ML13123A333: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(6 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML13123A333
| number = ML13123A333
| issue date = 05/01/2013
| issue date = 05/01/2013
| title = U.S. Dept of Transportation, Submittal of Final Safety Analysis Report, Revision Vii
| title = U.S. Dept of Transportation, Submittal of Final Safety Analysis Report, Revision VII
| author name = Koehler E W
| author name = Koehler E
| author affiliation = US Dept of Transportation, Maritime Admin
| author affiliation = US Dept of Transportation, Maritime Admin
| addressee name =  
| addressee name =  
Line 14: Line 14:
| page count = 32
| page count = 32
}}
}}
=Text=
{{#Wiki_filter:U.S. Department                          Savannah Technical Staff                    1200 New Jersey Ave., SE of Transportation                          Office of Ship Disposal                      Washington, DC 20590 Maritime Administration Ref: 10 CFR 50.71(e)
May 1, 2013 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555
==SUBJECT:==
Docket No. 50-238; License No. NS-1; N.S. SAVANNAH Submittal of Final Safety Analysis Report, Revision VII Pursuant to 10 CFR 50.71(e), the Maritime Administration (MARAD) hereby submits Revision VII of the Final Safety Analysis Report as Enclosure (1). MARAD certifies that the updated information accurately presents changes made since the previous revision.
Revision VII is submitted on a replacement-page basis and includes a list which identifies the current pages of the FSAR following page replacement. The updated FSAR includes the effects of the following:
a    all changes made in the facility or procedures as described in the FSAR; U
all safety evaluations performed to support a license amendments; and, a    all analyses of new safety issues performed by or on behalf of the licensee at Commission request.
This submittal contains no new Regulatory Commitments.
If there are any questions or concerns with any issue discussed in this request, please contact me at (202) 366-2631, and/or e-mail me at erhard.koehler@dot.gov.
Erhard W. Koehler Senior Technical Advisor, N.S. SAVANNAH Office of Ship Disposal Enclosure
Docket No. 50-238; License NS-I; N.S. SA VANNAH Submittal of Final Safety Analysis Report, Revision VII May 1, 2013
==Enclosure:==
: 1.        Change Instructions and Replacement Pages for Final Safety Analysis Report, Revision VII 2
Docket No. 50-238; License NS-1; N.S. SAVANNAH Submittal of Final Safety Analysis Report, Revision VII May 1, 2013 cc:
Electronic copy NSS ESC NSS SRC MAR 610, 612, 615 Hardcopy, cover letter only MAR-600, 640, 640.2 Hardcopy w/ all enclosures MAR-100, 640.2 (ri)
USNRC (John T. Buckley, Mark C. Roberts)
USNRC Regional Administrator - NRC Region I MD Department of the Environment (Roland G. Fletcher; George S. Aburn, Jr.)
NC Department of Environment & Natural Resources (Beverly 0. Hall)
SC Department of Health & Environmental Control (Susan E. Jenkins; Aaron Gantt)
VA Department of Emergency Management (Michael M. Cline)
VA Dcpartmcnt of Hcalth (Lcslic P. Foldcsi)
EWK/jmo 3
Sa-U.S. Department                      Savannah Technical Staff          1200 New Jersey Ave., SE of Transportation                      Office of Ship Disposal          Washington, DC 20590 Maritime Administration Docket No. 50-238; License No. NS-1; N.S. SAVANNAH  to Submittal of Final Safety Analysis Report, Revision VII 4
Docket No. 50-238; License NS-1; N.S. SAVANNAH  to Submittal of Final Safety Analysis Report, Revision VIt May 1, 2013 Change Instructions for Final Safety Analysis Report, Revision VII Replace the following pages of the Final Safety Analysis Report, Revision VI with the attached revised pages. The revised pages are identified by revision number and contain marginal lines indicating the areas of change.
REMOVE                                                INSERT Title Page                                            Title Page ii through xiv                                        ii through xv 1-11                                                  1-11 128                                                  128 5
U.S. Department of Transportation Maritime Administration Office of Ship Disposal N.S. SAVANNAH UPDATED FINAL SAFETY ANALYSIS REPORT
              'S-004-002
                                    )17 /
Senior Technical Advisor Prepared by:
Totes Services, Inc.
Updated Final Safety Analysis Report - (STS-004-002)
RECORD OF REVISIONS Summary of Revisions Revision Following Final Shutdown and Permanent Defueling STS-004-002,      A complete revision to the FSAR that incorporates numerous changes that Revsi Ioccurred            from 1968 through March 2007 Revision IV STS-004-002,      These revision numbers to the STS were not used. By not using these numbers, Revsions14-0      the revision number for the FSAR and the revision number to STS-004-002 will be the same revision number.
STS-004-002,      This revision incorporates changes that occurred after March 2007. The most Rev. 5;        significant changes are in Chapter 2 (Fire Detection and Alarm Systems, Security FSAR Revision      Systems and General Alarm) and Chapter 3 (Ship Movement and Port Operating V          Criteria).
STS-004-002,      This revision incorporates changes that occurred after March 2009. The most Rev. 6;        significant change was the electrical modification to deenergize all originally installed 450 volt switchgear. All required 450/480 volt loads were moved to a I
FSAR Revision      new 800A Shore Power Switchboard. Chapter 2.4.2, Fire Detection and Alarm VI          system (FA) and Chapter 2.9. Dehumidification System were rewritten.
STS-004-002,      This revision incorporates changes that occurred after March 2011. These changes Rev. 7;        correct historical discussion in Chapter 1 and correct grammatical errors in Chapter FSAR Revision VII Rev. VII                                              ii
Updated Final Safety Analysis Report - (STS-004-002)
PREVIOUS ISSUES N.S. SAVANNAH SAFETY ASSESSMENT, Volumes I-V, 1960-1962 N.S. SAVANNAH HAZARDS
==SUMMARY==
REPORT FOR DOCKSIDE OPERATION, September 1963 N.S. SA VANNAH HAZARDS
==SUMMARY==
REPORT FOR 1964 SEA TRIALS, December 1963 N.S. SAVANNAH SAFETY ASSESSMENT, Revision 1,July 1965 N.S. SA vANAH SAFETY ASSESSMENT, Revision II, March 1967 SAFETY ANALYSIS REPORT N.S. SA VANNAH FUEL SHUFFLE, December 1, 1967 N.S. SA VA*NAH SAFETY ASSESSMENT, Revision III, October 1968 SAFETY ANALYSIS
==SUMMARY==
- N.S. SAVANNAH DEFUELING, February 1971 SUPPLEMENT NO. I TO SAFETY ANALYSIS REPORT N.S. SAVANNAH FUEL SHUFFLE -
FUELING WITH CORE II, October 1971 (Note that Core H was never installed)
UPDATED FINAL SAFETY ANALYSIS REPORT, Revision IV, April 2007 UPDATED FINAL SAFETY ANALYSIS REPORT, Revision V, May 2009 UPDATED FINAL SAFETY ANALYSIS REPORT, Revision VI, May 2011 Rev. VII                          °.°
Updated Final Safety Analysis Report - (STS-004-002)
LIST OF EFFECTIVE PAGES Page  Rev. Page    Rev.      Page        Rev. Page      Rev. Page Rev.
No. No. No.      No.        No.          No. No.      No. No. No.
Title Page  7    ii      7          iii          7    iv      7    v Page                                                                    7 vi  7    vii      7        viii          7    ix      7    x  7 xi  7    xii      7        xiii          7    xiv      7    xv  7 1  7    2        7          3            7    4        7    5  7 6  7    7        7          8            7    9        7    10  7 11  7    12      6          13            6    14      6    15  6 16  6    17      6          18            6    19      6    20  6 21    6    22        6        23            6    24        6    25  6 26    6    27        6        28            6    29        6    30  6 31    6    32        6        33            6    34        6    35  6 36    6    37        6          38            6    39        6    40  6 41    6    42        6        43            6    44        6    45  6 46    6    47        6        48            6    49        6    50  6 51    6    52      6          53            6    54        6    55  6 56  6    57      6          58            6    59        6    60  6 61    6    62        6        63            6    64        6    65  6 66    6    67        6        68            6    69        6    70  6 71    6    72        6        73            6    74        6    75  6 76    6    77        6          78            6    79        6    80  6 81    6    82        6          83            6    84        6    85  6 86    6    87        6        88            6    89        6    90  6 91    6    92        6        93            6    94        6    95  6 96    6    97        6        98            6    99        6    100  6 101  6    102      6        103            6    104      6    105  6 106  6    107      6        108            6    109      6    110  6 111  6    112      6        113            6    114      6    115  6 Rev. VIIi                              iv
Updated Final Safety Analysis Report - (STS-004-002)
Page Rev. Page    Rev.      Page      Rev. Page      Rev. Page Rev.
No. No. No.      No.        No.      No.      No.      No. No. No.
116  6    117      6        118        6      119      6    120  6 121  6    122      6        123        6      124      6    125  6 126  6    127      6        128        7      129      6    130  6 131  6    132      6        133        6      134      6    135  6 136  6    137      6        138        6      139      6    140  6 141  6    142      6        143        6      144      6    145  6 146  6    147      6        148        6      149      6    150  6 151  6    152      6 Rev. VIIE                                V
Updated Final Safety Analysis Report - (STS-004-002)
Table of Contents Record of Revisions ......................................................................................................................................              ii Previous Issues .............................................................................................................................................          iii List of Effective Pages .................................................................................................................................              iv Forew ord to Revision V II (2013) ...............................................................................................................                      xiv Forew ord to Revision VI (2011) ...................................................................                            .................                      xiv Foreword to Revision V (2009) .................................................................................................................                        xiv Forew ord to Revision IV ............................................................................................................................                  xv IN TRO D UCTIO N A ND SUM MA RY .........................................................................................                                      I 1.1      Sum m ary of Significant Events ....................................................................................................                          1 1.2      Principal Safety Features of the Ship.......................................................................................                                8 1.2.1    The H ull .....................................................................................................................................            8 1.2.2    The Pow er Plant .........................................................................................                                      ...........9 1.3      Ship and System Status - 1976 to Present .............................................................................                                      10 1.3.1    Power Plant Status as reported in A pril 1976 ......................................................................                                      10 1.3.2    Status of N.S. SAVANNAH from April 1976 - April 2009 ...................................................                                                  13 1.3.3    Radiological and Environmental Characterization Scoping Survey ..................................                                                        17 1.3.4    Current Status of N.S. SAVANNAH April 2009 to present ...................................................                                                17 1.4      Symbols for the Reactor Plant A uxiliary System s .................................................................                                        18 2        SH IP D ESCRIPTIO N .....................................................................................................................                      19 2.1      Features and Characteristics ..................................................................................................                            19 2.2      Com partm entation, D ecks and Space Arrangem ent ...............................................................                                          19 2.2.1    Com partm entation ...................................................................................................................                    19 2.2.2    D eck A rrangem ents ...........................................................................................................                          20 2.2.3    Space Arrangem ent ...........................................................................................................                            21 2.3      N avigation and Steering Equipm ent ......................................................................................                                  21 2.3.1    N avigation Equipm ent .......................................................................................................                            21 2.3.2    Steering G ear ...........................................................................................................................                21 2.4      Fire D etection and Control System .........................................................................................                                21 2.4.1    Fire Detecting System .........................................................................................................                          21 2.4.2    Fire Detection and A larm System (FA ) .............................................................................                                      22 2.5      Lifesaving Equipm ent ............................................................................................................                          22 2.6      Radio Equipm ent ........................................................................................................................                  22 2.7      D eck M achinery .........................................................................................................................                  22 Rev. VII                                                                                    vi
Updated Final Safety Analysis Report - (STS-004-002) 2.8      Flooding Alarm s ......................................................................................................................... 22 2.9      Dehumidification System ......................................................................................................                22 2.10    Hull Cathodic Protection System ...........................................................................................                    23 2.11    Security System s ......................................................................................................................... 23 2.11.1  Cam era Surveillance System .............................................................................................                    23 2.11.2  Security Entrance Door .......................................................................................................              23 2.12    General Alarm ............................................................................................................................ 23 3        SITE AND SITE CRITERIA ....................................................................................................                      27 3.1      Site Description .......................................................................................................................... 27 3.2      Ship M ovem ent and Port Operating Criteria ........................................................................                          28 3.2.1    Purpose .................................................................................................................................... 28 3.2.2    Ship M ovem ent Criteria ....................................................................................................                28 3.2.3    Port Operating Criteria .......................................................................................................              29 3.3      Control Zones ............................................................................................................................. 29 3.4      Com parison with Central Station Site criteria in the USA ...................................................                                  29 4        CONTAINM ENT ...........................................................................................................................        30 4.1      Introduction ................................................................................................................................ 30 4.2      Primary Containm ent (Containm ent Vessel) ........................................................................                            30 4.2.1    Function and General Design Criteria ...............................................................................                        30 4.2.2    Containm ent Vessel ............................................................................................................            31 4.2.3    Containm ent Vessel Penetrations ......................................................................................                      33 4.2.4    Containm ent Auxiliary Features .........................................................................................                    34 4.2.5    Containm ent Perform ance Requirements ...........................................................................                          36 4.3      Reactor Compartm ent (Secondary Containm ent) .................................................................                                36 4.3.1    General Description ............................................................................................................            36 4.3.2    Cooling Section .......................................................................................................................      37 4.3.3    Exhaust Section .......................................................................................................................      37 5        RAD IATION SH IELDIN G ......................................................................................................                    53 5.1      Design Basis ............................................................................................................................... 53 5.2      Radiation Sources .......................................................................................................................      53 5.3      Radiation Shields ......................................................................................................................... 53 5.3.1    Prim ary Shield ......................................................................................................................... 53 5.3.2    Secondary Shield .....................................................................................................................      53 5.3.3    Local Shielding ........................................................................................................................ 55 5.4      Radiation Sources .......................................................................................................................      55 5.5      Shield Surveys ............................................................................................................................ 55 5.6      Calculated Doses from Failed Fuel Rods ...............................................................................                        55 6        REACTOR CORE ..........................................................................................................................          56 6.1      Reactor Core General Description........................................................................................                      56 Rev. VII                                                                          vii
