 OPEN pushbutton.

Operator observes the OPEN light illuminates and the CLOSED light extinguishes.

-- - - ......... -.. -~- ... -.-~--

Page 9 of 18

TQ-I-\A-106-0303 JPM: AE004 OPERATOR TRAINING PROGRAM NAME:

Rev: 05 JOB PERFORMANCE MEASURE DATE:

SYSTEM: Feedwater TASK: Respond To Rising Drywell Pressure

(*Denotes a Critical Step) COMMENTS STEP

  • ELEMENT (#Denotes a Sequential Step) EVAL (Required for UNSAT NO. #

STANDARD S/U evaluati IF AP228, HPCI JOCKEY PUMP is to 5.17.4.

be used to seal one or both Based on current conditions, Operator Feedwater lines, determines that this step does not apply I and continues at step 5.17.5.

THEN PERFORM the following:

5.17.5 I IF the BP228, RCIC JOCKEY PUMP is to be used to seal one or both Feedwater lines, THEN PERFORM the following:

5.17.5. PLACE the NORM/BYPASS Keylock Operator inserts key and places the

  • Y N Flagging A Switch for BO-HV-F013, RCIC PUMP Keylock switch for the RCIC HVF013 the BYPASS position. #

OSCH TO FW, in the BYPASS position to arm the Control Switch. Examiner Note: OHA B3-02 FEEOWATER LINE FILL ALT MODE will alarm.

Page 10 of 18

TQ-kA-106-0303 JPM: AE004 OPERATOR TRAINING PROGRAM NAME:

Rev: 05 JOB PERFORMANCE MEASURE DATE: __________________

SYSTEM: Feedwater TASK: Respond To Rising Drywell Pressure

(*Denotes a Critical Step) COMMENTS STEP

  • ELEMENT (#Denotes a Sequential Step) EVAL (Required for UNSAT NO. STANDARD # S/U evaluation) 5.17.5. OPEN BO-HV-F013, RCIC PUMP Operator observes the RCIC PUMP B OSCH TO FW. OSCH TO FW HVF013 CLSO light is illuminated and OPEN light is extinguished.

Operator presses the HVF013 OPEN

  • Y N Flagging pushbutton.

~~~~~ ---- ------ ------ ..

Operator observes the OPEN light illuminates and the CLSO light extinguishes.

5.17.5. OPEN BO- HV-F012, RCIC PUMP Operator observes the HVF012 OPEN C DSCH VLV. light is illuminated and CLSO light is extinguished.

-~~~ ~---- ------ i 5.17.5. WHEN required, THEN START Operator observes the RCIC JOCKEY 0 BP228, RCIC JOCKEY PUMP. PUMP red RUNNING light is illuminated and green STOPPED light is extinguished.

Page 11 of 18

TQ-,...1'\-106*0303 JPM: AE004 OPERATOR TRAINING PROGRAM NAME:

Rev: 05 JOB PERFORMANCE MEASURE DATE: __________________

SYSTEM: Feedwater TASK: Respond To Rising Drywell Pressure

(*Denotes a Critical Step) COMMENTS STEP

  • ELEMENT (#Denotes a Sequential Step) EVAL (Required for UNSAT NO. #

STANDARD Stu evaluation CUE WHEN operator informs you the task is complete, OR the JPM has been terminated other reasons, THEN RECORD the STOP TIME.

N/A REPEAT BACK any message from the operator on the status of the JPM, and then state "This JPM is complete",

STOP TIME:

Page 12 of 18

TQ-AA-106-0303 JOB PERFORMANCE MEASURE OPERATOR TRAINING PROGRAM EVALUATOR FOLLOWUP QUESTION DOCUMENTATION NAME:

DATE:

JPM Number: AE004 TASK: Respond To Rising Orywell Pressure TASK NUMBER: 4000510401 QUESTION:

RESPONSE

RESULT: SAT UNSAT QUESTION:

RESPONSE

RESULT: SAT UNSAT Page 13 of 18

TQ-AA-106*0303 JOB PERFORMANCE MEASURE INITIAL CONDITIONS:

1. The plant was at 100% power when a LOCA with indications of major fuel failure occurred.
2. The plant is depressurized.
3. The HPCI and RCIC jockey pumps are available.
4. RPV water level is being maintained with Core Spray pumps by another operator.
5. HC.OP-AB.CONT-0001 Condition 0 is being implemented.

INITIATING CUE:

You are the Plant Operator.

Place a water seal on both the 'A' AND '8' feedwater headers lAW HC.OP-SO.AE-0001.

Page 14 of 18

TQ-AA-106-0303 JOB PERFORMANCE MEASURE SIMULATOR SETUP INSTRUCTIONS (OPTIONAL)

INITIALIZE the simulator to 100% power, MOL.

INSERT Malfunction CR01 at 100% using ET-1.

WHEN MSL Radiation levels reach 3xNFPB, THEN INSERT Malfunction MS01 at 100% using ET-2.

INSERT Malfunction RM9635 to 5211 and RM9636 to 5185 to raise DAPA RMS readings using ET-3.

IMPLEMENT EOP-101 and EOP-102.

ENSURE MSIVs are closed.

TRIP all PCPs and SCPs.

~---

ESTABLISH RPV water level control with Core Spray.

ENSURE associated Schedule file open and running .

.. ~--

ENSURE associated Events file open.

ENSURE a copy of HC.OP-SO.AE-0001 is available.

--~-

ENSURE Mode Switch key is removed.

COMPLETE "Simulator Ready-for-Training/Examination Checklist".

Event code: . ZDHP278C >=1.0 II HPCI 8278 CLOSE pb pressed.

Description:

Trips HPCI Jockey Pump Event code: .

Description:

Event code:

Description:

Page 15 of 18

TQ-AA-106-0303 JOB PERFORMANCE MEASURE SIMULATOR SETUP INSTRUCTIONS (OPTIONAL)

  • Initial @Time Event Action Description Insert malfunction CR01 to 100.00000 None None Fuel cladding leak on event 1 Insert malfunction MS01 to 100.00000 None None Steam line break in drywell on event 2 Insert malfunction RM9635 to 9RX635, DAPA 'A' - Drywell Atmos Post-None None 5211.00000 on event 3 Accident Chan 'A' Insert malfunction RM9636 to 9RX636, DAPA 'B' - Drywell Atmps Post-None None 5185.00000 on event 3 Accident Chan 'B' Insert malfunction AN-B1 E4 after 30 CRYWOLF ANN B1 E4 HPCI JOCKEY None None on event 4 PUMP 1AP228 TROUBLE Insert malfunction AN-B1 F3 after 30 CRYWOLF ANN B1 F3 HPCI None None on event 4 COMPONENT O/PF Initial !@Time Event Action Description None None Insert remote IA10 to RUN IA10 Temporary station air compressor Insert remote ET066 to FAIL_OPEN None None ET066 HV-8278 HPCI to FW on event 2 Remove remote ET066 to FAIL_OPEN None None ET066 HV-8278 HPCI to FW on event 4 None Insert override 9S139_A_DI after 30 to HPCI JOCKEY START/STOP (DI)

Off on event 4 Insert override 9S138_A_LO after 30 None AP228 OVLD/PWR FAIL (LO) i to On on event 4 None  ! Insert override 9DS111_B_LO after 30 AP228 STOPPED (LO) to Off on event 4

  • Insert override 9M6_R_AO after 30 None PI-4891 R (AO)

. from 95.00000 to 0 in 5 on event 4 Page16of18

TQ*AA*106*0303 JOB PERFORMANCE MEASURE REVISION HISTORY JPM NUMBER: AE004 Rev # Date I Description Validation Required? I 01 12/3107 Revision 53 of HC.OP-SO.AE-0001 renumbered former N Feedwater Line Fill section from 5.16 to 5.17 with NO change in action steps. JPM AE004 updated to reflect this re-numbering of steps. No change in actions, validation not required.

Converted JPM AE004 to new JPM format. Since Critical JPM actions are now uniquely identified by the format, all statements identifying critical portion of action were redundant and deleted.

This change is editorial, validation not required.

Added procedure Note text to Element section. This is for examiner reference only and has no associated student actions.

This change is editorial, validation not required.

02 9/29/09 Complete revision due to procedure section revision. Validated Y with 2 operators from 'A' Shift. Average completion time was 12 I minutes.

03 8/12/10 Updated Reference procedure revision numbers only. No N I changes to operator actions. No validation required.

04 8/2111 Modified Malfunction, Remote, Override, and Event list sections N

. for TREX event syntax. Added Override to HV-8278 to maintain

! valve operation as before DCP. Updated Reference procedure revision numbers only. No changes to operator actions. No validation required.

05 1/14/12 Updated Reference procedure revision numbers only. No N changes to operator actions. No validation required.

JOB PERFORMANCE MEASURE STATION: Hope Creek SYSTEM: Residual Heat Removal TASK: Transfer Shutdown Cooling to the Standby Shutdown Cooling Loop TASK NUMBER: 2050120101 JPM NUMBER: 305H-JPM .BC015 REV #: 03 SAP BET: NOH05JPBC15E ALTERNATE PATH: 0 APPLICABILITY:

EO RO [KJ STA SRO I X I DEVELOPED BY: Archie E. Faulkner DATE: 9/13/11 Instructor REVIEWED BY:

~

Operations Representative DATE: 7~//// ,

APPROVED BY: O((Ju DATE: Q/2 o/([

Training Department

TQ-AA-106-0303 STATION: Hope Creek JPM NUMBER: BC015 REV: 03 SYSTEM: Residual Heat Removal TASK NUMBER: 2050120101 TASK: Transfer Shutdown Cooling to the Standby Shutdown Cooling Loop ALTERNATE PATH: W KiA NUMBER: 205000 A4.03 IMPORTANCE FACTOR: 3.6 3.5 APPLICABILITY: RO SRO EO D RO [KJ STA D SRO [KJ EVALUATION SETTING/METHOD: Simulator/Perform

REFERENCES:

HC.OP-SO.BC-0002 Rev. 27 TOOLS, EQUIPMENT AND PROCEDURES: None.

ESTIMATED COMPLETION TIME: 33 Minutes TIME PERIOD IDENTIFIED FOR TIME CRITICAL STEPS:

-- N/A

- - Minutes JPM PERFORMED BY: GRADE: D SAT D UNSAT ACTUAL COMPLETION TIME: Minutes ACTUAL TIME CRITICAL COMPLETION TIME: N/A Minutes REASON, IF UNSATISFACTORY:

EVALUATOR'S SIGNATURE: DATE:

Page 2 of22

TQ-AA-106-0303 NAME:

DATE:

SYSTEM: Residual Heat Removal TASK: Transfer Shutdown Cooling to the Standby Shutdown Cooling Loop TASK NUMBER: 2050120101 INITIAL CONDITIONS:

1. The plant is in OPCON 4.
2. The reactor has been shutdown for 200 hours0.00231 days <br />0.0556 hours <br />3.306878e-4 weeks <br />7.61e-5 months <br />.
3. '8' RHR pump has been in shutdown cooling at 10,000 gpm for several hours.
4. RCS temperature is 100 degF.
6. A SACS and SSW loops are aligned to support the evolution.
6. BC-HV-F007 A and BC-HV-F027A have been tagged closed to support the evolution.
7. Flush of A RHR Loop is not required.
8. Field operators have been briefed and are standing by on location.

INITIATING CUE:

You are an extra NCO.

Transfer RHR Shutdown Cooling to the A RHR loop.

The required shutdown cooling flow for the 'A' RHR pump is between 9500 -10,000 gpm.

Page 3 of 22

TQ-.kA-106-0303 JPM: BC015 OPERATOR TRAINING PROGRAM NAME:

Rev: 03 JOB PERFORMANCE MEASURE DATE:

SYSTEM: Residual Heat Removal TASK: Transfer Shutdown Cooling to the Standby Shutdown Cooling Loop

(*Denotes a Critical Step) COMMENTS STEP

  • ELEMENT (#Denotes a Sequential Step) EVAL (Required for UNSAT NO. #

STANDARD StU evaluatio CUE PROVIDE the operator the initiating cue. Operator repeats back initiating cue.

CUE ENTER START TIME AFTER OPERATOR REPEATS BACK INITIATING CUE:

START TIME:

Operator obtains procedure HC.OP-SO.BC-0002 Operator obtains the correct procedure.

Operator reviews precautions and Operator reviews precautions and limitations. limitations.

CUE IE excessive time is taken reviewing precautions and limitations, THEN INFORM operator that all are N/A satisfied.

Operator determines beginning step Operator determines correct beginning of the procedure. step to be 5.3.1.

Page 4 of 22

TQ-kA-106-0303 JPM: BC015 OPERATOR TRAINING PROGRAM NAME:

Rev: 03 JOB PERFORMANCE MEASURE DATE: ____________________

SYSTEM: Residual Heat Removal TASK: Transfer Shutdown Cooling to the Standby Shutdown Cooling Loop

(*Denotes a Critical Step) COMMENTS STEP

  • ELEMENT (#Denotes a Sequential Step) EVAL (Required for UNSAT NO. #

STANDARD S/U evaluation) 5.3.1 ENSURE all Prerequisites have been Operator reviews prerequisites.

satisfied lAW Section 2.3.

NOTE Operator reads NOTE.

BC-HV-F027A(B) RHR LOOP A(8)

SUPP POOL SPRAY HDR ISLN MOV will drain the Reactor Vessel to the Suppression Pool IF opened while the associated RHR pump is in shutdown cooling.

Page 5 of 22

TQ-.I-'\A-106-0303 JPM: BC015 OPERATOR TRAINING PROGRAM NAME:

Rev: 03 JOB PERFORMANCE MEASURE DATE: -------------------

SYSTEM: Residual Heat Removal TASK: Transfer Shutdown Cooling to the Standby Shutdown Cooling Loop STEP (*Denotes a Critical Step) COMMENTS ELEMENT (#Denotes a Sequential Step) EVAL (Required for UNSAT NO. #

STANDARD S/U evaluation)

CAUTION Operator reads CAUTION.

While in shutdown cooling, the following valves shall be closed to prevent uncontrolled drainage from the Reactor Vessel: [CD-389B, CD 6080, CO-157E, CO-567E]

SUPP POOL SUCT MOV

TEST RET MOV

TEST RET MOV

MIN FLOW MOV

I SUPP POOL SPRAY HOR ISLN IF the Reactor is in Mode 4 or Refuel or if a mode change is not desired, the delay in starting the second RHR Loop after having secured the first Loop should not approach the "Time to Boil" value.

[PR 971028283]

I --- -----~ - ~

Page 6 of 22

TQ-hM.-106-0303 JPM: BC015 OPERATOR TRAINING PROGRAM NAME:

Rev: 03 JOB PERFORMANCE MEASURE DATE: ___________________

SYSTEM: Residual Heat Removal TASK: Transfer Shutdown Cooling to the Standby Shutdown Cooling Loop

(*Denotes a Critical Step) COMMENTS STEP

  • ELEMENT (#Denotes a Sequential Step) EVAL. (Required for UNSAT NO. #

STANDARD S/U evaluatio 5.3.2 PERFORM the following to prepare loop to be placed in Shutdown Cooling:

5.3.2. IF a flush on the loop to be placed Operator determines step 5.3.2.A. does A Shutdown Cooling is required, THEN not apply.

REFER TO Steps 5.2.5 through 5.2.14.

ENSURE the following Valves are B CLOSED:

8C-HV-F003A(8) RHR HX A(8) Operator observes the 8C-HV-F003A OUTLETVLV RHR HX A OUTLET VL V CLSD light illuminated and OPEN is extinguished.

BC-HV-F004A(B) A(B) RHR PMP Operator observes the BC-HV-F004A A SUPP POOL SUCT MOV RHR PMP SUPP POOL SUCT MOV CLSD light illuminated and OPEN is extinguished.

Page 7 of 22

TQ-MA-106-0303 JPM: BC015 OPERATOR TRAINING PROGRAM NAME:

Rev: 03 JOB PERFORMANCE MEASURE DATE: ___________________

SYSTEM: Residual Heat Removal TASK: Transfer Shutdown Cooling to the Standby Shutdown Cooling Loop

(*Denotes a Critical Step) COMMENTS STEP

  • ELEMENT (#Denotes a Sequential Step) EVAL (Required for UNSAT NO, #

STANDARD S/U evaluation) 8C-HV-F007A(8) RHR PUMP A(B) Operator observes the BC-HV-F007A is MIN FLOW MOV TAGGED CLOSED and breaker 52 212041 OPEN AND INITIAL Attachment 1 .

BC-HV-F024A(B) RHR LOOP A(B) Operator observes the BC-HV-F024A TEST RET MOV RHR LOOP A TEST RET MOV CLSD light illuminated and OPEN is extinguished.

BC-HV-F027A(B) RHR LOOP A(B) Operator observes the BC-HV-F027A is SUPP POOL SPRAY HDR ISLN MOV TAGGED CLOSED and breaker 52 212081 OPEN AND INITIAL Attachment 1.

NOTE Operator reads NOTE.

This section may be continued once the valve is re-positioned and its breaker opened (step completion signoff after safety tagging completed).

Page 8 of 22

TQ-nA-106-0303 JPM: BC015 OPERATOR TRAINING PROGRAM NAME: --~~~~~

Rev: 03 JOB PERFORMANCE MEASURE DATE: -------------------

SYSTEM: Residual Heat Removal TASK: Transfer Shutdown Cooling to the Standby Shutdown Cooling Loop

(*Denotes a Critical Step)

  • COMMENTS STEP ELEMENT (#Denotes a Sequential Step) EVAL (Required for UNSAT NO. #

STANDARD StU evaluation) 5.3.2. VERIFY BC-HV-F007A(B) is Operator observes the BC-HV-F007A is C CLOSED THEN TAG breaker TAGGED CLOSED and breaker 52 212041 (52-222041) OPEN AND 212041 OPEN AND INITIAL INITIAL Attachment 1. Attachment 1.

NOTE Operator reads NOTE.

1-BC-V315 (V314) SUP POOL SPRY HDR MAN ISLN VLV may be tagged CLOSED instead of tagging the associated breaker for the BC-HV F027A(B) (if required to support outage activities), although BC-HV F027A(B) must still be closed.

This section may be continued once the valve is re-positioned and its breaker opened (step completion signoff after safety tagging completed).

5.3.2. VERIFY BC-HV-F027A(B) is Operator observes the BC-HV-F027A is D CLOSED AND TAG breaker 52 TAGGED CLOSED and breaker 52 212083 (52-222083) OPEN AND 212081 OPEN AND INITIAL INITIAL Attachment 1. Attachment 1.

Page 9 of 22

TQ-.n.A-106-0303 JPM: BC015 OPERATOR TRAINING PROGRAM NAME: ------------------~

Rev: 03 JOB PERFORMANCE MEASURE DATE: -------------------

SYSTEM: Residual Heat Removal TASK: Transfer Shutdown Cooling to the Standby Shutdown Cooling Loop

(*Denotes a Critical Step)

  • COMMENTS STEP ELEMENT (#Denotes a Sequential Step) EVAL (Required for UNSAT NO.

STANDARD # stu evaluation) 5.3.3. OPEN BC-HV-F006A(B) RHR PMP Operator presses BC-HV-F006A RHR

  • A(B) SUCT FROM RECIRC for the PMP A SUCT FROM RECIRC OPEN RH R Loop to be placed in SID pb.

Cooling.

Operator observes the BC-HV-FOO6A RHR PMP A SUCT FROM RECIRC OPEN light illuminated and CLSD extinguishes.

NOTE Operator reads NOTE.

RHR Loop B OR RHR Loop A prewarming is required IF the differential temperature between the Reactor Vessel water AND the RHR Loop to be utilized is greater than 100°F.

Page 10 of 22

TQ-nA-106-0303 JPM: BC015 OPERATOR TRAINING PROGRAM NAME:

Rev: 03 JOB PERFORMANCE M DATE: ____________________

SYSTEM: Residual Heat Removal TASK: Transfer Shutdown Cooling to the Standby Shutdown Cooling Loop

(*Denotes a Critical Step)

  • COMMENTS STEP ELEMENT (#Denotes a Sequential Step) EVAL (Required for UNSAT NO. #

STANDARD StU evaluation 5.3.4. IF RHR to Operator determines step 5.3.4 be placed in SID Cooling is required not apply.

THEN, PERFORM Steps 5.2.26 OR 5.2.27 of this procedure to equalize temperatures; OTHERWISE PROCEED.

5.3.5. SECURE the inservice Shutdown Cooling Loop as follows:

5.3.5. ENSURE 1-BC-V262 (1-BC-V212), Operator contacts Equipment Operator A ECCS Jockey Pmp D(C) DISCH to and directs opening 1-8C-V262.

RHR Loop 8(A) is LOCKED OPEN (local), AND INITIAL Attachment 1.

The valve is in the position CUE requested.

NOTE Operator reads NOTE.

5.3.5.C succession.

Page 11 of 22

TQ~~A-1 06-0303 JPM: BC015 OPERATOR TRAINING PROGRAM NAME:

Rev: 03 JOB PERFORMANCE MEASURE DATE:

SYSTEM: Residual Heat Removal TASK: Transfer Shutdown Cooling to the Standby Shutdown Cooling Loop

(*Denotes a Critical Step) COMMENTS STEP

  • ELEMENT (#Denotes a Sequential Step) EVAL (Required for UNSAT NO. #

STANDARD S/U evaluation) i 5.3.5. CLOSE BC-HV-F015B(A) RHR LOOP Operator presses and holds the BC

  • B B(A) RET TO RECIRC AND INITIAL HV-F015B RHR LOOP B RET TO Attachment 1 . RECIRC CLSD pb.

5.3.5. WHEN BC-HV-F015B(A) RHR LOOP Operator observes the BC-HV-F015B C B(A) RET TO RECIRC is fully closed, RHR LOOP B RET TO RECIRC CLSD THEN, IMMEDIATELY STOP light illuminated and OPEN is B(A)P202 RHR PUMP. extinguished.

1---------- -

Operator presses BP202 RHR PUMP

  • STOP pb.

L ______

Page 12 of 22

TQ-kA-106-0303 JPM: BC015 OPERATOR TRAINING PROGRAM NAME:

Rev: 03 JOB PERFORMANCE MEASURE DATE: -------------------

SYSTEM: Residual Heat Removal TASK: Transfer Shutdown Cooling to the Standby Shutdown Cooling Loop

(*Denotes a Critical Step) COMMENTS STEP

  • ELEMENT (#Denotes a Sequential Step) EVAL (Required for UNSAT NO. #

STANDARD stu evaluation) 5.3.5. CLOSE 8C-HV-F0068(A) RHR PMP Operator presses the 8C-HV-F0068 0 RHR PMP 8(A) SUCT FROM RECIRC 8(A) SUCT FROM RECIRC AND CLSD pb.

INITIAL Attachment 1.

Operator observes the 8C-HV-F0068 RHR PMP 8(A) SUCT FROM RECIRC CLSD light illuminated and OPEN is extinguished.

- f--~~~ ~~~~~~~-

5.3.6. ENSURE SACS is in service to the Operator observes the HV-2512A RHR Heat Exchanger for the RHR OPEN light illuminated and CLSD light loop to be placed in service lAW extinguished.

HC.OP-SO.EG-0001 (0).

~~~ ~

Operator observes RHR A HX SACS Flow approximately 9000 gpm.

... ~~~

I Page 13 of 22

TQ-M.A-106-0303 JPM: BC015 OPERATOR TRAINING PROGRAM NAME:

Rev: 03 JOB PERFORMANCE MEASURE DATE: ____________________

SYSTEM: Residual Heat Removal TASK: Transfer Shutdown Cooling to the Standby Shutdown Cooling Loop

(*Denotes a Critical Step) COMMENTS STEP

  • ELEMENT (#Denotes a Sequential Step) EVAL (Required for UNSAT NO. #

STANDARD Stu evaluation)

CAUTION Operator reads CAUTION.

Manual OR automatic opening of BC-HV-F007A(B) RHR PMP A(S)

MIN FLOW MOV will drain Reactor Vessel to Suppression Pool.

If BC-HV-F01S A(B) RHR LOOP A(B) RET TO RECIRC does NOT open immediately to establish flow, then the RHR pump should be secured.

BC-HV-F027A(B) RHR LOOP A(S)

SUPP POOL SPRAY HDR ISLN MOV will drain the Reactor Vessel to the Suppression Pool if opened while the associated RHR pump is in shutdown cooling.

Page 14 of 22

TQ-nA-106-0303 JPM: BC015 OPERATOR TRAINING PROGRAM NAME:

Rev: 03 JOB PERFORMANCE MEASURE DATE: ____________________

SYSTEM: Residual Heat Removal TASK: Transfer Shutdown Cooling to the Standby Shutdown Cooling Loop

(*Denotes a Critical Step) COMMENTS STEP

  • ELEMENT (#Denotes a Sequential Step) EVAL (Required for UNSAT NO. #

STANDARD StU evaluation) 5.3.7. START RHR PUMP A(8)P202 AND Operator presses the AP202 START

  • IMMEDIATELY THROTTLE OPEN pb.

BC-HV-F015A(8) RHR LOOP A(B)

RET TO RECIRC LOOP UNTIL FI R603A(B) OR FR-R60SA(8) - CRIDS A3137(A3139), LOOP A(B) FLOW indicates:::::: 3000 gpm.


---- ~- ~~~~~ ~ ~ ~ ~ ------~ ~

Operator observes the AP202 START light illuminated and STOP light extinguishes.


~--- --------- ----- ----------~

Examiner Note: F015A will fail Operator immediately presses and closed and not establish flow. holds the BC-HV-F015A RHR LOOP A Operator should secure the pump. RET TO RECIRC LOOP OPEN pb.

~---~~ ~~--~ ----- --------- ~~~~ ~ ~ ~ ~ ~ ------~ ~

Operator observes the CLSD light remains illuminated.

Operator observes the FI-R603A OR FR-R60SA - CRIDS A3137, LOOP A FLOW indicates 0 gpm.

Page 15 of 22

TQ-M.A-106-0303 JPM: BC015 OPERATOR TRAINING PROGRAM NAME:

Rev: 03 JOB PERFORMANCE MEASURE DATE: ___________________

SYSTEM: Residual Heat Removal TASK: Transfer Shutdown Cooling to the Standby Shutdown Cooling Loop

(*Denotes a Critical Step) COMMENTS STEP

  • ELEMENT (#Denotes a Sequential Step) EVAL (Required for UNSAT NO.

STANDARD # stu evaluation Operator determines CAUTION applies.

Operator presses AP202 STOP pb.

  • CUE WHEN operator informs you the task is complete, OR the JPM has been terminated for other reasons, THEN RECORD the STOP time.

REPEAT BACK any message from the operator on the status of the JPM, and then state "This JPM is complete".

STOP TIME:

Page 16 of 22

TQ-AA-106-0303 JOB PERFORMANCE MEASURE OPERATOR TRAINING PROGRAM EVALUATOR FOLLOWUP QUESTION DOCUMENTATION NAME:

DATE:

JPM Number: BC015 TASK: Transfer Shutdown Cooling to the Standby Shutdown Cooling Loop TASK NUMBER: 2050120101 QUESTION:

RESPONSE

RESULT: SAT UNSAT QUESTION:

RESPONSE

RESULT: SAT UNSAT Page 17 of 22

TQ-AA-106-0303 JOB PERFORMANCE MEASURE INITIAL CONDITIONS:

1. The plant is in OPCON 4.
2. The reactor has been shutdown for 200 hours0.00231 days <br />0.0556 hours <br />3.306878e-4 weeks <br />7.61e-5 months <br />.
3. 'B' RHR pump has been in shutdown cooling at 10,000 gpm for several hours.
4. RCS temperature is 100 degF.
5. A SACS and SSW loops are aligned to support the evolution.
6. BC-HV-F007A and BC-HV-F027A have been tagged closed to support the evolution.
7. Flush of A RHR Loop is not required.
8. Field operators have been briefed and are standing by on location.

INITIATING CUE:

You are an extra NCO.

Transfer RHR Shutdown Cooling to the A RHR loop.

The required shutdown cooling flow for the 'A' RHR pump is between 9500 -10,000 gpm.

Page 18 of 22

TQ*AA*106*0303 JOB PERFORMANCE MEASURE SIMULATOR SETUP INSTRUCTIONS (OPTIONAL)

INITIALIZE the simulator to an OPCON 4 IC with 'B' RHR in Shutdown Cooling at 10,000 gpm and an RCS temp of =100 degF.

OPEN BC-HV-F007B breaker OPEN BC-HV-F027B breaker ENSURE BC-HV-F003A is closed.

ENSURE BC-HV-F004A is closed, ENSURE BC-HV-F007 A is closed.

ENSURE EG-HV-2S12A is open.

ENSURE associated Schedule File is loaded.

OPEN BC-HV-F007A breaker using ET-1.

OPEN BC-HV-F027A breaker using ET-2.

PLACE red bezel covers on the BC-HV-F007B AND the BC-HV-F027B.

PLACE red bezel covers on the BC-HV-F007 A AND the BC-HV-F027A.

Page 19 of 22

TQ-AA-106-0303 JOB PERFORMANCE MEASURE SIMULATOR SETUP INSTRUCTIONS (OPTIONAL)

RH30 HV-F007B RHR Pump A Min Flow None None Insert remote RH30B to TAGGED Valve ET006 GROUP 3B HV-F027B RHR None None Insert remote ET006 to RACK_CLOSE Supp. Pool Spray Insert remote RH30A to TAGGED on RH30 HV-F007A RHR Pump A Min Flow None None event 1

  • Valve Insert remote ET005 to RACK_CLOSE ET005 GROUP 3B HV-F027A RHR None None
  • on event 2 Supp. Pool Spray RH29 GROUP 3E HV-F015A RHR SOC None None Insert remote RH29A to FAIL_CLOSE Return Isol Page 20 of 22

TQ-AA-106-0303 JOB PERFORMANCE MEASURE REVISION HISTORY JPM NUMBER: BC015 Rev # Date Description valida~

I Required?

3 5/3/11 Converted to new JPM format. Old JPM was a duplicate of ...1PM I y BC-009. Completely rewrote JPM for new task. Validated with 2 .

operators from "c" Shift. Avg completion time 33 minutes.

I I

I I I

JOB PERFORMANCE MEASURE STATION: Hope Creek SYSTEM: Condenser Air Removal TASK: Respond To A Main Condenser Low Vacuum TASK NUMBER: 4000580401 JPM NUMBER: 305H-JPM.CG003 REV #: 01 SAP BET: NOHOSJPCG03E ALTERNATE PATH: D APPLICABILITY:

EO RO [KJ STA D SRO [KJ DEVELOPED BY: Archie E. Faulkner DATE: 1/14/12

/

REVIEWED BY: <f<~it:L DATE: 1/06 APPROVED BY: ~

Training Department DATE: II/gilt

TQ~AA-1 06-0303 STATION: Hope Creek JPM NUMBER: CG003 REV: 01 SYSTEM: Condenser Air Removal TASK NUMBER: 4000580401 TASK: Respond To A Main Condenser Low Vacuum ALTERNATE PATH: D KIA NUMBER: 271000 A4.04 IMPORTANCE FACTOR: 3.4 3.5 APPLICABILITY: RO SRO EOD S TAD SRO[))

EVALUATION SETTING/METHOD: Simulator/Perform

REFERENCES:

HC.OP-AB.BOP-0006 Rev 14 HC.OP-AB.ZZ-0001 Rev 23 TOOLS, EQUIPMENT AND PROCEDURES:

ESTIMATED COMPLETION TIME: 13 Minutes TIME PERIOD IDENTIFIED FOR TIME CRITICAL STEPS: N/A Minutes JPM PERFORMED BY: GRADE: D SAT D UNSAT ACTUAL COMPLETION TIME: Minutes ACTUAL TIME CRITICAL COMPLETION TIME: N/A Minutes REASON, IF JPM UNSATISFACTORY:

EVALUATOR'S SIGNATURE: DATE:

Page 2 of 18

TQ-AA-106-0303 NAME:

DATE:

SYSTEM: Condenser Air Removal TASK: Respond To A Main Condenser Low Vacuum TASK NUMBER: 4000580401 INITIAL CONDITIONS:

1. The plant is operating at 100% power.
2. Main Condenser vacuum is degrading due to fluctuations in 3rd Stage SJAE flow.
3. Troubleshooting has determined that PIC-1964B, AIR EJECTOR B EXH PRESS, has an electronics problem and failure of the valve is imminent.
4. HC.OP-AB.BOP-0006, Main Condenser Vacuum, is being implemented.
5. Radwaste Operator has been notified.
6. Offgas is in service.

INITIATING CUE:

Place SJAE A in service on Main Steam accordance with HC.OP-AB.ZZ-0001.

Page 3 of 18

TQ-AA-106-0303 JPM: CG003 OPERATOR TRAINING PROGRAM NAME:

DATE: ___________________

Rev: 01 JOB PERFORMANCE MEASURE SYSTEM: Condenser Air Removal TASK: Respond To A Main Condenser Low Vacuum

(*Denotes a Critical Step)

  • COMMENTS STEP ELEMENT (#Denotes a Sequential Step) EVAL (Required for UNSAT NO. #

STANDARD stu evaluation)

CUE PROVIDE the operator the initiating cue. Operator repeats back initiating cue.

CUE ENTER START TIME AFTER Operator repeats back the Initiating Cue: N/A START TIME:

Operator obtains procedure Operator obtains the correct procedure. HC.OP-AB.zZ-0001 Attachment 11.

