Letter Sequence Request |
---|
|
|
MONTHYEARCNL-14-089, (Bfn), Units 1, 2, and 3 - Application to Modify Technical Specification 2.1.1, Reactor Core Safety Limits (BFN-TS-492)2014-12-11011 December 2014 (Bfn), Units 1, 2, and 3 - Application to Modify Technical Specification 2.1.1, Reactor Core Safety Limits (BFN-TS-492) Project stage: Request ML15020A4752015-01-20020 January 2015 NRR E-mail Capture - Acceptance Review - Browns Ferry LAR to Modify TS 2.1.1, Reactor Core Safety Limits (MF5412, MF5413, and MF5414) Project stage: Acceptance Review ML15044A4802015-03-16016 March 2015 Request for Withholding of Proprietary Information from Public Disclosure Project stage: Withholding Request Acceptance ML15091A7352015-03-31031 March 2015 NRR E-mail Capture - Browns Ferry Nuclear Plant, Units 1, 2, 3 - Request for Withholding of Proprietary Information from Public Disclosure Project stage: Withholding Request Acceptance ML15126A5302015-05-12012 May 2015 Request for Additional Information Related to License Amendment Request for Technical Specification Changes to Reactor Core Safety Limits Project stage: RAI CNL-15-129, Response to Follow-up NRC Request for Additional Information Regarding Proposed Technical Specification Change to Modify Technical Specification 2.1.1, Reactor Core Safety Limits (BFN TS-492)2015-07-30030 July 2015 Response to Follow-up NRC Request for Additional Information Regarding Proposed Technical Specification Change to Modify Technical Specification 2.1.1, Reactor Core Safety Limits (BFN TS-492) Project stage: Request 2015-03-16
[Table View] |
|
---|
Category:Letter type:CNL
MONTHYEARCNL-24-017, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions2024-01-17017 January 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions CNL-23-071, Response to Request for Additional Information Regarding Browns Ferry Nuclear Plant, Units 1, 2, and 3, Inservice Inspection and Augmented Program Interval Revised Request for Alternative 0-ISI-472024-01-11011 January 2024 Response to Request for Additional Information Regarding Browns Ferry Nuclear Plant, Units 1, 2, and 3, Inservice Inspection and Augmented Program Interval Revised Request for Alternative 0-ISI-47 CNL-23-070, Submittal of Fifth 10-Year Interval Inservice Testing Program Plan2023-11-29029 November 2023 Submittal of Fifth 10-Year Interval Inservice Testing Program Plan CNL-23-067, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-11-27027 November 2023 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions CNL-23-061, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revision2023-09-20020 September 2023 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revision CNL-23-057, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC-EPIP-1, Revision 76 and CECC-EPIP-9, Revision 642023-09-0505 September 2023 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC-EPIP-1, Revision 76 and CECC-EPIP-9, Revision 64 CNL-23-055, Tennessee Valley Authority - Emergency Preparedness Department Procedure Revision. Includes EPDP-3, Revision 3, Emergency Plan Exercises and Preparedness Drills2023-07-25025 July 2023 Tennessee Valley Authority - Emergency Preparedness Department Procedure Revision. Includes EPDP-3, Revision 3, Emergency Plan Exercises and Preparedness Drills CNL-23-053, Tennessee Valley Authority - Radiological Emergency Plan Revisions2023-07-18018 July 2023 Tennessee Valley Authority - Radiological Emergency Plan Revisions CNL-23-025, American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI, Inservice Inspection and Augmented Program Interval Revised Request for Alternative 0-ISI-472023-07-0303 July 2023 American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI, Inservice Inspection and Augmented Program Interval Revised Request for Alternative 0-ISI-47 CNL-23-049, Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan .2023-06-26026 June 2023 Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan . CNL-23-046, Revision to Notice of Intent to Pursue Subsequent License Renewal - Schedule Submittal2023-06-0606 June 2023 Revision to Notice of Intent to Pursue Subsequent License Renewal - Schedule Submittal CNL-23-037, Response to Request for Additional Information Regarding Browns Ferry Nuclear Plant, Units 1, 2, and 3 - Request to Use a Later Edition of the American Society of Mechanical Engineers Operation and Maintenance Code and Alternative Request2023-06-0101 June 2023 Response to Request for Additional Information Regarding Browns Ferry Nuclear Plant, Units 1, 2, and 3 - Request to Use a Later Edition of the American Society of Mechanical Engineers Operation and Maintenance Code and Alternative Requests CNL-23-042, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-05-16016 May 2023 Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions CNL-23-030, Tennessee Valley Authority - Hydrologic Engineering Center River Analysis System Project Milestone Status Update2023-04-27027 April 2023 Tennessee Valley Authority - Hydrologic Engineering Center River Analysis System Project Milestone Status Update CNL-23-032, Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 412023-04-27027 April 2023 Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 41 CNL-23-034, 10 CFR 50.46 Annual Report2023-04-26026 April 2023 10 CFR 50.46 Annual Report CNL-23-033, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revision2023-04-24024 April 2023 Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revision CNL-23-029, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-04-11011 April 2023 Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions CNL-23-018, Request for Amendment Regarding Technical Specification Surveillance Requirements 3.4.3.2 and 3.5.1.11 Regarding Safety Relief Valves (BFN TS-540)2023-03-30030 March 2023 Request for Amendment Regarding Technical Specification Surveillance Requirements 3.4.3.2 and 3.5.1.11 Regarding Safety Relief Valves (BFN TS-540) CNL-23-023, Annual Insurance Status Report2023-03-30030 March 2023 Annual Insurance Status Report CNL-23-027, Second Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505-A, Revision 2, Provide Risk-Informed Extended Completion Times RITSTF Initiative 4b (BFN TS-524)2023-03-29029 March 2023 Second Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505-A, Revision 2, Provide Risk-Informed Extended Completion Times RITSTF Initiative 4b (BFN TS-524) CNL-23-022, Decommissioning Funding Status Report2023-03-29029 March 2023 Decommissioning Funding Status Report CNL-23-024, TVA Guarantee of Payment of Deferred Premiums - 2022 Annual Report2023-03-29029 March 2023 TVA Guarantee of