Updated Final Safety Analysis Report - (STS-004-002) 6.1.1    Fuel Elem ents ..........................................................................................................................      56 6.1.2    Control Rods ...........................................................................................................................        56 6.1.3    Internals ................................................................................................................................... 56 6.2      Therm al and Hydraulic Characteristics .................................................................................                          58 6.3      Nuclear Characteristics .........................................................................................................                58 6.4      Shipboard Physics Test Program ...........................................................................................                        58 7        PRIM ARY COOLANT SYSTEM ..............................................................................................                              60 7.1      General Description ....................................................................................................................          60 7.1.1    General Design Data .........................................................................................................                  60 7.1.2    General Performance Data ..................................................................................................                    61 7.2      Reactor Vessel ............................................................................................................................      64 7.3      Steam Generators ........................................................................................................................        66 7.4      Pressurizer .................................................................................................................................. 67 7.5      Primary Pum ps ...........................................................................................................................        69 7.6      Valves ......................................................................................................................................... 69 7.7      Primary (Neutron) Shield Tank .............................................................................................                      69 7.8      Primary Piping ............................................................................................................................      69 8        POWER CONVERSION SYSTEM S .........................................................................................                                71 8.1      Steam Generators ........................................................................................................................        71 8.1.1    General Description ............................................................................................................                71 8.1.2    Design Conditions ...................................................................................................................          72 8.1.3    Construction Features .........................................................................................................                73 8.2      M ain and Auxiliary Steam Systems ......................................................................................                          73 8.2.1    M ain Steam System ...........................................................................................................                  73 8.2.2    Auxiliary Steam System ....................................................................................................                    74 8.2.3    Interm ediate Pressure Steam System ..................................................................................                          74 8.3      M ain Propulsion System .......................................................................................................                  74 8.3.1    High-Pressure Turbine ......................................................................................................                    74 8.3.2    Low-Pressure and Astern Turbine ......................................................................................                          75 8.3.3    Reduction Gears ......................................................................................................................          75 8.3.4    Propulsion Shafting and Propeller .......................................................................................                      75 8.3.5    M ain Condenser ......................................................................................................................          75 8.3.6    M ain Condensate and Feedwater System ...........................................................................                              76 8.4      Emergency Propulsion System .............................................................................................                        77 8.5      Electrical Power Systems ......................................................................................................                  77 8.5.1    Shore Power Connection ....................................................................................................                    78 8.5.2    Power D istribution ..................................................................................................................          78 8.6      Auxiliary Engine Room System s ...........................................................................................                        87 8.6.1    Instrum ent Air System .......................................................................................................                  87 8.6.2    W aste D ilution and Disposal (W D) System ......................................................................                              88 8.6.3    Engine Room Ventilation System ......................................................................................                          89 Rev. VII                                                                          viii
Updated Final Safety Analysis Report - (STS-004-002) 8.6.4    Blow down Evaporator System ...........................................................................................                    89 8.6.5    Fresh W ater System ............................................................................................................          89 8.7      W ater Chemistry and Control ................................................................................................                90 8.7.1    Prim ary System ....................................................................................................................... 90 8.7.2    Secondary System ...................................................................................................................      91 8.7.3    Laboratory Arrangem ents..................................................................................................                93 8.7.4    Instrum entation ........................................................................................................................ 94 8.7.5    Operating Experience .........................................................................................................            94 8.8      Power Plant Perform ance ......................................................................................................              94 9        REACTOR PLANT AUXILIARY SYSTEMS ........................................................................                                      95 9.1      Reactor Emergency System s ..................................................................................................                95 9.1.1    Emergency Cooling (DK ) System ......................................................................................                      95 9.1.2    Soluble Poison (SP) System ...............................................................................................                96 9.2      Reactor A uxiliary Systems ....................................................................................................              96 9.2.1    Prim ary Loop Purification (PP) System .............................................................................                      96 9.2.2    Buffer Seal (SL) System .....................................................................................................              99 9.2.3    Hydrogen Addition (HA) System ..........................................................................................                  102 9.2.4    Primary Relief (PR) System ..................................................................................................            103 9.2.5    Prim ary Sampling (SA ) System ............................................................................................              104 9.2.6    Interm ediate Cooling Water (CW ) System ...........................................................................                      106 9.2.7    Containm ent Cooling (CC) System .......................................................................................                  110 9.2.8    Shutdown Circulation (SC) System .......................................................................................                  113 9.2.9    Prim ary Pressurizing (PE) System ........................................................................................                113 9.3      W aste M anagem ent System s ....................................................................................................          115 9.3.1    Equipm ent Drain and W aste Collection (PD) System ...........................................................                            115 9.3.2    Gaseous W aste Collection and D isposal (W L) System .........................................................                            118 10      INSTRUM ENTATION A ND CONTROL ...................................................................................                            121 10.1    General Description ..................................................................................................................      121 10.2    Plant Control Arrangem ent .......................................................................................................          121 10.2.1 Introduction ........................................................................................................................... 121 10.2.2 M ain Control Room ...............................................................................................................          121 10.2.3 Hydraulic Power Supply Room .............................................................................................                  122 10.2.4 GE Cubicle ............................................................................................................................ 122 10.2.5 Em ergency Generator Room .................................................................................................                122 10.2.6 Forward Control Area ...........................................................................................................            122 10.2.7 Data Acquisition System .......................................................................................................            122 10.3    Instrum entation ......................................................................................................................... 122 10.3.1 N uclear Instrum entation System ...........................................................................................                122 10.3.2 Safety System ........................................................................................................................      122 10.3.3 N on-nuclear Instrum entation .................................................................................................            123 10.4    Reactor Control ......................................................................................................................... 123 10.5    Control Rod Drive System ........................................................................................................          123 Rev. VII                                                                            ix
Updated Final Safety Analysis Report - (STS-004-002) 10.5.1 System Description ................................................................................................................          123 10.5.2 Control Rod Drive Mechanisms ............................................................................................                    123 10.5.3 System Status as of March 1976 ...........................................................................................                    123 10.6    Radiation M onitoring System ...................................................................................................              124 11      COND UCT OF LICEN SED ACTIV ITIES ..................................................................................                            125 11.1    Organization ............................................................................................................................. 125 11.2    Training .................................................................................................................................... 126 11.3    Procedures ................................................................................................................................ 126 11.4    Records ..................................................................................................................................... 126 11.5    Quality Assurance Plan ............................................................................................................            127 11.6    Port Operating Plans .................................................................................................................        127 11.7    Radiation Protection Plan .........................................................................................................            127 11.8    Industrial Safety ........................................................................................................................ 128 11.8.1 Occupational Health and Environm ental Control .................................................................                              128 11.8.2 Personal Protection ................................................................................................................          128 11.8.3 Lifting and Handling Equipment ......................................................................................                        128 12      SH IP ACCID ENTS ......................................................................................................................          129 12.1    Introduction .............................................................................................................................. 129 12.2    Conventional Ship Safety .........................................................................................................            129 12.3    Collisions and A llisions ............................................................................................................        129 12.4    Grounding ................................................................................................................................. 130 12.5    Heavy W eather .........................................................................................................................      131 12.6    Fire and Explosion ....................................................................................................................        132 12.7    Flooding and Sinking ................................................................................................................          133 12.8    Salvage ...................................................................................................................................... 133 13      RADIOLOGICAL AND ENVIRONMENTAL CHARACTERIZATION ..................................                                                              134 13.1    Radiological Characterization Scoping Survey ........................................................................                          134 13.1.1 Dose Rates .............................................................................................................................      135 13.1.2 Radiological Contam ination ..................................................................................................                135 13.1.3 Non-Radiological Areas ........................................................................................................              135 13.1.4 Radiological Areas ................................................................................................................          136 13.1.5 Reactor Compartm ent (Secondary Containm ent) .................................................................                              137 13.1.6 Containm ent Vessel ...............................................................................................................          138 13.1.7 Estimate of the Quantity and Distribution of Radionuclides .................................................                                  138 13.1.8 Calculation of Total Contam ination Inventory ......................................................................                          142 13.1.9 Reactor Pressure Vessel (RPV) .............................................................................................                  144 13.2    Environm ental Characterization (HA ZM AT) Scoping Survey ................................................                                    145 13.2.1 Asbestos-Containing M aterial ...............................................................................................                146 13.2.2 Lead-Based Paint ...................................................................................................................          146 13.2.3 Liquids ................................................................................................................................... 146 Rev. VII                                                                          x
Updated Final Safety Analysis Report - (STS-004-002) 13.2.4 Polychlorinated Biphenyls (PCBs) ........................................................................................                  147 13.2.5 Mercury ................................................................................................................................. 148 13.3    U pdates to Known Radiological Conditions ............................................................................                      148 13.4    References ................................................................................................................................ 148 14      ACCIDENT ANALYSIS ..............................................................................................................              149 14.1    Overview .................................................................................................................................. 149 14.2    Radiation Exposures during Licensed Activities ......................................................................                        150 14.2.1 O ffsite and Unrestricted Area Exposure ................................................................................                    150 14.2.2 O ccupational Radiation Exposure .........................................................................................                  150 14.2.3 Radiation Exposure from Radwaste Transportation ..............................................................                              150 14.3    Protective Action Guidelines (PAGs) .......................................................................................                  150 14.4    M aterials Handling A ccident ....................................................................................................          151 14.5    Summ ary ................................................................................................................................... 152 Rev. VII                                                                          xi
Updated Final Safety Analysis Report - (STS-004-002)
List of Tables Table 1-1  Chronology of Significant Events                                2 Table 1-2  Tank Designation                                              12 Table 2-1  Principal Characteristics of the N.S. SA VANNAH                19 Table 2-2  Compartment Utilization                                      20 Table 4-1  List of Containment Penetrations                              41 Table 6-1  Reactor Internals                                            58 Table 7-1  Primary System Water Quality                                  63 Table 7-2  Primary System Radiochemistry                                63 Table 8-1  Steam Generator Data                                          72 Table 8-2  Group Control Centers                                        83 Table 8-3  480-Volt Power Panels                                        84 Table 8-4  450-Volt Power Panels                                        84 Table 8-5  120-Volt Power Panels                                        86 Table 8-6  Primary System Water Quality                                  90 Table 8-7  Steam Generator Water Quality                                91 Table 9-1  Liquid Drainage and Storage                                  115 Table 9-2  Double Bottom Tanks below RC                                117 Table 13-1  Non-Radiological Area Summary                                136 Table 13-2  Radiological Area Summary                                    136 Table 13-3  Reactor Compartment Radiological Summary                    137 Table 13-4  Containment Vessel Radiological Summary                      138 Table 13-5  Area Monitoring Results                                      140 Table 13-6  Sample Analysis Results                                      141 Table 13-7  Total Surface Contamination Inventory                        142 Table 13-8  Steam Generator Dose Rates (primary system side)            143 Table 13-9  Steam Generator Contamination Levels (primary system side)  143 Table 13-10 Volume of water remaining in the Primary Coolant system      144 Table 13-11 Summary of Radioactivity Present                            145 Table 13-12 Summary of Radioactivity Present                            145 Table 13-13 Radiological Spaces Liquid Sample Summary                    147 Rev. VII                    xii
