{{#Wiki_filter:ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0F2., 2ASeismic Walkdown Checklist (SWC)Equipment ID No. Q2E16H05B Sheet i of 3Status: YVNOIN UI[Equip. Class' 10Equipment Description AUX FEEDWA TER PUMP ROOM COOLER 2BLocation:
{{#Wiki_filter:ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS                                                     NO. SNCF164-RPT-02, VERSION 2.0 F2., 2A Sheet i of 3 Status: YVNOIN      UI[
Bldg. AUXILIARY Floor El. 100 Room, Area 2 ] ?#,7-Manufacturer, Model, Etc. (optional but recommended)
Seismic Walkdown Checklist (SWC)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results ofjudgments andfindings.
Equipment IDNo. Q2E16H05B                       Equip. Class' 10 Equipment Description AUX FEEDWA TER PUMP ROOM COOLER 2B Location: Bldg. AUXILIARY Floor El. 100                     Room, Area           2 ] ?#,7-Manufacturer, Model, Etc.     (optional but recommended)
Additional space is provided at the end of this checklist for documenting other comments.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
Anchorage
: 1. Is the anchorage configuration verification required (i.e., is the item oneof the 50% of SWEL items requiring such verification)?
: 1. Is the anchorage configuration verification required (i.e., is the item one  YD N8 of the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?             YgNE-'  UD N/AEI
: 3. Is the anchorage free of corrosion that is more than mild surfaceoxidation?
: 3. Is the anchorage free of corrosion that is more than mild surface            YR(N-     UD N/AD oxidation?
YD N8YgNE-' UD N/AEIYR(N- UD N/AD4. Is the anchorage free of visible cracks in the concrete near the anchors?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?     Y   NI'-I]UD N/AD 7
Y NI'-I] UD N/AD5. Is the anchorage configuration consistent with plant documentation?
: 5. Is the anchorage configuration consistent with plant documentation?           YD ND UD N/A[
(Note: This question only applies if the item is one of the 50% forwhich an anchorage configuration verification is required.)
(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free ofpotentially adverse seismic conditions?
: 6. Based on the above anchorage evaluations, is the anchorage free of            YO'-    U[]
YD ND UD N/A[7YO'- U[]'Enter the equipment class name from Appendix B: Classes of Equipment.
potentially adverse seismic conditions?
Page 69 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0Seismic Walkdown Checklist (SWC)Equipment ID No. Q2E16HOO5B Equip.SheSa2 Of 3Status: NEI- U--Equipment Description AUX FEEDWA TER PUMP ROOM COOLER 2BInteraction Effects7. Are soft targets free from impact by nearby equipment or structures?
          'Enter the equipment class name from Appendix B: Classes of Equipment.
: 8. Are overhead equipment, distribution  
Page 69 of 467
: systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
 
: 9. Do attached lines have adequate flexibility to avoid damage?Y/N[E UE1 /WYUKNEI IE1 N/AE-YZN I]UE N/Ao'4,4)
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS                                         NO. SNCF164-RPT-02, VERSION 2.0 SheSa2 Of 3 Status: Y;* NEI- U--
Toe. uf-- Sep eLbr4 -8 (ojT see r)o~.. --M .L OY-Q10. Based on the above seismic interaction evaluations, is equipment freeof potentially adverse seismic interaction effects?Y[-NE) U0-Other Adverse Conditions
Seismic Walkdown Checklist (SWC)
: 11. Have you looked for and found no other seismic conditions that could YIýE" UEadversely affect the safety functions of the equipment?
Equipment ID No. Q2E16HOO5B                     Equip.
Comments (Additional pages may be added as necessary) 04 /yEvaluated by: Scýf --" J I/.-. 1Date: P. 21. 2_.cl/l /2:/-Page 70 of 467 0ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0Page 71 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0Seismic Walkdown Checklist (SWC)Equipment ID No. Q2E16H007 Equip. Class, 10Equipment Description MCC 2A ROOM COOLER'A SSheet I of -Status: Y/N 'D UEILocation:
Equipment Description AUX FEEDWA TER PUMP ROOM COOLER 2B Interaction Effects
Bldg. AUXILIARY Floor El. 139 Room, Area 2-.'Manufacturer, Model, Etc. (optional but recommended)
: 7. Are soft targets free from impact by nearby equipment or structures?       Y/N[E UE1        /W
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results of judgments andfindings.
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YUKNEI      IE1 N/AE-and masonry block walls not likely to collapse onto the equipment?
Additional space is provided at the end of this checklist for documenting other comments.
: 9. Do attached lines have adequate flexibility to avoid damage?                     YZN I]UE N/Ao'4,4)
Toe.           uf--       Sep     eLbr4     -8 (ojT   see     r)o~.. --M           .L     OY-Q
: 10. Based on the above seismic interaction evaluations, is equipment free      Y[-NE) U0-of potentially adverse seismic interaction effects?
Other Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could       YIýE" UE adversely affect the safety functions of the equipment?
Comments (Additional pages may be added as necessary) 04/y Evaluated by:   Scýf --
                            *    "     J     I/.-.
1                                        Date: P. 21. ,*o 2_.
cl/l /2:/-
Page 70 of 467
 
0 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS               NO. SNCF164-RPT-02, VERSION 2.0 Page 71 of 467
 
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS                                             NO. SNCF164-RPT-02, VERSION 2.0
                                                                                                          'A S Sheet I of -
Status: Y/N'D UEI Seismic Walkdown Checklist (SWC)
Equipment ID No. Q2E16H007                       Equip. Class, 10 Equipment Description MCC 2A ROOM COOLER Location: Bldg. AUXILIARY Floor El. 139                     Room, Area   2-.'
Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
Anchorage
: 1. Is the anchorage configuration verification required (i.e., is the item oneof the 50% of SWEL items requiring such verification)?
: 1. Is the anchorage configuration verification required (i.e., is the item one Yl] N21 of the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?           Y[O/N4  " Ul- N/Al]
: 3. Is the anchorage free of corrosion that is more than mild surfaceoxidation?
: 3. Is the anchorage free of corrosion that is more than mild surface            Y[ý'NO Ul] N/A[]
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?
oxidation?
(Note: This question only applies if the item is one of the 50% forwhich an anchorage configuration verification is required.)
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?     YN-N[J Ul- N/Al-
: 6. Based on the above anchorage evaluations, is the anchorage free ofpotentially adverse seismic conditions?
: 5. Is the anchorage configuration consistent with plant documentation?           YO- NO" UI-    N/AGY (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Yl] N21Y[O/N4" Ul- N/Al]Y[ý'NO Ul] N/A[]YN-N[J Ul- N/Al-YO- NO" UI- N/AGYY N-] Un1Enter the equipment class name from Appendix B: Classes of Equipment.
: 6. Based on the above anchorage evaluations, is the anchorage free of            Y    N-] Un1 potentially adverse seismic conditions?
Page 72 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0-ASheet 2 ofX/-Status: UE-Seismic Walkdown Checklist (SWC)Equipment ID No. Q2E16HO07 Equip. Class' 10Equipment Description MCC 2A ROOM COOLERInteraction Effects7. Are soft targets free from impact by nearby equipment or structures?
Enter the equipment class name from Appendix B: Classes of Equipment.
: 8. Are overhead equipment, distribution  
Page 72 of 467
: systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
 
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment freeof potentially adverse seismic interaction effects?YEAEI UE] N/ADY[RNlf'I UEI N/AE-'YI/N4- U0I N/A[YEl'NEI UE]Other Adverse Conditions
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS                                           NO. SNCF164-RPT-02, VERSION 2.0
: 11. Have you looked for and found no other seismic conditions that could Y[/NEI Ul--adversely affect the safety functions of the equipment?
                                                                                                            -A Sheet 2 ofX/-
Status: Y[*N--    UE-Seismic Walkdown Checklist (SWC)
Equipment ID No.     Q2E16HO07               Equip. Class' 10 Equipment Description MCC 2A ROOM COOLER Interaction Effects
: 7. Are soft targets free from impact by nearby equipment or structures?       YEAEI UE] N/AD Y[RNlf'I UEI N/AE-'
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?               YI/N4-    U0I N/A[
: 10. Based on the above seismic interaction evaluations, is equipment free      YEl'NEI UE]
of potentially adverse seismic interaction effects?
Other Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could       Y[/NEI Ul--
adversely affect the safety functions of the equipment?
Comments (Additional pages may be added as necessary)
Comments (Additional pages may be added as necessary)
Evaluated by:.Y UAAL..Date: 6-29-144-0 .Xr" ~-1Page 73 of 467 0NO. SNCF164-RPT-02, VERSION 2.0ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS Page 74 of 467 0 0 0ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0Page 75 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0('2-.Sheet i of,'4Status: YZ N[] Ur]Seismic Walkdown Checklist (SWC)Equipment ID No. Q2E16H008 Equip. Class, 10Equipment Description 121'MCC2B Room ACULocation:
Evaluated by:       .YUAA                                      L..               Date: 6-29-144-
Bldg. Aux bldo Floor El. 121' Room, AreaManufacturer, Model, Etc. (optional but recommended)
: 0. Xr" ~-1 Page 73 of 467
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the resulls of judgments andfindings.
 
Additional space is provided at the end of this checklist for documenting other comments.
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS 0          NO. SNCF164-RPT-02, VERSION 2.0 Page 74 of 467
 
0 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS 0                                        0 NO. SNCF164-RPT-02, VERSION 2.0 Page 75 of 467
 
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS                                               NO. SNCF164-RPT-02, VERSION 2.0
('2-.                                                                                                 Sheet i of,'4 Status: YZ N[] Ur]
Seismic Walkdown Checklist (SWC)
Equipment ID No.       Q2E16H008                 Equip. Class, 10 Equipment Description 121'MCC2B Room ACU Location: Bldg. Aux bldo           Floor El. 121'           Room, Area Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the resulls of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
Anchorage
: 1. Is the anchorage configuration verification required (i.e., is the item oneof the 50% of SWEL items requiring such verification)?
: 1. Is the anchorage configuration verification required (i.e., is the item one YZ Ni of the 50% of SWEL items requiring such verification)?
Anchorage configuration was based on SEWS for Q2E16H008-B andQ2E16H007-A, dated 07-03-93 and 07-01-93 respectively.
Anchorage configuration was based on SEWS for Q2E16H008-B and Q2E16H007-A, dated 07-03-93 and 07-01-93 respectively.
: 2. Is the anchorage free of bent, broken, missing or loose hardware?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?           YZ NEI UD N/AD Welded to embedded steel
Welded to embedded steel3. Is the anchorage free of cortosion that is more than mild surfaceoxidation?
: 3. Is the anchorage free of cortosion that is more than mild surface            YN NO UD N/AD oxidation?
YZ NiYZ NEI UD N/ADYN NO UD N/ADVery minor surface corrosion and cracked paint observed.
Very minorsurface corrosionand cracked paintobserved. No degradationof weld observed. Condition has no adverse seismic impact.
Nodegradation of weld observed.
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?     YZ N'   UD N/AD
Condition has no adverse seismicimpact.4. Is the anchorage free of visible cracks in the concrete near the anchors?
: 5. Is the anchorage configuration consistent with plant documentation?           YN ND UD N/AD (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
YZ N' UD N/AD5. Is the anchorage configuration consistent with plant documentation?
: 6. Based on the above anchorage evaluations, is the anchorage free of            YN NO UD potentially adverse seismic conditions?
(Note: This question only applies if the item is one of the 50% forwhich an anchorage configuration verification is required.)
Enter the equipment class name fsom Appendix B: Classes of Equipment.
: 6. Based on the above anchorage evaluations, is the anchorage free ofpotentially adverse seismic conditions?
Page 76 of 467
YN ND UD N/ADYN NO UDEnter the equipment class name fsom Appendix B: Classes of Equipment.
 
Page 76 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0Sheet 2 4Status: YCK NEI uF"]Seismic Walkdown Checklist (SWC)Equipment ID No. Q2E16H008 Equip. Class' 10Equipment Description 121'MCC 2B Room ACUInteraction Effecs7. Are soft targets free from impact by nearby equipment or structures?
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS                                         NO. SNCF164-RPT-02, VERSION 2.0 Sheet 2 of* 4 Status: YCK NEI uF"]
: 8. Are overhead equipmoent, distribution  
Seismic Walkdown Checklist (SWC)
: systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Equipment ID No.       Q2E16H008               Equip. Class' 10 Equipment Description     121'MCC 2B Room ACU Interaction Effecs
Component is adjacent to a block wall. The wall was seismically qualified as part of the response to NRC t. E. Bulletin 80-11, asdocumented in Report No FTG-C-002, RO, and on drawing D-206004, R 16.9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment freeof potentially adverse seisnic interaction effects?Y0 NE UO N/AOYZ NO Ur N/AQ1Y13 NO UD N/AOY[ NO UMIOther Adverse Conditions 1I. Have you looked for and found no other seismic conditions that could Y9 NO UE-adversely affect the safety functions of the equipment?
: 7. Are soft targets free from impact by nearby equipment or structures?     Y0 NE      UO N/AO
Comments (Additional pages may be added as necessary) ly2& t,"Y P ,G I -/Evaluated by: P._Miktus~~tDt:0.31 Date: 08-23-1208-23-12Page 77 of 467 0ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0Page 78 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0Page 79 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0Sheet i ofýi 'I(IStatus: Y1 NO] Ui-]Seismic Walkdown Checklist (SWC)Equipment ID No. Q2E21FT0943 Equip. Class, 18Equipment Description HIGH HEAD SAFETY INJECTION FLOW TRANSMITTER Location:
: 8. Are overhead equipmoent, distribution systems, ceiling tiles and lighting, YZ NO Ur      N/AQ1 and masonry block walls not likely to collapse onto the equipment?
Bldg. AUXILIARY Floor El. 100 Room, Area 17Manufacturer, Model, Etc. (optional but recommended)
Component is adjacentto a block wall. The wall was seismically qualified as part of the response to NRC t. E. Bulletin 80-11, as documented in Report No FTG-C-002, RO, and on drawing D-206004, R 16.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results ofjudgments andfindings.
: 9. Do attached lines have adequate flexibility to avoid damage?               Y13 NO UD N/AO
Additional space is provided at the end of this checklist for documenting other comments.
: 10. Based on the above seismic interaction evaluations, is equipment free      Y[  NO UMI of potentially adverse seisnic interaction effects?
Other Adverse Conditions 1I. Have you looked for and found no other seismic conditions that could       Y9 NO UE-adversely affect the safety functions of the equipment?
Comments (Additional pages may be added as necessary) t,"Y P ,G ly2&                  -/I Evaluated by: P._Miktus~~tDt:0.31                                                   Date: 08-23-12 08-23-12 Page 77 of 467
 
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS 0          NO. SNCF164-RPT-02, VERSION 2.0 Page 78 of 467
 
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS               NO. SNCF164-RPT-02, VERSION 2.0 Page 79 of 467
 
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS                                               NO. SNCF164-RPT-02, VERSION 2.0 Sheet i ofýi 'I(I Status: Y1* NO] Ui-]
Seismic Walkdown Checklist (SWC)
Equipment ID No. Q2E21FT0943                     Equip. Class, 18 Equipment Description HIGH HEAD SAFETY INJECTION FLOW TRANSMITTER Location: Bldg. AUXILIARY Floor El. 100                     Room, Area       17 Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchoraee
Anchoraee
: 1. Is the anchorage configuration verification required (i.e., is the item oneof the 50% of SWEL items requiring such verification)?
: 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?           YId NO UEI N/AO
: 3. Is the anchorage free of corrosion that is more than mild surfaceoxidation?
: 3. Is the anchorage free of corrosion that is more than mild surface            Yd~ NEI UO N/AE oxidation?
YId NO UEI N/AOYd~ NEI UO N/AE4. Is the anchorage free of visible cracks in the concrete near the anchors?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?     Y[J NEI U-   N/AO
Y[J NEI U- N/AO5. Is the anchorage configuration consistent with plant documentation?
: 5. Is the anchorage configuration consistent with plant documentation?           YE] NE U-    N/A[v/
(Note: This question only applies if the item is one of the 50% forwhich an anchorage configuration verification is required.)
(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
YE] NE U- N/A[v/NO1,V0~ O45 ApeQewo :3 00%c A#J 4lq8CJ4D2A6iE V&AiFICATro&)
NO1,V0~ O45 ApeQewo :3 00%c                         A#J 4lq8CJ4D2A6iE V&AiFICATro&) ib Por
ib Por6. Based on the above anchorage evaluations, is the anchorage free ofpotentially adverse seismic conditions?
: 6. Based on the above anchorage evaluations, is the anchorage free of            YS'NEI U-potentially adverse seismic conditions?
YS'NEI U-I Enter the equipment class name from Appendix B: Classes of Equipment.
I Enter the equipment class name from Appendix B: Classes of Equipment.
Page 80 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0Seismic Walkdown Checklist (SWC)Equipment M1 No. Q2E21FT0943 Equip. Class, 18Equipment Description HIGH HEAD SAFETY INJECTION FLOW TRANSMITTER Sheet 2 of)' ,S tatus: Y"[f N -- U W- A"Interaction Effects7. Are soft targets free from impact by nearby equipment or structures?
Page 80 of 467
YM/N'- UC] N/AC-]8. Are overhead equipment, distribution  
 
: systems, ceiling tiles and lighting, Y[ NO- U[:] N/ACand masonry block walls not likely to collapse onto tite equipment?
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS                                           NO. SNCF164-RPT-02, VERSION 2.0 Sheet 2 of)'      ,
.oeK WAIJ-L5 e'j rNE We6r Oe V e_.,.LVA ArE)P9.NDo ac ed l T Fea t-(2-e ex , to -F. DW4 dN-ZoaN5og.
Y"[f  N  -- U W- A" S tatus:
: 9. Do attached lines have adequate flexibility to avoid damage? NO] U[- N/A[:Y/NO UC]10. Based on the above seismic interaction evaluations, is equipment freeof potentially adverse seismic interaction effects?Other Adverse Conditions
Seismic Walkdown Checklist (SWC)
: 11. Have you looked for and found no other seismic conditions that could YU NEI UC-]adversely affect the safety functions of the equipment?
Equipment M1No. Q2E21FT0943                   Equip. Class, 18 Equipment Description HIGH HEAD SAFETY INJECTION FLOW TRANSMITTER Interaction Effects
: 7. Are soft targets free from impact by nearby equipment or structures?     YM/N'- UC] N/AC-]
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Y[     NO- U[:] N/AC and masonry block walls not likely to collapse onto tite equipment?
                  .oeK WAIJ-L5         e'j   rNE We6r Oe                 V*    e_.,.LVA   ArE)P 9.NDo ac       ed l T Fea t-(2-e ex           , to   -F.dN-ZoaN5og.
DW4
: 9. Do attached lines have adequate flexibility to avoid damage?             Y]* NO] U[-       N/A[:
: 10. Based on the above seismic interaction evaluations, is equipment free    Y/NO UC]
of potentially adverse seismic interaction effects?
Other Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could     YU NEI UC-]
adversely affect the safety functions of the equipment?
Comments (Additional pages may be added as necessary)
Comments (Additional pages may be added as necessary)
/MoteEvaluated by:3.M'TVS 2Date: 1-274-Page 81 of 467 0NO. SNCF164-RPT-02, VERSION 2.0ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS Page 82 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0Page 83 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0Sheet i off 3Status: YA NO UOSeismic Walkdown Checklist (SWC)Equipment ID No. Q2E21LCVO115B Equip. Class' 8Equipment Description RWST TO CHARGING PUMP SUCTION VALVELocation:
        /Mote 1-274-Evaluated by:
Bldg. AUXILIARY Floor El. 100 Room, Area 2-.1-7 2.Manufacturer, Model, Etc. (optional but recommended)
3.M'TVS             2                                    Date:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results ofjudgments andfindings.
Page 81 of 467
Additional space is provided at the end of this checklist for documenting other comments.
 