Payment of Deferred Premiums - 2022 Annual Report CNL-23-019, Response to Request for Additional Information Regarding Browns Ferry Nuclear Plant, Units 1, 2, and 3, American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI, Request for Alternative BFN-0-ISI-322023-03-11011 March 2023 Response to Request for Additional Information Regarding Browns Ferry Nuclear Plant, Units 1, 2, and 3, American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI, Request for Alternative BFN-0-ISI-32 CNL-22-045, Application to Revise Technical Specifications to Adopt TSTF-566-A, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems, and TSTF-580-A, Revision 1, Provide Exception from Entering Mode 42023-03-10010 March 2023 Application to Revise Technical Specifications to Adopt TSTF-566-A, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems, and TSTF-580-A, Revision 1, Provide Exception from Entering Mode 4 CNL-23-021, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-03-0808 March 2023 Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions CNL-22-037, Application to Revise Technical Specifications to Adopt TSTF-541-A, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position (BFN TS-533)2023-01-31031 January 2023 Application to Revise Technical Specifications to Adopt TSTF-541-A, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position (BFN TS-533) CNL-23-003, Browns Nuclear Plant, Units 1, 2 & 3; Sequoyah Nuclear Plant, Units 1 & 2; and Watts Bar Nuclear Plant, Units 1 & 2 - Organizational Topic Report TVA-NPOD89-A2023-01-30030 January 2023 Browns Nuclear Plant, Units 1, 2 & 3; Sequoyah Nuclear Plant, Units 1 & 2; and Watts Bar Nuclear Plant, Units 1 & 2 - Organizational Topic Report TVA-NPOD89-A CNL-23-008, Tennessee Valley Authority Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2022-12-22022 December 2022 Tennessee Valley Authority Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions CNL-22-089, License Amendment Request for Adoption of TSTF-478, Revision 2, BWR Technical Specification Changes That Implement the Revised Rule for Combustible Gas Control (BFN TS-546)2022-12-20020 December 2022 License Amendment Request for Adoption of TSTF-478, Revision 2, BWR Technical Specification Changes That Implement the Revised Rule for Combustible Gas Control (BFN TS-546) CNL-22-090, Request to Use a Later Edition of the American Society of Mechanical Engineers Operation and Maintenance Code and Alternative Requests for the Fifth Inservice Testing Interval2022-12-12012 December 2022 Request to Use a Later Edition of the American Society of Mechanical Engineers Operation and Maintenance Code and Alternative Requests for the Fifth Inservice Testing Interval CNL-22-100, to Request for License Amendment Regarding Application of Advanced Framatome Methodologies, and Adoption of TSTF-564 Revision 2 for Browns Ferry Nuclear Plant Units 1, 2, and 3,in Support of Atrium 11 Fuel Use at Browns Ferry (TS-535)2022-12-0909 December 2022 to Request for License Amendment Regarding Application of Advanced Framatome Methodologies, and Adoption of TSTF-564 Revision 2 for Browns Ferry Nuclear Plant Units 1, 2, and 3,in Support of Atrium 11 Fuel Use at Browns Ferry (TS-535) CNL-22-097, Response to Request for Additional Information and Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide .2022-12-0101 December 2022 Response to Request for Additional Information and Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide . CNL-22-106, Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revision. Includes CECC EPIP-14, Revision 38, Nuclear Emergency Public Information Organization and Operat2022-11-28028 November 2022 Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revision. Includes CECC EPIP-14, Revision 38, Nuclear Emergency Public Information Organization and Operatio CNL-22-105, Physical Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program, Revision 222022-11-0808 November 2022 Physical Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program, Revision 22 CNL-22-099, Tennessee Valley Authority - Hydrologic Engineering Center River Analysis System Project Milestone Status Update2022-10-31031 October 2022 Tennessee Valley Authority - Hydrologic Engineering Center River Analysis System Project Milestone Status Update CNL-22-098, Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC EPIP-7, Rev. 45 & CECC EPIP-8, Rev. 552022-10-17017 October 2022 Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC EPIP-7, Rev. 45 & CECC EPIP-8, Rev. 55 CNL-22-055, Application to Delete Acreage Value Discussion from Technical Specifications (BFN TS-543)2022-09-29029 September 2022 Application to Delete Acreage Value Discussion from Technical Specifications (BFN TS-543) CNL-22-096, to Request for License Amendment Regarding Application of Advanced Framatome Methodologies, and Adoption of TSTF-564 Revision 2 for Browns Ferry Nuclear Plant Units 1, 2, and 3, in Support of Atrium 11 Fuel Use at Browns Ferry (TS-535)2022-09-29029 September 2022 to Request for License Amendment Regarding Application of Advanced Framatome Methodologies, and Adoption of TSTF-564 Revision 2 for Browns Ferry Nuclear Plant Units 1, 2, and 3, in Support of Atrium 11 Fuel Use at Browns Ferry (TS-535) CNL-22-083, to Request for License Amendment Regarding Application of Advanced Framatome Methodologies, and Adoption of TSTF-564 Revision 2 for Browns Ferry Nuclear Plant Units 1, 2, and 3, in Support of Atrium 11 Fuel Use at Browns Ferry (TS-535).2022-09-13013 September 2022 to Request for License Amendment Regarding Application of Advanced Framatome Methodologies, and Adoption of TSTF-564 Revision 2 for Browns Ferry Nuclear Plant Units 1, 2, and 3, in Support of Atrium 11 Fuel Use at Browns Ferry (TS-535). CNL-22-075, Response to Request for Additional Information Regarding Browns Ferry Nuclear Plant, Unit 2, Request for Alternative, BFN-21-ISI-02, Alternative to American Society of Mechanical Engineers, Boiler and Pressure Vessel Code, Section Xi,.2022-09-12012 September 2022 Response to Request for Additional Information Regarding Browns Ferry Nuclear Plant, Unit 2, Request for Alternative, BFN-21-ISI-02, Alternative to American Society of Mechanical Engineers, Boiler and Pressure Vessel Code, Section Xi,. CNL-22-025, American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI, Request for Alternative BFN-0-ISI-322022-08-22022 August 2022 American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI, Request for Alternative BFN-0-ISI-32 CNL-22-077, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2022-08-11011 August 2022 Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions CNL-22-065, Response to Request for Confirmation of Information and Additional Information and Second Supplement Regarding Application Requesting NRC Prior Approval of a Proposed Chilled-Water Cross-tie.2022-08-0101 August 2022 Response to Request for Confirmation of Information and Additional Information and Second Supplement Regarding Application Requesting NRC Prior Approval of a Proposed Chilled-Water Cross-tie. CNL-22-076, to Request for License Amendment Regarding Application of Advanced Framatome Methodologies, and Adoption of TSTF-564 Revision 2 in Support of Atrium 11 Fuel2022-07-28028 July 2022 to Request for License Amendment Regarding Application of Advanced Framatome Methodologies, and Adoption of TSTF-564 Revision 2 in Support of Atrium 11 Fuel CNL-22-066, Request for License Amendment Regarding Application of Advanced Framatome Methodologies, and Adoption of TSTF-564 Revision 2 for in Support of Atrium 11 Fuel Use Supplement 3, Response to Request for Additional Information2022-07-18018 July 2022 Request for License Amendment Regarding Application of Advanced Framatome Methodologies, and Adoption of TSTF-564 Revision 2 for in Support of Atrium 11 Fuel Use Supplement 3, Response to Request for Additional Information CNL-22-039, Application to Revise Technical Specifications to Adopt TSTF-554-A, Revision 1, Revise Reactor Coolant Leakage Requirements (BFN TS-537) (SQN-21-05) (WBN-TS-21-04)2022-07-13013 July 2022 Application to Revise Technical Specifications to Adopt TSTF-554-A, Revision 1, Revise Reactor Coolant Leakage Requirements (BFN TS-537) (SQN-21-05) (WBN-TS-21-04) CNL-22-008, and Watts Bar Nuclear Plant - Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules (BFN-TS-541, SQN-TS-21-09, and WBN-TS-22-002)2022-06-13013 June 2022 and Watts Bar Nuclear Plant - Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules (BFN-TS-541, SQN-TS-21-09, and WBN-TS-22-002) CNL-22-064, Response to Request for Additional Information Regarding Tennessee Valley Authority License Amendment Request to Revise Emergency Plan Implementing Procedure Regarding Seismic Event Emergency Action Level Change2022-06-0909 June 2022 Response to Request for Additional Information Regarding Tennessee Valley Authority License Amendment Request to Revise Emergency Plan Implementing Procedure Regarding Seismic Event Emergency Action Level Change CNL-22-068, Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2022-06-0808 June 2022 Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions 2024-01-17
[Table view] Category:Response to Request for Additional Information (RAI)
MONTHYEARCNL-23-071, Response to Request for Additional Information Regarding Browns Ferry Nuclear Plant, Units 1, 2, and 3, Inservice Inspection and Augmented Program Interval Revised Request for Alternative 0-ISI-472024-01-11011 January 2024 Response to Request for Additional Information Regarding Browns Ferry Nuclear Plant, Units 1, 2, and 3, Inservice Inspection and Augmented Program Interval Revised Request for Alternative 0-ISI-47 CNL-23-037, Response to Request for Additional Information Regarding Browns Ferry Nuclear Plant, Units 1, 2, and 3 - Request to Use a Later Edition of the American Society of Mechanical Engineers Operation and Maintenance Code and Alternative Request2023-06-0101 June 2023 Response to Request for Additional Information Regarding Browns Ferry Nuclear Plant, Units 1, 2, and 3 - Request to Use a Later Edition of the American Society of Mechanical Engineers Operation and Maintenance Code and Alternative Requests CNL-23-019, Response to Request for Additional Information Regarding Browns Ferry Nuclear Plant, Units 1, 2, and 3, American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI, Request for Alternative BFN-0-ISI-322023-03-11011 March 2023 Response to Request for Additional Information Regarding Browns Ferry Nuclear Plant, Units 1, 2, and 3, American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI, Request for Alternative BFN-0-ISI-32 CNL-22-097, Response to Request for Additional Information and Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide .2022-12-0101 December 2022 Response to Request for Additional Information and Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide . CNL-22-075, Response to Request for Additional Information Regarding Browns Ferry Nuclear Plant, Unit 2, Request for Alternative, BFN-21-ISI-02, Alternative to American Society of Mechanical Engineers, Boiler and Pressure Vessel Code, Section Xi,.2022-09-12012 September 2022 Response to Request for Additional Information Regarding Browns Ferry Nuclear Plant, Unit 2, Request for Alternative, BFN-21-ISI-02, Alternative to American Society of Mechanical Engineers, Boiler and Pressure Vessel Code, Section Xi,. CNL-22-065, Response to Request for Confirmation of Information and Additional Information and Second Supplement Regarding Application Requesting NRC Prior Approval of a Proposed Chilled-Water Cross-tie.2022-08-0101 August 2022 Response to Request for Confirmation of Information and Additional Information and Second Supplement Regarding Application Requesting NRC Prior Approval of a Proposed Chilled-Water Cross-tie. CNL-22-066, Request for License Amendment Regarding Application of Advanced Framatome Methodologies, and Adoption of TSTF-564 Revision 2 for in Support of Atrium 11 Fuel Use Supplement 3, Response to Request for Additional Information2022-07-18018 July 2022 Request for License Amendment Regarding Application of Advanced Framatome Methodologies, and Adoption of TSTF-564 Revision 2 for in Support of Atrium 11 Fuel Use Supplement 3, Response to Request for Additional Information CNL-22-064, Response to Request for Additional Information Regarding Tennessee Valley Authority License Amendment Request to Revise Emergency Plan Implementing Procedure Regarding Seismic Event Emergency Action Level Change2022-06-0909 June 2022 Response to Request for Additional Information Regarding Tennessee Valley Authority License Amendment Request to Revise Emergency Plan Implementing Procedure Regarding Seismic Event Emergency Action Level Change CNL-22-007, Supplement to Application Requesting NRC Prior Approval of a Proposed Chilled-Water Cross-tie Modification to Support System Operability (BFN-TS-518)2022-04-0606 April 2022 Supplement to Application Requesting NRC Prior Approval of a Proposed Chilled-Water Cross-tie Modification to Support System Operability (BFN-TS-518) CNL-22-028, Response to Request for Additional Information Regarding License Amendment Request Regarding Criticality Safety Analysis of Spent Fuel Pool Storage of Atrium 11 Fuel (TS-534)2022-03-18018 March 2022 Response to Request for Additional Information Regarding License Amendment Request Regarding Criticality Safety Analysis of Spent Fuel Pool Storage of Atrium 11 Fuel (TS-534) CNL-21-052, Response to Request for Additional Information Regarding License Amendment Request to Modify Technical Specification 3.8.6, Battery Cell Parameters (TS-531)2021-07-21021 July 2021 Response to Request for Additional Information Regarding License Amendment Request to Modify Technical Specification 3.8.6, Battery Cell Parameters (TS-531) CNL-21-033, Response to Request for Additional Information Regarding License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components2021-04-28028 April 2021 Response to Request for Additional Information Regarding License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components CNL-21-017, Response to Request for Additional Information Regarding License Amendment Request to Incorporate Tornado Missile Risk Evaluator Into the Licensing Basis, (L-2020-LLA-0099)2020-12-29029 December 2020 Response to Request for Additional Information Regarding License Amendment Request to Incorporate Tornado Missile Risk Evaluator Into the Licensing Basis, (L-2020-LLA-0099) CNL-20-089, Response to RAI Re Application for Tech. Specification Change Re Risk-Informed Justification for Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (BFN-TS-518)2020-12-21021 December 2020 Response to RAI Re Application for Tech. Specification Change Re Risk-Informed Justification for Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (BFN-TS-518) CNL-20-059, Response to Request for Additional Information Regarding Proposed Alternative Request No. 0-ISI-47 for the Third, Fifth, and Fourth 10-Year Inservice Inspection Intervals2020-08-10010 August 2020 Response to Request for Additional Information Regarding Proposed Alternative Request No. 0-ISI-47 for the Third, Fifth, and Fourth 10-Year Inservice Inspection Intervals CNL-19-122, Seismic Probabilistic Risk Assessment Response to NRC Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights2019-12-17017 December 2019 Seismic Probabilistic Risk Assessment Response to NRC Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights CNL-19-064, Response to NRC Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt Technical Specifications Task Force (TSTF)-542, Reactor Pressure Vessel Water...2019-08-0808 August 2019 Response to NRC Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt Technical Specifications Task Force (TSTF)-542, Reactor Pressure Vessel Water... CNL-19-052, Response to NRC Request for Additional Information Regarding Re-Submittal of American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI, Inservice Inspection (ISI) Program and Augmented Program, Second2019-07-19019 July 2019 Response to NRC Request for Additional Information Regarding Re-Submittal of American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI, Inservice Inspection (ISI) Program and Augmented Program, Second CNL-19-017, Proposed Technical Specifications (TS) Change TS-510 - Request for License Amendments - Maximum Extended Load Line Limit Analysis Plus - Supplement 7, Response to Requests for Additional Information2019-01-25025 January 2019 Proposed Technical Specifications (TS) Change TS-510 - Request for License Amendments - Maximum Extended Load Line Limit Analysis Plus - Supplement 7, Response to Requests for Additional Information CNL-19-007, Supplement 5, Response to Requests for Additional Information Proposed Technical Specifications (TS) Change TS-510 - Request for License Amendments - Maximum Extended Load Line Limit Analysis Plus2019-01-16016 January 2019 Supplement 5, Response to Requests for Additional Information Proposed Technical Specifications (TS) Change TS-510 - Request for License Amendments - Maximum Extended Load Line Limit Analysis Plus CNL-19-011, Proposed Technical Specifications (TS) Change TS-510 - Request for License Amendments - Maximum Extended Load Line Limit Analysis Plus - Supplement 6, Additional Operator Training Results2019-01-16016 January 2019 Proposed Technical Specifications (TS) Change TS-510 - Request for License Amendments - Maximum Extended Load Line Limit Analysis Plus - Supplement 6, Additional Operator Training Results CNL-18-139, Proposed Technical Specifications (TS) Change TS-510 - Request for License Amendments - Maximum Extended Load Line Limit Analysis Information2018-12-14014 December 2018 Proposed Technical Specifications (TS) Change TS-510 - Request for License Amendments - Maximum Extended Load Line Limit Analysis Information CNL-18-140, Response to Request for Additional Information Proposed Technical Specifications (TS) Change TS-510 - Request for License Amendments - Maximum Extended Load Line Limit Analysis Plus - Supplement 42018-12-13013 December 2018 Response to Request for Additional Information Proposed Technical Specifications (TS) Change TS-510 - Request for License Amendments - Maximum Extended Load Line Limit Analysis Plus - Supplement 4 CNL-18-117, Response to Request for Additional Information Regarding Browns Ferry Units 1, 2, and 3: Code Case N-702 for Alternative Request ISI-462018-10-17017 October 2018 Response to Request for Additional Information Regarding Browns Ferry Units 1, 2, and 3: Code Case N-702 for Alternative Request ISI-46 CNL-18-120, Response to Request for Additional Information Regarding Browns Ferry Nuclear Plant Unit 1, American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI, Inservice Inspection (ISI) Program, Unit 1 Second Ten-year ..2018-10-11011 October 2018 Response to Request for Additional Information Regarding Browns Ferry Nuclear Plant Unit 1, American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI, Inservice Inspection (ISI) Program, Unit 1 Second Ten-year ... ML18283A8972018-10-10010 October 2018 Enclosure 1: Proposed Changes to Browns Ferry Nuclear Plant Unit 1 Technical Specifications, Attachments 1, 2, & 3 CNL-18-089, Response to Request for Additional Information Regarding Decommissioning Funding Plan Update for Browns Ferry Nuclear Plant and Sequoyah Nuclear Plant Independent Spent Fuel Storage Installations, Docket Nos. 72-052 and 72-0342018-07-23023 July 2018 Response to Request for Additional Information Regarding Decommissioning Funding Plan Update for Browns Ferry Nuclear Plant and Sequoyah Nuclear Plant Independent Spent Fuel Storage Installations, Docket Nos. 72-052 and 72-034 CNL-18-044, Tennessee Valley Authority Response to NRC Request for Additional Information Related to Topical Report