Updated Final Safety Analysis Report - (STS-004-002)
List of Figures Figure 2-1 Containment, Reactor Compartment and Engine Room (Frames 99-148)            24 Figure 2-2 General Arrangement - Inboard Profile and Decks - Promenade, A and B        25 Figure 2-3 General Arrangement - Decks - C, D, Flats, Tank Tops and Containment Vessel  26 Figure 4-1 Arrangement of Principal Components in Containment                          31 Figure 4-2 Containment Inerting Schematic                                              36 Figure 4-3 Reactor Compartment                                                          37 Figure 4-4 Containment Vessel (showing the secondary shield)                            40 Figure 5-1 Primary Shield Tank                                                          54 Figure 6-1 Reactor Internals                                                            59 Figure 7-1 Plant Arrangement in the Containment Vessel                                  62 Figurc 7-2 Rcactor Vcsscl during Fabrication                                            64 Figure 7-3 Reactor Vessel                                                              65 Figure 7-4 Steam Generator                                                              66 Figure 7-5 Pressurizer                                                                  68 Figure 8-1 Original Electrical Distribution System                                      80 Figure 8-2 Current Electrical Distribution System 480 VAC                              81 Figure 9-1 Double Bottom Tanks below RC                                                118 Figure 9-2 Double Bottom Tanks                                                        120 Rev. VII                                    °°°i
Updated Final Safety Analysis Report - (STS-004-002)
FOREWORD TO REVISION VII (2013)
Revision VII to the UFSAR is the 2013 biennial update. This revision corrects historical discussion in Chapter 1 and grammatical errors in Chapter 11. Minor formatting changes are included to clarify the intent and structure of the document.
The ship and its nuclear facilities remain in protective storage. The ship is in an active layberthing condition, with a retention crew and regular attendance by the Maritime Administration's nuclear operations staff. This condition is projected to continue throughout the next two-year biennial UFSAR update period. The updated safety analyses found in this revision apply to all activities within the site boundary (i.e.; all shipboard activities), regardless of how they may be characterized.
FOREWORD TO REVISION VI (2011)
Revision VI to the UFSAR is the 2011 biennial update. This revision incorporates changes based on improved staff knowledge and understanding of the condition of the ship and its infrastructure based on continuous crewing since 2009. Revision VI also incorporates, as appropriate, materials and information contained in license submittals over the past two years. Minor formatting changes are included to clarify the intent and structure of the document.
The ship and its nuclear facilities remain in protective storage. The ship is in an active layberthing condition, with a retention crew and regular attendance by the Maritime Administration's nuclear operations staff. This condition is projected to continue throughout the next two-year biennial UFSAR update period. The updated safety analyses found in this revision apply to all activities within the site boundary (i.e.; all shipboard activities), regardless of how they may be characterized.
FOREWORD TO REVISION V (2009)
Revision V to the UFSAR is the 2009 biennial update. This revision incorporates changes based on improved staff knowledge and understanding of the condition of the ship and its infrastructure based on continuous crewing since 2001. ikevision V also incorporates materials and inf6rmation contained in license submittals over the past two years, including the most recent (April 2008) license amendment (14), the May 2008 Environmental Assessment (EA), and the December 2008 Post Shutdown Decommissioning Activities Report (PSDAR). Minor formatting changes are included to clarify the intent and structure of the document.
The ship and its nuclear facilities remain in protective storage. The ship is in an active layberthing condition, with a retention crew of four persons and regular attendance by the Maritime Administration's nuclear operations staff. This condition is projected to continue throughout the next two-year biennial UFSAR update period. The updated safety analyses found in this revision apply to all activities within the site boundary (i.e.; all shipboard activities), regardless of how they may be characterized.
The near-term focus of decommissioning planning, as described in the EA and PSDAR, is to bring the ship and its nuclear facilities into conformance with contemporary NRC SAFSTOR criteria, and to place the ship into active retention for a period of as much as 15 years before starting DECON and License Termination. This revision provides appropriate safety analyses and bounding conditions for these activities.
Rev. VII                                            xiv
Updated Final Safety Analysis Report - (STS-004-002)
FOREWORD TO REVISION IV Revision IV to the FSAR is intended to provide a 2007 status of the N.S. SAVANNAH. It is a complete rewrite of Revision III and includes a summary of numerous documents submitted to the NRC since the last update in 1968, including the most recent (January 2007) license amendment (13).
At the end of 1972, after the ship had been defueled and placed in wet layup status, the Maritime Administration decided not to refuel the ship and return it to service. In effect, this decision made the 1970 and 1971 actions permanent. The final shutdown was in November 1970 and the permanent defueling was completed in fall 1971, these actions are retroactively considered to be permanent cessation of operations. Therefore, the fall 1971 defueling became the de facto permanent defueling and cessation of operations with the issuance of Technical Specification Change 13.
The ship is in a state of protective storage. Most weather openings are sealed. Almost no mechanical system or equipment is functional excepted as noted in the following text. The functional systems include a significant portion of the electrical distribution system, the hull cathodic protection system, the dehumidification (DH) system, the intrusion, fire and flooding alarm system and the anchor windlass.
The DH system was newly installed in 1994, and is mechanically independent of any other ship's system.
Likewise, the alarm system was substantially renewed in 1994 and is isolated from any other ship's system except electrical distribution. Note that modifications associated with the DH and alarm systems (i.e., vent ducting and cabling) generally obstructs the doorways, passageways and ladders throughout ship as is typical in the marine industry for deactivated ships.
The electrical distribution system, hull cathodic protection system and the anchor windlass are the only currently functional portions of the ship's original outfit. Since 1994, there has been minimal maintenance and testing to the ship's electrical system. Any future use of the electrical system would require surveying prior to energizing any of its currently deenergized portions.
Rev. VII                                            XV
Updated Final Safety Analysis Report - (STS-004-002) 1    INTRODUCTION AND
==SUMMARY==
1.1    Summary of SignificantEvents A nuclear merchant ship was first proposed by President Eisenhower in a speech in New York on April 25, 1955 as evidence of this country's interest in the peaceful uses of atomic energy. Construction was authorized by Public Law 848', which provided funds for the design and construction of a vessel, subsequently named the N.S. SAVANNAH (NSS).
On October 15, 1956, the President directed the Atomic Energy Commission (AEC) and the Maritime Administration (MARAD) to proceed with design and construction. To complement this effort, the entire project was placed under the direction of a dual status staff chosen jointly by MARAD and the AEC. The vessel was designed by George G. Sharp, Inc. Naval Architects of New York. The Babcock and Wilcox Company (B&W) was awarded a fixed price contract for the design and construction of the nuclear power plant auxiliaries. The New York Shipbuilding Corporation (NYS) was selected to construct and test the ship at their Camden, New Jersey shipyard. In 1958, the States Marine Lines, Inc. was engaged as the operating agent for the ship. Todd Shipyard Corporation was chosen to provide the maintenance facility in May 1960. In 1963, American Export Isbrandtsen Lines Inc. (AEIL) became the operating agent. The initial operating License was issued in August 1965. First Atomic Ship Transport Inc., (FAST) a subsidiary of AEIL, placed the NSS in routine cargo service in September 1965.
The NSS, a vessel of the P-2 class (specifically P2-NI-MA40a) was powered by an 80 MWd, pressurized-water nuclear reactor and had a design speed of 22 knots at 22,000 shaft horsepower. The normal cruising speed was 20.25 knots at 20,000 shaft horsepower. The ship was intended to promote international goodwill by being displayed in the seaports of the world. Consequently, it was made as attractive and modem as any vessel of that era and its nuclear power plant was designed with an exceptional degree of reliability and safety.
The prime objectives of the creators of the NSS were to demonstrate the advanced technology and peaceful use of nuclear energy. The operation of a working test-bed laboratory ship provided a tool to be used in the development of economical ships and marine reactor operation. It also established acceptable standards for the design of ship and reactor, operating practices, manning, port entry and operation and safety of crew and the general public. It was necessary therefore, that entry into the domestic and foreign ports was in accordance with mutually acceptable regulations and operational procedures. The successful culmination of these objectives led to the general acceptance of the NSS's safety and reliability by governmental authorities, cargo shippers and the general public.
During its operating phase, regulatory procedures, inspection standards and training requirements were improved and implemented. The relation of manning to the ship's layout, design and service was studied.
The high degree of safety, reliability and performance of the NSS increased an acceptance of nuclear ships in the ports visited.
A chronology of significant events in the NSS program is shown in Table 1-1.
'U.S. Congress, An Act to amend Title VI!. of the Merchant Marine Act, 1936, to authorize the construction of a nuclear-powered merchant ship for operation in foreign commerce of the United States, and for other purposes. 84b Congress, 2nd Session. Public Law 848, (H.R. 6243), 70 STAT. 731, 46 U.S.C. 1206, Approved July 30, 1956.
Rev. VII                                                    I
Updated Final Safety Analysis Report - (STS-004-002)
The NSS completed its program of domestic and foreign.port visitation in March 1965. From that time until July 1970, the ship was in commercial cargo operations. The ports visited are listed in Table 1-2.
During the period of 1968 through 1970, future use options for the ship were studied and proposed.
These included the following:
Conversion to:                                              Proposed by:
Fish Protein Concentrate Factory Ship                      Marine Protein Incorporated Ocean Science Ship                                          Westinghouse Electric Corp.
Marine Nuclear Training Center                              Todd Shipyards Corp.
Containership including new Reactor and Steam              AEIL Generators These options were ultimately rejected, and the ship was removed from service. The ship was permanently shutdown and placed in wet layup in November 1970. In Fall 1971, the nuclear plant was permanently defueled. In March 1976, the ship's primary, auxiliary, and secondary systems were drained as completely as practical.
The ship was bareboat chartered 2 to the Patriots Point Development Authority and berthed at the Patriots Point Naval and Maritime Museum, Mt. Pleasant, SC from 1981 through 1994. The ship was dry docked in Baltimore, MD for hull maintenance and preservation in 1975 and 1994. From 1994 to 2006, the ship was moored at the James River Reserve Fleet, Ft. Eustis, VA. In August 2006, the ship was moved to Colonna's Shipyard, Norfolk, VA for infrequent, required topside maintenance.
The NSS is one of the most historically significant ships in existence. It is one of the first ships to be registered as a National Historic landmark. It is registered as an International Historical Mechanical Engineering Landmark by the American Society of Mechanical Engineers. It is a registered landmark of the American Nuclear Society.
Table 1-1      Chronology of Significant Events President Eisenhower announced a proposal to build a nuclear powered merchant ship to demonstrate peaceful uses of the atom.
July 30, 1956                  Congress passed P.L. 848, 84th Congress, authorizing construction of a nuclear powered merchant ship.
October 1956                    Contract to Babcock & Wilcox to design and construct the reactor.
MOU established between MARAD and AEC to perform tasks related to January 22, 1957                design development, testing, initial operation and international acceptance of nuclear merchant ships.
April 1957                      Contract to George Sharp to design hull.
December 10, 1957              Contract to New York Ship building to construct ship.
2 A bareboat charter is an arrangement where the owner gives possession of the ship to the charterer but no crew or provisions are included as part of the agreement. The charterer is responsible for all operating expenses.
Rev. VII
Updated Final Safety Analysis Report - (STS-004-002)
Table 1-1    Chronology of Significant Events May 22, 1958              Keel laid.
Contract signed with States Marine Lines, to operate ship under General Agency Agreement (AEC and MARAD).
July 21, 1959            Ship launched, crew training began.
May 1960                  Sclcction of Todd Shipyard Corporation for nuclear maintcnancc.
July 1960                Component testing started.
November 1960            Systems testing started.
March 1961                Public hearing.
July 24, 1961            Authorization of AEC fueling and operation for test and demonstration purposes.
September 1961            Pre-fueling testing complete.
November 11, 1961        Reactor Core installed.
December 21, 1961        Initial criticality.
U.S. Coast Guard Certificate of Inspection issued (Doe. No. 287392),
Passenger Nuclear.
January 1962              10% testing complete.
March 1962                Initial sea trials at Camden, NJ and Yorktown, VA.
April 19, 1962            States Marine Lines (Operator) under General Agreement.
May 1, 1962              Delivered to and accepted by the Government.
AEC provided interim sea and port operation authorization. Amended November 19, 1962 and May 1, 1963.
Commencement of initial voyage. First voyage to commercial port August 1962              Yorktown, VA to Savannah, GA. Demonstration phase of operations began with voyage from Savannah, GA to Norfolk, VA.
February 1963            Initial voyage complete.
May 1963                  Cancellation of General Agent contract with States Marine Lines, Inc.
May 1963 to Spring        Labor dispute halted operations.
1964 June 1963                New staff formation.
New Contract signed with American Export Isbrandtsen Lines (AEIL) to July 23, 1963            operate ship under General Agency Agreement from 1964-1965 (New crew trained).
Rev. VII                                        3
Updated Final Safety Analysis Report - (STS-004-002)
Table 1-1    Chronology of Significant Events February 20, 1964        AEIL sea trials.
1964                    Demonstration phase continued (May 1964) voyage from Galveston to East Coast, U.S. ports.
1964-65                  Called at U.S. and Western European ports.
May 28, 1964            Resume port operation.
Port visitation program complete and demonstration phase ended Mobile, March 1965              Alabama to Galveston, TX for annual drydocking, maintenance and inspection.
May 11, 1965            First Atomic Ship Transport, Inc. (FAST) and AEIL agreement to operate as a commercial cargo freighter.
May 18, 1965            USCG Certificate of IrspectionRenewed as Cargoý Nuclear.
August 1965              AEC Operating License (NS-1) issued.
August 1965              Experimental commercial operations began. Bareboat chartered to First Atomic Ship Transport, Inc. (FAST) (a subsidiary of AEIL).
September 1965          Begin scheduled commercial operation.
Commercial marine refueling at MARAD Refueling Facility, Todd Shipyards, Galveston, TX. The "fuel shuffle" was intended to extend the life of Core I. At the end of Core I lifetime, a shuffle operation was conducted to configure Core Ia. In this operation the four center elements were removed and replaced with four spare elements, two of 4.6% enrichment and the other two of 4.2%. The remaining 28 elements were rearranged to increase August to October 1968  reactivity. In general, the inside elements were moved out and the outside elements were moved in. Additionally, one control rod was replaced.
During the last voyage before the Fuel Shuffle Outage, evidence of a minor fuel failure was detected. It appeared that small amounts of fission products were released to the primary coolant whenever there was a significant change in reactor power level. Post shuffle operation indicated that the situation still existed; however, it did not limit operation or access anywhere on the ship.
The National Environmental Policy Act of 1969 requires Environmental January 1, 1970          Impact Statements for proposed actions. Past actions such as the initial NS-1 operating license are exempt.
Commercial Operations ended. During experimental commercial operation August 1965 - July 1970, 32 domestic ports and 45 foreign ports were visited.
July 25, 1970            NSS berthed at Pier "E" Todd Shipyards, Galveston, TX and Reactor Shutdown July 29, 1970.
Final Voyage to Pier "E" Todd Shipyards, Galveston, TX from annual November 6-8, 1970      drydocking 10/30 through 11/06 at Todd Shipyards, New Orleans, LA for maintenance per Operations Report, FAST-21 April 26 - November 9, 1970.
Rev. VII                                                    4
Updated Final Safety Analysis Report - (STS-004-002)
Table 1-1    Chronology of Significant Events Final Reactor shutdown at 5:50 PM and established Cold Iron condition at Todd Shipyard, Galveston, TX per FAST-2 1.
November 9, 1970          License NS-1 transferred from FAST to MARAD (License Amendment 7).
April 13, 1971            AEC approved Technical Specification Change 11 to defuel NSS.
Ship at MARAD Refueling Facility, Pier "E" Todd Shipyards, Galveston, TX, for preparation of vessel for lay-up. Started removing fuel August 23, 1971. The last fuel element was removed September 29. Control rod drive (CRD) system disabled and sealed plates installed on 21 CRD head nozzles to separate drives from the control rods. 36 Fuel element flow nozzles were loaded into fuel channels in the reactor vessel. One control rod (cut into two six feet long pieces and one twelve inch piece) was placed in reactor vessel.
This is the control rod removed during the 1968 fuel shuffle. RCP motors and impellers were removed. The RCP volutes were blank flanged. Reactor, secondary and saltwater system filled with water to establish wet lay-up conditions. The reactor vessel head was reinstalled with 6 of the normal 48 studs in place. The containment vessel, port and starboard charge pump room and lower reactor compartment bilges were decontaminated, washed, vacuumed and painted. All cargo holds were decontaminated.
October 24, 1971          U.S. Coast Guard Certificate of Inspection expired and was not renewed.
Permanent cessation of operations established by completing Layup Procedure LU-9. The Layup Procedure LU-9 is the procedure implemented December 3, 1971          by the defueling team. It reinstalled the reactor vessel head with six tensioned reactor head studs. This event establishes the date of permanent cessation of operations.
Towed to Savannah, GA and following a welcoming celebration, additional January 3-10, 1972        non nuclear layup work was performed (4/24/1972, Operations Report) [Not open to Public and primary system and steam generators (boilers) maintained in wet lay-up (MARAD letter Nov 19, 1971)].
AEC stopped review of Core II and noted "If reactivation of N. S. SA VANNAH
        ,1972            should become planned, an appropriate scope of review would need to be established in light of... the regulatory safety and environmental requirements at that time."
Thirty six spent fuel elements (32 plus the four replaced during the fuel December 21,1972          shuffle) (Core I and Ia) were shipped from Galveston, TX to AEC - Savannah River Plant, Aiken, SC for reprocessing. (September 21, 1973, Operations Report).
