ML13227A102: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(4 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML13227A102
| number = ML13227A102
| issue date = 08/12/2013
| issue date = 08/12/2013
| title = Hope Creek - Facility Comments on Draft NRC-Developed Exam (Operating) (Folder 2)
| title = Facility Comments on Draft NRC-Developed Exam (Operating) (Folder 2)
| author name = Fish T H
| author name = Fish T
| author affiliation = NRC/RGN-I/DRS/OB
| author affiliation = NRC/RGN-I/DRS/OB
| addressee name =  
| addressee name =  
Line 9: Line 9:
| docket = 05000354
| docket = 05000354
| license number = NPF-057
| license number = NPF-057
| contact person = Jackson D E
| contact person = Jackson D
| case reference number = TAC U01872
| case reference number = TAC U01872
| package number = ML13077A118
| package number = ML13077A118
| document type = License-Operator, Part 55 Examination Related Material
| document type = License-Operator, Part 55 Examination Related Material
| page count = 1
| page count = 1
| project = TAC:U01872
| stage = Draft Other
}}
}}


=Text=
=Text=
{{#Wiki_filter:HC Comments on NRC-Developed Operating Test Section A RO Admin A-3: changed critical task to not include check valve bypass valve. SRO Admin A-3: changed critical task to not include check valve bypass valve. SRO A-2: modified system lineup sheet to reflect current plant lineup SRO A-4: modified to require SRO applicants to assess tech spec implications.
{{#Wiki_filter:HC Comments on NRC-Developed Operating Test Section A RO Admin A-3: changed critical task to not include check valve bypass valve.
Section B Sim JPM S-3: enhanced termination criteria.
SRO Admin A-3: changed critical task to not include check valve bypass valve.
Sim JPM S-4: modified RHR flow rate value in script to match sim reading Sim JPM S-4: enhanced termination criteria Sim JPM S-5: added time requirement to critical step Section C Scenario  
SRO A-2: modified system lineup sheet to reflect current plant lineup SRO A-4: modified to require SRO applicants to assess tech spec implications.
#1: added critical task to script (open additional SRV) Scenario  
Section B Sim JPM S-3: enhanced termination criteria.
#1: added BPV jack failure to script Scenario  
Sim JPM S-4: modified RHR flow rate value in script to match sim reading Sim JPM S-4: enhanced termination criteria Sim JPM S-5: added time requirement to critical step Section C Scenario #1: added critical task to script (open additional SRV)
#2: enhanced critical task to match recent licensee change Scenario  
Scenario #1: added BPV jack failure to script Scenario #2: enhanced critical task to match recent licensee change Scenario #2: removed incorrect script actions Scenario #3: updated scenario summary to reflect script Scenario #3: updated "Restore Water Level" critical task with specific water level band Scenario #3: enhanced clarity of RPV-ED critical task description}}
#2: removed incorrect script actions Scenario  
#3: updated scenario summary to reflect script Scenario  
#3: updated "Restore Water Level" critical task with specific water level band Scenario  
#3: enhanced clarity of RPV-ED critical task description}}

Latest revision as of 15:41, 4 November 2019

Facility Comments on Draft NRC-Developed Exam (Operating) (Folder 2)
ML13227A102
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 08/12/2013
From: Todd Fish
Operations Branch I
To:
Public Service Enterprise Group
Jackson D
Shared Package
ML13077A118 List:
References
TAC U01872
Download: ML13227A102 (1)


Text

HC Comments on NRC-Developed Operating Test Section A RO Admin A-3: changed critical task to not include check valve bypass valve.

SRO Admin A-3: changed critical task to not include check valve bypass valve.

SRO A-2: modified system lineup sheet to reflect current plant lineup SRO A-4: modified to require SRO applicants to assess tech spec implications.

Section B Sim JPM S-3: enhanced termination criteria.

Sim JPM S-4: modified RHR flow rate value in script to match sim reading Sim JPM S-4: enhanced termination criteria Sim JPM S-5: added time requirement to critical step Section C Scenario #1: added critical task to script (open additional SRV)

Scenario #1: added BPV jack failure to script Scenario #2: enhanced critical task to match recent licensee change Scenario #2: removed incorrect script actions Scenario #3: updated scenario summary to reflect script Scenario #3: updated "Restore Water Level" critical task with specific water level band Scenario #3: enhanced clarity of RPV-ED critical task description