| issue date = 06/12/2014
| issue date = 06/12/2014
| title = Notification of Evaluations of Changes, Tests, or Experiments, and Permanent Plant Modifications Inspection (NRC Integrated Inspection Report 05000313/2014004 and 05000368/2014004) and Request for Information
| title = Notification of Evaluations of Changes, Tests, or Experiments, and Permanent Plant Modifications Inspection (NRC Integrated Inspection Report 05000313/2014004 and 05000368/2014004) and Request for Information
| author name = Farnholtz T R
| author name = Farnholtz T
| author affiliation = NRC/RGN-IV/DRS/EB-1
| author affiliation = NRC/RGN-IV/DRS/EB-1
| addressee name = Browning J
| addressee name = Browning J
Line 9: Line 9:
| docket = 05000313, 05000368
| docket = 05000313, 05000368
| license number = DPR-051, NPF-006
| license number = DPR-051, NPF-006
| contact person = Farnholtz T R
| contact person = Farnholtz T
| document report number = IR-14-004
| document report number = IR-14-004
| document type = Letter
| document type = Letter
| page count = 6
| page count = 6
}}
}}
See also: [[followed by::IR 05000313/2014004]]
See also: [[see also::IR 05000313/2014004]]


=Text=
=Text=
{{#Wiki_filter:June 12, 2014  
{{#Wiki_filter:June 12, 2014
    Mr. Jeremy Browning, Site Vice President
Mr. Jeremy Browning, Site Vice President
Arkansas Nuclear One
Arkansas Nuclear One
Entergy Operations, Inc.
Entergy Operations, Inc.
 
1448 SR 333
1448 SR 333 Russellville, AR 72802-0967 SUBJECT: ARKANSAS NUCLEAR ONE - NOTIFICATION OF EVALUATIONS OF CHANGES, TESTS, OR EXPERIMENTS, AND PERMANENT PLANT MODIFICATIONS INSPECTION (NRC INTEGRATED INSPECTION   REPORT 05000313/2014004 AND 05000368/2014004) AND REQUEST
Russellville, AR 72802-0967
FOR INFORMATION  
SUBJECT:       ARKANSAS NUCLEAR ONE - NOTIFICATION OF EVALUATIONS OF
Dear Mr. Browning:  
                CHANGES, TESTS, OR EXPERIMENTS, AND PERMANENT PLANT
From July 28 through August 8, 2014, reactor inspectors from NRC's Region IV office will perform the baseline inspection of changes, tests, experiments, and permanent plant modifications at Arkansas Nuclear One, Units 1 and 2, using NRC Inspection Procedure 71111.17, "Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications."
                MODIFICATIONS INSPECTION (NRC INTEGRATED INSPECTION
Experience has shown that this inspection is resource intensive both for the NRC inspectors  
                REPORT 05000313/2014004 AND 05000368/2014004) AND REQUEST
and your staff. In order to minimize the impact to your onsite resources and to ensure a productive inspection, we have enclosed a request for documents needed for this inspection. Upon review of these documents, the inspectors will select additional documentation for review  
                FOR INFORMATION
upon arrival. It is important that all of these documents are up to date and complete in order to  
Dear Mr. Browning:
minimize the number of additional documents requested during the preparation and/or the  
From July 28 through August 8, 2014, reactor inspectors from NRCs Region IV office will
onsite portions of the inspection.  
perform the baseline inspection of changes, tests, experiments, and permanent plant
We have discussed the schedule for these inspection activities with your staff and understand  
modifications at Arkansas Nuclear One, Units 1 and 2, using NRC Inspection Procedure
that our regulatory contact for this inspection will be Ms. Natalie Mosher of your licensing  
71111.17, Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications.
organization. If there are any questions about this inspection or the material requested, please  
Experience has shown that this inspection is resource intensive both for the NRC inspectors
contact the lead inspector, Mr. Ronald A. Kopriva, by telephone at 817-200-1104 or by e-mail
and your staff. In order to minimize the impact to your onsite resources and to ensure a
 
productive inspection, we have enclosed a request for documents needed for this inspection.
Upon review of these documents, the inspectors will select additional documentation for review
upon arrival. It is important that all of these documents are up to date and complete in order to
minimize the number of additional documents requested during the preparation and/or the
onsite portions of the inspection.
We have discussed the schedule for these inspection activities with your staff and understand
that our regulatory contact for this inspection will be Ms. Natalie Mosher of your licensing
organization. If there are any questions about this inspection or the material requested, please
contact the lead inspector, Mr. Ronald A. Kopriva, by telephone at 817-200-1104 or by e-mail
at Ron.Kopriva@nrc.gov.
at Ron.Kopriva@nrc.gov.
 
