| number = ML16112A295
| number = ML16112A295
| issue date = 04/27/2016
| issue date = 04/27/2016
| title = Grand Gulf Nuclear Station, Unit 1 - Request for Withholding Information from Public Disclosure (CAC No. MF5303)
| title = Request for Withholding Information from Public Disclosure
| author name = Kim J
| author name = Kim J
| author affiliation = NRC/NRR/DORL/LPLIV-2
| author affiliation = NRC/NRR/DORL/LPLIV-2
Line 14: Line 14:
| page count = 4
| page count = 4
| project = CAC:MF5303
| project = CAC:MF5303
| stage = Other
| stage = Withholding Request Acceptance
}}
}}


=Text=
=Text=
{{#Wiki_filter:Vice President, Operations Entergy Operations, Inc. Grand Gulf Nuclear Station P.O. Box 756 Port Gibson, MS 39150 UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 April 27, 2016 SUBJECT: GRAND GULF NUCLEAR STATION, UNIT 1 -REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE (CAC NO. MF5303) Dear Sir or Madam: By letter dated August 18, 2015 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML 15230A203), Entergy Operations, Inc. (Entergy, the licensee), submitted two affidavits dated November 15, 2014, and January 31, 2015, executed by Dr. M. P. Manahan, Sr., MP Machinery and Testing, requesting that information contained in the following documents (Attachment 3 of the letter dated November 21, 2014, and Attachment 3 of the letter dated February 18, 2015 (ADAMS Accession Nos. ML 14325A752 and ML 15049A536, respectively), be withheld from public disclosure pursuant to the Title 10 of the Code of Federal Regulations (10 CFR), Part 2, Section 2.390: Proprietary Version, Report Number MPM-814779, Revision 1, "Neutron Transport Analysis for Grand Gulf Nuclear Station," November 2014 [Attachment 3, Proprietary to the Grand Gulf Nuclear Station, Unit 1 (GGNS) Letter GNR0-2014/00080, "Application to Revise Grand Gulf Nuclear Station Unit 1 's [GGNS] Current Fluence Methodology from 0 EFPY [Effective Full-Power Year] Through the End of Extended Operations to a Single Fluence Method," dated November 21, 2014] Proprietary Version, Report Number MPM-814779, Revision 2, "Neutron Transport Analysis for Grand Gulf Nuclear Station," January 2015 [Attachment 3, Proprietary to the GGNS Letter GNR0-2015/00011, "Supplement to License Amendment Request Application to Revise Grand Gulf Nuclear Station Unit 1 's Current Fluence Methodology from 0 EFPY Through the End of Extended Operations to a Single Fluence Method," dated February 18, 2015] By letter dated March 23, 2016, the licensee submitted nonproprietary versions of these documents, designated as Attachments 1 and 2, which have been placed in the U.S. Nuclear Regulatory Commission's (NRC's) Public Document Room and added to ADAMS in the NRC Library at Accession No. ML 16084A976.
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 April 27, 2016 Vice President, Operations Entergy Operations, Inc.
-2 -The affidavit stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons: a. Information that discloses a process, method, or apparatus, including supporting data and analyses, where prevention of its use by MPM's competitors without license from MPM constitutes a competitive economic advantage over other companies and b. Information that, if used by a competitor, would reduce their expenditure of resources or improve their competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing of a similar product. We have reviewed your submittal in accordance with the requirements of 10 CFR 2.390 and, on the basis of the statements in the affidavit, we have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure. Therefore, the versions of the submitted information marked as proprietary will be withheld from public disclosure pursuant to 1 O CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended. Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information. If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.
Grand Gulf Nuclear Station P.O. Box 756 Port Gibson, MS 39150
-3 -If you have any questions regarding this matter, I may be reached at 301-415-4125. Docket No. 50-416 cc: Dr. M. P. Manahan, Sr., President MP Machinery and Testing 2161 Sandy Drive State College, PA 16803 Additional distribution via Listserv Sincerely, James Kim, Project Manager Plant Licensing IV-2 and Decommissioning Transition Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
 
-3 -If you have any questions regarding this matter, I may be reached at 301-415-4125. Docket No. 50-416 cc: Dr. M. P. Manahan, Sr., President MP Machinery and Testing 2161 Sandy Drive State College, PA 16803 Additional distribution via Listserv DISTRIBUTION: Sincerely, IRA/ James Kim, Project Manager Plant Licensing IV-2 and Decommissioning Transition Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation PUBLIC LPL4-2 R/F RidsACRS_MailCTR Resource RidsNrrDorllpl4-2 Resource RidsRgn4MailCenter Resource RidsNrrLAPBlechman Resource RidsNrrPMGrandGulf Resource ADAMS Accession No.: ML 16112A295 OFFICE NRR/DORL/LPL4-2/PM NRR/DORL/LPL4-2/LA NRR/DORL/LPL4-2/BC NRR/DORL/LPL4-2/PM NAME JKim PBlechman MKhanna JKim DATE 4/26/16 4/22/16 4/26/16 4/27/16 OFFICIAL RECORD COPY 
==SUBJECT:==
}}
GRAND GULF NUCLEAR STATION, UNIT 1 - REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE (CAC NO. MF5303)
 
==Dear Sir or Madam:==
 
By letter dated August 18, 2015 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML15230A203), Entergy Operations, Inc. (Entergy, the licensee),
submitted two affidavits dated November 15, 2014, and January 31, 2015, executed by Dr. M. P. Manahan, Sr., MP Machinery and Testing, requesting that information contained in the following documents (Attachment 3 of the letter dated November 21, 2014, and Attachment 3 of the letter dated February 18, 2015 (ADAMS Accession Nos. ML14325A752 and ML15049A536, respectively), be withheld from public disclosure pursuant to the Title 10 of the Code of Federal Regulations (10 CFR), Part 2, Section 2.390:
Proprietary Version, Report Number MPM-814779, Revision 1, "Neutron Transport Analysis for Grand Gulf Nuclear Station," November 2014
[Attachment 3, Proprietary to the Grand Gulf Nuclear Station, Unit 1 (GGNS)
Letter GNR0-2014/00080, "Application to Revise Grand Gulf Nuclear Station Unit 1's [GGNS] Current Fluence Methodology from 0 EFPY [Effective Full-Power Year] Through the End of Extended Operations to a Single Fluence Method,"
dated November 21, 2014]
Proprietary Version, Report Number MPM-814779, Revision 2, "Neutron Transport Analysis for Grand Gulf Nuclear Station," January 2015 [Attachment 3, Proprietary to the GGNS Letter GNR0-2015/00011, "Supplement to License Amendment Request Application to Revise Grand Gulf Nuclear Station Unit 1's Current Fluence Methodology from 0 EFPY Through the End of Extended Operations to a Single Fluence Method," dated February 18, 2015]
By letter dated March 23, 2016, the licensee submitted nonproprietary versions of these documents, designated as Attachments 1 and 2, which have been placed in the U.S. Nuclear Regulatory Commission's (NRC's) Public Document Room and added to ADAMS in the NRC Library at Accession No. ML16084A976.
 
The affidavit stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons:
: a.     Information that discloses a process, method, or apparatus, including supporting data and analyses, where prevention of its use by MPM's competitors without license from MPM constitutes a competitive economic advantage over other companies and
: b.     Information that, if used by a competitor, would reduce their expenditure of resources or improve their competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing of a similar product.
We have reviewed your submittal in accordance with the requirements of 10 CFR 2.390 and, on the basis of the statements in the affidavit, we have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure.
Therefore, the versions of the submitted information marked as proprietary will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.
Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.
If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.
 
