ML12235A497: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(7 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML12235A497
| number = ML12235A497
| issue date = 08/22/2012
| issue date = 08/22/2012
| title = Point Beach Nuclear Plant Units 1 2 - E-mail Transmitting Acceptance Review of Manager Qualifications
| title = E-mail Transmitting Acceptance Review of Manager Qualifications
| author name = Beltz T A
| author name = Beltz T
| author affiliation = NRC/NRR/DORL/LPLIII-1
| author affiliation = NRC/NRR/DORL/LPLIII-1
| addressee name = Costedio J
| addressee name = Costedio J
Line 9: Line 9:
| docket = 05000266, 05000301
| docket = 05000266, 05000301
| license number = DPR-024, DPR-027
| license number = DPR-024, DPR-027
| contact person = Beltz T A
| contact person = Beltz T
| case reference number = TAC ME9270, TAC ME9271
| case reference number = TAC ME9270, TAC ME9271
| document type = E-Mail
| document type = E-Mail
| page count = 1
| page count = 1
| project = TAC:ME9270, TAC:ME9271
| project = TAC:ME9270, TAC:ME9271
| stage = Acceptance Review
}}
}}


=Text=
=Text=
{{#Wiki_filter:From: Beltz, Terry Sent: Wednesday, August 22, 2012 1:22 PM To: Costedio, James Cc: Hennessy, William; Frankl, Istvan; Currie, Sean Subject: Point Beach Nuclear Plant, Units 1 & 2 - Acceptance Review re: License Amendment Request - Operations Manager Qualification Requirements (TAC Nos. ME9270 and ME9271)   Dear Mr. Costedio: By letter dated August 16, 2012 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML12229A581), NextEra Energy Point Beach, LLC, submitted a license amendment request (LAR) for the Point Beach Nuclear Plant, Units 1 and 2. The LAR proposes a revision to Technical Specification 5.3, "Facility Staff Qualifications," to clarify the required qualifications of the Point Beach Operations Manager.
{{#Wiki_filter:From:                           Beltz, Terry Sent:                           Wednesday, August 22, 2012 1:22 PM To:                             Costedio, James Cc:                             Hennessy, William; Frankl, Istvan; Currie, Sean
The purpose of this e-mail is to provide the final results of the U.S. Nuclear Regulatory Commission (NRC) staff's acceptance review of this request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed change. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
 
The NRC staff has reviewed your application and concluded that there appears to be sufficient technical information, both in scope and depth, to enable the staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the LAR in terms of regulatory requirements and the protection of public health and safety and the environment. If additional information is needed for the staff to complete its technical review, you will be advised by separate correspondence. Should you have any questions regarding this review, please contact me at (301) 415-3049.
==Subject:==
Sincerely,   Terry A. Beltz, Senior Project Manager Plant Licensing Branch III-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation (301) 415-3049 Terry.Beltz@nrc.gov
Point Beach Nuclear Plant, Units 1 & 2 - Acceptance Review re: License Amendment Request - Operations Manager Qualification Requirements (TAC Nos. ME9270 and ME9271)
}}
 
==Dear Mr. Costedio:==
 
By letter dated August 16, 2012 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML12229A581), NextEra Energy Point Beach, LLC, submitted a license amendment request (LAR) for the Point Beach Nuclear Plant, Units 1 and 2. The LAR proposes a revision to Technical Specification 5.3, Facility Staff Qualifications, to clarify the required qualifications of the Point Beach Operations Manager.
The purpose of this e-mail is to provide the final results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed change. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
The NRC staff has reviewed your application and concluded that there appears to be sufficient technical information, both in scope and depth, to enable the staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the LAR in terms of regulatory requirements and the protection of public health and safety and the environment.
If additional information is needed for the staff to complete its technical review, you will be advised by separate correspondence.
Should you have any questions regarding this review, please contact me at (301) 415-3049.
Sincerely, Terry A. Beltz, Senior Project Manager Plant Licensing Branch III-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation (301) 415-3049 Terry.Beltz@nrc.gov}}

Latest revision as of 23:27, 11 November 2019

E-mail Transmitting Acceptance Review of Manager Qualifications
ML12235A497
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 08/22/2012
From: Beltz T
Plant Licensing Branch III
To: Jim Costedio
Point Beach
Beltz T
References
TAC ME9270, TAC ME9271
Download: ML12235A497 (1)


Text

From: Beltz, Terry Sent: Wednesday, August 22, 2012 1:22 PM To: Costedio, James Cc: Hennessy, William; Frankl, Istvan; Currie, Sean

Subject:

Point Beach Nuclear Plant, Units 1 & 2 - Acceptance Review re: License Amendment Request - Operations Manager Qualification Requirements (TAC Nos. ME9270 and ME9271)

Dear Mr. Costedio:

By letter dated August 16, 2012 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML12229A581), NextEra Energy Point Beach, LLC, submitted a license amendment request (LAR) for the Point Beach Nuclear Plant, Units 1 and 2. The LAR proposes a revision to Technical Specification 5.3, Facility Staff Qualifications, to clarify the required qualifications of the Point Beach Operations Manager.

The purpose of this e-mail is to provide the final results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed change. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

The NRC staff has reviewed your application and concluded that there appears to be sufficient technical information, both in scope and depth, to enable the staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the LAR in terms of regulatory requirements and the protection of public health and safety and the environment.

If additional information is needed for the staff to complete its technical review, you will be advised by separate correspondence.

Should you have any questions regarding this review, please contact me at (301) 415-3049.

Sincerely, Terry A. Beltz, Senior Project Manager Plant Licensing Branch III-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation (301) 415-3049 Terry.Beltz@nrc.gov