| number = ML13042A056
| number = ML13042A056
| issue date = 02/08/2013
| issue date = 02/08/2013
| title = Grand Gulf Nuclear Station - Notification of Inspection (NRC Inspection Report 05000416-13-003) and Request for Information
| title = Notification of Inspection (NRC Inspection Report 05000416-13-003) and Request for Information
| author name = Farnholtz T R
| author name = Farnholtz T
| author affiliation = NRC/RGN-IV/DRS/EB-1
| author affiliation = NRC/RGN-IV/DRS/EB-1
| addressee name = Mulligan K
| addressee name = Mulligan K
Line 13: Line 13:
| page count = 5
| page count = 5
}}
}}
See also: [[followed by::IR 05000416/2013003]]
See also: [[see also::IR 05000416/2013003]]


=Text=
=Text=
{{#Wiki_filter: February 8, 2013 Kevin Mulligan  
{{#Wiki_filter:UNITE D S TATE S
Site Vice President Operations  
                                NUC LEAR RE GULATOR Y C OMMI S SI ON
Entergy Operations, Inc.  
                                                      R E G IO N I V
Grand Gulf Nuclear Station P.O. Box 756 Port Gibson, MS 39150  
                                                1600 EAST LAMAR BLVD
                                          AR L I NGTON , TEXAS 7 601 1- 4511
SUBJECT: GRAND GULF NUCLEAR STATION - NOTIFICATION OF INSPECTION (NRC INSPECTION REPORT 05000416/2013003) AND REQUEST FOR INFORMATION
                                                  February 8, 2013
Dear Mr. Mulligan  
Kevin Mulligan
Site Vice President Operations
From April 8 - April 19, 2013, Reactor Inspectors from the U.S. Nuclear Regulatory  
Entergy Operations, Inc.
Commission's (NRC) Region IV office will perform the baseline inspection of changes, tests, experiments, and permanent plant modifications at Grand Gulf Nuclear Station, using NRC Inspection Procedure 71111.17, "Evaluations of Changes, Tests, or Experiments and  
Grand Gulf Nuclear Station
Permanent Plant Modifications.
P.O. Box 756
Port Gibson, MS 39150
Experience has shown that this inspection is resource intensive both for the NRC inspectors and your staff. In order to minimize the impact to your onsite resources and to ensure a productive inspection, we have enclosed a request for documents needed for this inspection.
SUBJECT:       GRAND GULF NUCLEAR STATION - NOTIFICATION OF INSPECTION (NRC
Upon review of these documents, the inspectors will select additional documentation for review upon arrival. It is important that all of these documents are up to date and complete in order to  
                INSPECTION REPORT 05000416/2013003) AND REQUEST FOR
minimize the number of additional documents requested during the preparation and/or the onsite portions of the inspection. We have discussed the schedule for these inspection activities with your staff and understand  
                INFORMATION
that our regulatory contact for this inspection will be Richard Scarbrough of your regulatory  
Dear Mr. Mulligan
affairs organization. If there are any questions about this inspection or the material requested,  
From April 8 - April 19, 2013, Reactor Inspectors from the U.S. Nuclear Regulatory
please contact the lead inspector Matt Young at 817-200-1545 or by email Matt.Young@nrc.gov.
Commissions (NRC) Region IV office will perform the baseline inspection of changes, tests,
This letter does not contain new or amended information collection requirements subject to the  
experiments, and permanent plant modifications at Grand Gulf Nuclear Station, using NRC
Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information  
Inspection Procedure 71111.17, Evaluations of Changes, Tests, or Experiments and
collection requirements were approved by the Office of Management and Budget, control number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the  
Permanent Plant Modifications.
requesting document displays a currently valid Office of Management and Budget control number. UNITED STATESNUCLEAR REGULATORY COMMISSIONREGION IV1600 EAST LAMAR BLVDARLINGTON, TEXAS 76011-4511
Experience has shown that this inspection is resource intensive both for the NRC inspectors
K. Mulligan - 2 -  In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS).  ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). 
and your staff. In order to minimize the impact to your onsite resources and to ensure a
      Sincerely,  /RA/ 
productive inspection, we have enclosed a request for documents needed for this inspection.
      Thomas R. Farnholtz, Chief      Engineering Branch 1      Division of Reactor Safety
Upon review of these documents, the inspectors will select additional documentation for review
upon arrival. It is important that all of these documents are up to date and complete in order to
Dockets:  50-416
minimize the number of additional documents requested during the preparation and/or the
Licenses:  NPF-29  Enclosure: 
onsite portions of the inspection.
Information Request for Grand Gulf Nuclear Station Evaluations of Changes, Tests, or
We have discussed the schedule for these inspection activities with your staff and understand
Experiments and Permanent Plant Modifications Inspection
that our regulatory contact for this inspection will be Richard Scarbrough of your regulatory
affairs organization. If there are any questions about this inspection or the material requested,
Electronic Distribution for Grand Gulf   
please contact the lead inspector Matt Young at 817-200-1545 or by email
K. Mulligan -3-  Electronic distribution by RIV: Regional Administrator (Elmo.Collins@nrc.gov) Deputy Regional Administrator (Steven.Reynolds@nrc.gov)
Matt.Young@nrc.gov.
DRP Director (Kriss.Kennedy@nrc.gov)
This letter does not contain new or amended information collection requirements subject to the
Acting DRP Deputy Director (Michael.Scott@nrc.gov)
Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information
Acting DRS Director (Tom.Blount@nrc.gov)
collection requirements were approved by the Office of Management and Budget, control
Acting DRS Deputy Director (Jeff.Clark@nrc.gov) Senior Resident Inspector (Thomas.Hipschman@nrc.gov)  Resident Inspector (Laura.Micewski@nrc.gov)
number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to
Branch Chief, DRP/B (Neil.OKeefe@nrc.gov)
respond to, a request for information or an information collection requirement unless the
Senior Project Engineer, DRP/B (Michael.Bloodgood@nrc.gov)
requesting document displays a currently valid Office of Management and Budget control
Project Engineer, DRP/B (David.You@nrc.gov) DC Administrative Assistant (Madeleine.Arel-Davis@nrc.gov) Public Affairs Officer (Victor.Dricks@nrc.gov) Public Affairs Officer (Lara.Uselding@nrc.gov)
number.
Project Manager (Joseph.Sebrosky@nrc.gov)
Branch Chief, DRS/TSB (Ray.Kellar@nrc.gov) RITS Coordinator (Marisa.Herrera@nrc.gov) Regional Counsel (Karla.Fuller@nrc.gov)
Technical Support Assistant (Loretta.Williams@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
OEMail Resource
 