TVA-NPG-AWA16, TVA Overall Basin Probable Maximum Precipitation.2018-04-19019 April 2018 Tennessee Valley Authority Response to NRC Request for Additional Information Related to Topical Report TVA-NPG-AWA16, TVA Overall Basin Probable Maximum Precipitation. NL-18-044, Browns Ferry Units 1, 2, and 3; Sequoyah Units 1 and 2; Watts Bar Units 1 and 2 - Tennessee Valley Authority Response to NRC Request for Additional Information Related to Topical Report TVA-NPG-AWA16, TVA Overall Basin Probable Maximum Pre2018-04-19019 April 2018 Browns Ferry Units 1, 2, and 3; Sequoyah Units 1 and 2; Watts Bar Units 1 and 2 - Tennessee Valley Authority Response to NRC Request for Additional Information Related to Topical Report TVA-NPG-AWA16, TVA Overall Basin Probable Maximum Prec CNL-18-032, Tennessee Valley Authority Response to NRC Request for Additional Information (Set 2) Related to BFN Application to Revise Technical Specification 5.5.12 Primary Containment Leakage Rate Testing Program2018-03-27027 March 2018 Tennessee Valley Authority Response to NRC Request for Additional Information (Set 2) Related to BFN Application to Revise Technical Specification 5.5.12 Primary Containment Leakage Rate Testing Program CNL-18-011, Tennessee Valley Authority Response to NRC Request for Additional Information Related to BFN Application to Revise Technical Specification 5.5.12 Primary Containment Leakage Rate Testing Program (BFN-TS-497)2018-02-0505 February 2018 Tennessee Valley Authority Response to NRC Request for Additional Information Related to BFN Application to Revise Technical Specification 5.5.12 Primary Containment Leakage Rate Testing Program (BFN-TS-497) CNL-17-130, Update to Response to NRC Request for Additional Information for License Amendment Request to Revise Modifications and an Implementation Item Related to NFPA 805 Performance-Based Standard for Fire Protection For..2017-10-23023 October 2017 Update to Response to NRC Request for Additional Information for License Amendment Request to Revise Modifications and an Implementation Item Related to NFPA 805 Performance-Based Standard for Fire Protection For.. CNL-17-109, Response to NRC Request for Additional Information for License Amendment Request to Revise Modifications and an Implementation Item Related to NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Electric Genera2017-09-18018 September 2017 Response to NRC Request for Additional Information for License Amendment Request to Revise Modifications and an Implementation Item Related to NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generati CNL-17-098, Revised Response to NRC Request for Additional Information Related to TVA Fleet License Amendment Request to Adopt NEI 99-01 Revision 6 Emergency Action Levels2017-07-27027 July 2017 Revised Response to NRC Request for Additional Information Related to TVA Fleet License Amendment Request to Adopt NEI 99-01 Revision 6 Emergency Action Levels CNL-17-085, Response to NRC Request for Additional Information Related to TVA Fleet License Amendment Request to Adopt NEI 99-01 Revision 6 Emergency Action Levels2017-07-0707 July 2017 Response to NRC Request for Additional Information Related to TVA Fleet License Amendment Request to Adopt NEI 99-01 Revision 6 Emergency Action Levels CNL-17-039, Response to NRC Request for Information, Per 10CFR50.54(f) Regarding Recommendations 2.1, 2.3 and 9.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-Ichi Accident - Withdrawal of Regulatory..2017-03-10010 March 2017 Response to NRC Request for Information, Per 10CFR50.54(f) Regarding Recommendations 2.1, 2.3 and 9.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-Ichi Accident - Withdrawal of Regulatory.. CNL-17-035, Proposed Technical Specifications Change TS-505 - Request for License Amendments - Extended Power Uprate(Epu) - Supplement 38, Spent Fuel Pool Criticality Safety Analysis - Updated Information2017-03-0303 March 2017 Proposed Technical Specifications Change TS-505 - Request for License Amendments - Extended Power Uprate(Epu) - Supplement 38, Spent Fuel Pool Criticality Safety Analysis - Updated Information CNL-17-017, Proposed Technical Specifications (TS) Change TS-505 Request for License Amendments - Extended Power Uprate (EPU) - Supplement 37, Transmission System Update - Environmental Aspects2017-02-0303 February 2017 Proposed Technical Specifications (TS) Change TS-505 Request for License Amendments - Extended Power Uprate (EPU) - Supplement 37, Transmission System Update - Environmental Aspects CNL-17-015, Transmittal of Response to Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 36, Transmission System Update -Safety Aspects2017-01-20020 January 2017 Transmittal of Response to Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 36, Transmission System Update -Safety Aspects NL-17-015, Browns Ferry Nuclear Plant, Units 1, 2, and 3 - Transmittal of Response to Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 36, Transmission System Update -Saf2017-01-20020 January 2017 Browns Ferry Nuclear Plant, Units 1, 2, and 3 - Transmittal of Response to Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 36, Transmission System Update -Safe CNL-16-196, Revised Response to NRC Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools2016-12-19019 December 2016 Revised Response to NRC Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools CNL-16-161, Transmittal of Response to Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 33, Revised Response to Request for Additional..2016-10-13013 October 2016 Transmittal of Response to Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 33, Revised Response to Request for Additional.. CNL-16-145, Revised Responses to Requests for Additional Information Regarding Proposed Technical Specifications Change TS-505 - Extended Power Uprate - Supplement 302016-09-23023 September 2016 Revised Responses to Requests for Additional Information Regarding Proposed Technical Specifications Change TS-505 - Extended Power Uprate - Supplement 30 CNL-16-150, Revised Response to Requests for Additional Information Proposed Technical Specifications Change TS-505 - Request for License Amendment - Extended Power Uprate - Supplement 312016-09-21021 September 2016 Revised Response to Requests for Additional Information Proposed Technical Specifications Change TS-505 - Request for License Amendment - Extended Power Uprate - Supplement 31 CNL-16-133, Response to NRC Request for Additional Information Related to License Amendment Request for Adding New Specifications to Technical Specification 3.3.8.3 (BFN-TS-486) (CAC Nos. MF6738, MF6739, and