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS 0
NO. SNCF164-RPT-02, VERSION 2.0 Page 82 of 467
 
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS               NO. SNCF164-RPT-02, VERSION 2.0 Page 83 of 467
 
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS                                               NO. SNCF164-RPT-02, VERSION 2.0 Sheet i off3 Status: YA NO UO Seismic Walkdown Checklist (SWC)
Equipment ID No. Q2E21LCVO115B                   Equip. Class' 8 Equipment Description RWST TO CHARGING PUMP SUCTION VALVE Location: Bldg. AUXILIARY Floor El. 100                     Room, Area 2-.1-7 2.
Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
Anchorage
: 1. Is the anchorage configuration verification required (i.e., is the item one YE N[lof the 50% of SWEL items requiring such verification)?
: 1. Is the anchorage configuration verification required (i.e., is the item one YE N[l of the 50% of SWEL items requiring such verification)?
Inline Corry.rw-ht, rlc ctchot-jo.cd
Inline Corry.rw-ht, rlc ctchot-jo.cd
: 2. Is the anchorage free of bent, broken, missing or loose hardware?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?           YEr NEI UE N/Ap
: 3. Is the anchorage free of corrosion that is more than mild surfaceoxidation?
: 3. Is the anchorage free of corrosion that is more than mild surface            YEI NE UE N/A[I oxidation?
YEr NEI UE N/ApYEI NE UE N/A[I4. Is the anchorage free of visible cracks in the concrete near the anchors?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?   YE" NEI UiE N/Ap
YE" NEI UiE N/Ap5. Is the anchorage configuration consistent with plant documentation?
: 5. Is the anchorage configuration consistent with plant documentation?         YEVNE3 UEI N/AJA (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
(Note: This question only applies if the item is one of the 50% forwhich an anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of          ANE UDE potentially adverse seismic conditions?
: 6. Based on the above anchorage evaluations, is the anchorage free ofpotentially adverse seismic conditions?
      ý Enter the equipment class name from Appendix B: Classes of Equipment.
YEV NE3 UEI N/AJAANE UDEý Enter the equipment class name from Appendix B: Classes of Equipment.
Page 84 of 467
Page 84 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0Sheet 2 O 3fStatus: Y11 NF] [IE]Seismic Walkdown Checklist (SWC)Equipment ID No. Q2E21LCVO115B Equip. Class' 8Equipment Description RWST TO CHARGING PUMP SUCTION VALVEInteraction Effects7. Are soft targets free from impact by nearby equipment or structures?
 
Y? N] UM] N/AOeqimnsses tdes-.-t and-,  
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS                                             NO. SNCF164-RPT-02, VERSION 2.0 Sheet 2 O 3f Status: Y11 NF]     [IE]
: 8. Are overhead equipment, distribution  
Seismic Walkdown Checklist (SWC)
: systems, ceiling tiles and lighting, Y1M NO] U!- N/ADand masonry block walls not likely to collapse onto the equipment?
Equipment ID No. Q2E21LCVO115B                 Equip. Class' 8 Equipment Description RWST TO CHARGING PUMPSUCTION VALVE Interaction Effects
e9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment freeof potentially adverse seismic interaction effects?Other Adverse Conditions l1. Have you looked for and found no other seismic conditions that couldadversely affect the safety functions of the equipment?
: 7. Are soft targets free from impact by nearby equipment or structures?       Y? N] UM] N/AO eqimnsses                              tdes-.-tand-, sc*rt'a~x"acbt
YP NE] U!] N/A7YINE] U!]NEI UEComments (Additional pages may be added as necessary)
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting,   YM    NO] U!- N/AD e1 and masonry block walls not likely to collapse onto the equipment?
Evaluated by: r I!ga- / T"+/-+/-* .,r4 -',"A"JY1~
: 9. Do attached lines have adequate flexibility to avoid damage?                 YP NE] U!] N/A7
V U'- /An illol (06-dDate: _ W 1 i ~ 2--LLktm MaQdL~ao iPage 85 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0Page 86 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2,0i lifPage 87 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0Sheet I of 3Status: Y[VN- UE-Seismic Walkdown Checklist (SWC)Equipment ID No. Q2E21LT112 Equip. Class' 18Equipment Description VCT LEVEL TRANSMITTER Location:
: 10. Based on the above seismic interaction evaluations, is equipment free        YINE] U!]
Bldg. AUXILIARY Floor El. 121 Room, Area 2 -21,Manufacturer, Model, Etc. (optional but recommended)
of potentially adverse seismic interaction effects?
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results ofjudgments andfindings.
Other Adverse Conditions l1. Have you looked for and found no other seismic conditions that could              NEI UE adversely affect the safety functions of the equipment?
Additional space is provided at the end of this checklist for documenting other comments.
Comments (Additional pages may be added as necessary)
Evaluated by: r I!ga-                         / T"+/-+/-*     .,r4 -',"A"JY1~         Date:  _    i  ~W 12--
V       U'-       /
An illol           (06-d      LLktm   MaQdL~a o i Page 85 of 467
 
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS               NO. SNCF164-RPT-02, VERSION 2.0 Page 86 of 467
 
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS         NO. SNCF164-RPT-02, VERSION 2,0 i lif Page 87 of 467
 
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS                                               NO. SNCF164-RPT-02, VERSION 2.0 Sheet I of 3 Status: Y[VN-       UE-Seismic Walkdown Checklist (SWC)
Equipment ID No. Q2E21LT112                       Equip. Class' 18 Equipment Description VCT LEVEL TRANSMITTER Location: Bldg. AUXILIARY         Floor El. 121           Room, Area           2 - 21, Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
Anchorage
: 1. Is the anchorage configuration verification required (i.e., is the item oneof the 50% of SWEL items requiring such verification)?
: 1. Is the anchorage configuration verification required (i.e., is the item one YEN of the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?                 "NO"UE N/AE[
: 3. Is the anchorage free of corrosion that is more than mild surfaceoxidation?
: 3. Is the anchorage free of corrosion that is more than mild surface              Y1$EN"   U0 N/AE oxidation?
YEN"NO" UE N/AE[Y1$EN" U0 N/AE4. Is the anchorage free of visible cracks in the concrete near the anchors?  
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?     \TNE" UE N/AE"
\TNE" UE N/AE"5. Is the anchorage configuration consistent with plant documentation?
: 5. Is the anchorage configuration consistent with plant documentation?           YE NE UE] N/A/
(Note: This question only applies if the item is one of the 50% forwhich an anchorage configuration verification is required.)
(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free ofpotentially adverse seismic conditions?
: 6. Based on the above anchorage evaluations, is the anchorage free of            Y"/ND UE potentially adverse seismic conditions?
YE NE UE] N/A/Y"/ND UE'Enter the equipment class name from Appendix B: Classes of Equipment.
      'Enter the equipment class name from Appendix B: Classes of Equipment.
Page 88 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0Seismic Walkdown Checklist (SWC)Sh t Of 3Status: Y;['N[- Un-Equipment ED No. 02E21LT112 Equip. Class, 18Equipment Description VCT LEVEL TRANSMITTER Interaction Effects7. Are soft targets free from impact by nearby equipment or structures?
Page 88 of 467
S. Are overhead equipment, distribution  
 
: systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS                                         NO. SNCF164-RPT-02, VERSION 2.0 Sh t     Of 3 Status: Y;['N[- Un-Seismic Walkdown Checklist (SWC)
YO/ND UE1 N/AE3YE-týfl UE] N/AE19. Do attached lines have adequate flexibility to avoid damage? Y[E)NEI UrI N/A0--1 -r. ,) o ,10. Based on the above seismic interaction evaluations, is equipment free Y-" NEI Uof potentially adverse seismic interaction effects?Other Adverse Conditions 1I. Have you looked for and found no otiler seismic conditions that could 'YEýN-I UE]adversely affect the safety functions of the equipment?
Equipment ED No. 02E21LT112                   Equip. Class, 18 Equipment Description VCT LEVEL TRANSMITTER Interaction Effects
: 7. Are soft targets free from impact by nearby equipment or structures?       YO/ND UE1 N/AE3 S. Are overhead equipment, distribution systems, ceiling tiles and lighting, YE-týfl UE] N/AE1 and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?               Y[E)NEI UrI N/A0-
      -1         -r.                                               ,)                   o     *      ,
: 10. Based on the above seismic interaction evaluations, is equipment free       Y-" NEI U of potentially adverse seismic interaction effects?
Other Adverse Conditions 1I. Have you looked for and found no otiler seismic conditions that could       'YEýN-I UE]
adversely affect the safety functions of the equipment?
Comments (Additional pages may be added as necessary)
Comments (Additional pages may be added as necessary)
'IEvaluated by: Date: -__________
                                                              'I Evaluated by:                         -__________                                Date:
DateJJPage 89 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0Page 90 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0-This 'cqof: A iS, css , c, -n,.- a'SSeismic Walkdown Checklist (SWC) QQ E a2 I Va 3Equipment ID No. 02E21MOV8100 Equip. Class' 8Equipment Description RCP SEAL WATER RETURN ISOLATION Sheet i ofXAtStatus: Yd NO UUJLocation:
Date J                    J Page 89 of 467
Bldg. AUXILIARY Floor El. 121 Room, Area ,?QManufacturer, Model, Etc. (optional but recommended)
 
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results of judgments andfindings.
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS               NO. SNCF164-RPT-02, VERSION 2.0 Page 90 of 467
Additional space is provided at the end of this checklist for documenting other comments.
 
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS                                             NO. SNCF164-RPT-02, VERSION 2.0
                              -This 'cqof:         A iS,         ,
css     c,   -n,.-     a'S          Sheet i ofXAt Status: Yd NO UUJ Seismic Walkdown Checklist (SWC)                   QQ E a2 I Va         4* 3 Equipment ID No. 02E21MOV8100                     Equip. Class' 8 Equipment Description RCP SEAL WATER RETURN ISOLATION Location: Bldg. AUXILIARY Floor El. 121                       Room, Area   ,?Q Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchoraoe
Anchoraoe
: 1. Is the anchorage configuration verification required (i.e., is the item one Y" Neof the 50% of SWEL items requiring such verification)?
: 1. Is the anchorage configuration verification required (i.e., is the item one Y"   Ne of the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?           YE NM U171 N/Adf
: 3. Is the anchorage free of corrosion that is more than mild surfaceoxidation?
: 3. Is the anchorage free of corrosion that is more than mild surface            YO NO UO N/A@/
YE NM U171 N/AdfYO NO UO N/A@/w , ,k ' q .e_.\, ,q ,t , , x Q U -?.V\ Y 4 , ( O , , \ z ý c t -o- 12 .4. Is the anchorage free of visible cracks in the concrete near the anchors?
oxidation?
YO No UiE N/An'k \- V rit5. Is the anchorage configuration consistent with plant documentation?
w,     ,k' ,tq . e_.\,
(Note: This question only applies if the item is one of the 50% forwhich an anchorage configuration verification is required.)
QU,q- ?.V\
: 6. Based on the above anchorage evaluations, is the anchorage free ofpotentially adverse seismic conditions?
                                        *,,x Y4 ,    Y*      (O,, \ z ýct - o-12 .
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?     YO No UiE N/An'
              \-
k    V                                   rit
: 5. Is the anchorage configuration consistent with plant documentation?           YO NE Uti N/AX' (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of            Y0"N0 uC potentially adverse seismic conditions?
Enter the equipment class name from Appendix B: Classes of Equipment.
Enter the equipment class name from Appendix B: Classes of Equipment.
YO NE Uti N/AX'Y0"N0 uCPage 91 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0Sheet 2 of3 lStatus: Y[Z- NE-] U[]Seismic Walkdown Checklist (SWC)Equipment ID No. Q2E21MOV8100 Equip. Class, 8Equipment Description RCP SEAL WATER RETURN ISOLATION Interaction Effects7. Are soft targets free from impact by nearby equipment or structures?
Page 91 of 467
: 8. Are overhead equipment, distribution  
 
: systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS                                         NO. SNCF164-RPT-02, VERSION 2.0 Sheet 2 of3 l Status: Y[Z- NE-] U[]
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment freeof potentially adverse seismic interactiou effects?Y2 NEI UI- N/A[lY5ý/1- UEI N/A5Y(NE] UE3 N/AEIYE]N1 E3UuOther Adverse Conditions 1I. Have you looked for and found no other seismic conditions that could Ye NEl UFIadversely affect the safety functions of the equipment?
Seismic Walkdown Checklist (SWC)
Equipment ID No. Q2E21MOV8100                 Equip. Class, 8 Equipment Description RCP SEAL WATER RETURN ISOLATION Interaction Effects
: 7. Are soft targets free from impact by nearby equipment or structures?     Y2 NEI    UI- N/A[l
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Y5ý/1-    UEI N/A5 and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?               Y(NE] UE3 N/AEI
: 10. Based on the above seismic interaction evaluations, is equipment free      YE]N1  E3Uu of potentially adverse seismic interactiou effects?
Other Adverse Conditions 1I. Have you looked for and found no other seismic conditions that could       Ye NEl UFI adversely affect the safety functions of the equipment?
Comments (Additional pages may be added as necessary)
Comments (Additional pages may be added as necessary)
Evaluated by: / jDate: ''~3l~Page 92 of 467 NO. SNCF164-RPT-02, VERSION 2.0ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS Page 93 of 467 NO. SNCF164-RPT-02, VERSION 2.0ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS Page 94 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0T Ci _ r\l -' s qlso , o-5 She71of 3Seismic Walkdown Checklist (SWC) E & \'"/, t% Status: 7 NEl UE-Equipment D No. Q2E21MOV8108 Equip. Class' 8Equipment Description CHARGING PUMP TO RCS ISOLATION Location:
Evaluated by:     I.,*                                                            Date:   ''~   3  l~
Bldg. AUXILIARY Floor El. 121 Room, Area Q69aManufacturer, Model, Etc. (optional but recommended)
                                                                    /    j Page 92 of 467
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results of judgments andfindings.
 
Additional space is provided at the end of this checklist for documenting other comments.
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS                NO. SNCF164-RPT-02, VERSION 2.0 Page 93 of 467
 
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS               NO. SNCF164-RPT-02, VERSION 2.0 Page 94 of 467
 
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS                                                 NO. SNCF164-RPT-02, VERSION 2.0 T          Ci_      r\l           -' s   qlso                       ,
o-5                   She71of 3
                                                                        .*  E & \'"/, t%       Status: 7   NEl UE-Seismic Walkdown Checklist (SWC)
Equipment D No. Q2E21MOV8108                     Equip. Class' 8 Equipment Description CHARGING PUMP TO RCS ISOLATION Location: Bldg. AUXILIARY Floor El. 121                     Room, Area Q69a Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
Anchorage
: 1. Is the anchorage configuration verification required (i.e., is the item one YOI N%of the 50% of SWEL items requiring such verification)?
: 1. Is the anchorage configuration verification required (i.e., is the item one   YOI N%
: 2. Is the anchorage free of bent, broken, missing or loose hardware?
of the 50% of SWEL items requiring such verification)?
: 3. Is the anchorage free of corrosion that is more than mild surfaceoxidation?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?             YO] NEI UO N/AE9-
YO] NEI UO N/AE9-Y(:] NI- UF] N/A2-4'. I st a ch e , 4f-re o s c k t c _ocrc hO-4. Is the anchorage free of visible cracks in the concrete near the anchors?
: 3. Isthe anchorage free of corrosion that is more than mild surface              Y(:] NI- UF] N/A2-oxidation?
YI-] N-I U-i] N/Az']5. Is the anchorage configuration consistent with plant documentation?
4'.I sta    ch e         o  s,   c 4f-re k t           c _ocrc         hO-
(Note: This question only applies if the item is one of the 50% forwhich an anchorage configuration verification is required.)
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?     YI-] N-I U-i] N/Az']
: 6. Based on the above anchorage evaluations, is the anchorage free ofpotentially adverse seismic conditions?
: 5. Is the anchorage configuration consistent with plant documentation?           YOI NI] UI0 N/As (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
YOI NI] UI0 N/AsYR NI] U-I1ý1- `ýý A-ýý is -ý-ctze ý:PEnter the equipment class name from Appendix B: Classes of Equipment.
: 6. Based on the above anchorage evaluations, is the anchorage free of            YR NI] U-I potentially adverse seismic conditions?
Page 95 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0Sheet 2 of 3Status: YZI NEI UE"]Seismic Walkdown Checklist (SWC)Equipment lD No. Q2E21MOV8108 Equip. Class, 8Equipment Description CHARGING PUMP TO RCS ISOLATION Interaction Effects7. Are soft targets free from impact by nearby equipment or structures?
1ý1-     `ýý                   A-ýý                           is   -ý-ctze   ý:P Enter the equipment class name from Appendix B: Classes of Equipment.
: 8. Are overhead equipment, distribution  
Page 95 of 467
: systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
 
: 9. Do attached lines have adequate flexibility to avoid damage?I0. Based on the above seismic interaction evaluations, is equipment freeof potentially adverse seismic interaction effects?Ya NO U- N/A-Y~f/N- U] N/ACYE(NI U- N/AI/UCOther Adverse Conditions 1I. Have you looked for and found no other seismic conditions that could YO'NO U-adversely affect the safety functions of the equipment?
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS                                             NO. SNCF164-RPT-02, VERSION 2.0 Sheet 2 of 3 Status: YZI NEI     UE"]
Comments (Additional pages may be added as necessary)Evaluated by: ..3,Q...1&cVX Date:Page 96 of 467 0ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0Page 97 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0V2" 1PSeismic Walkdown Checklist (SWC)Equipment ID No. Q2E21MOV8109C Equip. Class, 8Equipment Description CHARGING PUMP PO02C MINIFLOW VALVESheet i of Status: Y5 NEI U1-]Location:
Seismic Walkdown Checklist (SWC)
Bldg. AUXILIARY Floor El. 102 Room, Area M 2ý1ýýManufacturer, Model, Etc. (optional but recommended)
Equipment lD No. Q2E21MOV8108                 Equip. Class, 8 Equipment Description CHARGING PUMP TO RCS ISOLATION Interaction Effects
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results of judgments andfindings.
: 7. Are soft targets free from impact by nearby equipment or structures?     Ya NO U- N/A-
Additional space is provided at the end of this checldist for documenting other comments.
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Y~f/N-    U] N/AC and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?             YE(NI      U- N/AI
                                                                                              /
YV*NC UC I0. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Other Adverse Conditions 1I. Have you looked for and found no other seismic conditions that could       YO'NO U-adversely affect the safety functions of the equipment?
Comments (Additional pages may be added as necessary)
Gac*
* Evaluated by:                                 .._*\k*(j, 3 ,Q...1&cVX           Date:
Page 96 of 467
 
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS 0          NO. SNCF164-RPT-02, VERSION 2.0 Page 97 of 467
 
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS                                                 NO. SNCF164-RPT-02, VERSION 2.0 V2" 1P Sheet i of ¢*
Status: Y5  NEI U1-]
Seismic Walkdown Checklist (SWC)
Equipment ID No. Q2E21MOV8109C                   Equip. Class, 8 Equipment Description CHARGING PUMPPO02C MINIFLOW VALVE Location: Bldg. AUXILIARY Floor El. 102                     Room, Area   M       2ý1ýý Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checldist for documenting other comments.
Anchorage
Anchorage
: 1. Is the anchorage configuration verification required (i.e., is the item one YE Njtof the 50% of SWEL items requiring such verification)?
: 1. Is the anchorage configuration verification required (i.e., is the item one YE Njt of the 50% of SWEL items requiring such verification)?
Irtitpr a c hO oCboro,-cue.
Irtitpr ac    arx*er*'    hO oCboro,-cue.
: 2. Is the anchorage free of bent, broken, missing or loose hardware?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?             YED NE UE N/AC&
: 3. Is the anchorage free of corrosion that is more than mild surfaceoxidation?
: 3. Is the anchorage free of corrosion that is more than mild surface            YE NE UE N/Ap oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?     YE NEI UE N/A0
(Note: This question only applies if the item is one of the 50% forwhich an anchorage configuration verification is required.)
: 5. Is the anchorage configuration consistent with plant documentation?           YE NEI UE N/A4 (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free ofpotentially adverse seismic conditions?
: 6. Based on the above anchorage evaluations, is the anchorage free of            Y0 NO UE potentially adverse seismic conditions?
YED NE UE N/AC&YE NE UE N/ApYE NEI UE N/A0YE NEI UE N/A4Y0 NO UEEnter the equipment class name from Appendix B: Classes of Equipment.
Enter the equipment class name from Appendix B: Classes of Equipment.
Page 98 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0Sheet 2 of" 4Status: Y[5 NEI UE-Seismic Walkdown Checklist (SWC)Equipment ID No. Q2E21MOV8109C Equip. Class' 8Equipment Description CHARGING PUMP PO02C MINIFLOW VALVEInteraction Effects7. Are soft targets free from impact by nearby equipment or structures?
Page 98 of 467
YEA NO UD N/AD8. Are overhead equipment, distribution  
 
: systems, ceiling tiles and lighting, Yg NDI UD N/ADand masonry block walls not likely to collapse onto the equipment?
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS                                           NO. SNCF164-RPT-02, VERSION 2.0 Sheet 2 of" 4 Status: Y[5 NEI UE-Seismic Walkdown Checklist (SWC)
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment freeof potentially adverse seismic interaction effects?YV NEI UD N/ADYP NO UDOther Adverse Conditions I1. Have you looked for and found no other seismic conditions that could Yy ND UDadversely affect the safety functions of the equipment?
Equipment ID No. Q2E21MOV8109C               Equip. Class' 8 Equipment Description CHARGING PUMP PO02C MINIFLOW VALVE Interaction Effects
: 7. Are soft targets free from impact by nearby equipment or structures?     YEA NO UD N/AD
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Yg NDI UD N/AD and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?             YV NEI UD N/AD
: 10. Based on the above seismic interaction evaluations, is equipment free    YP NO UD of potentially adverse seismic interaction effects?
Other Adverse Conditions I1. Have you looked for and found no other seismic conditions that could       Yy ND UD adversely affect the safety functions of the equipment?
Comments (Additional pages may be added as necessary)
Comments (Additional pages may be added as necessary)
Evaluated by: .GoAMAa o- -1(W Loolut o\AC'tUA/
Evaluated by: .GoAMAa             o--     1(W   Loolut             o\AC'tUA/     Date: _ -_   ___     __
Date: _ -_ ___ __Page 99 of 467 0 3ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0Page 100 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0IPage 101 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0Sheet i °fz¢ 43 AStatus: Yf NO UE $1011"Seismic Walkdown Checklist (SWC)Equipment ID No. Q2E21MOV8130A Equip. Classw 8Equipment Description CHG PUMP SUCTION HDR ISOLATION Location:
Page 99 of 467
Bldg. AUXILIARY Floor El. 100 Room, AreaManufacturer, Model, Etc. (optional but recommended)
 
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results ofjudgments andfindings.
3 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS     0          NO. SNCF164-RPT-02, VERSION 2.0 Page 100 of 467
Additional space is provided at the end of this checklist for documenting other comments.
 
Anchorage I. Is the anchorage configuration verification required (i.e., is the item oneof the 50% of SWEL items requiring such verification)?
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS         NO. SNCF164-RPT-02, VERSION 2.0 101 of 467 IPage
: 2. Is the anchorage free of bent, broken, missing or loose hardware?
 
: 3. Is the anchorage free of corrosion that is more than mild surfaceoxidation?
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS                                               NO. SNCF164-RPT-02, VERSION 2.0 Sheet i °fz¢43 A Status: Yf NO UE $1011" Seismic Walkdown Checklist (SWC)
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?
Equipment ID No.       Q2E21MOV8130A             Equip. Classw   8 Equipment Description CHG PUMP SUCTION HDR ISOLATION Location: Bldg. AUXILIARY Floor El. 100                     Room, Area Manufacturer, Model, Etc. (optional but recommended)
(Note: This question only applies if the item is one of the 50% forwhich an anchorage configuration verification is required.)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
: 6. Based on the above anchorage evaluations, is the anchorage free ofpotentiafly adverse seismic conditions?
Anchorage I. Is the anchorage configuration verification required (i.e., is the item one  YEI Nd of the 50% of SWEL items requiring such verification)?
YEI NdYE NEI UE- N/A[RYEI NE UE N/AGYO NE UE N/A[?YEr NEI UE] N/AdN[- UE-Enter the equipment class name from Appendix B: Classes of Equipment.
: 2. Is the anchorage free of bent, broken, missing or loose hardware?             YE NEI UE- N/A[R
IPage 102 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0Sheet 2 of42Status: Y NEI U[Jltjl?
: 3. Is the anchorage free of corrosion that is more than mild surface            YEI NE UE N/AG oxidation?
vSeismic Walkdown Checklist (SWC)Equipment ID No. 02E21MOV8130A Equip. Class' 8Equipment Description CHG PUMP SUCTION HDR ISOLA TIONInteraction Effects7. Are soft targets free from impact by nearby equipment or structures?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?     YO NE UE N/A[?
Y[dNI-- U-J N/AE1Y[4 NE UE- N/AEl8. Are overhead equipment, distribution  
: 5. Is the anchorage configuration consistent with plant documentation?           YEr  NEI UE] N/Ad (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 6. Based on the above anchorage evaluations, is the anchorage free of            Y[* N[- UE-potentiafly adverse seismic conditions?
Siva Vag ' 0 y0 ME r £-'AI- d,4 oF 1e PAwimKegeeALLJA-T" tV4,o&V-  
Enter the equipment class name from Appendix B: Classes of Equipment.
&619'2r FTý-c!.-,94Z, 1-4. DaAiWtA tI-20b?2,IP9.
I Page 102 of 467
: 9. Do aitached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment freeof potentially adverse seismic interaction effects?YQ NE UI-1 N/AE1Yd NIE- UEIOther Adverse Conditions
 
: 11. Have you looked for and found no other seismic conditions that could Yd NEI UE-]adversely affect the safety functions of the equipment?
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS                                             NO. SNCF164-RPT-02, VERSION 2.0 Sheet 2 of42 Status: Y     NEI U[Jltjl? v Seismic Walkdown Checklist (SWC)
Equipment ID No. 02E21MOV8130A                 Equip. Class' 8 Equipment Description CHG PUMP SUCTION HDR ISOLA TION Interaction Effects
: 7. Are soft targets free from impact by nearby equipment or structures?     Y[dNI-- U-J N/AE1
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Y[4 NE UE- N/AEl and masonry block walls not likely to collapse onto the equipment?
Siva Vag 0 ' ME            y0               d,4 oF 1e PAw r £-'AI-imKegeeALLJA-T" tV4,o&V- &619'2r FTý-c!.-,94Z, 1-4. DaAiWtA tI-20b?2,IP9.
: 9. Do aitached lines have adequate flexibility to avoid damage?               YQ NE UI-1 N/AE1
: 10. Based on the above seismic interaction evaluations, is equipment free      Yd NIE- UEI of potentially adverse seismic interaction effects?
Other Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could     Yd NEI UE-]
adversely affect the safety functions of the equipment?
Comments (Additional pages may be added as necessary)
Comments (Additional pages may be added as necessary)
Evaluated byPn~R5Date: __ "_ 7-/___Page 103 of 467 00ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0Page 104 of 467 SATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS 0NO. SNCF164-RPT-02, VERSION 2.0Page 105 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0II&I ISheetttsd.:Y uE%Status: U[71Seismic Walkdown Checklist (SWC)Equipment ID No. Q2E21MOV8133A Equip. Class, 8Equipment Description CHG PUMP DISCHARGE HDR ISOLATION Location:
Evaluated by                Pn~R5                                                  Date: __   "_ 7-/___
Bldg. AUXILIARY Floor El. 100 Room, Area ZI1_Manufacturer, Model, Etc. (optional but recommended)
Page 103 of 467
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results ofjudgments andfindings.
 
Additional space is provided at the end of this checklist for documenting other conmnents.
0 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS 0          NO. SNCF164-RPT-02, VERSION 2.0 Page 104 of 467
 
S ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS 0
NO. SNCF164-RPT-02, VERSION 2.0 Page 105 of 467
 
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS                                             NO. SNCF164-RPT-02, VERSION 2.0 II
                                                                                                                        &II Sheetttsd.:YuE%
Status: YZ*N[D U[71 Seismic Walkdown Checklist (SWC)
Equipment ID No.         Q2E21MOV8133A           Equip. Class, 8 Equipment Description CHG PUMP DISCHARGE HDR ISOLATION Location: Bldg. AUXILIARY Floor El. 100                     Room, Area     ZI1_
Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other conmnents.
Anchorage
Anchorage
: 1. Is the anchorage configuration verification required (i.e., is the item oneof the 50% of SWEL items requiring such verification)?
: 1. Is the anchorage configuration verification required (i.e., is the item one Y[3N of the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?           Y[3 N[3 uE N/UD(
: 3. Is the anchorage free of corrosion that is more than mild surfaceoxidation?
: 3. Is the anchorage free of corrosion that is more than mild surface            YE- NE UCI N/A[/
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?
oxidation?
(Note: This question only applies if the item is one of the 50% forwhich an anchorage configuration verification is required.)
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?     YEI NE- UC- N/A[v'
: 6. Based on the above anchorage evaluations, is the anchorage free ofpotentially adverse seismic conditions?
: 5. Is the anchorage configuration consistent with plant documentation?           YE[ NEI  U['-D (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Y[3NY[3 N[3 uE N/UD(YE- NE UCI N/A[/YEI NE- UC- N/A[v'YE[ NEI U['-DY4NC UEIEnter the equipment class name from Appendix B: Classes of Equipment.
: 6. Based on the above anchorage evaluations, is the anchorage free of            Y4NC    UEI potentially adverse seismic conditions?
Page 106 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0F! -3qSeismic Walkdown Checklist (SWC)Sheet Status: Y0- NEI U[:[ ,lDl'lEquipment ID No. Q2E21MOV8133A Equip. Class' 8Equipment Description CHG PUMP DISCHARGE HDR ISOLATION Interaction Effects7. Are soft targets free from impact by nearby equipment or structures?
Enter the equipment class name from Appendix B: Classes of Equipment.
YW"ND U'- N/AC]8. Are overhead equipment, distribution  
Page 106 of 467
: systems, ceiling tiles and lighting, YNr"NC] UC) N/ACand masonry block walls not likely to collapse onto the equipment?
 
JA01- RF-,,2- FrA,-C.-0,,0.-
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS                                                 NO. SNCF164-RPT-02, VERSION 2.0 F! -3q Sheet 2n*f  *,
16L&CI -WAL Tl VALLtA1Tj  
Status: Y0- NEI U[:[ ,lDl'l Seismic Walkdown Checklist (SWC)
' 1W 9 PPi T- -29. Do attached lines have adequate flexibiltty to avoi damage? YC"Nr UC- N/AC10. Based on the above seismic interaction evaluations, is equipment free Y[2j NCI UCof potentially adverse seismic interaction effects?Other Adverse Conditions
Equipment ID No. Q2E21MOV8133A                   Equip. Class' 8 Equipment Description CHG PUMPDISCHARGE HDR ISOLATION Interaction Effects
: 11. Have you looked for and found no other seismic conditions that could YEY NCI UCDadversely affect the safety functions of the equipment?
: 7. Are soft targets free from impact by nearby equipment or structures?     YW"ND U'- N/AC]
Comments (Additional pages may be added as necessary) dIatJIFvalutaedtby PIMIRM)..........
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YNr"NC] UC) N/AC and masonry block walls not likely to collapse onto the equipment?
2.5 IVA ..Date: 11274-rS 7-f 7,Page 107 of 467 NO. SNCF164-RPT-02, VERSION 2.0ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS Page 108 of 467 0ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0Page 109 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0/Seismic Walkdown Checklist (SWC)Sheet i ofl JfStatus: YP NEI Uj-]Equipment ID No. Q2E21MOV8885 Equip. Class, 8Equipment Description HHSI TO RCS COLD LEG ISOLATION Location:
JA01-                                 RF-,,2-     FrA,-C.-0,,0.-
Bldg. AUXILIARY Floor El. 100 Room, Area 2., AManufacturer, Model, Etc. (optional but recommended)
16L&CI -WAL Tl VALLtA1Tj                         '   1W 9-2 PPi         T-
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results of judgments andfindings.
: 9. Do attached lines have adequate flexibiltty to avoi damage?               YC"Nr     UC- N/AC
Additional space is provided at the end of this checklist for documenting other comments.
: 10. Based on the above seismic interaction evaluations, is equipment free     Y[2j NCI UC of potentially adverse seismic interaction effects?
Other Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could       YEY NCI UCD adversely affect the safety functions of the equipment?
Comments (Additional pages may be added as necessary) dIatJI Fvalutaedtby
      ..........         2.
PIMIRM)                                                          Date:    11274-r 5 IVA             ..                                                       S  7-f 7, Page 107 of 467
 
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS                NO. SNCF164-RPT-02, VERSION 2.0 Page 108 of 467
 
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS 0          NO. SNCF164-RPT-02, VERSION 2.0 Page 109 of 467
 
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS                                             NO. SNCF164-RPT-02, VERSION 2.0
    /
Sheet i ofl Jf Status: YP NEI Uj-]
Seismic Walkdown Checklist (SWC)
Equipment ID No. Q2E21MOV8885                     Equip. Class, 8 Equipment Description HHSI TO RCS COLD LEG ISOLATION Location: Bldg. AUXILIARY Floor El. 100                     Room, Area 2., A Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
Anchorage
: 1. Is the anchorage configuration verification required (i.e., is the item one YO] Noof the 50% of SWEL items requiring such verification)?
: 1. Is the anchorage configuration verification required (i.e., is the item one YO] No of the 50% of SWEL items requiring such verification)?
il-%lrxr coirn~ctx-,t, no~ a.nr,ý2. Is the anchorage free of bent, broken, missing or loose hardware?
il-%lrxr coirn~ctx-,t, no~ a.nr,ý
: 3. Is the anchorage free of corrosion that is more than mild surfaceoxidation?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?           YE] NE] UE] N/AI9
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?
: 3. Is the anchorage free of corrosion that is more than mild surface            YE] NE] UE] N/Ag oxidation?
(Note: This question only applies if the item is one of the 50% forwhich an anchorage configuration verification is required.)
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?   YE] NE] UE] N/A0
: 6. Based on the above anchorage evaluations, is the anchorage free ofpotentially adverse seismic conditions?
: 5. Is the anchorage configuration consistent with plant documentation?         YE] NE] UE] N/A0 (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
YE] NE] UE] N/AI9YE] NE] UE] N/AgYE] NE] UE] N/A0YE] NE] UE] N/A0Y'rNEI U50Ie* kEnter the equipment class name from Appendix B: Classes of Equipment.
: 6. Based on the above anchorage evaluations, is the anchorage free of                                    k potentially adverse seismic conditions?                                     Y'rNEI U50Ie*
Page 110 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0Seismic Walkdown Checklist (SWC)Equipment ID No. Q2E21MOV8885 Sheet 2 oftStatus: Y54! NF'- U#JEquip. Class, 8Equipment Description HHSt TO RCS COLD LEG ISOLATPON Interaction Effects7. Are soft targets free from impact by nearby equipment or structures?
Enter the equipment class name from Appendix B: Classes of Equipment.
Y ' NE] UF] N/A[]i,ý I Ix' ýq-'1/2 %3F- j4't -, , s'j tý,cj Mcqcgosc8. Are overhead equipment, distribution  
Page 110 of 467
: systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
 
: 9. Do attached lines have adequate flexibility to avoid damage'?10. Based on the above seismic interaction evaluations, is equipment freeof potentially adverse seismic interaction effects?YZ NEI U[E] N/AE[Ye NE] U[3 N/A]Y[A NE] U[EOther Adverse Conditions
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS                                           NO. SNCF164-RPT-02, VERSION 2.0 Sheet 2 oft Status: Y54! NF'- U#J Seismic Walkdown Checklist (SWC)
: 11. Have you looked fbr and found no other seismic conditions that could U[Iadversely affect the safety functions of the equipment?
Equipment ID No.       Q2E21MOV8885           Equip. Class, 8 Equipment Description HHSt TO RCS COLD LEG ISOLATPON Interaction Effects
: 7. Are soft targets free from impact by nearby equipment or structures?     Y   ' NE] UF] N/A[]
i,ý IIx'             ýq-'1/2 4  't %3F- - j ,, s'j tý,cj     Mcqcgosc
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YZ NEI U[E] N/AE[
and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage'?             Ye NE] U[3 N/A]
: 10. Based on the above seismic interaction evaluations, is equipment free      Y[A NE] U[E of potentially adverse seismic interaction effects?
Other Adverse Conditions
: 11. Have you looked fbr and found no other seismic conditions that could       Y*N]- U[I adversely affect the safety functions of the equipment?
Comments (Additional pages may be added as necessary)
Comments (Additional pages may be added as necessary)
Evaluated by:L.acixg Mctc~lcxf Date: -2Z VZ-"Page 111 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0Page 112 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0Page 113 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0Seismic Walkdown Checklist (SWC)Equipment ID No. 02E21PO02  
Evaluated by:                                   L.acixg Mctc~lcxf                 Date:       -2Z VZ-"
-Equip.Sheet s of 16Status;:
Page 111 of 467
YJ'No Ut]Equipment Description CHARGING/HHSI PUMP P002B SWING PUMPLocation:
 
Bldg. AUXILIARY Floor El. 100 Room, Area 7"11-4Manufacturer, Model, Etc. (optional but recommended)
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS                 NO. SNCF164-RPT-02, VERSION 2.0 Page 112 of 467
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results ofjudgments andfindings.
 
Additional space is provided at the end ofthis checklist for documenting other comments.
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS       NO. SNCF164-RPT-02, VERSION 2.0 Page 113 of 467
 
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS                                                 NO. SNCF164-RPT-02, VERSION 2.0 Sheets of 16 Status;: YJ'No Ut]
Seismic Walkdown Checklist (SWC)
Equipment ID No. 02E21PO02                   -   Equip.
Equipment Description CHARGING/HHSI PUMP P002B SWING PUMP Location: Bldg. AUXILIARY Floor El. 100                       Room, Area       7"11-4 Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end ofthis checklist for documenting other comments.
Anchoraee
Anchoraee
: 1. Is the anchorage configuration verification required (i.e., is the item one Y10 Noof the 50% of SWEL items requiring such verification)?
: 1. Is the anchorage configuration verification required (i.e., is the item one Y10 No of the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?
: 2. Is the anchorage free ofbent, broken, missing or loose hardware?             Y'ND ULID    N/AD
: 3. Is the anchorage free of corrosion that is more than mild surfaceoxidation?
: 3. Is the anchorage free of corrosion that is more than mild surface            Y[1N-    UO N/AD oxidation?
: 4. Is the anchorage fe of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?
: 4. Is the anchorage fe of visible cracks in the concrete near the anchors?       YINO Uf N/AD
(Note: This question only applies if the item is one of the 50% forwhich an anchorage configuration verfication is required.)
: 5. Is the anchorage configuration consistent with plant documentation?           Y'/NO UQ N/AD (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verfication is required.)
~a 5N~.05e jI 4v k IE-Z I 9,907A6. Based on the above anchorage evaluations, is the anchorage free ofpotentially adverse seismic conditions?
              ~a 5N~.05e jI               4v         k IE-Z     I 9,907A
Y'ND ULID N/ADY[1N- UO N/ADYINO Uf N/ADY'/NO UQ N/ADYG(NO U-I Ent=i the equipment class name from Appendix B: Claones of Equipment Page 114 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0Sheet 2 of rSStatus: Yf NO] U0Seismic Walkdown Checklist (SWC)Equipment ID No. Q2E21PO02B Equip. Class, 5Equipment Description CHARGING/I"/HSI PUMP P00219 SWING PUMPInteraction Effects7. Are soft targets free from impact by nearby equipment or structures?
: 6. Based on the above anchorage evaluations, is the anchorage free of            YG(NO U-potentially adverse seismic conditions?
: 8. Are overhead equipment, distribution  
IEnt=i the equipment class name from Appendix B: Claones of Equipment Page 114 of 467
: systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
 
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment freeof potentially adverse seismic interaction effects?Y&ýNO UC N/AQ3Y[/N0 U[:] N/AtYI'NQ UD N/AQYL NC UQOther Adverse Conditions
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS                                           NO. SNCF164-RPT-02, VERSION 2.0 Sheet 2 of rS Status: Yf NO] U0 Seismic Walkdown Checklist (SWC)
: 11. Have you looked for and found no other seismic conditions that couldadversely affect the safety functions of the equipment?
Equipment ID No. Q2E21PO02B                   Equip. Class, 5 Equipment Description CHARGING/I"/HSI PUMP P00219 SWING PUMP Interaction Effects
YG/N[] UDComments (Additional pages may be added as necessary)
: 7. Are soft targets free from impact by nearby equipment or structures?     Y&ýNO UC N/AQ3
C 6 0 k j0r 60 r 01~t~M1 T A6 V- M4fi ý Ome pýýDEvaluated by:_ P-MIXTO ad"9"Date: 27-1 1.6.- 7 -1'/,Page 115 of 467 0ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0Page 116 of 467 0ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS 0NO. SNCF164-RPT-02, VERSION 2.0NJPage 117 of 467 0ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS 00NO. SNCF164-RPT-02, VERSION 2.0(AJ-,,J"c1Page 118 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0Sheet ovY4 11Status: Y) NO UE-Seismic Walkdown Checklist (SWC)Equipment ID No. Q2F16LT0501 Equip. Class, 18Equipment Description RWST LEVEL TRANSMITTER Location:
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Y[/N0 U[:] N/At and masonry block walls not likely to collapse onto the equipment?
Bldg. YARD Floor El. 155 Room, Area RWSTManufacturer, Model. Etc. (optional but recontmended)
: 9. Do attached lines have adequate flexibility to avoid damage?               YI'NQ UD N/AQ
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results of judgments andfindings.
: 10. Based on the above seismic interaction evaluations, is equipment free      YL    NC UQ of potentially adverse seismic interaction effects?
Additional space is provided at the end of this checklist for documenting other comments.
Other Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could      YG/N[] UD adversely affect the safety functions of the equipment?
Comments (Additional pages may be added as necessary)
C60k          0j0 r    6   r       01~t~M1 T V-   A6        ýM4fiOme pýýD Evaluated by:_   P-MIXTO             ad"9"                                       Date:     27-11.
6.- 7-1'/,
Page 115 of 467
 
0 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS                 NO. SNCF164-RPT-02, VERSION 2.0 Page 116 of 467
 
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS 0                                        0 NO. SNCF164-RPT-02, VERSION 2.0 NJ Page 117 of 467
 
0 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS 0                                        0 NO. SNCF164-RPT-02, VERSION 2.0 (AJ
                                                                                -,,J "c1 Page 118 of 467
 
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS                                             NO. SNCF164-RPT-02, VERSION 2.0 Sheet  ovY4 11 Status: Y)   NO UE-Seismic Walkdown Checklist (SWC)
Equipment ID No. Q2F16LT0501                       Equip. Class, 18 Equipment Description RWST LEVEL TRANSMITTER Location: Bldg. YARD                 Floor El. 155             Room, Area RWST Manufacturer, Model. Etc. (optional but recontmended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
Anchorage
: 1. Is the anchorage configuration verification required (i.e.. is the item one YEI N52"of the 50% of SWEL items requiring such verification)?
: 1. Is the anchorage configuration verification required (i.e.. is the item one YEI N52" of the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware? UE- N/AEr3. Is the anchorage free of corrosion that is more than mild surface YO '"NDN UEI N/AEroxidation?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?           Y*"N"E! UE- N/AEr
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?
: 3. Is the anchorage free of corrosion that is more than mild surface           YO '"NDN UEI N/AEr oxidation?
YR.NE-I UEJ N/AE_a,,,j,;',/d 07" -'5*10.¢  
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?   YR.NE-I UEJ N/AE
" o( 5. Is the anchorage configuration consistent with plant documentation?
_a,,,j,;',/d                                           07" -'5*10.¢ " o
YE3 NEI UE" N/AAI-'"(Note: This question only applies if the item is one of the 50% forwhich an anchorage configuration verification is required.)
(     5. Isthe anchorage configuration consistent with plant documentation?
: 6. Based on the above anchorage evaluations, is the anchorage free of YkNiE UErpotentially adverse seismic conditions?
(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
YE3 NEI UE" N/AAI-'"
: 6. Based on the above anchorage evaluations, is the anchorage free of           YkNiE     UEr potentially adverse seismic conditions?
Enter the equipment class name front Appendix B: Classes uf Equpnment.
Enter the equipment class name front Appendix B: Classes uf Equpnment.
Page 119 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0Shee. of (,/WLjStatus: YM NEI U['-Seismic Walkdown Checklist (SWC)Equipment ID No. Q2F16LT0501 Equip. Class' 18Equipment Description RWST LEVEL TRANSMITTER Interaction Effects7. Are soft targets free from impact by nearby equipment or structures?
Page 119 of 467
: 8. Are. overhead equipment, distribution  
 
: systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS                                           NO. SNCF164-RPT-02, VERSION 2.0 Shee. of (,/WLj Status: YM NEI U['-
Y6frEi5UD N/AD*ý NNo U'] N/AD9. Do attached lines have adequate flexibility to avoid damage? 6N" UEI-' N/ADofBased on the above seismic interaction evaluations, is equipment free Y ND UDof potentially adverse seismidc interaction effects?Other Adverse Conditions 1I. Have you looked for and found no other seismic conditions that could UDadversely affect the safety functions of the equipment?
Seismic Walkdown Checklist (SWC)
Equipment ID No. Q2F16LT0501                   Equip. Class' 18 Equipment Description RWST LEVEL TRANSMITTER Interaction Effects
: 7. Are soft targets free from impact by nearby equipment or structures?       Y6frEi5UD N/AD
: 8. Are. overhead equipment, distribution systems, ceiling tiles and lighting, *ý NNo U'] N/AD and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?                 6N*"     UEI-'N/AD ofBased on the above seismic interaction evaluations, is equipment free   Y     ND UD of potentially adverse seismidc interaction effects?
Other Adverse Conditions 1I. Have you looked for and found no other seismic conditions that could                   UD adversely affect the safety functions of the equipment?
Comments (Additional pages may be added as necessary)
Comments (Additional pages may be added as necessary)
Evaluated by: (2- .Date: V. -o. 2 ./uzo/20/ZPage 120 of 467 0NO. SNCF164-RPT-02, VERSION 2.0ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS Page 121 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0Page 122 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0Seismic Walkdown Checklist (SWC)Sheet i of 3ý4Status: YP -] UF]Equipment ID No. Q2G31HOO1B Equip. Class' 21Equipment Description SFP HEAT EXCHANGER TRAIN ALocation:
Evaluated by:           (2-                                         .             Date:       o.
Bldg. AUXILIARY Floor El. 165 Room, Area Z4La7Manufacturer, Model, Etc. (optional but recommended)
V. 2-     ./
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results ofjudgments andfindings.
uzo/20/Z Page 120 of 467
Additional space is provided at the end of this checklist for documenting other comments.
 
Anchorage I. Is the anchorage configuration verification required (i.e., is the item one YO/NE)of the 50% of SWEL items requiring such verification)?
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS 0
2.1--b2. Is the anchorage free of bent, broken, missing or loose hardware?
NO. SNCF164-RPT-02, VERSION 2.0 Page 121 of 467
YkýNEI UE] N/AEYP'NE] UO N/AM3. Is the anchorage free of corrosion that is more than mild surfaceoxiOation?
 
4shean the- convret 4ea othe aor Y[p<c ] N4. Is the anchorage free of visible cracks in the concrete near the anchors?
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS                 NO. SNCF164-RPT-02, VERSION 2.0 Page 122 of 467
YONE] UE] N/ACI5. Is the anchorage configuration consistent with plant documentation?
 
(Note: This question only applies if the item is one of the 50% forwhich an anchorage configuration verification is required.)
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS                                                 NO. SNCF164-RPT-02, VERSION 2.0 Sheet i of 3&#xfd;4 Status: YP -]       UF]
: 6. Based on the above anchorage evaluations, is the anchorage free ofpotentially adverse seistmic conditions?
Seismic Walkdown Checklist (SWC)
4KNE] UE1 N/AE1'&#xfd;i0/N UEIEnter the equipment class natne from Appendix B: Classes of Equipment.
Equipment ID No. Q2G31HOO1B                         Equip. Class' 21 Equipment Description SFP HEAT EXCHANGER TRAIN A Location: Bldg. AUXILIARY           Floor El. 165             Room, Area   Z4La7 Manufacturer, Model, Etc. (optional but recommended)
Page 123 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0CleoSheet 2 of/ IStatus: Y[t NE- U-Seismic Walkdown Checklist (SWC)Equipment ID No. Q2G31HOO1B Equip. ClassI 21Equipment Description SFP HEAT EXCHANGER TRAIN AInteraction Effects7. Are soft targets free from impact by nearby equipment or structures?
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
YPAE] U[- N/A128. Are overhead equipment, distribution  
Anchorage I. Is the anchorage configuration verification required (i.e., is the item one YO/NE) of the 50% of SWEL items requiring such verification)?
: systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
1--b                          2.
: 9. Do attached lines have adequate flexibility to avoid damage?Y~1\JE U0 N/AEI10. Based on the above seismic interaction evaluations, is equipment free Yt]-Nf Uijof potentially adverse seismic interaction effects?Other Adverse Conditions
: 2. Is the anchorage free of bent, broken, missing or loose hardware?             Yk&#xfd;NEI UE] N/AE
: 11. Have you looked for and found no other seismic conditions that could O-NE] UE-adversely affect the safety functions of the equipment?
: 3. Is the anchorage free of corrosion that is more than mild surface            YP'NE] UO N/AM oxiOation?
4shean                                             the- convret     aor 4ea     Y[p<c ] otheN
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?     YONE] UE] N/ACI
: 5. Is the anchorage configuration consistent with plant documentation?           4K*NE] UE1 N/AE1 (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of            '&#xfd;i0/N     UEI potentially adverse seistmic conditions?
Enter the equipment class natne from Appendix B: Classes of Equipment.
Page 123 of 467
 
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS                                         NO. SNCF164-RPT-02, VERSION 2.0 Cleo Sheet 2 of/ I Status: Y[t NE- U-Seismic Walkdown Checklist (SWC)
Equipment ID No.       Q2G31HOO1B             Equip. ClassI 21 Equipment Description SFP HEAT EXCHANGER TRAIN A Interaction Effects
: 7. Are soft targets free from impact by nearby equipment or structures?     YPAE] U[-       N/A12
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Y~1\JE U0 N/AEI and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?
: 10. Based on the above seismic interaction evaluations, is equipment free     Yt]-Nf     Uij of potentially adverse seismic interaction effects?
Other Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could         O-NE] UE-adversely affect the safety functions of the equipment?
Comments (Additional pages may be added as necessary)
Comments (Additional pages may be added as necessary)
,fb Af &Evaluated Date: -'2~Page 124 of 467 0ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0Page 125 of 467 NO. SNCF164-RPT-02, VERSION 2.0ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS Page 126 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0r&#xfd;- 41Seismic Walkdown Checklist (SWC)Sheet i ofN u/j Status: NEI UE-- '4111"Equipment ID No. Q2H11NGASC2506D Equip. Class, 20Equipment Description AUX SAFEGUARDS CABINET DLocation:
                                    ,fb Af &
Bldg. AUXILIARY Floor El. 155 Room, Area 471Manufacturer, Model, Etc. (optional but recommended)
Evaluated                                                                         Date:                     -
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results ofjudgments andfindings.
                                                                                                      '2~
Additional space is provided at the end of this checklist for documenting other comments.
Page 124 of 467
Anchora2e I. Is the anchorage configuration verification required (i.e., is the item oneof the 50% of SWEL items requiring such verification)?
 
: 2. Is the anchorage free of bent, broken, missing or loose hardware?
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS 0          NO. SNCF164-RPT-02, VERSION 2.0 Page 125 of 467
: 3. Is the anchorage free of corrosion that is more than mild surfaceoxidation?
 
Yd NEIYEl NEI UO N/AOYE/N- UI- N/A7]4. Is the anchorage free of visible cracks in the concrete near the anchors?
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS                NO. SNCF164-RPT-02, VERSION 2.0 Page 126 of 467
Y[ NOI UFJ N/A]5. Is the anchorage configuration consistent with plant documentation?
 
(Note: This question only applies if the item is one of the 50% forwhich an anchorage configuration verification is required.)
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS                                               NO. SNCF164-RPT-02, VERSION 2.0 r&#xfd;- 41 Sheet i ofNu/j '*$
h4M .ollgj&#xfd; 06jF167tY 4rigiV 0.2&lr/9//
Status: Y2* NEI   UE-- '4111" Seismic Walkdown Checklist (SWC)
A61A " vsr -56. Based on the above anchorage evaluations, is the anchorage free ofpotentially adverse seismic conditions?
Equipment ID No. Q2H11NGASC2506D Equip. Class, 20 Equipment Description AUX SAFEGUARDS CABINET D Location: Bldg. AUXILIARY Floor El. 155                     Room, Area     471 Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchora2e I. Is the anchorage configuration verification required (i.e., is the item one  Yd NEI of the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?             YEl  NEI UO N/AO
: 3. Is the anchorage free of corrosion that is more than mild surface            YE/N-     UI- N/A7]
oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?     Y[   NOI UFJ N/A]
: 5. Is the anchorage configuration consistent with plant documentation?               YfNO Ul] N/Al]
(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
h4M     .ollgj&#xfd;     06jF167tY       4rigiV 0.2&lr/9// A61A                vsr
                                                                              "     -5    Qz  UithYOA 50 2 ,5-o&            A-q2' 4P 0 PIUPC 216o54-)
: 6. Based on the above anchorage evaluations, is the anchorage free of            Y9~ NO Ul potentially adverse seismic conditions?
Enter the equipment class name from Appendix B: Classes of Equipment.
Enter the equipment class name from Appendix B: Classes of Equipment.
YfNO Ul] N/Al]Qz Uit hYOA 50 2,5-o& A-q2' 4P 0 PIUPC 216o54-)Y9~ NO UlPage 127 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0Sheet 2 of X 5 7(jdy ,Status: Y9NE- U[-- O'llSeismic Walkdown Checklist (SWC)Equipment ID No. Q2H1INGASC2506D Equip. Class1Equipment Description AUX SAFEGUARDS CABINET LInteraction Effects7. Are soft targets free from impact by nearby equipment or structures?
Page 127 of 467
: 8. Are overhead equipment, distribution  
 
: systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS                                             NO. SNCF164-RPT-02, VERSION 2.0 Sheet 2 of X 5 7(jdy ,
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment freeof potentially adverse seismic interaction effects?Y[2(N[E UE1 N/AE]YE3'NEJ Ul1 N/AE1YD/NE) UEI N/AQlY2( NEI UMOther Adverse Conditions
Status: Y9NE- U[-- O'll Seismic Walkdown Checklist (SWC) 1 Equipment ID No.     Q2H1INGASC2506D Equip. Class          *v Equipment Description AUX SAFEGUARDS CABINET L Interaction Effects
: 11. Have you looked for and found no other seismic conditions that could YE'N"I Ufadversely affect the safety functions of the equipment?
: 7. Are soft targets free from impact by nearby equipment or structures?         Y[2(N[E UE1 N/AE]
Comments (Additional pages may be added as necessary) rMi- A/ I c Mg-,9 " FZ -;;70 ,' TA , 'k. : ,-.-&deg;,VA.II" tEvaluated by: , VL). 0Al(-Date: __ __ _- __ __//Page 128 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0Page 129 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0Page 130 of 467 0ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0Page 131 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0..I ' "Sheet s of" 4e &Status: YE NO U["] Seismic Walkdown Checklist (SWC)Equipment ID No. 02H1 1NGB2504K Equip. Class' 20Equipment Description BOP INSTRUMENTATION CABINET KLocation:
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting,     YE3'NEJ Ul1 N/AE1 and masonry block walls not likely to collapse onto the equipment?
Bldg. AUX Floor El. 155 Room, Area 0471Manufacturer, Model. Etc. (optional but recommended)
: 9. Do attached lines have adequate flexibility to avoid damage?                 YD/NE) UEI N/AQl
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results of judgments andfindings.
: 10. Based on the above seismic interaction evaluations, is equipment free        Y2( NEI    UM of potentially adverse seismic interaction effects?
Additional space is provided at the end of this checklist for documenting other comments.
Other Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could         YE'N"I Uf adversely affect the safety functions of the equipment?
Comments (Additional pages may be added as necessary) rMi- A/cI        Mg-,9 " FZ -             ;;70,'TA         ,     'k.&deg;,VA.II" :t ,-.-
Evaluated by:         0
                          ,VL).                                                         Date:   __ __ _- __ __
Al(-
                                          //
Page 128 of 467
 
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS                 NO. SNCF164-RPT-02, VERSION 2.0 Page 129 of 467
 
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS                 NO. SNCF164-RPT-02, VERSION 2.0 Page 130 of 467
 
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS 0          NO. SNCF164-RPT-02, VERSION 2.0 Page 131 of 467
 
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS                                             NO. SNCF164-RPT-02, VERSION 2.0 I ' "..
Sheet s of"4e &
Status: YE NO U["] Xji*1' Seismic Walkdown Checklist (SWC)
Equipment ID No.       02H1 1NGB2504K           Equip. Class' 20 Equipment Description BOP INSTRUMENTATION CABINET K Location: Bldg. AUX               Floor El. 155             Room, Area   0471 Manufacturer, Model. Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
Anchorage
: 1. Is the anchorage configuration verification required (i.e., is the item one YZ NMof the 50% of SWEL items requiring such verification)?
: 1. Is the anchorage configuration verification required (i.e., is the item one YZ NM of the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?           Y[  NEI UErN/AEf
: 3. Is the anchorage free of conrosion that is more than mild surfaceoxidation?
: 3. Is the anchorage free of conrosion that is more than mild surface            YN NEI UE" N/Ar-oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?     YN NEI ur- N/AE
(Note: This question only applies if the item is one of the 50% forwhich an anchorage configuration verification is required.)
: 5. Is the anchorage configuration consistent with plant documentation?           YZ NE] UEI N/A['-
Panel is welded to embedded plate in floor. Welds are on the outsideof the panel. The welds were confirmed to be consistent with the weldsidentified and evaluated in the SEWS package for this component dated 7/1/93. All welds were determined to be free from adverseconditions and to match plant documentation.
(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
See pages ,t3'forpictures of typical welds 4. "-t9Enter the equipment class name from Appendix B: Classes of Equipment.
Panel is welded to embedded plate in floor. Welds are on the outside of the panel. The welds were confirmed to be consistent with the welds identified and evaluatedin the SEWS package for this component dated 7/1/93. All welds were determinedto be free from adverse conditions and to match plant documentation. See pages,t3'for pictures of typical welds                                     4. "-t9 Enter the equipment class name from Appendix B: Classes of Equipment.
Y[ NEI UEr N/AEfYN NEI UE" N/Ar-YN NEI ur- N/AEYZ NE] UEI N/A['-Page 132 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0Sheet 2 of,-r (g MStatus: Y[ NEI U[] Seismic Walkdown Checklist (SWC)Equipment ID No. Q2HI INGB254KU Equip. Class, 20Equipmient Description BOP INSTRUMENTATION CABINET KInteraction Effects6. Based on the above anchorage evaluations, is the anchorage free ofpotentially adverse seismic conditions?
Page 132 of 467
YED NEI U-Interaction Effects7. Are soft targets free from impact by nearby equipment or structures?
 
: 8. Are overhead equipment, distribution  
ATTACHMENT 3: SEISMIC Effects WALKDOWN CHECKLISTS                                     NO. SNCF164-RPT-02, VERSION 2.0 Sheet 2 of,-r (g M Status: Y[ NEI U[] 4"* '*
: systems, ceiling tiles and lighting.
Seismic Walkdown Checklist (SWC)
and masonry block walls not likely to collapse onto the equipment?
Equipment ID No. Q2HI INGB254KU                   Equip. Class, 20 Equipmient Description BOP INSTRUMENTATION CABINET K
Isolated cases were found where some of the east-west spanningrunners were not clipped to the north south spanning runners.However, all north south spanning runners are supported from the roofand are prevented from lateral motion. The lights, vents and otheritems are supported from the structure independently from the ceilingtile system. The overall configuration is consistent with theconfiguration identified and evaluated in the SEWS walkdownperformed on 7/1/93. Due to the fact that the unclipped runners occuronly in isolated cases and the fact that all tiles are supported on at leastthree sides, the ceiling tiles will not fall and adversely impact thepanels. There are no ceiling tiles directly over any panels and thepanels are all closed on the top. A corrective action report has beenissued to reattach the loose runners.9. Do attached lines have adequate flexibility to avoid damage?YZ NEI UI N/AOYZ NO U[O N/ArYG3 NO Ufi N/AO10. Based on the above seistmtic interaction evaluations, is equipment fiee YZ NO U-of potentially adverse seismic interaction effects?Other Adverse Conditions I1. Have you looked for and found no other seismic conditions that couldadversely affect the safety functions of the equipment?
: 6. Based on the above anchorage evaluations, is the anchorage free of          YED NEI U-potentially adverse seismic conditions?
YZ NO UOPage 133 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0Sheet 3 of,4/0 JWStatus: Y1 N'-' UE" 11011.Seismic Walkdown Checklist (SWC)Equipmenl ID No. Q2H11NGB2504K Equip. ClassI 20Equipment Description BOP INSTRUMENTATION CABINET KComments (Additional pages may be added as necessary)
Interaction Interaction Effects
Evaluated by: hamIKWt' Date: f-7_.- 7-S I -)-.Page 134 of 467 0ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0Page 135 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0Page 136 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0Page 137 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0Sheet 1 of 4Status: YE] NE] UN20Seismic Walkdown Checklist (SWC)Equipment ID No. Q2HI1NGNIS2503A Equip. ClassEquipment Description NIS EXCORE DETECTOR CABLocation:
: 7. Are soft targets free from impact by nearby equipment or structures?       YZ NEI UI N/AO
Bldg. AUXILIARY Floor El. 155' Room, Area 416Manufacturer, Model, Etc. (optional but recommended)
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting. YZ NO U[O N/Ar and masonry block walls not likely to collapse onto the equipment?
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results ofjudgments andfindings.
Isolated cases were found where some of the east-west spanning runners were not clipped to the north south spanning runners.
Additional space is provided at the end of this checklist for documenting other comments.
However, all north south spanning runners are supportedfrom the roof and are prevented from lateral motion. The lights, vents and other items are supportedfrom the structure independently from the ceiling tile system. The overall configurationis consistent with the configurationidentified and evaluated in the SEWS walkdown performed on 7/1/93. Due to the fact that the unclipped runners occur only in isolatedcases and the fact that all tiles are supported on at least three sides, the ceiling tiles will not fall and adversely impact the panels. There are no ceiling tiles directly over any panels and the panels are all closed on the top. A corrective action reporthas been issued to reattach the loose runners.
: 9. Do attached lines have adequate flexibility to avoid damage?                 YG3 NO Ufi N/AO
: 10. Based on the above seistmtic interaction evaluations, is equipment fiee     YZ NO U-of potentially adverse seismic interaction effects?
Other Adverse Conditions I1. Have you looked for and found no other seismic conditions that could        YZ NO UO adversely affect the safety functions of the equipment?
Page 133 of 467
 
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS                         NO. SNCF164-RPT-02, VERSION 2.0 Sheet 3 of,4/0 JW Status: Y1   N'-' UE" 11011.
Seismic Walkdown Checklist (SWC)
Equipmenl ID No. Q2H11NGB2504K           Equip. ClassI 20 Equipment Description BOP INSTRUMENTATION CABINET K Comments (Additional pages may be added as necessary)
Evaluated by: hamIKWt'     (,*          l,*                    Date:   f-7_.-   7-S -23  - I -)-.
Page 134 of 467
 
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS 0          NO. SNCF164-RPT-02, VERSION 2.0 Page 135 of 467
 
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS                 NO. SNCF164-RPT-02, VERSION 2.0 Page 136 of 467
 
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS                 NO. SNCF164-RPT-02, VERSION 2.0 Page 137 of 467
 
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS                               NO. SNCF164-RPT-02, VERSION 2.0 Sheet 1 of 4 Status: YE] NE] UN Seismic Walkdown Checklist (SWC)
Equipment ID No. Q2HI1NGNIS2503A                 Equip. Class 20 Equipment Description NIS EXCORE DETECTOR CAB Location: Bldg. AUXILIARY Floor El. 155'                     Room, Area 416 Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
Anchorage
: 1. Is the anchorage configuration verification required (i.e., is the item oneof the 50% of SWEL items requiring such verification)?
: 1. Is the anchorage configuration verification required (i.e., is the item one YE[: NO of the 50% of SWEL items requiring such verification)?
See note in question  
See note in question #6
#62. Is the anchorage free of bent, broken, missing or loose hardware?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?           YEO NOI UZ N/AE
: 3. Is the anchorage free of corrosion that is more than mild surfaceoxidation?
: 3. Is the anchorage free of corrosion that is more than mild surface            YEI NEI UO N/AE oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?   YO NE UO N/AE
(Note: This question only applies if the item is one of the 50% forwhich an anchorage configuration verification is required.)
: 5. Is the anchorage configuration consistent with plant documentation?         YE NE UO N/AE (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free ofpotentially adverse seismic conditions?
: 6. Based on the above anchorage evaluations, is the anchorage free of          YO NEI UO potentially adverse seismic conditions?
Some anchorages (welds) of this cabinet are under a vinyl kick plateat its base. The FNP Ops Shift Sup was uncomfortable authorizing the removal of the kick plate due to the potential to bump the cabinetduring removal.
Some anchorages(welds) of this cabinet are under a vinyl kick plate at its base. The FNP Ops Shift Sup was uncomfortable authorizing the removal of the kick plate due to the potential to bump the cabinet during removal. Review of the anchorages(and of this component overall) were therefore marked Undetermined.See Comments pg 2.
Review of the anchorages (and of this component overall) were therefore marked Undetermined.
Enter the equipment class name from Appendix B: Classes of Equipment.
See Comments pg 2.YE[: NOYEO NOI UZ N/AEYEI NEI UO N/AEYO NE UO N/AEYE NE UO N/AEYO NEI UOEnter the equipment class name from Appendix B: Classes of Equipment.
Page 138 of 467
Page 138 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS Seismic Walkdown Checklist (SWC)Equipment ID No. Q2H11NGNIS2503A Equip. Class'Equipment Description NIS EXCORE DETECTOR CABNO. SNCF164-RPT-02, VERSION 2.0Sheet 2 of 4Status: YE] NEl] U[20INETInteraction Effects7. Are soft targets free from impact by nearby equipment or structures?
 
YZ NE] Ur- N/A28. Are overhead equipment, distribution  
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS                           NO. SNCF164-RPT-02, VERSION 2.0 Sheet 2 of 4 Status: YE] NEl] U[
: systems, ceiling tiles and lighting, YZ NE] Ur- N/AOand masonry block walls not likely to collapse onto the equipment?
Seismic Walkdown Checklist (SWC)
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment freeof potentially adverse seismic interaction effects?YZ NE! UE N/AC]YO NEI UOOther Adverse Conditions
Equipment ID No. Q2H11NGNIS2503A         Equip. Class' 20 INET Equipment Description NIS EXCORE DETECTOR CAB Interaction Effects
: 11. Have you looked for and found no other seismic conditions that couldadversely affect the safety functions of the equipment?
: 7. Are soft targets free from impact by nearby equipment or structures?     YZ NE] Ur- N/A2
YI NEI UIComments (Additional pages may be added as necessary)
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YZ NE] Ur- N/AO and masonry block walls not likely to collapse onto the equipment?
This SWC was originally completed on 8-28-12 and retyped for clarity on 8-27-13.
: 9. Do attached lines have adequate flexibility to avoid damage?             YZ NE! UE      N/AC]
The subjectcomponent was removed from the SWEL since the anchorages could not be verified.
: 10. Based on the above seismic interaction evaluations, is equipment free    YO NEI UO of potentially adverse seismic interaction effects?
This isdiscussed in the note in Question 6 on pg 1. However, the conclusions of the 8-28-12 walkdown, inresponse to Questions 7 through 11 above are valid. The Area Walk By for this component, i.e., forRoom 416 is documented in AWC package FI-091.Evaluated by: Stephen Yuankw, A aDate: 08-28-1208-28-12Paul A. MiktusPage 139 of 467 0ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0Page 140 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.03Page 141 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0Sheet t ofA Status; YEE NO UF]Seismic Walkdown Checklist (SWC)Equipment ID No. O2HI1NGPIC2505D Equip. Class, 20Equipment Description Process Protection Cabinet Channel 4Location:
Other Adverse Conditions
Bldg. Aux. Bldq Floor El. 155' Room. AreaManufacturer, Model, Etc. (optional but recommended)
: 11. Have you looked for and found no other seismic conditions that could      YI NEI UI adversely affect the safety functions of the equipment?
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results of judgments andfindings.
Comments (Additional pages may be added as necessary)
Additional space is provided at the end of this checklist for documenting other comments.
This SWC was originally completed on 8-28-12 and retyped for clarity on 8-27-13. The subject component was removed from the SWEL since the anchorages could not be verified. This is discussed in the note in Question 6 on pg 1. However, the conclusions of the 8-28-12 walkdown, in response to Questions 7 through 11 above are valid. The Area Walk By for this component, i.e., for Room 416 is documented in AWC package FI-091.
Evaluated by: Stephen Yuan                                                      Date: 08-28-12 PaulA. Miktus                    kw, Aa                                  08-28-12 Page 139 of 467
 
0 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS                 NO. SNCF164-RPT-02, VERSION 2.0 Page 140 of 467
 
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS                 NO. SNCF164-RPT-02, VERSION 2.0 3
Page 141 of 467
 
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS                                             NO. SNCF164-RPT-02, VERSION 2.0 Sheet t ofA t*b Status; YEE NO UF]
Seismic Walkdown Checklist (SWC)
Equipment ID No. O2HI1NGPIC2505D                 Equip. Class, 20 Equipment Description Process ProtectionCabinetChannel 4 Location: Bldg. Aux. Bldq           Floor El. 155'           Room. Area Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorag$.
Anchorag$.
I. Is the anchorage configuration verification required (i.e.. is the item one YZ NOof the 50% of SWEL items requiring such verification)?
I. Is the anchorage configuration verification required (i.e.. is the item one YZ NO of the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent. broken. missing or loose hardware?
: 2. Is the anchorage free of bent. broken. missing or loose hardware?           YZ NEI UD N/AD Cabinet is welded to embedded steel in the floor.
Cabinet is welded to embedded steel in the floor.3. Is the anchorage fiee of corrosion that is more than mild surfaceoxidation?
: 3. Is the anchorage fiee of corrosion that is more than mild surface            YZ NO UE N/AO oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?     YZ NI    UQ N/AE
(Note: This question only applies if the item is one of the 50% forwhich an anchorage configuration verification is required.)
: 5. Is the anchorage configuration consistent with plant documentation?           YZ NO Uf    N/A" (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Anchorage documentation was obtained from SEWS package for thiscomponent, dated 7/1/93. Anchorage consists of welds to anembedded plate located on outside of cabinet.
Anchorage documentation was obtainedfrom SEWS package for this component, dated 7/1/93. Anchorage consists of welds to an embedded plate located on outside of cabinet. Carpetingwas partially removed to verify that welds match documented condition and that they have no adverse seismic conditions.
Carpeting was partially removed to verify that welds match documented condition and that theyhave no adverse seismic conditions.
Enter the equipment class name from Appendix B: Classes of Equipment.
YZ NEI UD N/ADYZ NO UE N/AOYZ NI UQ N/AEYZ NO Uf N/A"Enter the equipment class name from Appendix B: Classes of Equipment.
Page 142 of 467
Page 142 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0Seismic Walkdown Checklist (SWC)Sheet 2ofkfg 1[$.[ VStatus: YN NEI U["]Equipment ID No. 02HI 1NGPIC2505D Equip. Class' 20Equipment Description Process Protection Cabinet Channel 46. Based on the above anchorage evaluations, is the anchorage free ofpotentially adverse seismic conditions?
 
YI ND UOInteraction Effects7. Are soft targets free from impact by nearby equipment or structures?
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS                                         NO. SNCF164-RPT-02, VERSION 2.0 Sheet 2ofkfg 1[$.[ V Status: YN NEI U["]
: 8. Are overhead equipment.
Seismic Walkdown Checklist (SWC)
distribution  
Equipment ID No. 02HI 1NGPIC2505D Equip. Class' 20 Equipment Description ProcessProtection Cabinet Channel4
: systems, ceiling tiles and lighting, and masonry block walls not likely to collapse Onto the equipment?
: 6. Based on the above anchorage evaluations, is the anchorage free of      YI  ND UO potentially adverse seismic conditions?
Suspended ceiling and fixtures (lights, vents, etc) inspected anddetermined to be seismically adequate.
Interaction Effects
Isolated cases found whererunners were not clipped at both ends. See walkdown package for02H I1NGB2504K (package F2-42) and CR506358 for additional information on the control room ceiling.9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment freeof potentially adverse seismic interaction effects?Y0 NEI U- N/ADYZ NEI U- N/ADYZ NO UD N/ADY0 NO U-Other Adverse Conditions
: 7. Are soft targets free from impact by nearby equipment or structures?     Y0 NEI U-    N/AD
: 11. Have you looked for and found no other seismic conditions that could YO ND UDadversely affect the safety functions of the equipment?
: 8. Are overhead equipment. distribution systems, ceiling tiles and lighting, YZ NEI U- N/AD and masonry block walls not likely to collapse Onto the equipment?
Suspended ceiling and fixtures (lights, vents, etc) inspected and determined to be seismically adequate. Isolated cases found where runners were not clipped at both ends. See walkdown package for 02H I1NGB2504K (package F2-42)and CR506358 for additional information on the control room ceiling.
: 9. Do attached lines have adequate flexibility to avoid damage?             YZ NO UD N/AD
: 10. Based on the above seismic interaction evaluations, is equipment free      Y0 NO U-of potentially adverse seismic interaction effects?
Other Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could     YO ND UD adversely affect the safety functions of the equipment?
Comments (Additional pages may be added as necessary)
Comments (Additional pages may be added as necessary)
Verified the adequacy of welds as per SEWS for O2H 11NGBR2504K-B and Q2H11 NGPIC2505A-I,dated 7-1-93. The Area Walk By is included in package F2-42.Page 143 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0Evaluated by: P. MiktusS. YuanSheet 3 of 4-'.iDate: 08-23-1208-23-12Page 144 of 467 0ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0Page 145 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0Page 146 of 467 SNO. SNCF164-RPT-02, VERSION 2.0ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS Page 147 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.011IJPage 148 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0-iPage 149 of 467 0ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0Page 150 of 467 0NO. SNCF164-RPT-02, VERSION 2.0ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS Page 151 of 467I ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0Page 152 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0Page 153 of 467 0NO. SNCF164-RPT-02, VERSION 2.0ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS
Verified the adequacy of welds as perSEWS for O2H 11NGBR2504K-B and Q2H11 NGPIC2505A-I, dated 7-1-93. The Area Walk By is includedin package F2-42.
~~1Page 154 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0FZ-4.Seismic Walkdown Checklist (SWC)Sheet i feIt 0'sStatus: YZ NrD UEI1Equipment ID No. Q2HI1NGPIC2505H Equip. Class' 20Equipment Description Process Control Cabinet Channel 4Location:
Page 143 of 467
Bldg. Aux. Bldg Floor El. 155' Room, AreaManufacturer, Model, Etc. (optional but recommended)
 
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results of judgments andfindings.
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS       NO. SNCF164-RPT-02, VERSION 2.0 Sheet 3 of 4-'.i Evaluated by: P. Miktus                        Date: 08-23-12 S. Yuan                                08-23-12 Page 144 of 467
Additional space is provided at the end of this checklist for documenting other comments.
 