  R:/REACTORS/GG 2013003 RFI-MRY    ML13042A056  ADAMS:    No      Yes  SUNSI Review Complete Reviewer Initials: MRY    Publicly Available  Non-Sensitive    Non-publicly Available  Sensitive EB1  C:EB1 M. Young  T. Farnholtz /E/  /RA/ 2/7/13  2/8/13 OFFICIAL RECORD COPY                                        T=Telephone          E=E-mail        F=Fax 
  - 1 - Enclosure Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 
Inspection Dates:  April 8 - April 19, 2013
Inspection Procedures: IP 71111.17 "Evaluation of Changes, Tests, or Experiments and 
    Permanent Plant Modifications"  Inspectors:  Matthew Young, Reactor Inspector (Lead)
    Eduardo Uribe, Reactor Inspector
    (1)TBD
  Information Requested for sample selection and the In-Office Preparation Week  The information in Section I and Section II should be sent to the Region IV office in hard copy or
electronic format (Certrec database preferred), in care of Matt Young.  To facilitate the selection of specific items that will be reviewed during the onsite inspection week, please submit Section I by March 11, 2013, and Section II by April 1, 2013.  We ask that you categorize the documents in your response with the numbered list below.  If requested documents are large and only hard copy formats are available, please inform the inspectors.  If you have any questions regarding this information request, please call the lead inspector as soon as possible.
Section I (Information by March 11, 2013)  The first group lists information necessary for our initial inspection scoping.  Upon review of
these documents, the inspectors will select a number of samples greater than required sample
size. This will allow for the inspectors to focus on the most safety significant requests.  Note:  Description of screenings should be of sufficient detail that inspectors can determine the significance of the issue.
1. A list with descriptions, of all 10 CFR 50.59 screenings (or equivalent) performed since February 11, 2010, which did not result in an evaluation.
2. A list with descriptions, of all 10 CFR 50.59 evaluations performed which did not result in an application for license amendment to NRC and meet the following criteria from February 11, 2010, to the present.
* Updated Final Safety Analysis Report changes that have been updated in accordance with 10 CFR 50.71(e)(4) * Modifications that are field work complete * Changes to calculations that have been issued  3. A list with descriptions of all permanent plant modifications dating from February 11, 2010.  For this inspection, permanent plant modifications include permanent plant changes, design changes, setpoint changes, procedure changes, equivalency evaluations, suitability analyses, calculations, and commercial grade
dedications. 
- 2 - Enclosure 4. A list with descriptions of all Corrective Action documents related to 50.59 activities, including screenings and evaluations and your permanent plant modification program and its implementation since February 11, 2010.  Section II (Information by April 1, 2013)  The second group of documents requested is needed to support our in-office preparation week
and our on-site inspection activities.  It is also requested that corrective action documents and responses to questions developed during the inspection be provided to the inspector as the documents are generated.   
5. Complete documentation/packages pertaining to the requested 50.59 screens, 50.59 evaluations, modifications, and corrective action documents to support final sample selection.  6. Grand Gulf Nuclear Station procedures for conducting 10 CFR 50.59 screenings and evaluations.
7. A listing of personnel qualified to prepare 10 CFR 50.59 screenings and evaluations, including qualification dates.
8. A listing of personnel qualified to review and approve 10 CFR 50.59 screenings and/or evaluations, including qualification dates.
9. Grand Gulf Nuclear Station procedures for implementing and controlling permanent plant modifications. 
Inspector Contact Information:
Matthew Young  Eduardo Uribe  Reactor Inspector  Reactor Inspector
817-200-1545  817-200-1534
Matt.Young@nrc.gov  Eduardo.Uribe@nrc.gov 
Mailing Address: US NRC Region IV Attn: Matt Young
1600 E. Lamar Blvd.
Arlington, TX  76011-4511
 