J. Browning -2-
  In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter  and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's
document system (ADAMS).  ADAMS is accessible from the NRC Web site at
http://www.nrc.gov/reading-rm/adams.html
(the Public Electronic Reading Room).
Sincerely,                       
                   
                   
         
      /RA/
Thomas R. Farnholtz, Branch Chief Engineering Branch 1 Division of Reactor Safety
  Dockets:  50-313; 50-368 Licenses:  DRP-51; NPF-6
Enclosure:  Evaluations of Changes, Tests, or Experiments and 
  Permanent Plant Modifications Request for Information
cc:  Electronic Distribution for Arkansas Nuclear One 


 
J. Browning                                      -2-
ML14163A733
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter
  SUNSI Review By:  TRF ADAMS  Yes    No  Publicly Available Non-Publicly Available  Non-Sensitive  Sensitive Keyword:  OFFICE SRI:EB1 C:EB1      NAME RKopriva:PBH TFarnholtz      SIGNATURE /RA/ /RA/     DATE 06/12/14 06/12/14     
and its enclosure will be available electronically for public inspection in the NRC Public
J. Browning -2-      Letter to Jeremy Browning from Thomas R. Farnholtz dated June 12, 2014
Document Room or from the Publicly Available Records (PARS) component of NRC's
document system (ADAMS). ADAMS is accessible from the NRC Web site at
SUBJECT:     ARKANSAS NUCLEAR ONE - NOTIFICATION OF EVALUATIONS OF                                                CHANGES, TESTS, OR EXPERIMENTS, AND PERMANENT PLANT   
http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
                        MODIFICATIONS INSPECTION (NRC INTEGRATED INSPECTION 
                                              Sincerely,
                      REPORT 05000313/2014004 AND 05000368/2014004) AND REQUEST 
                                              /RA/
                      FOR INFORMATION
                                              Thomas R. Farnholtz, Branch Chief
Electronic distribution by RIV
                                              Engineering Branch 1
: Regional Administrator (Marc.Dapas@nrc.gov)
                                              Division of Reactor Safety
Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)
Dockets: 50-313; 50-368
Acting DRP Director (Troy.Pruett@nrc.gov) DRS Director (Anton.Vegel@nrc.gov) DRS Deputy Director (Jeff.Clark@nrc.gov) 
Licenses: DRP-51; NPF-6
Senior Resident Inspector (Brian.Tindell@nrc.gov)
Enclosure:
Evaluations of Changes, Tests, or Experiments and
  Permanent Plant Modifications Request for Information
cc: Electronic Distribution for Arkansas Nuclear One


Resident Inspector (Matt.Young@nrc.gov)
Resident Inspector (Abin.Fairbanks@nrc.gov)


Branch Chief, DRP/E (Greg.Werner@nrc.gov) Senior Project Engineer, DRP/E (Cale.Young@nrc.gov) Project Engineer, DRP/E (Jim.Melfi@nrc.gov)  
      ML14163A733
ANO Administrative Assistant (Gloria.Hatfield@nrc.gov)  
  SUNSI Review              ADAMS            Publicly Available      Non-Sensitive    Keyword:
Public Affairs Officer (Victor.Dricks@nrc.gov)  
By: TRF                      Yes  No        Non-Publicly Available  Sensitive
Public Affairs Officer (Lara.Uselding@nrc.gov) Project Manager (Peter.Bamford@nrc.gov) Branch Chief, DRS/TSB (Geoffrey.Miller@nrc.gov)
OFFICE        SRI:EB1      C:EB1
ACES (R4ACES@nrc.gov)  
NAME          RKopriva:PBH  TFarnholtz
RITS Coordinator (Marisa.Herrera@nrc.gov)  
SIGNATURE /RA/              /RA/
Regional Counsel (Karla.Fuller@nrc.gov)  
DATE          06/12/14      06/12/14
Technical Support Assistant (Loretta.Williams@nrc.gov) Congressional Affairs Officer (Jenny.Weil@nrc.gov) RIV/ETA: OEDO (Joseph.Nick@nrc.gov)  
                                       