I

~~~r~~~ ---------

Operator determines beginning step of Operator determines correct beginning step the procedure. to be 1.0.

1.0 OPEN HV-1957A. Operator presses the HV-1957 A OPEN

  • Y N Flagging pushbutton.

Operator observes the HV-1957A OPEN light illuminates and the CLOSE light extinguishes.

~~------~~~ -

Page 4 of 18

TQ-I-\A-106-0303 JPM: CG003 OPERATOR TRAINING PROGRAM NAME:

DATE: ___________________

Rev: 01 JOB PERFORMANCE MEASURE SYSTEM: Condenser Air Removal TASK: Respond To A Main Condenser Low Vacuum

(*Denotes a Critical Step) COMMENTS STEP

  • ELEMENT (#Denotes a Sequential Step) EVAL (Required for UNSAT NO. #

STANDARD S/U evaluation) 2.0 Operator presses the HV-1955A OPEN

  • Y N Flagging OPEN HV-1955A. pushbutton.

Operator observes the HV-1955A OPEN light illuminates and the CLOSE light extinguishes.

OPEN HV-2016A (HV-2020A if the

  • Y N Flagging 3.0 SJAE's are being supplied by Aux. Stm)

THEN OBSERVE 145-150 psig (with #

Main Steam supplying) OR approximately Operator presses the HV-2016A OPEN 175 psig (Aux Steam supplying) on PI pushbutton.

2022A.

Operator observes the HV-2016A OPEN light illuminates and the CLOSE light extinguishes.

Operator observes the PIC-2022A SJAE steam supply pressure at approximately 145-150 psig.

Page 5 of 18

TQ-J.\A-106-0303 JPM: CG003 OPERATOR TRAINING PROGRAM NAME:

DATE: ___________________

Rev: 01 JOB PERFORMANCE MEASURE SYSTEM: Condenser Air Removal TASK: Respond To A Main Condenser Low Vacuum

(*Denotes a Critical Step) COMMENTS STEP

  • ELEMENT (#Denotes a Sequential Step) EVAL (Required for UNSAT NO. #

STANDARD stu evaluation) 4.0 Operator presses the PIC-1964A AUTO

  • Y N Flagging ENSURE PIC-1964A is in AUTO at 11 pushbutton.

psig. #

Operator observes the PIC-1964A is in AUTO light illuminates and the MAN light extinguishes.

Operator presses the PIC-1964A

  • Y N Flagging UPIDOWN Arrows as necessary to place the setpoint indicator on 11 psig.

5.0 Operator presses the HV-1959A OPEN

  • Y N Flagging OPEN HV-1959A. pushbutton.

Operator observes the HV-1959A OPEN light illuminates and the CLOSE light extinguishes.

6.0 Operator presses the HV-1956A OPEN

  • Y N Flagging OPEN HV-1956A. pushbutton.

Operator observes the HV-1956A OPEN light illuminates and the CLOSE light extinguishes.

Page 6 of 18

TQ~I-\A~1 06~0303 JPM: CG003 OPERATOR TRAINING PROGRAM NAME:

DATE: __________________

Rev: 01 JOB PERFORMANCE MEASURE SYSTEM: Condenser Air Removal TASK: Respond To A Main Condenser Low Vacuum

(*Denotes a Critical Step) COMMENTS STEP

  • ELEMENT (#Denotes a Sequential Step) EVAL (Required for UNSAT NO. #

STANDARD S/U evaluation) 7.0 OBSERVE the following 3rd stage indications:

Operator observes the FR-2021A SJAE 3rd FR-2021 A increasing stage flow increasing.

-~~ ~--- ~ ~~~-- ----- ------

Operator observes the PIC-1954A SJAE 3 rd PI-1 954A lowering. stage pressure lowering.

8.0 Operator presses the HV-1963A OPEN

  • Y N Flagging OPEN HV-1963A. pushbutton.

I Operator observes the HV-1963A OPEN light illuminates and the CLOSE light extinguishes.

~~-

~-~

9.0 Operator presses the HV-1962A OPEN

  • Y N Flagging OPEN HV-1962A. pushbutton.

~---

--~~~--~~

Operator observes the HV-1962A OPEN light illuminates and the CLOSE light exting uishes.

c-----~ ------ ---- ----

rd 10.0 Operator observes the PI-1966A SJAE 2 OBSERVE 2nd stage pressure PI-1966A stage pressure lowering.

lowering.

~

Page 7 of 18

TQ-MA-106-0303 JPM: CG003 OPERATOR TRAINING PROGRAM NAME:

DATE: ___________________

Rev: 01 JOB PERFORMANCE MEASURE SYSTEM: Condenser Air Removal TASK: Respond To A Main Condenser Low Vacuum

(*Denotes a Critical Step) COMMENTS STEP

  • ELEMENT (#Denotes a Sequential Step) EVAL (Required for UNSAT NO. #

STANDARD stU evaluation) 11.0 Operator presses the HV-1967A OPEN

  • Y N Flagging OPEN HV-1967A pushbutton.

I Operator observes the HV-1963A OPEN light illuminates and the CLOSE light extinguishes.

~~~- -----

I 12.0 Operator presses the HV-1968 A 1, A2, A3,

  • Y N Flagging OPEN HV-1968 A1, A2, A3. OPEN pushbutton.

Operator observes the HV-1968A1, A2, A3, OPEN light illuminates and the CLOSE light extinguishes.

-~ ~~---~~ ------

13.0 Operator observes all "A "SJAE valves VERIFY valve operated in Steps 1.0 thru open.

12.0 have successfully repositioned.

--- ~-~- ---

14.0 Operator presses the HV-1968 B1, B2, B3, Y N Flagging CLOSE HV-1968 B1, B2, B3. CLOSE pushbutton.

--- ~~~- -----

Operator observes the HV-1968B1, B2, B3 CLOSE light illuminates and the OPEN light extinguishes.

'------~ --- ---

Page 8 of 18

TQ-A.A-106-0303 JPM: CG003 OPERATOR TRAINING PROGRAM NAME:

Rev: 01 JOB PERFORMANCE MEASURE DATE: __________________

SYSTEM: Condenser Air Removal TASK: Respond To A Main Condenser Low Vacuum

(*Denotes a Critical Step) COMMENTS STEP

  • ELEMENT (#Denotes a Sequential Step) EVAL (Required for UNSAT NO. #

STANDARD stU evaluatio 15.0 MONITOR PIC-1964A for the following indications:

Operator observes the PIC-1964A SJAE 3rd stage outlet pressure at approximately 11 SJAE 3rd stage outlet < 11 psig.

psig.

Operator observes the Gaseous Radwaste Gaseous Radwaste < 75 scfm Flow <75 scfm.

(1900 #/hr).

CUE Examiner Note: Operator should check CRIOS points A3431 or A9343 for indication of Offgas Treatment Flow.

IF asked as Radwaste Operator, for Operator may request Radwaste to Offgas Flow, THEN REPORT that provide flow indication from 1HAFI Offgas flow is approximately 35 scfm. 5665. It will take a few minutes for flow to lower to < 75 scfm.

16.0 Five minutes AFTER closing HV-1968 B1, B2, B3, CLOSE the following valves:

CUE "Five minutes have elapsed."

Page 9 of 18

TQ-AA-106-0303 JPM: CG003 OPERATOR TRAINING PROGRAM NAME:

Rev: 01 JOB PERFORMANCE MEASURE DATE:

SYSTEM: Condenser Air Removal TASK Respond To A Main Condenser Low Vacuum

(*Denotes a Critical Step) COMMENTS STEP

  • ELEMENT (#Denotes a Sequential Step) EVAL (Required for UNSAT NO. #

STANDARD StU evaluation)

Operator presses the HV-1967B CLOSE Y N Flagging

  • HV-1967B pushbutton.

Operator observes the HV-1967B CLOSE light illuminates and the OPEN light extinguishes.

Operator presses the HV-1963B CLOSE Y N Flagging

  • HV-1963B pushbutton.

Operator observes the HV-1963B CLOSE light illuminates and the OPEN light extinguishes.

Operator presses the HV-1962B CLOSE Y N Flagging

  • HV-1962B pushbutton.

Operator observes the HV-1962B CLOSE light illuminates and the OPEN light extinguishes .

Operator presses the HV-1955B CLOSE Y N Flagging

  • HV-1955B pushbutton.

Page 10 of 18

TQ-AA-106-0303 JPM: CG003 OPERATOR TRAINING PROGRAM NAME:

DATE: ___________________

Rev: 01 JOB PERFORMANCE MEASURE SYSTEM: Condenser Air Removal TASK: Respond To A Main Condenser Low Vacuum

(*Denotes a Critical Step) COMMENTS STEP

  • ELEMENT (#Denotes a Sequential Step) EVAL (Required for UNSAT NO. #

STANDARD StU evaluation)

Operator observes the HV-1955B CLOSE light illuminates and the OPEN light extinguishes.

r~~ ~- ~-~

Operator presses the HV-1956B CLOSE YN Flagging

  • HV-1956B pushbutton.

Operator observes the HV-1956B CLOSE light illuminates and the OPEN light extinguishes.

1-------- I--~~

  • HV-1957B Operator presses the HV-1957B CLOSE Y N Flagging pushbutton.

I---~~~ -

Operator observes the HV-1957B CLOSE light illuminates and the OPEN light extinguishes.