K. Mulligan                                    -2-
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its
enclosure will be available electronically for public inspection in the NRC Public Document
Room or from the Publicly Available Records (PARS) component of NRC's document system
(ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-
rm/adams.html (the Public Electronic Reading Room).
                                              Sincerely,
                                                /RA/
                                              Thomas R. Farnholtz, Chief
                                              Engineering Branch 1
                                              Division of Reactor Safety
Dockets: 50-416
Licenses: NPF-29
Enclosure:
Information Request for Grand Gulf Nuclear Station Evaluations of Changes, Tests, or
Experiments and Permanent Plant Modifications Inspection
Electronic Distribution for Grand Gulf
K. Mulligan                                  -3-
Electronic distribution by RIV:
Regional Administrator (Elmo.Collins@nrc.gov)
Deputy Regional Administrator (Steven.Reynolds@nrc.gov)
DRP Director (Kriss.Kennedy@nrc.gov)
Acting DRP Deputy Director (Michael.Scott@nrc.gov)
Acting DRS Director (Tom.Blount@nrc.gov)
Acting DRS Deputy Director (Jeff.Clark@nrc.gov)
Senior Resident Inspector (Thomas.Hipschman@nrc.gov)
Resident Inspector (Laura.Micewski@nrc.gov)
Branch Chief, DRP/B (Neil.OKeefe@nrc.gov)
Senior Project Engineer, DRP/B (Michael.Bloodgood@nrc.gov)
Project Engineer, DRP/B (David.You@nrc.gov)
DC Administrative Assistant (Madeleine.Arel-Davis@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov)
Public Affairs Officer (Lara.Uselding@nrc.gov)
Project Manager (Joseph.Sebrosky@nrc.gov)
Branch Chief, DRS/TSB (Ray.Kellar@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov)
Technical Support Assistant (Loretta.Williams@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
OEMail Resource
R:/REACTORS/GG 2013003 RFI-MRY                                    ML13042A056
ADAMS:  No          Yes        SUNSI Review Complete      Reviewer Initials: MRY
                                    Publicly Available          Non-Sensitive
                                    Non-publicly Available      Sensitive
EB1                                                                  C:EB1
M. Young                                                              T. Farnholtz
/E/                                                                  /RA/
2/7/13                                                                  2/8/13
OFFICIAL RECORD COPY                                  T=Telephone      E=E-mail      F=Fax
    Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications
Inspection Dates:                April 8 - April 19, 2013
Inspection Procedures:          IP 71111.17 Evaluation of Changes, Tests, or Experiments and
                                Permanent Plant Modifications
Inspectors:                      Matthew Young, Reactor Inspector (Lead)
                                Eduardo Uribe, Reactor Inspector
                                (1)TBD
Information Requested for sample selection and the In-Office Preparation Week
The information in Section I and Section II should be sent to the Region IV office in hard copy or
electronic format (Certrec database preferred), in care of Matt Young. To facilitate the selection
of specific items that will be reviewed during the onsite inspection week, please submit Section I
by March 11, 2013, and Section II by April 1, 2013. We ask that you categorize the documents
in your response with the numbered list below. If requested documents are large and only hard
copy formats are available, please inform the inspectors. If you have any questions regarding
this information request, please call the lead inspector as soon as possible.
Section I (Information by March 11, 2013)
The first group lists information necessary for our initial inspection scoping. Upon review of
these documents, the inspectors will select a number of samples greater than required sample
size. This will allow for the inspectors to focus on the most safety significant requests.
Note: Description of screenings should be of sufficient detail that inspectors can determine the
significance of the issue.
    1. A list with descriptions, of all 10 CFR 50.59 screenings (or equivalent) performed since
        February 11, 2010, which did not result in an evaluation.
    2. A list with descriptions, of all 10 CFR 50.59 evaluations performed which did not result in
        an application for license amendment to NRC and meet the following criteria from
        February 11, 2010, to the present.
            *  Updated Final Safety Analysis Report changes that have been updated in
                accordance with 10 CFR 50.71(e)(4)
            *  Modifications that are field work complete
            *  Changes to calculations that have been issued
    3. A list with descriptions of all permanent plant modifications dating from
        February 11, 2010. For this inspection, permanent plant modifications include
        permanent plant changes, design changes, setpoint changes, procedure changes,
        equivalency evaluations, suitability analyses, calculations, and commercial grade
        dedications.
                                                  -1-                              Enclosure
    4. A list with descriptions of all Corrective Action documents related to 50.59 activities,
        including screenings and evaluations and your permanent plant modification program
        and its implementation since February 11, 2010.
Section II (Information by April 1, 2013)
The second group of documents requested is needed to support our in-office preparation week
and our on-site inspection activities. It is also requested that corrective action documents and
responses to questions developed during the inspection be provided to the inspector as the
documents are generated.
    5. Complete documentation/packages pertaining to the requested 50.59 screens, 50.59
        evaluations, modifications, and corrective action documents to support final sample
        selection.
    6. Grand Gulf Nuclear Station procedures for conducting 10 CFR 50.59 screenings and
        evaluations.
    7. A listing of personnel qualified to prepare 10 CFR 50.59 screenings and evaluations,
        including qualification dates.
    8. A listing of personnel qualified to review and approve 10 CFR 50.59 screenings and/or
        evaluations, including qualification dates.
    9. Grand Gulf Nuclear Station procedures for implementing and controlling permanent plant
        modifications.
Inspector Contact Information:
Matthew Young                  Eduardo Uribe
Reactor Inspector              Reactor Inspector
817-200-1545                    817-200-1534
Matt.Young@nrc.gov              Eduardo.Uribe@nrc.gov
Mailing Address:
US NRC Region IV
Attn: Matt Young
1600 E. Lamar Blvd.
Arlington, TX 76011-4511
                                                    -2-                            Enclosure
}}
}}

