ML13045A643: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(5 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML13045A643
| number = ML13045A643
| issue date = 02/25/2013
| issue date = 02/25/2013
| title = Three Mile Island Nuclear Station, Unit 1 - Request for Additional Information Regarding Relief Request VR-01, Associated with the Fifth Inservice Testing Interval (TAC No. ME9819)
| title = Request for Additional Information Regarding Relief Request VR-01, Associated with the Fifth Inservice Testing Interval
| author name = Bamford P J
| author name = Bamford P
| author affiliation = NRC/NRR/DORL/LPLI-2
| author affiliation = NRC/NRR/DORL/LPLI-2
| addressee name = Pacilio M J
| addressee name = Pacilio M
| addressee affiliation = Exelon Nuclear, Exelon Generation Co, LLC
| addressee affiliation = Exelon Nuclear, Exelon Generation Co, LLC
| docket = 05000289
| docket = 05000289
| license number =  
| license number =  
| contact person = Bamford P J
| contact person = Bamford P
| case reference number = TAC ME9819
| case reference number = TAC ME9819
| document type = Request for Additional Information (RAI), Letter
| document type = Request for Additional Information (RAI), Letter
| page count = 3
| page count = 3
| project = TAC:ME9819
| project = TAC:ME9819
| stage = Other
| stage = RAI
}}
}}


=Text=
=Text=
{{#Wiki_filter:UNITED NUCLEAR REGULATORY WASHINGTON, D.C. 20555*0001 February 25,2013 Mr. Michael J. Pacilio President and Chief Nuclear Officer Exelon Nuclear 4300 Winfield Road Warrenville,IL 60555 THREE MILE ISLAND NUCLEAR STATION, UNIT 1 -REQUEST FOR ADDITIONAL INFORMATION REGARDING RELIEF REQUESTVR-01, ASSOCIATED WITH THE FIFTH INSERVICE TESTING INTERVAL (TAC NO. ME9819) Dear Mr. Pacilio: By letter dated October 18, 2012 (Agencywide Documents Access and Management System Accession No. ML 12292A585), Exelon Generation Company, LLC (Exelon, the licensee) submitted a relief request, VR-01, associated with the fifth inservice testing interval at Three Mile Island Nuclear Station, Unit 1. The request proposes alternative testing, as compared to the requirements of the applicable American Society of Mechanical Engineers Code for Operation and Maintenance of Nuclear Power Plants, for the Pressurizer Pilot Operated Relief Valve. The Nuclear Regulatory Commission staff has been reviewing the submittal and has determined that additional information is needed to complete its review. The specific questions are found in the enclosed request for additional information (RAI). The questions were sent via electronic transmission on February 13, 2013, to Mr. Thomas Loomis, of your staff. The draft questions were sent to ensure that they were understandable, the regulatory basis was clear, and to determine if the information was previously docketed. The draft questions were discussed in a teleconference with your staff on February 20, 2013. It was agreed that a response to this RAI would be submitted by March 29, 2013. Please contact me at 301-415-2833, if you have any questions. Peter Bamford, Pr ject Manager Plant Licensing Branch 1-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. Request for Additional cc: Distribution via Listserv REQUEST FOR ADDITIONAL INFORMATION THREE MILE ISLAND NUCLEAR STATION, UNIT 1 RELIEF REQUEST VR-01, ASSOCIATED WITH THE FIFTH INSERVICE TESTING INTERVAL DOCKET NO. 50-289 By letter dated October 18, 2012 (Agencywide Documents Access and Management System Accession No. ML 12292A585), Exelon Generation Company, LLC (Exelon, the licensee) submitted a relief request, VR-01, associated with the fifth Inservice Testing (1ST) interval at Three Mile Island Nuclear Station, Unit 1 (TMI-1). The request proposes alternative testing, as compared to the requirements of the applicable American Society of Mechanical Engineers (ASME) Code for Operation and Maintenance of Nuclear Power Plants (OM Code), for the Pressurizer Pilot Operated Relief Valve (PORV). The U.S. Nuclear Regulatory Commission staff has been reviewing the submittal and has determined that additional information is needed to complete its review. The PORV, 1-RC-RV-2, is categorized as a BIC valve in the referenced request. In addition to the requirements of the OM Code, ISTC-3310 and ISTC-3510 (for which relief is being requested), are any other ASME OM Code ISTC or Mandatory Appendix I test requirements applicable to this valve? Please provide any specific ASME OM Code test requirements for this valve type, but don't provide general test requirements from the OM Code. Is the Pressurizer PORV block valve included in the TMI-1 1ST program? If not, please provide the basis for not including this valve in the program. Enclosure February 25, 2013 Mr. Michael J. Pacilio President and Chief Nuclear Officer Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555 THREE MILE ISLAND NUCLEAR STATION, UNIT 1 -REQUEST FOR ADDITIONAL INFORMATION REGARDING RELIEF REQUEST VR-01, ASSOCIATED WITH THE FIFTH INSERVICE TESTING INTERVAL (TAC NO. ME9819) Dear Mr. Pacilio: By letter dated October 18, 2012 (Agencywide Documents Access and Management System Accession No. ML 12292A585), Exelon Generation Company, LLC (Exelon, the licensee) submitted a relief request, VR-01, associated with the fifth inservice testing interval at Three Mile Island Nuclear Station, Unit 1. The request proposes alternative testing, as compared to the requirements of the applicable American Society of Mechanical Engineers Code for Operation and Maintenance of Nuclear Power Plants, for the Pressurizer Pilot Operated Relief Valve. The Nuclear Regulatory Commission staff has been reviewing the submittal and has determined that additional information is needed to complete its review. The specific questions are found in the enclosed request for additional information (RAI). The questions were sent via electronic transmission on February 13, 2013, to Mr. Thomas Loomis, of your staff. The draft questions were sent to ensure that they were understandable, the regulatory basis was clear, and to determine if the information was previously docketed. The draft questions were discussed in a teleconference with your staff on February 20, 2013. It was agreed that a response to this RAI would be submitted by March 29, 2013. Please contact me at 301-415-2833, if you have any questions. Sincerely, Iral Peter Bamford, Project Manager Plant Licensing Branch 1-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-289 Enclosure: Request for Additional Information cc: Distribution via Listserv DISTRIBUTION: RidsNrrPMThreeMilelsland Resource PUBLIC LPLI-2 RlF RidsAcrsAcnw MailCTR Resource RidsNrrLAABaxter Resource RidsOgcRp Resource RidsRgn1 MailCenter Resource RidsNrrDorlDpr Resource RidsNrrDorlLpl1-2 Resouce JBillerbeck, NRR RidsNrrDeEptb Resource ADAMS Accession Number' ML13045A643 .. via email OFFICE LPL1-2/PM LPL1-2/LA* DE/EPTB/BC LPLI-2/BC NAME PBamford ABaxter AMcMurtray" MKhanna DATE 02/20/13 02/22/13 02/12/13 02/25/13 OFFICIAL RECORD COpy
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555*0001 February 25,2013 Mr. Michael J. Pacilio President and Chief Nuclear Officer Exelon Nuclear 4300 Winfield Road Warrenville,IL 60555
}}
 
