ML13042A056: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(3 intermediate revisions by the same user not shown) | |||
Line 2: | Line 2: | ||
| number = ML13042A056 | | number = ML13042A056 | ||
| issue date = 02/08/2013 | | issue date = 02/08/2013 | ||
| title = | | title = Notification of Inspection (NRC Inspection Report 05000416-13-003) and Request for Information | ||
| author name = Farnholtz T | | author name = Farnholtz T | ||
| author affiliation = NRC/RGN-IV/DRS/EB-1 | | author affiliation = NRC/RGN-IV/DRS/EB-1 | ||
| addressee name = Mulligan K | | addressee name = Mulligan K | ||
Line 13: | Line 13: | ||
| page count = 5 | | page count = 5 | ||
}} | }} | ||
See also: [[ | See also: [[see also::IR 05000416/2013003]] | ||
=Text= | =Text= | ||
{{#Wiki_filter: February 8, 2013 Kevin Mulligan | {{#Wiki_filter:UNITE D S TATE S | ||
Site Vice President Operations | NUC LEAR RE GULATOR Y C OMMI S SI ON | ||
Entergy Operations, Inc. | R E G IO N I V | ||
Grand Gulf Nuclear Station P.O. Box 756 Port Gibson, MS | 1600 EAST LAMAR BLVD | ||
AR L I NGTON , TEXAS 7 601 1- 4511 | |||
SUBJECT: GRAND GULF NUCLEAR STATION - NOTIFICATION OF INSPECTION (NRC INSPECTION REPORT 05000416/2013003) AND REQUEST FOR INFORMATION | February 8, 2013 | ||
Dear Mr. Mulligan | Kevin Mulligan | ||
Site Vice President Operations | |||
From April 8 - April 19, 2013, Reactor Inspectors from the U.S. Nuclear Regulatory | Entergy Operations, Inc. | ||
Grand Gulf Nuclear Station | |||
Permanent Plant Modifications. | P.O. Box 756 | ||
Port Gibson, MS 39150 | |||
Experience has shown that this inspection is resource intensive both for the NRC inspectors and your staff. | SUBJECT: GRAND GULF NUCLEAR STATION - NOTIFICATION OF INSPECTION (NRC | ||
Upon review of these documents, the inspectors will select additional documentation for review upon arrival. | INSPECTION REPORT 05000416/2013003) AND REQUEST FOR | ||
minimize the number of additional documents requested during the preparation and/or the onsite portions of the inspection. | INFORMATION | ||
that our regulatory contact for this inspection will be Richard Scarbrough of your regulatory | Dear Mr. Mulligan | ||
affairs organization. | From April 8 - April 19, 2013, Reactor Inspectors from the U.S. Nuclear Regulatory | ||
please contact the lead inspector Matt Young at 817-200-1545 or by email Matt.Young@nrc.gov. | Commissions (NRC) Region IV office will perform the baseline inspection of changes, tests, | ||
This letter does not contain new or amended information collection requirements subject to the | experiments, and permanent plant modifications at Grand Gulf Nuclear Station, using NRC | ||
Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). | Inspection Procedure 71111.17, Evaluations of Changes, Tests, or Experiments and | ||
collection requirements were approved by the Office of Management and Budget, control number 3150-0011. | Permanent Plant Modifications. | ||
requesting document displays a currently valid Office of Management and Budget control | Experience has shown that this inspection is resource intensive both for the NRC inspectors | ||
and your staff. In order to minimize the impact to your onsite resources and to ensure a | |||
productive inspection, we have enclosed a request for documents needed for this inspection. | |||
Upon review of these documents, the inspectors will select additional documentation for review | |||
upon arrival. It is important that all of these documents are up to date and complete in order to | |||
minimize the number of additional documents requested during the preparation and/or the | |||
onsite portions of the inspection. | |||
We have discussed the schedule for these inspection activities with your staff and understand | |||
that our regulatory contact for this inspection will be Richard Scarbrough of your regulatory | |||
affairs organization. If there are any questions about this inspection or the material requested, | |||
please contact the lead inspector Matt Young at 817-200-1545 or by email | |||
Matt.Young@nrc.gov. | |||
This letter does not contain new or amended information collection requirements subject to the | |||
Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information | |||
collection requirements were approved by the Office of Management and Budget, control | |||
number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to | |||
respond to, a request for information or an information collection requirement unless the | |||
requesting document displays a currently valid Office of Management and Budget control | |||