License Amendment (Technical Specification Change 13) eliminated "Technical Specifications that referred to operational aspects since all January 29, 1973          nuclear fuel has been removed from the ship and the nuclear power plant (and the ship) is no longer operational." Note that even though the final shutdown was in November 1970 and the permanent defueling was completed in fall Rev. VII                                                5
Updated Final Safety Analysis Report - (STS-004-002)
Table 1-1    Chronology of Significant Events 1971, these actions were not considered to be permanent cessation of operations until the decision was finally made to not load Core II. Therefore, the fall 1971 defueling became the de facto permanent defueling and cessation of operations with the completion of Layup Procedure LU-9 on December 3, 1971.
1972-75                  Legislation transfer shipwas  introduced to authorize the Secretary of Commerce to to the City of Savannah, GA.
MARAD memo "Supplemental Memo on Working Document:
EnvironmentalImpact Analysis Nuclear Merchant Ship Program" -MARAD recommended moving Core II from storage at Defense Atomic Support January 31, 1975          Agency, Killeen, TX to Nuclear Weapons and Storage Facility, Manzano Air Force Base, Albuquerque, NM for indefinite storage. This action would be taken via an Interagency Agreement by Energy Research and Development Administration (ERDA) (formerly AEC). Per NSS Defueling Log September 9, 1971, (MMA File 61-8), Core 11 consists of 36 new fuel elements.
Attachment I to memo for Assistant Administrator for Commercial April 3, 1975            Development states "In response to M-700 memo of December 23, 1974,
: 5. Nuclear Fuel (Core II) it is understood this fuel will be returned to AEC
[ERDA]."
City of Savannah, GA requested removal of the ship and the ship left July 28, 1975            Savannah, GA for Baltimore, MD drydocking.
Moved from Baltimore, MD Drydock to Detyens Shipyard, Inc. Charleston, SC (topside work).
Moved from Detyens Shipyard, Charleston, SC to N. Charleston Army August 29, 1975          Depot, SC pending the outcome of legislation before the Congress to permit use of the NSS as an addition to the Patriots Point Naval and Maritime Museum, Mt. Pleasant, SC.
While at N. Charleston Army Depot, SC, the primary, auxiliary and secondary systems were drained by Todd Research and Technical Division as completely as practical.
Per the September 14, 1976, Annual Operations Report, water from the reactor vessel shield water tank and secondary side of the steam generators was transferred to a double bottom tank below the reactor compartment.
March 1976                Demineralizer resins (28 Ci) and 12,200 gallons of liquid (Primary Coolant and liquid waste) were properly disposed. Three dewatered primary purification ion exchangers (demineralizers) were removed and disposed.
Radiation levels in the containment vessel did not increase appreciably after the water was removed.
Per March 9, 1976 MARAD memo "Status Report on the Transfer of N.S.
SAVANNAH to [James River Reserve Fleet] JFFR," the water from the secondary system was analyzed and does not have to be disposed of as Rev. VII                                                6
Updated Final Safety Analysis Report - (STS-004-002)
Table 1-1    Chronology of Significant Events nuclear waste.
Possession Only License issued (License Amendment 8) and recognized the May 19, 1976            ship was in a state of protective storage. Total estimated residual activity 1.09E+5 Ci.
Main reduction bull gear was removed (NRC Inspection Report 81-01, March 2, 1981).
Public law 96-331 was enacted to authorize the NSS to be sent to Patriots Point, Mt. Pleasant, SC for use as a Museum and other public purposes.
Bureau Radiological Health, SC Department of Health & Environmental September 24, 1980      Control certifies all ten remaining radioactive sources have been transferred from the ship to them.
Patriots Point Development Authority (PPDA) became a co-licensee and the August 14, 1981          ship was bareboat chartered for public display at the Patriots Point Naval and Maritime Museum, Mt. Pleasant, SC from 1981 through 1994.
The American Society of Mechanical Engineers designated the ship as the Fourteenth International Historic Mechanical Engineering Landmark.
July 15, 1986            The NS-I License was renewed for ten years by License Amendment 11.
September 1989          Hurricane Hugo hits the Charleston, SC area.
The National Park Service designated the ship as a National Historic July 17, 1991Ladrk      Landmark.
The Board of Directors for the American Nuclear Society approved the ship for a Nuclear Historic Landmark Award.
Shortly after the second bareboat charter renewal in 14 July 1991, a hull leak developed. After a series of surveys and inspections, funding was requested July 1991                from Congress in 1993 to drydock the ship to correct deterioration of the underwater hull.
December 1993            Public Tours of the ship were no longer allowed.
NSS left Patriots Point on the spring flood tide to minimize silting effects from Hurricane Hugo of September 1989.
License Amendment 12 removed PPDA as co-licensee. After routine drydocking and hull maintenance in Drydock # 4, Sparrows Point, Baltimore, MD, the ship was placed in protective storage at the James River Reserve Fleet, Ft. Eustis, VA. Numerous minor modifications including installation June 29, 1994            of a DH system were completed. Modifications associated with the DH system (i.e., vent ducting and cabling) generally obstructs the doorways, passageways and ladders throughout ship as is typical in the marine industry for deactivated ships.
July 29, 1996            License Renewal was no longer required by the revised 10 CFR 50.51, Rev. VII                                                7
Updated Final Safety Analysis Report - (STS-004-002)
Table 1-1      Chronology of Significant Events Continuation of license.
(b) Each license for a facility that has permanently ceased operations, continues in effect beyond the expiration date to authorize ownership and possession of the production or utilization facility, until the Commission notifies the licensee in writing that the license is tcrminatcd.
NSS was moved to Colonna's Shipyard, Norfolk, VA for infrequent, required topside maintenance.
Post Shutdown Decommissioning Activities Report, Revision 0 was submitted but withdrawn on January 27, 2007.
January 30, 2007              NSS moved to Pier 23 Newport News, VA for temporary layberthing.
License Amendment 13 was issued. It included six administrative changes.
January 31, 2007              The most significant change is following 30 day notification to NRC, the ship can be located at any appropriate U.S. domestic location with a MARAD approved Port Operating Plan.
NSS was moved to BAE Systems Norfolk Ship Repair facility in South Norfolk, Virginia in preparation for drydocking. On January 19, 2008, the NSS was placed onto the Titan Drydock and remained there until March 3 for May 31, 2007                  hull maintenance and exterior surface cleaning and preservation. Hull inspections were conducted and identified no new degradation. These inspections included verifying the integrity of the underwater hull repairs made during the 1994 drydocking availability License Amendment No. 14 was issued. It revised the Technical Specifications to match the current ship status and ship's programs, policies April 3, 2008                  and procedures. The function of Review and Audit Committee was revised commensurate with the Decommissioning Quality Assurance Plan. The committee was renamed the Safety Review Committee.
NSS was moved to Pier 13, Canton Marine Terminal at 4601 Newgate Ave.,
Baltimore, MD.
December 11, 2008              Post Shutdown Decommissioning Activities Report, Revision I submitted.
Completed the electrical modifications to deenergize all originally installed November 2010                  450 volt switchgear. All required 450/480 volt loads were moved to a new 800A Shore Power Switchboard.
1.2    PrincipalSafety Featuresof the Ship 1.2.1    The Hull This text is retained from Revision III for historical context. In particular, items (1), (3) and (4) from the list below describe structural features installed on the N.S. SA VANNAH to enable it to resist the effects of damage. Item (2) describes the hydrodynamic standard applied to allow the ship to Rev. VII                                                  8
Updated Final Safety Analysis Report - (STS-004-002) passively resist the effects of damage and remain afloat; this condition is referred to as "damaged stability." During the period of museum operations at PPDA, most of the transverse watertight bulkheads listed in (1) were penetrated at various locations to permit convenient personnel access and service connections between the compartments. Most of these penetrations were closed prior to the ship's removal from PPDA in 1994. Current operations only require the NSS to meet "intact stability" requirements, where intact stability refers to the capability of the ship to remain stable when not damaged. Based on stability calculations prepared in 1994 and the current (2008) baseline structural condition assessment, the NSS is presumed capable of meeting a "one compartment" damaged stability standard For a ship of its generation, the hull design of the N.S. SA VANTNAH was that of a conventional vessel with trim and modem lines, designed in accordance with the latest practice in naval architecture and hydrodynamics.
The principal safety features in the hull design may be summarized as follows:
: 1. The hull is divided by 10 watertight bulkheads terminating at the B-deck level.
: 2. The ship wVill femiairi dfl6*i if nriy *W6 6f the iifie ý6iipaffiit &ir6fl66ded Within the meaning of U.S. Coast Guard (USCG) stability requirements.
: 3. Conventional all-welded steel construction is employed with full-continuity of structural members, except for a few longitudinal riveted seams serving as crack arresters in accordance with contemporary practices.
: 4. A 5-foot deep watertight double-bottom extends under all nine compartments but not under fore peak or after peak ballast tanks.
: 5. Special care was taken in the selection of materials to minimize galvanic corrosion.
: 6. The reactor compartment is reinforced outboard of the containment vessel with additional longitudinal and athwartship bulkheads, in addition to a laminated redwood and steel collision mat on each side, to minimize penetration in the event of a collision amidships.
: 7. The design details and construction of all components and systems was in accordance with the contemporary regulations of the Safety of Life at Sea Convention (SOLAS), MARAD, USCG, the U.S. Public Health Service, the American Bureau of Shipping (ABS) and other regulatory bodies.
1.2.2    The Power Plant From the beginning of the project, analyses of hypothetical casualties and topical reports covering every phase of the design were prepared and reviewed by the regulatory agencies as well as Oak Ridge National Laboratory (ORNL). In addition, a comprehensive analysis of reactor safeguards was prepared for review by the AEC and for the critical examination of the AEC's Advisory Committee on Reactor Safeguards (ACRS).
1.2.2.1      General In the design and construction of the power plant, a special philosophy of safety and reliability was adopted at the outset of the project. Both preparatory and concurrent research and development work and special operational testing were undertaken in many areas, including a series of critical experiments on various configurations and designs for the reactor core, full scale testing of a prototype control rod drive mechanism and system under simulated reactor Rev. VII                                                9
Updated Final Safety Analysis Report - (STS-004-002) conditions, irradiation tests of fuel elements and pellets, containment vessel leak rate tests and filter efficiency tests.
1.2.2.2      Particular Safety Features The NSS has four remaining safety features in the power plant design that merit special mention:
: 1. Reactor System Containment - The reactor and primary coolant system are located inside a containment vessel. During the operating period, any failure of the primary system would have been contained by the containment vessel system. The CV system, consisting of a USCG approved pressure vessel and associated isolation valves, was designed and hydrostatically tested to withstand a pressure of 173 psig. During the operating period, the system was routinely pneumatically tested at 60 psig and demonstrated to have a leak rate of less than 1.2% of the contained volume per day. No integrated leak rate testing has been performed since the final shutdown in November 1970.
: 2. Containment Vessel Isolation - During the operating period, the reactor system was operated with the CV hermetically sealed at all times. The penetrating pipe lines were isolated by automatic valves if the pressure inside the containment vessel rose above 5 psig for any reason whatsoever. The steel containment vessel, moreover, was sufficiently thick that no danger of penetration existed from any high speed missiles within the containment vessel, such as a thermocouple well from the primary coolant system. No individual penetrations have been leak rate tested since the final shutdown in November 1970.
: 3. Radioactive Waste Control - During the operating period, the power plant operated with a minimum of radioactive waste disposal. Gaseous and liquid wastes were discharged in accordance with the "Standards for Protection Against Radiation" (10 CFR Part 20) and the Technical Specifications. Any solid wastes are kept aboard the ship and periodically discharged to a licensed waste disposal facility.
: 4. Shielding - During the operating period, the reactor vessel was surrounded laterally by 33 inches of water and I to 4 inches of lead shielding so that maintenance work was possible shortly after shutdown. In 1976, the reactor vessel shield water tank was drained. The secondary shielding around the containment vessel fediiced the siifdiie&d696 1IekMl at frill reactor power to no more than 100 mR per week.
1.3    Ship and System Status - 1976 to Present 1.3.1    Power Plant Status as reported in April 1976 In support of the request for a possession only license in 1976, MARAD provided a "current" (i.e.,
contemporary) status of the ship. The April 1976 status of the NSS reactor plant following protective storage modifications to its operating condition was noted as follows:
: 1. Reactor Vessel - All 32 Core Ia fuel elements were removed from the reactor vessel to the spent fuel pool at the MARAD Refueling Facility, Todd Shipyards, Galveston, TX [License SNM-101 5-YGP (Docket 70-1062)]. All reactor internal components are in place, i.e., core basket, upper grid plate, upper flow baffle. Thirty-six upper flow transition pieces and one irradiated control rod (cut in three pieces) have been loaded into six fuel element channels in the core basket. Thirty-two upper flow transition pieces were from Core I and four were from Core Ia (i.e., the 1968 fuel shuffle). The additional control rod was the one replaced during the 1968 fuel shuffle. The reactor head is in place with six of the original 48 reactor head hold down studs tensioned.
Rev. VII                                                  10
Updated Final Safety Analysis Report - (STS-004-002)
: 2. Spent Fuel - Per September 21, 1973, Operations Report, thirty six spent fuel elements (Core I and la) were shipped from Galveston, TX to AEC - Savannah River Plant, Aiken, SC in nine shipments from October 4 through December 21, 1972 via a lowboy trailer using the Piqua/Elk River Shipping cask.
: 3. Fission Chambers - Per September 21, 1973, Operations Report, five fission Chambers were removed and shipped to Todd Shipyards, Galveston, TX in May 1973. On June 28, 1973, these five and an additional three stored on the NSV Atomic Servant (the nuclear services barge for NSS) were shipped to Chem-Nuclear Systems, Inc., Barnwell, SC for disposition as radioactive material.
: 4. Pressurizer - One relief valve PR-1V was removed. The nozzle flange was fitted with an absolute filter vent to allow for pressure equalization. Circuit breakers for the heaters have been opened at the switchboard.
: 5. Control Rod Drive System -
: a. Electrical - The breakers for the rod drives have been opened and tagged in the Control Rod Drive Electrical Cubicle and the Control Room. The cables between the junction boxes on the Control Rod Drive (CRD) structure and the junction boxes located around the periphery of the cupola have been disconnected, coiled and secured on the CRD structure in the containment vessel. The support wireways have been removed, packaged and stored in Hold No. 4. In addition, the twenty one buffer seal flow meter cables and the vibration monitor cables have been disconnected.
: b. Mechanical - All hydraulic oil has been drained and the piping disconnected between the cupola and the CRD structure. Buffer seal system valves have been closed and tagged out.
The inlet and outlet header spool pieces between the cupola and structure were removed.
The buffer seal system has been drained.
The 21 control rods were disconnected from their respective CRD extension shafts and remain in their fully inserted position between the empty fuel location channels. The CRD extension shafts have been disconnected from the lead screw and are in a fully inserted position from the reactor head nozzles to the top of the control rods. The CRD lead screws were withdrawn and pinned in place. Steel caps are placed onto the 21 reactor head nozzles to completely seal the nozzle from the containment vessel atmosphere and mechanically separate the CRD mechanism from the control rod.
: 6. Primary Coolant System - The system has been drained as completely as practical. All loop isolation inlet and outlet valves are open and back seated.
Primary Pump motors and impellers were removed. Blank flanges are installed over the volute openings. The grating, piping, valves, ducting, etc. that were disconnected while removing the pumaip fmiotorg and itfipellers ate left in the removed condition within the contairiiefit Veissel.
: 7. Secondary System - Both steam generators and piping were drained of water as completely as practical. The water on the secondary side of the steam generators was transferred to the double bottom tank below the reactor compartment. The isolation valves outside of the containment vessel are closed. There have been no modifications to the secondary system.
Rev. VII                                              II
Updated Final Safety Analysis Report - (STS-004-002) for health physics personnel. This document or any document that replaces it will be revised as necessary to support pre-decommissioning activities.
Procedures used for waste handling processing and characterization will be developed and used as required, with approval controls, throughout decommissioning. In addition, isotopic analyses, waste characterization computer codes and activation analyses are some of the methods which have been and will continue to be used to characterize the waste streams resulting from the NSS's decommissioning.
The procedures will meet 10 CFR 20, 10 CFR 61, disposal site criteria, and other Federal and State regulations.
Radwaste shipping and handling will be performed in accordance with the Quality Assurance Plan, applicable NRC and DOT regulations and administrative procedures. Radioactive waste and material will be shipped either by truck including open and closed transport, trailer mounted shipping cask or by a combination of truck and rail. Shipments will be planned in a practical and efficient manner. Facility procedures will be used with appropriate quality oversight to ensure the shipments are in compliance with company procedures, regulations and the receiving site licensee. Packages, packaging, and labeling for radioactive materials and waste will meet all applicable regulations and requirements.
11.8 IndustrialSafety There is a potential for workers to experience injuries and fatalities as a result of accidents occurring during protective storage or decommissioning activities. Accidents could result from falling objects, fires, operation of equipment, use of tools, lighting equipment and other activities.
The Coast Guard regulations in § 33 CFR 150.600 Subpart G -Workplace Safety and Health discuss requirements for workplace safety and health on a deepwater port. As necessary, this regulation refers to 29 CFR 1910, Occupational Safety and Health Standards. 29 CFR 1910.15, Shipyard employment adopts 29 CFR 1915 for shipbreaking. Shipbreaking is defined as any breaking down of a vessel's structure for the purpose of scrapping the vessel, including the removal of gear, equipment, or any component of a vessel. Although MARAD is not scrapping the NSS, the projected industrial activities associated with decommissioning most closely conform to this definition. Therefore, the shipbreaking code will be adopted for this activity. The occupational health and safety of workers will be protected by implementing measures in accordance with these regulations.
11.8.1 Occupational Health and Environmental Control Facilities and equipment will be provided to protect the occupational health of workers during the protective storage and decommissioning activities of the NSS. Such facilities and equipment include first aid kits within work areas, nearby medical facilities, transportation for injured workers, environmental controls in work areas (i.e. adequate ventilation, dust control, illumination, noise control, potable water and sanitary facilities), radiation protection and asbestos protection.
11.8..2 Personal Protection Personal protection devices provided workers will include, as necessary, hardhats, hearing protection devices, eye and face protection devices, hand protection and respiratory protection devices.
11.8.3 Lifting and Handling Equipment Lifting and handling equipment will comply with manufacturer's specifications and limitations.
Requirements regarding the rated load capacities, operating speeds, hazard warnings or instructions will be followed.
Rev. VII                                              128}}

