ML13080A408: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(5 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML13080A408
| number = ML13080A408
| issue date = 03/20/2013
| issue date = 03/20/2013
| title = Diablo Canyon Power Plant Units 1 and 2 - Notification of Inspection (Nrc Inspection Report 05000275-13-003, 05000323-13-003) and Request for Information
| title = Notification of Inspection (NRC Inspection Report 05000275-13-003, 05000323-13-003) and Request for Information
| author name = Gaddy V G
| author name = Gaddy V
| author affiliation = NRC/RGN-IV/DRS/OB
| author affiliation = NRC/RGN-IV/DRS/OB
| addressee name = Halpin E D
| addressee name = Halpin E
| addressee affiliation = Pacific Gas & Electric Co
| addressee affiliation = Pacific Gas & Electric Co
| docket = 05000275, 05000323
| docket = 05000275, 05000323
Line 14: Line 14:
| page count = 7
| page count = 7
}}
}}
See also: [[followed by::IR 05000275/2013003]]
See also: [[see also::IR 05000275/2013003]]


=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:UNITE D S TATE S
[[Issue date::March 20, 2013]]
                                  NUC LEAR RE GULATOR Y C OMMI S SI ON
                                                    R E G IO N I V
                                              1600 EAST LAMAR BLVD
                                        AR L I NGTON , TEXAS 7 601 1- 4511
                                                March 20, 2013
Mr. Edward D. Halpin
Senior Vice President and
  Chief Nuclear Officer
Pacific Gas and Electric Company
Diablo Canyon Power Plant
P.O. Box 56, Mail Code 104/6
Avila Beach, CA 93424
SUBJECT:       DIABLO CANYON POWER PLANT UNITS 1 AND 2 - NOTIFICATION OF
                INSPECTION (NRC INSPECTION REPORT 05000275/2013003,
                05000323/2013003) AND REQUEST FOR INFORMATION
Dear Mr. Halpin:
From May 20-24, 2013, inspectors from the U.S. Nuclear Regulatory Commissions (NRC)
Region IV office will perform the baseline biennial requalification inspection at Diablo Canyon
Power Plant Units 1 and 2, using NRC Inspection Procedure 71111.11B, Licensed Operator
Requalification Program. Experience has shown that this inspection is a resource intensive
inspection both for the NRC inspectors and your staff. In order to minimize the impact to your
onsite resources and to ensure a productive inspection, we have enclosed a request for
documents needed for this inspection. These documents have been divided into three groups.
The first group (Section A of the enclosure) identifies information to be provided prior to the
inspection to ensure that the inspectors are adequately prepared. The second group (Section B
of the enclosure) identifies the information the inspectors will need upon arrival at the site. The
third group (Section C of the enclosure) identifies the items which are necessary to close out the
inspection and are usually sent a few weeks after the team has left the site. It is important that
all of these documents are up to date and complete in order to minimize the number of
additional documents requested during the preparation and/or the onsite portions of the
inspection.
We have discussed the schedule for these inspection activities with your staff and understand
that our regulatory contact for this inspection will be Mr. John Becerra of your training
organization. Our inspection dates are subject to change based on your updated schedule of
examination activities. If there are any questions about this inspection or the material
requested, please contact the lead inspector Thomas Farina at 817-200-1117
(thomas.farina@nrc.gov) or Brian Larson at (817) 200-1172 (brian.larson@nrc.gov).