number. | |||
K. Mulligan -2- | |||
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its | |||
enclosure will be available electronically for public inspection in the NRC Public Document | |||
Room or from the Publicly Available Records (PARS) component of NRC's document system | |||
(ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading- | |||
rm/adams.html (the Public Electronic Reading Room). | |||
Sincerely, | |||
/RA/ | |||
Thomas R. Farnholtz, Chief | |||
Engineering Branch 1 | |||
Division of Reactor Safety | |||
Dockets: 50-416 | |||
Licenses: NPF-29 | |||
Enclosure: | |||
Information Request for Grand Gulf Nuclear Station Evaluations of Changes, Tests, or | |||
Experiments and Permanent Plant Modifications Inspection | |||
Electronic Distribution for Grand Gulf | |||
K. Mulligan -3- | |||
Electronic distribution by RIV: | |||
Regional Administrator (Elmo.Collins@nrc.gov) | |||
Deputy Regional Administrator (Steven.Reynolds@nrc.gov) | |||
DRP Director (Kriss.Kennedy@nrc.gov) | |||
Acting DRP Deputy Director (Michael.Scott@nrc.gov) | |||
Acting DRS Director (Tom.Blount@nrc.gov) | |||
Acting DRS Deputy Director (Jeff.Clark@nrc.gov) | |||
Senior Resident Inspector (Thomas.Hipschman@nrc.gov) | |||
Resident Inspector (Laura.Micewski@nrc.gov) | |||
Branch Chief, DRP/B (Neil.OKeefe@nrc.gov) | |||
Senior Project Engineer, DRP/B (Michael.Bloodgood@nrc.gov) | |||
Project Engineer, DRP/B (David.You@nrc.gov) | |||
DC Administrative Assistant (Madeleine.Arel-Davis@nrc.gov) | |||
Public Affairs Officer (Victor.Dricks@nrc.gov) | |||
Public Affairs Officer (Lara.Uselding@nrc.gov) | |||
Project Manager (Joseph.Sebrosky@nrc.gov) | |||
Branch Chief, DRS/TSB (Ray.Kellar@nrc.gov) | |||
RITS Coordinator (Marisa.Herrera@nrc.gov) | |||
Regional Counsel (Karla.Fuller@nrc.gov) | |||
Technical Support Assistant (Loretta.Williams@nrc.gov) | |||
Congressional Affairs Officer (Jenny.Weil@nrc.gov) | |||
OEMail Resource | |||
R:/REACTORS/GG 2013003 RFI-MRY ML13042A056 | |||
ADAMS: No Yes SUNSI Review Complete Reviewer Initials: MRY | |||
Publicly Available Non-Sensitive | |||
Non-publicly Available Sensitive | |||
EB1 C:EB1 | |||
M. Young T. Farnholtz | |||
/E/ /RA/ | |||
2/7/13 2/8/13 | |||
OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax | |||
Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications | |||
Inspection Dates: April 8 - April 19, 2013 | |||
Inspection Procedures: IP 71111.17 Evaluation of Changes, Tests, or Experiments and | |||
Permanent Plant Modifications | |||
Inspectors: Matthew Young, Reactor Inspector (Lead) | |||
Eduardo Uribe, Reactor Inspector | |||
(1)TBD | |||
Information Requested for sample selection and the In-Office Preparation Week | |||
The information in Section I and Section II should be sent to the Region IV office in hard copy or | |||
electronic format (Certrec database preferred), in care of Matt Young. To facilitate the selection | |||
of specific items that will be reviewed during the onsite inspection week, please submit Section I | |||
by March 11, 2013, and Section II by April 1, 2013. We ask that you categorize the documents | |||
in your response with the numbered list below. If requested documents are large and only hard | |||
copy formats are available, please inform the inspectors. If you have any questions regarding | |||
this information request, please call the lead inspector as soon as possible. | |||
Section I (Information by March 11, 2013) | |||
The first group lists information necessary for our initial inspection scoping. Upon review of | |||
these documents, the inspectors will select a number of samples greater than required sample | |||
size. This will allow for the inspectors to focus on the most safety significant requests. | |||
Note: Description of screenings should be of sufficient detail that inspectors can determine the | |||
significance of the issue. | |||
1. A list with descriptions, of all 10 CFR 50.59 screenings (or equivalent) performed since | |||
February 11, 2010, which did not result in an evaluation. | |||
2. A list with descriptions, of all 10 CFR 50.59 evaluations performed which did not result in | |||
an application for license amendment to NRC and meet the following criteria from | |||
February 11, 2010, to the present. | |||
* Updated Final Safety Analysis Report changes that have been updated in | |||
accordance with 10 CFR 50.71(e)(4) | |||
* Modifications that are field work complete | |||
* Changes to calculations that have been issued | |||