Latest revision as of 19:50, 4 November 2019

U.S. Dept of Transportation, Submittal of Final Safety Analysis Report, Revision VII
ML13123A333
Person / Time
Site: NS Savannah
Issue date: 05/01/2013
From: Koehler E
US Dept of Transportation, Maritime Admin
To:
Document Control Desk, NRC/FSME
References
STS-004-002, Rev VII
Download: ML13123A333 (32)


Text

U.S. Department Savannah Technical Staff 1200 New Jersey Ave., SE of Transportation Office of Ship Disposal Washington, DC 20590 Maritime Administration Ref: 10 CFR 50.71(e)

May 1, 2013 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555

SUBJECT:

Docket No. 50-238; License No. NS-1; N.S. SAVANNAH Submittal of Final Safety Analysis Report, Revision VII Pursuant to 10 CFR 50.71(e), the Maritime Administration (MARAD) hereby submits Revision VII of the Final Safety Analysis Report as Enclosure (1). MARAD certifies that the updated information accurately presents changes made since the previous revision.

Revision VII is submitted on a replacement-page basis and includes a list which identifies the current pages of the FSAR following page replacement. The updated FSAR includes the effects of the following:

a all changes made in the facility or procedures as described in the FSAR; U

all safety evaluations performed to support a license amendments; and, a all analyses of new safety issues performed by or on behalf of the licensee at Commission request.

This submittal contains no new Regulatory Commitments.

If there are any questions or concerns with any issue discussed in this request, please contact me at (202) 366-2631, and/or e-mail me at erhard.koehler@dot.gov.

Erhard W. Koehler Senior Technical Advisor, N.S. SAVANNAH Office of Ship Disposal Enclosure

Docket No. 50-238; License NS-I; N.S. SA VANNAH Submittal of Final Safety Analysis Report, Revision VII May 1, 2013

Enclosure:

1. Change Instructions and Replacement Pages for Final Safety Analysis Report, Revision VII 2

Docket No. 50-238; License NS-1; N.S. SAVANNAH Submittal of Final Safety Analysis Report, Revision VII May 1, 2013 cc:

Electronic copy NSS ESC NSS SRC MAR 610, 612, 615 Hardcopy, cover letter only MAR-600, 640, 640.2 Hardcopy w/ all enclosures MAR-100, 640.2 (ri)

USNRC (John T. Buckley, Mark C. Roberts)

USNRC Regional Administrator - NRC Region I MD Department of the Environment (Roland G. Fletcher; George S. Aburn, Jr.)

NC Department of Environment & Natural Resources (Beverly 0. Hall)

SC Department of Health & Environmental Control (Susan E. Jenkins; Aaron Gantt)

VA Department of Emergency Management (Michael M. Cline)

VA Dcpartmcnt of Hcalth (Lcslic P. Foldcsi)

EWK/jmo 3

Sa-U.S. Department Savannah Technical Staff 1200 New Jersey Ave., SE of Transportation Office of Ship Disposal Washington, DC 20590 Maritime Administration Docket No. 50-238; License No. NS-1; N.S. SAVANNAH to Submittal of Final Safety Analysis Report, Revision VII 4

Docket No. 50-238; License NS-1; N.S. SAVANNAH to Submittal of Final Safety Analysis Report, Revision VIt May 1, 2013 Change Instructions for Final Safety Analysis Report, Revision VII Replace the following pages of the Final Safety Analysis Report, Revision VI with the attached revised pages. The revised pages are identified by revision number and contain marginal lines indicating the areas of change.

REMOVE INSERT Title Page Title Page ii through xiv ii through xv 1-11 1-11 128 128 5

U.S. Department of Transportation Maritime Administration Office of Ship Disposal N.S. SAVANNAH UPDATED FINAL SAFETY ANALYSIS REPORT

'S-004-002

)17 /

Senior Technical Advisor Prepared by:

Totes Services, Inc.

Updated Final Safety Analysis Report - (STS-004-002)

RECORD OF REVISIONS Summary of Revisions Revision Following Final Shutdown and Permanent Defueling STS-004-002, A complete revision to the FSAR that incorporates numerous changes that Revsi Ioccurred from 1968 through March 2007 Revision IV STS-004-002, These revision numbers to the STS were not used. By not using these numbers, Revsions14-0 the revision number for the FSAR and the revision number to STS-004-002 will be the same revision number.

STS-004-002, This revision incorporates changes that occurred after March 2007. The most Rev. 5; significant changes are in Chapter 2 (Fire Detection and Alarm Systems, Security FSAR Revision Systems and General Alarm) and Chapter 3 (Ship Movement and Port Operating V Criteria).

STS-004-002, This revision incorporates changes that occurred after March 2009. The most Rev. 6; significant change was the electrical modification to deenergize all originally installed 450 volt switchgear. All required 450/480 volt loads were moved to a I

FSAR Revision new 800A Shore Power Switchboard. Chapter 2.4.2, Fire Detection and Alarm VI system (FA) and Chapter 2.9. Dehumidification System were rewritten.

STS-004-002, This revision incorporates changes that occurred after March 2011. These changes Rev. 7; correct historical discussion in Chapter 1 and correct grammatical errors in Chapter FSAR Revision VII Rev. VII ii

Updated Final Safety Analysis Report - (STS-004-002)

PREVIOUS ISSUES N.S. SAVANNAH SAFETY ASSESSMENT, Volumes I-V, 1960-1962 N.S. SAVANNAH HAZARDS

SUMMARY

REPORT FOR DOCKSIDE OPERATION, September 1963 N.S. SA VANNAH HAZARDS

SUMMARY

REPORT FOR 1964 SEA TRIALS, December 1963 N.S. SAVANNAH SAFETY ASSESSMENT, Revision 1,July 1965 N.S. SA vANAH SAFETY ASSESSMENT, Revision II, March 1967 SAFETY ANALYSIS REPORT N.S. SA VANNAH FUEL SHUFFLE, December 1, 1967 N.S. SA VA*NAH SAFETY ASSESSMENT, Revision III, October 1968 SAFETY ANALYSIS

SUMMARY

- N.S. SAVANNAH DEFUELING, February 1971 SUPPLEMENT NO. I TO SAFETY ANALYSIS REPORT N.S. SAVANNAH FUEL SHUFFLE -

FUELING WITH CORE II, October 1971 (Note that Core H was never installed)

UPDATED FINAL SAFETY ANALYSIS REPORT, Revision IV, April 2007 UPDATED FINAL SAFETY ANALYSIS REPORT, Revision V, May 2009 UPDATED FINAL SAFETY ANALYSIS REPORT, Revision VI, May 2011 Rev. VII °.°

Updated Final Safety Analysis Report - (STS-004-002)

LIST OF EFFECTIVE PAGES Page Rev. Page Rev. Page Rev. Page Rev. Page Rev.

No. No. No. No. No. No. No. No. No. No.

Title Page 7 ii 7 iii 7 iv 7 v Page 7 vi 7 vii 7 viii 7 ix 7 x 7 xi 7 xii 7 xiii 7 xiv 7 xv 7 1 7 2 7 3 7 4 7 5 7 6 7 7 7 8 7 9 7 10 7 11 7 12 6 13 6 14 6 15 6 16 6 17 6 18 6 19 6 20 6 21 6 22 6 23 6 24 6 25 6 26 6 27 6 28 6 29 6 30 6 31 6 32 6 33 6 34 6 35 6 36 6 37 6 38 6 39 6 40 6 41 6 42 6 43 6 44 6 45 6 46 6 47 6 48 6 49 6 50 6 51 6 52 6 53 6 54 6 55 6 56 6 57 6 58 6 59 6 60 6 61 6 62 6 63 6 64 6 65 6 66 6 67 6 68 6 69 6 70 6 71 6 72 6 73 6 74 6 75 6 76 6 77 6 78 6 79 6 80 6 81 6 82 6 83 6 84 6 85 6 86 6 87 6 88 6 89 6 90 6 91 6 92 6 93 6 94 6 95 6 96 6 97 6 98 6 99 6 100 6 101 6 102 6 103 6 104 6 105 6 106 6 107 6 108 6 109 6 110 6 111 6 112 6 113 6 114 6 115 6 Rev. VIIi iv

Updated Final Safety Analysis Report - (STS-004-002)

Page Rev. Page Rev. Page Rev. Page Rev. Page Rev.

No. No. No. No. No. No. No. No. No. No.

116 6 117 6 118 6 119 6 120 6 121 6 122 6 123 6 124 6 125 6 126 6 127 6 128 7 129 6 130 6 131 6 132 6 133 6 134 6 135 6 136 6 137 6 138 6 139 6 140 6 141 6 142 6 143 6 144 6 145 6 146 6 147 6 148 6 149 6 150 6 151 6 152 6 Rev. VIIE V

Updated Final Safety Analysis Report - (STS-004-002)

Table of Contents Record of Revisions ...................................................................................................................................... ii Previous Issues ............................................................................................................................................. iii List of Effective Pages ................................................................................................................................. iv Forew ord to Revision V II (2013) ............................................................................................................... xiv Forew ord to Revision VI (2011) ................................................................... ................. xiv Foreword to Revision V (2009) ................................................................................................................. xiv Forew ord to Revision IV ............................................................................................................................ xv IN TRO D UCTIO N A ND SUM MA RY ......................................................................................... I 1.1 Sum m ary of Significant Events .................................................................................................... 1 1.2 Principal Safety Features of the Ship....................................................................................... 8 1.2.1 The H ull ..................................................................................................................................... 8 1.2.2 The Pow er Plant ......................................................................................... ...........9 1.3 Ship and System Status - 1976 to Present ............................................................................. 10 1.3.1 Power Plant Status as reported in A pril 1976 ...................................................................... 10 1.3.2 Status of N.S. SAVANNAH from April 1976 - April 2009 ................................................... 13 1.3.3 Radiological and Environmental Characterization Scoping Survey .................................. 17 1.3.4 Current Status of N.S. SAVANNAH April 2009 to present ................................................... 17 1.4 Symbols for the Reactor Plant A uxiliary System s ................................................................. 18 2 SH IP D ESCRIPTIO N ..................................................................................................................... 19 2.1 Features and Characteristics .................................................................................................. 19 2.2 Com partm entation, D ecks and Space Arrangem ent ............................................................... 19 2.2.1 Com partm entation ................................................................................................................... 19 2.2.2 D eck A rrangem ents ........................................................................................................... 20 2.2.3 Space Arrangem ent ........................................................................................................... 21 2.3 N avigation and Steering Equipm ent ...................................................................................... 21 2.3.1 N avigation Equipm ent ....................................................................................................... 21 2.3.2 Steering G ear ........................................................................................................................... 21 2.4 Fire D etection and Control System ......................................................................................... 21 2.4.1 Fire Detecting System ......................................................................................................... 21 2.4.2 Fire Detection and A larm System (FA ) ............................................................................. 22 2.5 Lifesaving Equipm ent ............................................................................................................ 22 2.6 Radio Equipm ent ........................................................................................................................ 22 2.7 D eck M achinery ......................................................................................................................... 22 Rev. VII vi

Updated Final Safety Analysis Report - (STS-004-002) 2.8 Flooding Alarm s ......................................................................................................................... 22 2.9 Dehumidification System ...................................................................................................... 22 2.10 Hull Cathodic Protection System ........................................................................................... 23 2.11 Security System s ......................................................................................................................... 23 2.11.1 Cam era Surveillance System ............................................................................................. 23 2.11.2 Security Entrance Door ....................................................................................................... 23 2.12 General Alarm ............................................................................................................................ 23 3 SITE AND SITE CRITERIA .................................................................................................... 27 3.1 Site Description .......................................................................................................................... 27 3.2 Ship M ovem ent and Port Operating Criteria ........................................................................ 28 3.2.1 Purpose .................................................................................................................................... 28 3.2.2 Ship M ovem ent Criteria .................................................................................................... 28 3.2.3 Port Operating Criteria ....................................................................................................... 29 3.3 Control Zones ............................................................................................................................. 29 3.4 Com parison with Central Station Site criteria in the USA ................................................... 29 4 CONTAINM ENT ........................................................................................................................... 30 4.1 Introduction ................................................................................................................................ 30 4.2 Primary Containm ent (Containm ent Vessel) ........................................................................ 30 4.2.1 Function and General Design Criteria ............................................................................... 30 4.2.2 Containm ent Vessel ............................................................................................................ 31 4.2.3 Containm ent Vessel Penetrations ...................................................................................... 33 4.2.4 Containm ent Auxiliary Features ......................................................................................... 34 4.2.5 Containm ent Perform ance Requirements ........................................................................... 36 4.3 Reactor Compartm ent (Secondary Containm ent) ................................................................. 36 4.3.1 General Description ............................................................................................................ 36 4.3.2 Cooling Section ....................................................................................................................... 37 4.3.3 Exhaust Section ....................................................................................................................... 37 5 RAD IATION SH IELDIN G ...................................................................................................... 53 5.1 Design Basis ............................................................................................................................... 53 5.2 Radiation Sources ....................................................................................................................... 53 5.3 Radiation Shields ......................................................................................................................... 53 5.3.1 Prim ary Shield ......................................................................................................................... 53 5.3.2 Secondary Shield ..................................................................................................................... 53 5.3.3 Local Shielding ........................................................................................................................ 55 5.4 Radiation Sources ....................................................................................................................... 55 5.5 Shield Surveys ............................................................................................................................ 55 5.6 Calculated Doses from Failed Fuel Rods ............................................................................... 55 6 REACTOR CORE .......................................................................................................................... 56 6.1 Reactor Core General Description........................................................................................ 56 Rev. VII vii