Mr. Edward Senior Vice President and Chief Nuclear Officer Pacific Gas and Electric Company Diablo Canyon Power Plant P.O. Box 56, Mail Code 104/6 Avila Beach, CA 93424
E. Halpin                                    -2-
 
This letter does not contain new or amended information collection requirements subject to the
SUBJECT: DIABLO CANYON POWER PLANT UNITS 1 AND 2 - NOTIFICATION OF INSPECTION (NRC INSPECTION REPORT 05000275/2013003, 05000323/2013003) AND REQUEST FOR INFORMATION
Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection
 
requirements were approved by the Office of Management and Budget, control
==Dear Mr. Halpin:==
number 3150-0018. The NRC may not conduct or sponsor, and a person is not required to
From May 20-24, 2013, inspectors from the U.S. Nuclear Regulatory Commission's (NRC)
respond to, a request for information or an information collection requirement unless the
Region IV office will perform the baseline biennial requalification inspection at Diablo Canyon Power Plant Units 1 and 2, using NRC Inspection Procedure 71111.11B, "Licensed Operator Requalification Program." Experience has shown that this inspection is a resource intensive inspection both for the NRC inspectors and your staff. In order to minimize the impact to your onsite resources and to ensure a productive inspection, we have enclosed a request for documents needed for this inspection. These documents have been divided into three groups.
requesting document displays a currently valid Office of Management and Budget control
number.
In accordance with 10 CFR 2.390 of the NRCs "Rules of Practice," a copy of this letter and its
enclosure will be available electronically for public inspection in the NRC Public Document
Room or from the Publicly Available Records (PARS) component of NRCs document
system (ADAMS). ADAMS is accessible from the NRC web site at http://www.nrc.gov/reading-
rm/adams.html (the Public Electronic Reading Room).
                                                        Sincerely,
                                                          /RA/
                                                        Vincent Gaddy, Chief
                                                        Operations Branch
                                                        Division of Reactor Safety
Docket: 05000275; 05000323
License: DPR-80; DPR-82
Enclosure:
Biennial Requalification Inspection Document Request


The first group (Section A of the enclosure) identifies information to be provided prior to the inspection to ensure that the inspectors are adequately prepared. The second group (Section B of the enclosure) identifies the information the inspectors will need upon arrival at the site. The third group (Section C of the enclosure) identifies the items which are necessary to close out the inspection and are usually sent a few weeks after the team has left the site. It is important that all of these documents are up to date and complete in order to minimize the number of additional documents requested during the preparation and/or the onsite portions of the inspection.
E. Halpin                                  -3-
Electronic distribution by RIV:
Regional Administrator (Elmo.Collins@nrc.gov)
Deputy Regional Administrator (Robert.Lewis@nrc.gov)
DRP Director (Kriss.Kennedy@nrc.gov)
Acting DRP Deputy Director (Michael.Scott@nrc.gov)
DRS Director (Tom.Blount@nrc.gov)
Acting DRS Deputy Director (Jeff.Clark@nrc.gov)
Senior Resident Inspector (Thomas.Hipschman@nrc.gov)
Resident Inspector (Laura.Micewski@nrc.gov)
Branch Chief, DRP/B (Neil.OKeefe@nrc.gov)
Senior Project Engineer, DRP/B (Michael.Bloodgood@nrc.gov)
Project Engineer, DRP/B (David.You@nrc.gov)
DC Administrative Assistant (Madeleine.Arel-Davis@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov)
Public Affairs Officer (Lara.Uselding@nrc.gov)
Project Manager (Joseph.Sebrosky@nrc.gov)
Branch Chief, DRS/TSB (Ray.Kellar@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov)
Technical Support Assistant (Loretta.Williams@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
SUNSI Review Completed: ___Y___              ADAMS:  Yes        No  Initials: VGG_
Publicly Available        Non-Publicly Available    Sensitive      Non-Sensitive
S:\DRS\REPORTS\Reports Drafts\DC 2013 BRQ RFI Letter.docx                ML13080A408
SOE:OB                C:OB
TFarina              VGaddy
/RA/                  /RA/
3/20/13              3/20/13
OFFICIAL RECORD COPY T=Telephone                  E=E-mail    F=Fax


We have discussed the schedule for these inspection activities with your staff and understand that our regulatory contact for this inspection will be Mr. John Becerra of your training organization. Our inspection dates are subject to change based on your updated schedule of examination activities. If there are any questions about this inspection or the material requested, please contact the lead inspector Thomas Farina at 817-200-1117 (thomas.farina@nrc.gov) or Brian Larson at (817) 200-1172 (brian.larson@nrc.gov). This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, control number 3150-0018. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control number. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
              BIENNIAL REQUALIFICATION INSPECTION DOCUMENT REQUEST
From: Thomas Farina
        Operations Engineer, NRC RIV
        817-200-1117
To:    John Becerra
        Exam Development and Simulator Support Supervisor, Diablo Canyon Power Plant
        805-545-4006
Subj: Information Request to Support May 20 - 24, 2013, Licensed Operator Requalification
        Program Inspection (IP 71111.11B)
A. The following information is requested in order to support inspection preparation
    activities. These items are listed by section as they appear in the inspection module
    (ie 2.02, 2.04, etc). Requested materials should be sent either electronically or
    hardcopy in order to arrive at the Region IV office no later than May 10, 2013.
    *  Electronically to:  thomas.farina@nrc.gov
                      cc:    brian.larson@nrc.gov
                            duane.strickland@nrc.gov
    *  Hardcopy to: US Nuclear Regulatory Commission, Region IV
                        1600 E. Lamar Blvd
                        Arlington, TX 76011
                        ATTN: Thomas Farina
    General Requests:
        * List of licensed operators (SRO & RO) by crew (operating & staff)
        * Training and Operations Department organization charts (with qualified LOR
            evaluators identified)
        * Procedures that identify process for revising and maintaining LO continuing training
            program up to date
        * List of outstanding LOR program changes
        * List of plant events and industry operating experience incorporated into LOR
            program since last BRQ
        * Audits and/or self-assessment reports addressing the licensed operator
            requalification training program
        * Last two years of simulator review committee (or equivalent) meeting minutes
        * Last two years of CRC (or equivalent) meeting minutes
    02.03: Biennial Requalification Written Examination Quality
        * The current and approved biennial written examination schedule
        * The current requalification cycle written examination results for both SRO & RO that
            have already been administered up to the week prior to the inspection team arrival
            onsite.
                                            -1-                                     Enclosure


Sincerely,/RA/ Vincent Gaddy, Chief Operations Branch Division of Reactor Safety
  *  All written examinations that have been approved for administration up to and
      including the week before the inspection team is onsite. This will need to have
      adequate password protection if e-mailed or double envelope protection if mailed via
      regular mail per NUREG-1021.
  *  The current requalification cycle examination methodology (sample plan)
02.04: Annual Requalification Operating Test Quality
  * The schedule for the operating tests (JPMs & scenarios) to be given the week of
      May 20, 2013.
  * The operating tests (JPMs & scenarios) (password protected and provide separately
      via telephone at later date) to be given the week of May 20, 2013.
  * Current requalification cycle operating tests (SRO & RO) and results up to the week
      prior to the inspection team arrival onsite.
  * All of the previous years NRC required annual operating tests.
  * Current requalification cycle operating test methodology (sample plan)
  * All portions of the UFSAR that identify operator response times for time critical
      operator actions
02.05: Licensee Admin of Requal Exams
  *  All procedures used to administer the annual operating test
  *  All procedures used to assess operator performance
  *  All procedures that describe conduct of simulator training
  *  All Procedures used to test, operate, and maintain the simulator
02.06: Requalification Examination Security
  * Submit any tracking tools that you use as a means to prevent excessive overlap on
      the written examinations and also meet the intent of sampling all required topics on a
      periodic basis.
  * Submit any tracking tools that you use as a means to prevent excessive overlap on
      the operating tests and also meet the intent of sampling all required malfunctions
      (including major events, instrument/component malfunctions, TS calls, etc) on a
      periodic basis.
  * All Procedures that describe examination security, including procedures used to
      develop the examinations that include guidelines on overlap between examinations
      in current exam cycle tests and prior year examinations
  * List of all Condition Reports since the last biennial requal inspection related to
      examination security and overlap
02.07: Licensee Remedial Training Program
  * List of remedial training conducted or planned since last requal exams (includes
      training provided to operators to enable passing requal exams and training provided
      to correct generic or individual weaknesses observed during previous requal exam
      cycle)
  * Remediation plans (lesson plans, reference materials, and attendance
      documentation)
                                        -2-                                      Enclosure


Docket: 05000275; 05000323 License: DPR-80; DPR-82
  02.08: Conformance with Operator License Conditions
      * All Procedures and Program documentation for maintaining active operator licenses,
          tracking training attendance, and ensuring medical fitness of licensed operators
      * All Procedures and associated documentation that supports reactivation of any
          SRO/RO license (operating or staff crew) since the last biennial inspection
  02.09: Simulator Performance
      * All Simulator Management and Configuration Procedures if not already provided for
          section 02.05 above.
      * Simulator Discrepancy Report summary list for all open DRs. For closed DRs,
          summary list for those items closed between April 8, 2011 and May 19, 2013.
  02.10: Problem Identification and Resolution
      * A summary report of all condition reports related to operator actions/errors in the
          control room
      * Any revised requalification training that was based on licensed operator performance
          issues
B. The following information is requested in order to support the onsite inspection
  activities. Requested materials should be available to the inspection team, either
  electronically or hardcopy, upon site arrival on May 20, 2013.
  02.02: Exam Results / 02.03 and 02.04: Written Exam and Op Test Quality
      * All Operating tests (JPMs & scenarios) to be given in all subsequent weeks after
          onsite week
      * All results up to the day the team leaves the site.
  02.08:  Conformance with Operator License Conditions
      *  Access to licensed operators records (operating and staff crews)
      *  Access to licensed operators training attendance records
      *  Access to licensed operators medical records
  02.09: Simulator Performance
      * Simulator discrepancies (DRs) from April 8, 2011 to May 19, 2013. This should
          include all open DRs and DRs that have been closed, including the
          documentation/justification for closure.
      * Acceptance test documentation, including hardware and software model revisions at
          the time of acceptance (as available).
      * Documentation that validates current models, including the thermal-hydraulics and
          neutronics models, to the actual plant.
      * All current model deficiencies, including FSAR vs Design differences in the simulator
          (any documentation on this)
      * Summary list of modifications from April 8, 2011 to May 19, 2013.
      * Plant Modifications (both hardware and software) completed on the Simulator by due
          date from April 8, 2011 to May 19, 2013.
      * Simulator Differences Lesson plan used in training (current to May 19, 2013).
                                            -3-                                     Enclosure


===Enclosure:===
      *  The complete book of all Simulator annual performance test packages (usually in a
Biennial Requalification Inspection Document Request
          single book, but may be electronic or in single test packages), complete with all
          transient tests, steady state tests, and malfunction tests. This should also include the
          test procedures for each test, the acceptance criteria, and results. For each transient
          test, the reference chart should be included or an equivalent subject matter expert
          review versus the simulator results with a write-up for any differences beyond the
          ANSI 3.5 standard requirements.
      *  All test packages used to verify core physics parameters (such as MTC, IRW). The
          applicable reference graphs from the Plant physics data book (electronic or other
          means as available) should also be included as well as the test procedures used and
          the acceptance criteria with results.
      *  All Simulator test, configuration management, and related documents available in the
          room for inspectors to review. This includes training needs analysis packages,
          simulator review committee meeting minutes, etc.
      *  Current copy of ANSI 3.5 standard you are committed to for Simulator testing.
  02.10: Problem Identification and Resolution
      * All condition reports related to operator actions/errors in the control room
C. Diablo Canyon Power Plant is required to send the final results summary and any
  remaining exams and operating tests that have not been reviewed to the regional
  office lead inspector for this inspection for final review and comparison against the
  Significance Determination Tools in order to communicate the exit results for the
  inspection.
                                            -4-                                        Enclosure
}}
}}

Latest revision as of 21:28, 4 November 2019

Notification of Inspection (NRC Inspection Report 05000275-13-003, 05000323-13-003) and Request for Information
ML13080A408
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 03/20/2013
From: Vincent Gaddy
Operations Branch IV
To: Halpin E
Pacific Gas & Electric Co
References
IR-13-003
Download: ML13080A408 (7)


See also: IR 05000275/2013003

Text

UNITE D S TATE S

NUC LEAR RE GULATOR Y C OMMI S SI ON

R E G IO N I V

1600 EAST LAMAR BLVD

AR L I NGTON , TEXAS 7 601 1- 4511

March 20, 2013

Mr. Edward D. Halpin

Senior Vice President and

Chief Nuclear Officer

Pacific Gas and Electric Company

Diablo Canyon Power Plant

P.O. Box 56, Mail Code 104/6

Avila Beach, CA 93424

SUBJECT: DIABLO CANYON POWER PLANT UNITS 1 AND 2 - NOTIFICATION OF

INSPECTION (NRC INSPECTION REPORT 05000275/2013003,

05000323/2013003) AND REQUEST FOR INFORMATION

Dear Mr. Halpin:

From May 20-24, 2013, inspectors from the U.S. Nuclear Regulatory Commissions (NRC)

Region IV office will perform the baseline biennial requalification inspection at Diablo Canyon

Power Plant Units 1 and 2, using NRC Inspection Procedure 71111.11B, Licensed Operator

Requalification Program. Experience has shown that this inspection is a resource intensive

inspection both for the NRC inspectors and your staff. In order to minimize the impact to your

onsite resources and to ensure a productive inspection, we have enclosed a request for

documents needed for this inspection. These documents have been divided into three groups.

The first group (Section A of the enclosure) identifies information to be provided prior to the

inspection to ensure that the inspectors are adequately prepared. The second group (Section B

of the enclosure) identifies the information the inspectors will need upon arrival at the site. The

third group (Section C of the enclosure) identifies the items which are necessary to close out the

inspection and are usually sent a few weeks after the team has left the site. It is important that

all of these documents are up to date and complete in order to minimize the number of

additional documents requested during the preparation and/or the onsite portions of the

inspection.

We have discussed the schedule for these inspection activities with your staff and understand

that our regulatory contact for this inspection will be Mr. John Becerra of your training

organization. Our inspection dates are subject to change based on your updated schedule of

examination activities. If there are any questions about this inspection or the material

requested, please contact the lead inspector Thomas Farina at 817-200-1117

(thomas.farina@nrc.gov) or Brian Larson at (817) 200-1172 (brian.larson@nrc.gov).

E. Halpin -2-

This letter does not contain new or amended information collection requirements subject to the

Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection

requirements were approved by the Office of Management and Budget, control

number 3150-0018. The NRC may not conduct or sponsor, and a person is not required to

respond to, a request for information or an information collection requirement unless the

requesting document displays a currently valid Office of Management and Budget control

number.

In accordance with 10 CFR 2.390 of the NRCs "Rules of Practice," a copy of this letter and its

enclosure will be available electronically for public inspection in the NRC Public Document

Room or from the Publicly Available Records (PARS) component of NRCs document

system (ADAMS). ADAMS is accessible from the NRC web site at http://www.nrc.gov/reading-

rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Vincent Gaddy, Chief

Operations Branch

Division of Reactor Safety

Docket: 05000275; 05000323

License: DPR-80; DPR-82

Enclosure:

Biennial Requalification Inspection Document Request

E. Halpin -3-

Electronic distribution by RIV:

Regional Administrator (Elmo.Collins@nrc.gov)

Deputy Regional Administrator (Robert.Lewis@nrc.gov)

DRP Director (Kriss.Kennedy@nrc.gov)

Acting DRP Deputy Director (Michael.Scott@nrc.gov)

DRS Director (Tom.Blount@nrc.gov)

Acting DRS Deputy Director (Jeff.Clark@nrc.gov)

Senior Resident Inspector (Thomas.Hipschman@nrc.gov)

Resident Inspector (Laura.Micewski@nrc.gov)

Branch Chief, DRP/B (Neil.OKeefe@nrc.gov)

