ML18011A705: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 15: Line 15:
| document type = OPERATING LICENSES-APPLIATION TO AMEND-RENEW EXISTING, TEXT-LICENSE APPLICATIONS & PERMITS
| document type = OPERATING LICENSES-APPLIATION TO AMEND-RENEW EXISTING, TEXT-LICENSE APPLICATIONS & PERMITS
| page count = 2
| page count = 2
| project =
| stage = Request
}}
}}



Latest revision as of 01:43, 10 November 2019

Application for Amend to License NPF-63,revising TS to Relocate Certain TS Requirements in Accordance w/NUREG-1431, Std Ts,Westinghouse Plants.
ML18011A705
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 12/06/1994
From: Robinson W
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML18011A707 List:
References
RTR-NUREG-1431 HO-941106, NUDOCS 9412140064
Download: ML18011A705 (2)


Text

P RIGRITY (ACCELERATED RIDS PROCESSIi REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION,NBR:9412140064 DOC.DATE: 94/12/06 NOTARIZED: NO DOCKET FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina 05000400 AUTH. NAME AUTHOR AFFILIATION ROBINSON,W.R. Carolina Power S Light Co. P RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

R'

SUBJECT:

Application for amend to license NPF-63 to TS re rev to plant TS to relocate certain TS requirements in accordance w/NUREG-1431, "Std TS,Westinghouse Plants."

DISTRIBDTION CODE TITLE: OR AOOID COPIES RECEIVED'LTR Submittal: General Distribution L ENCL L SIZE NOTES:Application for permit renewal filed. o5ooo4oo R RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-1 LA 1 1 PD2-1 PD 1 1 LE,N 1 1 INTERNAL: ACRS 6 6 FILE CENTE~ 1 1 NRR/DRCH/HICB 1 1 RR/DSSA/SCSB 1 1 NRR/DSSA/SPLB 1 1 NRR/DSSA/SRXB 1 1 NUDOCS-ABSTRACT 1 1 OGC/HDS2 1 0 EXTERNAL: NOAC 1 1 NRC PDR 1 1 D

0 C

U M

N NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE 'O'ASTE! CONTACT'I'IIE DOCL'i!ENTCONTROL DESK, ROOI1I Pl-37 (EXT. 04-0083 ) TO ELIl1IINATEYOUR NAifE PROi!

DISTRIBUTION LIS'I'S I'OR DOCL'0 !EN'I'S YOL'ON"I'EED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 18 ENCL 17

Carolina Power & Light Company William R. Robinson PO Box 165 Vice President New Hill NC 27562 Harris Nuclear Plant NG-eSN Letter Number: HO-941106 SERIAL: HNP-94-094 10 CFR 50.90 United States Nuclear Regulatory Commission ATTENTION: Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO. 50-400/LICENSE NO. NPF-63 REVISED TECHNICAL SPECIFICATION PAGE - RELOCATION OF SELECTED TECHNICAL SPECIFICATIONS IN ACCORDANCE WITH NUREG-1431 Gentlemen:

On October 24, 1994, Carolina Power & Light Company requested a revision to the Shearon Harris Nuclear Power Plant (SHNPP) Technical Specifications (TS) to relocate certain TS requirements in accordance with NUREG-1431, "Standard Technical Specifications, Westinghouse Plants."

On November 4, 1994, the NRC issued Amendment No. 51 to the SHNPP TS to revise TS 3/4.8.1, AC Sources, and associated Bases to be consistent with NUREG-1431. This amendment independently changed a page which is currently under NRC staff review from our October 24, 1994 request. Enclosure 1 provides revised TS page x (Index), which reflects the changes issued with Amendment No. 51, as well as the proposed changes in our October 24, 1994 submittal. Accordingly, this page should be substituted for the corresponding page in our October 24, 1994 request. Thus, there is no new information provided in the enclosure.

Please refer any questions regarding this submittal to Mr. D. C. McCarthy at (919) 362-2100.

Sincerely, W. R. Robinson hlmr Enclosure Mr. Dayne H. Brown Mr. S. D. Ebneter Mr. S. A. Elrod eygp~400gq Mr. N. B. L PDR ADOCK 05000400 PDR State Road 1134 New Hill NC Tel 919 362-2502 Fax 919 362-6950