==SUBJECT:==
THREE MILE ISLAND NUCLEAR STATION, UNIT 1 - REQUEST FOR ADDITIONAL INFORMATION REGARDING RELIEF REQUESTVR-01, ASSOCIATED WITH THE FIFTH INSERVICE TESTING INTERVAL (TAC NO.
ME9819)
 
==Dear Mr. Pacilio:==
 
By letter dated October 18, 2012 (Agencywide Documents Access and Management System Accession No. ML12292A585), Exelon Generation Company, LLC (Exelon, the licensee) submitted a relief request, VR-01, associated with the fifth inservice testing interval at Three Mile Island Nuclear Station, Unit 1. The request proposes alternative testing, as compared to the requirements of the applicable American Society of Mechanical Engineers Code for Operation and Maintenance of Nuclear Power Plants, for the Pressurizer Pilot Operated Relief Valve.
The Nuclear Regulatory Commission staff has been reviewing the submittal and has determined that additional information is needed to complete its review. The specific questions are found in the enclosed request for additional information (RAI). The questions were sent via electronic transmission on February 13, 2013, to Mr. Thomas Loomis, of your staff. The draft questions were sent to ensure that they were understandable, the regulatory basis was clear, and to determine if the information was previously docketed. The draft questions were discussed in a teleconference with your staff on February 20, 2013. It was agreed that a response to this RAI would be submitted by March 29, 2013.
Please contact me at 301-415-2833, if you have any questions.
S~,~~~~~/
Peter Bamford, Pr ject Manager Plant Licensing Branch 1-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-289
 
==Enclosure:==
 
Request for Additional Information cc: Distribution via Listserv
 
REQUEST FOR ADDITIONAL INFORMATION THREE MILE ISLAND NUCLEAR STATION, UNIT 1 RELIEF REQUEST VR-01, ASSOCIATED WITH THE FIFTH INSERVICE TESTING INTERVAL DOCKET NO. 50-289 By letter dated October 18, 2012 (Agencywide Documents Access and Management System Accession No. ML12292A585), Exelon Generation Company, LLC (Exelon, the licensee) submitted a relief request, VR-01, associated with the fifth Inservice Testing (1ST) interval at Three Mile Island Nuclear Station, Unit 1 (TMI-1). The request proposes alternative testing, as compared to the requirements of the applicable American Society of Mechanical Engineers (ASME) Code for Operation and Maintenance of Nuclear Power Plants (OM Code), for the Pressurizer Pilot Operated Relief Valve (PORV). The U.S. Nuclear Regulatory Commission staff has been reviewing the submittal and has determined that additional information is needed to complete its review.
1.)    The PORV, 1-RC-RV-2, is categorized as a BIC valve in the referenced request. In addition to the requirements of the OM Code, ISTC-3310 and ISTC-3510 (for which relief is being requested), are any other ASME OM Code ISTC or Mandatory Appendix I test requirements applicable to this valve? Please provide any specific ASME OM Code test requirements for this valve type, but don't provide general test requirements from the OM Code.
2.)    Is the Pressurizer PORV block valve included in the TMI-1 1ST program? If not, please provide the basis for not including this valve in the program.
Enclosure
 
February 25, 2013 Mr. Michael J. Pacilio President and Chief Nuclear Officer Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555
 
==SUBJECT:==
THREE MILE ISLAND NUCLEAR STATION, UNIT 1 - REQUEST FOR ADDITIONAL INFORMATION REGARDING RELIEF REQUEST VR-01, ASSOCIATED WITH THE FIFTH INSERVICE TESTING INTERVAL (TAC NO.
ME9819)
 
==Dear Mr. Pacilio:==
 
By letter dated October 18, 2012 (Agencywide Documents Access and Management System Accession No. ML12292A585), Exelon Generation Company, LLC (Exelon, the licensee) submitted a relief request, VR-01, associated with the fifth inservice testing interval at Three Mile Island Nuclear Station, Unit 1. The request proposes alternative testing, as compared to the requirements of the applicable American Society of Mechanical Engineers Code for Operation and Maintenance of Nuclear Power Plants, for the Pressurizer Pilot Operated Relief Valve.
The Nuclear Regulatory Commission staff has been reviewing the submittal and has determined that additional information is needed to complete its review. The specific questions are found in the enclosed request for additional information (RAI). The questions were sent via electronic transmission on February 13, 2013, to Mr. Thomas Loomis, of your staff. The draft questions were sent to ensure that they were understandable, the regulatory basis was clear, and to determine if the information was previously docketed. The draft questions were discussed in a teleconference with your staff on February 20, 2013. It was agreed that a response to this RAI would be submitted by March 29, 2013.
Please contact me at 301-415-2833, if you have any questions.
Sincerely, Iral Peter Bamford, Project Manager Plant Licensing Branch 1-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-289
 
==Enclosure:==
 
Request for Additional Information cc: Distribution via Listserv DISTRIBUTION:
RidsNrrPMThreeMilelsland Resource       PUBLIC                           LPLI-2 RlF RidsAcrsAcnw MailCTR Resource           RidsNrrLAABaxter Resource       RidsOgcRp Resource RidsRgn1 MailCenter Resource           RidsNrrDorlDpr Resource         RidsNrrDorlLpl1-2 Resouce JBillerbeck, NRR                       RidsNrrDeEptb Resource ADAMS Accession Number' ML13045A643 .. via email OFFICE       LPL1-2/PM     LPL1-2/LA*     DE/EPTB/BC         LPLI-2/BC NAME       PBamford       ABaxter       AMcMurtray"       MKhanna DATE         02/20/13       02/22/13         02/12/13         02/25/13 OFFICIAL RECORD COpy}}

Latest revision as of 23:05, 4 November 2019

Request for Additional Information Regarding Relief Request VR-01, Associated with the Fifth Inservice Testing Interval
ML13045A643
Person / Time
Site: Three Mile Island Constellation icon.png
Issue date: 02/25/2013
From: Peter Bamford
Plant Licensing Branch 1
To: Pacilio M
Exelon Nuclear, Exelon Generation Co
Bamford P
References
TAC ME9819
Download: ML13045A643 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555*0001 February 25,2013 Mr. Michael J. Pacilio President and Chief Nuclear Officer Exelon Nuclear 4300 Winfield Road Warrenville,IL 60555

SUBJECT:

THREE MILE ISLAND NUCLEAR STATION, UNIT 1 - REQUEST FOR ADDITIONAL INFORMATION REGARDING RELIEF REQUESTVR-01, ASSOCIATED WITH THE FIFTH INSERVICE TESTING INTERVAL (TAC NO.

ME9819)

Dear Mr. Pacilio:

By letter dated October 18, 2012 (Agencywide Documents Access and Management System Accession No. ML12292A585), Exelon Generation Company, LLC (Exelon, the licensee) submitted a relief request, VR-01, associated with the fifth inservice testing interval at Three Mile Island Nuclear Station, Unit 1. The request proposes alternative testing, as compared to the requirements of the applicable American Society of Mechanical Engineers Code for Operation and Maintenance of Nuclear Power Plants, for the Pressurizer Pilot Operated Relief Valve.