r-----~ I Operator presses the HV-1959B CLOSE Y N Flagging

  • HV-1959B I pushbutton. I Operator observes the HV-1959B CLOSE light illuminates and the OPEN light extinguishes.

~~~ ---- ----

I Page 11 of 18

TQ-AA-106-0303 JPM: CG003 OPERATOR TRAINING PROGRAM NAME:

DATE: ___________________

Rev: 01 JOB PERFORMANCE MEASURE SYSTEM: Condenser Air Removal TASK: Respond To A Main Condenser Low Vacuum

(*Denotes a Critical Step)

  • COMMENTS STEP ELEMENT (#Denotes a Sequential Step) EVAL (Required for UNSAT NO. #

STANDARD S/U evaluation Operator presses the HV-2016B CLOSE Y N Flagging

  • HV-2016B (2020B if SJAE supplied by pushbutton.

Aux Steam)

Operator observes the HV-2016B CLOSE light illuminates and the OPEN light extinguishes.

CUE WHEN operator informs you the task is complete, OR the JPM has been terminated for other reasons, THEN RECORD the STOP TIME.

N/A REPEAT BACK any message from the operator on the status of the JPM, and then state "This JPM is complete".

STOP TIME:

Page 12 of 18

TQ*AA*106*0303 JOB PERFORMANCE MEASURE OPERATOR TRAINING PROGRAM EVALUATOR FOLLOWUP QUESTION DOCUMENTATION NAME:

DATE:

JPM Number: CG003 TASK: Respond To A Main Condenser Low Vacuum TASK NUMBER: 4000580401 QUESTION:

RESPONSE

RESULT: SAT UNSAT QUESTION:

RESPONSE

RESULT: SAT UNSAT Page 13 of 18

TQ-AA-106-0303 JOB PERFORMANCE MEASURE INITIAL CONDITIONS:

1. The plant is operating at 100% power.
2. Main Condenser vacuum is degrading due to fluctuations in 3 rd Stage SJAE flow.
3. Troubleshooting has determined that PIC-1964B, AIR EJECTOR B EXH PRESS, has an electronics problem and failure of the valve is imminent.
4. HC.OP-AB.BOP-0006, Main Condenser Vacuum, is being implemented.
5. Radwaste Operator has been notified.
6. Offgas is in service.

INITIATING CUE:

Place SJAE A in service on Main Steam accordance with HC.OP-AB.ZZ-0001.

Page 14 of 18

TQ-AA-106-0303 JOB PERFORMANCE MEASURE SIMULATOR SETUP INSTRUCTIONS (OPTIONAL)

INITIALIZE the simulator to 100% power, MOL.

ENSURE B SJAE Train in service.

INSERT Override 5M26_L_AO to 3.20.

INSERT Malfunction MC01 at 12.0%.

WHEN Main condenser vacuum alarms, MODIFY Malfunction MC01 as necessary to maintain vacuum steady in alarm.

IMPLEMENT AB.BOP-0005. Markup procedure to step B.1 ENSURE a copy of HC.OP-AB.BOP-0005 is available.

ENSURE a copy of HC.OP-AB.zZ-0001 Attachment 11 is available.

COMPLETE "Simulator Ready-for-Training/Examination Checklist".

Event code: ! ZLMC1968(1) >=1.0 &

Description:

Removes malfunction MC01 when SJAE swap complete.

Page 15 of 18

TQ-AA-106-0303 JOB PERFORMANCE MEASURE SIMULATOR SETUP INSTRUCTIONS (OPTIONAL)

Initial Action Description Insert malfunction MC01 to 12.00000 Low pressure turbine exhaust bellows l\lone None on event 1 leak I Description Action PIC 19648 AIR EJECTOR 8 STA MAN None Insert override 5M26_L_AO to 3.20 PRESSURE (AO)

Page 16 of 18

TQ-AA-106-0303 JOB PERFORMANCE MEASURE REVISION HISTORY JPM NUMBER: CG003 Description 01 nn\.IQrT<>n JPM CG003 to new "IPM format. Since Critical "IPM are now uniquely identified by the format, all statements critical portion of action were redundant and deleted.

change is editorial. Validation is required to establish times. Validated with 2 ROs on 1/3/12. Avg time was 13 minutes.

JOB PERFORMANCE MEASURE STATION: Hope Creek SYSTEM: Containment Atmosphere Control TASK: Vent to Control Containment Pressure With Suppression Pool Level Less Than 180 inches TASK NUMBER: 20009S0S01

..IPM NUMBER: 30SH-JPM.GSOOS REV #: 04 SAP BET: NOH05JPGS05E ALTERNATE PATH: W APPLICABILITY:

EO RO [K] STA '---' SRO I X I DEVELOPED BY: Archie E. Faulkner DATE: 1/14/12 Instructor REVIEWED BY: 1<f/l..<ef-z;vlZ.. DATE: 'kdt;Z APPROVED BY: ~01L DATE: )I //r))l Training Department

TQ-AA-106-0303 STATION: Hope Creek JPM NUMBER: GS005 REV: 04 SYSTEM: Containment Atmosphere Control TASK NUMBER: 2000950501 TASK: Vent to Control Containment Pressure With Suppression Pool Level Less Than 180 inches ALTERNATE PATH: W KIA NUMBER: 295024 EA1.19 IMPORTANCE FACTOR: 3.3 3.4 APPLICABILITY: RO SRO EO D RO [ ] ] STA D SRO [ ] ]

EVALUATION SETTING/METHOD: Simulator/Perform

REFERENCES:

HC.OP-EO.ZZ-0318(Q) Rev. 7 TOOLS, EQUIPMENT AND PROCEDURES: None ESTIMATED COMPLETION TIME: 15 Minutes TIME PERIOD IDENTIFIED FOR TIME CRITICAL STEPS: ----

N/A Minutes JPM PERFORMED BY: GRADE: D SAT D UNSAT ACTUAL COMPLETION TIME: Minutes ACTUAL TIME CRITICAL COMPLETION TIME: N/A Minutes REASON, IF UNSATISFACTORY:

EVALUATOR'S SIGNATURE: DATE:

Page 2 of 21

TQ-AA-106-0303 NAME:

DATE:

SYSTEM: Containment Atmosphere Control TASK: Vent to Control Containment Pressure With Suppression Pool Level Less Than 180 inches TASK NUMBER: 2000950501 INITIAL CONDITIONS:

1. The 'B' RHR pump suction was isolated due to a leak.
2. The Plant experienced a large break LOCA.
3. HC.OP-EO.ZZ-0102, Primary Containment Control has been implemented.
4. Drywell pressure is approximately 60 psig and rising AND Suppression Chamber pressure is approximately 59 psig and rising.
5. Suppression Pool Level indicates approximately 83 inches.
6. The Emergency Instrument Air Compressor has been restored lAW HC.OP-EO.ZZ-0319.
7. The Control Room Emergency Filtration System is operating in the Isolate/Recirculation Mode in accordance with HC.OP-SO.GK-0001 (Q).
8. FRVS is in operation in accordance with HC.OP-SO.GU-0001(Q).
9. The Emergency Duty Officer/Emergency Response Manager has been informed that containment venting will be performed.

10.Salem Operations has been notified that containment venting will be performed.

11. The Aux. Bldg. EO is standing by at panel 1Y-F404.
12. The Reactor Building is inaccessible and has been evacuated.

INITIATING CUE:

Vent the Containment via the Hard Torus Vent lAW HC.OP-EO.zZ-0318. Notify the CRS when venting has commenced.

Page 3 of 21

TQ~MA~1 06~0303 JPM: GS005 OPERATOR TRAINING PROGRAM NAME:

DATE: ___________________

Rev: 04 JOB PERFORMANCE MEASURE SYSTEM: Containment Atmosphere Control TASK: Vent to Control Containment Pressure With Suppression Pool Level Less Than 180 inches

(*Denotes a Critical Step) I

  • COMMENTS STEP ELEMENT (#Denotes a Sequential Step) EVAL (Required for UNSAT NO. #

STANDARD S/U evaluation)

CUE PROVIDE the operator the initiating cue. Operator repeats back initiating cue.

CUE I ENTERSTARTTIMEAFTER OPERATOR REPEATS BACK INITIATING CUE:

START TIME:

Operator obtains/locates procedure Operator obtains the correct procedure.

HC.OP-EO.ZZ-0318.

Operator reviews precautions and Operator reviews precautions and limitations. limitations.

CUE If excessive time is taken reviewing precautions and limitations, inform operator that all are satisfied.

Operator determines beginning step Operator determines correct beginning of the procedure step to be 5.1.1.

Page 4of21

TQ-f\A-106-0303 JPM: GS005 OPERATOR TRAINING PROGRAM NAME:

Rev: 04 JOB PERFORMANCE MEASURE DATE: ___________________

SYSTEM: Containment Atmosphere Control TASK: Vent to Control Containment Pressure With Suppression Pool Level Less Than 180 inches

(*Denotes a Critical Step) I

  • COMMENTS STEP ELEMENT (#Denotes a Sequential Step) EVAL (Required for UNSAT NO.

STANDARD # S/U evaluation) 5.1.1 VENT the containment via the Hard Operator reviews Prerequisites and Torus Vent as follows: ensures Prerequisites complete.

A. ENSURE that all prerequisites have been satisfied in accordance with Section 2.0 of this procedure.

CUE If excessive time is taken reviewing Prerequisites, inform operator that all are satisfied.

5.1.1 B. NOTIFY the Emergency Duty Operator notifies the CRS to notifiy the Officer that containment venting EDO that containment venting via the via the Hard Torus Vent will be Hard Torus Vent will be performed.

performed.

CUE Acknowledge the communication to the EDO.

It 5.1.1 C. In the Lower Relay Room, Elev 102'atpaneI1YF404(see Operator directs the field operator to install fuse F22 at panel 1YF404.

Attachment 2), INSTALL F22 (6 #

amp fuse).

Page 5 of 21

TQ-I-\A-106-0303 JPM: GS005 OPERATOR TRAINING PROGRAM NAME:

Rev: 04 JOB PERFORMANCE MEASURE DATE:

SYSTEM: Containment Atmosphere Control TASK: Vent to Control Containment Pressure With Suppression Pool Level Less Than 180 inches STEP (*Denotes a Critical Step)

  • COMMENTS ELEMENT (#Denotes a Sequential Step) EVAL (Required for UNSAT NO. #

STANDARD S/U evaluation)

CUE WHEN directed to install 1YF404 fuse F22, i<**::;:ii:;:

If1;:::'iiii~Y~

))~~0~: I)*~)).})))

THEN TRIGGER ET-3 I'))

AND REPORT the fuse is installed. 1 ..

,- i: I" / )/)

5.1.1 D. DEPRESS ISLN OVRD and Operator depresses the ISLN OVRD

  • OPEN GS-HV-4964 SUPP pushbutton for the HV-4964.

CHMBR TO CPCS DMP. #

~- ---

Operator observes the amber OVER RIDDEN indicator illuminates.

r--------- - --

Operator depresses the HV4964 OPEN

  • PB.

Operator observes the red OPEN indicator illuminates and the green CLSD indicator extinguishes.

5.1.1 E. ANNOUNCE that containment Operator announces containment venting will commence at the venting will commence at the South end South end of the Reactor Building of the Reactor Building via the Hard via the Hard Torus Vent. Torus Vent over the plant paging system.

Page 6 of21

TQ-AA-106-0303 JPM: GS005 OPERATOR TRAINING PROGRAM NAME:

Rev: 04 DATE: ___________________

JOB PERFORMANCE MEASURE SYSTEM: Containment Atmosphere Control TASK: Vent to Control Containment Pressure With Suppression Pool Level Less Than 180 inches STEP (*Denotes a Critical Step) COMMENTS ELEMENT (#Denotes a Sequential Step) EVAL (Required for UNSAT NO. #

STANDARD Stu evaluation) 5.1.1 F. When HV-4964 SUPP CHMBR TO Operator observes that the HV4964 CPCS DMP is full open, then OPEN indicator is illuminated.

OPEN GS-HV-11541 TORUS VENT ISOLATION VALVE. Operator observes that the HV4964 CLSD indicator is extinguished.

-~~~~~

Operator rotates HV11541 keylock

  • switch to the OPEN position.

Operator observes the red HV11541 OPEN indicator REMAINS EXTINGUISHED and the green CLOSED indicator REMAINS ILLUMINATED.

I Operator informs CRS.

~ilt:r:\0';/

CUE Repeat back report from Operator Examiner Note: Based on the Initial and direct Operator to continue to Conditions, the Reactor Building is NOT  :,!~ ~ ~;.]

implement the procedure until ~a accessible. Manually opening the .. l

~~ ~

vent path is established. HV-11541 is not an option.

  • ~~i

.~.... ... ~.~ ~.~ .

Page 7 of 21

TQ-MA-106-0303 JPM: GS005 OPERATOR TRAINING PROGRAM NAME:

Rev: 04 JOB PERFORMANCE MEASURE DATE:

SYSTEM: Containment Atmosphere Control TASK: Vent to Control Containment Pressure With Suppression Pool Level Less Than 180 inches

(*Denotes a Critical Step) COMMENTS I STEP

  • ELEMENT (#Denotes a Sequential Step) EVAL (Required for UNSAT NO. #

STANDARD S/U evaluation) 5.1.1 G. When drywell pressure can be Operator determines drywell pressure maintained below 60 psig, then is not being maintained below 60 pSig, CLOSE GS-HV-11541 TORUS continues on in the procedure.

VENT ISOLATION VALVE.

- ~--

5.1.1 H. REPEAT steps 5.1.1.E thru Operator determines repeating these 5.1.1.G as necessary to reduce steps will not establish a vent path.

and maintain drywell pressure below 65 pSig.

5.1.1 I. If actions taken to reduce Operator determined actions taken thus containment pressure have been far have not been successful, continues unsuccessful, then continue in this in the procedure.

procedure.

t--- -

5.1.2 VENT the containment via the Operator determines this path is not Suppression Chamber supply and available since it requires access to the ILRT piping as follows: Reactor Building and the reactor Building is not accessible.

~.

Page 8 of 21

TQ-kA-106-0303 JPM: GS005 OPERATOR TRAINING PROGRAM NAME:

Rev: 04 JOB PERFORMANCE MEASURE DATE:

SYSTEM: Containment Atmosphere Control TASK: Vent to Control Containment Pressure With Suppression Pool Level Less Than 180 inches

(*Oenotes a Critical Step) I

  • COMMENTS STEP ELEMENT (#Denotes a Sequential Step) EVAL (Required for UNSAT NO.

STANDARD # S/U evaluation)

CUE IF the Operator requests the status of the "angled piping downstream of 1-GS-V058",

THEN INFORM the Operator the piping has NOT been rotated to align the vent path and the Reactor Building is NOT accessible.

5.1.3 VENT the containment via the Orywell Operator determines this path is not supply and ILRT piping as follows: available since it requires access to the Reactor Building and the reactor Building is not accessible.

5.1.4 VENT the containment via the Operator determines the Suppression Suppression Chamber 2" exhaust as Chamber 2" exhaust is the next most follows: preferable path.

Examiner Note: 3.1.4 states: The selection of vent paths has been presented in priority order. However, if it can be determined that a particular path is unavailable or undesirable, the section addressing that vent path may be omitted (see Attachment 4).

Page 9 of 21

TQMJ-\AM106-0303 JPM: GS005 OPERATOR TRAINING PROGRAM NAME:

Rev: 04 JOB PERFORMANCE MEASURE DATE:

SYSTEM: Containment Atmosphere Control TASK: Vent to Control Containment Pressure With Suppression Pool Level Less Than 180 inches

(*Denotes a Critical Step)

  • COMMENTS STEP ELEMENT (#Denotes a Sequential Step) EVAL (Required for UNSAT NO. #

STANDARD S/U evaluation) 1.4 A. ENSURE that all prerequisites Operator reviews Prerequisites and have been satisfied in accordance ensures Prerequisites complete.

with Section 2.0 of this procedure.

~-'-'"

j',~t I:'"'

CUE If excessive time is taken reviewing Prerequisites, inform operator that 'i all are satisfied.

",,','.i<>* ",i'" ,",',,'-.'* '.','

5.1.4 B. NOTIFY the Emergency Duty Operator notifies the CRS to notifiy the Officer that containment venting of EDO that containment venting of the the Suppression Chamber to the Suppression Chamber to the Reactor Reactor Building will be Building will be performed.

performed.

,i c',.'*, .: ,"

CUE Acknowledge the communication to the EDO. ....'. r:F~'-' i 5.1.4 C. DEPRESS ISLN OVRD and Operator presses the DRYWELL

  • OPEN GT-HD-9372A Drwl Purge PURGE SHUT OFF DMPRS ISLN Vent Exh Dmpr. OVRD pushbutton. #

Operator observes the pushbutton backlights.

~- -----

Page 10 of 21

TQ-MA-106-0303 JPM: GS005 OPERATOR TRAINING PROGRAM NAME:

Rev: 04 JOB PERFORMANCE MEASURE DATE: _ _ _ _ _ _ _ _ _ __

SYSTEM: Containment Atmosphere Control TASK: Vent to Control Containment Pressure With Suppression Pool Level Less Than 180 inches

(*Denotes a Critical Step)

  • COMMENTS STEP ELEMENT (#Denotes a Sequential Step) EVAL (Required for UNSAT NO. #

STANDARD StU evaluation)

Operator presses the DRYWELL

  • PURGE SHUT OFF DMPRS HD9372A OPEN pushbutton. #

Operator observes the red HD9372A OPEN light illuminates and green CLOSED light extinguishes.


------- I 5.1.4 D. DEPRESS ISLN OVRD and Operator observes the amber OVER OPEN GS-HV-4964 SUpp RIDDEN light for the HV-4964 ISLN I CHMBR TO CPCS DMP. OVRD is already illuminated.

I Operator observes red HV4964 OPEN light is already illuminated and green ,

CLSD light is already extinguished.

I Examiner Note: It is only critical the HV-4964 is open. It is not critical whether it was left open from step 5.1 .1.C, or closed and then re-opened at this step.

I t---

5.1.4 E. ANNOUNCE containment venting Operator announces containment

  • of the Suppression Chamber to venting of the Suppression Chamber to the Reactor Building. the Reactor Building over the plant #

page.

Page 11 of 21

TQ-J-\A-106-0303 JPM: GS005 OPERATOR TRAINING PROGRAM NAME: _ _ _ _ _ _ _ _ __

Rev: 04 JOB PERFORMANCE MEASURE DATE: _ _ _ _ _ _ _ _ __

SYSTEM: Containment Atmosphere Control TASK: Vent to Control Containment Pressure With Suppression Pool Level Less Than 180 inches

(*Denotes a Critical Step) COMMENTS STEP

  • ELEMENT (#Denotes a Sequential Step) EVAL (Required for UNSAT NO. #

STANDARD S/U evaluation) 5.1.4 F. When GS-HV-4964 SUPP Operator observes red HV4964 OPEN CHMBR TO CPCS DMP is full light is illuminated and green CLSD open, then DEPRESS ISLN light is extinguished.

OVRD and OPEN GS-HV-4963 SUPP CHMBR N2 M/U EXH.

-~

Operator presses ISLN OVRD for the

  • HV4963.
  1. ~~

Operator observes the amber OVER RIDDEN light illuminates.

~---

~ -~ ,----~ --~

Operator presses the HV4963 OPEN

  • pushbutton.

-~

Operator observes the red OPEN light illuminates and green CLSD light extinguishes.

i--

CUE WHEN Vent path has been established, TRIGGER ET-6 to reduce Drywell Pressure.

Page 12 of21

TQ-JI"\A-106-0303 JPM: GS005 OPERATOR TRAINING PROGRAM NAME:

DATE: __________________

Rev: 04 JOB PERFORMANCE MEASURE SYSTEM: Containment Atmosphere Control TASK: Vent to Control Containment Pressure With Suppression Pool Level Less Than 180 inches

(*Denotes a Critical Step) I

  • COMMENTS STEP ELEMENT (#Denotes a Sequential Step) EVAL (Required for UNSAT NO.

STANDARD # S/U evaluation) 5.1.4 G. When drywell pressure can be Operator informs CRS that drywell maintained below 60 psig, then venting has commenced and monitors CLOSE GS-HV-4963 SUPP drywell pressure.

CHMBR N2 M/U EXH and GS HV-4964 SUPP CHMBR TO CPCS DMP.

CUE WHEN operator informs you the task is complete, OR the J PM has been terminated for other reasons, THEN RECORD the STOP time.

REPEAT BACK any message from the operator on the status of the JPM, and then state "This JPM is complete".

STOP TIME:

Page 13 of 21

TQ-AA-106-0303 JOB PERFORMANCE MEASURE OPERATOR TRAINING PROGRAM EVALUATOR FOLLOWUP QUESTION DOCUMENTATION NAME:

-~--'---

DATE:

JPM Number: GS005 TASK: Vent to Control Containment Pressure With Suppression Pool Level Less Than 180 inches TASK NUMBER: 2000950501 QUESTION:


~.---------

RESPONSE

RESULT: SAT UNSAT QUESTION:

RESPONSE

-- ---- ----.--~ .. ------------~---

RESULT: SAT UNSAT L.__

Page 14 of 21

TQ-AA-106-0303 JOB PERFORMANCE MEASURE INITIAL CONDITIONS:

1. The 'B' RHR pump suction was isolated due to a leak.
2. The Plant experienced a large break LOCA.
3. HC.OP-EO.ZZ-0102, Primary Containment Control has been implemented.
4. Drywell pressure is approximately 60 psig and rising AND Suppression Chamber pressure is approximately 59 psig and rising.
5. Suppression Pool Level indicates approximately 83 inches.
6. The Emergency Instrument Air Compressor has been restored lAW HC.OP-EO.zZ-0319.
7. The Control Room Emergency Filtration System is operating in the Isolate/Recirculation Mode in accordance with HC.OP-SO.GK-0001 (0).
8. FRVS is in operation in accordance with HC.OP-SO.GU-0001 (0).
9. The Emergency Duty Officer/Emergency Response Manager has been informed that containment venting will be performed.
10. Salem Operations has been notified that containment venting will be performed.
11. The Aux. Bldg. EO is standing by at paneI1Y-F404.
12. The Reactor Building is inaccessible and has been evacuated.

INITIATING CUE:

Vent the Containment via the Hard Torus Vent lAW HC.OP-EO.ZZ-0318. Notify the CRS when venting has commenced.

Page 15 of 21

TQ*AA*106*0303 JOB PERFORMANCE MEASURE INITIALIZE the simulator to 100% power, MOL, EPU.

CLOSE the BC-HV-F004B RHR pump suction valve.

ISOLATE drywell cooling by closing the inboard and outboard drywell chilled water isolation valves.

TRIGGER ET-1 and ESTABLISH post large break LOCA conditions with a downcomer break and drywell pressure approximately 60 pSig. Malfunctions may be modified as necessary.

CLOSE the MSIVs and drains.

IMPLEMENT EOP-101 AND EOP-102 AFTER drywell pressure is raised to approximately 60 psig.

! RESTORE Instrument Air lAW EOP-319.

PLACE Temporary Air Compressor in service.

Trend DW pressure using Insight Item MONVAR(19)

OPEN BCHV-F016A I OVERRIDE and close BCHV-F017A PLACE 'A' RHR pump in drywell spray with the exception of opening the HV-F021 A.

FAIL OPEN an ADS SRV.

USE Insight Item rhv021(1 ) (set to -0.00 to 0.2) to crack open the F021A as necessary to establish drywell i pressure at 60 psig and rising slowly.

Trigger ET-5 to stabilize DW pressure indications at 62 psig.

I USE Insight Item rhv017(1) (set to -0.00 to 0.1) to crack open the F017A as necessary to establish slowly i rising RPV level.

r - I ENSURE CREF is in service in the ISOLATE/RECIRC Mode lAW SO.GK-0001.

I I

ENSURE FRVS is in Service lAW SO.GU-0001.

i Description I COMPLETE "Simulator Ready-for-Training/Examination Checklist".

TQ*AA*106-0303 JOB PERFORMANCE MEASURE pcpdw>= 16.2 II Drywell Pressure in psia i Inserts Feedwater line break and LOCA after drywell preheated ZLHVDPDO(1) >= 1.0 & ZLPCBLO(2) >= 1.0 & ZLPCISVO(2) >= 1.0 6 9372A + 4963 + 4964 Open lights ON II Lowers DW established.

Event code:

Description:

TQ-AA-106-0303 JOB PERFORMANCE MEASURE Initial @Time Event Action Description Insert malfunction FW32 to Feedwater line break inside None None 100.00000 on event 2 containment Insert malfunction FW04A after 60 on Secondary condensate pump AP137 l\Jone None event 2 trip Insert malfunction FW04B after 60 on Secondary condensate pump BP137 None None event 2 trip Insert malfunction FW04C after 60 on Secondary condensate pump CP137 None Non event 2 trip Insert malfunction MS01 after 90 to None None Steam line break in drywell 4.00000 on event 2 None None Insert malfunction PC04 on event 4 Downcomer break None None Insert remote RH23B to TAGGED RH23 RHR Pump B None None Insert remote RH20A to RACK_OUT RH20 HV-F021A RHR CTMT SPRAY Insert remote ET067 to INSTALLED None None ET067 HV-11S41 Torus vent on event 3 None None Insert remote IA 10 to RUN IA 10 T em porary station air com pressor EP38 EOP-319, Restoring Instrume None None Insert remote EP38 to Emergency Air in an Emergency

TQ*AA*106-0303 JOB PERFORMANCE MEASURE

  • Description None Insert override 6S151 _A_DI to Dff i HV-11541 DPEN KEY SW (DI)

Insert override 6AR11_B_AD to I PRESSURE DRYWELL PR-4960A2

. None 28.00000 on event 5

  • WIDE RANGE (AD)

Insert override 6AR11_R_AD to I PRESSURECHAMBER PR-4960A 1 None i 28.00000 on event 5 WIDE RANGE (AD)

  • Insert override 6AR13_B_AD to PRESSURE DRYWELL PR-4960B2 None 26.00000 on event 5 WIDE RANGE (AD)
  • Insert override 6AR13_R_AD to i PRESSURE CHAMBER PR-4960B1 None 26.00000 on event 5
  • WIDE RANGE
  • Insert override 6AR11_B_AD after 1 PRESSURE DRYWELL l\lone to 22.00000 in 60 on event 6 WIDE RANGE (AD) i Insert override 6AR11_R_AD after 1 PRESSURECHAMBER PR-4960A1 None None
  • to 22.00000 in 60 on event 6 WIDE RANGE (AD)

None None i Insert override 6AR13_B_AD after 1 I PRESSURE DRYWELL PR-4960B2 i

  • to 22.00000 in 60 on event 6 WIDE RAI\lGE (AD)

' Insert override

, None None I to 22.00000 in

TQ*AA*106*0303 JOB PERFORMANCE MEASURE REVISION HISTORY JPM NUMBER: G8005 Rev # I Date Description Validation Required?

01 9/4/2008 This revision converts to HC LOR format, documents validation, y and generates estimated completion time.

Since Critical JPM actions are now uniquely identified by the format, all statements identifying critical portion of action were redundant and deleted.

Corrected typo error at step 5.1.4.F Updated Reference procedure revision number. No Operator i actions changed I

Added Remote functions for Temp Air Compressor and EOP I 319 I 02 i 5/6/10 This revision updates the turnover sheet to suppression pool N I level from 80 to 83 inches. No changes to operator actions. No i validation required 03 5/9/11 Modified Malfunction, Remote, Override, and Event list sections N for TREX event syntax. Updated Reference procedure revision numbers only. No changes to operator actions. No validation required . ... - - . I i

i 04 1/14/12 Added Overrides to freeze OW pressure indications to prevent Y Simulator aborts. Adds Trigger to delete Overrides when I flowpath established. No changes to operator actions.

Validated with 2 ROs on 1/4/12. Avg completion time was 15 I i minutes, i

JOB PERFORMANCE MEASURE STATION: Hope Creek SYSTEM: Control Rod and Drive Mechanism TASK: Respond To An Uncoupled Control rod TASK NUMBER: 4000040401 JPM NUMBER: 305H-JPM.BF011 REV#: 01 SAP BET: NOH05JPBF11 E ALTERNATE PATH: IT]

APPLICABILITY:

EO D RO 00 STA D SRO 00 DEVELOPED BY: Archie E. Faulkner DATE: 9/14/11 Instructor REVIEWED BY:

.fi Operations Representative DATE: ///y/;/

7 /

APPROVED BY: q[~

IV DATE: Ullll1 Training Department

TQ-AA-106-0303 STATION: Hope Creek JPM NUMBER: BF011 REV: 01 SYSTEM: Control Rod and Drive Mechanism TASK NUMBER: 4000040401 TASK: Respond To An Uncoupled Control rod ALTERNATE PATH: [KJ KIA NUMBER: 201003A2.02 IMPORTANCE FACTOR: 3.7 3.8 APPLICABILITY: RO SRO EO D RO [KJ STA D SRO [KJ EVALUATION SETTING/METHOD: Simulator/Perform

REFERENCES:

HC.OP-ST.BF-0001 Rev 31 HC.OP-AB.IC-0001 Rev 14 TOOLS, EQUIPMENT AND PROCEDURES:

00-7 for IC-2 rod positions. Signed on copy of OP.ST.BF-0001 for rod 38-03 only.

ESTIMATED COMPLETION TIME: 33 Minutes TIME PERIOD IDENTIFIED FOR TIME CRITICAL STEPS: N/A

-- - - Minutes JPM PERFORMED BY: GRADE: D SAT D UNSAT ACTUAL COMPLETION TIME: Minutes ACTUAL TIME CRITICAL COMPLETION TIME: N/A Minutes REASON, IF JPM UNSATISFACTORY:

EVALUATOR'S SIGNATURE: DATE: ~-. -.~ i Page 2 of 21

TQ-AA-106-0303 NAME:

DATE:

SYSTEM: Control Rod and Drive Mechanism TASK: Respond To An Uncoupled Control rod TASK NUMBER: 4000040401 INITIAL CONDITIONS:

1. The Plant is operating at 100% power.
2. Maintenance was performed on the position indication circuit of rod 38-03
3. The maintenance is complete.
4. As part of the retest requirements, performance of HC.OP-ST.BF-0001 Control Rod Drive Exercise - Weekly is required for control rod 38-03 only.
5. The "ON DUTY" Reactor Engineer has been notified that control rod 38-03 will be exercised lAW HC.OP-ST.BF-0001.
6. The Reactor Engineer has approved exercising rod 38-03 at 100% power.
7. Stall flows are NOT required.

INITIATING CUE:

Exercise control rod 38-03 lAW HC.OP-ST.BF-0001.

Page 3 of 21

TQ-MA-106-0303 JPM: BF011 OPERATOR TRAINING PROGRAM NAME: ------------------

Rev: 01 JOB PERFORMANCE MEASURE DATE: -------------------

SYSTEM: Control Rod and Drive Mechanism TASK: Respond To An Uncoupled Control rod

(*Denotes a Critical Step)

  • COMMENTS STEP ELEMENT (#Denotes a Sequential Step) EVAL (Required for UNSAT NO. #

STANDARD S/U evaluation)

CUE PROVIDE the operator the initiating cue. Operator repeats back initiating cue.

CUE ENTER START TIME AFTER Operator repeats back the Initiating Cue: N/A START TIME:

Examiner Cue: PROVIDE the Operator obtains the correct Operator with the mark-up copy of procedure.

HC.OP-ST.BF-0001.

Operator reviews precautions and Operator reviews precautions and limitations. limitations.

CUE IF excessive time is taken reviewing precautions and limitations, II ~

THEN INFORM operator that all are N/A satisfied. ~

~~

KX JOOOO<

Page 4 of 21

TQ-J-\.A-106-0303 JPM: BF011 OPERATOR TRAINING PROGRAM NAME: - - - - - - - - - - - - - - - - - - -

Rev: 01 JOB PERFORMANCE MEASURE DATE: _________________

SYSTEM: Control Rod and Drive Mechanism TASK: Respond To An Uncoupled Control rod

(*Denotes a Critical Step)

  • COMMENTS STEP ELEMENT (#Denotes a Sequential Step) EVAL (Required for UNSAT NO. #

STANDARD StU evaluation)

Operator determines beginning step Operator determines correct beginning of the procedure. step to be 5.1.

5.1 LOG test start time in the Control Operator requests the procedure be Room log(s). logged in the Control Room log.

CUE The start time for HC.OP-ST.BF 0001 for retest of rod 38-03 only, Examiner Note: It is not critical to initial has been logged in the Control the procedure steps.

Room log.

~

5.2 ENSURE all prerequisites of Section Operator ensures that all prerequisites 2.0 are satisfied. have been satisfied.

CUE If excessive time is taken reviewing prerequisites, inform operator that N/A all are satisfied.

g§ 5.3 ENSURE Attachment 1, Section 1.0 Operator observes Attachment 1, has been completed Section 1.0 has been completed AND Regular Surveillance AND Retest is indicated.

OR Retest is indicated.

Page 5 of 21

TQ-,",A-106-0303 JPM: BF011 OPERATOR TRAINING PROGRAM NAME: -------------------

Rev: 01 JOB PERFORMANCE MEASURE DATE: --------------------

SYSTEM: Control Rod and Drive Mechanism TASK: Respond To An Uncoupled Control rod

(*Denotes a Critical Step) COMMENTS STEP

  • ELEMENT (#Denotes a Sequential Step) EVAL (Required for UNSAT NO. #

STANDARD S/U evaluation) 5.4 OBTAIN a computer printout (OD-7) Operator prints 00-7 from PPC of the current Control Rod positions. computer terminal.

CUE Provide copy of OD-7. IF OD-7 Operator reviews 00-7 for rod 38-03 I i

printout not available, THEN direct position. I operator to use ppe terminal. I i

5.5 OBSERVE proper response of the Operator reviews the requirement to Nuclear Instrumentation while observe proper response of the Nuclear withdrawing Instrumentation while withdrawing OR inserting all Control Rods. OR inserting all Control Rods.

5.6 SELECT a withdrawn Control Rod Operator presses ROD SELECT

  • Y N Flagging AND RECORD the initial Control Rod MODULE 38-03 pushbutton. Y N Barriers position on Attachment 2. # I i

Operator records the initial rod position  !

of 48 on Attachment 2.

1-- I 5.7 IF Control Rod is at position 00, RECORD final Control Rod position on Attachment 2. All other blocks are N/A for this rod.

Page 6 of 21

TQ"AA-106-0303 1 OPERATOR PROGRAM Rev: 01 JOB PERFORMANCE MEASURE DATE:

SYSTEM: Control Rod and Drive Mechanism TASK: Respond To An Uncoupled Control rod

(*Denotes a Critical Step) COMMENTS STEP

  • ELEMENT (#Denotes a Sequential Step) EVAL (Required for UNSAT NO. #

STANDARD S/U evaluation) 5.8 OBSERVE ClPproximately 6 gpm total Operator obselVes approximately 6 through both the insert AND gpm total flow through both the insert Stabilizing Valves as AND withdraw Stabilizing Valves as indicated on CRID's point B2117. indicated on CRID's point B2117.

NOTE The following two steps will exercise Operator reads NOTE.

the 1-BF-V138, Cooling Water Header Check Valve, as required by TIS 4.0.5.

If a "failed position" is encountered a single notch insertion is attempted, an alternate position may selected to insert the rod, provided that guidance is obtained from Reactor Engineering. In this situation tile remarks section of Attachment 3 should document the alternate position utilized.

5.9 INSERT the selected Control Rod one Operator momentarily presses the ROD

  • Y N Flagging as directed by Reactor MOTION CONTROLS INSERT Y N Barriers Engineering) AND PERFORM #

following: [TIS 4.1.3.1.2, TIS 4.1.3.7]

Page 7 of 21

TQ-I-\.A-106-0303 JPM: BF011 OPERATOR TRAINING PROGRAM NAME: -------------------

Rev: 01 JOB PERFORMANCE MEASURE DATE: ___________________

SYSTEM: Control Rod and Drive Mechanism TASK: Respond To An Uncoupled Control rod

(*Denotes a Critical Step) COMMENTS STEP

  • ELEMENT (#Denotes a Sequential Step) EVAL (Required for UNSAT NO. #

STANDARD stU evaluation) 5.9.1 ENSURE proper operation of the Operator observes the CONTROL ROD RPIS. POSITION FOUR ROD DISPLAY, RWM, or CRIDS indicates control rod movement to position 46.

5.9.2 IF the Control Rod was inserted Examiner Note: IF the Operator inserts beyond its intended position, the Control Rod beyond position 46, THEN IMMEDIATELY WITHDRAW THEN the Operator IMMEDIATELY the Control Rod to its intended withdraws the Control Rod to position position AND CONTACT Reactor 46 AND contacts Reactor Engineering.

Engineering.

5.9.3 IF the control rod does not insert to Operator recognizes this step is not the next notch after one attempt, applicable and continues at step 5.9.4 PERFORM the following:

5.9.4 INDICATE the condition of RPIS Operator then indicates the RPIS indication on Attachment 2. indication is SAT on Attachment 2.

5.10 IE the position recorded in Step 5.7 is Operator determines the position an intermediate position, recorded in Step 5.7 is NOT an THEN PERFORM Step 5.10.1, intermediate position, continues at step otherwise, GO TO Step 5.10.2 to 5.10.2 to return the control rod to its return the control rod to its original original position.

