|
|
(5 intermediate revisions by the same user not shown) |
Line 2: |
Line 2: |
| | number = ML14192B324 | | | number = ML14192B324 |
| | issue date = 07/11/2014 | | | issue date = 07/11/2014 |
| | title = Turkey Point Material Control and Accounting Inspection Report 05000250/2014405 and 05000251/2014405 | | | title = Material Control and Accounting Inspection Report 05000250/2014405 and 05000251/2014405 |
| | author name = Rich D W | | | author name = Rich D |
| | author affiliation = NRC/RGN-II/DRP/RPB3 | | | author affiliation = NRC/RGN-II/DRP/RPB3 |
| | addressee name = Nazar M K | | | addressee name = Nazar M |
| | addressee affiliation = Florida Power & Light Co | | | addressee affiliation = Florida Power & Light Co |
| | docket = 05000250, 05000251 | | | docket = 05000250, 05000251 |
Line 18: |
Line 18: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 July 11, 2014 Mr. Mano Nazar President and Chief Nuclear Officer Nuclear Division Florida Power and Light Company P.O. Box 14000 Juno Beach, Florida 33408-0420 | | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION uly 11, 2014 |
|
| |
|
| SUBJECT: TURKEY POINT NUCLEAR PLANT - NRC MATERIAL CONTROL AND ACCOUNTING (MC&A) INSPECTION REPORT 05000250/2014405 AND | | ==SUBJECT:== |
| | | TURKEY POINT NUCLEAR PLANT - NRC MATERIAL CONTROL AND ACCOUNTING (MC&A) INSPECTION REPORT 05000250/2014405 AND 05000251/2014405 |
| 05000251/2014405 | |
|
| |
|
| ==Dear Mr. Nazar:== | | ==Dear Mr. Nazar:== |
| On June 6, 2014, the US Nuclear Regulatory Commission (NRC) completed a security inspection at your Turkey Point Units 3 and 4. The enclosed inspection report documents the inspection results, which were discussed on July 2, 2014, with Mr. Kiley and other members of your staff. The material enclosed contains security related information as defined by 10 CFR 2.390(d)(1) and should be withheld from public disclosure. | | On June 6, 2014, the US Nuclear Regulatory Commission (NRC) completed a security inspection at your Turkey Point Units 3 and 4. The enclosed inspection report documents the inspection results, which were discussed on July 2, 2014, with Mr. Kiley and other members of your staff. The material enclosed contains security related information as defined by 10 CFR 2.390(d)(1) and should be withheld from public disclosure. |
|
| |
|
| The inspection examined activities conducted under your license, as they relate to material control and accountability, to confirm compliance with the commission's rules and regulations and the conditions of your license. Within these areas, the inspection consisted of selected examination of procedures and records, observations of activities, and interviews with personnel. The NRC inspectors did not identify any findings or violations of more than minor significance. | | The inspection examined activities conducted under your license, as they relate to material control and accountability, to confirm compliance with the commissions rules and regulations and the conditions of your license. Within these areas, the inspection consisted of selected examination of procedures and records, observations of activities, and interviews with personnel. The NRC inspectors did not identify any findings or violations of more than minor significance. |
| | |
| In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding,"
| |
| of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, the material enclosed herewith contains security related information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability.
| |
| | |
| Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAMS. If you choose to provide a response and security related information is necessary to provide an acceptable response, please mark your entire response "Security Related Information - Withhold from Public Disclosure under 10 CFR 2.390" in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.
| |
| | |
| Sincerely,/RA/ Daniel W. Rich, Chief Reactor Projects Branch 3 Division of Reactor Projects
| |
| | |
| Docket Nos.: 50-250, 50-251 License Nos.: DPR-31, DPR-41
| |
| | |
| ===Enclosure:===
| |
| Inspection Report 05000250/2014405 and 05000251/2014405
| |
| | |
| ===w/Attachment:===
| |
| Supplemental Information (Security Related Information)
| |
| cc w/encl: See page 3 cc w/o encl distribution via ListServ
| |
| | |
| _________________________ SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRP RII:DRP RII:DRP RII:DRP RII:DRP SIGNATURE Via email Via email MJR /RA/ MJR /RA for/ DWR /RA/ NAME THoeg MEndress MRiches SSandal DRich DATE 7/10/2014 7/10/2014 7/10/2014 7/10/2014 7/11/2014 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO cc w/Encls:
| |
| | |
| Mano Nazar NextEra Energy P. O. Box 14000 Juno Beach, FL 33408-0420 Michael Kiley - Site VP
| |
| | |
| Turkey Point Nuclear Generating Station
| |
| | |
| Florida Power & Light Company
| |
| | |
| 9760 SW 344th Street Florida City, FL 33035
| |
| | |
| Don Grissette General Manager Organizational Support
| |
| | |
| Florida Power & Light Co. P. O. Box 14000 Juno Beach, FL 33408-0420
| |
| | |
| Anthony Silakoski Nuclear Fleet Security
| |
| | |
| Florida Power & Light Compay 700 Universe Boulevard Juno Beach, FL 33408-0420
| |
| | |
| Timothy Eck, Site Security Manager
| |
| | |
| Turkey Point Nuclear Generating Station Florida Power & Light Company 9760 SW 344th Street
| |
| | |
| Florida City, FL 33035
| |
| | |
| Robert J. Tomonto, Licensing Manager
| |
| | |
| Turkey Point Nuclear Plant Florida Power & Light Company 9760 SW 344th Street
| |
| | |
| Florida City, FL 33035
| |
|
| |
|
| Timothy Eck, Site Security Manager Turkey Point Nuclear Generating Station Florida Power & Light Company
| | In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, the material enclosed herewith contains security related information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. |
|
| |
|
| 9760 SW 344th Street
| | Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAMS. If you choose to provide a response and security related information is necessary to provide an acceptable response, please mark your entire response Security Related Information - Withhold from Public Disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response. |
|
| |
|
| Florida City, FL 33035 Letter to Mano Nazar from Daniel W. Rich dated July 11, 2014.