MF6740) - Letter 72016-09-15015 September 2016 Response to NRC Request for Additional Information Related to License Amendment Request for Adding New Specifications to Technical Specification 3.3.8.3 (BFN-TS-486) (CAC Nos. MF6738, MF6739, and MF6740) - Letter 7 CNL-16-152, Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 32, Revised Responses to Requests for Additional Information2016-09-12012 September 2016 Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 32, Revised Responses to Requests for Additional Information CNL-16-126, Response to NRC Request for Additional Information Related to License Amendment Request for Adding New Specifications to Technical Specification 3.3.8.3 (BFN-TS-486)2016-08-24024 August 2016 Response to NRC Request for Additional Information Related to License Amendment Request for Adding New Specifications to Technical Specification 3.3.8.3 (BFN-TS-486) CNL-16-129, Response to Request for Additional Information Regarding Proposed Technical Specifications (TS) Change TS-505 License Amendments - Extended Power Uprate (EPU) - Supplement 292016-08-0303 August 2016 Response to Request for Additional Information Regarding Proposed Technical Specifications (TS) Change TS-505 License Amendments - Extended Power Uprate (EPU) - Supplement 29 CNL-16-127, Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Upgrade (EPU) - Supplement 28, Responses to Requests for Additional Information2016-08-0303 August 2016 Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Upgrade (EPU) - Supplement 28, Responses to Requests for Additional Information CNL-16-114, Responses to Requests for Additional Information and Containment Accident Pressure Credit Elimination Updates on Proposed Technical Specifications Change TS-505 - Request for License Amendments - Extended Power Uprate .2016-08-0303 August 2016 Responses to Requests for Additional Information and Containment Accident Pressure Credit Elimination Updates on Proposed Technical Specifications Change TS-505 - Request for License Amendments - Extended Power Uprate . 2024-01-11
[Table view] |
Text
Proprietary Information Withhold Under 10 CFR 2.390(a)(4)
This letter is decontrolled when separated from Enclosure 1 Tennessee Valley Authority, 1101 Market Street, Chattanooga, Tennessee 37402 CNL-15-129 July 30, 2015 10 CFR 50.4 10 CFR 50.90 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Browns Ferry Nuclear Plant, Units 1, 2, and 3 Renewed Facility Operating License Nos. DPR-33, DPR-52, and DPR-68 NRC Docket Nos. 50-259, 50-260, and 50-296
Subject:
Response to Follow-up NRC Request for Additional Information Regarding Proposed Technical Specification Change to Modify Technical Specification 2.1.1, Reactor Core Safety Limits (BFN TS-492)
(TAC Nos. MF5412, MF5413, MF5414)
References:
- 1. Letter from TVA to NRC, "Browns Ferry Nuclear Plant (BFN), Units 1, 2, and 3 - Application to Modify Technical Specification 2.1.1, Reactor Core Safety Limits (BFN TS-492)," dated December 11, 2014 (ADAMS Accession No. ML14363A158)
- 2. Letter from NRC to TVA, Browns Ferry Nuclear Plant, Units 1, 2, and 3 -
Request for Additional Information Related to License Amendment Request for Technical Specification Changes to Reactor Core Safety Limits, dated May 12, 2015 (TAC Nos. MF5412, MF5413, and MF5414)
(ADAMS Accession No. ML15126A530)
- 3. Letter from TVA to NRC, Response to NRC Request for Additional Information Regarding Proposed Technical Specification Change to Modify Technical Specification 2.1.1, Reactor Core Safety Limits (BFN TS-492), dated June 5, 2015
- 4. Electronic Mail from NRC to TVA, BFN SL: Revised Follow-up RAI, dated July 1, 2015 (ML15189A236)
By letter dated December 11, 2014 (Reference 1), Tennessee Valley Authority (TVA) submitted a license amendment request (LAR) for Browns Ferry Nuclear Plant (BFN),
Units 1, 2, and 3, to modify Technical Specification (TS) 2.1.1, Reactor Core Safety Limits, to revise the reactor dome pressure limit.
U.S. Nuclear Regulatory Commission CNL-15-129 Page2 July 30, 2015 By letter dated May 12, 2015 (Reference 2), the Nuclear Regulatory Commission (NRC) transmitted a request for additional information (RAI). By letter dated June 5, 2015 (Reference 3), TVA submitted responses to the Reference 2 RAls. By electronic mail dated July 1, 2015 (Reference 4 ), the NRC transmitted an RAI requesting additional information.
The due date for the response is July 31, 2015. contains AREVA report ANP-3427P, Revision 1, that provides the responses to the Reference 4 RAI. Enclosure 1 contains information that AREVA Inc. considers to be proprietary in nature and subsequently, pursuant to 10 Code of Federal Regulations 2.390, "Public inspections, exemptions, requests for withholding," paragraph (a)(4}, it is requested that such information be withheld from public disclosure. Enclosure 2 contains the non-proprietary version of the Enclosure 1 report with the proprietary material removed, and is suitable for public disclosure. Enclosure 3 provides the affidavit supporting this request.
There are no new regulatory commitments contained in this submittal. Please address any questions regarding this submittal to Mr. Edward D. Schrull at (423) 751-3850.
I declare under penalty of perjury that the foregoing is true and correct. Executed on this 30th day of July 2015.
Enclosures:
- 1. ANP-3427P Revision 1, "AREVA Round 2 RAI Responses for Browns Ferry Steam Dome Pressure for Reactor Core Safety Limits" (Proprietary)
- 2. ANP-3427NP Revision 1, "AREVA Round 2 RAI Responses for Browns Ferry Steam Dome Pressure for Reactor Core Safety Limits" (Non-proprietary)
- 3. Affidavit for ANP-3427P Revision 1 cc (Enclosures):
NRC Regional Administrator - Region II NRC Senior Resident Inspector - Browns Ferry Nuclear Plant NRC Project Manager - Browns Ferry Nuclear Plant NRC Branch Chief - Region II State Health Officer, Alabama State Department of Health
ENCLOSURE 2 TENNESSEE VALLEY AUTHORITY BROWNS FERRY NUCLEAR PLANT UNITS 1, 2, AND 3 ANP-3427NP Revision 1, AREVA Round 2 RAI Responses for Browns Ferry Steam Dome Pressure for Reactor Core Safety Limits (Non-proprietary)
AREVA Round 2 RAI ANP-3427NP Revision 1 Responses for Browns Ferry Steam Dome Pressure for Reactor Core Safety Limits July 2015
© 2015 AREVA Inc.
ANP-3427NP Revision 1 Copyright © 2015 AREVA Inc.
All Rights Reserved
AREVA Inc.
ANP-3427NP AREVA Round 2 RAI Responses for Revision 1 Browns Ferry Steam Dome Pressure for Reactor Core Safety Limits Page i Nature of Changes Section(s)
Item or Page(s) Description and Justification 1 1-1 Changed an initial set of questions to a second round of questions.