3. A list with descriptions of all permanent plant modifications dating from | |||
February 11, 2010. For this inspection, permanent plant modifications include | |||
permanent plant changes, design changes, setpoint changes, procedure changes, | |||
equivalency evaluations, suitability analyses, calculations, and commercial grade | |||
dedications. | |||
-1- Enclosure | |||
4. A list with descriptions of all Corrective Action documents related to 50.59 activities, | |||
including screenings and evaluations and your permanent plant modification program | |||
and its implementation since February 11, 2010. | |||
Section II (Information by April 1, 2013) | |||
The second group of documents requested is needed to support our in-office preparation week | |||
and our on-site inspection activities. It is also requested that corrective action documents and | |||
responses to questions developed during the inspection be provided to the inspector as the | |||
documents are generated. | |||
5. Complete documentation/packages pertaining to the requested 50.59 screens, 50.59 | |||
evaluations, modifications, and corrective action documents to support final sample | |||
selection. | |||
6. Grand Gulf Nuclear Station procedures for conducting 10 CFR 50.59 screenings and | |||
evaluations. | |||
7. A listing of personnel qualified to prepare 10 CFR 50.59 screenings and evaluations, | |||
including qualification dates. | |||
8. A listing of personnel qualified to review and approve 10 CFR 50.59 screenings and/or | |||
evaluations, including qualification dates. | |||
9. Grand Gulf Nuclear Station procedures for implementing and controlling permanent plant | |||
modifications. | |||
Inspector Contact Information: | |||
Matthew Young Eduardo Uribe | |||
Reactor Inspector Reactor Inspector | |||
817-200-1545 817-200-1534 | |||
Matt.Young@nrc.gov Eduardo.Uribe@nrc.gov | |||
Mailing Address: | |||
US NRC Region IV | |||
Attn: Matt Young | |||
1600 E. Lamar Blvd. | |||
Arlington, TX 76011-4511 | |||
-2- Enclosure | |||
}} | }} |
Latest revision as of 22:20, 4 November 2019
ML13042A056 | |
Person / Time | |
---|---|
Site: | Grand Gulf |
Issue date: | 02/08/2013 |
From: | Thomas Farnholtz Region 4 Engineering Branch 1 |
To: | Kevin Mulligan Entergy Operations |
References | |
Download: ML13042A056 (5) | |
See also: IR 05000416/2013003
Text
UNITE D S TATE S
NUC LEAR RE GULATOR Y C OMMI S SI ON
R E G IO N I V
1600 EAST LAMAR BLVD
AR L I NGTON , TEXAS 7 601 1- 4511
February 8, 2013
Site Vice President Operations
Entergy Operations, Inc.
Grand Gulf Nuclear Station
P.O. Box 756
Port Gibson, MS 39150
SUBJECT: GRAND GULF NUCLEAR STATION - NOTIFICATION OF INSPECTION (NRC
INSPECTION REPORT 05000416/2013003) AND REQUEST FOR
INFORMATION
Dear Mr. Mulligan
From April 8 - April 19, 2013, Reactor Inspectors from the U.S. Nuclear Regulatory
Commissions (NRC) Region IV office will perform the baseline inspection of changes, tests,
experiments, and permanent plant modifications at Grand Gulf Nuclear Station, using NRC
Inspection Procedure 71111.17, Evaluations of Changes, Tests, or Experiments and
Permanent Plant Modifications.
Experience has shown that this inspection is resource intensive both for the NRC inspectors
and your staff. In order to minimize the impact to your onsite resources and to ensure a
productive inspection, we have enclosed a request for documents needed for this inspection.
Upon review of these documents, the inspectors will select additional documentation for review
upon arrival. It is important that all of these documents are up to date and complete in order to
minimize the number of additional documents requested during the preparation and/or the
onsite portions of the inspection.
We have discussed the schedule for these inspection activities with your staff and understand
that our regulatory contact for this inspection will be Richard Scarbrough of your regulatory
affairs organization. If there are any questions about this inspection or the material requested,
please contact the lead inspector Matt Young at 817-200-1545 or by email
Matt.Young@nrc.gov.
This letter does not contain new or amended information collection requirements subject to the
Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information
collection requirements were approved by the Office of Management and Budget, control
number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to
respond to, a request for information or an information collection requirement unless the
requesting document displays a currently valid Office of Management and Budget control
number.
