ML14134A322: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(7 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML14134A322
| number = ML14134A322
| issue date = 05/22/2014
| issue date = 05/22/2014
| title = Three Mile Island Nuclear Station, Unit 1 - Request for Additional Information Regarding Review of Three Mile Island Nuclear Station Unit 1 Cycle 20 Core Operating Limits Report (TAC No. MF3332)
| title = Request for Additional Information Regarding Review of Three Mile Island Nuclear Station Unit 1 Cycle 20 Core Operating Limits Report
| author name = Whited J A
| author name = Whited J
| author affiliation = NRC/NRR/DORL/LPLI-2
| author affiliation = NRC/NRR/DORL/LPLI-2
| addressee name = Pacilio M J
| addressee name = Pacilio M
| addressee affiliation = Exelon Nuclear
| addressee affiliation = Exelon Nuclear
| docket = 05000289
| docket = 05000289
| license number = DPR-050
| license number = DPR-050
| contact person = Whited J A, NRR/DORL/LPLI-2
| contact person = Whited J, NRR/DORL/LPLI-2
| case reference number = TAC MF3332
| case reference number = TAC MF3332
| document type = Letter, Request for Additional Information (RAI)
| document type = Letter, Request for Additional Information (RAI)
| page count = 4
| page count = 4
| project = TAC:MF3332
| project = TAC:MF3332
| stage = Other
| stage = RAI
}}
}}


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 Mr. Michael J. Pacilio President and Chief Nuclear Officer Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555 May 22, 2014 SUBJECT: THREE MILE ISLAND NUCLEAR STATION, UNIT 1-REQUEST FOR ADDITIONAL INFORMATION REGARDING REVIEW OF CYCLE 20 CORE OPERATING LIMITS REPORT (TAG NO. MF3332) Dear Mr. Pacilio: By letter dated November 8, 2013, Exelon Generation Company, LLC (Exelon) submitted the Three Mile Island Nuclear Station, Unit 1, Cycle 20 Core Operating Limits Report. To complete its review, the Nuclear Regulatory Commission staff requests a response to the enclosed questions. The draft questions were sent to Mr. Francis Mascitelli, of your staff, to ensure that the questions were understandable, the regulatory basis for the questions were clear, and to determine if the information was previously docketed. On May 22, 2014, Mr. Mascitelli agreed that you would provide a response by June 23, 2014. If you have any questions regarding this matter, please contact me at 301-415-4090. Docket No. 50-289 Enclosure: Request for Additional Information cc: Distribution via Listserv Sincerely, Plant Licensing Branch 1-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation REQUEST FOR ADDITIONAL INFORMATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO THE REVIEW OF CYCLE 20 CORE OPERATING LIMITS REPORT THREE MILE ISLAND NUCLEAR STATION. UNIT 1 DOCKET NO. 50-289 By letter dated November 8, 2013,1 Exelon Generation Company, LLC (Exelon) submitted the Three Mile Island Nuclear Station, Unit 1, Cycle 20 (TMI C20) Core Operating Limits Report (COLR). To complete its review of the TMI C20 COLR, the Nuclear Regulatory Commission (NRC or Commission) requests a response to the questions below. Generic Letter (GL) 88-16, "Removal of Cycle-Specific Parameter Limits from Technical Specifications," provides guidance for the preparation of a license amendment request to modify Technical Specifications (TSs) that have cycle-specific parameter limits. An acceptable alternative to specifying the values of cycle-specific parameter limits in the TSs consists of: (1) the addition of the definition of a named formal report that includes the values of specific parameter limit that have been established using an NRC-approved methodology and consistent with all applicable limits of the safety analysis; (2) the addition of an administrative reporting requirement to submit the formal report on cycle-specific parameter limits to the Commission for information; and (3) the modification of individual TSs to note that cycle-specific parameters shall be maintained within the limits provided in the defined formal report. GL 88-16 further clarifies that in COLR TS [6.x.x] core operating limits shall be established and documented in the COLR before each reload cycle or any remaining part of a reload cycle. The analytical methods used to determine the core operating limits shall be those previously reviewed and approved by the NRC staff. Based on the GL 88-16 guidance, TMI C20 TS 6.9.5.2 lists all approved methodologies to support the cycle-specific core operating parameters specified in TS 6.9.5.1. Therefore, both TS 6.9.5.1 and 6.9.5.2 in the TMI COLR TSs are associated with the acceptable alternative stated in item (1) above. The current TMI C20 COLR is associated with the acceptable alternative stated in item (2) above. While TS 6.9.5.2 lists six NRC approved methodology references, TMI C20 COLR lists 3 references in "REFERENCES." The staff found that: (1) there are no cycle-specific core operating limits listed in TS 6.9.5.1; (2) there is no clear identification for cycle-specific core operating limits in the TMI C20 COLR, but only mentioned in the ABSTRACT; and (3) there are no clear cycle-specific operating limits in the TMI C20 COLR. RAI-1: Please identify plant and cycle-specific parameters forTS 6.9.5.1 and show those core operating limits in the TMI C20 COLR. 1 Agencywide Documents Access and Management System (ADAMS) Accession No. ML 13317 A073. Enclosure
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 May 22, 2014 Mr. Michael J. Pacilio President and Chief Nuclear Officer Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555
-2-RAI-2: Please justify that the use of any methodologies referenced in REFERENCES of the TMI C20 COLR to support the cycle-specific core operating limits (to be provided in RAI-1) is consistent with TS 6.9.5.2. RAI-3: Please organize the TMI C20 COLR in accordance toTS 6.9.5.3 to include the proper TSs for cycle-specific core operating limits, the detailed limits, and their supporting methodologies listed in TS 6.9.5.2.
 