Senior Project Engineer, DRP/B (Michael.Bloodgood@nrc.gov)

Project Engineer, DRP/B (David.You@nrc.gov)

DC Administrative Assistant (Madeleine.Arel-Davis@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Public Affairs Officer (Lara.Uselding@nrc.gov)

Project Manager (Joseph.Sebrosky@nrc.gov)

Branch Chief, DRS/TSB (Ray.Kellar@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov)

Technical Support Assistant (Loretta.Williams@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov)

SUNSI Review Completed: ___Y___ ADAMS: Yes No Initials: VGG_

Publicly Available Non-Publicly Available Sensitive Non-Sensitive

S:\DRS\REPORTS\Reports Drafts\DC 2013 BRQ RFI Letter.docx ML13080A408

SOE:OB C:OB

TFarina VGaddy

/RA/ /RA/

3/20/13 3/20/13

OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax

BIENNIAL REQUALIFICATION INSPECTION DOCUMENT REQUEST

From: Thomas Farina

Operations Engineer, NRC RIV

817-200-1117

To: John Becerra

Exam Development and Simulator Support Supervisor, Diablo Canyon Power Plant

805-545-4006

Subj: Information Request to Support May 20 - 24, 2013, Licensed Operator Requalification

Program Inspection (IP 71111.11B)

A. The following information is requested in order to support inspection preparation

activities. These items are listed by section as they appear in the inspection module

(ie 2.02, 2.04, etc). Requested materials should be sent either electronically or

hardcopy in order to arrive at the Region IV office no later than May 10, 2013.

  • Electronically to: thomas.farina@nrc.gov

cc: brian.larson@nrc.gov

duane.strickland@nrc.gov

  • Hardcopy to: US Nuclear Regulatory Commission, Region IV

1600 E. Lamar Blvd

Arlington, TX 76011

ATTN: Thomas Farina

General Requests:

  • List of licensed operators (SRO & RO) by crew (operating & staff)
  • Training and Operations Department organization charts (with qualified LOR

evaluators identified)

  • Procedures that identify process for revising and maintaining LO continuing training

program up to date

  • List of outstanding LOR program changes
  • List of plant events and industry operating experience incorporated into LOR

program since last BRQ

  • Audits and/or self-assessment reports addressing the licensed operator

requalification training program

  • Last two years of simulator review committee (or equivalent) meeting minutes
  • Last two years of CRC (or equivalent) meeting minutes

02.03: Biennial Requalification Written Examination Quality

  • The current and approved biennial written examination schedule
  • The current requalification cycle written examination results for both SRO & RO that

have already been administered up to the week prior to the inspection team arrival

onsite.

-1- Enclosure

  • All written examinations that have been approved for administration up to and

including the week before the inspection team is onsite. This will need to have

adequate password protection if e-mailed or double envelope protection if mailed via

regular mail per NUREG-1021.

  • The current requalification cycle examination methodology (sample plan)

02.04: Annual Requalification Operating Test Quality

  • The schedule for the operating tests (JPMs & scenarios) to be given the week of

May 20, 2013.

  • The operating tests (JPMs & scenarios) (password protected and provide separately

via telephone at later date) to be given the week of May 20, 2013.

  • Current requalification cycle operating tests (SRO & RO) and results up to the week

prior to the inspection team arrival onsite.

  • All of the previous years NRC required annual operating tests.
  • Current requalification cycle operating test methodology (sample plan)
  • All portions of the UFSAR that identify operator response times for time critical

operator actions

02.05: Licensee Admin of Requal Exams

  • All procedures used to administer the annual operating test
  • All procedures used to assess operator performance
  • All procedures that describe conduct of simulator training
  • All Procedures used to test, operate, and maintain the simulator

02.06: Requalification Examination Security

  • Submit any tracking tools that you use as a means to prevent excessive overlap on

the written examinations and also meet the intent of sampling all required topics on a

periodic basis.