If you have any questions regarding this matter, I may be reached at 301-415-4125.
Sincerely, James Kim, Project Manager Plant Licensing IV-2 and Decommissioning Transition Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-416 cc: Dr. M. P. Manahan, Sr., President MP Machinery and Testing 2161 Sandy Drive State College, PA 16803 Additional distribution via Listserv
 
ML16112A295 OFFICE   NRR/DORL/LPL4-2/PM       NRR/DORL/LPL4-2/LA     NRR/DORL/LPL4-2/BC   NRR/DORL/LPL4-2/PM NAME     JKim                     PBlechman             MKhanna               JKim DATE     4/26/16                 4/22/16               4/26/16               4/27/16}}

Latest revision as of 19:10, 10 November 2019

Request for Withholding Information from Public Disclosure
ML16112A295
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 04/27/2016
From: James Kim
Plant Licensing Branch IV
To:
Entergy Operations
Kim J, NRR/DORL/LPLIV-2
References
CAC MF5303
Download: ML16112A295 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 April 27, 2016 Vice President, Operations Entergy Operations, Inc.

Grand Gulf Nuclear Station P.O. Box 756 Port Gibson, MS 39150

SUBJECT:

GRAND GULF NUCLEAR STATION, UNIT 1 - REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE (CAC NO. MF5303)

Dear Sir or Madam:

By letter dated August 18, 2015 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML15230A203), Entergy Operations, Inc. (Entergy, the licensee),

submitted two affidavits dated November 15, 2014, and January 31, 2015, executed by Dr. M. P. Manahan, Sr., MP Machinery and Testing, requesting that information contained in the following documents (Attachment 3 of the letter dated November 21, 2014, and Attachment 3 of the letter dated February 18, 2015 (ADAMS Accession Nos. ML14325A752 and ML15049A536, respectively), be withheld from public disclosure pursuant to the Title 10 of the Code of Federal Regulations (10 CFR), Part 2, Section 2.390:

Proprietary Version, Report Number MPM-814779, Revision 1, "Neutron Transport Analysis for Grand Gulf Nuclear Station," November 2014

[Attachment 3, Proprietary to the Grand Gulf Nuclear Station, Unit 1 (GGNS)

Letter GNR0-2014/00080, "Application to Revise Grand Gulf Nuclear Station Unit 1's [GGNS] Current Fluence Methodology from 0 EFPY [Effective Full-Power Year] Through the End of Extended Operations to a Single Fluence Method,"

dated November 21, 2014]

Proprietary Version, Report Number MPM-814779, Revision 2, "Neutron Transport Analysis for Grand Gulf Nuclear Station," January 2015 [Attachment 3, Proprietary to the GGNS Letter GNR0-2015/00011, "Supplement to License Amendment Request Application to Revise Grand Gulf Nuclear Station Unit 1's Current Fluence Methodology from 0 EFPY Through the End of Extended Operations to a Single Fluence Method," dated February 18, 2015]

By letter dated March 23, 2016, the licensee submitted nonproprietary versions of these documents, designated as Attachments 1 and 2, which have been placed in the U.S. Nuclear Regulatory Commission's (NRC's) Public Document Room and added to ADAMS in the NRC Library at Accession No. ML16084A976.

The affidavit stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons:

a. Information that discloses a process, method, or apparatus, including supporting data and analyses, where prevention of its use by MPM's competitors without license from MPM constitutes a competitive economic advantage over other companies and
b. Information that, if used by a competitor, would reduce their expenditure of resources or improve their competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing of a similar product.

We have reviewed your submittal in accordance with the requirements of 10 CFR 2.390 and, on the basis of the statements in the affidavit, we have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure.

Therefore, the versions of the submitted information marked as proprietary will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.

Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.

If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.

If you have any questions regarding this matter, I may be reached at 301-415-4125.

Sincerely, James Kim, Project Manager Plant Licensing IV-2 and Decommissioning Transition Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-416 cc: Dr. M. P. Manahan, Sr., President MP Machinery and Testing 2161 Sandy Drive State College, PA 16803 Additional distribution via Listserv

ML16112A295 OFFICE NRR/DORL/LPL4-2/PM NRR/DORL/LPL4-2/LA NRR/DORL/LPL4-2/BC NRR/DORL/LPL4-2/PM NAME JKim PBlechman MKhanna JKim DATE 4/26/16 4/22/16 4/26/16 4/27/16