Mr. Michael J. Pacilio President and Chief Nuclear Officer Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555 May 22, 2014 SUBJECT: THREE MILE ISLAND NUCLEAR STATION, UNIT 1 -REQUEST FOR ADDITIONAL INFORMATION REGARDING REVIEW OF CYCLE 20 CORE OPERATING LIMITS REPORT (TAC NO. MF3332) Dear Mr. Pacilio: By letter dated November 8, 2013, Exelon Generation Company, LLC (Exelon) submitted the Three Mile Island Nuclear Station, Unit 1, Cycle 20 Core Operating Limits Report. To complete its review, the Nuclear Regulatory Commission staff requests a response to the enclosed questions. The draft questions were sent to Mr. Francis Mascitelli, of your staff, to ensure that the questions were understandable, the regulatory basis for the questions were clear, and to determine if the information was previously docketed. On May 22, 2014, Mr. Mascitelli agreed that you would provide a response by June 23, 2014. If you have any questions regarding this matter, please contact me at 301-415-4090. Docket No. 50-289 Enclosure: Request for Additional Information cc: Distribution via Listserv DISTRIBUTION: PUBLIC Sincerely, IRA/ Jeffrey A. Whited, Project Manager Plant Licensing Branch 1-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation RidsNrrPMThreeMilelsland Resource LPLI-2 R/F RidsAcrsAcnw_MaiiCTR Resource RidsNrrLAABaxter Resource RidsRgn1 MaiiCenter Resource RidsNrrDoriDpr Resource THuang, NRR RidsNrrDssSrxb Resource RidsNrrDorllpl1-2 Resouce ADAMS Accession Number* ML 14134A322 *via e-mail **via memo OFFICE LPL 1-2/PM LPL 1-2/LA SRXB/BC LPLI-2/BC LPL 1-2/PM NAME JWhited ABaxter* CJackson** MKhanna JWhited (REnnis for} DATE 05/22/2014 05/14/2014 05/14/2014 05/22/2014 05/22/2014 OFFICIAL RECORD COPY
==SUBJECT:==
}}
THREE MILE ISLAND NUCLEAR STATION, UNIT 1- REQUEST FOR ADDITIONAL INFORMATION REGARDING REVIEW OF CYCLE 20 CORE OPERATING LIMITS REPORT (TAG NO. MF3332)
 