AREVA Inc.
ANP-3427NP AREVA Round 2 RAI Responses for Revision 1 Browns Ferry Steam Dome Pressure for Reactor Core Safety Limits Page ii Contents Page
1.0 INTRODUCTION
............................................................................................... 1-1 2.0 NRC QUESTIONS AND AREVA RESPONSE .................................................. 2-1
3.0 REFERENCES
.................................................................................................. 3-1
AREVA Inc.
ANP-3427NP AREVA Round 2 RAI Responses for Revision 1 Browns Ferry Steam Dome Pressure for Reactor Core Safety Limits Page iii Nomenclature Acronym Definition BFN Browns Ferry Nuclear Plant BWR Boiling Water Reactor CPR Critical Power Ratio LAR Licensing Amendment Request MCPR Minimum Critical Power Ratio NRC U. S. Nuclear Regulatory Commission PRFO Pressure Regulator Failure Open RAI Request for Additional Information TS Technical Specification TVA Tennessee Valley Authority
AREVA Inc.
ANP-3427NP AREVA Round 2 RAI Responses for Revision 1 Browns Ferry Steam Dome Pressure for Reactor Core Safety Limits Page 1-1
1.0 INTRODUCTION
Tennessee Valley Authority (TVA) submitted a License Amendment Request (LAR) to change the Browns Ferry Nuclear Plant (BFN) Technical Specifications (TS) in support of steam dome pressure for reactor core safety limits. In response to the LAR, the U. S.
Nuclear Regulatory Commission (NRC) has issued a second round of questions, in the form of Request for Additional Information (RAI), Reference 1.
Based on the information provided in this report, TVA will prepare a formal response to the NRC RAIs.
AREVA Inc.
ANP-3427NP AREVA Round 2 RAI Responses for Revision 1 Browns Ferry Steam Dome Pressure for Reactor Core Safety Limits Page 2-1 2.0 NRC QUESTIONS AND AREVA RESPONSE The NRC questions (i.e., RAIs) listed below are according to Reference 1:
RAI-08: Response to RAI-04b points out for pressures below 700 psia an enthalpy offset is added to the nodal enthalpy used by the SPCB/GE14 correlation. The dashed curves in Figure 4.5 appear to be horizontal extensions from the corresponding values at 700 psia.
a) Clarify with an example how the offset was applied in generating the dashed curves in Figure 4.5 of ANP-3245P Revision 1 (Attachment 5 to the LAR).
AREVA Response a):
Consider the following example from core monitoring. The pressure is 600 psia. The inlet subcooling is 20 Btu/lb. At this state point, the saturated liquid enthalpy is 471.6 Btu/lb. Therefore, the inlet enthalpy is 471.6 - 20 = 451.6 Btu/lb. At a mass flow rate of 0.05 Mlb/h, the critical power for this point is shown as the square symbol at a pressure of 600 psia in Figure 4.5.
Now, for this state point, the critical power is to be calculated with the SPCB/GE14 correlation. For the purpose of calculating critical power only, the pressure is limited to a minimum of 700 psia. At this pressure, the saturated liquid enthalpy is 491.5 Btu/lb.
Calculate the enthalpy offset. This is hoffset = hf ( 700 ) hf ( 600 ) = 491.5 471.6 = 19.9 Btu / lb Add the enthalpy offset to the inlet enthalpy, to obtain the effective enthalpy associated with the pressure of 700 psia.
hin700 = 451.6 + 19.9 = 471.5 Btu / lb The SPCB/GE14 correlation is applied with this inlet enthalpy and a pressure of 700 psia. The critical power after applying the enthalpy offset is shown as the square
AREVA Inc.
ANP-3427NP AREVA Round 2 RAI Responses for Revision 1 Browns Ferry Steam Dome Pressure for Reactor Core Safety Limits Page 2-2 symbol located at 700 psia in Figure 4.5, the intersection of the solid line curve and the dashed line curve. As a check, the difference between this inlet enthalpy and the saturated liquid enthalpy at 700 psia can be calculated. It is hsub= 491.5 471.5= 20 Btu / lb Thus, the critical power has been calculated at the boundary, 700 psia, preserving the inlet subcooling of 20 Btu/lb.
The dashed curves (at pressures lower than 700 psia) are calculated using the method applied in this example.
b) Did the limiting case with the minimum steam dome pressure shown in Figure 3.2 of ANP-3245P Revision 1 reach a core inlet condition that is saturated (two-phase)? What is the core inlet enthalpy when the steam dome pressure reaches the minimum in Figure 3.2? Will the SPCB/GE14 correlation issue an error message during the transient calculation when the core inlet or the node of interest reaches a condition that is beyond the applicability range of the correlation?
AREVA Response b):
- The limiting case with the minimum steam dome pressure shown in Figure 3.2 of ANP-3245P Revision 1 did not reach saturated conditions at the core inlet at any time during the event.
- The core inlet enthalpy at the time at which minimum steam dome pressure was achieved is [ ].
- Consistent with Section 2.6 of the EMF-2209(P)(A) Revision 3 licensing topical report, the SPCB/GE14 correlation will issue a message to alert the analyst if the core inlet or the node of interest reaches a condition that is beyond the range of applicability.
AREVA Inc.
ANP-3427NP AREVA Round 2 RAI Responses for Revision 1 Browns Ferry Steam Dome Pressure for Reactor Core Safety Limits Page 2-3 c) The SPCB correlation is applicable to the ATRIUM-10 fuel. The SPCB/GE14 correlation was developed using the indirect method (Indirect Correlation Application) and is applicable to the legacy GE14 fuel in BFN Unit1 for pressures not less than 700 psia. Clarify whether the solid curves in Figure 4.5 were calculated using the SPCB or the SPCB/GE14 correlation.
AREVA Response c):
The solid curves are the application of SPCB/GE14, but without applying the alternative low pressure boundary treatment (enthalpy offset and evaluation at 700 psia). Because the co-resident fuel methodology, EMF-2245(P)(A), [
]
d) The last paragraph on page 4-2 of the AREVA topical report ANP-3245P Revision 1 states, For pressures that are lower than the SPCB/GE14 700 psia correlation boundary, the critical power will be evaluated as though the pressure was at 700 psia (preserving the same inlet subcooling). The results of applying the SPCB/GE14 correlation to pressures lower than 700 psia is illustrated with dashed lines in Figure 4.5 and indicates that the alternative low pressure boundary treatment is conservative. It appears that the term conservative is used because the dashed line values are lower than the solid line values when the pressure is lower than 700 psia.