Latest revision as of 22:20, 4 November 2019

Notification of Inspection (NRC Inspection Report 05000416-13-003) and Request for Information
ML13042A056
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 02/08/2013
From: Thomas Farnholtz
Region 4 Engineering Branch 1
To: Kevin Mulligan
Entergy Operations
References
Download: ML13042A056 (5)


See also: IR 05000416/2013003

Text

UNITE D S TATE S

NUC LEAR RE GULATOR Y C OMMI S SI ON

R E G IO N I V

1600 EAST LAMAR BLVD

AR L I NGTON , TEXAS 7 601 1- 4511

February 8, 2013

Kevin Mulligan

Site Vice President Operations

Entergy Operations, Inc.

Grand Gulf Nuclear Station

P.O. Box 756

Port Gibson, MS 39150

SUBJECT: GRAND GULF NUCLEAR STATION - NOTIFICATION OF INSPECTION (NRC

INSPECTION REPORT 05000416/2013003) AND REQUEST FOR

INFORMATION

Dear Mr. Mulligan

From April 8 - April 19, 2013, Reactor Inspectors from the U.S. Nuclear Regulatory

Commissions (NRC) Region IV office will perform the baseline inspection of changes, tests,

experiments, and permanent plant modifications at Grand Gulf Nuclear Station, using NRC

Inspection Procedure 71111.17, Evaluations of Changes, Tests, or Experiments and

Permanent Plant Modifications.

Experience has shown that this inspection is resource intensive both for the NRC inspectors

and your staff. In order to minimize the impact to your onsite resources and to ensure a

productive inspection, we have enclosed a request for documents needed for this inspection.

Upon review of these documents, the inspectors will select additional documentation for review

upon arrival. It is important that all of these documents are up to date and complete in order to

minimize the number of additional documents requested during the preparation and/or the

onsite portions of the inspection.

We have discussed the schedule for these inspection activities with your staff and understand

that our regulatory contact for this inspection will be Richard Scarbrough of your regulatory

affairs organization. If there are any questions about this inspection or the material requested,

please contact the lead inspector Matt Young at 817-200-1545 or by email

Matt.Young@nrc.gov.

This letter does not contain new or amended information collection requirements subject to the

Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information

collection requirements were approved by the Office of Management and Budget, control

number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to

respond to, a request for information or an information collection requirement unless the

requesting document displays a currently valid Office of Management and Budget control

number.

K. Mulligan -2-

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its

enclosure will be available electronically for public inspection in the NRC Public Document

Room or from the Publicly Available Records (PARS) component of NRC's document system

(ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-

rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Thomas R. Farnholtz, Chief

Engineering Branch 1

Division of Reactor Safety

Dockets: 50-416

Licenses: NPF-29

Enclosure:

Information Request for Grand Gulf Nuclear Station Evaluations of Changes, Tests, or

Experiments and Permanent Plant Modifications Inspection

Electronic Distribution for Grand Gulf

K. Mulligan -3-

Electronic distribution by RIV:

Regional Administrator (Elmo.Collins@nrc.gov)

Deputy Regional Administrator (Steven.Reynolds@nrc.gov)

DRP Director (Kriss.Kennedy@nrc.gov)

Acting DRP Deputy Director (Michael.Scott@nrc.gov)

Acting DRS Director (Tom.Blount@nrc.gov)

Acting DRS Deputy Director (Jeff.Clark@nrc.gov)

Senior Resident Inspector (Thomas.Hipschman@nrc.gov)

Resident Inspector (Laura.Micewski@nrc.gov)

Branch Chief, DRP/B (Neil.OKeefe@nrc.gov)

Senior Project Engineer, DRP/B (Michael.Bloodgood@nrc.gov)