Updated Final Safety Analysis Report - (STS-004-002) 6.1.1 Fuel Elem ents .......................................................................................................................... 56 6.1.2 Control Rods ........................................................................................................................... 56 6.1.3 Internals ................................................................................................................................... 56 6.2 Therm al and Hydraulic Characteristics ................................................................................. 58 6.3 Nuclear Characteristics ......................................................................................................... 58 6.4 Shipboard Physics Test Program ........................................................................................... 58 7 PRIM ARY COOLANT SYSTEM .............................................................................................. 60 7.1 General Description .................................................................................................................... 60 7.1.1 General Design Data ......................................................................................................... 60 7.1.2 General Performance Data .................................................................................................. 61 7.2 Reactor Vessel ............................................................................................................................ 64 7.3 Steam Generators ........................................................................................................................ 66 7.4 Pressurizer .................................................................................................................................. 67 7.5 Primary Pum ps ........................................................................................................................... 69 7.6 Valves ......................................................................................................................................... 69 7.7 Primary (Neutron) Shield Tank ............................................................................................. 69 7.8 Primary Piping ............................................................................................................................ 69 8 POWER CONVERSION SYSTEM S ......................................................................................... 71 8.1 Steam Generators ........................................................................................................................ 71 8.1.1 General Description ............................................................................................................ 71 8.1.2 Design Conditions ................................................................................................................... 72 8.1.3 Construction Features ......................................................................................................... 73 8.2 M ain and Auxiliary Steam Systems ...................................................................................... 73 8.2.1 M ain Steam System ........................................................................................................... 73 8.2.2 Auxiliary Steam System .................................................................................................... 74 8.2.3 Interm ediate Pressure Steam System .................................................................................. 74 8.3 M ain Propulsion System ....................................................................................................... 74 8.3.1 High-Pressure Turbine ...................................................................................................... 74 8.3.2 Low-Pressure and Astern Turbine ...................................................................................... 75 8.3.3 Reduction Gears ...................................................................................................................... 75 8.3.4 Propulsion Shafting and Propeller ....................................................................................... 75 8.3.5 M ain Condenser ...................................................................................................................... 75 8.3.6 M ain Condensate and Feedwater System ........................................................................... 76 8.4 Emergency Propulsion System ............................................................................................. 77 8.5 Electrical Power Systems ...................................................................................................... 77 8.5.1 Shore Power Connection .................................................................................................... 78 8.5.2 Power D istribution .................................................................................................................. 78 8.6 Auxiliary Engine Room System s ........................................................................................... 87 8.6.1 Instrum ent Air System ....................................................................................................... 87 8.6.2 W aste D ilution and Disposal (W D) System ...................................................................... 88 8.6.3 Engine Room Ventilation System ...................................................................................... 89 Rev. VII viii

Updated Final Safety Analysis Report - (STS-004-002) 8.6.4 Blow down Evaporator System ........................................................................................... 89 8.6.5 Fresh W ater System ............................................................................................................ 89 8.7 W ater Chemistry and Control ................................................................................................ 90 8.7.1 Prim ary System ....................................................................................................................... 90 8.7.2 Secondary System ................................................................................................................... 91 8.7.3 Laboratory Arrangem ents.................................................................................................. 93 8.7.4 Instrum entation ........................................................................................................................ 94 8.7.5 Operating Experience ......................................................................................................... 94 8.8 Power Plant Perform ance ...................................................................................................... 94 9 REACTOR PLANT AUXILIARY SYSTEMS ........................................................................ 95 9.1 Reactor Emergency System s .................................................................................................. 95 9.1.1 Emergency Cooling (DK ) System ...................................................................................... 95 9.1.2 Soluble Poison (SP) System ............................................................................................... 96 9.2 Reactor A uxiliary Systems .................................................................................................... 96 9.2.1 Prim ary Loop Purification (PP) System ............................................................................. 96 9.2.2 Buffer Seal (SL) System ..................................................................................................... 99 9.2.3 Hydrogen Addition (HA) System .......................................................................................... 102 9.2.4 Primary Relief (PR) System .................................................................................................. 103 9.2.5 Prim ary Sampling (SA ) System ............................................................................................ 104 9.2.6 Interm ediate Cooling Water (CW ) System ........................................................................... 106 9.2.7 Containm ent Cooling (CC) System ....................................................................................... 110 9.2.8 Shutdown Circulation (SC) System ....................................................................................... 113 9.2.9 Prim ary Pressurizing (PE) System ........................................................................................ 113 9.3 W aste M anagem ent System s .................................................................................................... 115 9.3.1 Equipm ent Drain and W aste Collection (PD) System ........................................................... 115 9.3.2 Gaseous W aste Collection and D isposal (W L) System ......................................................... 118 10 INSTRUM ENTATION A ND CONTROL ................................................................................... 121 10.1 General Description .................................................................................................................. 121 10.2 Plant Control Arrangem ent ....................................................................................................... 121 10.2.1 Introduction ........................................................................................................................... 121 10.2.2 M ain Control Room ............................................................................................................... 121 10.2.3 Hydraulic Power Supply Room ............................................................................................. 122 10.2.4 GE Cubicle ............................................................................................................................ 122 10.2.5 Em ergency Generator Room ................................................................................................. 122 10.2.6 Forward Control Area ........................................................................................................... 122 10.2.7 Data Acquisition System ....................................................................................................... 122 10.3 Instrum entation ......................................................................................................................... 122 10.3.1 N uclear Instrum entation System ........................................................................................... 122 10.3.2 Safety System ........................................................................................................................ 122 10.3.3 N on-nuclear Instrum entation ................................................................................................. 123 10.4 Reactor Control ......................................................................................................................... 123 10.5 Control Rod Drive System ........................................................................................................ 123 Rev. VII ix

Updated Final Safety Analysis Report - (STS-004-002) 10.5.1 System Description ................................................................................................................ 123 10.5.2 Control Rod Drive Mechanisms ............................................................................................ 123 10.5.3 System Status as of March 1976 ........................................................................................... 123 10.6 Radiation M onitoring System ................................................................................................... 124 11 COND UCT OF LICEN SED ACTIV ITIES .................................................................................. 125 11.1 Organization ............................................................................................................................. 125 11.2 Training .................................................................................................................................... 126 11.3 Procedures ................................................................................................................................ 126 11.4 Records ..................................................................................................................................... 126 11.5 Quality Assurance Plan ............................................................................................................ 127 11.6 Port Operating Plans ................................................................................................................. 127 11.7 Radiation Protection Plan ......................................................................................................... 127 11.8 Industrial Safety ........................................................................................................................ 128 11.8.1 Occupational Health and Environm ental Control ................................................................. 128 11.8.2 Personal Protection ................................................................................................................ 128 11.8.3 Lifting and Handling Equipment ...................................................................................... 128 12 SH IP ACCID ENTS ...................................................................................................................... 129 12.1 Introduction .............................................................................................................................. 129 12.2 Conventional Ship Safety ......................................................................................................... 129 12.3 Collisions and A llisions ............................................................................................................ 129 12.4 Grounding ................................................................................................................................. 130 12.5 Heavy W eather ......................................................................................................................... 131 12.6 Fire and Explosion .................................................................................................................... 132 12.7 Flooding and Sinking ................................................................................................................ 133 12.8 Salvage ...................................................................................................................................... 133 13 RADIOLOGICAL AND ENVIRONMENTAL CHARACTERIZATION .................................. 134 13.1 Radiological Characterization Scoping Survey ........................................................................ 134 13.1.1 Dose Rates ............................................................................................................................. 135 13.1.2 Radiological Contam ination .................................................................................................. 135 13.1.3 Non-Radiological Areas ........................................................................................................ 135 13.1.4 Radiological Areas ................................................................................................................ 136 13.1.5 Reactor Compartm ent (Secondary Containm ent) ................................................................. 137 13.1.6 Containm ent Vessel ............................................................................................................... 138 13.1.7 Estimate of the Quantity and Distribution of Radionuclides ................................................. 138 13.1.8 Calculation of Total Contam ination Inventory ...................................................................... 142 13.1.9 Reactor Pressure Vessel (RPV) ............................................................................................. 144 13.2 Environm ental Characterization (HA ZM AT) Scoping Survey ................................................ 145 13.2.1 Asbestos-Containing M aterial ............................................................................................... 146 13.2.2 Lead-Based Paint ................................................................................................................... 146 13.2.3 Liquids ................................................................................................................................... 146 Rev. VII x

Updated Final Safety Analysis Report - (STS-004-002) 13.2.4 Polychlorinated Biphenyls (PCBs) ........................................................................................ 147 13.2.5 Mercury ................................................................................................................................. 148 13.3 U pdates to Known Radiological Conditions ............................................................................ 148 13.4 References ................................................................................................................................ 148 14 ACCIDENT ANALYSIS .............................................................................................................. 149 14.1 Overview .................................................................................................................................. 149 14.2 Radiation Exposures during Licensed Activities ...................................................................... 150 14.2.1 O ffsite and Unrestricted Area Exposure ................................................................................ 150 14.2.2 O ccupational Radiation Exposure ......................................................................................... 150 14.2.3 Radiation Exposure from Radwaste Transportation .............................................................. 150 14.3 Protective Action Guidelines (PAGs) ....................................................................................... 150 14.4 M aterials Handling A ccident .................................................................................................... 151 14.5 Summ ary ................................................................................................................................... 152 Rev. VII xi

Updated Final Safety Analysis Report - (STS-004-002)

List of Tables Table 1-1 Chronology of Significant Events 2 Table 1-2 Tank Designation 12 Table 2-1 Principal Characteristics of the N.S. SA VANNAH 19 Table 2-2 Compartment Utilization 20 Table 4-1 List of Containment Penetrations 41 Table 6-1 Reactor Internals 58 Table 7-1 Primary System Water Quality 63 Table 7-2 Primary System Radiochemistry 63 Table 8-1 Steam Generator Data 72 Table 8-2 Group Control Centers 83 Table 8-3 480-Volt Power Panels 84 Table 8-4 450-Volt Power Panels 84 Table 8-5 120-Volt Power Panels 86 Table 8-6 Primary System Water Quality 90 Table 8-7 Steam Generator Water Quality 91 Table 9-1 Liquid Drainage and Storage 115 Table 9-2 Double Bottom Tanks below RC 117 Table 13-1 Non-Radiological Area Summary 136 Table 13-2 Radiological Area Summary 136 Table 13-3 Reactor Compartment Radiological Summary 137 Table 13-4 Containment Vessel Radiological Summary 138 Table 13-5 Area Monitoring Results 140 Table 13-6 Sample Analysis Results 141 Table 13-7 Total Surface Contamination Inventory 142 Table 13-8 Steam Generator Dose Rates (primary system side) 143 Table 13-9 Steam Generator Contamination Levels (primary system side) 143 Table 13-10 Volume of water remaining in the Primary Coolant system 144 Table 13-11 Summary of Radioactivity Present 145 Table 13-12 Summary of Radioactivity Present 145 Table 13-13 Radiological Spaces Liquid Sample Summary 147 Rev. VII xii

Updated Final Safety Analysis Report - (STS-004-002)

List of Figures Figure 2-1 Containment, Reactor Compartment and Engine Room (Frames99-148) 24 Figure 2-2 General Arrangement - Inboard Profile and Decks - Promenade, A and B 25 Figure 2-3 General Arrangement - Decks - C, D, Flats, Tank Tops and Containment Vessel 26 Figure 4-1 Arrangement of Principal Components in Containment 31 Figure 4-2 Containment Inerting Schematic 36 Figure 4-3 Reactor Compartment 37 Figure 4-4 Containment Vessel (showing the secondary shield) 40 Figure 5-1 Primary Shield Tank 54 Figure 6-1 Reactor Internals 59 Figure 7-1 Plant Arrangement in the Containment Vessel 62 Figurc 7-2 Rcactor Vcsscl during Fabrication 64 Figure 7-3 Reactor Vessel 65 Figure 7-4 Steam Generator 66 Figure 7-5 Pressurizer 68 Figure 8-1 Original Electrical Distribution System 80 Figure 8-2 Current Electrical Distribution System 480 VAC 81 Figure 9-1 Double Bottom Tanks below RC 118 Figure 9-2 Double Bottom Tanks 120 Rev. VII °°°i

Updated Final Safety Analysis Report - (STS-004-002)

FOREWORD TO REVISION VII (2013)

Revision VII to the UFSAR is the 2013 biennial update. This revision corrects historical discussion in Chapter 1 and grammatical errors in Chapter 11. Minor formatting changes are included to clarify the intent and structure of the document.

The ship and its nuclear facilities remain in protective storage. The ship is in an active layberthing condition, with a retention crew and regular attendance by the Maritime Administration's nuclear operations staff. This condition is projected to continue throughout the next two-year biennial UFSAR update period. The updated safety analyses found in this revision apply to all activities within the site boundary (i.e.; all shipboard activities), regardless of how they may be characterized.

FOREWORD TO REVISION VI (2011)

Revision VI to the UFSAR is the 2011 biennial update. This revision incorporates changes based on improved staff knowledge and understanding of the condition of the ship and its infrastructure based on continuous crewing since 2009. Revision VI also incorporates, as appropriate, materials and information contained in license submittals over the past two years. Minor formatting changes are included to clarify the intent and structure of the document.

The ship and its nuclear facilities remain in protective storage. The ship is in an active layberthing condition, with a retention crew and regular attendance by the Maritime Administration's nuclear operations staff. This condition is projected to continue throughout the next two-year biennial UFSAR update period. The updated safety analyses found in this revision apply to all activities within the site boundary (i.e.; all shipboard activities), regardless of how they may be characterized.

FOREWORD TO REVISION V (2009)

Revision V to the UFSAR is the 2009 biennial update. This revision incorporates changes based on improved staff knowledge and understanding of the condition of the ship and its infrastructure based on continuous crewing since 2001. ikevision V also incorporates materials and inf6rmation contained in license submittals over the past two years, including the most recent (April 2008) license amendment (14), the May 2008 Environmental Assessment (EA), and the December 2008 Post Shutdown Decommissioning Activities Report (PSDAR). Minor formatting changes are included to clarify the intent and structure of the document.

The ship and its nuclear facilities remain in protective storage. The ship is in an active layberthing condition, with a retention crew of four persons and regular attendance by the Maritime Administration's nuclear operations staff. This condition is projected to continue throughout the next two-year biennial UFSAR update period. The updated safety analyses found in this revision apply to all activities within the site boundary (i.e.; all shipboard activities), regardless of how they may be characterized.

The near-term focus of decommissioning planning, as described in the EA and PSDAR, is to bring the ship and its nuclear facilities into conformance with contemporary NRC SAFSTOR criteria, and to place the ship into active retention for a period of as much as 15 years before starting DECON and License Termination. This revision provides appropriate safety analyses and bounding conditions for these activities.

Rev. VII xiv

Updated Final Safety Analysis Report - (STS-004-002)

FOREWORD TO REVISION IV Revision IV to the FSAR is intended to provide a 2007 status of the N.S. SAVANNAH. It is a complete rewrite of Revision III and includes a summary of numerous documents submitted to the NRC since the last update in 1968, including the most recent (January 2007) license amendment (13).

At the end of 1972, after the ship had been defueled and placed in wet layup status, the Maritime Administration decided not to refuel the ship and return it to service. In effect, this decision made the 1970 and 1971 actions permanent. The final shutdown was in November 1970 and the permanent defueling was completed in fall 1971, these actions are retroactively considered to be permanent cessation of operations. Therefore, the fall 1971 defueling became the de facto permanent defueling and cessation of operations with the issuance of Technical Specification Change 13.

The ship is in a state of protective storage. Most weather openings are sealed. Almost no mechanical system or equipment is functional excepted as noted in the following text. The functional systems include a significant portion of the electrical distribution system, the hull cathodic protection system, the dehumidification (DH) system, the intrusion, fire and flooding alarm system and the anchor windlass.

The DH system was newly installed in 1994, and is mechanically independent of any other ship's system.

Likewise, the alarm system was substantially renewed in 1994 and is isolated from any other ship's system except electrical distribution. Note that modifications associated with the DH and alarm systems (i.e., vent ducting and cabling) generally obstructs the doorways, passageways and ladders throughout ship as is typical in the marine industry for deactivated ships.