J. Browning                                  -2-
Letter to Jeremy Browning from Thomas R. Farnholtz dated June 12, 2014
SUBJECT:        ARKANSAS NUCLEAR ONE - NOTIFICATION OF EVALUATIONS OF
                CHANGES, TESTS, OR EXPERIMENTS, AND PERMANENT PLANT
                MODIFICATIONS INSPECTION (NRC INTEGRATED INSPECTION
                REPORT 05000313/2014004 AND 05000368/2014004) AND REQUEST
                FOR INFORMATION
Electronic distribution by RIV:
Regional Administrator (Marc.Dapas@nrc.gov)
Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)
Acting DRP Director (Troy.Pruett@nrc.gov)
DRS Director (Anton.Vegel@nrc.gov)
DRS Deputy Director (Jeff.Clark@nrc.gov)
Senior Resident Inspector (Brian.Tindell@nrc.gov)
Resident Inspector (Matt.Young@nrc.gov)
Resident Inspector (Abin.Fairbanks@nrc.gov)
Branch Chief, DRP/E (Greg.Werner@nrc.gov)
Senior Project Engineer, DRP/E (Cale.Young@nrc.gov)
Project Engineer, DRP/E (Jim.Melfi@nrc.gov)
ANO Administrative Assistant (Gloria.Hatfield@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov)
Public Affairs Officer (Lara.Uselding@nrc.gov)
Project Manager (Peter.Bamford@nrc.gov)
Branch Chief, DRS/TSB (Geoffrey.Miller@nrc.gov)
ACES (R4ACES@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov)
Technical Support Assistant (Loretta.Williams@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
RIV/ETA: OEDO (Joseph.Nick@nrc.gov)


 
    Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications
Enclosure  Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications
                                    Inspection Request for Information
Inspection Request for Information  
Inspection Report:               05000313/2014004 and 05000368/2014004
 
Inspection Dates:                 July 28 - August 8, 2014
Inspection Report: 05000313/2014004 and 05000368/2014004  
Inspection Procedure:             IP 71111.17, Evaluation of Changes, Tests, or Experiments and
Inspection Dates: July 28 - August 8, 2014  
                                  Permanent Plant Modifications
Inspection Procedure: IP 71111.17, "Evaluation of Changes, Tests, or Experiments and Permanent Plant Modifications"
Lead Inspector:                   Ronald Kopriva, Senior Reactor Inspector
Lead Inspector: Ronald Kopriva, Senior Reactor Inspector  
 