Project Engineer, DRP/B (David.You@nrc.gov)

DC Administrative Assistant (Madeleine.Arel-Davis@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Public Affairs Officer (Lara.Uselding@nrc.gov)

Project Manager (Joseph.Sebrosky@nrc.gov)

Branch Chief, DRS/TSB (Ray.Kellar@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov)

Technical Support Assistant (Loretta.Williams@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov)

OEMail Resource

R:/REACTORS/GG 2013003 RFI-MRY ML13042A056

ADAMS: No Yes SUNSI Review Complete Reviewer Initials: MRY

Publicly Available Non-Sensitive

Non-publicly Available Sensitive

EB1 C:EB1

M. Young T. Farnholtz

/E/ /RA/

2/7/13 2/8/13

OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax

Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications

Inspection Dates: April 8 - April 19, 2013

Inspection Procedures: IP 71111.17 Evaluation of Changes, Tests, or Experiments and

Permanent Plant Modifications

Inspectors: Matthew Young, Reactor Inspector (Lead)

Eduardo Uribe, Reactor Inspector

(1)TBD

Information Requested for sample selection and the In-Office Preparation Week

The information in Section I and Section II should be sent to the Region IV office in hard copy or

electronic format (Certrec database preferred), in care of Matt Young. To facilitate the selection

of specific items that will be reviewed during the onsite inspection week, please submit Section I

by March 11, 2013, and Section II by April 1, 2013. We ask that you categorize the documents

in your response with the numbered list below. If requested documents are large and only hard

copy formats are available, please inform the inspectors. If you have any questions regarding

this information request, please call the lead inspector as soon as possible.

Section I (Information by March 11, 2013)

The first group lists information necessary for our initial inspection scoping. Upon review of

these documents, the inspectors will select a number of samples greater than required sample

size. This will allow for the inspectors to focus on the most safety significant requests.

Note: Description of screenings should be of sufficient detail that inspectors can determine the

significance of the issue.

1. A list with descriptions, of all 10 CFR 50.59 screenings (or equivalent) performed since

February 11, 2010, which did not result in an evaluation.

2. A list with descriptions, of all 10 CFR 50.59 evaluations performed which did not result in

an application for license amendment to NRC and meet the following criteria from

February 11, 2010, to the present.

accordance with 10 CFR 50.71(e)(4)

  • Modifications that are field work complete
  • Changes to calculations that have been issued

3. A list with descriptions of all permanent plant modifications dating from

February 11, 2010. For this inspection, permanent plant modifications include

permanent plant changes, design changes, setpoint changes, procedure changes,

equivalency evaluations, suitability analyses, calculations, and commercial grade

dedications.

-1- Enclosure

4. A list with descriptions of all Corrective Action documents related to 50.59 activities,

including screenings and evaluations and your permanent plant modification program

and its implementation since February 11, 2010.

Section II (Information by April 1, 2013)

The second group of documents requested is needed to support our in-office preparation week

and our on-site inspection activities. It is also requested that corrective action documents and

responses to questions developed during the inspection be provided to the inspector as the

documents are generated.

5. Complete documentation/packages pertaining to the requested 50.59 screens, 50.59

evaluations, modifications, and corrective action documents to support final sample

selection.

6. Grand Gulf Nuclear Station procedures for conducting 10 CFR 50.59 screenings and

evaluations.

7. A listing of personnel qualified to prepare 10 CFR 50.59 screenings and evaluations,

including qualification dates.

8. A listing of personnel qualified to review and approve 10 CFR 50.59 screenings and/or

evaluations, including qualification dates.

9. Grand Gulf Nuclear Station procedures for implementing and controlling permanent plant

modifications.

Inspector Contact Information:

Matthew Young Eduardo Uribe

Reactor Inspector Reactor Inspector

817-200-1545 817-200-1534

Matt.Young@nrc.gov Eduardo.Uribe@nrc.gov

Mailing Address:

US NRC Region IV

Attn: Matt Young

1600 E. Lamar Blvd.

Arlington, TX 76011-4511

-2- Enclosure