Line 3: Line 3:
| issue date = 08/17/2012
| issue date = 08/17/2012
| title = E-mail from C. Phillips to J. Giessner, Subject: 8/17 Discussion with Licensee at Palisades
| title = E-mail from C. Phillips to J. Giessner, Subject: 8/17 Discussion with Licensee at Palisades
| author name = Phillips C J
| author name = Phillips C
| author affiliation = NRC/RGN-III/DRP
| author affiliation = NRC/RGN-III/DRP
| addressee name = Giessner J B
| addressee name = Giessner J
| addressee affiliation = NRC/RGN-II/DRP
| addressee affiliation = NRC/RGN-II/DRP
| docket = 05000255
| docket = 05000255
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:Hills, David From: Phillips, Charles Sent: Friday, August 17, 2012 3:42 PM To: Giessner, John Cc: Sanchez Santiago, Elba; Shaikh, Atif; Hills, David; Alley, David; Lennartz, Jay; Shah, Swetha;Betancourt, Diana  
{{#Wiki_filter:Hills, David From:                         Phillips, Charles Sent:                         Friday, August 17, 2012 3:42 PM To:                           Giessner, John Cc:                           Sanchez Santiago, Elba; Shaikh, Atif; Hills, David; Alley, David; Lennartz, Jay; Shah, Swetha; Betancourt, Diana


==Subject:==
==Subject:==
8/17 Discussion with licensee at Palisades 1. Extent of condition NDE on CRDM housings with only cover the area where the flaw occurred on CRDM 24. The licensee feels they understand the failure mechanism to be similar to Fort Calhoun. They recognize they are at risk only doing this small area.2. They think NDE machine will most likely arrive on Sunday. They will call Elba when the truck leaves Pittsburgh.
8/17 Discussion with licensee at Palisades
The machine is conventional not phased array.3. The licensee will do an NDE on CRDM 24 of the area above the flaw that they did not do the other day on site before they send it to Lynchberg.
: 1. Extent of condition NDE on CRDM housings with only cover the area where the flaw occurred on CRDM 24. The licensee feels they understand the failure mechanism to be similar to Fort Calhoun. They recognize they are at risk only doing this small area.
: 4. The new replacement housing is NOT a like for like replacement.
: 2. They think NDE machine will most likely arrive on Sunday. They will call Elba when the truck leaves Pittsburgh.
There is no longer an inlay weld. The 316 area will now be 347 but the whole thing will be annealed.
The machine is conventional not phased array.
This makes a difference as far as TGSCC goes.5. They will provide us with as found and as left bare metal pictures.6. Bare metal inspection -two handfuls of BA to clean up -there was crusted BA but no wastage when it was removed -no indications that more insulation needed to be removed for further inspections.
: 3. The licensee will do an NDE on CRDM 24 of the area above the flaw that they did not do the other day on site before they send it to Lynchberg.
Elba says they thoroughly cleaned the head. We will compare pics from this bare metal visual to last bare metal visual.}}
: 4. The new replacement housing is NOT a like for like replacement. There is no longer an inlay weld. The 316 area will now be 347 but the whole thing will be annealed. This makes a difference as far as TGSCC goes.
: 5. They will provide us with as found and as left bare metal pictures.
: 6. Bare metal inspection -two handfuls of BA to clean up - there was crusted BA but no wastage when it was removed - no indications that more insulation needed to be removed for further inspections. Elba says they thoroughly cleaned the head. We will compare pics from this bare metal visual to last bare metal visual.}}

Latest revision as of 22:00, 11 November 2019

E-mail from C. Phillips to J. Giessner, Subject: 8/17 Discussion with Licensee at Palisades
ML12272A166
Person / Time
Site: Palisades Entergy icon.png
Issue date: 08/17/2012
From: Charles Phillips
Division Reactor Projects III
To: Jack Giessner
Division Reactor Projects II
References
FOIA-2012-0312
Download: ML12272A166 (1)


Text

Hills, David From: Phillips, Charles Sent: Friday, August 17, 2012 3:42 PM To: Giessner, John Cc: Sanchez Santiago, Elba; Shaikh, Atif; Hills, David; Alley, David; Lennartz, Jay; Shah, Swetha; Betancourt, Diana

Subject:

8/17 Discussion with licensee at Palisades

1. Extent of condition NDE on CRDM housings with only cover the area where the flaw occurred on CRDM 24. The licensee feels they understand the failure mechanism to be similar to Fort Calhoun. They recognize they are at risk only doing this small area.
2. They think NDE machine will most likely arrive on Sunday. They will call Elba when the truck leaves Pittsburgh.

The machine is conventional not phased array.

3. The licensee will do an NDE on CRDM 24 of the area above the flaw that they did not do the other day on site before they send it to Lynchberg.
4. The new replacement housing is NOT a like for like replacement. There is no longer an inlay weld. The 316 area will now be 347 but the whole thing will be annealed. This makes a difference as far as TGSCC goes.
5. They will provide us with as found and as left bare metal pictures.
6. Bare metal inspection -two handfuls of BA to clean up - there was crusted BA but no wastage when it was removed - no indications that more insulation needed to be removed for further inspections. Elba says they thoroughly cleaned the head. We will compare pics from this bare metal visual to last bare metal visual.