==Dear Mr. Pacilio:==
 
By letter dated November 8, 2013, Exelon Generation Company, LLC (Exelon) submitted the Three Mile Island Nuclear Station, Unit 1, Cycle 20 Core Operating Limits Report. To complete its review, the Nuclear Regulatory Commission staff requests a response to the enclosed questions.
The draft questions were sent to Mr. Francis Mascitelli, of your staff, to ensure that the questions were understandable, the regulatory basis for the questions were clear, and to determine if the information was previously docketed. On May 22, 2014, Mr. Mascitelli agreed that you would provide a response by June 23, 2014.
If you have any questions regarding this matter, please contact me at 301-415-4090.
Sincerely, Je~1:~ger Plant Licensing Branch 1-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-289
 
==Enclosure:==
 
Request for Additional Information cc: Distribution via Listserv
 
REQUEST FOR ADDITIONAL INFORMATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO THE REVIEW OF CYCLE 20 CORE OPERATING LIMITS REPORT THREE MILE ISLAND NUCLEAR STATION. UNIT 1 DOCKET NO. 50-289 By letter dated November 8, 2013, 1 Exelon Generation Company, LLC (Exelon) submitted the Three Mile Island Nuclear Station, Unit 1, Cycle 20 (TMI C20) Core Operating Limits Report (COLR). To complete its review of the TMI C20 COLR, the Nuclear Regulatory Commission (NRC or Commission) requests a response to the questions below.
Generic Letter (GL) 88-16, "Removal of Cycle-Specific Parameter Limits from Technical Specifications," provides guidance for the preparation of a license amendment request to modify Technical Specifications (TSs) that have cycle-specific parameter limits. An acceptable alternative to specifying the values of cycle-specific parameter limits in the TSs consists of:
(1) the addition of the definition of a named formal report that includes the values of cycle-specific parameter limit that have been established using an NRC-approved methodology and consistent with all applicable limits of the safety analysis; (2) the addition of an administrative reporting requirement to submit the formal report on cycle-specific parameter limits to the Commission for information; and (3) the modification of individual TSs to note that cycle-specific parameters shall be maintained within the limits provided in the defined formal report. GL 88-16 further clarifies that in COLR TS [6.x.x] core operating limits shall be established and documented in the COLR before each reload cycle or any remaining part of a reload cycle. The analytical methods used to determine the core operating limits shall be those previously reviewed and approved by the NRC staff.
Based on the GL 88-16 guidance, TMI C20 TS 6.9.5.2 lists all approved methodologies to support the cycle-specific core operating parameters specified in TS 6.9.5.1. Therefore, both TS 6.9.5.1 and 6.9.5.2 in the TMI COLR TSs are associated with the acceptable alternative stated in item (1) above. The current TMI C20 COLR is associated with the acceptable alternative stated in item (2) above. While TS 6.9.5.2 lists six NRC approved methodology references, TMI C20 COLR lists 3 references in "REFERENCES." The staff found that:
(1) there are no cycle-specific core operating limits listed in TS 6.9.5.1; (2) there is no clear identification for cycle-specific core operating limits in the TMI C20 COLR, but only mentioned in the ABSTRACT; and (3) there are no clear cycle-specific operating limits in the TMI C20 COLR.
RAI-1: Please identify plant and cycle-specific parameters forTS 6.9.5.1 and show those core operating limits in the TMI C20 COLR.
1 Agencywide Documents Access and Management System (ADAMS) Accession No. ML13317A073.
Enclosure
 
RAI-2: Please justify that the use of any methodologies referenced in REFERENCES of the TMI C20 COLR to support the cycle-specific core operating limits (to be provided in RAI-1) is consistent with TS 6.9.5.2.
RAI-3: Please organize the TMI C20 COLR in accordance toTS 6.9.5.3 to include the proper TSs for cycle-specific core operating limits, the detailed limits, and their supporting methodologies listed in TS 6.9.5.2.
 
May 22, 2014 Mr. Michael J. Pacilio President and Chief Nuclear Officer Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555
 
==SUBJECT:==
THREE MILE ISLAND NUCLEAR STATION, UNIT 1 -REQUEST FOR ADDITIONAL INFORMATION REGARDING REVIEW OF CYCLE 20 CORE OPERATING LIMITS REPORT (TAC NO. MF3332)
 
==Dear Mr. Pacilio:==
 
By letter dated November 8, 2013, Exelon Generation Company, LLC (Exelon) submitted the Three Mile Island Nuclear Station, Unit 1, Cycle 20 Core Operating Limits Report. To complete its review, the Nuclear Regulatory Commission staff requests a response to the enclosed questions.
The draft questions were sent to Mr. Francis Mascitelli, of your staff, to ensure that the questions were understandable, the regulatory basis for the questions were clear, and to determine if the information was previously docketed. On May 22, 2014, Mr. Mascitelli agreed that you would provide a response by June 23, 2014.
If you have any questions regarding this matter, please contact me at 301-415-4090.
Sincerely, IRA/
Jeffrey A. Whited, Project Manager Plant Licensing Branch 1-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-289
 
==Enclosure:==
 
Request for Additional Information cc: Distribution via Listserv DISTRIBUTION:
PUBLIC RidsNrrPMThreeMilelsland Resource     LPLI-2 R/F RidsAcrsAcnw_MaiiCTR Resource         RidsNrrLAABaxter Resource            RidsNrrDssSrxb Resource RidsRgn1 MaiiCenter Resource         RidsNrrDoriDpr Resource             RidsNrrDorllpl1-2 Resouce THuang, NRR ADAMS Accession Number* ML14134A322                      *via e-mail **via memo OFFICE     LPL 1-2/PM     LPL 1-2/LA       SRXB/BC           LPLI-2/BC       LPL 1-2/PM MKhanna NAME       JWhited         ABaxter*         CJackson**                         JWhited (REnnis for}
DATE       05/22/2014     05/14/2014       05/14/2014         05/22/2014     05/22/2014 OFFICIAL RECORD COPY}}

Latest revision as of 04:32, 4 November 2019

Request for Additional Information Regarding Review of Three Mile Island Nuclear Station Unit 1 Cycle 20 Core Operating Limits Report
ML14134A322
Person / Time
Site: Three Mile Island Constellation icon.png
Issue date: 05/22/2014
From: Jeffrey Whited
Plant Licensing Branch 1
To: Pacilio M
Exelon Nuclear
Whited J, NRR/DORL/LPLI-2
References
TAC MF3332
Download: ML14134A322 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 May 22, 2014 Mr. Michael J. Pacilio President and Chief Nuclear Officer Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

THREE MILE ISLAND NUCLEAR STATION, UNIT 1- REQUEST FOR ADDITIONAL INFORMATION REGARDING REVIEW OF CYCLE 20 CORE OPERATING LIMITS REPORT (TAG NO. MF3332)

Dear Mr. Pacilio:

By letter dated November 8, 2013, Exelon Generation Company, LLC (Exelon) submitted the Three Mile Island Nuclear Station, Unit 1, Cycle 20 Core Operating Limits Report. To complete its review, the Nuclear Regulatory Commission staff requests a response to the enclosed questions.

The draft questions were sent to Mr. Francis Mascitelli, of your staff, to ensure that the questions were understandable, the regulatory basis for the questions were clear, and to determine if the information was previously docketed. On May 22, 2014, Mr. Mascitelli agreed that you would provide a response by June 23, 2014.

If you have any questions regarding this matter, please contact me at 301-415-4090.

Sincerely, Je~1:~ger Plant Licensing Branch 1-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-289

Enclosure:

Request for Additional Information cc: Distribution via Listserv

REQUEST FOR ADDITIONAL INFORMATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO THE REVIEW OF CYCLE 20 CORE OPERATING LIMITS REPORT THREE MILE ISLAND NUCLEAR STATION. UNIT 1 DOCKET NO. 50-289 By letter dated November 8, 2013, 1 Exelon Generation Company, LLC (Exelon) submitted the Three Mile Island Nuclear Station, Unit 1, Cycle 20 (TMI C20) Core Operating Limits Report (COLR). To complete its review of the TMI C20 COLR, the Nuclear Regulatory Commission (NRC or Commission) requests a response to the questions below.