The electrical distribution system, hull cathodic protection system and the anchor windlass are the only currently functional portions of the ship's original outfit. Since 1994, there has been minimal maintenance and testing to the ship's electrical system. Any future use of the electrical system would require surveying prior to energizing any of its currently deenergized portions.

Rev. VII XV

Updated Final Safety Analysis Report - (STS-004-002) 1 INTRODUCTION AND

SUMMARY

1.1 Summary of SignificantEvents A nuclear merchant ship was first proposed by President Eisenhower in a speech in New York on April 25, 1955 as evidence of this country's interest in the peaceful uses of atomic energy. Construction was authorized by Public Law 848', which provided funds for the design and construction of a vessel, subsequently named the N.S. SAVANNAH (NSS).

On October 15, 1956, the President directed the Atomic Energy Commission (AEC) and the Maritime Administration (MARAD) to proceed with design and construction. To complement this effort, the entire project was placed under the direction of a dual status staff chosen jointly by MARAD and the AEC. The vessel was designed by George G. Sharp, Inc. Naval Architects of New York. The Babcock and Wilcox Company (B&W) was awarded a fixed price contract for the design and construction of the nuclear power plant auxiliaries. The New York Shipbuilding Corporation (NYS) was selected to construct and test the ship at their Camden, New Jersey shipyard. In 1958, the States Marine Lines, Inc. was engaged as the operating agent for the ship. Todd Shipyard Corporation was chosen to provide the maintenance facility in May 1960. In 1963, American Export Isbrandtsen Lines Inc. (AEIL) became the operating agent. The initial operating License was issued in August 1965. First Atomic Ship Transport Inc., (FAST) a subsidiary of AEIL, placed the NSS in routine cargo service in September 1965.

The NSS, a vessel of the P-2 class (specifically P2-NI-MA40a) was powered by an 80 MWd, pressurized-water nuclear reactor and had a design speed of 22 knots at 22,000 shaft horsepower. The normal cruising speed was 20.25 knots at 20,000 shaft horsepower. The ship was intended to promote international goodwill by being displayed in the seaports of the world. Consequently, it was made as attractive and modem as any vessel of that era and its nuclear power plant was designed with an exceptional degree of reliability and safety.

The prime objectives of the creators of the NSS were to demonstrate the advanced technology and peaceful use of nuclear energy. The operation of a working test-bed laboratory ship provided a tool to be used in the development of economical ships and marine reactor operation. It also established acceptable standards for the design of ship and reactor, operating practices, manning, port entry and operation and safety of crew and the general public. It was necessary therefore, that entry into the domestic and foreign ports was in accordance with mutually acceptable regulations and operational procedures. The successful culmination of these objectives led to the general acceptance of the NSS's safety and reliability by governmental authorities, cargo shippers and the general public.

During its operating phase, regulatory procedures, inspection standards and training requirements were improved and implemented. The relation of manning to the ship's layout, design and service was studied.

The high degree of safety, reliability and performance of the NSS increased an acceptance of nuclear ships in the ports visited.

A chronology of significant events in the NSS program is shown in Table 1-1.

'U.S. Congress, An Act to amend Title VI!. of the Merchant Marine Act, 1936, to authorize the construction of a nuclear-powered merchant ship for operation in foreign commerce of the United States, and for other purposes. 84b Congress, 2nd Session. Public Law 848, (H.R. 6243), 70 STAT. 731, 46 U.S.C. 1206, Approved July 30, 1956.

Rev. VII I

Updated Final Safety Analysis Report - (STS-004-002)

The NSS completed its program of domestic and foreign.port visitation in March 1965. From that time until July 1970, the ship was in commercial cargo operations. The ports visited are listed in Table 1-2.

During the period of 1968 through 1970, future use options for the ship were studied and proposed.

These included the following:

Conversion to: Proposed by:

Fish Protein Concentrate Factory Ship Marine Protein Incorporated Ocean Science Ship Westinghouse Electric Corp.

Marine Nuclear Training Center Todd Shipyards Corp.

Containership including new Reactor and Steam AEIL Generators These options were ultimately rejected, and the ship was removed from service. The ship was permanently shutdown and placed in wet layup in November 1970. In Fall 1971, the nuclear plant was permanently defueled. In March 1976, the ship's primary, auxiliary, and secondary systems were drained as completely as practical.

The ship was bareboat chartered 2 to the Patriots Point Development Authority and berthed at the Patriots Point Naval and Maritime Museum, Mt. Pleasant, SC from 1981 through 1994. The ship was dry docked in Baltimore, MD for hull maintenance and preservation in 1975 and 1994. From 1994 to 2006, the ship was moored at the James River Reserve Fleet, Ft. Eustis, VA. In August 2006, the ship was moved to Colonna's Shipyard, Norfolk, VA for infrequent, required topside maintenance.

The NSS is one of the most historically significant ships in existence. It is one of the first ships to be registered as a National Historic landmark. It is registered as an International Historical Mechanical Engineering Landmark by the American Society of Mechanical Engineers. It is a registered landmark of the American Nuclear Society.

Table 1-1 Chronology of Significant Events President Eisenhower announced a proposal to build a nuclear powered merchant ship to demonstrate peaceful uses of the atom.

July 30, 1956 Congress passed P.L. 848, 84th Congress, authorizing construction of a nuclear powered merchant ship.

October 1956 Contract to Babcock & Wilcox to design and construct the reactor.

MOU established between MARAD and AEC to perform tasks related to January 22, 1957 design development, testing, initial operation and international acceptance of nuclear merchant ships.

April 1957 Contract to George Sharp to design hull.

December 10, 1957 Contract to New York Ship building to construct ship.

2 A bareboat charter is an arrangement where the owner gives possession of the ship to the charterer but no crew or provisions are included as part of the agreement. The charterer is responsible for all operating expenses.

Rev. VII

Updated Final Safety Analysis Report - (STS-004-002)

Table 1-1 Chronology of Significant Events May 22, 1958 Keel laid.

Contract signed with States Marine Lines, to operate ship under General Agency Agreement (AEC and MARAD).

July 21, 1959 Ship launched, crew training began.

May 1960 Sclcction of Todd Shipyard Corporation for nuclear maintcnancc.

July 1960 Component testing started.

November 1960 Systems testing started.

March 1961 Public hearing.

July 24, 1961 Authorization of AEC fueling and operation for test and demonstration purposes.

September 1961 Pre-fueling testing complete.

November 11, 1961 Reactor Core installed.

December 21, 1961 Initial criticality.

U.S. Coast Guard Certificate of Inspection issued (Doe. No. 287392),

Passenger Nuclear.

January 1962 10% testing complete.

March 1962 Initial sea trials at Camden, NJ and Yorktown, VA.

April 19, 1962 States Marine Lines (Operator) under General Agreement.

May 1, 1962 Delivered to and accepted by the Government.

AEC provided interim sea and port operation authorization. Amended November 19, 1962 and May 1, 1963.

Commencement of initial voyage. First voyage to commercial port August 1962 Yorktown, VA to Savannah, GA. Demonstration phase of operations began with voyage from Savannah, GA to Norfolk, VA.

February 1963 Initial voyage complete.

May 1963 Cancellation of General Agent contract with States Marine Lines, Inc.

May 1963 to Spring Labor dispute halted operations.

1964 June 1963 New staff formation.

New Contract signed with American Export Isbrandtsen Lines (AEIL) to July 23, 1963 operate ship under General Agency Agreement from 1964-1965 (New crew trained).

Rev. VII 3

Updated Final Safety Analysis Report - (STS-004-002)

Table 1-1 Chronology of Significant Events February 20, 1964 AEIL sea trials.

1964 Demonstration phase continued (May 1964) voyage from Galveston to East Coast, U.S. ports.

1964-65 Called at U.S. and Western European ports.

May 28, 1964 Resume port operation.

Port visitation program complete and demonstration phase ended Mobile, March 1965 Alabama to Galveston, TX for annual drydocking, maintenance and inspection.

May 11, 1965 First Atomic Ship Transport, Inc. (FAST) and AEIL agreement to operate as a commercial cargo freighter.

May 18, 1965 USCG Certificate of IrspectionRenewed as Cargoý Nuclear.

August 1965 AEC Operating License (NS-1) issued.

August 1965 Experimental commercial operations began. Bareboat chartered to First Atomic Ship Transport, Inc. (FAST) (a subsidiary of AEIL).

September 1965 Begin scheduled commercial operation.

Commercial marine refueling at MARAD Refueling Facility, Todd Shipyards, Galveston, TX. The "fuel shuffle" was intended to extend the life of Core I. At the end of Core I lifetime, a shuffle operation was conducted to configure Core Ia. In this operation the four center elements were removed and replaced with four spare elements, two of 4.6% enrichment and the other two of 4.2%. The remaining 28 elements were rearranged to increase August to October 1968 reactivity. In general, the inside elements were moved out and the outside elements were moved in. Additionally, one control rod was replaced.

During the last voyage before the Fuel Shuffle Outage, evidence of a minor fuel failure was detected. It appeared that small amounts of fission products were released to the primary coolant whenever there was a significant change in reactor power level. Post shuffle operation indicated that the situation still existed; however, it did not limit operation or access anywhere on the ship.

The National Environmental Policy Act of 1969 requires Environmental January 1, 1970 Impact Statements for proposed actions. Past actions such as the initial NS-1 operating license are exempt.

Commercial Operations ended. During experimental commercial operation August 1965 - July 1970, 32 domestic ports and 45 foreign ports were visited.

July 25, 1970 NSS berthed at Pier "E" Todd Shipyards, Galveston, TX and Reactor Shutdown July 29, 1970.

Final Voyage to Pier "E" Todd Shipyards, Galveston, TX from annual November 6-8, 1970 drydocking 10/30 through 11/06 at Todd Shipyards, New Orleans, LA for maintenance per Operations Report, FAST-21 April 26 - November 9, 1970.

Rev. VII 4

Updated Final Safety Analysis Report - (STS-004-002)

Table 1-1 Chronology of Significant Events Final Reactor shutdown at 5:50 PM and established Cold Iron condition at Todd Shipyard, Galveston, TX per FAST-2 1.

November 9, 1970 License NS-1 transferred from FAST to MARAD (License Amendment 7).

April 13, 1971 AEC approved Technical Specification Change 11 to defuel NSS.

Ship at MARAD Refueling Facility, Pier "E" Todd Shipyards, Galveston, TX, for preparation of vessel for lay-up. Started removing fuel August 23, 1971. The last fuel element was removed September 29. Control rod drive (CRD) system disabled and sealed plates installed on 21 CRD head nozzles to separate drives from the control rods. 36 Fuel element flow nozzles were loaded into fuel channels in the reactor vessel. One control rod (cut into two six feet long pieces and one twelve inch piece) was placed in reactor vessel.

This is the control rod removed during the 1968 fuel shuffle. RCP motors and impellers were removed. The RCP volutes were blank flanged. Reactor, secondary and saltwater system filled with water to establish wet lay-up conditions. The reactor vessel head was reinstalled with 6 of the normal 48 studs in place. The containment vessel, port and starboard charge pump room and lower reactor compartment bilges were decontaminated, washed, vacuumed and painted. All cargo holds were decontaminated.

October 24, 1971 U.S. Coast Guard Certificate of Inspection expired and was not renewed.

Permanent cessation of operations established by completing Layup Procedure LU-9. The Layup Procedure LU-9 is the procedure implemented December 3, 1971 by the defueling team. It reinstalled the reactor vessel head with six tensioned reactor head studs. This event establishes the date of permanent cessation of operations.

Towed to Savannah, GA and following a welcoming celebration, additional January 3-10, 1972 non nuclear layup work was performed (4/24/1972, Operations Report) [Not open to Public and primary system and steam generators (boilers) maintained in wet lay-up (MARAD letter Nov 19, 1971)].

AEC stopped review of Core II and noted "If reactivation of N. S. SA VANNAH

,1972 should become planned, an appropriate scope of review would need to be established in light of... the regulatory safety and environmental requirements at that time."

Thirty six spent fuel elements (32 plus the four replaced during the fuel December 21,1972 shuffle) (Core I and Ia) were shipped from Galveston, TX to AEC - Savannah River Plant, Aiken, SC for reprocessing. (September 21, 1973, Operations Report).

License Amendment (Technical Specification Change 13) eliminated "Technical Specifications that referred to operational aspects since all January 29, 1973 nuclear fuel has been removed from the ship and the nuclear power plant (and the ship) is no longer operational." Note that even though the final shutdown was in November 1970 and the permanent defueling was completed in fall Rev. VII 5

Updated Final Safety Analysis Report - (STS-004-002)

Table 1-1 Chronology of Significant Events 1971, these actions were not considered to be permanent cessation of operations until the decision was finally made to not load Core II. Therefore, the fall 1971 defueling became the de facto permanent defueling and cessation of operations with the completion of Layup Procedure LU-9 on December 3, 1971.

1972-75 Legislation transfer shipwas introduced to authorize the Secretary of Commerce to to the City of Savannah, GA.

MARAD memo "Supplemental Memo on Working Document:

EnvironmentalImpact Analysis Nuclear Merchant Ship Program" -MARAD recommended moving Core II from storage at Defense Atomic Support January 31, 1975 Agency, Killeen, TX to Nuclear Weapons and Storage Facility, Manzano Air Force Base, Albuquerque, NM for indefinite storage. This action would be taken via an Interagency Agreement by Energy Research and Development Administration (ERDA) (formerly AEC). Per NSS Defueling Log September 9, 1971, (MMA File 61-8), Core 11 consists of 36 new fuel elements.

Attachment I to memo for Assistant Administrator for Commercial April 3, 1975 Development states "In response to M-700 memo of December 23, 1974,

5. Nuclear Fuel (Core II) it is understood this fuel will be returned to AEC

[ERDA]."

City of Savannah, GA requested removal of the ship and the ship left July 28, 1975 Savannah, GA for Baltimore, MD drydocking.

Moved from Baltimore, MD Drydock to Detyens Shipyard, Inc. Charleston, SC (topside work).

Moved from Detyens Shipyard, Charleston, SC to N. Charleston Army August 29, 1975 Depot, SC pending the outcome of legislation before the Congress to permit use of the NSS as an addition to the Patriots Point Naval and Maritime Museum, Mt. Pleasant, SC.

While at N. Charleston Army Depot, SC, the primary, auxiliary and secondary systems were drained by Todd Research and Technical Division as completely as practical.

Per the September 14, 1976, Annual Operations Report, water from the reactor vessel shield water tank and secondary side of the steam generators was transferred to a double bottom tank below the reactor compartment.

March 1976 Demineralizer resins (28 Ci) and 12,200 gallons of liquid (Primary Coolant and liquid waste) were properly disposed. Three dewatered primary purification ion exchangers (demineralizers) were removed and disposed.

Radiation levels in the containment vessel did not increase appreciably after the water was removed.

Per March 9, 1976 MARAD memo "Status Report on the Transfer of N.S.

SAVANNAH to [James River Reserve Fleet] JFFR," the water from the secondary system was analyzed and does not have to be disposed of as Rev. VII 6

Updated Final Safety Analysis Report - (STS-004-002)

Table 1-1 Chronology of Significant Events nuclear waste.

Possession Only License issued (License Amendment 8) and recognized the May 19, 1976 ship was in a state of protective storage. Total estimated residual activity 1.09E+5 Ci.