However, the SPCB correlation is not applicable to the GE14 fuel and the SPCB/GE14 correlation is not applicable for pressures lower than 700 psia. Justify how the alternative low pressure boundary treatment is conservative.
AREVA Inc.
ANP-3427NP AREVA Round 2 RAI Responses for Revision 1 Browns Ferry Steam Dome Pressure for Reactor Core Safety Limits Page 2-4 AREVA Response d):
In the co-resident fuel methodology, [
]
In the application of the critical power correlation (including SPCB/GE14), boundaries are checked in the computer code. The boundaries can be separated into two groups.
For those cases where there is a mitigating conservative action (described in EMF-2209(P)(A) Revision 3, Section 2.6), a warning message is written and the conservative action is taken. For those cases where there is no mitigating action, an error message is written and the code stops.
ANP-3245(P) describes a mitigating action for low pressure. In this mitigating action, for pressures lower than 700 psia, the SPCB/GE14 correlation will be applied within its range of applicability, at a pressure of 700 psia with an enthalpy offset as demonstrated in the example in part (a) above. This mitigating action is conservative because:
- Critical heat flux increases as the pressure is decreased from 700 psia, as shown in Figure 4.1, but no credit is taken for this increase. [
].
- The critical power increases as the pressure is decreased (see Figure 4.2 and the statement that the trend continues to a pressure below 600 psia) for BWR fuel assemblies. No credit is taken for this increase.
- The trend for increase in critical power with decreasing pressure is confirmed with ATRIUM-10 test data (see Figure 4.3) that was used in the development of the SPCB correlation. Using the critical power at 700 psia for the critical power at lower pressures is conservative. No credit is taken for this increase in critical power.
- ATRIUM is a trademark of AREVA Inc.
AREVA Inc.
ANP-3427NP AREVA Round 2 RAI Responses for Revision 1 Browns Ferry Steam Dome Pressure for Reactor Core Safety Limits Page 2-5 The critical power calculated with the SPCB/GE14 correlation, limiting the pressure to 700 psia and applying the enthalpy offset, is lower than that which would be achieved if the measurements were available, and is therefore conservative.
The event that is the basis for the low pressure safety limit is pressure regulator failure open, a MCPR increasing event. The ratio of MCPR to initial CPR is shown in Figure 2-1. The trend in MCPR is shown for both ATRIUM-10 and GE14. The calculation is carried out until 700 psia is reached. The trend is clearly towards increasing MCPR. In addition to any conservatism that is described above, the MCPR is far away from the boiling transition point.
Figure 2-1 Browns Ferry PRFO MCPR(t)/MCPRinitial
AREVA Inc.
ANP-3427NP AREVA Round 2 RAI Responses for Revision 1 Browns Ferry Steam Dome Pressure for Reactor Core Safety Limits Page 3-1
3.0 REFERENCES
- 1. Email, F. E. Saba (NRC) to G. R. Williams (TVA), BFN SL: Revised Follow-up RAI, USNRC, July 1, 2015. (38-9243793-000)
ENCLOSURE 3 TENNESSEE VALLEY AUTHORITY BROWNS FERRY NUCLEAR PLANT UNITS 1, 2, AND 3 Affidavit for ANP-3427P Revision 1
AFFIDAVIT STATE OF WASHINGTON )
) SS.
COUNTY OF BENTON )
- 1. My name is Alan B. Meginnis. I am Manager, Product Licensing, for AREVA Inc. and as such I am authorized to execute this Affidavit.
- 2. I am familiar with the criteria applied by AREVA to determine whether certain AREVA information is proprietary. I am familiar with the policies established by AREVA to ensure the proper application of these criteria.
- 3. I am familiar with the AREVA information contained in the report ANP-3427P, Revision 1, "AREVA Round 2 RAI Responses for Browns Ferry Steam Dome Pressure for Reactor Core Safety Limits," dated July 2015 and referred to herein as "Document." Information contained in this Document has been classified by AREVA as proprietary in accordance with the policies established by AREVA for the control and protection of proprietary and confidential information.
- 4. This Document contains information of a proprietary and confidential nature and is of the type customarily held in confidence by AREVA and not made available to the public. Based on my experience, I am aware that other companies regard information of the kind contained in this Document as proprietary and confidential.
- 5. This Document has been made available to the U.S. Nuclear Regulatory Commission in confidence with the request that the information contained in this Document be withheld from public disclosure. The request for withholding of proprietary information is made in accordance with 10 CFR 2.390. The information for which withholding from disclosure is
requested qualifies under 10 CFR 2.390(a)(4) 'Trade secrets and commercial or financial information."
- 6. The following criteria are customarily applied by AREVA to determine whether information should be classified as proprietary:
(a) The information reveals details of AREVA's research and development plans and programs or their results.
(b) Use of the information by a competitor would permit the competitor to significantly reduce its expenditures, in time or resources, to design, produce, or market a similar product or service.
(c) The information includes test data or analytical techniques concerning a process, methodology, or component, the application of which results in a competitive advantage for AREVA (d) The information reveals certain distinguishing aspects of a process, methodology, or component, the exclusive use of which provides a competitive advantage for AREVA in product optimization or marketability.
(e) The information is vital to a competitive advantage held by AREVA, would be helpful to competitors to AREVA, and would likely cause substantial harm to the competitive position of AREVA The information in the Document is considered proprietary for the reasons set forth in paragraphs 6(b), 6(d) and 6(e) above.
- 7. In accordance with AREVA's policies governing the protection and control of information, proprietary information contained in this Document have been made available, on a limited basis, to others outside AREVA only as required and under suitable agreement providing for nondisclosure and limited use of the information .
. 8. AREVA policy requires that proprietary information be kept in a secured file or area and distributed on a need-to-know basis.
- 9. The foregoing statements are true and correct to the best of my knowledge, information, and belief.
SUBSCRIBED before me this ~~
day of J w~ , 2015.
NOTARY PUBLIC, STATE OF WASHINGTON MY COMMISSION EXPIRES: 1/14/2016