Generic Letter (GL) 88-16, "Removal of Cycle-Specific Parameter Limits from Technical Specifications," provides guidance for the preparation of a license amendment request to modify Technical Specifications (TSs) that have cycle-specific parameter limits. An acceptable alternative to specifying the values of cycle-specific parameter limits in the TSs consists of:

(1) the addition of the definition of a named formal report that includes the values of cycle-specific parameter limit that have been established using an NRC-approved methodology and consistent with all applicable limits of the safety analysis; (2) the addition of an administrative reporting requirement to submit the formal report on cycle-specific parameter limits to the Commission for information; and (3) the modification of individual TSs to note that cycle-specific parameters shall be maintained within the limits provided in the defined formal report. GL 88-16 further clarifies that in COLR TS [6.x.x] core operating limits shall be established and documented in the COLR before each reload cycle or any remaining part of a reload cycle. The analytical methods used to determine the core operating limits shall be those previously reviewed and approved by the NRC staff.

Based on the GL 88-16 guidance, TMI C20 TS 6.9.5.2 lists all approved methodologies to support the cycle-specific core operating parameters specified in TS 6.9.5.1. Therefore, both TS 6.9.5.1 and 6.9.5.2 in the TMI COLR TSs are associated with the acceptable alternative stated in item (1) above. The current TMI C20 COLR is associated with the acceptable alternative stated in item (2) above. While TS 6.9.5.2 lists six NRC approved methodology references, TMI C20 COLR lists 3 references in "REFERENCES." The staff found that:

(1) there are no cycle-specific core operating limits listed in TS 6.9.5.1; (2) there is no clear identification for cycle-specific core operating limits in the TMI C20 COLR, but only mentioned in the ABSTRACT; and (3) there are no clear cycle-specific operating limits in the TMI C20 COLR.

RAI-1: Please identify plant and cycle-specific parameters forTS 6.9.5.1 and show those core operating limits in the TMI C20 COLR.

1 Agencywide Documents Access and Management System (ADAMS) Accession No. ML13317A073.

Enclosure

RAI-2: Please justify that the use of any methodologies referenced in REFERENCES of the TMI C20 COLR to support the cycle-specific core operating limits (to be provided in RAI-1) is consistent with TS 6.9.5.2.

RAI-3: Please organize the TMI C20 COLR in accordance toTS 6.9.5.3 to include the proper TSs for cycle-specific core operating limits, the detailed limits, and their supporting methodologies listed in TS 6.9.5.2.

May 22, 2014 Mr. Michael J. Pacilio President and Chief Nuclear Officer Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

THREE MILE ISLAND NUCLEAR STATION, UNIT 1 -REQUEST FOR ADDITIONAL INFORMATION REGARDING REVIEW OF CYCLE 20 CORE OPERATING LIMITS REPORT (TAC NO. MF3332)

Dear Mr. Pacilio:

By letter dated November 8, 2013, Exelon Generation Company, LLC (Exelon) submitted the Three Mile Island Nuclear Station, Unit 1, Cycle 20 Core Operating Limits Report. To complete its review, the Nuclear Regulatory Commission staff requests a response to the enclosed questions.

The draft questions were sent to Mr. Francis Mascitelli, of your staff, to ensure that the questions were understandable, the regulatory basis for the questions were clear, and to determine if the information was previously docketed. On May 22, 2014, Mr. Mascitelli agreed that you would provide a response by June 23, 2014.

If you have any questions regarding this matter, please contact me at 301-415-4090.

Sincerely, IRA/

Jeffrey A. Whited, Project Manager Plant Licensing Branch 1-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-289

Enclosure:

Request for Additional Information cc: Distribution via Listserv DISTRIBUTION:

PUBLIC RidsNrrPMThreeMilelsland Resource LPLI-2 R/F RidsAcrsAcnw_MaiiCTR Resource RidsNrrLAABaxter Resource RidsNrrDssSrxb Resource RidsRgn1 MaiiCenter Resource RidsNrrDoriDpr Resource RidsNrrDorllpl1-2 Resouce THuang, NRR ADAMS Accession Number* ML14134A322 *via e-mail **via memo OFFICE LPL 1-2/PM LPL 1-2/LA SRXB/BC LPLI-2/BC LPL 1-2/PM MKhanna NAME JWhited ABaxter* CJackson** JWhited (REnnis for}

DATE 05/22/2014 05/14/2014 05/14/2014 05/22/2014 05/22/2014 OFFICIAL RECORD COPY