| | Sincerely, |
| | /RA/ |
| | Daniel W. Rich, Chief Reactor Projects Branch 3 Division of Reactor Projects Docket Nos.: 50-250, 50-251 License Nos.: DPR-31, DPR-41 Enclosure: Inspection Report 05000250/2014405 and 05000251/2014405 w/Attachment: Supplemental Information (Security Related Information) |
| | cc w/encl: See page 3 cc w/o encl distribution via ListServ _________________________ SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRP RII:DRP RII:DRP RII:DRP RII:DRP SIGNATURE Via email Via email MJR /RA/ MJR /RA for/ DWR /RA/ |
| | NAME THoeg MEndress MRiches SSandal DRich DATE 7/10/2014 7/10/2014 7/10/2014 7/10/2014 7/11/2014 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO cc w/Encls: |
| | Mano Nazar NextEra Energy P. O. Box 14000 Juno Beach, FL 33408-0420 Michael Kiley - Site VP Turkey Point Nuclear Generating Station Florida Power & Light Company 9760 SW 344th Street Florida City, FL 33035 Don Grissette General Manager Organizational Support Florida Power & Light Co. |
|
| |
|
| SUBJECT: TURKEY POINT NUCLEAR PLANT - NRC MATERIAL CONTROL AND ACCOUNTING (MC&A) INSPECTION REPORT 05000250/2014405 AND
| | P. O. Box 14000 Juno Beach, FL 33408-0420 Anthony Silakoski Nuclear Fleet Security Florida Power & Light Compay 700 Universe Boulevard Juno Beach, FL 33408-0420 Timothy Eck, Site Security Manager Turkey Point Nuclear Generating Station Florida Power & Light Company 9760 SW 344th Street Florida City, FL 33035 Robert J. Tomonto, Licensing Manager Turkey Point Nuclear Plant Florida Power & Light Company 9760 SW 344th Street Florida City, FL 33035 Timothy Eck, Site Security Manager Turkey Point Nuclear Generating Station Florida Power & Light Company 9760 SW 344th Street Florida City, FL 33035 Letter to Mano Nazar from Daniel W. Rich dated July 11, 2014. |
|
| |
|
| 05000251/2014405 Distribution: | | SUBJECT: TURKEY POINT NUCLEAR PLANT - NRC MATERIAL CONTROL AND ACCOUNTING (MC&A) INSPECTION REPORT 05000250/2014405 AND 05000251/2014405 Distribution: |
| RidsNrrPMTurkeyPoint Resource L. Douglas, RII D. Gamberoni, RII B. Westreich, NSIR E. McNiel, NSIR RIDSNRRDIRS OE Mail PUBLIC | | RidsNrrPMTurkeyPoint Resource L. Douglas, RII D. Gamberoni, RII B. Westreich, NSIR E. McNiel, NSIR RIDSNRRDIRS OE Mail PUBLIC |
| }} | | }} |
|
---|
Category:Letter
MONTHYEARL-2024-175, Cycle 34 Core Operating Report2024-10-24024 October 2024 Cycle 34 Core Operating Report ML24291A2882024-10-24024 October 2024 Westinghouse Topical Report - Request for Withholding Information from Public Disclosure L-2024-177, Revised Response to Requests for Additional Information Regarding Turkey Point License Amendment Request 277, Updated Spent Fuel Pool Criticality Analysis2024-10-22022 October 2024 Revised Response to Requests for Additional Information Regarding Turkey Point License Amendment Request 277, Updated Spent Fuel Pool Criticality Analysis ML24276A2302024-10-16016 October 2024 Westinghouse Topical Report – Request for Withholding Information from Public Disclosure ML24289A2372024-10-15015 October 2024 Transmittal of Revision 1 Additional Errata Pages for WCAP-18830-P (Proprietary) and WCAP-18830-NP (Non-Proprietary), Turkey Point Fuel Storage Criticality Analysis for 24 Month Cycles L-2024-118, Fleet License Amendment Request to Relocate Staff Qualifications from Technical Specifications to the Quality Assurance Topical Report (FPL-1)2024-10-0808 October 2024 Fleet License Amendment Request to Relocate Staff Qualifications from Technical Specifications to the Quality Assurance Topical Report (FPL-1) L-2024-157, Response to Requests for Additional Information Regarding License Amendment Request (278) to Facilitate a Transition to 24-Month Fuel Cycles2024-10-0303 October 2024 Response to Requests for Additional Information Regarding License Amendment Request (278) to Facilitate a Transition to 24-Month Fuel Cycles IR 05000250/20243012024-10-0303 October 2024 NRC Operator License Examination Report 05000250/2024301 and 05000251/2024301 L-2024-147, Submission of Periodic Reports2024-10-0101 October 2024 Submission of Periodic Reports L-2024-158, Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-25025 September 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes ML24269A1292024-09-24024 September 2024 Response to Requests for Additional Information Regarding