IR 05000528/2012403: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(3 intermediate revisions by the same user not shown) | |||
Line 3: | Line 3: | ||
| issue date = 10/31/2012 | | issue date = 10/31/2012 | ||
| title = IR 05000528-12-403, 0500529-12-403, 0500530-12-403; 09/07/2012; Palo Verde Nuclear Generating Station, Units 1, 2, and 3 NRC Security Inspection Report | | title = IR 05000528-12-403, 0500529-12-403, 0500530-12-403; 09/07/2012; Palo Verde Nuclear Generating Station, Units 1, 2, and 3 NRC Security Inspection Report | ||
| author name = Haire M | | author name = Haire M | ||
| author affiliation = NRC/RGN-IV/DRS/PSB-1 | | author affiliation = NRC/RGN-IV/DRS/PSB-1 | ||
| addressee name = Edington R | | addressee name = Edington R | ||
| addressee affiliation = Arizona Public Service Co | | addressee affiliation = Arizona Public Service Co | ||
| docket = 05000528, 05000529, 05000530 | | docket = 05000528, 05000529, 05000530 | ||
Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:UNITE D S TATE S NUC LEAR RE GULATOR Y C OMMI S SI ON ber 31, 2012 | ||
==SUBJECT:== | |||
PALO VERDE NUCLEAR GENERATING STATION, UNITS 1, 2, AND 3 - | |||
SUBJECT: PALO VERDE NUCLEAR GENERATING STATION, UNITS 1, 2, AND 3 -NRC SECURITY INSPECTION REPORT 05000528/2012403, 05000529/2012403 AND 05000530/2012403 | NRC SECURITY INSPECTION REPORT 05000528/2012403, 05000529/2012403 AND 05000530/2012403 | ||
==Dear Mr. Edington:== | ==Dear Mr. Edington:== | ||
On September 27, 2012, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Palo Verde Nuclear Generating Station, Units 1, 2, and 3. The inspection covered one or more of the key attributes of the security cornerstone of the NRC's Reactor Oversight Process. The enclosed inspection report documents the inspection results, which were discussed on September 27, 2012, with Mr. D. Mims, Vice President, Nuclear Regulatory Affairs and Oversight, and other members of your staff. | On September 27, 2012, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Palo Verde Nuclear Generating Station, Units 1, 2, and 3. The inspection covered one or more of the key attributes of the security cornerstone of the NRC's Reactor Oversight Process. The enclosed inspection report documents the inspection results, which were discussed on September 27, 2012, with Mr. D. Mims, Vice President, Nuclear Regulatory Affairs and Oversight, and other members of your staff. | ||
The inspection examined activities conducted under your license as they relate to security and compliance with the | The inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations and with the conditions of your license. | ||
The inspector reviewed selected procedures and records, observed activities, and interviewed personnel. | The inspector reviewed selected procedures and records, observed activities, and interviewed personnel. | ||
Line 33: | Line 33: | ||
No findings were identified during this inspection. | No findings were identified during this inspection. | ||
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be | In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html. | ||
If Security-Related Information is necessary to provide an acceptable response, please mark your entire response Security-Related Information in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response. | |||
10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response. | |||
Sincerely, | Sincerely, | ||
/RA/ Mark S. Haire, Chief Plant Support Branch 1 Division of Reactor Safety | /RA/ | ||
Mark S. Haire, Chief Plant Support Branch 1 Division of Reactor Safety Docket Nos.: 50-528, 50-529, 50-530 License Nos.: NPF-41, NPF-51, NPF-74 Nonpublic Enclosure: | |||
Docket Nos.: 50-528, 50-529, 50-530 License Nos.: NPF-41, NPF-51, NPF-74 Nonpublic Enclosure: | |||
NRC Inspection Report 05000528/2012403, 05000529/2012403, and 05000530/2012403 w/Attachment: Supplemental Information cc w/enclosure: | NRC Inspection Report 05000528/2012403, 05000529/2012403, and 05000530/2012403 w/Attachment: Supplemental Information cc w/enclosure: | ||
Mr. Randall Bramlett Department Leader, Nuclear Security Programs | Mr. Randall Bramlett Department Leader, Nuclear Security Programs Arizona Public Service Co. | ||
Arizona Public Service Co. | |||
cc: Electronic Distribution for Palo Verde w/o enclosure | P.O. Box 52034, MS 7002 Phoenix, AZ 85072-2034 cc: Electronic Distribution for Palo Verde w/o enclosure | ||
}} | }} |
Latest revision as of 20:35, 11 November 2019
ML12307A231 | |
Person / Time | |
---|---|
Site: | Palo Verde |
Issue date: | 10/31/2012 |
From: | Mark Haire Plant Support Branch-1 |
To: | Edington R Arizona Public Service Co |
References | |
IR-12-403 | |
Download: ML12307A231 (3) | |
Text
UNITE D S TATE S NUC LEAR RE GULATOR Y C OMMI S SI ON ber 31, 2012
SUBJECT:
PALO VERDE NUCLEAR GENERATING STATION, UNITS 1, 2, AND 3 -
NRC SECURITY INSPECTION REPORT 05000528/2012403, 05000529/2012403 AND 05000530/2012403
Dear Mr. Edington:
On September 27, 2012, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Palo Verde Nuclear Generating Station, Units 1, 2, and 3. The inspection covered one or more of the key attributes of the security cornerstone of the NRC's Reactor Oversight Process. The enclosed inspection report documents the inspection results, which were discussed on September 27, 2012, with Mr. D. Mims, Vice President, Nuclear Regulatory Affairs and Oversight, and other members of your staff.
The inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations and with the conditions of your license.
The inspector reviewed selected procedures and records, observed activities, and interviewed personnel.
No findings were identified during this inspection.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.
If Security-Related Information is necessary to provide an acceptable response, please mark your entire response Security-Related Information in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.
Sincerely,
/RA/
Mark S. Haire, Chief Plant Support Branch 1 Division of Reactor Safety Docket Nos.: 50-528, 50-529, 50-530 License Nos.: NPF-41, NPF-51, NPF-74 Nonpublic Enclosure:
NRC Inspection Report 05000528/2012403, 05000529/2012403, and 05000530/2012403 w/Attachment: Supplemental Information cc w/enclosure:
Mr. Randall Bramlett Department Leader, Nuclear Security Programs Arizona Public Service Co.
P.O. Box 52034, MS 7002 Phoenix, AZ 85072-2034 cc: Electronic Distribution for Palo Verde w/o enclosure