  • Submit any tracking tools that you use as a means to prevent excessive overlap on

the operating tests and also meet the intent of sampling all required malfunctions

(including major events, instrument/component malfunctions, TS calls, etc) on a

periodic basis.

  • All Procedures that describe examination security, including procedures used to

develop the examinations that include guidelines on overlap between examinations

in current exam cycle tests and prior year examinations

  • List of all Condition Reports since the last biennial requal inspection related to

examination security and overlap

02.07: Licensee Remedial Training Program

  • List of remedial training conducted or planned since last requal exams (includes

training provided to operators to enable passing requal exams and training provided

to correct generic or individual weaknesses observed during previous requal exam

cycle)

  • Remediation plans (lesson plans, reference materials, and attendance

documentation)

-2- Enclosure

02.08: Conformance with Operator License Conditions

  • All Procedures and Program documentation for maintaining active operator licenses,

tracking training attendance, and ensuring medical fitness of licensed operators

  • All Procedures and associated documentation that supports reactivation of any

SRO/RO license (operating or staff crew) since the last biennial inspection

02.09: Simulator Performance

  • All Simulator Management and Configuration Procedures if not already provided for

section 02.05 above.

  • Simulator Discrepancy Report summary list for all open DRs. For closed DRs,

summary list for those items closed between April 8, 2011 and May 19, 2013.

02.10: Problem Identification and Resolution

  • A summary report of all condition reports related to operator actions/errors in the

control room

  • Any revised requalification training that was based on licensed operator performance

issues

B. The following information is requested in order to support the onsite inspection

activities. Requested materials should be available to the inspection team, either

electronically or hardcopy, upon site arrival on May 20, 2013.

02.02: Exam Results / 02.03 and 02.04: Written Exam and Op Test Quality

  • All Operating tests (JPMs & scenarios) to be given in all subsequent weeks after

onsite week

  • All results up to the day the team leaves the site.

02.08: Conformance with Operator License Conditions

  • Access to licensed operators records (operating and staff crews)
  • Access to licensed operators training attendance records
  • Access to licensed operators medical records

02.09: Simulator Performance

  • Simulator discrepancies (DRs) from April 8, 2011 to May 19, 2013. This should

include all open DRs and DRs that have been closed, including the

documentation/justification for closure.

  • Acceptance test documentation, including hardware and software model revisions at

the time of acceptance (as available).

  • Documentation that validates current models, including the thermal-hydraulics and

neutronics models, to the actual plant.

  • All current model deficiencies, including FSAR vs Design differences in the simulator

(any documentation on this)

  • Summary list of modifications from April 8, 2011 to May 19, 2013.
  • Plant Modifications (both hardware and software) completed on the Simulator by due

date from April 8, 2011 to May 19, 2013.

  • Simulator Differences Lesson plan used in training (current to May 19, 2013).

-3- Enclosure

  • The complete book of all Simulator annual performance test packages (usually in a

single book, but may be electronic or in single test packages), complete with all

transient tests, steady state tests, and malfunction tests. This should also include the

test procedures for each test, the acceptance criteria, and results. For each transient

test, the reference chart should be included or an equivalent subject matter expert

review versus the simulator results with a write-up for any differences beyond the

ANSI 3.5 standard requirements.

  • All test packages used to verify core physics parameters (such as MTC, IRW). The

applicable reference graphs from the Plant physics data book (electronic or other

means as available) should also be included as well as the test procedures used and

the acceptance criteria with results.

  • All Simulator test, configuration management, and related documents available in the

room for inspectors to review. This includes training needs analysis packages,

simulator review committee meeting minutes, etc.

  • Current copy of ANSI 3.5 standard you are committed to for Simulator testing.

02.10: Problem Identification and Resolution

  • All condition reports related to operator actions/errors in the control room

C. Diablo Canyon Power Plant is required to send the final results summary and any

remaining exams and operating tests that have not been reviewed to the regional

office lead inspector for this inspection for final review and comparison against the

Significance Determination Tools in order to communicate the exit results for the

inspection.

-4- Enclosure