| issue date = 07/18/2013
| issue date = 07/18/2013
| title = Acceptance Review for TACs MF1970 and MF1971 - Peach Bottom Units 2 and 3 - License Amendment Request to Increase the Safety Relief Valve/Safety Valve Setpoint Tolerance
| title = Acceptance Review for TACs MF1970 and MF1971 - Peach Bottom Units 2 and 3 - License Amendment Request to Increase the Safety Relief Valve/Safety Valve Setpoint Tolerance
| author name = Ennis R B
| author name = Ennis R
| author affiliation = NRC/NRR/DORL/LPLI-2
| author affiliation = NRC/NRR/DORL/LPLI-2
| addressee name = Loomis T
| addressee name = Loomis T
Line 9: Line 9:
| docket = 05000277, 05000278
| docket = 05000277, 05000278
| license number =  
| license number =  
| contact person = Ennis R B
| contact person = Ennis R
| case reference number = TAC MF1970, TAC MF1971
| case reference number = TAC MF1970, TAC MF1971
| document type = E-Mail, Acceptance Review Letter
| document type = E-Mail, Acceptance Review Letter
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:From: Ennis, Rick Sent: Thursday, July 18, 2013 2:36 PM To: Tom Loomis Cc: Kevin Borton (kevin.borton@exeloncorp.com); David Neff  
{{#Wiki_filter:From:                         Ennis, Rick Sent:                         Thursday, July 18, 2013 2:36 PM To:                           Tom Loomis Cc:                           Kevin Borton (kevin.borton@exeloncorp.com); David Neff


==Subject:==
==Subject:==
Acceptance Review for TACs MF1970 and MF1971 - Peach Bottom Units 2 and 3 - License Amendment Request to Increase the Safety Relief Valve/Safety Valve Setpoint Tolerance Tom, By letter dated June 10, 2013 (ADAMS Accession No. ML131750144), Exelon Generation Company, LLC submitted a license amendment request for Peach Bottom Atomic Power Station, Units 2 and 3. The proposed amendment would revise the Technical Specifications (TSs) to: (1) increase the allowable as-found safety relief valve (SRV) and safety valve (SV) lift setpoint tolerance from +/- 1% to +/- 3%; (2) increase the required number of operable SRVs and SVs from 11 to 12; and (3) increase the Standby Liquid Control System pump discharge pressure from 1255 pounds per square inch gauge (psig) to 1275 psig.  
Acceptance Review for TACs MF1970 and MF1971 - Peach Bottom Units 2 and 3 - License Amendment Request to Increase the Safety Relief Valve/Safety Valve Setpoint Tolerance
 
: Tom, By letter dated June 10, 2013 (ADAMS Accession No. ML131750144), Exelon Generation Company, LLC submitted a license amendment request for Peach Bottom Atomic Power Station, Units 2 and 3. The proposed amendment would revise the Technical Specifications (TSs) to: (1) increase the allowable as-found safety relief valve (SRV) and safety valve (SV) lift setpoint tolerance from +/- 1% to +/- 3%; (2) increase the required number of operable SRVs and SVs from 11 to 12; and (3) increase the Standby Liquid Control System pump discharge pressure from 1255 pounds per square inch gauge (psig) to 1275 psig.
The purpose of this e-mail is to provide the result s of the NRC staff's acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.  
The purpose of this e-mail is to provide the results of the NRC staffs acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
 
Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license (including the TSs) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.
Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license (including the TSs) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.  
The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment request in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. You will be advised of any further information needed to support the NRC staffs detailed technical review by separate correspondence.
 
If you have any questions, please contact me at (301) 415-1420.
The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment request in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be inst ances in which issues that impact the NRC staff's ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. You will be advised of any further information needed to support the NRC staff's detailed technical review by separate correspondence.  
 
If you have any questions, please contact me at (301) 415-1420.  
 
Richard B. Ennis, Senior Project Manager Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation}}
Richard B. Ennis, Senior Project Manager Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation}}

Latest revision as of 16:50, 4 November 2019

Acceptance Review for TACs MF1970 and MF1971 - Peach Bottom Units 2 and 3 - License Amendment Request to Increase the Safety Relief Valve/Safety Valve Setpoint Tolerance
ML13199A414
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 07/18/2013
From: Richard Ennis
Plant Licensing Branch 1
To: Tom Loomis
Exelon Generation Co
Ennis R
References
TAC MF1970, TAC MF1971
Download: ML13199A414 (1)


Text

From: Ennis, Rick Sent: Thursday, July 18, 2013 2:36 PM To: Tom Loomis Cc: Kevin Borton (kevin.borton@exeloncorp.com); David Neff

Subject:

Acceptance Review for TACs MF1970 and MF1971 - Peach Bottom Units 2 and 3 - License Amendment Request to Increase the Safety Relief Valve/Safety Valve Setpoint Tolerance

Tom, By letter dated June 10, 2013 (ADAMS Accession No. ML131750144), Exelon Generation Company, LLC submitted a license amendment request for Peach Bottom Atomic Power Station, Units 2 and 3. The proposed amendment would revise the Technical Specifications (TSs) to: (1) increase the allowable as-found safety relief valve (SRV) and safety valve (SV) lift setpoint tolerance from +/- 1% to +/- 3%; (2) increase the required number of operable SRVs and SVs from 11 to 12; and (3) increase the Standby Liquid Control System pump discharge pressure from 1255 pounds per square inch gauge (psig) to 1275 psig.

The purpose of this e-mail is to provide the results of the NRC staffs acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license (including the TSs) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment request in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. You will be advised of any further information needed to support the NRC staffs detailed technical review by separate correspondence.

If you have any questions, please contact me at (301) 415-1420.

Richard B. Ennis, Senior Project Manager Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation