ML14100A476: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:1 Whited, Jeffrey From: Whited, Jeffrey Sent: Thursday, April 10, 2014 3:03 PM To:phlashley@firstenergycorp.com Cc:talentz@firstenergycorp.com
{{#Wiki_filter:Whited, Jeffrey From:                             Whited, Jeffrey Sent:                             Thursday, April 10, 2014 3:03 PM To:                               phlashley@firstenergycorp.com Cc:                               talentz@firstenergycorp.com


==Subject:==
==Subject:==
THIRD DRAFT-RAI to FENOC PROPOS ED REVISION TO REACTOR VESSEL SURVEILLANCE CAPSULE WITHDRAWAL SCHEDULES Attachments:
THIRD DRAFT-RAI to FENOC PROPOSED REVISION TO REACTOR VESSEL SURVEILLANCE CAPSULE WITHDRAWAL SCHEDULES Attachments:                       DRAFT Capsule Third RAIs.pdf Mr. Lashley, By letter dated May 28, 2013 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML13151A058), as supplemented by letter dated December 13, 2013 (ADAMS Accession No.
DRAFT Capsule Third RAIs.pdf Mr. Lashley, By letter dated May 28, 2013 (Agencywide Document s Access and Management System (ADAMS) Accession No. ML13151A058), as supplemented by letter dated December 13, 2013 (ADAMS Accession No.
ML13350A581), First Energy Nuclear Operating Company submitted a request to revise the reactor vessel surveillance capsule withdrawal schedules for the Beaver Valley Power Station, Units 1 and 2.
ML13350A581), First Energy Nuclear Operating Company submitted a request to revise the reactor vessel surveillance capsule withdrawal schedules for the Beaver Valley Power Station, Units 1 and 2.
 
The NRC staff has reviewed the information submitted by the licensee, and based on this review, determined additional information is required to complete the assessment of the submitted information. Please find attached a Draft Request For Additional Information. It is being sent to you to ensure that the question is understandable, the regulatory basis for the question is clear, and to determine if the information was previously docketed. Please notify me by Wednesday, April 16, 2014, if you desire to hold a teleconference to discuss the question. The NRC staff will request a response to the RAIs within 30 days of the formal NRC RAI transmittal letter.
The NRC staff has reviewed the information submitted by the licensee, and based on this review, determined additional information is required to complete the assessment of the submitted information. Please find attached a Draft Request For Additional Information. It is being sent to you to ensure that the question is understandable, the regulatory basis for the question is clear, and to determine if the information was previously docketed. Please notify me by Wednesday, April 16, 2014, if you desire to hold a teleconference to discuss the question. The NRC staff will request a response to the RAIs within 30 days of the formal NRC RAI transmittal letter.  
Thank you, Jeffrey Whited Project ManagerBeaver Valley and Susquehanna Plant Licensing Branch I2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission (301)4154090 jeffrey.whited@nrc.gov 1}}
 
Thank you, JeffreyWhitedProjectManager BeaverValleyandSusquehannaPlantLicensingBranchI 2DivisionofOperatingReactorLicensingOfficeofNuclearReactorRegulationU.S.NuclearRegulatoryCommission(301)4154090jeffrey.whited@nrc.gov}}

Revision as of 05:52, 4 November 2019

E-mail from J. Whited to P. Lashley Transmitting Third Draft RAIs Capsule Withdrawal Schedule Review
ML14100A476
Person / Time
Site: Beaver Valley
Issue date: 04/10/2014
From: Jeffrey Whited
Plant Licensing Branch 1
To: Lashley P
FirstEnergy Nuclear Operating Co
References
Download: ML14100A476 (1)


Text

Whited, Jeffrey From: Whited, Jeffrey Sent: Thursday, April 10, 2014 3:03 PM To: phlashley@firstenergycorp.com Cc: talentz@firstenergycorp.com

Subject:

THIRD DRAFT-RAI to FENOC PROPOSED REVISION TO REACTOR VESSEL SURVEILLANCE CAPSULE WITHDRAWAL SCHEDULES Attachments: DRAFT Capsule Third RAIs.pdf Mr. Lashley, By letter dated May 28, 2013 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML13151A058), as supplemented by letter dated December 13, 2013 (ADAMS Accession No.

ML13350A581), First Energy Nuclear Operating Company submitted a request to revise the reactor vessel surveillance capsule withdrawal schedules for the Beaver Valley Power Station, Units 1 and 2.

The NRC staff has reviewed the information submitted by the licensee, and based on this review, determined additional information is required to complete the assessment of the submitted information. Please find attached a Draft Request For Additional Information. It is being sent to you to ensure that the question is understandable, the regulatory basis for the question is clear, and to determine if the information was previously docketed. Please notify me by Wednesday, April 16, 2014, if you desire to hold a teleconference to discuss the question. The NRC staff will request a response to the RAIs within 30 days of the formal NRC RAI transmittal letter.

Thank you, Jeffrey Whited Project ManagerBeaver Valley and Susquehanna Plant Licensing Branch I2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission (301)4154090 jeffrey.whited@nrc.gov 1