Main reduction bull gear was removed (NRC Inspection Report 81-01, March 2, 1981).

Public law 96-331 was enacted to authorize the NSS to be sent to Patriots Point, Mt. Pleasant, SC for use as a Museum and other public purposes.

Bureau Radiological Health, SC Department of Health & Environmental September 24, 1980 Control certifies all ten remaining radioactive sources have been transferred from the ship to them.

Patriots Point Development Authority (PPDA) became a co-licensee and the August 14, 1981 ship was bareboat chartered for public display at the Patriots Point Naval and Maritime Museum, Mt. Pleasant, SC from 1981 through 1994.

The American Society of Mechanical Engineers designated the ship as the Fourteenth International Historic Mechanical Engineering Landmark.

July 15, 1986 The NS-I License was renewed for ten years by License Amendment 11.

September 1989 Hurricane Hugo hits the Charleston, SC area.

The National Park Service designated the ship as a National Historic July 17, 1991Ladrk Landmark.

The Board of Directors for the American Nuclear Society approved the ship for a Nuclear Historic Landmark Award.

Shortly after the second bareboat charter renewal in 14 July 1991, a hull leak developed. After a series of surveys and inspections, funding was requested July 1991 from Congress in 1993 to drydock the ship to correct deterioration of the underwater hull.

December 1993 Public Tours of the ship were no longer allowed.

NSS left Patriots Point on the spring flood tide to minimize silting effects from Hurricane Hugo of September 1989.

License Amendment 12 removed PPDA as co-licensee. After routine drydocking and hull maintenance in Drydock # 4, Sparrows Point, Baltimore, MD, the ship was placed in protective storage at the James River Reserve Fleet, Ft. Eustis, VA. Numerous minor modifications including installation June 29, 1994 of a DH system were completed. Modifications associated with the DH system (i.e., vent ducting and cabling) generally obstructs the doorways, passageways and ladders throughout ship as is typical in the marine industry for deactivated ships.

July 29, 1996 License Renewal was no longer required by the revised 10 CFR 50.51, Rev. VII 7

Updated Final Safety Analysis Report - (STS-004-002)

Table 1-1 Chronology of Significant Events Continuation of license.

(b) Each license for a facility that has permanently ceased operations, continues in effect beyond the expiration date to authorize ownership and possession of the production or utilization facility, until the Commission notifies the licensee in writing that the license is tcrminatcd.

NSS was moved to Colonna's Shipyard, Norfolk, VA for infrequent, required topside maintenance.

Post Shutdown Decommissioning Activities Report, Revision 0 was submitted but withdrawn on January 27, 2007.

January 30, 2007 NSS moved to Pier 23 Newport News, VA for temporary layberthing.

License Amendment 13 was issued. It included six administrative changes.

January 31, 2007 The most significant change is following 30 day notification to NRC, the ship can be located at any appropriate U.S. domestic location with a MARAD approved Port Operating Plan.

NSS was moved to BAE Systems Norfolk Ship Repair facility in South Norfolk, Virginia in preparation for drydocking. On January 19, 2008, the NSS was placed onto the Titan Drydock and remained there until March 3 for May 31, 2007 hull maintenance and exterior surface cleaning and preservation. Hull inspections were conducted and identified no new degradation. These inspections included verifying the integrity of the underwater hull repairs made during the 1994 drydocking availability License Amendment No. 14 was issued. It revised the Technical Specifications to match the current ship status and ship's programs, policies April 3, 2008 and procedures. The function of Review and Audit Committee was revised commensurate with the Decommissioning Quality Assurance Plan. The committee was renamed the Safety Review Committee.

NSS was moved to Pier 13, Canton Marine Terminal at 4601 Newgate Ave.,

Baltimore, MD.

December 11, 2008 Post Shutdown Decommissioning Activities Report, Revision I submitted.

Completed the electrical modifications to deenergize all originally installed November 2010 450 volt switchgear. All required 450/480 volt loads were moved to a new 800A Shore Power Switchboard.

1.2 PrincipalSafety Featuresof the Ship 1.2.1 The Hull This text is retained from Revision III for historical context. In particular, items (1), (3) and (4) from the list below describe structural features installed on the N.S. SA VANNAH to enable it to resist the effects of damage. Item (2) describes the hydrodynamic standard applied to allow the ship to Rev. VII 8

Updated Final Safety Analysis Report - (STS-004-002) passively resist the effects of damage and remain afloat; this condition is referred to as "damaged stability." During the period of museum operations at PPDA, most of the transverse watertight bulkheads listed in (1) were penetrated at various locations to permit convenient personnel access and service connections between the compartments. Most of these penetrations were closed prior to the ship's removal from PPDA in 1994. Current operations only require the NSS to meet "intact stability" requirements, where intact stability refers to the capability of the ship to remain stable when not damaged. Based on stability calculations prepared in 1994 and the current (2008) baseline structural condition assessment, the NSS is presumed capable of meeting a "one compartment" damaged stability standard For a ship of its generation, the hull design of the N.S. SA VANTNAH was that of a conventional vessel with trim and modem lines, designed in accordance with the latest practice in naval architecture and hydrodynamics.

The principal safety features in the hull design may be summarized as follows:

1. The hull is divided by 10 watertight bulkheads terminating at the B-deck level.
2. The ship wVill femiairi dfl6*i if nriy *W6 6f the iifie ý6iipaffiit &ir6fl66ded Within the meaning of U.S. Coast Guard (USCG) stability requirements.
3. Conventional all-welded steel construction is employed with full-continuity of structural members, except for a few longitudinal riveted seams serving as crack arresters in accordance with contemporary practices.
4. A 5-foot deep watertight double-bottom extends under all nine compartments but not under fore peak or after peak ballast tanks.
5. Special care was taken in the selection of materials to minimize galvanic corrosion.
6. The reactor compartment is reinforced outboard of the containment vessel with additional longitudinal and athwartship bulkheads, in addition to a laminated redwood and steel collision mat on each side, to minimize penetration in the event of a collision amidships.
7. The design details and construction of all components and systems was in accordance with the contemporary regulations of the Safety of Life at Sea Convention (SOLAS), MARAD, USCG, the U.S. Public Health Service, the American Bureau of Shipping (ABS) and other regulatory bodies.

1.2.2 The Power Plant From the beginning of the project, analyses of hypothetical casualties and topical reports covering every phase of the design were prepared and reviewed by the regulatory agencies as well as Oak Ridge National Laboratory (ORNL). In addition, a comprehensive analysis of reactor safeguards was prepared for review by the AEC and for the critical examination of the AEC's Advisory Committee on Reactor Safeguards (ACRS).

1.2.2.1 General In the design and construction of the power plant, a special philosophy of safety and reliability was adopted at the outset of the project. Both preparatory and concurrent research and development work and special operational testing were undertaken in many areas, including a series of critical experiments on various configurations and designs for the reactor core, full scale testing of a prototype control rod drive mechanism and system under simulated reactor Rev. VII 9

Updated Final Safety Analysis Report - (STS-004-002) conditions, irradiation tests of fuel elements and pellets, containment vessel leak rate tests and filter efficiency tests.

1.2.2.2 Particular Safety Features The NSS has four remaining safety features in the power plant design that merit special mention:

1. Reactor System Containment - The reactor and primary coolant system are located inside a containment vessel. During the operating period, any failure of the primary system would have been contained by the containment vessel system. The CV system, consisting of a USCG approved pressure vessel and associated isolation valves, was designed and hydrostatically tested to withstand a pressure of 173 psig. During the operating period, the system was routinely pneumatically tested at 60 psig and demonstrated to have a leak rate of less than 1.2% of the contained volume per day. No integrated leak rate testing has been performed since the final shutdown in November 1970.
2. Containment Vessel Isolation - During the operating period, the reactor system was operated with the CV hermetically sealed at all times. The penetrating pipe lines were isolated by automatic valves if the pressure inside the containment vessel rose above 5 psig for any reason whatsoever. The steel containment vessel, moreover, was sufficiently thick that no danger of penetration existed from any high speed missiles within the containment vessel, such as a thermocouple well from the primary coolant system. No individual penetrations have been leak rate tested since the final shutdown in November 1970.
3. Radioactive Waste Control - During the operating period, the power plant operated with a minimum of radioactive waste disposal. Gaseous and liquid wastes were discharged in accordance with the "Standards for Protection Against Radiation" (10 CFR Part 20) and the Technical Specifications. Any solid wastes are kept aboard the ship and periodically discharged to a licensed waste disposal facility.
4. Shielding - During the operating period, the reactor vessel was surrounded laterally by 33 inches of water and I to 4 inches of lead shielding so that maintenance work was possible shortly after shutdown. In 1976, the reactor vessel shield water tank was drained. The secondary shielding around the containment vessel fediiced the siifdiie&d696 1IekMl at frill reactor power to no more than 100 mR per week.

1.3 Ship and System Status - 1976 to Present 1.3.1 Power Plant Status as reported in April 1976 In support of the request for a possession only license in 1976, MARAD provided a "current" (i.e.,

contemporary) status of the ship. The April 1976 status of the NSS reactor plant following protective storage modifications to its operating condition was noted as follows:

1. Reactor Vessel - All 32 Core Ia fuel elements were removed from the reactor vessel to the spent fuel pool at the MARAD Refueling Facility, Todd Shipyards, Galveston, TX [License SNM-101 5-YGP (Docket 70-1062)]. All reactor internal components are in place, i.e., core basket, upper grid plate, upper flow baffle. Thirty-six upper flow transition pieces and one irradiated control rod (cut in three pieces) have been loaded into six fuel element channels in the core basket. Thirty-two upper flow transition pieces were from Core I and four were from Core Ia (i.e., the 1968 fuel shuffle). The additional control rod was the one replaced during the 1968 fuel shuffle. The reactor head is in place with six of the original 48 reactor head hold down studs tensioned.

Rev. VII 10

Updated Final Safety Analysis Report - (STS-004-002)

2. Spent Fuel - Per September 21, 1973, Operations Report, thirty six spent fuel elements (Core I and la) were shipped from Galveston, TX to AEC - Savannah River Plant, Aiken, SC in nine shipments from October 4 through December 21, 1972 via a lowboy trailer using the Piqua/Elk River Shipping cask.
3. Fission Chambers - Per September 21, 1973, Operations Report, five fission Chambers were removed and shipped to Todd Shipyards, Galveston, TX in May 1973. On June 28, 1973, these five and an additional three stored on the NSV Atomic Servant (the nuclear services barge for NSS) were shipped to Chem-Nuclear Systems, Inc., Barnwell, SC for disposition as radioactive material.
4. Pressurizer - One relief valve PR-1V was removed. The nozzle flange was fitted with an absolute filter vent to allow for pressure equalization. Circuit breakers for the heaters have been opened at the switchboard.
5. Control Rod Drive System -
a. Electrical - The breakers for the rod drives have been opened and tagged in the Control Rod Drive Electrical Cubicle and the Control Room. The cables between the junction boxes on the Control Rod Drive (CRD) structure and the junction boxes located around the periphery of the cupola have been disconnected, coiled and secured on the CRD structure in the containment vessel. The support wireways have been removed, packaged and stored in Hold No. 4. In addition, the twenty one buffer seal flow meter cables and the vibration monitor cables have been disconnected.
b. Mechanical - All hydraulic oil has been drained and the piping disconnected between the cupola and the CRD structure. Buffer seal system valves have been closed and tagged out.

The inlet and outlet header spool pieces between the cupola and structure were removed.

The buffer seal system has been drained.

The 21 control rods were disconnected from their respective CRD extension shafts and remain in their fully inserted position between the empty fuel location channels. The CRD extension shafts have been disconnected from the lead screw and are in a fully inserted position from the reactor head nozzles to the top of the control rods. The CRD lead screws were withdrawn and pinned in place. Steel caps are placed onto the 21 reactor head nozzles to completely seal the nozzle from the containment vessel atmosphere and mechanically separate the CRD mechanism from the control rod.

6. Primary Coolant System - The system has been drained as completely as practical. All loop isolation inlet and outlet valves are open and back seated.

Primary Pump motors and impellers were removed. Blank flanges are installed over the volute openings. The grating, piping, valves, ducting, etc. that were disconnected while removing the pumaip fmiotorg and itfipellers ate left in the removed condition within the contairiiefit Veissel.

7. Secondary System - Both steam generators and piping were drained of water as completely as practical. The water on the secondary side of the steam generators was transferred to the double bottom tank below the reactor compartment. The isolation valves outside of the containment vessel are closed. There have been no modifications to the secondary system.

Rev. VII II

Updated Final Safety Analysis Report - (STS-004-002) for health physics personnel. This document or any document that replaces it will be revised as necessary to support pre-decommissioning activities.

Procedures used for waste handling processing and characterization will be developed and used as required, with approval controls, throughout decommissioning. In addition, isotopic analyses, waste characterization computer codes and activation analyses are some of the methods which have been and will continue to be used to characterize the waste streams resulting from the NSS's decommissioning.

The procedures will meet 10 CFR 20, 10 CFR 61, disposal site criteria, and other Federal and State regulations.

Radwaste shipping and handling will be performed in accordance with the Quality Assurance Plan, applicable NRC and DOT regulations and administrative procedures. Radioactive waste and material will be shipped either by truck including open and closed transport, trailer mounted shipping cask or by a combination of truck and rail. Shipments will be planned in a practical and efficient manner. Facility procedures will be used with appropriate quality oversight to ensure the shipments are in compliance with company procedures, regulations and the receiving site licensee. Packages, packaging, and labeling for radioactive materials and waste will meet all applicable regulations and requirements.

11.8 IndustrialSafety There is a potential for workers to experience injuries and fatalities as a result of accidents occurring during protective storage or decommissioning activities. Accidents could result from falling objects, fires, operation of equipment, use of tools, lighting equipment and other activities.

The Coast Guard regulations in § 33 CFR 150.600 Subpart G -Workplace Safety and Health discuss requirements for workplace safety and health on a deepwater port. As necessary, this regulation refers to 29 CFR 1910, Occupational Safety and Health Standards. 29 CFR 1910.15, Shipyard employment adopts 29 CFR 1915 for shipbreaking. Shipbreaking is defined as any breaking down of a vessel's structure for the purpose of scrapping the vessel, including the removal of gear, equipment, or any component of a vessel. Although MARAD is not scrapping the NSS, the projected industrial activities associated with decommissioning most closely conform to this definition. Therefore, the shipbreaking code will be adopted for this activity. The occupational health and safety of workers will be protected by implementing measures in accordance with these regulations.

11.8.1 Occupational Health and Environmental Control Facilities and equipment will be provided to protect the occupational health of workers during the protective storage and decommissioning activities of the NSS. Such facilities and equipment include first aid kits within work areas, nearby medical facilities, transportation for injured workers, environmental controls in work areas (i.e. adequate ventilation, dust control, illumination, noise control, potable water and sanitary facilities), radiation protection and asbestos protection.

11.8..2 Personal Protection Personal protection devices provided workers will include, as necessary, hardhats, hearing protection devices, eye and face protection devices, hand protection and respiratory protection devices.

11.8.3 Lifting and Handling Equipment Lifting and handling equipment will comply with manufacturer's specifications and limitations.

Requirements regarding the rated load capacities, operating speeds, hazard warnings or instructions will be followed.

Rev. VII 128