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS 0          NO. SNCF164-RPT-02, VERSION 2.0 Page 145 of 467
 
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS                 NO. SNCF164-RPT-02, VERSION 2.0 Page 146 of 467
 
S ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS                NO. SNCF164-RPT-02, VERSION 2.0 Page 147 of 467
 
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS                 NO. SNCF164-RPT-02, VERSION 2.0 11 IJ Page 148 of 467
 
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS                 NO. SNCF164-RPT-02, VERSION 2.0
                                                                                -i Page 149 of 467
 
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS 0
NO. SNCF164-RPT-02, VERSION 2.0 Page 150 of 467
 
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS 0
NO. SNCF164-RPT-02, VERSION 2.0 Page 151 of 467
 
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS                 NO. SNCF164-RPT-02, VERSION 2.0 Page 152 of 467
 
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS                 NO. SNCF164-RPT-02, VERSION 2.0 Page 153 of 467
 
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS 0
NO. SNCF164-RPT-02, VERSION 2.0
                                                                                ~~1 Page 154 of 467
 
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS                                             NO. SNCF164-RPT-02, VERSION 2.0 FZ-4.                                                                                         Sheet i feIt 0's Status: YZ NrD UEI1 Seismic Walkdown Checklist (SWC)
Equipment ID No. Q2HI1NGPIC2505H Equip. Class' 20 Equipment Description Process Control Cabinet Channel 4 Location: Bldg. Aux. Bldg           Floor El. 155'           Room, Area Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
Anchorage
: 1. Is the anchorage configuration verification required (i.e., is the item one YED NDIof the 50% of SWEL items requiring such verification)?
: 1. Is the anchorage configuration verification required (i.e., is the item one YED NDI of the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?           YZ NEI    UD N/AD Cabinet is welded to embedded steel in the floor.
Cabinet is welded to embedded steel in the floor.3. Is the anchorage free of corrosion that is more than mild surfaceoxidation?
: 3. Is the anchorage free of corrosion that is more than mild surface            Y0 ND UD N/AD oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?   Y[  NDI  UD N/AD
(Note: This question only applies if the item is one of the 50% forwhich an anchorage configuration verification is required.)
: 5. Is the anchorage configuration consistent with plant documentation?         YZ ND UD N/AD (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Anchorage documentation was obtained from SEWS package for thiscomponent, dated 7/1/93. Anchorage consists of welds to anembedded plate located on outside of cabinet.
Anchorage documentation was obtained from SEWS package for this component, dated 7/1/93. Anchorage consists of welds to an embedded plate located on outside of cabinet. Carpetingwas partially removed to verify that welds match documented condition and that they have no adverse seismic conditions.
Carpeting was partially removed to verify that welds match documented condition and that theyhave no adverse seismic conditions.
IEnter the equipment class name from Appendix B: Classes of Equipment.
YZ NEI UD N/ADY0 ND UD N/ADY[ NDI UD N/ADYZ ND UD N/ADI Enter the equipment class name from Appendix B: Classes of Equipment.
Page 155 of 467
Page 155 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0Sheet 2 OfI74t~trA Status: YZ NEI U-Seismic Walkdown Checklist (SWC)Equipment ID No. Q2HI1NGPIC2505H Equip. Class,Equipment Description Process Control Cabinet Channet146. Based on the above anchorage evaluations, is the anchorage free ofpotentially adverse seismic conditions?
 
YZ NE UDInteraction Effects7. Are soft targets free froom impact by nearby equipment or structures?
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS                                         NO. SNCF164-RPT-02, VERSION 2.0 Sheet 2 OfI74t~trA Status: YZ NEI U-Seismic Walkdown Checklist (SWC)
: 8. Are overhead equipment, distribution  
Equipment ID No.     Q2HI1NGPIC2505H Equip. Class, Equipment Description Process Control Cabinet Channet14
: systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 6. Based on the above anchorage evaluations, is the anchorage free of        YZ NE UD potentially adverse seismic conditions?
Suspended ceiling and fixtures (lights, vents, etc) inspected anddetermined to be seismically adequate.
Interaction Effects
Isolated cases found whererunners were not clipped at both ends. See walkdown package for02H11 NGB2504K (package F2-42) and CR506358 for additional information on the control room ceiling.9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment freeof potentially adverse seismic interaction effects?YZ NEI UE N/AQYN NEI U0 N/AElYZ NEl UE- N/AEYZ NC UEOther Adverse Conditions 1I. Have you looked for and found no other seismic conditions that could Y[ NEI UEiadversely affect the safety functions of the equipment?
: 7. Are soft targets free froom impact by nearby equipment or structures?     YZ NEI    UE N/AQ
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YN NEI U0 N/AEl and masonry block walls not likely to collapse onto the equipment?
Suspended ceiling and fixtures (lights, vents, etc) inspectedand determined to be seismically adequate. Isolated cases found where runners were not clipped at both ends. See walkdown package for 02H11 NGB2504K (package F2-42) and CR506358 for additional information on the control room ceiling.
: 9. Do attached lines have adequate flexibility to avoid damage?               YZ NEl UE- N/AE
: 10. Based on the above seismic interaction evaluations, is equipment free      YZ NC    UE of potentially adverse seismic interaction effects?
Other Adverse Conditions 1I. Have you looked for and found no other seismic conditions that could       Y[ NEI   UEi adversely affect the safety functions of the equipment?
Comments (Additional pages may be added as necessary)
Comments (Additional pages may be added as necessary)
Verified the adequacy of welds as per SEWS for Q2H 11NGBR2504K-B and Q2HI 1NGPIC2505A-1, dated 7-1-93. The Area Walk By package in included in package F2-42Page 156 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0Eva Iu a kdby: P. Miktu 1 J- 92S. YzianSheet 3 Of" 3 itDate: 08.23-1208-23-12Page 157 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0Page 158 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0Page 159 of 467 0ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0Page 160 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0Page 161 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0Page 162 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0Page 163 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0Page 164 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0Page 165 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0S heet Nof Ustatus: y[f1" NE] uE'Seismic Walkdown Checklist (SWC)Equipment ID No. Q2H1 INGSSP2506N Equip. Class, 20Equipment Description SOLID STATE PROTECTION TEST CABINETLocation:
Verified the adequacy of welds as per SEWS for Q2H 11NGBR2504K-B and Q2HI1NGPIC2505A-1, dated 7-1-93. The Area Walk By package in included in package F2-42 Page 156 of 467
Bldg. AUXILIARY FloorEl.
 
155 Room, Area 4-1Manufacturer, Model, Etc. (optional but recommended)
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS           NO. SNCF164-RPT-02, VERSION 2.0 Sheet 3 Of"3 it Eva Iu akdby: P. Miktu J-1 92                      Date: 08.23-12 S. Yzian                                  08-23-12 Page 157 of 467
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results ofjudgments andfindings.
 
Additional space is provided at the end of this checklist for documenting other comments.
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS                 NO. SNCF164-RPT-02, VERSION 2.0 Page 158 of 467
An chorage1. Is the anchorage configuration verification required (i.e., is the item oneof the 50% of SWEL items requiring such verification)?
 
: 2. Is the anchorage free of bent, broken, missing or loose hardware?
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS                 NO. SNCF164-RPT-02, VERSION 2.0 Page 159 of 467
: 3. Is the anchorage free of corrosion that is more than mild surfaceoxidation?
 
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?Y2/NDY[-I(NE]
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS 0          NO. SNCF164-RPT-02, VERSION 2.0 Page 160 of 467
UED N/AE1YM/N[] UE3 N/A[sYt9INE] UE1 N/AEI5. Is the anchorage configuration consistent with plant documentation? N[l U[' N/AE3(Note: This question only applies if the item is one of the 50% forwhich an anchorage configuration verification is required.)
 
Re-..70 Pok2 Q2HaI00G5P~Z5064-.A,VATet>
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS                 NO. SNCF164-RPT-02, VERSION 2.0 Page 161 of 467
7-1 -4, Ao 0 eu D -5E- --6. Based on the above anchorage evaluations, is the anchorage free of Y.N[ Urnpotentially adverse seismic conditions?
 
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS                 NO. SNCF164-RPT-02, VERSION 2.0 Page 162 of 467
 
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS                 NO. SNCF164-RPT-02, VERSION 2.0 Page 163 of 467
 
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS                 NO. SNCF164-RPT-02, VERSION 2.0 Page 164 of 467
 
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS                 NO. SNCF164-RPT-02, VERSION 2.0 Page 165 of 467
 
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS                                             NO. SNCF164-RPT-02, VERSION 2.0 S heetNof U status: y[f1" NE] uE' Seismic Walkdown Checklist (SWC)
Equipment ID No. Q2H1 INGSSP2506N Equip. Class, 20 Equipment Description SOLID STATE PROTECTION TEST CABINET Location: Bldg. AUXILIARY           FloorEl. 155             Room, Area       4-1 Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
An chorage
: 1. Is the anchorage configuration verification required (i.e., is the item one Y2/ND of the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?           Y[-I(NE] UED N/AE1
: 3. Is the anchorage free of corrosion that is more than mild surface            YM/N[] UE3 N/A[s oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?     Yt9INE] UE1 N/AEI
: 5. Is the anchorage configuration consistent with plant documentation?           YI* N[l U[' N/AE3 (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Re-..70 5[pW* Pok2 Q2HaI00G5P~Z5064-.A,VATet>                               7-1 -4,             eu -
Ao0 D -5E-   -
: 6. Based on the above anchorage evaluations, is the anchorage free of           Y.N[     Urn potentially adverse seismic conditions?
Enter the equipment class name from Appendix B: Classes of Equipment.
Enter the equipment class name from Appendix B: Classes of Equipment.
Page 166 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0JSheet 2 6f,!&#xfd;"&#xfd;Status: YIgNE[ U-]Seismic Walkdown Checklist (SWC)Equipment ID No. Q2H11NGSSP2506N Equip. Class' 20Equipment Description SOLID STATE PROTECTION TEST CABINETInteraction Effects7. Are soft targets free from impact by nearby equipmcnt or structures?
Page 166 of 467
: 8. Are overhead equipment, distribution  
 
: systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS                                         NO. SNCF164-RPT-02, VERSION 2.0 JSheet 2 6f,!&#xfd;"&#xfd; Status: YIgNE[           U-]
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment freeof potentially adverse seismic interaction effects?YEZ NEI UE3 N/AE3YP&#xfd;INEI UIII N/AElY[E]NEI UEI N/ACIYEI'NE1 UE]Other Adverse Conditions 1I. Hlave you looked for and found no other seismic conditions that could YE]. 'NrE UE-adversely affect the safety functions of the equipment?
Seismic Walkdown Checklist (SWC)
Comments (Additional pages may be added as necessary) idj 0 &#xfd;PEvaluated by: 'PA&#xfd;) ADate: -"&: .$ A, 3 -',.: sPage 167 of 467 0ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0!vPage 168 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO, SNCF164-RPT-02, VERSION 2.0Page 169 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0Page 170 of 467}}
Equipment ID No.     Q2H11NGSSP2506N         Equip. Class' 20 Equipment Description SOLID STATE PROTECTION TEST CABINET Interaction Effects
: 7. Are soft targets free from impact by nearby equipmcnt or structures?     YEZ NEI UE3 N/AE3
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YP&#xfd;INEI UIII N/AEl and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?               Y[E]NEI UEI N/ACI
: 10. Based on the above seismic interaction evaluations, is equipment free      YEI'NE1 UE]
of potentially adverse seismic interaction effects?
Other Adverse Conditions 1I. Hlave you looked for and found no other seismic conditions that could     YE]. 'NrE UE-adversely affect the safety functions of the equipment?
Comments (Additional pages may be added as necessary) idj0&#xfd;P Evaluated by:   'PA&#xfd;)                   A                                    Date:     -         "
                                                                                                    .&:3$ -' A,
                                                                                                              ,.:s Page 167 of 467
 
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS 0              NO. SNCF164-RPT-02, VERSION 2.0
                                                          !v Page 168 of 467
 
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS                 NO, SNCF164-RPT-02, VERSION 2.0 Page 169 of 467
 
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS                 NO. SNCF164-RPT-02, VERSION 2.0 Page 170 of 467}}

Latest revision as of 14:48, 4 November 2019

Enclosure 1, Including Attachments 1 to 8: Licensing Summary of Walkdown Report. Part 2 of 7
ML13252A153
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 09/04/2013
From:
Southern Nuclear Operating Co
To:
Office of Nuclear Reactor Regulation
Shared Package
ML13252A148 List:
References
NL-13-1555
Download: ML13252A153 (102)


Text

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 F2., 2A Sheet i of 3 Status: YVNOIN UI[

Seismic Walkdown Checklist (SWC)

Equipment IDNo. Q2E16H05B Equip. Class' 10 Equipment Description AUX FEEDWA TER PUMP ROOM COOLER 2B Location: Bldg. AUXILIARY Floor El. 100 Room, Area 2 ] ?#,7-Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YD N8 of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YgNE-' UD N/AEI
3. Is the anchorage free of corrosion that is more than mild surface YR(N- UD N/AD oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? Y NI'-I]UD N/AD 7
5. Is the anchorage configuration consistent with plant documentation? YD ND UD N/A[

(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6. Based on the above anchorage evaluations, is the anchorage free of YO'- U[]

potentially adverse seismic conditions?

'Enter the equipment class name from Appendix B: Classes of Equipment.

Page 69 of 467

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 SheSa2 Of 3 Status: Y;* NEI- U--

Seismic Walkdown Checklist (SWC)

Equipment ID No. Q2E16HOO5B Equip.

Equipment Description AUX FEEDWA TER PUMP ROOM COOLER 2B Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? Y/N[E UE1 /W
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YUKNEI IE1 N/AE-and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? YZN I]UE N/Ao'4,4)

Toe. uf-- Sep eLbr4 -8 (ojT see r)o~.. --M .L OY-Q

10. Based on the above seismic interaction evaluations, is equipment free Y[-NE) U0-of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YIýE" UE adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary) 04/y Evaluated by: Scýf --

  • " J I/.-.

1 Date: P. 21. ,*o 2_.

cl/l /2:/-

Page 70 of 467

0 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Page 71 of 467

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0

'A S Sheet I of -

Status: Y/N'D UEI Seismic Walkdown Checklist (SWC)

Equipment ID No. Q2E16H007 Equip. Class, 10 Equipment Description MCC 2A ROOM COOLER Location: Bldg. AUXILIARY Floor El. 139 Room, Area 2-.'

Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one Yl] N21 of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? Y[O/N4 " Ul- N/Al]
3. Is the anchorage free of corrosion that is more than mild surface Y[ý'NO Ul] N/A[]

oxidation?

4. Is the anchorage free of visible cracks in the concrete near the anchors? YN-N[J Ul- N/Al-
5. Is the anchorage configuration consistent with plant documentation? YO- NO" UI- N/AGY (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of Y N-] Un1 potentially adverse seismic conditions?

Enter the equipment class name from Appendix B: Classes of Equipment.

Page 72 of 467

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0

-A Sheet 2 ofX/-

Status: Y[*N-- UE-Seismic Walkdown Checklist (SWC)

Equipment ID No. Q2E16HO07 Equip. Class' 10 Equipment Description MCC 2A ROOM COOLER Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YEAEI UE] N/AD Y[RNlf'I UEI N/AE-'
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? YI/N4- U0I N/A[
10. Based on the above seismic interaction evaluations, is equipment free YEl'NEI UE]

of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could Y[/NEI Ul--

adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

Evaluated by: .YUAA L.. Date: 6-29-144-

0. Xr" ~-1 Page 73 of 467

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS 0 NO. SNCF164-RPT-02, VERSION 2.0 Page 74 of 467

0 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS 0 0 NO. SNCF164-RPT-02, VERSION 2.0 Page 75 of 467

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0

('2-. Sheet i of,'4 Status: YZ N[] Ur]

Seismic Walkdown Checklist (SWC)

Equipment ID No. Q2E16H008 Equip. Class, 10 Equipment Description 121'MCC2B Room ACU Location: Bldg. Aux bldo Floor El. 121' Room, Area Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the resulls of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YZ Ni of the 50% of SWEL items requiring such verification)?

Anchorage configuration was based on SEWS for Q2E16H008-B and Q2E16H007-A, dated 07-03-93 and 07-01-93 respectively.

2. Is the anchorage free of bent, broken, missing or loose hardware? YZ NEI UD N/AD Welded to embedded steel
3. Is the anchorage free of cortosion that is more than mild surface YN NO UD N/AD oxidation?

Very minorsurface corrosionand cracked paintobserved. No degradationof weld observed. Condition has no adverse seismic impact.

4. Is the anchorage free of visible cracks in the concrete near the anchors? YZ N' UD N/AD
5. Is the anchorage configuration consistent with plant documentation? YN ND UD N/AD (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of YN NO UD potentially adverse seismic conditions?

Enter the equipment class name fsom Appendix B: Classes of Equipment.

Page 76 of 467

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Sheet 2 of* 4 Status: YCK NEI uF"]

Seismic Walkdown Checklist (SWC)

Equipment ID No. Q2E16H008 Equip. Class' 10 Equipment Description 121'MCC 2B Room ACU Interaction Effecs

7. Are soft targets free from impact by nearby equipment or structures? Y0 NE UO N/AO
8. Are overhead equipmoent, distribution systems, ceiling tiles and lighting, YZ NO Ur N/AQ1 and masonry block walls not likely to collapse onto the equipment?

Component is adjacentto a block wall. The wall was seismically qualified as part of the response to NRC t. E.Bulletin 80-11, as documented in Report No FTG-C-002, RO, and on drawing D-206004, R 16.

9. Do attached lines have adequate flexibility to avoid damage? Y13 NO UD N/AO
10. Based on the above seismic interaction evaluations, is equipment free Y[ NO UMI of potentially adverse seisnic interaction effects?