Information Requested for the In-Office Preparation Week
Information Requested for the In-Office Preparation Week
  The following information should be sent to the Region IV office in hard copy or electronic format (Certrec IMS preferred), to the attention of Ronald Kopriva, by July 14, 2014, to facilitate the selection of specific items that will be reviewed during the onsite inspection week. The  
The following information should be sent to the Region IV office in hard copy or electronic format
inspectors will select specific items from the information requested below and then request from  
(Certrec IMS preferred), to the attention of Ronald Kopriva, by July 14, 2014, to facilitate the
your staff additional documents needed during the onsite inspection weeks. We ask that the  
selection of specific items that will be reviewed during the onsite inspection week. The
specific items requested be available and ready for review on the first day of inspection. Also,  
inspectors will select specific items from the information requested below and then request from
we request that you categorize the documents in your response with the numbered list below. Please provide requested documentation electronically, if possible. If requested documents are large and only hard copy formats are available, please inform the inspector(s), and provide subject documentation during the first day of the onsite inspection. If you have any questions  
your staff additional documents needed during the onsite inspection weeks. We ask that the
regarding this information request, please call the lead inspector as soon as possible. 1. A list, with descriptions of all 10 CFR 50.59 screenings (or equivalent) performed since July 1, 2011, which did not result in an evaluation. Note: Description of screenings should be brief, but of sufficient detail so that inspectors can determine  
specific items requested be available and ready for review on the first day of inspection. Also,
the significance of the issue.  
we request that you categorize the documents in your response with the numbered list below.
2. A list, with descriptions, of all 10 CFR 50.59 evaluations performed which did not result in an application for license amendment since July 1, 2011. Note: Description of  
Please provide requested documentation electronically, if possible. If requested documents are
evaluations should be brief, but of sufficient detail so that inspectors can determine the significance of the issue.  
large and only hard copy formats are available, please inform the inspector(s), and provide
3. Arkansas Nuclear One procedure(s) for conducting 10 CFR 50.59 screenings and evaluations.  
subject documentation during the first day of the onsite inspection. If you have any questions
4. A list with descriptions of all Corrective Action documents related to   10 CFR 50.59 activities, including screenings and evaluations from July 1, 2011, to the present.  
regarding this information request, please call the lead inspector as soon as possible.
5. A list, with descriptions of all permanent plant modifications since July 1, 2011.  
    1. A list, with descriptions of all 10 CFR 50.59 screenings (or equivalent) performed
- 2 -  Include sufficient detail to enable the inspector to determine the significance of each modification. For this inspection, permanent plant modifications include permanent  
          since July 1, 2011, which did not result in an evaluation. Note: Description of
plant changes, design changes, setpoint changes, procedure changes, equivalency evaluations, suitability analyses, calculations, and commercial grade dedications.  
          screenings should be brief, but of sufficient detail so that inspectors can determine
6. Arkansas Nuclear One procedure for implementing and controlling permanent plant modifications.  
          the significance of the issue.
7. A list, with descriptions of all Corrective Action documents related to your permanent plant modification program and its implementation since July 1, 2011. Include  
    2. A list, with descriptions, of all 10 CFR 50.59 evaluations performed which did not result
sufficient detail to enable the inspector to determine the significance of each  
        in an application for license amendment since July 1, 2011. Note: Description of
modification.  
        evaluations should be brief, but of sufficient detail so that inspectors can determine the
8. A listing of personnel qualified to prepare 50.59 screenings and evaluations, including qualification dates.  
        significance of the issue.
9. A listing of personnel qualified to review and approve 50.59 screenings and/or evaluations, including qualification dates.  
    3. Arkansas Nuclear One procedure(s) for conducting 10 CFR 50.59 screenings and
 
        evaluations.
    4. A list with descriptions of all Corrective Action documents related to
        10 CFR 50.59 activities, including screenings and evaluations from July 1, 2011,
          to the present.
    5. A list, with descriptions of all permanent plant modifications since July 1, 2011.
                                                                                          Enclosure
 
        Include sufficient detail to enable the inspector to determine the significance of each
        modification. For this inspection, permanent plant modifications include permanent
        plant changes, design changes, setpoint changes, procedure changes, equivalency
        evaluations, suitability analyses, calculations, and commercial grade dedications.
    6. Arkansas Nuclear One procedure for implementing and controlling
        permanent plant modifications.
    7. A list, with descriptions of all Corrective Action documents related to your permanent
        plant modification program and its implementation since July 1, 2011. Include
        sufficient detail to enable the inspector to determine the significance of each
        modification.
    8. A listing of personnel qualified to prepare 50.59 screenings and evaluations, including
        qualification dates.
    9. A listing of personnel qualified to review and approve 50.59 screenings and/or
        evaluations, including qualification dates.
Inspector Contact Information:
Inspector Contact Information:
   Ronald Kopriva Robert Latta John Watkins Senior Reactor Inspector Senior Reactor Inspector Reactor Inspector 817-200-1104 817-200-1532 817-200-0170 Ron.Kopriva@nrc.gov Robert.Latta@nrc.gov John.Watkins@nrc.gov
   Ronald Kopriva                 Robert Latta                   John Watkins
  Mailing Address:  
  Senior Reactor Inspector       Senior Reactor Inspector       Reactor Inspector
U.S. NRC, Region IV Attn: Ronald Kopriva 1600 East Lamar Blvd. Arlington, TX 76011-4511
  817-200-1104                   817-200-1532                   817-200-0170
  Ron.Kopriva@nrc.gov             Robert.Latta@nrc.gov           John.Watkins@nrc.gov
Mailing Address:
U.S. NRC, Region IV
Attn: Ronald Kopriva
1600 East Lamar Blvd.
Arlington, TX 76011-4511
                                                    -2-
}}
}}