The Nuclear Regulatory Commission staff has been reviewing the submittal and has determined that additional information is needed to complete its review. The specific questions are found in the enclosed request for additional information (RAI). The questions were sent via electronic transmission on February 13, 2013, to Mr. Thomas Loomis, of your staff. The draft questions were sent to ensure that they were understandable, the regulatory basis was clear, and to determine if the information was previously docketed. The draft questions were discussed in a teleconference with your staff on February 20, 2013. It was agreed that a response to this RAI would be submitted by March 29, 2013.

Please contact me at 301-415-2833, if you have any questions.

S~,~~~~~/

Peter Bamford, Pr ject Manager Plant Licensing Branch 1-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-289

Enclosure:

Request for Additional Information cc: Distribution via Listserv

REQUEST FOR ADDITIONAL INFORMATION THREE MILE ISLAND NUCLEAR STATION, UNIT 1 RELIEF REQUEST VR-01, ASSOCIATED WITH THE FIFTH INSERVICE TESTING INTERVAL DOCKET NO. 50-289 By letter dated October 18, 2012 (Agencywide Documents Access and Management System Accession No. ML12292A585), Exelon Generation Company, LLC (Exelon, the licensee) submitted a relief request, VR-01, associated with the fifth Inservice Testing (1ST) interval at Three Mile Island Nuclear Station, Unit 1 (TMI-1). The request proposes alternative testing, as compared to the requirements of the applicable American Society of Mechanical Engineers (ASME) Code for Operation and Maintenance of Nuclear Power Plants (OM Code), for the Pressurizer Pilot Operated Relief Valve (PORV). The U.S. Nuclear Regulatory Commission staff has been reviewing the submittal and has determined that additional information is needed to complete its review.

1.) The PORV, 1-RC-RV-2, is categorized as a BIC valve in the referenced request. In addition to the requirements of the OM Code, ISTC-3310 and ISTC-3510 (for which relief is being requested), are any other ASME OM Code ISTC or Mandatory Appendix I test requirements applicable to this valve? Please provide any specific ASME OM Code test requirements for this valve type, but don't provide general test requirements from the OM Code.

2.) Is the Pressurizer PORV block valve included in the TMI-1 1ST program? If not, please provide the basis for not including this valve in the program.

Enclosure

February 25, 2013 Mr. Michael J. Pacilio President and Chief Nuclear Officer Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

THREE MILE ISLAND NUCLEAR STATION, UNIT 1 - REQUEST FOR ADDITIONAL INFORMATION REGARDING RELIEF REQUEST VR-01, ASSOCIATED WITH THE FIFTH INSERVICE TESTING INTERVAL (TAC NO.

ME9819)

Dear Mr. Pacilio:

By letter dated October 18, 2012 (Agencywide Documents Access and Management System Accession No. ML12292A585), Exelon Generation Company, LLC (Exelon, the licensee) submitted a relief request, VR-01, associated with the fifth inservice testing interval at Three Mile Island Nuclear Station, Unit 1. The request proposes alternative testing, as compared to the requirements of the applicable American Society of Mechanical Engineers Code for Operation and Maintenance of Nuclear Power Plants, for the Pressurizer Pilot Operated Relief Valve.

The Nuclear Regulatory Commission staff has been reviewing the submittal and has determined that additional information is needed to complete its review. The specific questions are found in the enclosed request for additional information (RAI). The questions were sent via electronic transmission on February 13, 2013, to Mr. Thomas Loomis, of your staff. The draft questions were sent to ensure that they were understandable, the regulatory basis was clear, and to determine if the information was previously docketed. The draft questions were discussed in a teleconference with your staff on February 20, 2013. It was agreed that a response to this RAI would be submitted by March 29, 2013.

Please contact me at 301-415-2833, if you have any questions.

Sincerely, Iral Peter Bamford, Project Manager Plant Licensing Branch 1-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-289

Enclosure:

Request for Additional Information cc: Distribution via Listserv DISTRIBUTION:

RidsNrrPMThreeMilelsland Resource PUBLIC LPLI-2 RlF RidsAcrsAcnw MailCTR Resource RidsNrrLAABaxter Resource RidsOgcRp Resource RidsRgn1 MailCenter Resource RidsNrrDorlDpr Resource RidsNrrDorlLpl1-2 Resouce JBillerbeck, NRR RidsNrrDeEptb Resource ADAMS Accession Number' ML13045A643 .. via email OFFICE LPL1-2/PM LPL1-2/LA* DE/EPTB/BC LPLI-2/BC NAME PBamford ABaxter AMcMurtray" MKhanna DATE 02/20/13 02/22/13 02/12/13 02/25/13 OFFICIAL RECORD COpy