Other Adverse Conditions 1I. Have you looked for and found no other seismic conditions that could Y9 NO UE-adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary) t,"Y P ,G ly2& -/I Evaluated by: P._Miktus~~tDt:0.31 Date: 08-23-12 08-23-12 Page 77 of 467

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS 0 NO. SNCF164-RPT-02, VERSION 2.0 Page 78 of 467

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Page 79 of 467

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Sheet i ofýi 'I(I Status: Y1* NO] Ui-]

Seismic Walkdown Checklist (SWC)

Equipment ID No. Q2E21FT0943 Equip. Class, 18 Equipment Description HIGH HEAD SAFETY INJECTION FLOW TRANSMITTER Location: Bldg. AUXILIARY Floor El. 100 Room, Area 17 Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchoraee

1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YId NO UEI N/AO
3. Is the anchorage free of corrosion that is more than mild surface Yd~ NEI UO N/AE oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? Y[J NEI U- N/AO
5. Is the anchorage configuration consistent with plant documentation? YE] NE U- N/A[v/

(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

NO1,V0~ O45 ApeQewo :3 00%c A#J 4lq8CJ4D2A6iE V&AiFICATro&) ib Por

6. Based on the above anchorage evaluations, is the anchorage free of YS'NEI U-potentially adverse seismic conditions?

I Enter the equipment class name from Appendix B: Classes of Equipment.

Page 80 of 467

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Sheet 2 of)' ,

Y"[f N -- U W- A" S tatus:

Seismic Walkdown Checklist (SWC)

Equipment M1No. Q2E21FT0943 Equip. Class, 18 Equipment Description HIGH HEAD SAFETY INJECTION FLOW TRANSMITTER Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YM/N'- UC] N/AC-]
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Y[ NO- U[:] N/AC and masonry block walls not likely to collapse onto tite equipment?

.oeK WAIJ-L5 e'j rNE We6r Oe V* e_.,.LVA ArE)P 9.NDo ac ed l T Fea t-(2-e ex , to -F.dN-ZoaN5og.

DW4

9. Do attached lines have adequate flexibility to avoid damage? Y]* NO] U[- N/A[:
10. Based on the above seismic interaction evaluations, is equipment free Y/NO UC]

of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YU NEI UC-]

adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

/Mote 1-274-Evaluated by:

3.M'TVS 2 Date:

Page 81 of 467

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS 0

NO. SNCF164-RPT-02, VERSION 2.0 Page 82 of 467

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Page 83 of 467

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Sheet i off3 Status: YA NO UO Seismic Walkdown Checklist (SWC)

Equipment ID No. Q2E21LCVO115B Equip. Class' 8 Equipment Description RWST TO CHARGING PUMP SUCTION VALVE Location: Bldg. AUXILIARY Floor El. 100 Room, Area 2-.1-7 2.

Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YE N[l of the 50% of SWEL items requiring such verification)?

Inline Corry.rw-ht, rlc ctchot-jo.cd

2. Is the anchorage free of bent, broken, missing or loose hardware? YEr NEI UE N/Ap
3. Is the anchorage free of corrosion that is more than mild surface YEI NE UE N/A[I oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? YE" NEI UiE N/Ap
5. Is the anchorage configuration consistent with plant documentation? YEVNE3 UEI N/AJA (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of ANE UDE potentially adverse seismic conditions?

ý Enter the equipment class name from Appendix B: Classes of Equipment.

Page 84 of 467

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Sheet 2 O 3f Status: Y11 NF] [IE]

Seismic Walkdown Checklist (SWC)

Equipment ID No. Q2E21LCVO115B Equip. Class' 8 Equipment Description RWST TO CHARGING PUMPSUCTION VALVE Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? Y? N] UM] N/AO eqimnsses tdes-.-tand-, sc*rt'a~x"acbt
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YM NO] U!- N/AD e1 and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? YP NE] U!] N/A7
10. Based on the above seismic interaction evaluations, is equipment free YINE] U!]

of potentially adverse seismic interaction effects?

Other Adverse Conditions l1. Have you looked for and found no other seismic conditions that could NEI UE adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

Evaluated by: r I!ga- / T"+/-+/-* .,r4 -',"A"JY1~ Date: _ i ~W 12--

V U'- /

An illol (06-d LLktm MaQdL~a o i Page 85 of 467

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Page 86 of 467

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2,0 i lif Page 87 of 467

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Sheet I of 3 Status: Y[VN- UE-Seismic Walkdown Checklist (SWC)

Equipment ID No. Q2E21LT112 Equip. Class' 18 Equipment Description VCT LEVEL TRANSMITTER Location: Bldg. AUXILIARY Floor El. 121 Room, Area 2 - 21, Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YEN of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? "NO"UE N/AE[
3. Is the anchorage free of corrosion that is more than mild surface Y1$EN" U0 N/AE oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? \TNE" UE N/AE"
5. Is the anchorage configuration consistent with plant documentation? YE NE UE] N/A/

(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6. Based on the above anchorage evaluations, is the anchorage free of Y"/ND UE potentially adverse seismic conditions?

'Enter the equipment class name from Appendix B: Classes of Equipment.

Page 88 of 467

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Sh t Of 3 Status: Y;['N[- Un-Seismic Walkdown Checklist (SWC)

Equipment ED No. 02E21LT112 Equip. Class, 18 Equipment Description VCT LEVEL TRANSMITTER Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YO/ND UE1 N/AE3 S. Are overhead equipment, distribution systems, ceiling tiles and lighting, YE-týfl UE] N/AE1 and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? Y[E)NEI UrI N/A0-

-1 -r. ,) o * ,

10. Based on the above seismic interaction evaluations, is equipment free Y-" NEI U of potentially adverse seismic interaction effects?

Other Adverse Conditions 1I. Have you looked for and found no otiler seismic conditions that could 'YEýN-I UE]

adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

'I Evaluated by: -__________ Date:

Date J J Page 89 of 467

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Page 90 of 467

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0

-This 'cqof: A iS, ,

css c, -n,.- a'S Sheet i ofXAt Status: Yd NO UUJ Seismic Walkdown Checklist (SWC) QQ E a2 I Va 4* 3 Equipment ID No. 02E21MOV8100 Equip. Class' 8 Equipment Description RCP SEAL WATER RETURN ISOLATION Location: Bldg. AUXILIARY Floor El. 121 Room, Area ,?Q Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchoraoe

1. Is the anchorage configuration verification required (i.e., is the item one Y" Ne of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YE NM U171 N/Adf
3. Is the anchorage free of corrosion that is more than mild surface YO NO UO N/A@/

oxidation?

w, ,k' ,tq . e_.\,

QU,q- ?.V\

  • ,,x Y4 , Y* (O,, \ z ýct - o-12 .
4. Is the anchorage free of visible cracks in the concrete near the anchors? YO No UiE N/An'

\-

k V rit

5. Is the anchorage configuration consistent with plant documentation? YO NE Uti N/AX' (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of Y0"N0 uC potentially adverse seismic conditions?

Enter the equipment class name from Appendix B: Classes of Equipment.

Page 91 of 467

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Sheet 2 of3 l Status: Y[Z- NE-] U[]

Seismic Walkdown Checklist (SWC)

Equipment ID No. Q2E21MOV8100 Equip. Class, 8 Equipment Description RCP SEAL WATER RETURN ISOLATION Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? Y2 NEI UI- N/A[l
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Y5ý/1- UEI N/A5 and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? Y(NE] UE3 N/AEI
10. Based on the above seismic interaction evaluations, is equipment free YE]N1 E3Uu of potentially adverse seismic interactiou effects?

Other Adverse Conditions 1I. Have you looked for and found no other seismic conditions that could Ye NEl UFI adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

Evaluated by: I.,* Date: ~ 3 l~

/ j Page 92 of 467

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Page 93 of 467

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Page 94 of 467

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 T Ci_ r\l -' s qlso ,

o-5 She71of 3

.* E & \'"/, t% Status: 7 NEl UE-Seismic Walkdown Checklist (SWC)

Equipment D No. Q2E21MOV8108 Equip. Class' 8 Equipment Description CHARGING PUMP TO RCS ISOLATION Location: Bldg. AUXILIARY Floor El. 121 Room, Area Q69a Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YOI N%

of the 50% of SWEL items requiring such verification)?

2. Is the anchorage free of bent, broken, missing or loose hardware? YO] NEI UO N/AE9-
3. Isthe anchorage free of corrosion that is more than mild surface Y(:] NI- UF] N/A2-oxidation?

4'.I sta ch e o s, c 4f-re k t c _ocrc hO-

4. Is the anchorage free of visible cracks in the concrete near the anchors? YI-] N-I U-i] N/Az']
5. Is the anchorage configuration consistent with plant documentation? YOI NI] UI0 N/As (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of YR NI] U-I potentially adverse seismic conditions?

1ý1- `ýý A-ýý is -ý-ctze ý:P Enter the equipment class name from Appendix B: Classes of Equipment.

Page 95 of 467

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Sheet 2 of 3 Status: YZI NEI UE"]

Seismic Walkdown Checklist (SWC)

Equipment lD No. Q2E21MOV8108 Equip. Class, 8 Equipment Description CHARGING PUMP TO RCS ISOLATION Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? Ya NO U- N/A-
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Y~f/N- U] N/AC and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? YE(NI U- N/AI

/

YV*NC UC I0. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Other Adverse Conditions 1I. Have you looked for and found no other seismic conditions that could YO'NO U-adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

Gac*

  • Evaluated by: .._*\k*(j, 3 ,Q...1&cVX Date:

Page 96 of 467

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS 0 NO. SNCF164-RPT-02, VERSION 2.0 Page 97 of 467

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 V2" 1P Sheet i of ¢*

Status: Y5 NEI U1-]

Seismic Walkdown Checklist (SWC)

Equipment ID No. Q2E21MOV8109C Equip. Class, 8 Equipment Description CHARGING PUMPPO02C MINIFLOW VALVE Location: Bldg. AUXILIARY Floor El. 102 Room, Area M 2ý1ýý Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checldist for documenting other comments.

Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YE Njt of the 50% of SWEL items requiring such verification)?

Irtitpr ac arx*er*' hO oCboro,-cue.

2. Is the anchorage free of bent, broken, missing or loose hardware? YED NE UE N/AC&
3. Is the anchorage free of corrosion that is more than mild surface YE NE UE N/Ap oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? YE NEI UE N/A0
5. Is the anchorage configuration consistent with plant documentation? YE NEI UE N/A4 (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of Y0 NO UE potentially adverse seismic conditions?

Enter the equipment class name from Appendix B: Classes of Equipment.

Page 98 of 467

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Sheet 2 of" 4 Status: Y[5 NEI UE-Seismic Walkdown Checklist (SWC)

Equipment ID No. Q2E21MOV8109C Equip. Class' 8 Equipment Description CHARGING PUMP PO02C MINIFLOW VALVE Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YEA NO UD N/AD
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Yg NDI UD N/AD and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? YV NEI UD N/AD
10. Based on the above seismic interaction evaluations, is equipment free YP NO UD of potentially adverse seismic interaction effects?

Other Adverse Conditions I1. Have you looked for and found no other seismic conditions that could Yy ND UD adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

Evaluated by: .GoAMAa o-- 1(W Loolut o\AC'tUA/ Date: _ -_ ___ __

Page 99 of 467

3 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS 0 NO. SNCF164-RPT-02, VERSION 2.0 Page 100 of 467

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 101 of 467 IPage

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Sheet i °fz¢43 A Status: Yf NO UE $1011" Seismic Walkdown Checklist (SWC)

Equipment ID No. Q2E21MOV8130A Equip. Classw 8 Equipment Description CHG PUMP SUCTION HDR ISOLATION Location: Bldg. AUXILIARY Floor El. 100 Room, Area Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage I. Is the anchorage configuration verification required (i.e., is the item one YEI Nd of the 50% of SWEL items requiring such verification)?

2. Is the anchorage free of bent, broken, missing or loose hardware? YE NEI UE- N/A[R
3. Is the anchorage free of corrosion that is more than mild surface YEI NE UE N/AG oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? YO NE UE N/A[?
5. Is the anchorage configuration consistent with plant documentation? YEr NEI UE] N/Ad (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of Y[* N[- UE-potentiafly adverse seismic conditions?

Enter the equipment class name from Appendix B: Classes of Equipment.

I Page 102 of 467

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Sheet 2 of42 Status: Y NEI U[Jltjl? v Seismic Walkdown Checklist (SWC)

Equipment ID No. 02E21MOV8130A Equip. Class' 8 Equipment Description CHG PUMP SUCTION HDR ISOLA TION Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? Y[dNI-- U-J N/AE1
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Y[4 NE UE- N/AEl and masonry block walls not likely to collapse onto the equipment?

Siva Vag 0 ' ME y0 d,4 oF 1e PAw r £-'AI-imKegeeALLJA-T" tV4,o&V- &619'2r FTý-c!.-,94Z, 1-4. DaAiWtA tI-20b?2,IP9.

9. Do aitached lines have adequate flexibility to avoid damage? YQ NE UI-1 N/AE1
10. Based on the above seismic interaction evaluations, is equipment free Yd NIE- UEI of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could Yd NEI UE-]

adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

Evaluated by Pn~R5 Date: __ "_ 7-/___

Page 103 of 467

0 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS 0 NO. SNCF164-RPT-02, VERSION 2.0 Page 104 of 467

S ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS 0

NO. SNCF164-RPT-02, VERSION 2.0 Page 105 of 467

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 II

&II Sheetttsd.:YuE%

Status: YZ*N[D U[71 Seismic Walkdown Checklist (SWC)

Equipment ID No. Q2E21MOV8133A Equip. Class, 8 Equipment Description CHG PUMP DISCHARGE HDR ISOLATION Location: Bldg. AUXILIARY Floor El. 100 Room, Area ZI1_

Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other conmnents.

Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one Y[3N of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? Y[3 N[3 uE N/UD(
3. Is the anchorage free of corrosion that is more than mild surface YE- NE UCI N/A[/

oxidation?

4. Is the anchorage free of visible cracks in the concrete near the anchors? YEI NE- UC- N/A[v'
5. Is the anchorage configuration consistent with plant documentation? YE[ NEI U['-D (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of Y4NC UEI potentially adverse seismic conditions?

Enter the equipment class name from Appendix B: Classes of Equipment.

Page 106 of 467

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 F! -3q Sheet 2n*f *,

Status: Y0- NEI U[:[ ,lDl'l Seismic Walkdown Checklist (SWC)

Equipment ID No. Q2E21MOV8133A Equip. Class' 8 Equipment Description CHG PUMPDISCHARGE HDR ISOLATION Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YW"ND U'- N/AC]
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YNr"NC] UC) N/AC and masonry block walls not likely to collapse onto the equipment?

JA01- RF-,,2- FrA,-C.-0,,0.-

16L&CI -WAL Tl VALLtA1Tj ' 1W 9-2 PPi T-

9. Do attached lines have adequate flexibiltty to avoi damage? YC"Nr UC- N/AC
10. Based on the above seismic interaction evaluations, is equipment free Y[2j NCI UC of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YEY NCI UCD adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary) dIatJI Fvalutaedtby

.......... 2.

PIMIRM) Date: 11274-r 5 IVA .. S 7-f 7, Page 107 of 467

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Page 108 of 467

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS 0 NO. SNCF164-RPT-02, VERSION 2.0 Page 109 of 467

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0

/

Sheet i ofl Jf Status: YP NEI Uj-]

Seismic Walkdown Checklist (SWC)

Equipment ID No. Q2E21MOV8885 Equip. Class, 8 Equipment Description HHSI TO RCS COLD LEG ISOLATION Location: Bldg. AUXILIARY Floor El. 100 Room, Area 2., A Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YO] No of the 50% of SWEL items requiring such verification)?

il-%lrxr coirn~ctx-,t, no~ a.nr,ý

2. Is the anchorage free of bent, broken, missing or loose hardware? YE] NE] UE] N/AI9
3. Is the anchorage free of corrosion that is more than mild surface YE] NE] UE] N/Ag oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? YE] NE] UE] N/A0
5. Is the anchorage configuration consistent with plant documentation? YE] NE] UE] N/A0 (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of k potentially adverse seismic conditions? Y'rNEI U50Ie*

Enter the equipment class name from Appendix B: Classes of Equipment.

Page 110 of 467

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Sheet 2 oft Status: Y54! NF'- U#J Seismic Walkdown Checklist (SWC)

Equipment ID No. Q2E21MOV8885 Equip. Class, 8 Equipment Description HHSt TO RCS COLD LEG ISOLATPON Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? Y ' NE] UF] N/A[]

i,ý IIx' ýq-'1/2 4 't %3F- - j ,, s'j tý,cj Mcqcgosc

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YZ NEI U[E] N/AE[

and masonry block walls not likely to collapse onto the equipment?

9. Do attached lines have adequate flexibility to avoid damage'? Ye NE] U[3 N/A]
10. Based on the above seismic interaction evaluations, is equipment free Y[A NE] U[E of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked fbr and found no other seismic conditions that could Y*N]- U[I adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

Evaluated by: L.acixg Mctc~lcxf Date: -2Z VZ-"

Page 111 of 467

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Page 112 of 467

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Page 113 of 467

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Sheets of 16 Status;: YJ'No Ut]

Seismic Walkdown Checklist (SWC)

Equipment ID No. 02E21PO02 - Equip.

Equipment Description CHARGING/HHSI PUMP P002B SWING PUMP Location: Bldg. AUXILIARY Floor El. 100 Room, Area 7"11-4 Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end ofthis checklist for documenting other comments.

Anchoraee

1. Is the anchorage configuration verification required (i.e., is the item one Y10 No of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free ofbent, broken, missing or loose hardware? Y'ND ULID N/AD
3. Is the anchorage free of corrosion that is more than mild surface Y[1N- UO N/AD oxidation?
4. Is the anchorage fe of visible cracks in the concrete near the anchors? YINO Uf N/AD
5. Is the anchorage configuration consistent with plant documentation? Y'/NO UQ N/AD (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verfication is required.)

~a 5N~.05e jI 4v k IE-Z I 9,907A

6. Based on the above anchorage evaluations, is the anchorage free of YG(NO U-potentially adverse seismic conditions?

IEnt=i the equipment class name from Appendix B: Claones of Equipment Page 114 of 467

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Sheet 2 of rS Status: Yf NO] U0 Seismic Walkdown Checklist (SWC)

Equipment ID No. Q2E21PO02B Equip. Class, 5 Equipment Description CHARGING/I"/HSI PUMP P00219 SWING PUMP Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? Y&ýNO UC N/AQ3
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Y[/N0 U[:] N/At and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? YI'NQ UD N/AQ
10. Based on the above seismic interaction evaluations, is equipment free YL NC UQ of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YG/N[] UD adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

C60k 0j0 r 6 r 01~t~M1 T V- A6 ýM4fiOme pýýD Evaluated by:_ P-MIXTO ad"9" Date: 27-11.