Latest revision as of 04:29, 4 November 2019

Notification of Evaluations of Changes, Tests, or Experiments, and Permanent Plant Modifications Inspection (NRC Integrated Inspection Report 05000313/2014004 and 05000368/2014004) and Request for Information
ML14163A733
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 06/12/2014
From: Thomas Farnholtz
Region 4 Engineering Branch 1
To: Jeremy G. Browning
Entergy Operations
Farnholtz T
References
IR-14-004
Download: ML14163A733 (6)


See also: IR 05000313/2014004

Text

June 12, 2014

Mr. Jeremy Browning, Site Vice President

Arkansas Nuclear One

Entergy Operations, Inc.

1448 SR 333

Russellville, AR 72802-0967

SUBJECT: ARKANSAS NUCLEAR ONE - NOTIFICATION OF EVALUATIONS OF

CHANGES, TESTS, OR EXPERIMENTS, AND PERMANENT PLANT

MODIFICATIONS INSPECTION (NRC INTEGRATED INSPECTION

REPORT 05000313/2014004 AND 05000368/2014004) AND REQUEST

FOR INFORMATION

Dear Mr. Browning:

From July 28 through August 8, 2014, reactor inspectors from NRCs Region IV office will

perform the baseline inspection of changes, tests, experiments, and permanent plant

modifications at Arkansas Nuclear One, Units 1 and 2, using NRC Inspection Procedure 71111.17, Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications.

Experience has shown that this inspection is resource intensive both for the NRC inspectors

and your staff. In order to minimize the impact to your onsite resources and to ensure a

productive inspection, we have enclosed a request for documents needed for this inspection.

Upon review of these documents, the inspectors will select additional documentation for review

upon arrival. It is important that all of these documents are up to date and complete in order to

minimize the number of additional documents requested during the preparation and/or the

onsite portions of the inspection.

We have discussed the schedule for these inspection activities with your staff and understand

that our regulatory contact for this inspection will be Ms. Natalie Mosher of your licensing

organization. If there are any questions about this inspection or the material requested, please

contact the lead inspector, Mr. Ronald A. Kopriva, by telephone at 817-200-1104 or by e-mail

at Ron.Kopriva@nrc.gov.

J. Browning -2-

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter

and its enclosure will be available electronically for public inspection in the NRC Public

Document Room or from the Publicly Available Records (PARS) component of NRC's

document system (ADAMS). ADAMS is accessible from the NRC Web site at

http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Thomas R. Farnholtz, Branch Chief

Engineering Branch 1

Division of Reactor Safety

Dockets: 50-313; 50-368

Licenses: DRP-51; NPF-6

Enclosure:

Evaluations of Changes, Tests, or Experiments and

Permanent Plant Modifications Request for Information

cc: Electronic Distribution for Arkansas Nuclear One

ML14163A733

SUNSI Review ADAMS Publicly Available Non-Sensitive Keyword:

By: TRF Yes No Non-Publicly Available Sensitive

OFFICE SRI:EB1 C:EB1

NAME RKopriva:PBH TFarnholtz

SIGNATURE /RA/ /RA/

DATE 06/12/14 06/12/14

J. Browning -2-

Letter to Jeremy Browning from Thomas R. Farnholtz dated June 12, 2014

SUBJECT: ARKANSAS NUCLEAR ONE - NOTIFICATION OF EVALUATIONS OF

CHANGES, TESTS, OR EXPERIMENTS, AND PERMANENT PLANT

MODIFICATIONS INSPECTION (NRC INTEGRATED INSPECTION

REPORT 05000313/2014004 AND 05000368/2014004) AND REQUEST

FOR INFORMATION

Electronic distribution by RIV:

Regional Administrator (Marc.Dapas@nrc.gov)

Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)

Acting DRP Director (Troy.Pruett@nrc.gov)

