L-13-396, Response to Request for Additional Information on Proposed Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule
| ML13350A581 | |
| Person / Time | |
|---|---|
| Site: | Beaver Valley |
| Issue date: | 12/13/2013 |
| From: | Emily Larson FirstEnergy Nuclear Operating Co |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| L-13-396, TAC MF1929 | |
| Download: ML13350A581 (2) | |
Text
Firs/Energy Nuclear Operating Company Eric A. Larson Site Vice President December 13, 2013 L-13-396 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
SUBJECT:
Beaver Valley Power Station, Unit No. 1 Docket No. 50-334, License No. DPR-66 Beaver Valley Power Station P.O. Box 4 Shippingport, PA 15077 724-682-5234 Fax: 724-643-8069 10 CFR 50, Appendix H Response to Request for Additional Information on Proposed Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule (TAG No. MF1929)
By correspondence dated May 28, 2013 (Accession No. ML13151A058), FirstEnergy Nuclear Operating Company (FENOC) submitted a proposed revision to the Beaver Valley Power Station, Unit No. 1, reactor vessel surveillance capsule withdrawal schedule.
By correspondence dated December 6, 2013 (Accession No. 13339A437), the Nuclear Regulatory Commission (NRC) requested additional information to complete its review of the submitted information. FENOC's response to this request, which is due by January 10, 2014, is attached.
There are no regulatory commitments established in this submittal. If there are any questions or additional information is required, please contact Mr. Thomas A. Lentz, Manager-Fleet Licensing, at (330) 315-6810.
Sincerely,
~-/
[_ ?/~~
Eric A. Larson
Attachment:
Response to December 6, 2013 Request for Additional Information cc:
NRC Region I Administrator NRC Resident Inspector NRC Project Manager Director BRP/DEP Site BRP/DEP Representative
Attachment L-13-396 Response to December 6, 2013 Request for Additional Information Page 1 of 1 By correspondence dated May 28, 2013, FirstEnergy Nuclear Operating Company (FENOC) submitted a request to revise the reactor vessel surveillance capsule withdrawal schedule for the Beaver Valley Power Station, Unit 1, for Nuclear Regulatory Commission (NRC) review and approval. By correspondence dated December 6, 2013, NRC staff requested additional information to complete its review. The requested information is presented in bold type, followed by the FENOC response.
- 1. Provide the withdrawal date for BVPS-1 Capsule X.
Response
Capsule X was withdrawn on October 15, 2013.