K. Mulligan -2-
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its
enclosure will be available electronically for public inspection in the NRC Public Document
Room or from the Publicly Available Records (PARS) component of NRC's document system
(ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-
rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Thomas R. Farnholtz, Chief
Engineering Branch 1
Division of Reactor Safety
Dockets: 50-416
Licenses: NPF-29
Enclosure:
Information Request for Grand Gulf Nuclear Station Evaluations of Changes, Tests, or
Experiments and Permanent Plant Modifications Inspection
Electronic Distribution for Grand Gulf
K. Mulligan -3-
Electronic distribution by RIV:
Regional Administrator (Elmo.Collins@nrc.gov)
Deputy Regional Administrator (Steven.Reynolds@nrc.gov)
DRP Director (Kriss.Kennedy@nrc.gov)
Acting DRP Deputy Director (Michael.Scott@nrc.gov)
Acting DRS Director (Tom.Blount@nrc.gov)
Acting DRS Deputy Director (Jeff.Clark@nrc.gov)
Senior Resident Inspector (Thomas.Hipschman@nrc.gov)
Resident Inspector (Laura.Micewski@nrc.gov)
Branch Chief, DRP/B (Neil.OKeefe@nrc.gov)
Senior Project Engineer, DRP/B (Michael.Bloodgood@nrc.gov)
Project Engineer, DRP/B (David.You@nrc.gov)
DC Administrative Assistant (Madeleine.Arel-Davis@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov)
Public Affairs Officer (Lara.Uselding@nrc.gov)
Project Manager (Joseph.Sebrosky@nrc.gov)
Branch Chief, DRS/TSB (Ray.Kellar@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov)
Technical Support Assistant (Loretta.Williams@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
OEMail Resource
R:/REACTORS/GG 2013003 RFI-MRY ML13042A056
ADAMS: No Yes SUNSI Review Complete Reviewer Initials: MRY
Publicly Available Non-Sensitive
Non-publicly Available Sensitive
EB1 C:EB1
M. Young T. Farnholtz
/E/ /RA/
2/7/13 2/8/13
OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax
Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications
Inspection Dates: April 8 - April 19, 2013
Inspection Procedures: IP 71111.17 Evaluation of Changes, Tests, or Experiments and
Permanent Plant Modifications
Inspectors: Matthew Young, Reactor Inspector (Lead)
Eduardo Uribe, Reactor Inspector
(1)TBD
Information Requested for sample selection and the In-Office Preparation Week
The information in Section I and Section II should be sent to the Region IV office in hard copy or
electronic format (Certrec database preferred), in care of Matt Young. To facilitate the selection
of specific items that will be reviewed during the onsite inspection week, please submit Section I
by March 11, 2013, and Section II by April 1, 2013. We ask that you categorize the documents
in your response with the numbered list below. If requested documents are large and only hard
copy formats are available, please inform the inspectors. If you have any questions regarding
this information request, please call the lead inspector as soon as possible.
Section I (Information by March 11, 2013)
The first group lists information necessary for our initial inspection scoping. Upon review of
these documents, the inspectors will select a number of samples greater than required sample
size. This will allow for the inspectors to focus on the most safety significant requests.
Note: Description of screenings should be of sufficient detail that inspectors can determine the
significance of the issue.
1. A list with descriptions, of all 10 CFR 50.59 screenings (or equivalent) performed since
February 11, 2010, which did not result in an evaluation.
2. A list with descriptions, of all 10 CFR 50.59 evaluations performed which did not result in
an application for license amendment to NRC and meet the following criteria from
February 11, 2010, to the present.
- Updated Final Safety Analysis Report changes that have been updated in
accordance with 10 CFR 50.71(e)(4)
- Modifications that are field work complete
- Changes to calculations that have been issued
3. A list with descriptions of all permanent plant modifications dating from
February 11, 2010. For this inspection, permanent plant modifications include
permanent plant changes, design changes, setpoint changes, procedure changes,
equivalency evaluations, suitability analyses, calculations, and commercial grade
dedications.
-1- Enclosure
4. A list with descriptions of all Corrective Action documents related to 50.59 activities,
including screenings and evaluations and your permanent plant modification program
and its implementation since February 11, 2010.
Section II (Information by April 1, 2013)
The second group of documents requested is needed to support our in-office preparation week
and our on-site inspection activities. It is also requested that corrective action documents and
responses to questions developed during the inspection be provided to the inspector as the
documents are generated.
5. Complete documentation/packages pertaining to the requested 50.59 screens, 50.59
evaluations, modifications, and corrective action documents to support final sample
selection.
6. Grand Gulf Nuclear Station procedures for conducting 10 CFR 50.59 screenings and
evaluations.
7. A listing of personnel qualified to prepare 10 CFR 50.59 screenings and evaluations,
including qualification dates.
8. A listing of personnel qualified to review and approve 10 CFR 50.59 screenings and/or
evaluations, including qualification dates.
9. Grand Gulf Nuclear Station procedures for implementing and controlling permanent plant
modifications.
Inspector Contact Information:
Matthew Young Eduardo Uribe
Reactor Inspector Reactor Inspector
817-200-1545 817-200-1534
Matt.Young@nrc.gov Eduardo.Uribe@nrc.gov
Mailing Address:
US NRC Region IV
Attn: Matt Young
1600 E. Lamar Blvd.
Arlington, TX 76011-4511
-2- Enclosure