DRS Director (Anton.Vegel@nrc.gov)

DRS Deputy Director (Jeff.Clark@nrc.gov)

Senior Resident Inspector (Brian.Tindell@nrc.gov)

Resident Inspector (Matt.Young@nrc.gov)

Resident Inspector (Abin.Fairbanks@nrc.gov)

Branch Chief, DRP/E (Greg.Werner@nrc.gov)

Senior Project Engineer, DRP/E (Cale.Young@nrc.gov)

Project Engineer, DRP/E (Jim.Melfi@nrc.gov)

ANO Administrative Assistant (Gloria.Hatfield@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Public Affairs Officer (Lara.Uselding@nrc.gov)

Project Manager (Peter.Bamford@nrc.gov)

Branch Chief, DRS/TSB (Geoffrey.Miller@nrc.gov)

ACES (R4ACES@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov)

Technical Support Assistant (Loretta.Williams@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov)

RIV/ETA: OEDO (Joseph.Nick@nrc.gov)

Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications

Inspection Request for Information

Inspection Report: 05000313/2014004 and 05000368/2014004

Inspection Dates: July 28 - August 8, 2014

Inspection Procedure: IP 71111.17, Evaluation of Changes, Tests, or Experiments and

Permanent Plant Modifications

Lead Inspector: Ronald Kopriva, Senior Reactor Inspector

Information Requested for the In-Office Preparation Week

The following information should be sent to the Region IV office in hard copy or electronic format

(Certrec IMS preferred), to the attention of Ronald Kopriva, by July 14, 2014, to facilitate the

selection of specific items that will be reviewed during the onsite inspection week. The

inspectors will select specific items from the information requested below and then request from

your staff additional documents needed during the onsite inspection weeks. We ask that the

specific items requested be available and ready for review on the first day of inspection. Also,

we request that you categorize the documents in your response with the numbered list below.

Please provide requested documentation electronically, if possible. If requested documents are

large and only hard copy formats are available, please inform the inspector(s), and provide

subject documentation during the first day of the onsite inspection. If you have any questions

regarding this information request, please call the lead inspector as soon as possible.

1. A list, with descriptions of all 10 CFR 50.59 screenings (or equivalent) performed

since July 1, 2011, which did not result in an evaluation. Note: Description of

screenings should be brief, but of sufficient detail so that inspectors can determine

the significance of the issue.

2. A list, with descriptions, of all 10 CFR 50.59 evaluations performed which did not result

in an application for license amendment since July 1, 2011. Note: Description of

evaluations should be brief, but of sufficient detail so that inspectors can determine the

significance of the issue.

3. Arkansas Nuclear One procedure(s) for conducting 10 CFR 50.59 screenings and

evaluations.

4. A list with descriptions of all Corrective Action documents related to

10 CFR 50.59 activities, including screenings and evaluations from July 1, 2011,

to the present.

5. A list, with descriptions of all permanent plant modifications since July 1, 2011.

Enclosure

Include sufficient detail to enable the inspector to determine the significance of each

modification. For this inspection, permanent plant modifications include permanent

plant changes, design changes, setpoint changes, procedure changes, equivalency

evaluations, suitability analyses, calculations, and commercial grade dedications.

6. Arkansas Nuclear One procedure for implementing and controlling

permanent plant modifications.

7. A list, with descriptions of all Corrective Action documents related to your permanent

plant modification program and its implementation since July 1, 2011. Include

sufficient detail to enable the inspector to determine the significance of each

modification.

8. A listing of personnel qualified to prepare 50.59 screenings and evaluations, including

qualification dates.

9. A listing of personnel qualified to review and approve 50.59 screenings and/or

evaluations, including qualification dates.

Inspector Contact Information:

Ronald Kopriva Robert Latta John Watkins

Senior Reactor Inspector Senior Reactor Inspector Reactor Inspector

817-200-1104 817-200-1532 817-200-0170

Ron.Kopriva@nrc.gov Robert.Latta@nrc.gov John.Watkins@nrc.gov

Mailing Address:

U.S. NRC, Region IV

Attn: Ronald Kopriva

1600 East Lamar Blvd.

Arlington, TX 76011-4511

-2-