position:

Page 8 of 21

TQ-kA 106-0303 M

JPM: BF011 OPERATOR TRAINING PROGRAM NAME: ___________________

Rev: 01 JOB PERFORMANCE MEASURE DATE: _________________

SYSTEM: Control Rod and Drive Mechanism TASK: Respond To An Uncoupled Control rod

(*Denotes a Critical Step)

  • COMMENTS STEP ELEMENT (#Denotes a Sequential Step) EVAL (Required for UNSAT NO. #

STANDARD S/U evaluation)

NOTE IF drive water pressure was increased Operator reads NOTE and determines to withdraw a control rod from position the NOTE is not applicable.

46, the same or slightly higher pressure should be used to perform the uncoupling check. [80009340J Control Rods experiencing coupling problems should be single-notched to 48 (with settle) prior to using continuous withdraw to verify coupling.

5.10.2 WITHDRAW the control rod to Operator simultaneously presses AND

  • Y N Barriers position 48 AND PERFORM the holds both the WITHDRAW pushbutton following while giving the selected AND the CONTINUOUS WITHDRAW #

Control Rod a continuous withdraw pushbutton.

signal: [TIS 4.1.3.6, TIS 4.1.3.7]

A. OBSERVE the following as indication of the Control Rod NIA being coupled:

1. ROD OVERTRAVEL alarm does Operator observes OHA C6-F3 ROD NOT annunciate. OVERTRAVEL DOES annunciate.

I

- _I Page 9 of 21

TQ-M.A-106-0303 JPM: BF011 OPERATOR TRAINING PROGRAM NAME: -------------------

Rev: 01 JOB PERFORMANCE MEASURE DATE: -------------------

SYSTEM: Control Rod and Drive Mechanism TASK: Respond To An Uncoupled Control rod

(*Denotes a Critical Step) COMMENTS STEP

  • ELEMENT (#Denotes a Sequential Step) EVAL (Required for UNSAT NO. #

STANDARD S/U evaluation)

Operator releases both the WITHDRAW pushbutton AND the CONTINUOUS WITHDRAW pushbutton.

2. Red Full Out light illuminates on Operator observes the red FULL OUT the Full Core Display_ light on the Full Core Display EXTINGUISHES~
3. RP1S indicates the Control Rod is Operator observes RPIS does NOT full out (48). indicate position 48.
4. Proper response of the Nuclear Operator recognizes the expected Instrumentation while response of the Nuclear withdrawing the Control Rod. Instrumentation while withd rawing the Control Rod.

Examiner Note: The expected response for a rod from 46 to 48 is negligible.

B. INDICATE on Attachment 2 the Operator indicates the coupling check condition of Coupling Check. is UNSAT on Attachment 2.

Page 10 of 21

TQ-.kA-106-0303 JPM: BF011 OPERATOR TRAINING PROGRAM NAME:

Rev: 01 JOB PERFORMANCE MEASURE DATE: ___________________

SYSTEM: Control Rod and Drive Mechanism TASK: Respond To An Uncoupled Control rod

(*Denotes a Critical Step) COMMENTS STEP

  • ELEMENT (#Denotes a Sequential Step) EVAL (Required for UNSAT NO. #

STANDARD S/U evaluation C, PERFORM the following for stall Based on the Initial Conditions, flow: Operator determines Stall Flow is NOT required. Operator marks the step uN/A",

Examiner Note: Due to the failed coupling check, this step may not be performed until later, or may not be performed at all.

D. IF the CRD over travels, Operator informs the CRS of uncoupled THEN IMPLEMENT control rod and entry condition into HC.OP-AB.IC-0001 (Q), HC.OP-AB.lC-0001.

Control Rod.

CUE Acknowledge the report and DIRECT the Operator to implement N/A Condition D of HC.OP-AB.lC-0001.

HC.OP-AB.lC-0001 Condition D Uncoupled Rod and Movement Permitted by RWM D.1 OBTAIN Reactor Engineering Operator requests Reactor Engineering guidance to recouple the Control Rod. guidance to recouple the Control Rod.

Page 11 of 21

TQ-MA-106-0303 BF011 OPERATOR TRAINING PROGRAM NAME:

01 JOB PERFORMANCE MEASURE DATE: ____________________

SYSTEM: Control Rod and Drive Mechanism TASK: Respond To An Uncoupled Control rod

(*Denotes a Critical Step)

  • COMMENTS STEP ELEMENT (#Denotes a Sequential Step) EVAL (Required for UNSAT NO. #

STANDARD S/U evaluation)

CUE INFORM the Operator that Reactor Engineer's guidance in NOT available.

N/A

~

0.2 IF Reactor Engineering guidance Operator determines step D.2 is CAN NOT be obtained, applicable.

THEN RECOUPLE the Control Rod as follows:

0.2.a INSERT the CRD no more than 2 Operator single notch inserts rod 38-03 notches from the point of discovery. to position 46 using INSERT PB.

Examiner Note: Due to the rod being at Overtravel, it will take two single notch insertions to insert the rod to 46.

The first insertion will settle the rod at 48 and may bring in OHA C6-E3 ROD DRIFT. IF ROD DRIFT alarm comes in, THEN operator will respond using OHA C6-E3 Alarm Response Procedure and determine rod 38-03 caused the alarm.

c------

D.2.b Single Notch WITHDRAW the Control Operator single notch withdraws rod

  • Rod to original position AND VERIFY 38-03 to position 48. Y N Flagging

,.., v,",,,,,,f,,,

~"I"~~'~

response * # Y N Barriers Operator observes correct response of the control rod.

Page 12 of 21

TQ-I-\A-106-0303 JPM: BF011 OPERATOR TRAINING PROGRAM NAME:

Rev: 01 JOB PERFORMANCE MEASURE DATE: --------------------

SYSTEM: Control Rod and Drive Mechanism TASK: Respond To An Uncoupled Control rod

(*Denotes a Critical Step) COMMENTS STEP

  • ELEMENT (#Denotes a Sequential Step) EVAL (Required for UNSAT NO. #

STANDARD StU evaluation)

D.2.c PERFORM a coupling check on the NIA associated control rod lAW ST.BF 0001.

CUE Provide operator 2 nd marked up NIA copy of HC.OP-ST.BF-0001.

HC.OP-ST.BF-0001 5.10.2 WITHDRAW the control rod to Operator simultaneously presses AND

  • position 48 holds both the WITHDRAW pushbutton Y N Barriers AND PERFORM the following while AND the CONTINUOUS WITHDRAW #

giving the selected Control pushbutton.

Rod a continuous withdraw signal:

[TIS 4.1.3.6, TIS 4.1.3.7]

A. OBSERVE the following as Operator observes OHA C6-F3 ROD indication of the Control Rod OVERTRAVEL does NOT annunciate.

being coupled:

1. ROD OVERTRAVEL alarm does NOT annunciate.
2. Red Full Out light illuminates on Operator observes the red FULL OUT the Full Core Display. light on the Full Core Display illuminates.

Page 13 of 21

TQ-J-'\A-106-0303 JPM: BF011 OPERATOR TRAINING PROGRAM NAME:

Rev: 01 JOB PERFORMANCE MEASURE DATE: ____________________

SYSTEM: Control Rod and Drive Mechanism TASK: Respond To An Uncoupled Control rod

(*Denotes a Critical Step) COMMENTS STEP

  • ELEMENT (#Denotes a Sequential Step) EVAL (Required for UNSAT NO. #

STANDARD S/U evaluation)

3. RPIS indicates the Control Rod is Operator observes RPIS indicates the full out (48). Control Rod is full out (48).
4. Proper response of the Nuclear Operator recognizes the expected Instrumentation while response of the Nuclear withdrawing the Control Rod. Instrumentation while withdrawing the Control Rod.

Examiner Note: The expected response for a rod at 48 is negligible.

l B. INDICATE on Attachment 2 the condition of Coupling Check.

Operator indicates the coupling check is SAT on Attachment 2.

Page 14 of 21

TQ~MA-1 06-0303 JPM: BF011 OPERATOR TRAINING PROGRAM NAME:

Rev: 01 JOB PERFORMANCE MEASURE DATE:

SYSTEM: Control Rod and Drive Mechanism TASK: Respond To An Uncoupled Control rod

(*Denotes a Critical Step) COMMENTS STEP

  • ELEMENT (#Denotes a Sequential Step) EVAL (Required for UNSAT NO. #

STANDARD S/U evaluation)

HC.OP-AB.IC-0001 Condition D Uncoupled Rod and Movement Permitted by RWM


+--1 ---j D.3 RESTRICT all further withdrawals of Operator informs the CRS that all this rod to Single Notch movement further withdrawals of this rod should be Y N Barriers repairs have been completed. restricted to Single repairs have been completed.

CUE WHEN operator informs you the task is complete, the JPM has been terminated for other reasons,

-"---'--'-~ RECORD the STOP TIME.

REPEAT BACK any N/A operator on the status state "This JPM is complete".

STOP TIME:

Page 15 of 21

TQ*AA*106*0303 JOB PERFORMANCE MEASURE OPERATOR TRAINING PROGRAM EVALUATOR FOLLOWUP QUESTION DOCUMENTATION NAME:

DATE:

JPM Number: BF011 TASK: Respond To An Uncoupled Control rod TASK NUMBER: 4000040401 QUESTION:

RESPONSE

RESULT: SAT UNSAT QUESTION:

RESPONSE

RESULT: SAT I UNSAT Page 16 of 21

TQ*AA*106*0303 JOB PERFORMANCE MEASURE INITIAL CONDITIONS:

1. The Plant is operating at 100% power.
2. Maintenance was performed on the position indication circuit of rod 38-03
3. Tile maintenance is complete.
4. As part of the retest requirements, performance of HC.OP-ST.BF-0001 Control Rod Drive Exercise - Weekly is required for control rod 38-03 only.
5. The "ON DUTY" Reactor Engineer has been notified that control rod 38-03 will be exercised lAW HC.OP-ST.BF-0001.
6. The Reactor Engineer has approved exercising rod 38-03 at 100% power.
7. Stall flows are I\JOT required.

INITIATING CUE:

Exercise control rod 38-03 lAW HC.OP-ST.BF-0001, Page 17 of 21

TQ-AA-106-0303 JOB PERFORMANCE MEASURE SIMULATOR SETUP INSTRUCTIONS (OPTIONAL)

INITIALIZE the simulator to IC#2, 100% power, MOL.

SELECT rod 02-19 on the Rod Select Module.

ENSURE CRD Drive Water pressure 260 - 270 psid.

ENSURE associated Schedule file open and running.

ENSURE associated Events file open.

Description ENSURE two copies of HC.OP-ST.BF-0001 are available, marked up for rod 38-03 ONLY, and with Step 5.1 initialed.

ENSURE OD-7 for IC#2 is available COMPLETE "Simulator Ready-for-Training/Examination Checklist".

Initial Event code: Icvposx(6)::> 770 II Rod 38-03 Overtravel

Description:

Senses 38-03 withdrawn past 48.

Event code:

  • et_array(1) ::>= 1.0 & Icvposx(6) < 740

Description:

Rod 38-03 Overtravel and inserted 1/ Deletes uncoupled rod after it has been inserted more than one notch lAW AB Event code:

Description:

Page 18 of 21

TQ*AA*106*0303 JOB PERFORMANCE MEASURE SIMULATOR SETUP INSTRUCTIONS (OPTIONAL)

MALFUNOTIONSCHEDULE*

'" ~,

'",/:.'; ,,' >"f /.,.-'<

~" > '?'<,-->,

'i"~  :,,<'i i">i i}'T";: i"';"i":'~"

,i

~;

'" ' I "

Initial @Time Event Action Description None None Insert malfunction CD043803 Control Rod 38-03 uncoupled Insert malfunction CD043803 on event None None Control Rod 38-03 uncoupled 2 delete in 1 Initial @Time I Event Action Description "OVERRfDEscHEDurE*

i 10"', " 'i, Initial @Time Event Action Description Insert override 3A81 G_DI to On on ROD SELECT - ROD DRIFT RESET (DI) event 1 Page 19 of 21

TQ-AA-106-0303 JOB PERFORMANCE MEASURE REVISION HISTORY JPM NUMBER: BF011 Rev# Date Description Validation Required?

01 9/14/11 This revision converts to HC LOR format, documents validation, and Y generates estimated completion time.

Since Critical JPM actions are now uniquely identified by the format, all statements identifying critical portion of action were redundant and deleted.

Modified Malfunction, Remote, Override, and Event list sections for TREX event syntax. Updated Reference procedure revision numbers only. Rewrote steps for uncoupled rod with no RE guidance. Validated with 2 operators from "C" Shift 9/13/11. Avg completion time 33 minutes.

I

JOB PERFORMANCE MEASURE STATION: Hope Creek SYSTEM: Reactor Protection System TASK: Respond To A Reactor Protection System Malfunction TASK NUMBER: 4000110401 JPM NUMBER: 305H-JPM.SB010 REV #: 05 SAP BET: NOH05JPSB10E ALTERNATE PATH: D APPLICABILITY:

EOD RO [ ] ] STA D SRO [ ] ]

DEVELOPED BY: Archie E. Faulkner DATE: 12/30/11 Instructor REVIEWED BY:  !'(k..- ~f~"["1 DATE: ~cf;-2 APPROVED BY: 9tr0Jl~

Training Department DATE: }/)r/) 2

TQ-AA-106-0303 STATION: Hope Creek JPM NUMBER: S8010 REV: 05 SYSTEM: Reactor Protection System TASK NUMBER: 4000110401 TASK: Respond To A Reactor Protection System Malfunction ALTERNATE PATH: D KIA NUMBER: _ _ 2_12_0_0_0_A_2._0_1__

IMPORTANCE FACTOR: 3.7 3.9 APPLICABILITY: RO SRO EO D RO [ ] ] STA D SRO EVALUATION SETTING/METHOD: Simulator/Perform

REFERENCES:

HC.OP-AB.IC-0003, Rev 04 TOOLS, EQUIPMENT AND PROCEDURES: None ESTIMATED COMPLETION TIME: 8 Minutes TIME PERIOD IDENTIFIED FOR TIME CRITICAL STEPS: N/A Minutes

..IPM PERFORMED BY: GRADE: D SAT D UNSAT ACTUAL COMPLETION TIME: Minutes ACTUAL TIME CRITICAL COMPLETION TIME: N/A Minutes REASON, IF UNSATISFACTORY:

EVALUATOR'S SIGNATURE: DATE:

Page 2 of 14

TQ-AA-106-0303 NAME:

DATE:

SYSTEM: Reactor Protection System TASK: Respond To A Reactor Protection System Malfunction TASK NUMBER: 4000110401 INITIAL CONDITIONS:

1. The plant was operating at 100% power when the 'A' RPS MG set tripped due to a bearing problem.
2. Restoration of the 'A' RPS MG set is not possible at this time.
3. There is no damage to the 'A' RPS bus.

INITIATING CUE:

Perform Condition A of HC.OP-AB.IC-0003.

Restoration of isolated equipment is not necessary at this time.

Page 3 of 14

TQ-nA-106-0303 JPM: SB010 OPERATOR TRAINING PROGRAM NAME: ___________________

Rev: 05 JOB PERFORMANCE MEASURE DATE: ___________________

SYSTEM: Reactor Protection System TASK: Respond To A Reactor Protection System Malfunction

(*Denotes a Critical Step) COMMENTS STEP

  • ELEMENT (#Denotes a Sequential Step) EVAL (Required for UNSAT NO. #

STANDARD stu evaluation)

CUE PROVIDE the operator the initiating cue. Operator repeats back initiating cue.

CUE ENTER START TIME AFTER OPERATOR REPEATS BACK INITIATING CUE: N/A START TIME: ...

Operator obtains procedure Operator obtains the correct procedure.

Operator determines beginning step Operator determines correct beginning of the procedure. step to be A.1 .

A.1 RESTORE Normal Power to the Operator determines restoration of Normal affected Bus. Power to the bus is not possible lAW Initial (if possible) Conditions provided.

Page 4 of 14

TQ-MA-106-0303 SB010 OPERATOR TRAINING PROGRAM NAME:

Rev: 05 JOB PERFORMANCE MEASURE DATE: ------------------

SYSTEM: Reactor Protection System TASK: Respond To A Reactor Protection System Malfunction

(*Denotes a Critical Step) COMMENTS STEP

  • ELEMENT (#Denotes a Sequential Step) EVAL (Required for UNSAT NO. #

STANDARD S/U evaluation)

CAUT Operator reviews Caution 1.

1 1. The RPS MG Set Transfer Switch is a "Break before Make" type switch.

Positioning it to the wrong position will result in a full scram.

A.2 lE Normal Power cannot be restored: Operator verifies Alternate Power is available by observing the ALTERNATE A

a. VERIFY Alternate Power is FEED light on 10C610 is illuminated.

available.

CUE If contacted as the NEO to verify N/A I~,; ; ::'

Alternate power is available, REPORT i~~[!;~:

Alternate power appears to be available.

. " ,;~!~

b. TRANSFER Power to the Operator turns the RPS MG SET
  • Alternate Power Supply by TRANSFER SWITCH to the ALTA POSITIONING the RPS MG SET position. #

TRANSFER SWITCH to the Alternate position.

[CD324X]

Page 5 of 14

TQ-J-lA-106-0303 JPM: SB010 OPERATOR TRAINING PROGRAM NAME: __________________

Rev: 05 JOB PERFORMANCE MEASURE DATE: __________________

SYSTEM: Reactor Protection System TASK: Respond To A Reactor Protection System Malfunction

(*Denotes a Critical Step)

  • COMMENTS STEP ELEMENT (#Denotes a Sequential Step) EVAL (Required for UNSAT NO. #

STANDARD S/U evaluation)

A.3 RESET the 1/2 Scram as follows: Operator turns the key for the RPS A 1 Trip

  • Logic to RESET and back to NORMAL.
a. TURN the key for the Affected #

RPS channel(s) to the RESET position.

b. TURN the key BACK to NORMAL.

Operator turns the key for the RPS A2 Trip

  • Logic to RESET and back to NORMAL.
c. VERIFY the Scram is reset. Operator verifies the scram is reset by observing the following:
  • RPS TRIP LOGIC A 1 and A2 NORMAL/RESET lights are illuminated
  • All four PILOT SCRAM VALVE SOLENOID LOGIC A NORMAL lights are illuminated
  • REACTOR SCRAM TRIP LOGIC A 1 and A2 OHAs are no longer illuminated Page 6 of 14

TQ-~A-1 06-0303 JPM: SB010 OPERATOR TRAINING PROGRAM NAME:

Rev: 05 JOB PERFORMANCE MEASURE DATE: __________________

SYSTEM: Reactor Protection System TASK: Respond To A Reactor Protection System Malfunction

(*Denotes a Critical Step) COMMENTS STEP

  • ELEMENT (#Denotes a Sequential Step) EVAL (Required for UNSAT NO. #

STANDARD S/U evaluation)

A.4 IF the MSIV's are OPEN Operator presses the NUCLEAR STEAM

  • THEN RESET the tripped NSSSS SUPPLY SHUTOFF SYSTEM TRIP Logic as follows: LOGIC A pushbutton. #
a. PRESS the NUCLEAR STEAM SUPPLY SHUTOFF SYSTEM TRIP LOGIC A(8,C,D) RESET Pb.

i~~~~~

Operator presses the NUCLEAR STEAM

  • SUPPLY SHUTOFF SYSTEM TRIP LOGIC C RESET pushbutton. #
b. VERIFY MSIV TRIP LOGIC Operator verifies the MSIV TRIP LOGIC TRIPPED goes off. TRIPPED light for LOGIC A is extinguished.

Operator verifies the MSIV TRIP LOGIC TRIPPED light for LOGIC C is extinguished.

Page 7 of 14

TQ-r-.A-106-0303 JPM: SB010 OPERATOR TRAINING PROGRAM NAME:

Rev: 05 JOB PERFORMANCE MEASURE DATE:

SYSTEM: Reactor Protection System TASK: Respond To A Reactor Protection System Malfunction

(*Denotes a Critical Step) COMMENTS STEP

  • ELEMENT (#Denotes a Sequential Step) EVAL (Required for UNSAT NO. #

STANDARD stU evaluation)

WHEN operator informs you the task is N/A complete, the JPM has been terminated for other reasons, THEN RECORD the STOP time.

REPEAT BACK any message from the operator on the status of the JPM, and then state "This JPM is complete".

STOP TIME:

Page 8 of 14

TQ-AA-106*0303 JOB PERFORMANCE MEASURE OPERATOR TRAINING PROGRAM EVALUATOR FOLLOWUP QUESTION DOCUMENTATION NAME:

DATE:

JPM Number: SB010 TASK: Respond To A Reactor Protection System Malfunction TASK NUMBER: 4000110401 QUESTION:

RESPONSE

RESULT: SAT UNSAT QUESTION:

RESPONSE

RESULT: SAT UNSAT Page 9 of 14

TQ-AA-106-0303 JOB PERFORMANCE MEASURE INITIAL CONDITIONS:

1. The plant was operating at 100% power when the "A' RPS MG set tripped due to a bearing problem.
2. Restoration of the 'A' RPS MG set is not possible at this time.
3. There is no damage to the "A' RPS bus.

INITIATING CUE:

Perform Condition A of HC.OP-AB.IC-0003.

Restoration of isolated equipment is not necessary at this time.

Page 10 of 14

TQ-AA-106-0303 JOB PERFORMANCE MEASURE (r'::~

,-~;::~,~ ,'/'"

\,~/." ,

':, Ie Initial INITIALIZE the simulator to 100% power, MOL.

INSERT malfunction RP02A.

AFTER RWCU trips and conditions stabilize, ACKNOWLEDGE all overhead and RM11 alarms.

ENSURE associated Schedule file open and running.

ENSURE associated Events file open.

Initial Description COMPLETE "Simulator Ready-for-Training/Examination Checklist".

Initial ET #

Event code:

Description:

Event code:

Description:

Event code:

Description:

TQ-AA-106-0303 JOB PERFORMANCE MEASURE Action None None Insert malfunction RP02A RPS MG Set A failure Initial @Time Event Action Description

TQ-AA-106-0303 JOB PERFORMANCE MEASURE REVISION HISTORY JPM NUMBER: S8010 Rev# Date Description Validation Required?

04 9/4/2008 This revision converts to HC LOR format, documents validation, Y and generates estimated completion time.

Since Critical JPM actions are now uniquely identified by the format, ali statements identifying critical portion of action were redundant and deleted.

Updated Reference procedure revision number. No change to operator actions.

05 12130/11 Revised Initial Conditions from 97% to 100%. Modified N Malfunction, Remote, Override, and Event list sections for TREX event syntax. Updated Reference procedure revision numbers

! only. No changes to operator actions. No validation required.

I I

JOB PERFORMANCE MEASURE STATION: Hope Creek SYSTEM: Reactor Auxiliaries Cooling System TASK: Respond To A Reactor Auxiliary Cooling Malfunction TASK NUMBER: 4000230401 JPM NUMBER: 305H-JPM.ED002 REV#: 05 SAP BET: NOH05JPED02E ALTERNATE PATH: 0 APPLICABILITY:

EO RO [KJ STA D SRO [KJ DEVELOPED BY: Archie E. Faulkner DATE: 12/22/11 Instructor REVIEWED BY: 0,z-ufi-oc DATE:

APPROVED BY: CV~

Training Department DATE: JI flail<

TQ-AA-106-0303 STATION: Hope Creek JPM NUMBER: ED002 REV: 05 SYSTEM: Reactor Auxiliaries Cooling System TASK NUMBER: 4000230401 TASK: Respond To A Reactor Auxiliary Cooling Malfunction ALTERNATE PATH: W KIA NUMBER:

IMPORTANCE FACTOR:

295018 AA2.02 3.3 3.4 APPLICABILITY: RO SRO EOD ROCK] STAD SRO CK]

EVALUATION SETTING/METHOD: Simulator/Perform

REFERENCES:

HC.OP-SO.ED-0001 Rev 23 HC.OP-AR.ZZ-0002 Rev 21 HC.OP-AB.COOL-0003 Rev 4 TOOLS, EQUIPMENT AND PROCEDURES: None ESTIMATED COMPLETION TIME: 13 Minutes TIME PERIOD IDENTIFIED FOR TIME CRITICAL STEPS: I\J/A Minutes

..IPM PERFORMED BY: GRADE: D SAT D UNSAT ACTUAL COMPLETION TIME: Minutes ACTUAL TIME CRITICAL COMPLETION TIME: N/A Minutes REASON, IF UNSATISFACTORY:

EVALUATOR'S SIGNATURE: DATE:

Page 2 of 19

TQ-AA-106-0303 NAME:

DATE:

SYSTEM: Reactor Auxiliaries Cooling System TASK: Respond To A Reactor Auxiliary Cooling Malfunction TASK NUMBER: 4000230401 INITIAL CONDITIONS:

1. The RACS System is in service with the AP209 and CP209 RACS pumps running.
2. AP209 RACS pump is scheduled for an oil change.
3. The Reactor Building EO has been briefed and is stationed at the BP209 RACS pump.
4. The BP209 has NOT been isolated since the last time it was in service and is ready for a start.

INITIATING CUE:

You are the Plant Operator.

Place the BP209 RACS pump in service and secure the AP209 RACS pump.

Page 3 of 19

TQ-hM-106-0303 JPM: ED002 OPERATOR TRAINING PROGRAM NAME: __________________

Rev: 05 JOB PERFORMANCE MEASURE DATE: __________________

SYSTEM: Reactor Auxiliaries Cooling System TASK: Respond To A Reactor Auxiliary Cooling Malfunction

(*Denotes a Critical Step)

  • COMMENTS STEP ELEMENT (#Denotes a Sequential Step) EVAL (Required for UNSAT NO. #

STANDARD S/U evaluatio CUE PROVIDE the operator the initiating cue. Operator repeats back initiating cue.

CUE ENTER START TIME '--'-'---'~

OPERATOR REPEATS BACK INITIATING CUE: N/A START TIME:

Operator obtains the correct Operator obtains procedure procedure. HC.OP-SO.ED-0001.

Operator reviews precautions and Operator reviews precautions and limitations. limitations.

CUE If excessive time is taken reviewing precautions and limitations, inform operator that all are satisfied. N/A Operator determines beginning step Operator determines correct beginning of the procedure. step to be 5.3.1.

Page 4 of 19

TQ-M.A-106-0303 JPM: ED002 OPERATOR TRAINING PROGRAM NAME: __________________

Rev: 05 JOB PERFORMANCE MEASURE DATE: __________________

SYSTEM: Reactor Auxiliaries Cooling System TASK: Respond To A Reactor Auxiliary Cooling Malfunction

(*Denotes a Critical Step) COMMENTS STEP

  • ELEMENT (#Denotes a Sequential Step) EVAL (Required for UNSAT NO. #

STANDARD S/U eval 5.3.1 ENSURE all prerequisites have been Operator ensures that all prerequisites satisfied lAW Section 2.3. have been satisfied.

Operator then initials the appropriate Reactor Auxiliaries Cooling Water procedure step.

System is in service.

CUE If excessive time is taken reviewing prerequisites, inform operator that all are satisfied. N/A 5.3.2 ENSURE that one of the following On 1OC651 A operator observes the HX valves are OPEN (10C651A): INLET VALVES:

ED-HV-2537A(B) HX INLET VLVS.

  • HX AE217 INLET red HV2537 A OPEN light is illuminated and green CLOSE light is extinguished
  • HX BE217 INLET red HV2537B OPEN light is illuminated and green CLOSE light is extinguished.

Page 5 of 19

TQ-kA-106-0303 JPM: ED002 OPERATOR TRAINING PROGRAM NAME:

Rev: 05 JOB PERFORMANCE MEASURE DATE: __________________

SYSTEM: Reactor Auxiliaries Cooling System TASK: Respond To A Reactor Auxiliary Cooling Malfunction

(*Denotes a Critical Step) COMMENTS STEP

  • ELEMENT (#Denotes a Sequential Step) EVAL (Required for UNSAT NO. #

STANDARD S/U evaluation) 5.3.3 OBSERVE the following lights are off for the RACS Pumps Operator observes the REACTOR going in service: AUXILIARIES COOLING PUMPS

  • OVLD/PWR FAIL PUMP Bamber OVLD/PWR FAIL, INOP, and white REMOTE lights are
  • INOP extinguished.
  • REMOTE 5.3.4 For the 1AP209 and/or 1BP209, as applicable, ENSURE RACS PMP 1AP209 BKR On 10C650E operator observes the 52-41011, RACS PMP BP209 BRKR 52-42011 and/or 1BP209 BKR 52-42011 red CLOSED light is illuminated and CLOSED is on. (10C650E) green TRIPPED light is extinguished.

5.3.5 IF returning a pump to service that has been isolated and drained, PERFORM the following steps as necessary to correct/prevent air Operator determines to proceed to Step binding, otherwise, PROCEED to 5.3.6, since the Initiating Cue states Step 5.3.6 for a normal start of a that the pump was not isolated.

standby pump:

Page 6 of 19

TQ-,...",,-106-0303 JPM: ED002 OPERATOR TRAINING PROGRAM NAME:

Rev: 05 JOB PERFORMANCE MEASURE DATE: __________________

SYSTEM: Reactor Auxiliaries Cooling System TASK: Respond To A Reactor Auxiliary Cooling Malfunction

(*Denotes a Critical Step)

  • COMMENTS STEP ELEMENT (#Denotes a Sequential Step) EVAL (Required for UNSAT NO. #

STANDARD S/U evaluation) 5.3.6 PRESS REACTOR AUXILIARIES

  • COOLING PUMP A(B)(C) Operator presses the REACTOR #

START PB (10C651A). START AUXILIARIES COOLING PUMPS comes on. PUMP B BP209 START pushbutton.

OBSERVE AI-6460 (AI-6461)

REACTOR AUXILIARIES COOLING Operator observes:

PUMP A(B)(C) MOT AMPS settles at

  • The red BP209 START light

< 180 amps illuminates and the green STOP AND is approximately the same as light extinguishes.

the other I/S RACS pumps' motor

  • AI-6461 is < 180 amps and settles amps. at approximately the same value as the "An and "C" RACS pumps' amps.

5.3.7 PRESS REACTOR AUXILIARIES

  • COOLING PUMP B(A)(C) Operator presses the REACTOR AUXILIARI COOLI NG PU M PS #

STOP PB. STOP comes on.

PUMP A STOP pushbutton.

Operator observes the green STOP light illuminates and the red AP209 START light extinguishes.

L __________

Page 7 of 19

TQ-kA-106-0303 JPM: ED002 OPERATOR TRAINING PROGRAM NAME:

Rev: 05 JOB PERFORMANCE MEASURE DATE: - - - - - - - - - - - - - - - - - - -

SYSTEM: Reactor Auxiliaries Cooling System TASK: Respond To A Reactor Auxiliary Cooling Malfunction

(*Denotes a Critical Step) COMMENTS STEP

  • ELEMENT (#Denotes a Sequential Step) EVAL (Required for UNSAT NO. #

STANDARD S/U evaluation)

N/A Operations Fundamental: 5 seconds after the 'A' RACS pump has been secured, the Operator observes Control Board Awareness the following:

  • OHA A2-E2, "RACS TROUBLE"
  • CRIOS 05762 RACS PUMP BP209 TRBL
  • Amber OVLD/PWR FAIL is flashing
  • Red BP209 START light is extinguished.
  • Green STOP light is flashing.
  • AI-6461 reads 0 amps.

N/A HC.OP-AR.ZZ-0002 N/A ATT OPERATOR ACTION:

E2 1. REFER to HC.OP-AB.COOL-0003(Q); Reactor Auxiliary Cooling System.

2. ENSURE compliance with Operator refers to Technical Specifications 3.6.3 HC.OP-AB.COOL-0003.

Containment Isolation Valves.

3. ENSURE compliance with Technical Specifications 3.6.5 Secondary Containment Integrity.

Page 8 of 19

TQ-AA-106-0303 JPM: ED002 OPERATOR TRAINING PROGRAM NAME:

Rev: 05 JOB PERFORMANCE MEASURE DATE:

SYSTEM: Reactor Auxiliaries Cooling System TASK: Respond To A Reactor Auxiliary Cooling Malfunction STEP (*Denotes a Critical Step)

  • COMMENTS ELEMENT (#Denotes a Sequential Step) EVAL (Required for UNSAT NO. #

STANDARD S/U evaluation CUE Direct the Operator to perform Condition 'A' of HC.OP-AB.COOL-0003 Reactor N/A Auxiliary Cooling System.

N/A HC.OP-AB.COOL-0003 N/A COND Date/Time Operator enters the current Date/Time in the spaces provided.

A A.1 PRESS the START P.B. for any Operator presses the REACTOR available RACS pump in standby. AUXILIARIES COOLING PUMPS PUMP A AP209 START pushbutton.

Operator observes:

  • The red AP209 START light remains extinguished and the green STOP light remains illuminated.
  • Motor amps continue to indicate O.

Page 9 of 19

TQ-,",,,,-106-0303 ED002 OPERATOR TRAINING PROGRAM NAME:

DATE: ___________________

Rev: 05 JOB PERFORMANCE MEASURE SYSTEM: Reactor Auxiliaries Cooling System TASK: Respond To A Reactor Auxiliary Cooling Malfunction TEP (*Denotes a Critical Step) COMMENTS SNO ELEMENT (#Denotes a Sequential Step) EVAL (Required for UNSAT I

  • STANDARD # StU evalu I CUE Respond to any reports of the 'A' RACS pump failure to start by directing the operator to continue implementing Condition 'A' of N/A HC.OP-AB.COOL-0003.

A.2 LE a second RACS Pump CANNOT be placed in service, THEN ISOLATE RACS to the out of Operator observes the OFFGAS service Off-Gas Train as follows: RECOMB TRAIN SELECT:

  • LE the Common Off-Gas Train
  • COM TRAIN red OPEN light is in service, illuminated and green CLOSE light THEN CLOSE HV-2577. extinguished.
  • LE Unit 1 Off-Gas Train is in
  • TRAIN 1 red OPEN light service, extinguished and green CLOSE light

-'-'--'.=-=-=- CLOSE HV-7712A1. illuminated.

Operator presses the OFF GAS CLR

  • CNDS COOLING 10E306 UNIT 1 green CLOSE pushbutton.

Operator observes the green CLOSE light illuminates and red HV2577 OPEN light extinguishes.

Page 10 of 19

TQ-kA-106-0303 JPM: ED002 OPERATOR TRAINING PROGRAM NAME: ___________________

Rev: 05 JOB PERFORMANCE MEASURE DATE: ___________________

SYSTEM: Reactor Auxiliaries Cooling System TASK: Respond To A Reactor Auxiliary Cooling Malfunction

(*Denotes a Critical Step) COMMENTS STEP

  • ELEMENT (#Denotes a Sequential Step) EVAL (Required for UNSAT NO. #

STANDARD S/U evaluati wvoJ CUE If the Operator Closes HV2577 the JPM may be terminated. If the operator closes the HV7712A1, allow 1 minute to recognize the mistake and then terminate the JPM. N/A Leaving the HV7712A1 closed and/or causing an isolation of the Common Offgas Train is failure criteria.

CUE WHEN operator informs you the task is complete, OR the JPM has been terminated for other reasons,

- - - - RECORD THEN STOP N/A REPEAT BACK any message from the operator on the status of the JPM, and then state "This JPM is complete".

STOP TIME:

Page 11 of 19

TQ-AA-106-0303 JOB PERFORMANCE MEASURE OPERATOR TRAINING PROGRAM EVALUATOR FOLLOWUP QUESTION DOCUMENTATION NAME:

DATE:

JPM Number: ED002 TASK: Respond To A Reactor Auxiliary Cooling Malfunction TASK NUMBER: 4000230401 QUESTION:

RESPONSE

RESULT: SAT UNSAT QUESTION:

RESPONSE

RESULT: SAT UNSAT Page 12 of 19

TQ-AA-106-0303 JOB PERFORMANCE MEASURE INITIAL CONDITIONS:

1. The RACS System is in service with the AP209 and CP209 RACS pumps running.
2. AP209 RACS pump is scheduled for an oil change.
3. The Reactor Building EO has been briefed and is stationed at the BP209 RACS pump.
4. The BP209 has NOT been isolated since the last time it was in service and is ready for a start.

INITIATING CUE:

You are the Plant Operator.

Place the BP209 RACS pump in service and secure the AP209 RACS pump.

Page 13 of 19

TQ*AA*106-0303 JOB PERFORMANCE MEASURE SIMULATOR SETUP INSTRUCTIONS (OPTIONAL)

'I:.

INITIALIZE the simulator to any IC with the Main Generator loaded.

ENSURE the 'A' & 'C' RACS pumps are in service and the 'B' RACS pump is in STBY.

ENSURE the Common Offgas Train is in service and HV-2577 is open.

ENSURE associated Schedule file open and running.

ENSURE associated Events file open.

Initial I Description ENSURE simulator is reset.

Event code: I cwnra209 <= 0.5 /I AP209 RACS pump normalized pump speed

Description:

Trips BP209 RACS pump after the AP209 RACS pump is stopped Event code:

Description:

Page 14 of 19

TQ-AA-106-0303 JOB PERFORMANCE MEASURE SIMULATOR SETUP INSTRUCTIONS (OPTIONAL)

Action Insert malfunction CW08B after 5 None I None on event 1 Initial AP209 START-REACTOR None Insert override 5A33_E_DI to Off AUXILIARIES COOLING PUMP-PUMP Page 15 of 19

TQ-AA-106-0303 JOB PERFORMANCE MEASURE SIMULATOR SETUP INSTRUCTIONS (OPTIONAL)

CW08B Trip of BP209 RACS pump.

5A33 E 01 AP209 RACS pump start pushbutton. NONE OFF Page 16 of 19

TQ-AA-106-0303 JOB PERFORMANCE MEASURE REVISION HISTORY JPM NUMBER: ED002 Rev # Date Description Validation Required?

01 7/23/07 Originally developed for ILOT NRC exam in 2005. This revision Y converts to HC LOR format, documents validation, and generates estimated completion time.

02 8/26/08 Updated reference procedure revisions. Corrected previous typo N error in procedure step A.2. No change in operator actions from previous revision. No validation required.

03 9/9/09 Updated reference procedure revisions. No change in operator N actions from previous revision. No validation required.

04 9/12/11 Modified Malfunction, Remote, Override, and Event list sections 1\1 for TREX event syntax. Updated Reference procedure revision numbers only. No changes to operator actions. No validation required.

03 12/30/11 Updated reference procedure revisions. No change in operator 1\1 actions from previous revision. No validation required.

TQ-AA-106-0303 JOB PERFORMANCE MEASURE INITIAL CONDITIONS:

1. The RACS System is in service with the AP209 and CP209 RACS pumps running.
2. AP209 RACS pump is scheduled for an oil change.
3. The Reactor Building EO has been briefed and is stationed at the BP209 RACS pump.
4. The BP209 has NOT been isolated since the last time it was in service and is ready for a start.

INITIATING CUE:

You are the Plant Operator.

Place the BP209 RACS pump in service and secure the AP209 RACS pump.

J RFORMANCE MEASUR STATION: Hope Creek SYSTEM: Main Steam TASK: Install Jumpers To Bypass MSIV Low Leve! Isolation Interlock TASK NUMBER: 2000010501/200059054 JPM NUMBER: 305H-JPM.AB001 REV#: 07 SAP BET: NOH05JPAB01 E ALTERNATE PATH: D APPLICABILITY:

r--

EO RO STA [ ] SRO [ ] ]

DEVELOPED BY: Archie E. Faulkner DATE: 9/4/08 Instructor REVIEWED BY:

J2I1l:L ~

Operations Representative DATE: 9-1:;'-08 APPROVED BY: 3Jj- CflL--..

Training Department DATE: ~LI6/or

06*0303 STATIOr..!: Hope Creek JPM NUMBER: AB001 REV: 07 SYSTEM: Main Steam TASK NUMBER: 2000010501/200059054 TASK: Install Jumpers To Bypass MSIV Low Level Isolation Interlock ALTERNATE PATH: D KIA NUMBER: 239001 A2.03 IMPORTANCE FACTOR: 4.0 4.2 APPLICABILITY: RO SRO EOD ROW STAD SROW EVALUATION SETTING/METHOD: Simulator/Perform

REFERENCES:

HC.OP-EO.ZZ-0301, Rev. 6 TOOLS, EQUIPMENT AND PROCEDURES: None ESTIMATED COMPLETION TIME: 0; Minutes TIME PERIOD IDENTIFIED FOR TIME CRITICAL STEPS: N/A Minutes I-------------~ ...- -.....- - - - - - - - . - - - - - - - - - - - - - - - - - - - - _ l JPM PERFORMED BY: GRADE: D SAT D UNSAT ACTUAL COMPLETION TIME: Minutes ACTUAL TIME CRITICAL COMPLETION TIME: N/A Minutes REASON, IF UNSATISFACTORY:

EVALUATOR'S SIGNATURE: DATE:

Page 2 of 13

TQ~AA* 'i 06*0303 NAf\'1E:

OJ\.

SYSTEM: Main Steam TASK: Install Jumpers To Bypass MSIV Low Level Isolation Interlock TASK NUMBER: 2000010501/200059054 INITIAL CONDITIONS:

1. The Reactor is at 32% power following a full core ATWS.
2. The Main Turbine is tripped.
3. The MSIVs are open.
4. The Main Condenser is available.
5. HC.OP-EO.zZ-0101A, ATWS - RPV Control, is being executed.
6. HC.OP-EO.ZZ-0311, Bypassing Primary Containment Instrument Gas Interlocks, and HC.OP-EO.zZ-0319, Restoring Instrument Air in an Emergency, have been completed.
7. There is no indication of fuel cladding failure or main steam line break.

INITIATING CUE:

Bypass the MSIV Low RPV Water Level Isolation Interlock lAW HC.OP-EO.zZ-0301.

Page 3 of 13

,"~1 JPM: AB001 OPERATOR TRAINING PROGRAM NAME:

Rev: 07 JOB PERFORMANCE MEASURE DATE: _______________ _

SYSTEM: Main Steam TASK: Install Jumpers To Bypass MSIV Low Level Isolation Interlock

(*Denotes a Critical Step)

  • COMMENTS STEP ELEMENT (#Denotes a Sequential Step) EVAL (Required for UNSAT NO. #

STANDARD S/U evaluation) ..... ,."..,.."..

CUE PROVIDE the operator the initiating cue. Operator repeats back initiating cue.

r- ,>


------- ~~~~"---------

CUE ENTER START TIME AFTER -" ...

OPERATOR REPEATS BACK INITIATING CUE:

~

START TIME:

'-' i I** " , '-

Operator obtains and locates Operator obtains the correct procedure.

procedure HC.OP-EO.ZZ-0301.

Operator reviews precautions and Operator reviews precautions and limitations. limitations.

CUE If excessive time is taken reviewing precautions and limitations, inform t,

operator that all are satisfied.

Page 4 of 13

.;-\~i \lU**U~f.'l.-'

JPM: AB001 OPERATOR TRAINING PROGRAM NAME:

Rev: 07 JOB PERFORMANCE MEASURE DATE: - - -

SYSTEM: Main Steam TASK: Install Jumpers To Bypass MSIV Low Level Isolation Interlock STEP (*Denotes a Critical Step) COMMENTS NO. ELEMENT (#Denotes a Sequential Step) EVAL (Required for UNSAT STANDARD # S/U evaluation) 4.0 EQUIPMENT REQUIRED Operator obtains the following required equipment:

  • 4.1 EOP-301 Implementation Kit (OS Office EOP Drawer) EOP-301 Implementation Kit from NSS Contents: 4 Banana Plug Jumpers Office EOP drawer OR 1 Flashlight Key #9 from OS Office or key from OR break glass key holder in OSC for OSC 4.2 Key #9 for EOP Locker in OSC EOP locker (obtain from OS office or break red AND key holder glass in OSC) EOP-301 Implementation kit from the AND EOP Locker in OSC.

EOP-301 Implementation Kit (EOP Locker in OSC). Examiner Note: After operator has I

Contents: 4 Banana Plug Jumpers demonstrated ability to obtain I 1 Flashlight required equipment, ensure that the equipment is returned to its appropriate storage location. _J Operator determines beginning step Operator determines the correct of the procedure. beginning step to be 5.2.

5.2.1 ENSURE that all prerequisites have Operator ensures that all prerequisites been satisfied lAW Section 2.0 of this have been satisfied.

procedure. I I


~- ..

CUE If excessive time is taken reviewing prerequisites, inform operator that all are satisfied. . ...

Page 5 of 13

T" A-106-0303 JPM: AB001 OPERATOR TRAINING PROGRAM NAME:

Rev: 07 JOB PERFORMANCE MEASURE DATE: ----~---

SYSTEM: Main Steam TASK: Install Jumpers To Bypass MSIV Low Level Isolation Interlock STEP (*Denotes a Critical Step)

  • COMMENTS ELEMENT (#Denotes a Sequential Step) EVAL (Required for UNSAT NO. #

STANDARD stu evaluation)

I I 5.2.2 At panel 10C609 Div. 1 (front) Operator installs jumper between the

  • INSTALL a jumper in the red and red and black jacks labeled 821 H black jacks labeled: K212A T1-M1 HC.OP-EO.zZ-0301 B21H-K212A T1-M1 OP-EO.ZZ-301 (10C609)

(fourth column, first row)

CUE The jumper has been installed as you have indicated.

I -- ----~

5.2.3 At panel 10C609 Div 3 (front) Operator installs jumper between the INSTALL a jumper in the red and red and black jacks labeled 821 H

  • black jacks labeled: K212C T1-M1 HC.OP-EO.zZ-0301 B21H-K212C T1-M1 OP-EO.ZZ-301 (10C609)

(fourth column, first row)


~-,,- -~---~

CUE The jumper has been installed as- --:

I you have indicated.


~~ ~~-.---~-

5.2.4 At panel10C611 Div. 2 (front) Operator installs jumper between the INSTALL a jumper in the red and red and black jacks labeled 821 H

  • black jacks labeled: K2128 T1-M1 HC.OP-EO.zZ-0301 I B21 H-K212B T1-M1 OP-EO.ZZ-301 (10C611).

(fourth column, first row)

CUE The jumper has been installed as you have indicated.  :

Page 6 of 13

Tl... .A-106-0303 JPM: AB001 OPERATOR TRAINING PROGRAM NAME:

Rev: 07 JOB PERFORMANCE MEASURE DATE: ___________

SYSTEM: Main Steam TASK: Install Jumpers To Bypass MSIV Low Level Isolation Interlock

(*Denotes a Critical Step) COMMENTS STEP ELEMENT (#Denotes a Sequential Step)

  • EVAL (Required for UNSAT NO. #

STANDARD S/U evaluation) 5.2.5 At panel 1OC611 Div. 4 (front) Operator installs jumper between the INSTALL a jumper in the red and red and black jacks labeled 821 H black jacks labeled: K212D T1-M1 HC.OP-EO.ZZ-0301 B21H-K212D T1-M1 OP-EO.ZZ-301 (1 OC611).

(fourth column, first row)

CUE The jumper has been installed as you have indicated.

CUE WHEN operator informs you the task is complete, OR the JPM has been terminated for other reasons, THEN RECORD the STOP time.

REPEAT BACK any message from the operator on the status of the JPM, and then state "This JPM is complete".

STOP TIME:

Page 7 of 13

TQ~At,,*1 06-0303 JOB PERFORMANCE MEASURE OPER..d.TOR TRAINING PROGRAM EVALUATOR FOLLOWUP QUESTION DOCUMENTATION NAME:

DATE:

JPM Number: AB001 TASK: Install Jumpers To Bypass MSIV Low Level Isolation Interlock TASK NUMBER: 2000010501/200059054 QUESTION:

RESPONSE

RESULT: SAT UNSAT QUESTION:

RESPONSE

RESULT: SAT L - I_ - - - '

UNSAT , - - - - - I_ - - - - '

Page 8 of 13

TQ-AA*1 06~0303 JOB PERFORMANCE MEASURE INITIAL CONDITIONS:

1. The Reactor is at 32% power following a full core ATWS.
2. The Main Turbine is tripped.
3. The MSIVs are open.
4. The Main Condenser is available.
5. HC.OP-EO.ZZ-0101A, ATWS - RPV Control, is being executed.
6. HC.OP-EO.ZZ-0311, Bypassing Primary Containment Instrument Gas Interlocks, and HC.OP-EO.ZZ-0319, Restoring Instrument Air in an Emergency, have been completed.
7. There is no indication of fuel cladding failure or main steam line break.

INITIATING CUE:

Bypass the MSIV Low RPV Water Level Isolation Interlock lAW HC.OP-EO.zZ-0301.

Page 9 of 13

TQ-AA-1 06~0303 JOB PERFORMANCE MEASURE SIMULATOR SETUP INSTRUCTIONS (OPTIONAL)

,',':;" '~<~~_ ',:: "".'__ .... ,:':. ~"~:i~--<_

INITIALCOl\i1)trI()N~."

, " "-' . ,- -- ,--- ><@';/J4:- - "-"~

INITIALIZE the simulator to 97 power, MOL.

Lock the reactor Mode Switch in Shutdown Take actions of HC.OP-AB.ZZ-0001 Attachment 1 Initiate SLC.

Trip the Main Turbine.

Ensure the MSIVs are open.

Ensure the Main Condenser is available.

Place the simulator into Freeze.

COMPLETE "Simulator Ready-for-Training/Examination Checklist".

Description EVENT ACTION:

COMMAND:

PURPOSE:

2 Page 10 of 13

TQ*AA*106*0303 JOB PERFORMANCE MEASIJRE SIMULATOR SETUP INSTR:JCTIONS (OPTIONAL)

Initial Left Side RP07 Half Core ATWS - Right Side None EG11 Main Generator Trip

TQ-AI'~.~i06*0303 JOB PERFORMANCE MEASURE REVISION HISTORY JPM NUMBER: AB001 Rev # Date Description I Validation I Required?

9/4/2008 This revision converts to HC LOR format, documents validation, Y and generates estimated completion time.

Since Critical JPM actions are now uniquely identified by the format, all statements identifying critical portion of action were redundant and deleted.

Revised power level from 48% to 32% based on IC and current core model.

Added Remote functions for EOP 311 and 319 implementation.

Updated Reference procedure revision number. No change to operator actions.

I

TQ-AAg"106-0303 JOB PERFORIv1ANCE MEASURE VALIDATION CHECKLIST JPM NUMBER: AB001 REV#: 07 TASK: Install Jumpers To Bypass MSIV Low Level Isolation Interlock

~ 1. Task description and number, JPM description and number are identified.

ci ~/ 2. Knowledge and Abilities (KIA) references are included.

If ~ p.,. 3. Performance location specified (in-plant, control room, or simulator).

aL,7 4. Initial setup conditions are identified.

a77 5. Initiating and terminating cues are properly identified.

~ 6. Task standards identified and verified by SME review.

fl...¥: 7. Critical steps meet the specified criteria and are identified with an asterisk (*).

Q(--J- 8. Verify the JPM steps rnatch the rnost current revision of the procedure.

f1 4% 9. Pilot test the JPM:

f1l..-v a. verify cues both verbal and visual are free of conflict

~. b. ensure performance time is accurate VALIDATED BY:

Qualification Level Required: RO Eel ~kh3oL-J Name Q.o Qual

~ Signature

'1-II-D{?

Date k' ;M;vI!LJ)!l Name

.0(;;

Qual

~~ Signature 9~Z!(t Date

JOB PERFORMANCE MEASURE STATION: Hope Creek SYSTEM: Safety Auxiliaries Cooling Water TASK: Respond To A SACS Malfunction TASK NUMBER: 400780401 JPM NUMBER: 30SH-JPM.EG003 REV*#: 17 SAP BET: NOH05JPEG03E ALTERNATE PATH: D APPLICABILITY:

EO r-RO [KJ STA D SRO [KJ DEVELOPED BY: Archie E. Faulkner DATE: 12/30/11 Instructor REVIEWED' BY: -----/ ~rlJVL DATE: 1/& c/;z.

perations Repre~

APPROVED BY: qu~ DATE: 1/1 tLt<

Training Department

TQ-AA-106-0303 STATION: Hope Creek I JPM NUMBER: EG003 REV: 17 SYSTEM: Safety Auxiliaries Cooling Water TASK NUMBER: 400780401 TASK: Respond To A SACS Malfunction ALTERNATE PATH: D KIA NUMBER: 400000 A2.01 IMPORTANCE FACTOR: 3.3 3.4 APPLICABILITY: RO SRO EO D RO [K] STA D SRO [K]

EVALUATION SETTING/METHOD: Reactor Building/Simulate

REFERENCES:

HC.OP-SO.EG-0001, Rev 45 HC.OP-AB.COOL-0002, Rev 7 Annotated copy of HC.OP-SO.EG-0001, valve TOOLS, EQUIPMENT AND PROCEDURES:

locking devices.

ESTIMATED COMPLETION TIME: 20 Minutes TIME PERIOD IDENTIFIED FOR TIME CRITICAL STEPS: N/A Minutes JPM PERFORMED BY: GRADE: D SAT D UNSAT ACTUAL COMPLETION TIME: Minutes ACTUAL TIME CRITICAL COMPLETION TIME: N/A Minutes REASON, IF UNSATISFACTORY:

EVALUATOR'S SIGNATURE: DATE:

Page 2 of 12

TQ-AA-106-0303 NAME: ____________________

DATE: ____________________

SYSTEM: Safety Auxiliaries Cooling Water TASK: Respond To A SACS Malfunction TASK NUMBER: 400780401 INITIAL CONDITIONS:

1. SACS Loop B has been declared inoperable.
2. HC.OP-AB.COOL-0002, SafetylTurbine Auxiliaries Cooling System, is being implemented.
3. Components are being realigned lAW Section 5.12 of HC.OP-SO.EG-0001.
4. The 'D! EDG Coolers AND Room Coolers have been cross tied to the 'A' SACS loop lAW HC.OP-SO.EG-0001 Attachment 3 Part A.

INITIATING CUE:

Cross Tie the 'D' FRVS Recirculation Unit to the 'A' SACS Loop in the sequence presented in HC.OP-SO.EG-0001 Attachment 3 Part B.

WCM update and tagging will be performed by another operator.

Page 3 of 12

TQ-.-.~-106-0303 JPM: EG003 OPERATOR TRAINING PROGRAM NAME:

Rev: 17 JOB PERFORMANCE MEASURE DATE:

SYSTEM: Safety Auxiliaries Cooling Water TASK: Respond To A SACS Malfunction

(*Denotes a Critical Step)

  • COMMENTS STEP ELEMENT (#Denotes a Sequential Step) EVAL (Required for UNSAT NO. #

STANDARD Stu evaluation CUE PROVIDE the operator the cue. Operator repeats back initiating cue.

CUE ENTER START TIME AFTER OPERATOR REPEATS BACK INITIATING CUE: N/A START TIME:

Operator obtains/locates procedure Operator locates the proper procedure.

HC.OP-SO.EG-0001.

Operator reviews precautions and Operator reviews precautions and limitations. limitations.

CUE If excessive time is taken reviewing Examiner Note: The sequence critical Precautions and Limitations, portion of the following steps is to close inform operator that all are the 1-EG-V689 AND 1-EG-V692 satisfied. BEFORE opening the 1-EG-V703 OR 1-EG-V702.

ATT.3 FRVS CLG COIL DVH-213 LP B SUP Operator unlocks 1-EG-V689.

10 1-EG-V689 Examiner Note: Support operator's requests for Verifier.

LOCKED CLOSED Page 4 of 12

TO-. .A-1 06-0303 JPM: EG003 OPERATOR TRAINING PROGRAM NAME:

DATE: __________________

Rev: 17 JOB PERFORMANCE MEASURE SYSTEM: Safety Auxiliaries Cooling Water TASK: Respond To A SACS Malfunction

(*Denotes a Critical Step)

  • COMMENTS STEP ELEMENT (#Denotes a Sequential Step) EVAL (Required for UNSAT NO. #

STANDARD S/U evaluation)

CUE The lock has been removed from N/A the valve indicated.

Operator closes 1-EG-V689.

CUE The valve indicated has been N/A rotated in the direction stated and has come to hard stop.

Operator reinstalls a locking device on valve 1-EG-V689.

CUE The lock is installed on the valve N/A indicated.

ATT.3 FRVS CLG COIL DVH-213 LP B RTN Operator unlocks 1-EG-V692.

11 1-EG-V692 Examiner Note: Support operator's requests for Verifier.

LOCKED CLOSED CUE The lock has been removed from N/A the valve indicated.

Page 5 of 12

TQ-.,....,..\-106-0303 EG003 OPERATOR TRAINING PROGRAM NAME:

Rev: 17 JOB PERFORMANCE MEASURE DATE:

SYSTEM: Safety Auxiliaries Cooling Water TASK: Respond To A SACS Malfunction

(*Denotes a Critical Step)

  • COMMENTS STEP ELEMENT (#Denotes a Sequential Step) EVAL (Required for UNSAT NO. #

STANDARD S/U evaluatio Operator closes 1-EG-V692.

  • CUE The valve indicated has been N/A rotated in the direction stated and has come to hard stop.

Operator reinstalls a locking device on valve 1-EG-V692.

CUE The lock is installed on the valve N/A indicated.

ATT.3 FRVS CLG COIL DVH-213 LP A SUP Operator unlocks 1-EG-V703.

12 1-EG-V703 Examiner Note: Support operator's requests for Verifier.

LOCKED OPEN CUE The lock has been removed from N/A the valve indicated.

Operator opens 1-EG-V703.

  • Page 6 of 12

TQ-n.r\-106-0303 JPM: EG003 OPERATOR TRAINING PROGRAM NAME:

Rev: 17 JOB PERFORMANCE MEASURE DATE:

SYSTEM: Safety Auxiliaries Cooling Water TASK: Respond To A SACS Malfunction

(*Denotes a Critical Step) COMMENTS STEP

  • ELEMENT (#Denotes a Sequential Step) EVAL (Required for UNSAT NO. #

STANDARD S/U evaluation CUE The valve indicated has been N/A rotated in the direction stated and has come to hard stop.

Operator reinstalls a locking device on valve 1-EG-V703.

CUE The lock is installed on the valve N/A indicated.

ATT.3 FRVS CLG COIL DVH-213 LP A RET Operator unlocks 1-EG-V702.

13 1-EG-V702 Examiner Note: Support operator's requests for Verifier.

LOCKED OPEN CUE The lock has been removed from N/A the valve indicated.

Operator opens 1-EG-V702.

CUE The valve indicated has been rotated in the direction stated and has come to hard stop. N/A Page 7 of 12

TQ-,...r\-106-0303 JPM: EG003 OPERATOR TRAINING PROGRAM NAME:


~

Rev: 17 JOB PERFORMANCE MEASURE DATE:

SYSTEM: Safety Auxiliaries Cooling Water TASK: Respond To A SACS Malfunction

(*Denotes a Critical Step) COMMENTS STEP

  • ELEMENT (#Denotes a Sequential Step) EVAL (Required for UNSAT NO. #

STANDARD S/U evaluation Operator reinstalls a locking device on valve 1-EG-V702.

CUE The lock is installed on the valve indicated. N/A CUE WHEN operator informs you the task is complete, OR the JPM has been terminated for other reasons, THEN RECORD the STOP time.

REPEAT BACK any message from the operator on the status of the JPM, and then state "This JPM is complete".

STOP TIME:

Page 8 of 12

TQ-AA-106-0303 JOB PERFORMANCE MEASURE OPERATOR TRAINING PROGRAM EVALUATOR FOLLOWUP QUESTION DOCUMENTATION NAME:

DATE:

JPM Number: EG003 TASK: Respond To A SACS Malfunction TASK NUMBER: 400780401 QUESTION:

RESPONSE

RESULT: SAT UNSAT QUESTION:

RESPONSE

RESULT: SAT UNSAT Page 9 of 12

TQ*AA*106-0303 JOB PERFORMANCE MEASURE INITIAL CONDITIONS:

1. SACS Loop B has been declared inoperable.
2. HC.OP-AB.COOL-0002, SafetylTurbine Auxiliaries Cooling System, is being implemented.
3. Components are being realigned lAW Section 5.12 of HC.OP-SO.EG-0001.
4. The '0' EOG Coolers ANO Room Coolers have been cross tied to the 'A' SACS loop lAW HC.OP-SO.EG-0001 Attachment 3 Part A.

INITIATING CUE:

Cross Tie the '0' FRVS Recirculation Unit to the 'A' SACS Loop in the sequence presented in HC.OP-SO.EG-0001 Attachment 3 Part B.

WCM update and tagging will be performed by another operator.

Page 10 of 12

TQ-AA-106-0303 JOB PERFORMANCE MEASURE REVISION HISTORY JPM NUMBER: EG003 Rev # Date Description Validation Required?

13 8/28/2008 Revised to new JPM format. Revalidated JPM time. y Updated reference procedure revision number. Operator actions did not change.

14 12/1/2008 Updated Procedure revision numbers. No effect on JPM. N 15 9;9109 Updated Procedure revision numbers. No change to operator N actions. No validation required.

16 4/27/10 Updated Procedure revision numbers. No change to operator N actions. No validation required.

17 5/9;11 Updated Procedure revision numbers. No change to operator N actions. No validation required.

JOB PERFORMANCE MEASURE STATION: Hope Creek SYSTEM: Main Steam TASK: Respond to a Failed Open Safety Relief Valve TASK NUMBER: 4000210401 JPM NUMBER: 305H-JPM.AB003 REV #: 02 SAP BET: NOH05JPAB03E ALTERNATE PATH: D APPLICABI LlTY:

EO r:

_._1 RO STA SRO [ ] ]

DEVELOPED BY: Archie E. Faulkner DATE: 5/7/2009 Instructor

~~4,~ ,I '.

1~2JI/(}~/

REVIEWED BY:

7f?lAYf/

Operations Representative DATE:

I APPROVED BY:

1t<10k Training Department DATE: 1Jl11/D1

TQ-AA-106-0303 Hope Creek JPM NUMBER: AB00302 REV: 02 SYSTEM: Main Steam TASK NUMBER: 4000210401 TASK: Respond to a Failed Open Safety Relief Valve ALTERNATE PATH: D KIA NUMBER: 239002 A2.03 IMPORTANCE FACTOR: 4.1 4.2 APPLICABILITY: RO SRO EO D RO [ ] ] STA D SRO [ ] ]

EVALUATION SETIING/METHOD: PlanUSimulate

REFERENCES:

HC.OP-AB.RPV-0006 Rev. 3 TOOLS, EQUIPMENT AND PROCEDURES: HC.OP-AB.RPV-0006 ESTIMATED COMPLETION TIME: 13 Minutes TIME PERIOD IDENTIFIED FOR TIME CRITICAL STEPS: N/A Minutes J PM PERFORMED BY: GRADE: D SAT D UNSAT ACTUAL COMPLETION TIME: Minutes ACTUAL TIME CRITICAL COMPLETION TIME: N/A Minutes REASON, IF JPM UNSATISFACTORY:

EVALUATOR'S SIGNATURE: DATE:

Page 2 of 12

TQ-AA-106-0303 NAME: ___________________

DATE: ___________________

SYSTEM: Main Steam TASK: Respond to a Failed Open Safety Relief Valve TASK NUMBER: 4000210401 INITIAL CONDITIONS:

1. The Reactor is shutdown due to the "D" SRV being electrically held open with both Logic Train Band D solenoids.
2. HC.OP-AB.RPV-0006 Safety Relief Valve, is being executed.
3. Attempts to close the SRV from the Main Control Room have been u ns u ccessfu I.

INITIATING CUE:

Use the fuse pullers provided (simulated) to pull the fuses for the "D" SRV lAW HC.OP-AB. RPV-0006.

Page 3 of 12

T .A-106-030 JPM: AB00302 OPERATOR TRAINING PROGRAM NAME:

Rev: 02 JOB PERFORMANCE MEASURE DATE:

SYSTEM: Main Steam TASK: Respond to a Failed Open Safety Relief Valve STEP (e Denotes a Critical Element

  • COMMENTS

(*Denotes a Critical Step) of a Critical Step) EVAL (Required for UNSAT NO.

ELEMENT STANDARD ., S/U evalu CUE PROVIDE the operator the initiating cue. Operator repeats back initiating cue.

CUE ENTER START TIME AFTER Operator repeats back the Initiating Cue: I N/A START TIME:

Operator obtains the correct Operator obtains procedure procedure. HC.OP-AB.RPV-0006 Operator reviews Immediate Operator Operator reviews Immediate Operator Actions, Retainment Overrides, Actions, Retainment Overrides, applicable Cautions and Notes. applicable Cautions and Notes.

Operator determines beginning step Operator determines correct beginning of the procedure. step to be A.3 A.3 IF the SRV solenoid cannot be de Operator determines this step applies energized from the Control Room, and reviews Attachment 2.

THEN REMOVE SRV fuses associated with the energized logic lAW Attachment 2.

EXAMINER NOTE: The sequence for pulling the fuses is not critical.

Placing the fuses in a storage bag is not critical.

Page 4 of 12

T .A-106-030 JPM: AB00302 OPERATOR TRAINING PROGRAM NAME:

Rev: 02 JOB PERFORMANCE MEASURE DATE:

SYSTEM: Main Steam TASK: Respond to a Failed Open Safety Relief Valve (e Denotes a Critical Element COMMENTS STEP (*Denotes a Critical Step)

  • of a Critical Step) EVAL (Required for UNSAT NO. STANDARD ELEMENT
  • S/U evaluati Att 2 At panel 10C628 (ADS DIV 2) the
  • Y N STAR Operator simulates pulling fuse operator pulls fuse 821 C F3D F9.

Logic 821 C F3D F9 at panel 10C628 (ADS 8 DIV 2).

CUE The fuse that you have indicated is N/A pulled.

Att 2 At panel 10C628 (ADS DIV 2) the Operator simulates pulling fuse

  • Y N STAR operator pulls fuse 821 C F4D F10. 821 C F4D F10 at panel 10C628 (ADS Logic 8 DIV 2).

CUE The fuse that you have indicated is N/A pulled.

Att 2 At panel10C631 (ADS DIV 4) the Operator simulates pulling fuse

  • Y N STAR operator pulls fuse 821 C F7D F9. 821C F7D F9 at panel10C631 (ADS Logic o DIV 4).

CUE The fuse that you have indicated is N/A pulled.

At panel10C631 (ADS DIV 4) the Y N STAR Att 2 Operator simulates pulling fuse operator pulls fuse 821 C F8D F10. B21C F8D F10 at panel10C631 (ADS Logic o DIV 4).

CUE The fuse that you have indicated is N/A pulled.

Page 5 of 12

1 .A-106-030 JPM: AB00302 OPERATOR TRAINING PROGRAM NAME:

Rev: 02 JOB PERFORMANCE MEASURE DATE:

SYSTEM: Main Steam TASK: Respond to a Failed Open Safety Relief Valve

(. Denotes a Critical Element

  • COMMENTS STEP (*Denotes a Critical Step) of a Critical Step) EVAL (Required for UNSAT NO. STANDARD ELEMENT
  • S/U evaluati CUE WHEN operator informs you the task is complete, OR the JPM has been terminated for other reasons, THEN RECORD the STOP TIME.

N/A REPEAT BACK any message from the operator on the status of the JPM, and then state "This JPM is complete".

STOP TIME:

Page 6 of 12

TQ-AA-106-0303 OPERATOR TRAINING PROGRAM EVALUATOR FOLLOWUP QUESTION DOCUMENTATION NAME:

DATE:

JPM Number: AB00302 TASK: Respond to a Failed Open Safety Relief Valve TASK NUMBER: 4000210401 QUESTION:

RESPONSE

RESULT: UNSAT SAT L - I_----...l QUESTION:


~.----------------- .. --

RESPONSE

RESULT: SAT UNSAT Page 7 of 12

TQ*AA*106-0303 JOB PERFORMANCE MEASURE SIMULATOR SETUP INSTRUCTIONS (OPTIONAL)

JPM NUMBER: AB00302 REV#: 02 Initial

! Initial Description

! ENSURE a copy of HC.OP-AB.RPV-0006 is available.

EVENT ACTION:

COMMAND:

PURPOSE:

Page 8 of 12

TQ*AA*106-0303 JOB PERFORMANCE MEASURE SIMULATOR SETUP INSTRUCTIONS (OPTIONAL)

JPM NUMBER: AB00302 REV#: 02 Page 9 of 12

TQ-AA*106-0303 JOB PERFORMANCE MEASURE REVISION HISTORY JPM NUMBER: AB00302 I Rev # : Date 02 JPM Template, Revised to add both SRV 0 y with operators from A Shift. Avg time 13 Page 10 of 12

TQ-AA-106*0303 JOB PERFORMANCE MEASURE INITIAL CONDITIONS:

1. The Reactor is shutdown due to the "D" SRV being electrically held open with both Logic Train Band D solenoids.
2. HC.OP-AB.RPV-0006 Safety Relief Valve, is being executed.
3. Attempts to close the SRV from the Main Control Room have been unsuccessful.

Use the fuse pullers provided (simulated) to pull the fuses for the "D" SRV lAW HC.OP*

AB.RPV-0006.

Page 12 of 12

JOB PERFORMANCE MEASURE STATION: Hope Creek SYSTEM: DC Electrical Distribution TASK: Respond To A Station Blackout TASK NUMBER: 4000020404 JPM NUMBER: 305H-JPM.PK001 REV #: 02 SAP BET: NOH05JPPK01 E ALTERNATE PATH: D APPLICABILITY:

EO [KJ RO [KJ STA D SRO [KJ DEVELOPED BY: Archie E. Faulkner DATE: 1/14/12 Instructor 1-<fl, ~ I i "Vt.. If;;. o/;.:z

~

REVIEWED BY: DATE:

eratio APPROVED BY: OftfUfJJ- DATE:  ;//6//<

Training Department

TQ-AA-106-0303 STATION: Hope Creek JPM NUMBER: PK001 REV: 02 SYSTEM: DC Electrical Distribution TASK NUMBER: 4000020404 TASK: Respond To A Station Blackout ALTERNATE PATH: D KIA NUMBER: 295003.AA 1.04 IMPORTANCE FACTOR: 3.6 3.7 APPLICABILITY: RO SRO EO [ ] ] RO [ ] ] STA D SRO [ ] ]

EVALUATION SETTING/METHOD: Plant/Perform

REFERENCES:

HC.OP-AB.ZZ-0135 Rev 35 TOOLS, EQUIPMENT AND PROCEDURES: HC.OP-AB.ZZ-0135 ESTIMATED COMPLETION TIME: 20 Minutes TIME PERIOD IDENTIFIED FOR TIME CRITICAL STEPS: N/A Minutes JPM PERFORMED BY: GRADE: D SAT D UNSAT ACTUAL COMPLETION TIME: Minutes ACTUAL TIME CRITICAL COMPLETION TIME: N/A Minutes REASON, IF JPM UNSATISFACTORY:

EVALUATOR'S SIGNATURE: DATE:

Page 2 of 14

TQ-AA-106-0303 NAME:

DATE:

SYSTEM: DC Electrical Distribution TASK: Respond To A Station Blackout TASK NUMBER: 4000020404 INITIAL CONDITIONS:

1. The plant is in OPCON 3.
2. A loss of all offsite and onsite AC power occurred 15 minutes ago.
3. HC.OP-AB.zZ-0135, STATION BLACKOUT IILOSS OF OFFSITE POWERI/DIESEL GENERATOR MALFUNCTION has been completed through step 4.5.4.

INITIATING CUE:

IMPLEMENT Attachment 3, Radwaste Building Actions of HC.OP-AB.zZ-0135(Q).

Page 3 of 14

JPM: PK001 OPERATOR TRAINING PROGRAM NAME:

Rev: 02 JOB PERFORMANCE MEASURE DATE: __________________

SYSTEM: DC Electrical Distribution TASK: Respond To A Station Blackout

(*Denotes a Critical Step) COMMENTS STEP

  • ELEMENT (#Denotes a Sequential Step) EVAL (Required for UNSAT NO. #

STANDARD S/U evaluati CUE PROVIDE the operator the initiating Operator repeats back initiating cue.

cue.

CUE ENTER START TIME AFTER Operator repeats back the Initiating Cue: I N/A START TIME:

Operator obtains the correct Operator obtains procedure procedure. HC.OP-AB.ZZ-0135(Q).

Operator determines beginning step Operator determines correct beginning of the procedure. step to be 4.5.5.

Operator locates Attachment 3.

Page 4 of 14

JPM: PK001 OPERATOR TRAINING PROGRAM NAME:

Rev: 02 JOB PERFORMANCE MEASURE DATE:

SYSTEM: DC Electrical Distribution TASK: Respond To A Station Blackout

(*Denotes a Critical Step)

  • COMMENTS STEP ELEMENT (#Denotes a Sequential Step) EVAL (Required for UNSAT NO. #

STANDARD StU evaluati Attach OPEN the circuit breakers in the 3 following tables when plant has entered an S80.

Step

1. CLOSE the circuit breakers in the Examiner Note: A map showing panel following tables when restoring offsite locations is provided on the bottom of power. Attachment 3.

All are ARC Flash Category O.

1B0318 Operator locates panel 1 80318 in Room 3449.

0 Circuit 12 Operator simulates opening breaker 12 I

  • on 80318.

CUE The breaker you have indicated is open. N/A o Circuit 19 Operator simulates opening breaker 19

  • on 80318.

Page 5 of 14

JPM: PK001 OPERATOR TRAINING PROGRAM NAME:

Rev: 02 JOB PERFORMANCE MEASURE DATE:

SYSTEM: DC Electrical Distribution TASK: Respond To A Station Blackout

(*Denotes a Critical Step)

  • COMMENTS STEP ELEMENT (#Denotes a Sequential Step) EVAL (Required for UNSAT NO. #

STANDARD S/U evaluation CUE The breaker you have indicated is open. N/A o Circuit 24 Operator simulates opening breaker 24 on 80318.

CUE The breaker you have indicated is open. N/A o Circuit 27 Operator simulates opening breaker 27 on 80318.

CUE The breaker you have indicated is open. N/A 1AD318 Operator locates panel 1A0318 in Room 3449.

o Circuit 12 Operator simulates opening breaker 12

  • on A0318.

Page 6 of 14

JPM: PK001 OPERATOR TRAINING PROGRAM NAME:

DATE: ___________________

Rev: 02 JOB PERFORMANCE MEASURE SYSTEM: DC Electrical Distribution TASK: Respond To A Station Blackout

(*Denotes a Critical Step)

  • COMMENTS STEP ELEMENT (#Denotes a Sequential Step) (Required for UNSAT NO.

STANDARD CUE The breaker you have indicated is open. N/A o Circuit 27 Operator simulates opening breaker 27 on A0318.

CUE The breaker you have indicated is open. N/A o Circuit 28 Operator simulates opening breaker 28 on A0318.

CUE The breaker you have indicated is open. N/A 1DD318 Operator locates panel 100318 in Room 3432.

o Circuit 11 Operator simulates opening breaker 11

  • on 00318.

Page 7 of 14

JPM: PK001 OPERATOR TRAINING PROGRAM NAME:

DATE: __________________

Rev: 02 JOB PERFORMANCE MEASURE SYSTEM: DC Electrical Distribution TASK: Respond To A Station Blackout

(*Denotes a Critical Step)

  • COMMENTS STEP ELEMENT (#Denotes a Sequential Step) EVAL (Required for UNSAT NO. #

STANDARD S/U evaluatio CUE The breaker you have indicated is open. N/A o Circuit 12 Operator simulates opening breaker 12 on 00318.

CUE The breaker you have indicated is open. N/A o Circuit 14 Operator simulates opening breaker 14 on 00318.

CUE The breaker you have indicated is open. N/A o Circuit 27 Operator simulates opening breaker 27 on 00318.

CUE The breaker you have indicated is open. N/A Page 8 of 14

JPM: PK001 OPERATOR TRAINING PROGRAM NAME:

Rev: 02 JOB PERFORMANCE MEASURE DATE: __________________

SYSTEM: DC Electrical Distribution TASK: Respond To A Station Blackout

(*Denotes a Critical Step)

  • COMMENTS STEP ELEMENT (#Denotes a Sequential Step) EVAL (Required for UNSAT NO. #

STANDARD S/U evaluatio 1CD318 Operator locates panel 1CD318 Room 3432.

o Circuit 11 Operator simulates opening breaker 11

  • on CD318.

CUE The breaker you have indicated is open. N/A o Circuit 12 Operator simulates opening breaker 12 on CD318.

CUE The breaker you have indicated is open. N/A o Circuit 14 Operator simulates opening breaker 14 on CD318.

CUE The breaker you have indicated is open. N/A Page 9 of 14

JPM: PK001 OPERATOR TRAINING PROGRAM NAME: __________________

Rev: 02 JOB PERFORMANCE MEASURE DATE: __________________

SYSTEM: DC Electrical Distribution TASK: Respond To A Station Blackout

(*Denotes a Critical Step)

  • COMMENTS STEP ELEMENT (#Denotes a Sequential Step) EVAL (Required for UNSAT NO. #

STANDARD stu evaluation o Circuit 27 Operator simulates opening breaker 27

  • on CD318, CUE The breaker you have indicated is open. N/A CUE WHEN operator informs you the task is complete, OR the JPM has been terminated for other reasons, THEN RECORD the STOP TIME.

N/A REPEAT BACK any message from the operator on the status of the JPM, and then state "This JPM is complete",

STOP TIME:

Page 10 of 14

TQ*AA*106-0303 JOB PERFORMANCE MEASURE OPERATOR TRAINING PROGRAM EVALUATOR FOLLOWUP QUESTION DOCUMENTATION NAME:

DATE:

JPM Number: PK001 TASK: Respond To A Station Blackout TASK NUMBER: 4000020404 QUESTION:

RESPONSE

RESULT: SAT UNSAT QUESTION:

RESPONSE

RESULT: SAT UNSAT Page 11 of 14

TQ-AA-106-0303 JOB PERFORMANCE MEASURE INITIAL CONDITIONS:

1. The plant is in OPCON 3.
2. A loss of all offsite and onsite AC power occurred 15 minutes ago.
3. HC.OP-AB.ZZ-0135, STATION BLACKOUT IILOSS OF OFFSITE POWERI/OIESEL GENERATOR MALFUNCTION has been completed through step 4.5.4.

INITIATING CUE:

IMPLEMENT Attachment 3, Radwaste Building Actions of HC.OP-AB.ZZ-0135{Q).

Page 12 of 14

TQ*AA*106-0303 JOB PERFORMANCE MEASURE REVISION HISTORY JPM NUMBER: PK001 Rev # I Date Description 00 10/13/09 I Converted NRC 2007JPM 009 to new JPM format. This revision includes latest revision to HC.OP-AB.ZZ-0135. Validated with 2

. ODerators from "A" Shift. Estimated ComDletion time 20 minutes.

01 5/12/11 Updated Reference procedure revision numbers only. No N chanqes to oDerator actions. No validation required.

02 1/14/12 Updated Reference procedure revision numbers onlv. No N chanqes to operator

PSEG Internal Use Only H C.OP-AB.ZZ-O 135(Q}

ATTACHMENT 3 RAD WASTE BUILDING ACTIONS [CD-675F]

DC LOAD SHEDDING

1. OPEN the circuit breakers in the following tables when plant has entered an S80.

CLOSE the circuit breakers in the following tables when restoring offsite power.

All are ARC Flash Category O.

LOCATION PANEL # CIRCUIT # LOAD (840 W) OPEN CLOSE 12 STA SERV XFMR A PROT 1BC654 124' 19 TACS SOLV 1AC658A Radwaste 1BD318

  • RM 3449 24 PNL,BUS PROT 1DC654D 27 STA SERV XFMR PROT PNL 1EC654A LOCATION PANEL # CIRCUIT # LOAD (580 W) OPEN CLOSE 124' 12 STA SRV XFMR A PROT PNL 1BC654 Radwaste 1AD318
  • 27 STA SERV C PROT RLY 1EC654B RM 3449 28 PNL,BUS PROT 1DC654C RLY LOCATION PANEL # CIRCUIT # LOAD (840 W) OPEN CLOSE 11 PNL,BUS PROT 1DC654B BtU 124' lOD318 12 STA SERV XFMR PROT PNL 1CC654B Radwaste
  • 14 PROCESS INST CAB 10C613 RM 3432 27 STA SERV XFMR PROT PNL 1FC654A LOCATION PANEL # CIRCUIT # LOAD (570 W) OPEN CLOSE 11 PNL,BUS PROT 1DC654A 124' 1CD318 12 XFMR B PROTECT REC PNL 1CC654A Radwaste
  • 14 CAB,FDWTR & RECIRC INST 10C612 RM 3432 27 STA SERV XFMR D PNL 1FC654B
  • "0

~ ~~

]

/  ;:s * ;.

~

....-=:

r----r r --I., . loc%3 ~, ~

fil RFP Governor Panels Hope Creek Page 45 of 58 Rev 36

SCENARIO TITLE: NRC SCENARIO 4 SCENARIO NUMBER: ESG-NRC-S4 EFFECTIVE DATE: Effective when approved.

EXPECTED DURATION: 60-75 minutes REVISION NUMBER: 04 PROGRAM: ~ LO.REQUAL

~ INITIAL LICENSE OTHER REVISION

SUMMARY

1. Updated PRA checklist.
2. Modified Malfunction, Remote, Override, and Event list sections for TREX event syntax.
3. Deleted RR Pump Trip per Chief Examiner Outline review.
4. Changed to Low Power Scenario per Chief Examiner Outline review.
5. Added Rod Drift Out per Chief Examiner Outline review.
6. Changed IC power level to 3%
7. Added setup guidance for markup of HC.OP-SO.EA-0001
8. Revised Ramp rate for ET-16 to same as ET-8 per validation crew request.

PREPARED BY: Archie E. Faulkner 1/14/12 Instructor DATE APPROVED BY: ~~

LORT Group Lead or Designee

}/i7 /J~

DATE APPROVED BY: ( "l) yry.-~ i-,<p..'.eivv /L fons Supervisor or Designee I/lrl..zDATE

Enabling Objectives A. The crew must demonstrate the ability to operate effectively as a team while completing a series of CREW CRITICAL TASKS, which measure the crew's ability to safely operate the plant during normal, abnormal, and emergency plant conditions.

(Crew critical tasks within this examination scenario guide are identified with an " *.")

A. Raise reactor power with control rods S. Control rod 26-03 drifts out (TS SRO)

C. Swap SSW Pumps D. SSW Pump Malfunction (TS SRO)

E. Single Reactor Recirc Pump Runaway F. Fuel Failure with Scram G. Torus Leak I Emergency Depressurization H. RHR HX Inlet Valve F047S fails closed The scenario starts with the plant at approximately 3% power at rated pressure. The crew will withdraw Control Rods to 8% power in preparation to place the reactor Mode Switch to Run.

During the rod withdrawal, rod 26-03 drifts out. This results in an Abnormal Procedure and Tech Spec entry. The crew will insert the rod with RMCS or SRI Test Switches. When the rod reaches full-in, the malfunction will be removed. After TS have been addressed, SSW Pumps will be swapped for planned maintenance. After pump swap, "An SSW pump will malfunction requiring entering Tech Spec LCO. After Tech Specs have been addressed, the'S' Reactor Recirculation pump will runaway to it's upper mechanical stops. After AS-RPV-0001/003 actions are taken and Tech Specs have been addressed, US" Recirc Pump vibrations will climb into the Danger level.

This will require a manual pump trip. Once power has stabilized, fuel damage symptoms will begin and increase in magnitude, requiring a reactor scram. After the MSIV's are closed, an unisolable leak will develop on the Torus requiring an Emergency Depressurization. When S Loop of RHR is placed in Suppression Pool Cooling, SC-HV-F047S will fail to open, forcing the crew to swap to the A RHR Loop for containment cooling. The scenario ends when the reactor is depressurized by the SRVs, reactor level stabilized between RPV Level 2 and 8 and Suppression Pool Cooling in service on the A RHR Loop.

ESG-NRC-S4 Page 2 of 28 Rev.: 04

INITIALIZE the simulator to 3% power, MOL.

INITIALIZE the simulator to 3% power IIC, BOL. Pull step 409 INSERT control rods through step 409.

ENSURE 'A' EHC pump is in service.

crr 'B' EHC pump as follows:

1. INSERT Malfunction TC07B
2. PLACE 'B' EHC pump in MAN INITIAL IO.zZ-0003 Section 5.3 up to and including step 5.3.43.

INITIAL HC.OP-SO.EA-0001 for pump swap.

At a minimum rio Reference section and CLEAN the bolded EOPs, ABs and SOPs listed.

(80091396 0270)

ENSURE Data Collection is trending the following parameters as a minimum:

  • W/R Reactor Water Level
  • W/R RPV Pressure
  • Suppression Pool level
  • Suppression Pool temperature COMPLETE "Simulator Ready-for-Training/Examination Checklist".

i ENSURE associated Schedule file open and running.

ENSURE associated Events file open.

ESG-NRC-S4 Page 3 of 28 Rev.: 04

et_array(11) >= 1.0 & et_array(12) >= 1.0 & eCarray(13) >= 1.0 & et_array(14) >= 1.0 7 & et_array(15) >= 1.0 Triggers Torus leak when MSIVs and MSL Drains isolated code: crqnmi <= 2 10

Description:

Reactor Power <2% Illnserts Fuel Cladding failure if Crew scrams during Recirc Runaway msvf022(1) <= 0.0 I msvf028(1) <= 0.0 11 Detects 'A' MSL isolation Event code: msvf022(2) <= 0.0 I msvf028(2) <= 0.0 12 I

Description:

Detects 'B' MSL isolation Event 0 msvf022(3) <= 0.0 I msvf028(3) <= 0.0 13 Detects 'C' MSL isolation msvf022(4) <= 0.0 I msvf028(4) <= 0.0 14 i

Description:

Detects 'D' MSL isolation Event code: msvfdrn1(1) <= 0.0 I msvfdrn1(2) <= 0.0 15 I

Description:

F016 or F019 shut /I Detects MSL drain isolation Event code: crqnmi <= 2 16 I

Description:

Reactor Power <2% II Ramps MSL rad to 3xNFPB after reactor scrammed.**

Event code: et_array(11) >= 1.0 & et_array(15) >= 1.0 17 I

Description:

Removes high radiation from 'A' MSL

  • et_array(12) >= 1.0 & et_array(15) >= 1.0 18
  • Removes high radiation from 'B' MSL rray(13) >= 1.0 & eCarray(15} >= 1.0 oves high radiation from 'C' MSL eCarray(14} >= 1.0 & et_array(15) >= 1.0 Removes high radiation from 'D' MSL Event code: I Pclsp <= 119 21 I

Description:

Indicated SP levell/Removes torus leak at 25" to prevent reaching Simulator Limits

    • Value to be 12 mrlhr above current 3xNFPB Hi-Hi Alarm setpoint for I.C.

ESG-NRC-S4 Page 4 of 28 Rev.: 04

'. rv1/\~~qNf~I?~;.~R~;~gg~~:)~~,J*;~~L*l;~~~f:~Aqf~*t0;:;~: * ~~**i :;.\A"ji\'::':*:;S"l":,, *:;;~;'~;~:;~~';~"i.:\:.ri;'\i:¥,; \t)~;~c;.1;:0 .

<~;~. *~:t.; ./;.,

Initial @Time Event Action Description None None Insert malfunction TC07B ERC pump B trip None None Insert malfunction CD022603 Control Rod 26-03 drift out Insert malfunction CW23A to 50.00000 on None None Service water strainer A fouling event 1 None None Insert malfunction RR08B on event 2 Recirc system B speed controller fails high Insert malfunction RR26B2 to 20.00000 in Recirc pump BP201 elevated (added to calc)

None None 300 on event 4 Pump Vib None None Insert malfunction CW05A on event 6 Service water pump AP502 trip Insert malfunction PC06 after 180 to None None Suppression pool break 50.00000 on event 7 None None Insert malfunction RH03B on event 7 RHR RX inlet valve F047B fails closed Insert malfunction RH09 A after 210 on None None RHR pump AP202 room flood (Rm 4113) event 7 Insert malfunction CROI to 30.00000 in None None Fuel cladding leak 300 on event 8 Insert malfunction RM9509 to 118.00000 None None 9RX509, MSL 'A' - Main Steam Line Chan A in 300 on event 8 Insert malfunction RM9510 to 127.00000 None None 9RX510, MSL 'B' - Main Steam Line Chan B in 300 on event 8 Insert malfunction RM9511 to 119.00000 None None 9RX511, MSL 'C' - Main Steam Line Chan C in 300 on event 8 Insert malfunction RM9512 to 122.00000 None None 9RX512, MSL 'D' - Main Steam Line Chan D in 300 on event 8 Insert malfunction CRO 1 after 1 to None None Fuel cladding leak 50.00000 on event 10 Insert malfunction RM9509 after 1 to None None 9RX509, MSL 'A' - Main Steam Line Chan A 118.00000 in 300 on event 16 Insert malfunction RM9 510 after 1 to None None 9RX510, MSL 'B' - Main Steam Line Chan B 127.00000 in 300 on event 16 Insert malfunction RM9511 after 1 to None None 9RX511, MSL 'Co - Main Steam Line Chan C 119.00000 in 300 on event 16 Insert malfunction RM9512 after 1 to None None 9RX512, MSL 'D' - Main Steam Line Chan D 122.00000 in 300 on event 16 Insert malfunction RM9509 to 19.00000 in None None 9RX509, MSL 'A' - Main Steam Line Chan A 60 on event 17 Insert malfunction RM9510 to 19.00000 in None None 9RX510, MSL 'B' - Main Steam Line Chan B 60 on event 18 Insert malfunction RM9511 to 15.00000 in None None 9RX51 1, MSL 'Co - Main Steam Line Chan C 60 on event 19 Insert malfunction RM9512 to 18.00000 in None None 9RX512, MSL 'D' - Main Steam Line Chan D 60 on event 20 Insert malfunction PC06 after 1 to None None Suppression pool break 50.00000 on event 21 delete in I

None None Insert malfunction CD032603 on event 26 Control Rod 26-03 stuck None None Insert malfunction CD052603 on event 27 Control Rod 26-03 accumulator trouble Insert malfunction AN-C6C3 after 60 on CRYWOLF ANN C6C3 CRD HYDR UNIT None None event 27 TEMP HI None None Insert malfunction CD062603 on event 28 Control Rod 26-03 SCRAM

,"~EMOifcE'~'

Initial @Time I Event Action Description

. ';l~;dWgR~lpE Initial @Time I Event Action Description HV-23568 OPEN--LOOP B-YARD DUMP None None Insert override 5A8 E LO to Off VALVE (LO)

HV-23568 CLOSE--LOOP B-YARD DUMP None None Insert override 5A8 F LO to On VALVE (LO)

HV-2256A OPEN-LOOP A-YARD DUMP None None Insert override 5A3 E LO to Off VALVE (LO)

HV-2256A CLOSE-LOOP A-YARD DUMP None None Insert override 5A3 F LO to On VALVE (LO)

ESG-NRC-S4 Page 6 of 28 Rev.: 04

'. \!.,;;*. ~ *.c~,~;~e§!~~~~;I~~~~,E(i6EN;Q~~~~Q!~~~~;~TE6*R~~*g~~§~~~~~~i::.~:

,.~:~~,~~~!:I:r~.~~!'~~3§\r~~\f~~illXr~;;~* . ExP~C1~:~!~I.~rt~~~~~;~*~t~~~p~6~~~*.I~~%*\10;;~!.**~

Raise Reactor Power with

watch.

NOTE: LPRM downscale

  • RO withdraws Control Rods in alarms can be expected. As accordance with HC.OP-SO.SF RE, inform crew alarms are 0001 and CRS directions.

expected for this. rod pattern. =:> Selected rod PB comes ON (bright white).

=:> CONTROL ROD POSITION FOUR ROD DISPLAY indicates the control rod position (1 OC650C).

=:> The associated Full Core Display (white) numbered rod identification light comes ON (10C650C).

NOTE: Operator may single

  • At the ROD SELECT MODULE, notch withdraw the rods, as simultaneously press and hold necessary, in which case the both the WITHDRAW PB CONTINUOUS WITHDRAW AND the CONTINUOUS PB is NOT used. WITHDRAW PB and observe the following:

=:> The INSERT (white) light comes ON momentarily.

=:> The WITHDRAW (white) light comes ON and the CONTINUOUS WITHDRAW (white) light comes ON.

=:> CONTROL ROD POSITION FOUR ROD DISPLAY indicates control rod movement.

ESG-NRC-S4 Page 7 of 28 Rev.: 04

  • Prior to reaching the desired control rod position, simultaneously release both the WITHDRAW PB and the CONTINUOUS WITHDRAW PB and OBSERVE the following:

=> The WITHDRAW (white) light goes OUT.

=> The SETTLE (white) light comes ON for;:: 6 seconds, then goes out.

=> CONTROL ROD POSITION FOUR ROD DISPLAY indicates the control rod has settled to the desired position.

=> At position 48 the applicable Full Core Display FULL OUT (red) light comes on.

  • Perform the following while giving the selected Control Rod a continuous withdraw signal:

=> Observe the following as indication of the Control Rod being coupled:

1. ROD OVERTRAVEL alarm does NOT annunciate.
2. Red Full Out light illuminates on the Full Core Display.
3. RPIS indicates the Control Rod is full out (48).

ESG-NRC-S4 Page 8 of 28 Rev.: 04

,, '" ">" .,, .,;:<Y~i~>J~:::;;stI~]~':>,:";< '1'.' >.. ~.:\~~\~.~,;.:~ <:~, " "; '<::t>~*<;~,},<~":: ,:" -;:>. () ,:t<:~, \d~*;;t "';Y!~:~~i~~;~'~~~~~,~~;~:~?~::.~;:<.,:¥;;~%~ '" "i-.,:. ,'~ '. ':~:,,;~:i.':::.::~~~~~:~:~~~:k V.., ....;=.': SCENARIOG,UJDE.SEQUENCEAND EXRECTEOtRESPONSE;i'*\';:;~';;~~r?,,();~: .\".,,~.,;;,;; ... X)!f/;;1~~;:~0i\,.

".- .~ .~,'. -. ,\.,,< q~: ~ ,~>'>}VJ::!f;~',>"5:~'%'"'~~" ~'.~:' ~ '~h: :':.,\, .yi'~"::"i "",> ' :,~,~,.. > "', '> :>~'> . :.~ 0:.0f~F~':~1t* "\<~~':~:i;'<,' ~ t<? i::;":.' '0.: _,,' '~: :'h' '. :--, ,.<>"';:}.~-F~Ji~**.;~{i :.A;,:~tr;*"~

O

.C " "": h .(t :.j; ->{;?,~~t \,:.::'j2\~'Y(:}k,' ',1>fF;~~~::~}

.*§~~@~~~~:',p);I~V~~;~~.~~t**B~'~~~~~~:,;:t*.~i'*~'~~. f~#~.lij~~f~:~Z"g}!:;;

4. Proper response of the Nuclear Instrumentation while withdrawing the Control Rod.
  • Indicates the completion of the movement on the Pull Listing.

Rod Drift:

selected and withdrawn. => OHA C6-E3 "ROD DRIFT"

=> Amber DRIFT light for 26-03 Pre-Inserted (Control Rod 26 on Full Core Display

=> RWM Drifting Rod display 03 Drifts Out).

"DR 26-03"

=> CRIDS C078 "ROD DRIFT ALARM"

=> Slight rise in reactor power

=> Various rod position indications

  • CRS implements AB.IC-0001: CRS rnay refer to

=> Condition C AB.RPV-0001 but no actions are applicable.

  • IF a Rod Drift has occurred THEN REFER to Digital Alarm Point C078 of AR.ZZ-0011.
  • RO implements AR.ZZ-0011:

=> Cause 4 "Drift Out" lE asked, THEN as Reactor => RO applies a continuous Engineer, provide guidance to control rod insert signal under CRS to continuously insert rod the direction of the Reactor 26-03 to 00 if possible. Engineer AND SM/CRS.

=> RO releases insert signal.

=> IF the control rod continues to drift out or does not respond to the insert signal THEN, ESG-NRC-S4 Page 9 of 28 Rev.: 04

IF directed to place both SRI => PLACE both SRI test Test Switches for HCU 26-03 switches (local) to the TEST to TEST, position to initiate a single control rod scram.

THEN TRIGGER ET-28.

=> PLACE both SRI test switches to NORM position.

=> IF the control rod attempts to drift outward again, THEN

=> INSERT to position 00 AND:

  • A. CLOSE BF-V101
  • B. CLOSE BF-V102

=> IF the control rod continues to drift out following isolation (e.g. problem is internal to the mechanism) THEN OPEN BF-V102 and OPEN BF-V101 (reestablishes cooling water flow).

WHEN dispatched to 26-03

  • Crew dispatches RBEO to 26-03 HCU, HCU.

THEN REPORT the HCU appears normal.

ESG-NRC-S4 Page 10 of 28 Rev.: 04

IE directed to electrically AND

  • CRS recognize the following hydraulically dis-arm 26-03 Tech Spec actions apply:

lAW SO.BF-0002, =:> Control Rod Operability THEN PERFORM the 3.1.3.1 action b following:

  • CRS directs disarming the 26-03
1. DELETE malfunction directional control valves within CD022603 (drifting rod) and one hour.

allow 26-03 to settle back to 00.

2. TRIGGER ET-26 (stuck rod)
3. TRIGGER ET-27 (accum trouble)
4. IF isolating Scram pilot Air BF-V116 (as in Isolating for Maintenance section),

THEN TRIGGER ET-28.

5. AFTER OHA C6-C3 (CRD TEMP HI) is received, THEN DELETE Malfunction AN-C6C3
6. REPORT 26-03 is hydraulically dis-armed with cooling water restored.

CRD Hi Temp alarm was 26-03 and is now clear.

IF directed only to electrically dis-armed 26-03 lAW SO.BF-0002, THEN TRIGGER ET-26 (stuck rod).

  • RO resets the Rod Drift alarm lAW HC.OP-AR.ZZ-0020.

Swap Service Water Pumps:

  • CRS directs removal of "C" SSW After the Crew assumes the from service using HC.OP watch. SO.EA-0001.
  • PO places "A" SSW in service using HC.OP-SO.EA-0001 section 5.6.3.

ESG-NRC-S4 Page 11 of 28 Rev.: 04

As Yard operator, report field

  • PO removes "C" SSW from actions are complete for service using HC.OP-SO.EA starting "An SSW pump. 0001 section 5.6.5.

SSW Pump "A" Malfunction:

  • Crew recognizes "A" SSW At the discretion of the lead strainer Hi DP to the strainer by:

Examiner, => A1-B1 SSWS INTAKE A TRIGGER ET-1 (Service water TROUBLE pump A marsh grass intrusion => D3857 SSW STRAINER A to 50%). DIFF HI HI STRAINER PRESSURE DIP

=> D5507 SSW STRAINER A DRIVE OPF WHEN requested as Yard

  • CRS implements Operator, REPORT "An SSW AB.COOL-0001 :

pump strainer is not rotating => Condition A and the screen is covered with

=> Condition 0 grass.

The breaker for the strainer is tripped and will not reset.

the crew does not remove

  • Crew removes "A" SSW pump the "A" SSW pump from from service lAW:

service, THEN TRIGGER ET-6 AB.ZZ-0001 Att 19 to trip the pump.

  • Crew places "C" SSW pump in service lAW:

AB.ZZ-0001 Att 19

  • CRS recognize the following 30 day LCO Tech Spec applies:

=> Station Service Water 3.7.1.2 Action a

  • Crew contacts maintenance.

ESG-NRC-S4 Page 12 of 28 Rev.: 04

, ", ':':-':.~, ,'::,:.>."f~~;2>F ,,:*;~;t:~~',:l:~;:<~,~,~**', "" ,'" ,," ,. ~ .',- ~:('~ . , ,', ,.,' _:,;*.,.w~,<:' .<>*.,:;~:0.s:,>:; >:,>;:~::~;;~",',,:',

SCENARIQ;.G.UIDi:SE9,(jENCEiAN

<,".
','. '" '~ , . .,;<:" >""=:.'i:\,i;:'-"

DEXPE:CTI:0'RESPONSE

,.,;:;",,';..,y\,; :';:.":;-\~~ ,

.* ;;<:\:,~::\:~\.: *~::;;:.:;A. *:;h';'y;,;.:V*,

Y_ **' , ' . ' }"X ** ',',' , > .'",'~ ,~""

.".' **~:f'~II:I~st~~~Jc)r. ~BtiYitY;I,:*;~;I;~~*~~ct~a(~i~:~~*tnci~~~{R~~~~~~~::*I::~;f::;\;:;:::~~:£.g~m?~pts. .;. . '

"8" Reactor Recirc Pump

  • Crew recognizes "B" Reactor runaway: Recirculation pump runaway by:

TRIGGER ET-2, five minutes => Reactor power increases after Tech Specs have been => C3-B1 SRM PERIOD addressed OR at the discretion => CRIDS D2900 "RECIRC MG of the Lead Examiner. B SPEED CONTROL SIG FAIL"

=> CRIDS D2931 "RECIRC MG B DRIVE TUBE LOCK TRBL"

=> SIC-R621 B SPEED DEM"ID and SPEED Upscale

=> 10C650C Recirc and Jet pump indications

  • RO performs the following: Immediate Operator

=> Presses SCOOP TUBE TRIP Action lAW for "B" Recirc Pump AB.RPV-0001.

=> Reduces "A" Recirc Pump (A Recirc pump is speed to red uce power to already in manual at pre-transient value minimum speed.)

  • CRS implements AB.RPV-0001:

=> Condition F SUPPORT requests for local

  • Crew checks Recirc Loop Flow operation of 'B' Recirc MG mismatch lAW ST.BB-0001.

scoop tube using Remote Function RR10.

!E called as RE to determine

  • Crew determines peak thermal maximum thermal power power during the transient.

reached, THEN REPORT thermal power peaked at 5.2% (200 MWth).

  • CRS recognize the following Must restore recirc loop Tech Specs/actions apply: flow mismatch within

=> 3.4.1.3 Action a. Recirculation two hours or declare Loop Flow the B loop not in operation.

ESG-NRC-S4 Page 13 of 28 Rev.: 04

IE directed to monitor/control

  • RO/PO direct TBEO to recirc MG oil temps, monitor/control reactor recirc MG INSIGHT Items: oil temps.
  • rrtoila(1) for "A' MG
  • rrtoila(2) for 'B' MG
  • Crew monitors Offgas Pre Treatment and Main Steam Line Radiation Monitors for indications of Fuel Damage.

As RE, REPORT:

  • Crew contacts RE.
  • Thermal Limits are SAT
  • If rodline needs to be reduced, use Reverse Pull Sequence.

Reactor Recirculation Pump

  • Crew recognizes 'B' Recirc Pump High Vibrations: high vibrations by:

At the discretion of the Lead => OHA C1-E4 "REACTOR Examiner, RECIRC PUMP VIB HI" TRIGGER ET-4. => CRIDS D5352 "RECIRC PUMP B VIBRATION HI"

=> CRIDS D2921 "RECIRC PMP MOTOR B VIBRATION HI"

=> CRIDS A2603 "RECIRC PMP B SHAFT RADIAL"

=> OHA C1-F5 "COMPUTER PT IN ALARM"

  • Crew implements AB.RPV-0003:

=> Condition F ESG-NRC-S4 Page 14 of 28 Rev.: 04

  • Crew evaluates the following Recirc Pump parameters for degradation of the pump(s) in ALARM to validate the condition.

~ Seal Parameters (Temperature, Pressure, Flow)

~ Pump Parameters (Temperature, Vibration)

~ Motor Parameters (Temperature, Vibration)

  • Crew contacts Engineering Duty Manager to obtain and assess vibration data.

!E requested, THEN as RE

  • Crew determines "B" Recirc PROVIDE guidance to the Pump Vibration points cannot be CRS to reduce reactor power maintained below the DANGER lAW the Standard Power limit and performs the following to Reduction Instructions (SPRI). remove A(B) Recirc Pump from service:

!E crew manually scrams, THEN TRIGGER ET-8 (Fuel ~ Press PUMP B MOTOR cladding failure). BRKR TRIP push button

  • PO verifies the Feedwater system is responding automatically and is restoring RPV level between level 4 and 7.

AsTBEO, ADJUST

  • Crew implements AB.RPV-0003:

temperature for the Recirc MG ~ Condition A Sets as directed.

  • RO/PO monitors and reports power, pressure and level parameters.

ESG-NRC-S4 Page 15 of 28 Rev.: 04

<~~~~~t~g~~I~nf£~\~~~,\~'

  • CRS verifies core parameters are within the OPRM Enable Region of the Power to Flow Map.
  • RO/PO closes HV-F031 B Recirc pump discharge valve for 5 minutes and then re-opens.
  • CRS directs the following TS requirements:

=> 3.4.1.1 Action a. within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> of entering Single Loop Operations.

  • CRS directs implementation of DL.ZZ-0026 Att.3v.
  • Crew implements DL.zZ-0026 Att.3v.

Fuel Cladding Failure:

  • Crew recognizes fuel clad IE the Crew scrarns 10 minutes after the Recirc damage by: during the Recirc Pump Runaway, ~ RM11 9RX621/622 Offgas Runaway, OR, Pretreatment Alarms THEN the Fuel Failure at the Lead Examiners ~ OHA C6-A3 "MN STM LINE will automatically be discretion, RADIATION HI" inserted.

TRIGGER ET-8 (Fuel cladding ~ RM119RX509/510/511/512 MSL Radiation levels failure). Alert alarms and readings will reach 3xNFPB

~ CRIDS Page 37 MSL approximately 5 Radiation readings minutes after the failure begins.

  • CRS implements AB.RPV-0008: If the plant is shutdown,

~ Condition A Condition B actions are

~ Condition B not applicable.

~ Condition C ESG-NRC-S4 Page 16 of 28 Rev: 04

.v. .. . $CE~~~t§:~~~!P'~,#~QUEN5E~~i[)~~~~8t~gf5ESi~~9~~.~~;~~~:ii,~; ;c#';*>

,/ ' ~' " " <,.~.>\,>>/~~j';': .~. ;:,,0.':?_\'*~< .';:"~; ,:\ :~~. r~" ;,:._;" >,_ -':' /':/!;~:-",:,"2': ~ --*,~'F':::<;""" .\~*.;';.'t::.:: ,~,~ .'<, *i~.*, <'<~~A:"~::;:L;:*..,;:~~~:~~,-.F :::'~>1(.*,<:'-'}5t;::; (~"'."~ .",,' .,\.h,',,;:. ~~<<,<:,;;;~,j; ~;~';;:"~{A"~'2 f(

Event/tn~Jr~f:t9r,ActlvJtY;:fS1,~ ;.Ex()~p~edPI~nV$tudentReSf>0!ls~,i;

" .;.- !", ,;.~ ,",.:' ",~'.' ," ":"'<"; '/','.,", . -,.>,v'., > ~.. " ~  :>: ** ""';-~ v ,,~ ;i,; , " ,,-<:<-,;,.\<,;.,' ".~. ","~'

," '. C~l11mentsi'i>;:}~:.;

";",,',', ~,-.>.,*~W, .~~.,,:(:;.;~~.';; ....;.",H;;.

. ',-,')K)'" -! ,;0: ,

  • RO reduces power lAW RE Guidance (Reverse Pull Sequence)asnecessa~.
  • Crew recognizes HI-HI MSL Radiation levels by:

=> OHA C6-B2 "MN STM LINE RAD HI HI OR INOP"

=> RM119RX509/510/511/512 High alarms

=> CRIDS Page A037 MSL Radiation readings

=> Locking the lVIode Switch in SHUTDOWN

=> Closing MSIVs, HV-F016 and HV-F019 steam line drains.

  • RO locks the Mode Switch in SHUTDOWN.
  • RO performs scram actions lAW AB.ZZ-0001 Attachment 1.
  • PO controls level as directed by CRS with:

=> Feedwater lAW AB.ZZ-0001 Attachment 14

=> HPCI/RCIC lAW AB.zZ-0001 Attachment 6 ENSURE MSL Radiation

  • RO/PO close MSIVs, HV-F016 Malfunctions RM9509-RM9512 and HV-F019 stearn line drains.

ramp down to <20 when the Main Steam Lines AND drain lines are isolated.

ESG-NRC-S4 Page 17 of 28 Rev.: 04

  • The Crew inserts a manual The Critical Task is scram and closes at least one satisfied as long as all MSIV in each Main Steam Line lines are isolated. For and the HV-F016 or F019 drain instance, closing the valve before MSL radiation has HV-F016, but NOT the been above the Hi-Hi setpoint HV-F019 satisfies for three minutes. isolation of the F016/F019 drain line.

RECORD time (if any) between OHA C6-B2 and reactor scrammed with main steam and drain lines isolated:

TIME: _ _ __

  • LE RPV Level 2 is reached, TH EN CRS implements AB.RPV-0003:

=> Condition G

  • LE directed by the CRS, THEN RO/PO place RHR in Suppression Pool Clg lAW AB.ZZ-0001 Att. 3.

Unisolable Torus Leak:

  • Crew recognizes torus leak by: It will take The Torus Leak will begin three => OHA D3-C2 "REACTOR approximately 12.5 minutes after the MSIVs are BLDG SUMP LVL HI/LO" minutes for Supp Pool isolated. => OHA B1-C3 "SUPPRESSION level to reach 38.5".

POOL LEVEL HI/LO"

=> Various Suppression Pool level indicators lowering LE dispatched to the Torus

  • Crew dispatches personnel to Room to look for a leak, inspect Rx Bldg '54 and Torus THEN REPORT there is a Room for leak.

large, unisolable leak at on the bottom of the torus at Az. 180.

There is about one inch of water on the torus room floor.

ESG-NRC-S4 Page 18 of 28 Rev.: 04

IE asked,

  • Crew contacts RWEO and THEN REPORT both sump informs them of leak.

pumps are running in both the North and South RB Floor Drain sumps.

  • Crew recognizes Supp Pool Level Below 74.5 In EOP entry condition by:

=> OHA B1-C3 "SUPPRESSION POOL LEVEL HI/LO"

=> Various Suppression Pool level indicators

IE directed to implement

WHEN torus level reaches 45",

INSERT Remote Functions CS01-CS04 to make-up as directed.

Do NOT open more than two valves.

  • RO/PO coordinate implementation of EOP-315 with NEO.

RHR Pump Room Flooded:

  • Crew recognizes Reactor Bldg The 'A' RHR Room flooded Room Floor Level Above Max alarm will be received about 4 Normal Op EOP Entry Condition minutes after the Torus Leak by:

starts. => OHA A6-A5 "RHR PUMP ROOM FLOODED" CRIDS D2891 "RHR PMP ROOM 4113 LSH-4403A 1"

=> CRIDS D2892 "RHR PMP ROOM 4113 LSH-4403A2"

=> SPDS RB LVITE indication ESG-NRC-S4 Page 19 of 28 Rev.: 04

IF dispatched to 'A' RHR room,

THEN, AFTER OHA A6-A5 "RHR ROOM FLOODED" is received, REPORT there is about two inches of water on the floor and it appears to be coming up through a floor drain.
  • WHEN it is determined that Supp Pool level cannot be maintained above 38.5",

THEN CRS determines Emergency Depressurization is required.

  • RO/PO opens five ADS SRVs lAW AB.ZZ-0001 Att. 13.
  • Crew determines that RECORD Supp Pool Suppression Pool water level level at which ADS was cannot be maintained above initiated.

38.5" and initiates opening of five SRVs before Suppression LEVEL: _ __

Pool level reaches 30".

  • RO/PO maintain RPV level as directed by CRS.
  • Supp Pool level drops to 30",

THEN the Crew ensures HPCI is secured.

ESG-NRC-S4 Page 20 of 28 Rev.: 04

  • WHEN Suppression Pool temperature reaches 95 degrees, THEN Crew recognizes Supp Pool Temp Above 95°F EOP entry condition by:

=:> OHA C8-F1 "SUPPR POOL TEMP HIGH"

=:> Flashing 95 degree status light on 10C650C

=:> RM 11 9AX833 alarm

=:> Various Suppression Pool temperature indicators

  • WHEN Suppression Pool temperature reaches 95 degrees, THEN the CRS re-enters EOP-102.
  • WHEN directed by the CRS, THEN RO/PO place RHR in Suppression Pool Clg lAW AB.ZZ-0001 AU. 3.

RHR HX INLET Valve F047B

  • Crew recognizes RHR HV-F047B Fails closed: is failed closed.

The 'A' RHR HX Inlet Valve HV-F047B will fail closed when the Torus leak begins.

  • RO/PO places A RHR in Suppression Pool Clg lAW AB.ZZ-0001 AU. 3.

Termination Requirement: I

  • The scenario may be terminated at the discretion of the Lead Examiner when the RPV has been depressurized lAW EOP-202.

ESG-NRC-S4 Page 21 of 28 Rev.: 04

A. TO-AA-106-0304 Licensed Operator Requal Training Exam Development Job Aid B. NUREG 1021 Examiner Standards C. JTA Listing D. Probabilistic Risk Assessment E. Technical Specifications F. Emergency Plan (ECG)

G. Alarm Response Procedures (Various)

H. HU-AA-101 Performance Tools and Verification Practices I. HU-AA-104-101 Procedure Use and Adherence J. HU-AA-1081 Fundamentals Toolkit K. HU-AA-1211 Briefing L. OP-AA-1 01-111-1 004 Operations Standards M. 0 P-AA-1 01-111 Roles and Responsibilities of On Shift Personnel N. OP-AA-106-101-1001 Event Response Guidelines O. OP-AA-108-114 Post Transient Review P. OP-HC-1 08-115-1 001 Operability Assessment and Equipment Control Program O. OP-HC-1 08-1 06-1 001 Equipment Operational Control R. HC.OP-SO.BB-0001 Reactor Recirculation System Operation S. HC.OP-DD.ZZ-0020 Review of Core Performance Information T. HC.OP-DLZZ-0026 Surveillance Log U. HC.OP-AB.ZZ-0001 Transient Plant Conditions V. HC.OP-AB.RPV-0001 Reactor Power W. HC.OP-AB.RPV-0003 Recirculation System X. HC.OP-AB.RPV-0008 Reactor Coolant Activity Y. HC.OP-AB.CONT-0004 Radioactive Gaseous Release Z. HC.OP-AB.ZZ-OOO Reactor Scram AA. HC.OP-EO.ZZ-0101 RPV Control BB. HC.OP-EO.ZZ-0102 Primary Containment Control CC. HC.OP-EO.ZZ-0103 Reactor Building Control DO. HC.RE-RA.BB-0002 Core Flow Determination EE. HC.OP-IO.ZZ-0004 Shutdown From Rated Power To Cold Shutdown FF.

ESG-NRC-S4 Page 22 of 28 Rev.: 04

ESG-NRC-S4/04 1.

  • The Crew inserts a manual scram and closes at least one MSIV in each Main Steam Line and the HV-F016 or F019 drain valve before MSL radiation has been above the Hi-Hi setpoint for three minutes.

KIA 239001 Main Steam and Reheat Steam System A2 Ability to (a) predict the impacts of the following on the MAIN AND REHEAT STEAM SYSTEM; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions or operations:

A2.05 tMain steam line high radiation RO 3.9 SRO 4.2 Hope Creek was originally designed with an automatic reactor scram and MSIV isolation on Hi-Hi MSL Radiation levels. This was designed to limit the release to the public during a Control Rod Drop Accident. As part of an industry effort to reduce spurious MSIV isolations, the automatic scram and MSIV isolations were removed in Tech Spec Amendment 54. One of the trlree conditions for approval of this amendment was that we would have procedures to expeditiously control significant increases in MSL radioactivity to limit both occupational doses and environmental releases. To meet this requirement, AB.RPV-0008 directs scramming the reactor and closing the MSIVs if a valid MSL Hi-Hi radiation condition exists. In this scenario, three minutes provides adequate time to initiate a manual scram and close the MSIVs and drains. This includes the valve stroking time. In order to accomplish isolation of the release, only one valve in each line need be closed. For instance, closing all valves but the F019 would meet the Critical Task. The failure to close this valve would be applied to the overall performance evaluation.

Isolating the lines BEFORE receiving the Hi-Hi alarms is a conservative action that also satisfies this Critical Task. Scramming prior to the fuel cladding failure and subsequently closing the MSIVs lAW the above requirements also satisfies this Critical Task.

2.

  • Crew determines that Suppression Pool water level cannot be maintained above 38.5" and initiates opening of five SRVs before Suppression Pool level reaches 30".

KIA 295030 Low Suppression Pool Water Level EA2 Ability to determine and/or interpret the following as they apply to LOW SUPPRESSION POOL WATER LEVEL EA2.01 Suppression Pool level RO 4.1 SRO 4.2 KIA 218000 Automatic Depressurization System A.4 Ability to manually operate and/or monitor in the control room:

A4.01 ADS Valves RO 4.4 SRO 4.4 If Suppression Pool Level drops below 38.5", the downcomer pipes are uncovered and the Pressure Suppression function of the Primary Containment is lost. EOPs direct Emergency Depressurizing if Suppression Pool level cannot be maintained above 38.5". Requiring the Emergency Depressurization to be initiated before Supp Pool Level reaches 30" allows the Crew three minutes to implement this action in this scenario.

ESG-NRC-S4 Page 23 of 28 Rev.: 04

ESG*NRC*S4/ 04 HOPE CREEK ESG - PRA RELATIONSHIPS EVALUATION FORM INITIATING EVENTS THAT LEAD TO CORE DAMAGE YIN EVENT YIN EVENT

- - - Loss Of Offsite PowerlSBO Internal Flooding LOCA Loss of 1E AC/DC Buses TRANSIENTS:

Turbine Trip Loss of SSW Loss of Condenser Vacuum Loss of SACS Loss of Feedwater Loss of Instrument Air Inadvertent MSIV Closure Inadvertent SRV Opening COMPONENT/TRAIN/SYSTEM UNAVAILABILITY THAT INCREASES CORE DAMAGE FREQUENCY YIN KEY EQUIPMENT YIN 1E 4.16KV Bus 120VAC 481 Inverter Hard Torus Vent SWitchgear Room Cooler 1E 125VDC Bus RCIC SACS Loop SSW Ventilation SSW Loop Y SSW Pump AlB RHR RACS Heat Exchanger HPCI SLC Core Spray Loop Torus DIW Vacuum Breakers EDG SACS Heat Exchanger OPERATOR ACTIONS IMPORTANT IN PREVENTING CORE DAMAGE YIN OPERATOR ACTION

_ _ _ Emergency Depressurize RPV WIO High Pressure Injection Emergency Venting of Primary Containment Aligning RHR for Suppression Pool Cooling

_ _ _ Restore Switchgear Cooling Control Plant via Remote Shutdown Panel Y Manually Start SW Pump

_ _ _ Cross-tie DC Charger to Portable Supply Isolate SW Pipe Rupture in RACS Room Initiating LP ECCS with No High Pressure Injection Available Monitoring and Control of SACS heat loads Complete this evaluation form for each ESG.

ESG-NRC-S4 Page 24 of 28 Rev.: 04

Rx Power: 3%

Work Week: A Risk Color: Green Activities Completed Last Shift:

"An RFPT is in service in MAN with the SULCV in AUTO Single Element Control "S" RFPT is warmed up and available at 1000 rpm.

Major Activities Next 12 Hours:

Swap in service SSW pumps from "C" to "A".

The "A" SSW Traveling Screen has been run for >30 minutes.

SSW Chlorination has been removed from service.

Protected Equipment:

None Tagged Equipment:

'S' EHC Pump is tagged for maintenance.

ESG-NRC-S4 Page 25 of 28 Rev.: 04

EXAMINATION SCENARIO GUIDE REVIEWNALIDATION Note: This form is used as guidance for an examination team to conduct a review for the proposed exam scenario( s). Attach a separate copy of this form to each scenario revL~wed.

SELF CHECK ESG- NRC-S4 REVIEWER: alf!1 Gte 1. The scenario has clearly stated objectives in the scenario.

,~ t---I/

~e2. The initial conditions are realistic, equipment and/or Instrumentation may be out of service, but it does not cue crew into expected events.

Q: ~() 3. Each event description consists of:

  • The point in the scenario when it is to be initiated
  • The malfunction(s) that are entered to initiate the event
  • The symptoms/cues that will be visible to the crew
  • The expected operator actions (by shift position)
  • The event term ination point (l ~24. The use of non-mechanistic failures (e.g. pipe break) should be limited to one or a credible preceding event has occurred.

a'175. The events are valid with regard to physics and thermodynamics.

G £r6. Sequencing/timing of events is reasonable (e.g. the crew has time to respond to the malfunctions in an appropriate time frame and implements procedures and/or corrective actions).

[} f7 7. Sequencing/timing of events is reasonable, and allows for the examination team to obtain complete evaluation results commensurate with the scenario objectives.

UA 8. If time compression techniques are used, scenario summary clearly so indicates.

af 9. The simulator modeling is not altered.

Ct t;/-, 1O. All crew competencies can be evaluated.

({ 77 11. Appropriate reference materials are available (SOERs. LERs. etc.)

e.# 12. Proper critical task methodology used lAW NRC procedures.

ESG-NRC-S4 Page 26 of 28 Rev.: 04

EXAMINATION SCENARIO GUIDE (ESG) "ALIPATION (con't)

Note: The following criteria list scenario traits that are numerical in nature. A second set of numbers indicates a range to be met for a set of two scenarios. Therefore, to complete this part of the review, the set of scenarios must be available. The section below should be completed once per scenario set.

ESG: NRC-S4 SELF-CHECK arJ~ 1. Total malfunctions inserted: 5-8 G N 2. Malfunctions that occur after EOP entry: 1-2 o£'i 3. Abnormal Events: 2-4 '3 (2 ~k 4. Major Transients: 1-2

~

EOPs entered requiring substantive actions: 1-2 "

EOP Contingency Procedures requiring substantive actions: 0-2 I Approximate scenario run time: 60-90 minutes Gf)

Critical Tasks: 2-3 C-Technical Specifications are exercised during the test:

Comments:

ESG-NRC-S4 Page 27 of 28 Rev.. 04

Crew Validation Rev: 04 Date Validated: 2 Validated with 3 man crew. Runtime was 60 minutes.

Validation Comments Disposition 0'/////////7/7/////////7/////&/7///7///////7/////////7//7//7//////7//7/7/////7/7/////////////////7/7///////7//£0'/////////7/7/7///////£lJL/L:0'ff///7///7/7////////7/////////a Sign preregs in SSW SOP. -'A':-'c=..c:...:e:.Lp-'-'te:....:d:-:-.- = - : : : - : : : - - - - - c - - - - : - - - - : - : - - - - : : - - - : - - - - - - - - - - -

Run SSW pump swap before rod movement. Accepted. ESG written to do either first.

MSL Rads came up hard on manual scram. Corrected ramp rate for ET-16 to be the same as ET-8.

Crew Validation Rev: Date Validated: - - - - -

Validation Comments DiWJsition W///7///////////7/7/7//7////Z0////7/////////////////////7////////////7///7@//////7///////d////////////////@///~//@//Y////////@/Z0//Y//////7/7////7/7/7/7ff/Lj ESG-NRC-S4 Page 28 of 28 Rev.: 04

~E)(A.MINATION SCENARIO TITLE: NRC SCENARIO 2 SCENARIO NUMBER: ESG*NRC*S2 EFFECTIVE DATE: Effective when approved.

EXPECTED DURATION: 75 minutes REVISION NUMBER: 00 PROGRAM: ~ L.O. REQUAL

~ INITIAL LICENSE L--_-.JI OTHER REVISION

SUMMARY

PREPARED BY: Archie E. Faulkner 1/14/12 Instructor APPROVED BY:

~t~ee VJ7~L~

APPROVED BY: 11~:z DATE

Enabling Objectives A. The crew must demonstrate the ability to operate effectively as a team while completing a series of CREW CRITICAL TASKS, which measure the crew's ability to safely operate the plant during normal, abnormal, and emergency plant conditions.

(Crew critical tasks within this examination scenario guide are identified with an " *.")

A. Raise Power 84.5% to 90% using Control Rodsl Place C RFPT in service B. Stuck Rod (TS)

C. Flow Unit Fails Downscale wi Half Scram (TS)

D. A EHC Pump Trip E. Loss of EHC due to Filter Clogging wi Manual Scram F. ATWS G. Failure of RWCU to Auto Isolate H. Failure of HPCI Components to Auto-Initiate The scenario begins with the plant at 84.5% power with power ascension in progress following a load reduction for C RFPT vibration troubleshooting. The RO will withdraw control rods for the power change. The BOP operator will place the C RFPT in service. Control Rod 46-47 will stick when movement is attempted. Attempts to free the rod will be successful. The B APRM Flow Unit will fail downscale resulting in a half scram and rod block. The RO will bypass the Flow Unit and reset the half scrarn. After the Flow Unit failure is addressed, EHC Pump A trips. EHC system filters will clog forcing a manual scram. The scram will result in a half-core ATWS. RWCU Isolation valves HV-F001 and HV-F004 will fail to automatically close on SLC pump start requiring operator action. HPCI components will fail to auto-initiate, and will need to be manually operated to continue to use HPCI. The scenario ends when the reactor is shutdown either by manual rod insertion with RMCS or manual scrams with EOP-320.

ESG-NRC-S2 Page 2 of 29 Rev.: 00

INITIALIZE the simulator to 100% power, 3840 MWt EPU.

REOUCE Reactor power to 84.5% using reactor recirc pumps and control rods.

Stick control rod 46-47 at position 00 using ET -1.

Remove C RFPT from service and place recirc at 1000 rpm lAW HC.OP-SO.AE-0001.

Remove Crossflow from service and clear Overhead Alarm.

ENSURE A EHC Pump is in service.

ENSURE associated Schedule file open and running.

ENSURE associated Events file open.

INITIAL 10-6 for Power Ascension.

APPL Y Protected Equipment bezel covers to A and B RFPTs.

MARKUP HC.OP-SO.AE-0001 Section 5.7 for C RFPT.

ENSURE Move Sheets are available for Control Rods:

  • Group 90 Position 00 to 12
  • Group 9E Position 24 to 48
  • Group 90 Position 12 to 22 At a minimum review the Scenario Reference section and CLEAN the bolded EOPs, ABs and SOPs listed.

(80091396 0270)

ENSURE Oata Collection is trending the following parameters as a minimum:

  • W/R Reactor Water Level
  • W IR RPV Pressure
  • Fuel Zone Reactor Water Level
  • Suppression Pool temperature COMPLETE "Simulator Ready-for-Training/Examination Checklist".

ESG-NRC-S2 Page 3 of 29 Rev.: 00

Event code: I LCPNEP01 >= 300 2

Description:

Deletes malfunction when drive pressure is 300 psig Event code:

Description:

Event code:

Descri ption:

Event code:

Description:

Event code:

Description:

ESG-NRC-S2 Page 4of29 Rev.: 00

MALFUNCTION SCHEDULE: " ""

Initial @Time Event Action Description None None Insert malfunction RP07 Half-core ATWS - right side RWCU isolation valve FOOl failure to auto None None Insert malfunction CUllA close RWCU isolation valve F004 failure to auto None None Insert malfunction CUllE close None None Insert malfunction HP 14 HPCI HV-F006 failure to auto open None None Insert malfunction HP 15 HPCI HV-8278 failure to auto open None None Insert malfunction HP 16 HPCI HV-F059 failure to auto open None None Insert malfunction HP06E HPCI aux oil pump failure to auto start None None Insert malfunction CD034647 Control Rod 46-47 stuck Insert malfunction CD034647 after 1 on None None Control Rod 46-47 stuck event 2 delete in 1 None None Insert malfunction NM 12B to 0 on event 3 Flow summer K607B failure None None Insert malfunction TC07 A on event 4 EHC pump A trip Insert malfunction TC16 to 100.000 on None None EHC pump discharge filter plugging event 4 Insert malfunction EG 11 after 360 on None None Main generator trip event 4 Insert malfunction TCOl-lO after 380 on None None All turbine bypass valves fail closed event 4 ESG-NRC-S2 Page 5 of 29 Rev.: 00

Initial @Tlme i Event Action Description None None Insert remote PP04 to NO PP04 OD-3 Crossflow Applied None None Insert remote AN28 to NOR1Yl AN28 CROSSFLOW ALARMITRBL I Insert ren:.0te EPOI after 360 to BYPASS EPOI EOP-30l, bypass MSN (-129")

None I None on event  ::> isolation interlock I Insert remote EP02 after 480 to BYPASS EP02 EOP-3 11 , bypass PCIG (-129")

None I None on event 6 isolation interlock None I None I Insert remote EP38 after 180 to EP38 EOP-319, Restoring Instrument Air in Emergency on event 7 an I Insert remote EP09 after 240 to EP09 EOP-320 (step 5.l.2), ARI valve fuses None I None REMOVED on event 8 F6A1F5A I Insert remote EP 10 after 240 to EP 10 EOP-320 (step 5.1.4), ARI valve fuses None I None REMOVED on event 8 F6B!F5B I Insert remote EP 11 after 360 to EP 11 EOP-320 (step 5.2.2), RPS division 1 None I None INST ALLED on event 8 jumper I Insert remote EP l3 after 360 to EPl3 EOP-320 (step 5.2.3), RPS division 3 None I None jumper INSTALLED on event 8 I Insert remote EP12 after no to EP12 EOP-320 (step 5.2.4), RPS division 2 None I None jumper INSTALLED on event 8 I Insert remote EP 14 after no to EP14 EOP-320 (step 5.2.5), RPS division 4 None I None jumper INSTALLED on event 8 I Insert remote EP35 after 180 to FAIL None I None EP35 EOP-322 HV-F006 HPCI to CS CLOSE on event 9 ESG-NRC-S2 Page 6 of 29 Rev.: 00

v..

  • SCENARldGU;OE'SEQUENCE: AND EXPECTED

~ ,': <' ";, ,~'/<< <,~."', ,,' :,:t: >:'~~~'L'\<' ",.

RESPONSe};':* ,>'".;.. <

j~jpectedPlantlSto~et1tR.~~~6ns~,

,; , ..*' " ......... '" ',,; , . " . .,~." -,' : '- ."' ',h"; , ......,.,.

Place C RFPT in service:

  • CRS directs BOP Operator to After the Crew assumes the place C RFPT in service feeding watch. the RPV lAW HC.OP-SO.AE 0001.
  • BOP Operator places C RFPT in service feeding the RPV lAW HC.OP-SO.AE-0001.

Raise Reactor Power with

After the Crew assumes the watch.

~ Selected rod PB comes ON (bright white).

~ CONTROL ROD POSITION FOUR ROD DISPLAY indicates the control rod position (1 OC650C).

~ The associated Full Core Display (white) numbered rod identification light comes ON (10C650C).

NOTE: Operator may single

  • At the ROD SELECT MODULE, notch withdraw the rods, as simultaneously press and hold necessary, in which case the both the WITHDRAW PB CONTINUOUS WITHDRAW AND the CONTII\JUOUS PB is NOT used. WITHDRAW PB and observe the following:

~ The INSERT (white) light comes ON momentarily.

~ The WITHDRAW (white) light comes ON and the CONTII\JUOUS WITHDRAW (white) light comes ON.

ESG-NRC-S2 Page 7 of 29 Rev.: 00

. v~ iSCENARiO'GiUlbE,$~'QLJ;ENC*E.~AN Ij:EXPE(j'T~DRESPONSEi

~'.;C,:*\.,.~.i,}<~,,/ ,~t .; ,.Y,****;/*,,"

'Ey~nt} Ih~ti:uc:to~Aaivity

, .. ' " .. ," ~. :~ '.'. ,. ,.,,<,: '.

.\>:~{.i*Comf11ents ./

=> CONTROL ROD POSITION FOUR ROD DISPLAY indicates control rod movement.

  • Prior to reaching the desired control rod position, simultaneously release both the WITHDRAW PB and the CONTINUOUS WITHDRAW PB and OBSERVE the following:

=> The WITHDRAW (white) light goes OUT.

=> The SETTLE (white) light comes ON for::::: 6 seconds, then goes out.

=> CONTROL ROD POSITION FOUR ROD DISPLAY indicates the control rod has settled to the desired position.

=> At position 48 the applicable Full Core Display FULL OUT (red) light comes on.

  • Perform the following while giving the selected Control Rod a continuous withdraw signal:

=> Observe the following as indication of the Control Rod being coupled:

1. ROD OVERTRAVEL alarm does NOT annunciate.

ESG-NRC-S2 Page 8 of 29 Rev.: 00

V. '~GENARIO(3l)IPE:~:~t:qpENCE AND"EXPECJEPRt:~'PONSE EventllnstructorAtiitTity

>,' -<' ~"" J .:' ;<'..:' ".,.'. ;'~ . . >:,:,.~~.>" ."

2. Red Full Out light illuminates on the Full Core Display.
3. RPIS indicates the Control Rod is full out (48).
4. Proper response of the Nuclear Instrumentation while withdrawing the Control Rod.
  • Indicates the completion of the movement on the Pull Listing.

Stuck Control Rod 46*47:

change in rod motion on the 4 Rod Display or the RWM and Examiner Note: The rod wilt informs the CRS.

remain stuck until Drive Water Pressure has been intentionally raised to >300 psid.

  • CRS directs actions in accordance with HC.OP-AB.IC 0001 :

~ Condition F.

  • RO performs actions in accordance with CRS directions:

~ Verifies no Rod Blocks are present.

~ Attempts to operate the drive NOTE: Crew may request RE in both directions to guidance. Respond that a determine the exact condition withdraw signal then an insert of the Control Rod.

signal may be attempted.

~ Verifies drive water flow fluctuates normally.

ESG-NRC-S2 Page 9 of 29 Rev.: 00

}'~CENARI()GLrfdr~

~/k~~';{~~'~)\ .~~:/~".1: ;.. ,,,>,::_.£~~;\,,:)_-!:,:-,- ". \:f!;;'¢i; X
> Verifies proper operation of the SETTLE, INSERT, AND WITHDRAW lights.
> VENT Control Rod using CONTINUOUS INSERT PB.
> ATTEMPT to withdraw Control Rod using WITHDRAW PB (including CONTINUOUS WITHDRAW PB).
> PERFORM the following:
a. SIMULTANEOUSLY PRESS AND HOLD BOTH the WITHDRAW PB AND the CONTINUOUS WITHDRAW PB.
b. MOMENTARILY PRESS and then RELEASE the CONTINUOUS INSERT PB (this step may be repeated).
c. RELEASE BOTH the WITHDRAW PB AND the CONTINUOUS WITHDRAW PB.

ENSURE ET-2 triggers when

  • Performs the following:

drive water pressure dp >300 => Raises the drive water psid. This deletes stuck rod pressure in approximately 50 malfunction. psid increments, not to exceed 500 psid.

=> Attempts to notch in OR notch out the Control Rod at the new pressure increment.

  • RO observes Rod Movement as indicated on the 4 Rod Display or RWM, and notifies the CRS.

ESG-NRC-S2 Page 10 of 29 Rev.: 00

!~~%~S~t~~~1~~~~1~:~Qt~R~~~6~~1:

  • RO returns the drive water pressure to the normal operating range (260-270 psid on A3015).

Flow Unit Failure:

  • Crew monitors Reactor power, At the Lead Examiners pressure, and level and ensure discretion, plant conditions are stable.

TRIGGER ET-3 (8 APRM Flow Ensures no scram setpoints have Unit Failure Downscale). been exceeded.

=> OHA C3-A4 "REACTOR SCRAM TRIP LOGIC 81"

=> OHA C3-A5 "REACTOR SCRAM TRIP LOGIC 82"

=> OHA C5-A 1 "NEUTRON MONITORII\JG SYSTEM"

=> RPS Trip Logic 81 NORMAL/RES ET status lights extinguished

=> RPS Trip Logic 82 NORMAL/RESET status lights extinguished

=> Pilot Scram Valve Solenoid LOGIC 8 NORMAL status lights for all four groups extinguished.

=> CRIDS 02126 NEUTRON MON SYST SCRAM X

=> CRIDS 02174 "REACTOR SCRAM X TRIP"

=> CRIDS 02175 "REACTOR SCRAM Z TRIP" ESG-NRC-S2 Page 11 of 29 Rev.: 00

v. SCEN;ARIOGUIDE SEQUENtk;:ANDExPEcT'E:DREsPoNsE

"" ';,\{A.. ~' <, ".,., , '.\";, <".{/;: c.,-; ">"; "

Eventl Instr~ct~r Acti"itY;I~xp,~~ted

,. "t >,.~" ';. '

PlantlStt.i;d~ntR~sPQn~~

./ ".J \~>> ".~" . . ,:.. ,.....

,.,~, '~:

  • Crew recognizes 'B', 'D', and 'F' APRMs Upscale by:

~ OHA C3-C5 "APRM SYS B UPSCALE TRIP/INOP"

~ C3-D4 "APRM UPSCALE"

~ APRMs B, D, and F "UPSC TR OR INOP" status lights

~ APRM B, D, and F "UPSC ALARM" status lights

~ CRIDS D4305 "APRM CH B UPSCALE THERMAL TRIP"

~ CRIDS D4307 "APRM CH D UPSCALE THERMAL TRIP"

~ CRIDS D4309 "APRM CH F UPSCALE THERMAL TRIP"

  • Crew recognizes 'B' RECIRC LOOP FLOW SUMMER FAILURE Downscale by:

~ FLOW UNIT Band B "COM PAR" status lights

~ APRM B, D, and F "UPSC ALARM" status lights

~ CRIDS C026 "EITHER RBM CHANNEL UPSCALE"

~ CRI DS C049 "RECI RC FLOW COMPR OUT LIMITS"

  • CRS implements AB.IC-0004:

~ Condition F

  • CRS references AB.IC-0003:

~ Condition B

  • RO bypasses 'B' Flow Unit.
  • CRS refers to DD.zZ-0020 for a failed PPC Sensor.
  • CRS directs Reactor Engineering to evaluate the flow unit failure on the PPC.

ESG-NRC-S2 Page 12 of 29 Rev.: 00

. . **<Ever"lFlrnstru~t~rAtH~jfi

, ". - .. ",. ,.,-" '~'." -- ';,;,;;> -. N -;;;:a-/. ~cB~~1~(~",~~~~~!~~~:6 IF directed to place the Flow

  • RO directs I&C to place the Unit B MODE Switch in the MODE Switch, on the applicable unlabeled position, THEN flow unit, to the "UNLABELED" CHANGE Malfunction NM12B position between STANDBY and Final value to 100%. ZERO.
  • RO verifies RPS trip clear.
  • RO resets RPS trip as follows:

=> TURN the affected RPS Trip Logic key to RESET, AND RETURN to the NORMAL position.

=> VERIFY that RPS is reset.

  • CRS determine no Tech Spec actions required. Enter Tracking Action statement for:

=> Table 3.3.6-1 Function 6

=> 3.3.1

=> 3.1.4.3 Trip of 'A' EHC Pump:

  • Crew recognizes trip of AP116 If left in AUTO, the After the Crew resets RPS and EHC pump by: BP116 EHC pump will addresses Tech Spec, => OHA D3-F5 "TURB HYDR auto-start in about 50 OR, PUMP TROUBLE" seconds.

at the discretion of the Lead => OHA D3-E5 "TURB HYDR Examiner, RESERVOIR TROUBLE" TRIGGER ET-4 (Loss of EHC). => CRIDS D5542 "HYDRAULIC FLUID PUMP A TRBL"

=> CRIDS D5575 "TURBINE HYDRAULIC FLUID PRESS LO"

=> HYDR FLUID PUMP A flashing LOW DISCH PRESS light lE dispatched to the EHC

  • RO/PO start the BP116 EHC Immediate Operator pump, THEN REPORT AP116 pump. action lAW motor is very hot to the touch. AB. BOP-0003.

ESG-NRC-S2 Page 13 of 29 Rev.: 00

InSight Item:

  • CRS implements AB.BOP-0003. There are no
  • EHC Header Pressure subsequent actions in tupehchd AB.BOP-0003 for a trip of a pump.
  • EHC Pump Disch Pressure tupehc(2) - 15
  • EHC Pump Filter DIP tupehcdp(2)

EHC Filter Plugging:

  • Crew recognizes BP116 With NO discharge filter The BP116 discharge filter will discharge filter clogging by: swap, EHC pressure begin clogging after the pump  :=:> OHA D3-F5 "TURB HYDR will reach 1100# in starts. PUMPTROUBL about 6 minutes after
=:> CRIDS D3629 "MAIN TURB the pump trip.

EHC PUMP B FILTER DP HI" HYDR FLUID PUMP B flashing HI FILTER DIP light

=:> Lowering EHC header pressure
  • CRS implements AB.BOP-0003:

Condition A IF directed to swap BP116

  • Crew directs TBEO to swap EHC header pressure discharge filters, BP116 pump discharge filters. will continue to decay.

REFER to SO.CH-0001 Section 5.20, THEN REPORT the duplex filter transfer handle will not move.

  • WHEN EHC pressure lowers to May direct earlier, 1200 psig, based on rate of THEN CRS directs locking the pressure drop and Mode Switch in SHUTDOWN. absence of any remaining compensatory actions.
  • RO locks the Mode switch in SHUTDOWN.

ESG-NRC-S2 Page 14 of 29 Rev.: 00

,V.:'~;"*~~SCE'N(~IB~~WP,~~.~~tJE~*p~c~

E~~:n,i:1,~9~#~~!?:~.~~!I~i;¥>~ ";.,

ATWS:

  • Crew recognizes Scram Condition and Reactor Power The half core ATWS is already inserted. Above 4% EOP entry condition:

APRM indications

~ Absence of rod FULL IN lights on the right side of Full Core Display

~ Rod position indications

  • RO performs scram actions lAW AB.ZZ-0001 Art. 1.
  • PO stabilizes and maintains RPV level as directed by CRS.

~ Initiating SLC

~ Verifying RWCU Isolates

  • RO/PO initiate SLC.
  • Crew recognizes RWCU failure to isolate by:

~ HV-F004 OPEN indication on 10C651C and 10C650D

=:> HV-F001 OPEN indication on 1OC651 C and 10C650D RWCU pump running indication on 1OC651 C

~ RWCU flow indication on CRIDS page 61 and 232

  • RO/PO isolate RWCU HV-F001 OR HV-F004 following SBLC pump start.
  • RO/PO inform CRS of failure to automatically isolate.

ESG-NRC-S2 Page 15 of 29 Rev.: 00

i'i.~'~X~pq~n.~~is~;g~~~~~i~ii~*
  • CRS directs: Recirc RPT breakers

=> Verifying Recirc runback to may already be tripped minimum due to Main Turbine

=> Tripping reactor recirc pumps Trip.

  • RO/PO:

=> Verify Recirc runback to minimum

=> Trip reactor recirc pumps

  • Crew verifies bypass valves control pressure.
  • RO/PO inhibit ADS lAW AB.ZZ-0001 AU. 13.
  • CREW prevents an This Critical Task is not uncontrolled depressurization applicable if RPV level during ATWS conditions by never reaches -129".

preventing ADS ACTUA TlON. See justification for failure criteria.

REFER to the appropriate EOP

  • CRS directs performance of the The timing, order, and and SUPPORT Crew requests following EOPs: priority of the EOP for EOPs lAW with the => EO.ZZ-0320 "Defeating ARI performance may vary.

following. Validated execution and RPS Interlocks" time delays are built-in: => EO.ZZ-0301 "Bypassing EOP-301: ET-5 MSIV Isolation Interlocks" EOP-311: ET-6 => EO.zZ-0311 "Bypassing EOP-319: ET-7 Primary Containment EOP-320: ET-8 Instrument Gas Isolation EOP-322: ET-9 Interlocks"

=> EO.ZZ-0319 "Restoring Instrument Air in an Emergency"

=> EO.ZZ-0322 "Core Spray Injection Valve Override" ESG-NRC-S2 Page 16 of 29 Rev.: 00

i,~¥i~;7;1~ .f~~ENARI

  • CRS directs terminating and preventing injection to the RPV with the exception of:

=> SLC

=> CRD

=> RCIC

  • RO/PO terminate and prevent injection from HPCI, RHR and feedwater/condensate lAW AB.ZZ-0001 :

=> Attachment 16 (1 OC650)

=> Attachment 17 (10C651)

  • CRS directs maintaining RPV Typically, the lower end water level between -50" and of the level band is set

-185" with feedwater and/or above -129".

RCIC.

  • CRS directs bypassing the RWM and commencing manual rod insertion.
  • IF EOP-322 is complete before Typically, the lower end RPV water level reaches -129", of the level band is set THEN CRS directs maintaining above -129".

RPV water level between -50" and -185" with HPCI and RCIC.

ESG-NRC-S2 Page 17 of 29 Rev.: 00

.**~~Y~~l/~'JQ~i~r~i~~jl,t\c~!*i~~>';': .* i~~~.<it~;~l~;~~~~~t~i~p~~~j~

before RPV water level reaches "HPCI injection flow 29", should be limited (or THEN CRS directs maintaining secured, if not required water level between -129" and to maintain RPV level

-185" with HPCI and RCIC. above TAF) while this (After EOP-322 is complete, and procedure is in injection through the Core Spray line progress."

has been terminated, the CRS may Hope Creek has use the full level band allowed by defined the intent of EOP-1 01 A. In this case, with "above TAF" in this Suppression Pool temperature statement to mean no below 110°, the upper RPV level higher than -129",

limit is -50".)

  • RO/PO initiate HPCI as directed by CRS.
  • RO/PO recognize HPCI components fail to auto-initiate and align components lAW AB.ZZ-0001 Att. 6.

~ HPCI Aux Oil Pump

~ HPCI HV-F006

~ HPCI HV-8278

~ HPCI HV-F059

  • RO/PO inject with HPCI as necessary to maintain RPV water level as directed by CRS.
  • RO/PO inject lAW EO.zZ-0322 to maintain RPV water level as directed by CRS.
  • IF EOP-322 is complete in the field, RO/PO implements EOP 322 in Control Room as follows:

ESG-NRC-S2 Page 18 of 29 Rev.: 00

=> ENSURE HPCI flow is :s; 3000 gpm

=> CLOSE HV-F006

  • CREW maintains or restores adequate core cooling by restoring/maintaining Reactor water level to >-185" lAW HC.OP-EO.ZZ-0101A without Emergency Depressurizing.
  • !E the MSIVs close, THEN the CRS directs pressure control with the SRVs.
  • !E directed, THEN RO/PO control pressure with SRVs lAW AB.zZ-0001 Att. 13.
  • !E RPV level reaches -129",

THEN CRS directs restoring:

=> 1E Breakers CRD PCIG to SRVs

  • !E directed, THEN RO/PO restore 1 E breakers lAW AB.ZZ-0001 Att. 12.
  • IF directed, THEN RO/PO restore a CRD pump to service lAW either:

OP-AB.ZZ-0001 Attach 18 ESG-NRC-S2 Page 19 of 29 Rev.: 00

  • lE directed, Restoring PCIG to THEN RO/PO restore PCIG to the SRVs lAW SRVs lAW AB.zZ-0001 Att. 9 AB.zZ-0001 Att. 9 is also equivalent to the Control Room actions in EOP-311.
  • Crew recognizes Supp Pool Temp Above 95°F EOP entry condition by:

~ OHA C8-F1 "SUPPR POOL TEMP HIGH"

~ Flashing 95 degree status light on 10C650C

~ RM11 9AX833/834 alarm

~ Various Suppression Pool temperature indicators

  • CRS directs placing RHR in Suppression Pool Cooling.
  • RO/PO place RHR in Supp Pool Cooling lAW AB.ZZ-0001 Att. 3.
  • lE necessary, THEN RO/PO align SACS to support second RHR Hx lAW SO.EG-0001 Section 5.9.

WHEN the Crew has reset

  • WHEN EOP-320 Section 5.1 and RPS, 5.2 are complete, THEN DELETE Malfunction THEN the Crew implements RP07 to allow full rod insertion EOP-320 Section 5.3 and reset on the next scram. RPS.

At the Lead Examiners

  • WHEN OHA C6-E4 clears, discretion, MODIFY Insight THEN the Crew initiates a Item Iclsdv to accelerate manual scram lAW EOP-320 draining of the SDV. Section 5.3.

ESG-NRC-S2 Page 20 of 29 Rev.: 00

v; "SCENARlti~DrbE~sEat!ir'

,', - **** - ** -"'C'-C'. - _.' -" ~~-,;-~tt;~ 41:if;;7;0p;;~t;::;~;~~:

.~;f /:~:~.~,.:' :;:.::" __' . _. /.' ::7 -.-<;{:~;::~~~~~? -:+~~.~~. ?~0~t~~\ .;/"'.". . . ,*,;~~}1:~:~:r,~7~,

~;~~r
atL InsttUJit~ri~~tivity;~~,,;

.", - -.' _  :---- -co~" , ,-.. - c __, ' _m', ,>." / "",.,.' '," . ~

I

  • Crew recognizes the reactor is shutdown by:

~ SPDS ALL RODS IN

~ RWM Confirm Shutdown

~ CRIDS Rod positions

  • CRS directs terminating SLC injection.
  • RO/PO terminate SLC injection.

Termination Requirement:

terminated at the discretion of the Lead Examiner when:

  • RPV Level is being maintained above -161" AND
  • All rods are fully inserted ESG-NRC-S2 Page 21 of 29 Rev.: 00
  • VI. SCENARIO

REFERENCES:

A. TQ-AA-1 06-0304 Licensed Operator Requal Training Exam Development Job Aid B. NUREG 1021 Examiner Standards C. JTA Listing D. Probabilistic Risk Assessment E. Technical Specifications F. Emergency Plan (ECG)

G. Alarm Response Procedures (Various)

H. HU-AA-101 Performance Tools and Verification Practices I. HU-AA-1 04-1 01 Procedure Use and Adherence J. HU-AA-1081 Fundamentals Toolkit K. H U-AA-1211 Briefing L. OP-AA-101-111-1004 Operations Standards M. OP-AA-101-111 Roles and Responsibilities of On Shift Personnel N. OP-AA-1 06-101-1001 Event Response Guidelines O. OP-AA-1 08-114 Post Transient Review P. OP-HC-1 08-115-1 001 Operability Assessment and Equipment Control Program Q. OP-HC-1 08-1 06-1 001 Equipment Operational Control R. HC.OP-DD.ZZ-0020 Review of Core Performance Information S. HC.OP-SO.AE-0001 Feedwater System Operation T. HC.OP-SO.BF-0001 CRD Hydraulic System Operation U. HC.OP-SO.SF-0001 Reactor Manual Control V. HC.OP-SO.SF-0003 Rod Worth Minimizer Operation W. HC.RE-IO.ZZ-0001 Core Operations Guidelines X. HC.RE-AB.zZ-0001 Insertion of Control Rods in Response to an ATWS Y. HC.OP-AB.ZZ-0001 Transient Plant Conditions Z. HC.OP-AB.BOP-0003 Turbine Hydraulic Pressure AA. HC.OP-AB.IC-0001 Control Rod BB. HC.OP-AB.IC-0003 Reactor Protection System CC. HC.OP-AB.IC-0004 Neutron Monitoring DD. HC.OP-IO.ZZ-0006 Power Changes During Operation EE. HC.OP-AB.ZZ-OOO Reactor Scram FF. HC.OP-EO.ZZ-0101 RPV Control GG. HC.OP-EO.ZZ-0101A ATWS-RPV Control HH. HC.OP-EO.ZZ-0102 Primary Containment Control II. Strategies For Successful Transient Mitigation ESG-NRC-S2 Page 22 of 29 Rev.: 00

ESG-N RC-S2 I 00 1.

  • CREW prevents an uncontrolled depressurization during A TWS conditions by preventing ADS ACTUATION.

KIA 218000 Automatic Depressurization System A4 Ability to manually operate and/or monitor in the control room:

A4.04 ADS inhibit RO 4.1 SRO 4.1 Given the current ATWS conditions of this scenario, preventing ADS automatic operation and potential uncontrolled reactor level flood up prevents a significant transient and subsequent positive reactivity addition to the reactor. EOPs direct this action under the current conditions.

This critical task is only applicable if RPV water level goes below -129". Failure to satisfactorily complete the task is demonstrated by an automatic ACTUATION of ADS such that the ADS SRVs open and reduce reactor pressure to less than 100 psig.

2.

  • RO/PO isolate RWCU HV-F001 OR HV-F004 following SBLC pump start.

KIA 295037 SCRAM Condition Present and Reactor Power Above APRM Downscale or Unknown EA1. Ability to operate and/or monitor the following as they apply to SCRAM Condition Present and Reactor Power Above APRM Downscale or Unknown:

EA 1.02 RRCS RO 3.8 SRO 4.0 EA1.04 SBlC RO 4.5 SRO 4.5 KIA 211000 Standby Liquid Control Systems A3 Ability to monitor automatic operations of the STANDBY LlDUID CONTROL SYSTEM including:

A3.06 RWCU system isolation RO 4.0 SRO 4.1 A4 Ability to manually operate and/or monitor in the control room:

A4.06 RWCU system isolation RO 3.9 SRO 3.9 The failure of RWCU HV-F001 and F004 to automatically close will reduce the effectiveness of the SBlC injection. Crew action is required to correct the incorrect reactivity control before the BIIT is reached as directed by EOP-1 01 A.

3.

  • CREW maintains or restores adequate core cooling by restoring/maintaining Reactor water level to >-185" lAW HC.OP-EO.ZZ-0101A without Emergency Depressurizing.

KIA 295037 SCRAM Condition Present and Reactor Power Above APRM Downscale or Unknown EA2 Ability to determine and/or interpret the following as they apply to SCRAM Condition Present and Reactor Power Above APRM Downscale or Unknown:

EA2.02 Reactor water level RO 4.1 SRO 4.2 Maintaining adequate Core cooling under ATWS conditions is accomplished by maintaining/restoring level above -185". HPCI and RCIC are capable of maintaining level under the current conditions. AB.lZ-0001 provides directions on manual initiation of HPCI which will mitigate the automatic initiation failure. An Emergency Depressurization is not warranted and would result in a large injection of cold water and the potential displacement of boron from the core.

ESG-NRC-S2 Page 23 of 29 Rev.: 00

4.

KIA 295037 SCRAM Condition Present and Reactor Power Above APRM Downscale or Unknown EA 1. Ability to operate and/or monitor the following as they apply to SCRAM Condition Present and Reactor Power Above APRM Downscale or Unknown:

EA 1.01 Reactor Protection System RO 4.6 SRO 4.6 EA 1.07 RMCS RO 3.9 SRO 4.0 Manually inserting all control rods, OR, implementing HC.OP-EO.ZZ-0320, provides the only methods for control rod insertion and substantial negative reactivity addition. It is critical for the crew to implement one of these methods to insert control rods and shut the reactor down. Failure to initiate these actions may result in requiring RPV level to be lowered to or below TAF to reduce power to <4%. This represents a significant challenge to maintaining adequate core cooling.

ESG-NRC-S2 Page 24 of 29 Rev.: 00

ESG-NRC-S2/00 HOPE CREEK ESG - PRA RELATIONSHIPS EVALUATION FORM INITIATING EVENTS THAT LEAD TO CORE DAMAGE YIN EVENT Y/"I EVENT Loss Of Offsite PowerlSBO Internal Flooding LOCA Loss of 1 E AC/DC Buses LOSS OF SUPPORT TRANSIENTS: SYSTEMS:

Y Turbine Trip Loss of SSW Loss of Condenser Vacuum Loss of SACS Loss of Feedwater Loss of Instrument Air Inadvertent MSIV Closure Inadvertent SRV Opening COMPONENT/TRAIN/SYSTEM UNAVAILABILITY THAT INCREASES CORE DAMAGE FREQUENCY YIN KEY EQUIPMENT YIN KEY EQUIPMENT 1 E 4.16KV Bus 120VAC 481 Inverter Hard Torus Vent Switchgear Room Cooler 1 E 125VDC Bus RCIC

_ _ _ SACS Loop ---

SSW Ventilation SSW Loop SSW Pump NBRHR _ _ _ RACS Heat Exchanger HPCI _ _ _ SLC

_ _ _ Core Spray Loop

- - - Torus DIW Vacuum Breakers EDG _ _ _ SACS Heat Exchanger OPERATOR ACTIONS IMPORTANT IN PREVENTING CORE DAMAGE YIN OPERATOR ACTION Emergency Depressurize RPV WIO High Pressure Injection Emergency Venting of Primary Containment Y Aligning RHR for Suppression Pool Cooling Restore Switchgear Cooling

- - - Control Plant via Remote Shutdown Panel Manually Start SW Pump Cross-tie DC Charger to Portable Supply Isolate SW Pipe Rupture in RACS Room Initiating LP ECCS with No High Pressure Injection Available

_ _ _ Monitoring and Control of SACS heat loads Complete this evaluation form for each ESG.

ESG-NRC-S2 Page 25 of 29 Rev.: 00

Rx Power: 84.5%

Work Week: A Risk Color: Green Activities Completed Last Shift:

Reduced power to 84.5% for C RFPT vibration troubleshooting.

Commenced Power ascension lAW 10-6 C RFPT is in Recirc at -1000 rpm.

Major Activities Next 12 Hours:

Return to 100% power.

Protected Equipment:

A and B RFPTs Tagged Equipment:

None ESG-NRC-S2 Page 26 of 29 Rev.: 00

IX. SIMULATO'RESGREVI EWNALI[)AtION):~I;(;KLlST '

">1 EXAMINATION SCENARIO GUIDE (ESG) REVIEWNALIDATION Note: This form is used as guidance for an examination team to conduct a review for the proposed exam scenario(s). Attach a separate copy of this form to each scenario reviewed.

6~~CK ESG- NRC-S2 REVIEWER a~ ['ilL Q i'r 1. The scenario has clearly stated objectives in the scenario.

oc,/ 2. The initial conditions are realistic, equipment and/or Instrumentation may be out of service, but it does

-- not cue crew into expected events.

a~/ 3. Each event description consists of:

  • The point in the scenario when it is to be initiated
  • The malfunction(s) that are entered to initiate the event
  • The symptoms/cues that will be visible to the crew
  • The expected operator actions (by shift position)
  • The event termination point Q~'i 4. The use of non-mechanistic failures (e.g. pipe break) should be limited to one or a credible preceding event has occurred.

Qtz,'i 5. The events are valid with regard to physics and thermodynamics.

Ct~1 6. Sequencing/timing of events is reasonable (e.g. the crew has time to respond to the malfunctions in an appropriate time frame and implements procedures and/or corrective actions).

{;.~? 7. Sequencing/timing of events is reasonable, and allows for the examination team to obtain complete evaluation results commensurate with the scenario objectives.

1J4-- 8. If time compression techniques are used, scenario summary clearly so indicates.

~9. The simulator modeling is not altered.

(l (t 10. All crew competencies can be evaluated.

D. r111. Appropriate reference materials are available (SOERs, LERs, etc.)

0(1 12. Proper critical task methodology used lAW NRC procedures.

ESG-NRC-S2 Page 27 of 29 Rev.: 00

EXAMINATION SCENARIO GUIDE VALIDATION Note: The following criteria list scenario traits that are numerical In nature. A second set of numbers indicates a range to be met for a set of two scenarios. Therefore, to complete this part of the review, the set of scenarios must be available. The section below should be completed once per scenario set.

ESG: NRC-S2 ESG:

SELF-CHECK

1. Total malfunctions inserted: 4-8/10-14 rt Malfunctions that occur after EOP entry: 1-4/3-6 1 Abnormal Events: 1-2/2-3 t.-f
4. Major Transients: 1-2/2-3

_ 5. EOPs used beyond primary scram response EOP: 1-3/3-5 E- 6. EOP Contingency Procedures used: 0-3/1-3

~ 7. Approximate scenario run time: 45-60 minutes (one scenario may approach 90 minutes)

8. EOP run time: 40-70% of scenario run time

~ 9. Crew Critical Tasks: 2-5/5-8

~ 1 O. Technical Specifications are exercised during the test

~11. Events used in the two scenarios are not repeated (Only Applicable for an exam set)

Comments:

ESG-NRC-S2 Page 28 of 29 Rev.. 00

EXAMINATION SCENARIO GUIDE (ESG) VALIDATION (con't)

Crew Validation Rev: 00 Date Validated: 1/14/12 Validated with one 3 man crew from B Shift. Runtime was 75 minutes.

Validation Comments Disposition

//"////////////////////////////////////$/////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////5 RPV level control by operators kept level above - 129". Added MT trip and TBV fail closed after 6 minutes on ET -4 to drive pressure control to SRVs.

Crew Validation Rev: Date Validated: - - - - -

Validation Comments Disposition

//"//////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////$///////////////////////5 ESG-NRC-S2 Page 29 of 29 Rev.: 00

SCENARIO TITLE: NRC SCENARIO 1 SCENARIO NUMBER: ESG-NRC-S1 EFFECTIVE DATE: Effective when approved.

EXPECTED DURATION: 80 minutes REVISION NUMBER: 00 PROGRAM: ~ L.O. REQUAL

~ INITIAL LICENSE OTHER REVISION

SUMMARY

1. Added text for power increase with Reactor Recirc.
2. Revised wording of Critical Task for clarity.

PREPARED BY: Archie E. Faulkner 1/14/12 Instructor DATE APPROVED BY:

~ ---JJn/J.?,

APPROVED BY: / ~I/~C/ lifL~ IhiL DATE

Enabling Objectives A. The crew must demonstrate the ability to operate effectively as a team while completing a series of CREW CRITICAL TASKS, which measure the crew's ability to safely operate the plant during normal, abnormal, and emergency plant conditions.

(Crew critical tasks within this examination scenario guide are identified with an "*.")

A. Raise Power with Recirc B. PT-N076A MSL Pressure Fails Upscale C. A CRD Pump Trip D. Seismic Event with 10A403 Bus Lockout E. Small Break LOCA I Manual scram F. LOPI with A, B, and D EDG Malfunctions G. HPCI Oil Line Break H. RCIC Overspeed The scenario begins with the plant at 93% power; MOL. "B" EHC pump is tagged for maintenance. Reactor power is being raised to 98% with Reactor Recirc. Main Steam Line Pressure Transmitter PT-N076A fails upscale requiring a Tech Spec entry. After TS are addressed, the "A" CRD Pump will trip. The RO will need to place the "B" CRD Pump inservice.

Once CRD is restored, an earthquake will occur. The 10A403 bus will lockout. "An SSW Pump will fail to Auto-start and must be manually started by the operator. After Tech Specs are addressed for the bus loss, a Small Break LOCA occurs requiring a manual scram. The oil line to HPCI stearn control valve fails and is not recoverable. RCIC trips on Overspeed. An aftershock causes a Loss of Offsite Power. "D" EDG fails and is not recoverable. "B" EDG fails to start, but can be started by the operator (Critical Task). RCIC can be recovered with field operator action after RPV Level reaches -129", but is insufficient to prevent reaching TAF. Emergency Depressurization is required before RPV Level reaches -185" (Critical Task). "An EDG can be started after emergency depressurization. This will allow containment control to be exercised.

The scenario is terminated when the RPV has been depressurized, RPV water level restored to post LOCA level band and Drywell Sprays initiated.

ESG-NRC-S1 Page 2 of 24 Rev: 00

INITIALIZE the simulator to full power, MOL.

ENSURE A CRD pump is in service.

ENSURE B TACS Loop is in service.

ENSURE C SACS pump is in service.

ENSURE C SSW pump is in service.

ENSURE AP116 EHC pump is in service.

CfT BP116 EHC pump as follows:

1. INSERT Malfunction TC07B
2. PLACE 'B' EHC pump in MAN
3. START 'B' EHC pump and allow it to trip ENSURE associated Schedule file is loaded and running.

ENSURE associated Events file open.

PLACE red bezel cover on '6' EHC pump.

At a minimum review the Scenario Reference section and CLEAN the bolded EOPs, ABs and SOPs listed.

(800913960270)

ENSURE Data Collection is trending the following datapool variables:

  • W/R Reactor Water Level: rrln091a or equivalent
  • CRIDS Compensated Fuel Zone Reactor Water Level: B5042 or equivalent COMPLETE the Simulator Ready for Training/Examination Checklist.

ESG-NRC-S1 Page 3 of 24 Rev:OC

Initial Insert malfunction TC07B EHC pump B trip None I None I Insert malfunction DGO IA Diesel generator A failure to start Kone I None I Insert malfunction DG07B I Diesel generator B emergency start signal failure Diesel generator B breaker failure to auto Kone I None Insert malfunction DG08B close None None Insert malfunction DGO 1C Diesel generator C failure to start None None Insert malfunction DG02D Diesel generator D failure Insert malfunction MS09A to 100.00000 Steam line header pressure transmitter N076A None I None on event 1 fails None I None Insert malfunction CD10A on event 2 CRD hydraulic pump A trip None None Insert malfunction PC07 A on event 3 Seismic Event I None None Insert malfunction ED 16 on event 3 Loss of 4.16 KV vital bus C 10A403 None None Insert malfunction CWl4A on event 3 Service water pump AP502 fail to auto start I Insert malfunction RR31Al to 20.00000 in Recirc loop A small break [V] (10%--60 gpm, None I None 100%~600 gpm) 600 on event 4 Seismic Event II None None Insert malfunction PC07B on event 5 None None Insert malfunction EG 12 on event 5 Loss of all off site povver None I None I Insert malfunction HP06M on event 5 HPCI aux oil pump - oil line break None I None I Insert malfunction RCO 1 on event 5 RCIC turbine overspeed I Insert malfunction RR3lA2 to 4.00000 in Recirc loop A large break [V] (10%-6000 None I None gpm, 1000/0""60000 gpm) 60 on event 5 None I None I Insert malfunction DG07B on event 7 Diesel generator B emergency start signal delete in 1 failure i Insert malfunction RCO 1 on event 8 delete None I None , in 1 I RCIC turbine overspeed None I None ' Insert malfunction DGO 1A after 1 on event

' 12 d 1 '1 I D'lese1 generator A f at'I ure to start e ete in ESG-NRC-S1 Page 4 of 24 Rev: 00

I Insert remote Re02 after 5 to RESET on None I None event 8 I Re02 ReIC overspeed trip reset I Insert remote HP08 to TAGGED on event None I None HP08 HPCI Aux Oil Pump 10 I Insert remote eXll after 60 to OPEN on eXll ex valve AP-V041 to Core Spray None I None event 11 header A I Insert remote eX15 after 120 to OPEN on None I None eX] 5 ex valve AP-V044 to RHR header A event 11 I Insert remote eXl? after 180 to OPEN on None I None I eXl? ex valve AP-V04? to RHR header e event 11

Raise Power with Recirc:

  • CRS directs the RO to raise After the Crew assumes the Reactor power with Reactor watch. Recirc in accordance with RE guidance.
  • RO increases Reactor Recirc pump speeds in accordance with HC.OP-SO.BB-0002 and CRS directions.

PT-N076A Failure: .

  • Crew recognizes 'A' NSSSS Afterthe Crew assumes the instrument failure by:

watch and at the discretion of => OHA C8-A5 "NSSSS INBD the Lead Examiner, TRIGGER ISLN SYS OUT OF SVCE" ET-1 CA' NSSSS MSL => Amber NSSSS CH A "TRIP Pressure Transmitter Fails UNIT IN CAL OR GROSS High). FAIL" light

=> CRIDS D2633 "MSIV INBD SYS OUT OF SVCE CH A"

=> CRIDS D2636 "NON-MSIV INBD SYS OUT OF SVCE CHA"

  • RO/PO reference ARP.
  • Crew inspects 10C609 panel trip This will prevent the 'At units and finds B21-N676A is NSSSS Channel from failed upscale with a Gross Fail generating an MSIV Trip in. isolation signal on Low Main Steam Line pressure.

Transmitter is located in TB

  • Crew contacts Maintenance to Electrical Mezzanine. troubleshoot.

IE dispatched to transmitter, THEN REPORT there is no visible damage to transmitter.

ESG-NRC-S1 Page 6 of 24 Rev: 00

  • CRS recognize the following TIS TIS Table 3.3.2-1 Trip applies Function 3c.
, Isolation Actuation Instrumentation 3.3.2 action b.1.c applies (24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> to place in a tripped condition).

If requested, after an

  • Crew may implement HC.OP appropriate delay, support GP.ZZ-0011 to place trip units actions of placing trip units in into tripped condition tripped condition by changing MALF MS09A severity to O.

A CRD Pump Trip:

  • RO recognizes 'A' CRD pump After the Crew addresses Tech trip by:

Specs for the PT-N076A and at  ::;, OHA C6-F2 HCRD SYSTEM the discretion of the Lead TROUBLE" Examiner, TRIGGER ET-2.  ::;, CRIDS 02244 "CRD WATER PUMP A MOTOR"

, Flashing OVLD/POWER FAILURE bezel for A CRD Pump" IF dispatched to investigate the

CRD Pump trip, THEN REPORT the A CRD pump speed changer inboard bearing has overheated.

IE dispatched to investigate the trip of A CRD Pump Breaker, THEN REPORT breaker 52 43711 is tripped on overcurrent.

  • RO starts "B" CRD pump lAW ARP as follows:
, PLACE DRIVE WTR FLOW controller in MANUAL AND SET to O.

ESG-NRC-S1 Page 7 of 24 Rev: 00

START B CRD Pump AND RESTORE system flow to 63 gpm.

~ ADJUST HV-F003 to restore system pressure to normal, IF necessary.

RETURN DRIVE WTR FLOW controller to AUTO.

Earthquake/10A403 Bus

  • Crew recognizes Seismic Event Loss: by:

After the Crew restores CRD OHA C6-C4 "SEISMIC MON and at the discretion of the PNL C673" Lead Examiner: ~ CRIDS D3977 "SEISMIC

  • PLAY the Earthquake TROUBLE ALARM TRBL" Sound Effect (if available) at ~ Response Spectrum Analyzer medium volume for about indications on 10C650C 20 seconds ~ Loud rumbling noise OR (if available)

ANNOUNCE "You feel motion then it stops"

  • TRIGGER ET-3 (Seismic Eventl1 OA403 Bus Loss)
  • Crew monitors critical parameters to determine if plant is stable.

IF Crew calls National

  • CRS implements AB.MISC-0001: AB.MISC-0001 actions Earthquake Center, ~ Condition E provided for reference THEN REPORT a seismic ~ Condition F only. Due to the pace event of 6.0 on Richter scale of the scenario, it is centered 12 miles east of unlikely they will be Wilmington, DE. implemented.

IF Crew calls Security, THEN REPORT the Security system is intact.

ESG-NRC-S1 Page 8 of 24 Rev: 00

  • RO/PO implement AR.ZZ-0011 Attachment C4.

IF dispatched to 10C673,

  • Crew dispatches ABEO to THEN REPORT: 10C673.
  • The Event Indicator is
  • Crew recognizes a seismic event WHITE

>0.1 g has occurred

  • The tape machines have advanced but are not running
  • The Amber Alarm light on the Seismic Switch Power Supply drawer is lit.

IF directed to reset 10C673,

  • RO/PO direct ABEO to reset THEN DELETE Malfunction 10C673 lAW SO.SG-0001.

PC07A.

  • RO/PO record Seismic Response Spectrum Analyzer lights on AR.ZZ-0011 Att. C4-1.
  • RO/PO reset Seismic Response Spectrum Analyzer lAW SO.SG-0001.
  • Crew determines a shutdown lAW 10.ZZ-0004 is required.
  • Crew recognizes 10A403 bus loss by:

=> OHA E3-E2 4.16KV SYS INCOMING BRKR MALF

=> OHA E3-F2 4.16KV FOR TO USS XFMER BRKR MALF OHA 03-E3 120VAC UPS TROUBLE Flashing TRIP lights for 10A403 Infeed breakers

  • CRS implements AB.ZZ-0172.

ESG-NRC-S1 Page 9 of 24 Rev: 00

  • CRS directs PO to complete AB.ZZ-0172 Subsequent Actions.
  • PO ensures A SACS pump is in service.
  • PO ensures B TACS Loop is in service.
  • PO ensures A SSW pump is in service.
  • PO determines A SSW Pump has failed to auto-start.
  • PO starts A SSW pump as follows:

~ PO places A SSW Pump in MAN.

~ PO presses A SSW Pump START pb.

  • PO ensures B Control Room HVAC Train is in service.

IE dispatched to align AP to 'A'

  • TRIGGER ET-11 to open AP-V044N047N041
  • CRS recognize the following TIS TIS 3.8.3.1.

applies

~ 3.8.3.1.a.3. a)

Action a. applies (8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> to re energize the channel).

~ 3.8.1.1 Perform Power Distribution lineup within one hour.

ESG-NRC-S1 Page 10 of 24 Rev: 00

Small Break LOCA: i. Crew recognizes LOCA 20 minutes after the condition:

earthquake OHA C6-B 1 "OLD SYSTEM OR, ALARMffRBL"

=> RM11 9AX314 OLD FLOOR at the discretion of the Lead Examiner, TRIGGER ET-4. ORN FLOW alarm

=> RM 11 9AX317/318/320 OLD CCM alarms

=> OHA 03-C3 "ORYWELL SUMP LEVEL HIILO" OHA A4-F5 "COMPUTER PT IN ALARM"

=> OHA A 7-E4 "ORYWELL PRESSURE HI/LO"

=> Rising Orywell Pressure on various indicators

  • CRS implements AB.CONT Based on the rate of 0006: drywell pressure rise

=> Condition A (:::::10 minutes to 1.68#)

Condition B some or all of these

=> Condition C Conditions may not be entered.

  • CRS implements AB.CONT 0001 :

=> Condition A

  • RO/PO ensures drywell cooling maximized.
  • Crew checks

=> Recirc pump seal parameters

=> SRV temperatures ESG-NRC-S1 Page 11 of 24 Rev: 00

  • WHEN the Crew determines drywell pressure cannot be maintained below 1.5 psig, THEN CRS directs:

=> Reducing recirc pumps to minimum speed

=> Locking the Mode Switch in SHUTDOWN

  • RO:

=> Reduces recirc pumps to minimum speed Locks the Mode Switch in SHUTDOWN

  • Crew recognizes RPV Level Below 12.5" EOP entry condition by:

=> OHA C5-A4 "RPV WATER LEVEL LO"

=> OHA A7-D5 "RPV LEVEL 3"

=> Various water level indicators Aftershock/LOP/LOCA:

  • Crew recognizes Loss of Offsite Power by:

At the Lead Examiners => OHA "STA SERVICE discretion, TRANSFORMER TROUBLE"

  • PLAY the Earthquake for all transformers Sound Effect (ifavailabfe) at => TRIP indication for all 500 KV medium volume for about breakers 20 seconds => Flashing TRIP lights for all OR previously closed bus infeeds.

ANNOUNCE "You feel Numerous OVLD/PWR FAIL motion then it stops" lights.

  • TRIGGER ET-5 (LOP/LOCA)

ESG-NRC-S1 Page 12 of 24 Rev: 00

  • Crew recognizes failure of the Only 'B' EDG will start A/B/D EDGs to start and load by: from the Control Room.
> Engine STOP lights 'C' EDG is not available
> Output breaker TRIP lights due to the 10A403 bus OVLD/PWR lights on lockout.

associated Channel components IF directed to start the 'B' EDG

  • RO/PO attempt to start the A/BID Immediate Operator locally, EDGs. Action lAW AB.ZZ-0135 THEN TRIGGER ET*7 and REPORT 'B' EDG running.
  • RO/PO close 'B' EDG output Immediate Operator breaker. Action lAW AB.ZZ-0135.
  • Crew starts the '8' EDG by EITHER:

Pressing the '8' EDG START pushbutton in the Control Room, OR Directing an operator to locally start the '8' EDG, AND Closes '8' EDG output breaker.

  • CRS implements AB.zZ-0135.

IF dispatched to investigate the

  • Crew dispatches NEO and/or failure of 'D' EDGs to start, Maintenance to investigate THEN REPORT 'D' EDG has failure of D EDG to start.

Lube Oil Low Pressure Shutdown alarm. There is oil on 'D' EDG room floor.

ESG-NRC-S1 Page 13 of 24 Rev: 00

IF dispatched to investigate the

  • Crew dispatches NEO and/or failure of the 'A' EDG to start, Maintenance to investigate THEN REPORT there is a failure of 'A' EDG to start.

blown fuse on DC Circuit 3 on the AC421 panel.

IE directed to start the EDG using either local control

switch, THEN REPORT it did not work.

(AR.KJ-0001 Att. 37 A)

IF dispatched to check 86, SFR, and SDR relays for 'A'

EDG, THEN REPORT:
  • 86 lockout relays are reset (AC422, elev 137')
  • Blue buttons on SFR and SDR are out (de-energized)

(AC421 elev 102')

IE dispatched to determine

  • Crew recognizes HPCI Oil line status of HPCI, break problem by:

THEN REPORT

  • HPCI Aux oil pump is => HV- F001 open running.

=> "HPCI INIT AND SEALED IN"

  • HV-F001 is open light on
  • Oil in the floor surrounding => HPCI Governor valve closed the pump skid HPCI Turbine Speed 0 rpm IF directed to open the breaker for the HPCI Aux Oil pump, (72-251042)

THEN TRIGGER ET-10.

IE dispatched to investigate

  • Crew dispatches NEO to RCIC trip, investigate RCIC trip.

THEN REPORT the Overspeed device is tripped.

ESG-NRC-S1 Page 14 of 24 Rev: 00

!E directed to reset the RCIC

THEN TRIGGER ET-8.

  • CRS directs injecting with 'B' Only available injection SLC pump. source.
  • RO/PO start the 'B' SLC pump.
  • Crew recognizes Supp Pool Given the lowering RPV Temp Above 95°F EOP entry water level, and 'B' condition by: RHR being the only

=> OHA C8-F1 "SUPPR POOL available RHR pump, TEMP HIGH" the Crew may not place

=> Flashing 95 degree status 'B' RHR in Suppression light on 10C650C Pool cooling at this RM11 9AX833/834 alarm time.

Various Suppression Pool temperature indicators

  • Crew recognizes Supp Pool Given the LOP and the Level Above 78.5 In EOP entry unavailability of HPCI condition by: and RCIC, there is

=> OHA B1-C3 "SUPPRESSION nothing the Crew can POOL LEVEL HI/LO" do to lower

=> Various Suppression Pool Suppression Pool water level indicators level at this time.

  • CRS recognize RPV level continues to lower and Emergency Depressurization is required.
  • WHEN RPV water level reaches

-129",

TH EN CRS directs inhibiting ADS.

ESG-NRC-S1 Page 15 of 24 Rev: 00

  • RO/PO inhibit ADS lAW AB.ZZ-0001 Att. 13.
  • BEFORE RPV water level reaches -185",

THEN CRS directs opening five ADS SRVs.

  • RO/PO open five ADS SRVs lAW AB.ZZ-0001 Att. 13.
  • WHEN RPV Compensated water level cannot be maintained above -185",

THEN Before Compensated RPV water level is below 185", the Crew opens five SRVs to Emergency Depressurize the reactor and then restores RPV water level to above -185".

IF directed to restore the 'A'

  • Crew recognizes start of the 'A' The restoration of the EDG to service, AND after level EDG by: 'A' EDG makes the 'A' has been restored with 'B'  ;;;:- Diesel engine START light Core Spray Loop EDG,  ;;;:- Generator breaker CLOSE available for RPV water THEN TRIGGER ET-12 AND light level control.

REPORT the 'A' EDG has  ;;;:- OVLD/PWR FAIL lights been successfully restarted. extinguished on associated channel loads

  • RO/PO restores PCIG to the SRVs lAW AB.ZZ-0001 Att.9.
  • CRS directs placing the 'A' RHR pump in Drywell Spray as required by EOP-1 02.

ESG-NRC-S1 Page 16 of 24 Rev: 00

Termination Requirement:

  • RO/PO places 'A' RHR pump in The scenario should be Drywell Spray lAW AB.lZ-0001.

terminated at the discretion of the Lead Examiner when:

  • The reactor has been de pressurized
  • RPV water level is being maintained above -129"
  • Drywell Spray is initiated.

ESG-NRC-S1 Page 17 of 24 Rev: 00

A. TQ-M-106-0304 Licensed Operator Requal Training Exam Development Job Aid B. NUREG 1021 Examiner Standards C. JTA Listing D. Probabilistic Risk Assessment E. Technical Specifications F. Emergency Plan (ECG)

G. Alarm Response Procedures (Various)

H. HU-M-101 Performance Tools and Verification Practices I. OP-M-1 01-111 Roles and Responsibilities of On Shift Personnel J. OP-M-1 01-111-1 004 Operations Standards K. OP-M-1 01-112-1 002 On-Line Risk Assessment L. OP-M-1 06-1 01-1 001 Event Response Guidelines M. OP-HC-108-106-1001 Equipment Operational Control N. OP-M-108-114 Post Transient Review O. OP-HC-108-115-1001 Operability Assessment and Equipment Control Program P. HC.OP-AB.ZZ-0001 Transient Plant Conditions Q. HC.OP-AB.IC-0001 Control Rod R. HC.OP-AB.MISC-0001 Acts of Nature S. HC.OP-AB.ZZ-0172 Loss of 4.16KV Bus 10A403 C Channel T. HC.OP-AB.ZZ-0135 Station Blackout/Loss of Offsite Power/Diesel Generator Malfunction U. HC.OP-AB.ZZ-OOO Reactor Scram V. HC.OP-EO.ZZ-0101 RPV Control W. HC.OP-EO.ZZ-0102 Primary Containment Control X. HC.OP-EO.ZZ-0202 Emergency RPV Depressurization Y. Strategies For Successful Transient Mitigation ESG-NRC-S1 Page 18 of 24 Rev: 00

ESG-NRC-S1! 00 1.

Crew starts the is' EDG by EITHER:

Pressing the is' EDG START pushbutton in the Control Room, OR Directing an operator to locally start the IS' EDG, AND Closes IS' EDG output breaker.

KIA 2.0 Generic Knowledges and Abilities 2.1.8 Ability to coordinate personnel activities outside of the control room RO 3.8 SRO 3.6 KIA 295003 Partial or Complete Loss of A.C. Power M1 Ability to operate and/or monitor the following as they apply to PARTIAL OR COMPLETE LOSS OF A.C.

POWER M 1.02 Emergency generators RO 4.2 SRO 4.3 M 1.03 Systems necessary to assure safe plant shutdown RO 4.4 SRO 4.4 The 'A' RHR pump is not available because of failure of "N EDG. This leaves the '8' RHR pump as the only immediately available means of removing decay heat from the containment. Initiation of RHR for decay heat removal is one of the operator actions important to preventing core damage in our PRA. RCIC is not able to maintain RPV level under the current LOCA conditions.

Energization of the 10A402 bus makes the '8' SLC pump available for injection which will prolong the time before adequate core cooling will be lost and Emergency Depressurization is required.

The unavailability of 10A401, 10A403 and 10A404 buses leaves limited injection sources available for core reflood following Emergency Depressurization. Availability of the '8' RHR and Core Spray pumps will reduce the time the core is uncovered.

2.

  • WHEN RPV Compensated water level cannot be maintained above -185",

THEN Sefore RPV Compensated water level is below -185", the Crew opens five SRVs to Emergency Depressurize the reactor and then restores RPV water level to above

-185",

K/A 295031 Reactor Low Water Level EA1. Ability to operate and/or monitor the following as they apply to REACTOR LOW WATER LEVEL:

EA1.01 Low Pressure Coolant Injection RO: 4.4 SRO 4.4 EA 1.06 Automatic depressurization system RO 4.4 SRO 4.4 EA2 Ability to determine and/or interpret the following as they apply to REACTOR LOW WATER LEVEL:

EA2.04 Adequate core cooling RO 4.6 SRO 4.8 When Reactor water level cannot be maintained above -185" with injection to the RPV, adequate core cooling cannot be assured (MSCRWL). EOPs direct action to initiate emergency depressurization before RPV water level reaches this value if there are injection sources available. To restore adequate core cooling, the Crew must Emergency Depressurize and restore level with low pressure ECCS. The combination of vital bus losses, and manually inhibiting ADS, prevents the ADS logic from completing to initiate an automatic blowdown. Crew action is required. The failure to control the ADS blowdown should be viewed as a procedure use issue.

ESG-NRC-S1 Page 19 of 24 Rev: 00

ESG-NRC-S1 100 HOPE CREEK ESG - PRA RELATIONSHIPS EVALUATION FORM INITIATING EVENTS THAT LEAD TO CORE DAMAGE YIN EVENT YIN EVENT Loss Of Offsite PowerlSBO Internal Flooding Y LOCA Loss of 1 E AC/DC Buses LOSS OF SUPPORT TRANSIENTS: SYSTEMS:

Turbine Trip Loss of SSW Loss of Condenser Vacuum Loss of SACS Loss of Feedwater Loss of Instrument Air Inadvertent MSIV Closure Inadvertent SRV Opening COMPONENr/TRAIN/SYSTEM UNAVAILABILITY THAT INCREASES CORE DAMAGE FREQUENCY YIN KEY EQUIPMENT YIN KEY EQUIPMENT Y 1E 4.16KV Bus 120VAC 481 Inverter Hard Torus Vent Switchgear Room Cooler 1E 125VDC Bus Y RCIC

_ _ _ SACS Loop

- - - SSW Ventilation

_ _ _ SSW Loop SSW Pump

_ _ _ AlBRHR RACS Heat Exchanger Y HPCI SLC

_ _ _ Core Spray Loop Torus DIW Vacuum Breakers Y EDG ---

SACS Heat Exchanger OPERATOR ACTIONS IMPORTANT IN PREVENTING CORE DAMAGE YIN OPERATOR ACTION Y Emergency Depressurize RPV WIO High Pressure Injection Emergency Venting of Primary Containment Y Aligning RHR for Suppression Pool Cooling Restore Switchgear Cooling Control Plant via Remote Shutdown Panel

_ _ _ Manually Start SW Pump Cross-tie DC Charger to Portable Supply Isolate SW Pipe Rupture in RACS Room Y Initiating LP ECCS with No High Pressure Injection Available

- - - Monitoring and Control of SACS heat loads Complete this evaluation form for each ESG.

ESG-NRC-S1 Page 20 of 24 Rev: 00

Rx Power: 100%

Work Week: B Risk Color: Green Activities Completed Last Shift:

Tagged BP116 EHC pump for discharge line leak repair.

Major Activities Next 12 Hours:

Release BP116 after leak repaired.

Protected Equipment:

AP116 EHC pump Taqged Equipment:

BP116 EHC pump ESG-NRC-S1 Page 21 of 24 Rev: 00

EXAMINATION SCENARIO GUIDE REVI EW N ALiDATION Note: This form is used as guidance for an examination team to conduct a review for the proposed exam scenario(s). Attach a separate copy of this form to each scenario rel1iewej.

SELF-CHECK ESG- NRC-S1 REVIEWER:

Cl L r:-t' (

~4"., ~ / -

&c;?~1. The scenario has clearly stated objectives in the scenario.

(J[,~}- 2. The initial conditions are realistic, equipment and/or Instrumentation may be out of service, but it does not cue crew into expected events.

a0 (' 3. Each event description consists of:

  • The point in the scenario when it is to be initiated
  • The malfunction(s) that are entered to initiate the event
  • The symptoms/cues that will be visible to the crew
  • The expected operator actions (by shift position)
  • The event termination point (l~'7 4. The use of non-mechanistic failures (e.g. pipe break) should be limited to one or a credible preceding event has occurred.

rl¥ 5. The events are valid with regard to physics and thermodynamics.

(llr(j 6. Sequencing/timing of events is reasonable (e.g. the crew has time to respond to the malfunctions in an appropriate time frame and implements procedures and/or corrective actions).

rl!il 7. Sequencing/timing of events is reasonable, and allows for the examination team to obtain complete evaluation results commensurate with the scenario objectives.

/lilt- 8. If time compression techniques are used, scenario summary clearly so indicates.

a1;7)

~

9. The simulator modeling is not altered.

n4!- 10. All crew competencies can be evaluated.

aS7I11.

--c:::

Appropriate reference materials are available (SOERs, LERs, etc.)

CeJ112. Proper critical task methodology used lAW NRC procedures.

ESG-NRC-S1 Page 22 of 24 Rev.: 00

EXAMINATION SCENARIO GUIDE (ESG) VALIDATION (con't}

Note: The following criteria list scenario traits that are numerical in nature. A second set of numbers indicates a range to be met for a set of two scenarios. Therefore, to complete this part of the review, the set of scenarios must be available. The section below should be completed once per scenario set.

ESG: NRC-51 ESG:

SELF-CHECK Cu::.-;J-. 1. Total malfunctions inserted: 4-8/10-14 7 a0.1: 2. Malfunctions that occur after EOP entry: 1-4/3-6 Z G~{J 3. Abnormal Events: 1-2/2-3 ~

Ufi;}-' 4. Major Transients: 1-2/2-3 \

6.J;r 5. EOPs used beyond primary scram response EOP: 1-3/3-5 'Z Q!!L 6. EOP Contingency Procedures used: 0~3/1-3 t

~7. Approximate scenario run time: 45-60 minutes (one scenario may approach 90 minutes) 9() )1.-'-

tJ.!):. 8. EOP run time: 40-70% of scenario run time t1~2 9. Crew Critical Tasks: 2-5/5-8 '2 Ot~J 10. Technical Specifications are exercised during the test L

~ 11. Events used in the two scenarios are not repeated (Only Applicable for an exam set)

Comments:

ESG-NRC-S1 Page 23 of 24 Rev.: 00

EXAMINATION SCENARIO GUIDE (ESG) VALIDATION (con't)

Crew Validation Rev: 00 Date Validated: 2 Validated with a 3 man crew from B Shift. Runtime 80 minutes.

Validation Comments Disposition W/7////7////7//////////////7/////7//7//7////////////////7////// /////7/////:////7/////////7////////////////7//7/////////////7////////7//7/7/////7////////////7//////////7////7//#/

The crew thought the scenario was pretty tough for a 3 man crew. .....a=i...c.ns_ac-s~is_.~~~~......

Disagt!lEl.Re...m Crew Validation Rev: Date Validated: -~---

Validation Comments Disposition W/7//7//////7//7///////7///////7////7/7///7///////7///7/////////7// ////:///7/7//7///7//7//////7//7/7///7//7///://7////7////7/7//7///7/////////////7////7//////////////#///7/7//7//

ESG-NRC-S1 Page 24 of 24 Rev.: 00