6.- 7-1'/,

Page 115 of 467

0 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Page 116 of 467

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS 0 0 NO. SNCF164-RPT-02, VERSION 2.0 NJ Page 117 of 467

0 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS 0 0 NO. SNCF164-RPT-02, VERSION 2.0 (AJ

-,,J "c1 Page 118 of 467

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Sheet ovY4 11 Status: Y) NO UE-Seismic Walkdown Checklist (SWC)

Equipment ID No. Q2F16LT0501 Equip. Class, 18 Equipment Description RWST LEVEL TRANSMITTER Location: Bldg. YARD Floor El. 155 Room, Area RWST Manufacturer, Model. Etc. (optional but recontmended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is the anchorage configuration verification required (i.e.. is the item one YEI N52" of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? Y*"N"E! UE- N/AEr
3. Is the anchorage free of corrosion that is more than mild surface YO '"NDN UEI N/AEr oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? YR.NE-I UEJ N/AE

_a,,,j,;',/d 07" -'5*10.¢ " o

( 5. Isthe anchorage configuration consistent with plant documentation?

(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

YE3 NEI UE" N/AAI-'"

6. Based on the above anchorage evaluations, is the anchorage free of YkNiE UEr potentially adverse seismic conditions?

Enter the equipment class name front Appendix B: Classes uf Equpnment.

Page 119 of 467

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Shee. of (,/WLj Status: YM NEI U['-

Seismic Walkdown Checklist (SWC)

Equipment ID No. Q2F16LT0501 Equip. Class' 18 Equipment Description RWST LEVEL TRANSMITTER Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? Y6frEi5UD N/AD
8. Are. overhead equipment, distribution systems, ceiling tiles and lighting, *ý NNo U'] N/AD and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? 6N*" UEI-'N/AD ofBased on the above seismic interaction evaluations, is equipment free Y ND UD of potentially adverse seismidc interaction effects?

Other Adverse Conditions 1I. Have you looked for and found no other seismic conditions that could UD adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

Evaluated by: (2- . Date: o.

V. 2- ./

uzo/20/Z Page 120 of 467

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS 0

NO. SNCF164-RPT-02, VERSION 2.0 Page 121 of 467

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Page 122 of 467

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Sheet i of 3ý4 Status: YP -] UF]

Seismic Walkdown Checklist (SWC)

Equipment ID No. Q2G31HOO1B Equip. Class' 21 Equipment Description SFP HEAT EXCHANGER TRAIN A Location: Bldg. AUXILIARY Floor El. 165 Room, Area Z4La7 Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage I. Is the anchorage configuration verification required (i.e., is the item one YO/NE) of the 50% of SWEL items requiring such verification)?

1--b 2.

2. Is the anchorage free of bent, broken, missing or loose hardware? YkýNEI UE] N/AE
3. Is the anchorage free of corrosion that is more than mild surface YP'NE] UO N/AM oxiOation?

4shean the- convret aor 4ea Y[p<c ] otheN

4. Is the anchorage free of visible cracks in the concrete near the anchors? YONE] UE] N/ACI
5. Is the anchorage configuration consistent with plant documentation? 4K*NE] UE1 N/AE1 (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of 'ýi0/N UEI potentially adverse seistmic conditions?

Enter the equipment class natne from Appendix B: Classes of Equipment.

Page 123 of 467

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Cleo Sheet 2 of/ I Status: Y[t NE- U-Seismic Walkdown Checklist (SWC)

Equipment ID No. Q2G31HOO1B Equip. ClassI 21 Equipment Description SFP HEAT EXCHANGER TRAIN A Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YPAE] U[- N/A12
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Y~1\JE U0 N/AEI and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?
10. Based on the above seismic interaction evaluations, is equipment free Yt]-Nf Uij of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could O-NE] UE-adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

,fb Af &

Evaluated Date: -

'2~

Page 124 of 467

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS 0 NO. SNCF164-RPT-02, VERSION 2.0 Page 125 of 467

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Page 126 of 467

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 rý- 41 Sheet i ofNu/j '*$

Status: Y2* NEI UE-- '4111" Seismic Walkdown Checklist (SWC)

Equipment ID No. Q2H11NGASC2506D Equip. Class, 20 Equipment Description AUX SAFEGUARDS CABINET D Location: Bldg. AUXILIARY Floor El. 155 Room, Area 471 Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchora2e I. Is the anchorage configuration verification required (i.e., is the item one Yd NEI of the 50% of SWEL items requiring such verification)?

2. Is the anchorage free of bent, broken, missing or loose hardware? YEl NEI UO N/AO
3. Is the anchorage free of corrosion that is more than mild surface YE/N- UI- N/A7]

oxidation?

4. Is the anchorage free of visible cracks in the concrete near the anchors? Y[ NOI UFJ N/A]
5. Is the anchorage configuration consistent with plant documentation? YfNO Ul] N/Al]

(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

h4M .ollgjý 06jF167tY 4rigiV 0.2&lr/9// A61A vsr

" -5 Qz UithYOA 50 2 ,5-o& A-q2' 4P 0 PIUPC 216o54-)

6. Based on the above anchorage evaluations, is the anchorage free of Y9~ NO Ul potentially adverse seismic conditions?

Enter the equipment class name from Appendix B: Classes of Equipment.

Page 127 of 467

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Sheet 2 of X 5 7(jdy ,

Status: Y9NE- U[-- O'll Seismic Walkdown Checklist (SWC) 1 Equipment ID No. Q2H1INGASC2506D Equip. Class *v Equipment Description AUX SAFEGUARDS CABINET L Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? Y[2(N[E UE1 N/AE]
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YE3'NEJ Ul1 N/AE1 and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? YD/NE) UEI N/AQl
10. Based on the above seismic interaction evaluations, is equipment free Y2( NEI UM of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YE'N"I Uf adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary) rMi- A/cI Mg-,9 " FZ -  ;;70,'TA , 'k.°,VA.II" :t ,-.-

Evaluated by: 0

,VL). Date: __ __ _- __ __

Al(-

//

Page 128 of 467

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Page 129 of 467

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Page 130 of 467

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS 0 NO. SNCF164-RPT-02, VERSION 2.0 Page 131 of 467

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 I ' "..

Sheet s of"4e &

Status: YE NO U["] Xji*1' Seismic Walkdown Checklist (SWC)

Equipment ID No. 02H1 1NGB2504K Equip. Class' 20 Equipment Description BOP INSTRUMENTATION CABINET K Location: Bldg. AUX Floor El. 155 Room, Area 0471 Manufacturer, Model. Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YZ NM of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? Y[ NEI UErN/AEf
3. Is the anchorage free of conrosion that is more than mild surface YN NEI UE" N/Ar-oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? YN NEI ur- N/AE
5. Is the anchorage configuration consistent with plant documentation? YZ NE] UEI N/A['-

(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Panel is welded to embedded plate in floor. Welds are on the outside of the panel. The welds were confirmed to be consistent with the welds identified and evaluatedin the SEWS package for this component dated 7/1/93. All welds were determinedto be free from adverse conditions and to match plant documentation. See pages,t3'for pictures of typical welds 4. "-t9 Enter the equipment class name from Appendix B: Classes of Equipment.

Page 132 of 467

ATTACHMENT 3: SEISMIC Effects WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Sheet 2 of,-r (g M Status: Y[ NEI U[] 4"* '*

Seismic Walkdown Checklist (SWC)

Equipment ID No. Q2HI INGB254KU Equip. Class, 20 Equipmient Description BOP INSTRUMENTATION CABINET K

6. Based on the above anchorage evaluations, is the anchorage free of YED NEI U-potentially adverse seismic conditions?

Interaction Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YZ NEI UI N/AO
8. Are overhead equipment, distribution systems, ceiling tiles and lighting. YZ NO U[O N/Ar and masonry block walls not likely to collapse onto the equipment?

Isolated cases were found where some of the east-west spanning runners were not clipped to the north south spanning runners.

However, all north south spanning runners are supportedfrom the roof and are prevented from lateral motion. The lights, vents and other items are supportedfrom the structure independently from the ceiling tile system. The overall configurationis consistent with the configurationidentified and evaluated in the SEWS walkdown performed on 7/1/93. Due to the fact that the unclipped runners occur only in isolatedcases and the fact that all tiles are supported on at least three sides, the ceiling tiles will not fall and adversely impact the panels. There are no ceiling tiles directly over any panels and the panels are all closed on the top. A corrective action reporthas been issued to reattach the loose runners.

9. Do attached lines have adequate flexibility to avoid damage? YG3 NO Ufi N/AO
10. Based on the above seistmtic interaction evaluations, is equipment fiee YZ NO U-of potentially adverse seismic interaction effects?

Other Adverse Conditions I1. Have you looked for and found no other seismic conditions that could YZ NO UO adversely affect the safety functions of the equipment?

Page 133 of 467

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Sheet 3 of,4/0 JW Status: Y1 N'-' UE" 11011.

Seismic Walkdown Checklist (SWC)

Equipmenl ID No. Q2H11NGB2504K Equip. ClassI 20 Equipment Description BOP INSTRUMENTATION CABINET K Comments (Additional pages may be added as necessary)

Evaluated by: hamIKWt' (,* l,* Date: f-7_.- 7-S -23 - I -)-.

Page 134 of 467

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS 0 NO. SNCF164-RPT-02, VERSION 2.0 Page 135 of 467

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Page 136 of 467

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Page 137 of 467

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Sheet 1 of 4 Status: YE] NE] UN Seismic Walkdown Checklist (SWC)

Equipment ID No. Q2HI1NGNIS2503A Equip. Class 20 Equipment Description NIS EXCORE DETECTOR CAB Location: Bldg. AUXILIARY Floor El. 155' Room, Area 416 Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YE[: NO of the 50% of SWEL items requiring such verification)?

See note in question #6

2. Is the anchorage free of bent, broken, missing or loose hardware? YEO NOI UZ N/AE
3. Is the anchorage free of corrosion that is more than mild surface YEI NEI UO N/AE oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? YO NE UO N/AE
5. Is the anchorage configuration consistent with plant documentation? YE NE UO N/AE (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of YO NEI UO potentially adverse seismic conditions?

Some anchorages(welds) of this cabinet are under a vinyl kick plate at its base. The FNP Ops Shift Sup was uncomfortable authorizing the removal of the kick plate due to the potential to bump the cabinet during removal. Review of the anchorages(and of this component overall) were therefore marked Undetermined.See Comments pg 2.

Enter the equipment class name from Appendix B: Classes of Equipment.

Page 138 of 467

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Sheet 2 of 4 Status: YE] NEl] U[

Seismic Walkdown Checklist (SWC)

Equipment ID No. Q2H11NGNIS2503A Equip. Class' 20 INET Equipment Description NIS EXCORE DETECTOR CAB Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YZ NE] Ur- N/A2
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YZ NE] Ur- N/AO and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? YZ NE! UE N/AC]
10. Based on the above seismic interaction evaluations, is equipment free YO NEI UO of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YI NEI UI adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

This SWC was originally completed on 8-28-12 and retyped for clarity on 8-27-13. The subject component was removed from the SWEL since the anchorages could not be verified. This is discussed in the note in Question 6 on pg 1. However, the conclusions of the 8-28-12 walkdown, in response to Questions 7 through 11 above are valid. The Area Walk By for this component, i.e., for Room 416 is documented in AWC package FI-091.

Evaluated by: Stephen Yuan Date: 08-28-12 PaulA. Miktus kw, Aa 08-28-12 Page 139 of 467

0 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Page 140 of 467

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 3

Page 141 of 467

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Sheet t ofA t*b Status; YEE NO UF]

Seismic Walkdown Checklist (SWC)

Equipment ID No. O2HI1NGPIC2505D Equip. Class, 20 Equipment Description Process ProtectionCabinetChannel 4 Location: Bldg. Aux. Bldq Floor El. 155' Room. Area Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorag$.

I. Is the anchorage configuration verification required (i.e.. is the item one YZ NO of the 50% of SWEL items requiring such verification)?

2. Is the anchorage free of bent. broken. missing or loose hardware? YZ NEI UD N/AD Cabinet is welded to embedded steel in the floor.
3. Is the anchorage fiee of corrosion that is more than mild surface YZ NO UE N/AO oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? YZ NI UQ N/AE
5. Is the anchorage configuration consistent with plant documentation? YZ NO Uf N/A" (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Anchorage documentation was obtainedfrom SEWS package for this component, dated 7/1/93. Anchorage consists of welds to an embedded plate located on outside of cabinet. Carpetingwas partially removed to verify that welds match documented condition and that they have no adverse seismic conditions.

Enter the equipment class name from Appendix B: Classes of Equipment.

Page 142 of 467

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Sheet 2ofkfg 1[$.[ V Status: YN NEI U["]

Seismic Walkdown Checklist (SWC)

Equipment ID No. 02HI 1NGPIC2505D Equip. Class' 20 Equipment Description ProcessProtection Cabinet Channel4

6. Based on the above anchorage evaluations, is the anchorage free of YI ND UO potentially adverse seismic conditions?

Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? Y0 NEI U- N/AD
8. Are overhead equipment. distribution systems, ceiling tiles and lighting, YZ NEI U- N/AD and masonry block walls not likely to collapse Onto the equipment?

Suspended ceiling and fixtures (lights, vents, etc) inspected and determined to be seismically adequate. Isolated cases found where runners were not clipped at both ends. See walkdown package for 02H I1NGB2504K (package F2-42)and CR506358 for additional information on the control room ceiling.

9. Do attached lines have adequate flexibility to avoid damage? YZ NO UD N/AD
10. Based on the above seismic interaction evaluations, is equipment free Y0 NO U-of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YO ND UD adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

Verified the adequacy of welds as perSEWS for O2H 11NGBR2504K-B and Q2H11 NGPIC2505A-I, dated 7-1-93. The Area Walk By is includedin package F2-42.

Page 143 of 467

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Sheet 3 of 4-'.i Evaluated by: P. Miktus Date: 08-23-12 S. Yuan 08-23-12 Page 144 of 467

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS 0 NO. SNCF164-RPT-02, VERSION 2.0 Page 145 of 467

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Page 146 of 467

S ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Page 147 of 467

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 11 IJ Page 148 of 467

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0

-i Page 149 of 467

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS 0

NO. SNCF164-RPT-02, VERSION 2.0 Page 150 of 467

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS 0

NO. SNCF164-RPT-02, VERSION 2.0 Page 151 of 467

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Page 152 of 467

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Page 153 of 467

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS 0

NO. SNCF164-RPT-02, VERSION 2.0

~~1 Page 154 of 467

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 FZ-4. Sheet i feIt 0's Status: YZ NrD UEI1 Seismic Walkdown Checklist (SWC)

Equipment ID No. Q2HI1NGPIC2505H Equip. Class' 20 Equipment Description Process Control Cabinet Channel 4 Location: Bldg. Aux. Bldg Floor El. 155' Room, Area Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YED NDI of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YZ NEI UD N/AD Cabinet is welded to embedded steel in the floor.
3. Is the anchorage free of corrosion that is more than mild surface Y0 ND UD N/AD oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? Y[ NDI UD N/AD
5. Is the anchorage configuration consistent with plant documentation? YZ ND UD N/AD (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Anchorage documentation was obtained from SEWS package for this component, dated 7/1/93. Anchorage consists of welds to an embedded plate located on outside of cabinet. Carpetingwas partially removed to verify that welds match documented condition and that they have no adverse seismic conditions.

IEnter the equipment class name from Appendix B: Classes of Equipment.

Page 155 of 467

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Sheet 2 OfI74t~trA Status: YZ NEI U-Seismic Walkdown Checklist (SWC)

Equipment ID No. Q2HI1NGPIC2505H Equip. Class, Equipment Description Process Control Cabinet Channet14

6. Based on the above anchorage evaluations, is the anchorage free of YZ NE UD potentially adverse seismic conditions?

Interaction Effects

7. Are soft targets free froom impact by nearby equipment or structures? YZ NEI UE N/AQ
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YN NEI U0 N/AEl and masonry block walls not likely to collapse onto the equipment?

Suspended ceiling and fixtures (lights, vents, etc) inspectedand determined to be seismically adequate. Isolated cases found where runners were not clipped at both ends. See walkdown package for 02H11 NGB2504K (package F2-42) and CR506358 for additional information on the control room ceiling.

9. Do attached lines have adequate flexibility to avoid damage? YZ NEl UE- N/AE
10. Based on the above seismic interaction evaluations, is equipment free YZ NC UE of potentially adverse seismic interaction effects?

Other Adverse Conditions 1I. Have you looked for and found no other seismic conditions that could Y[ NEI UEi adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

Verified the adequacy of welds as per SEWS for Q2H 11NGBR2504K-B and Q2HI1NGPIC2505A-1, dated 7-1-93. The Area Walk By package in included in package F2-42 Page 156 of 467

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Sheet 3 Of"3 it Eva Iu akdby: P. Miktu J-1 92 Date: 08.23-12 S. Yzian 08-23-12 Page 157 of 467

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Page 158 of 467

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Page 159 of 467

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS 0 NO. SNCF164-RPT-02, VERSION 2.0 Page 160 of 467

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Page 161 of 467

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Page 162 of 467

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Page 163 of 467

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Page 164 of 467

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Page 165 of 467

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 S heetNof U status: y[f1" NE] uE' Seismic Walkdown Checklist (SWC)

Equipment ID No. Q2H1 INGSSP2506N Equip. Class, 20 Equipment Description SOLID STATE PROTECTION TEST CABINET Location: Bldg. AUXILIARY FloorEl. 155 Room, Area 4-1 Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

An chorage

1. Is the anchorage configuration verification required (i.e., is the item one Y2/ND of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? Y[-I(NE] UED N/AE1
3. Is the anchorage free of corrosion that is more than mild surface YM/N[] UE3 N/A[s oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? Yt9INE] UE1 N/AEI
5. Is the anchorage configuration consistent with plant documentation? YI* N[l U[' N/AE3 (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Re-..70 5[pW* Pok2 Q2HaI00G5P~Z5064-.A,VATet> 7-1 -4, eu -

Ao0 D -5E- -

6. Based on the above anchorage evaluations, is the anchorage free of Y.N[ Urn potentially adverse seismic conditions?

Enter the equipment class name from Appendix B: Classes of Equipment.

Page 166 of 467

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 JSheet 2 6f,!ý"ý Status: YIgNE[ U-]

Seismic Walkdown Checklist (SWC)

Equipment ID No. Q2H11NGSSP2506N Equip. Class' 20 Equipment Description SOLID STATE PROTECTION TEST CABINET Interaction Effects

7. Are soft targets free from impact by nearby equipmcnt or structures? YEZ NEI UE3 N/AE3
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YPýINEI UIII N/AEl and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? Y[E]NEI UEI N/ACI
10. Based on the above seismic interaction evaluations, is equipment free YEI'NE1 UE]

of potentially adverse seismic interaction effects?

Other Adverse Conditions 1I. Hlave you looked for and found no other seismic conditions that could YE]. 'NrE UE-adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary) idj0ýP Evaluated by: 'PAý) A Date: - "

.&:3$ -' A,

,.:s Page 167 of 467

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS 0 NO. SNCF164-RPT-02, VERSION 2.0

!v Page 168 of 467

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO, SNCF164-RPT-02, VERSION 2.0 Page 169 of 467

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Page 170 of 467