Turkey Point License Amendment Request 277, Updated Spent Fuel Pool Criticality Analysis ML24260A2262024-09-18018 September 2024 NRC Examination Results Summary - Examination Reports: 05000250/2024301 and 05000251/2024301 ML24262A2272024-09-18018 September 2024 Transmittal of Additional Errata Pages for WCAP-18830-P (Proprietary) and WCAP-18830-NP (Non-Proprietary), Turkey Point Fuel Storage Criticality Analysis for 24 Month Cycles ML24158A0052024-09-17017 September 2024 Completion of Subsequent License Renewal Site Specific Environmental Review and Modification to Subsequent Renewed Facility Operating Licenses L-2024-136, Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-16016 September 2024 Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes ML24256A1132024-09-13013 September 2024 Regulatory Audit Summary Related to the Review of Regarding the Updated Spent Fuel Pool Criticality Safety Analysis License Amendment Request ML24207A0342024-09-13013 September 2024 – Exemption from Certain Requirements of 10 CFR 50.46 for Use of Axiom Fuel Rod Cladding – Letter IR 05000250/20240052024-08-23023 August 2024 Updated Inspection Plan for Turkey Point Units 3 & 4 - Report 05000250/2024005 and 05000251/2024005 ML24234A0062024-08-22022 August 2024 Project Manager Assignment L-2024-106, Fifth and Sixth 10-Year Inservice Testing Interval Relief Request No. VR-022024-08-12012 August 2024 Fifth and Sixth 10-Year Inservice Testing Interval Relief Request No. VR-02 L-2024-122, Core Operating Limits Report2024-08-12012 August 2024 Core Operating Limits Report IR 05000250/20240112024-08-0606 August 2024 Comprehensive Engineering Team Inspection (CETI) Inspection Report 05000250/2024011 and 05000251/2024011 ML24163A0012024-08-0505 August 2024 LTR-24-0119-1-1 Response to Nh Letter Regarding Review of NextEras Emergency Preparedness Amendment Review L-2024-089, Notification of Deviation from Pressurized Water Owners Group (PWROG) Report WCAP- 17 451-P. Revision 1. Reactor Internals Guide Tube Wear - Westinghouse Domestic Fleet Operational Projections2024-07-25025 July 2024 Notification of Deviation from Pressurized Water Owners Group (PWROG) Report WCAP- 17 451-P. Revision 1. Reactor Internals Guide Tube Wear - Westinghouse Domestic Fleet Operational Projections L-2024-125, Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-07-24024 July 2024 Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes ML24184B2822024-07-16016 July 2024 – Request to Use a Later Code Edition and Addenda of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML24193A2432024-07-12012 July 2024 – Interim Audit Summary Report in Support of Review of License Amendment Requests Regarding Fleet Emergency Plan L-2024-114, Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal2024-07-10010 July 2024 Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal 05000250/LER-2024-002-01, Condition Prohibited by Technical Specifications2024-07-10010 July 2024 Condition Prohibited by Technical Specifications ML24173A1902024-06-28028 June 2024 Withdrawal of an Amendment Request ML24159A2652024-06-26026 June 2024 Correction of Safety Evaluation for Issuance of Amendment Nos. 298 & 291 Regarding Revising the Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project L-2024-102, Official Service List Update2024-06-19019 June 2024 Official Service List Update L-2024-100, Withdrawal of License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project2024-06-19019 June 2024 Withdrawal of License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project ML24149A2862024-06-12012 June 2024 NextEra Fleet - Proposed Alternative Frr 23-01 to Use ASME Code Case N-752-1, Risk-Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 and 3 Systems Section X1, Division 1 (EPID L-2023-LLR-0009) - Letter IR 05000250/20244012024-06-0505 June 2024 – Security Baseline Inspection Report 05000250-2024401, 05000251-2024401 and 07200062-2024401 L-2024-076, Reply to Notice of Violation; NOV 05000250, 05000251/2024010-052024-05-29029 May 2024 Reply to Notice of Violation; NOV 05000250, 05000251/2024010-05 L-2024-082, 2023 Annual Radiological Environmental Operating Report2024-05-15015 May 2024 2023 Annual Radiological Environmental Operating Report IR 05000250/20240012024-05-10010 May 2024 Integrated Inspection Report 05000250/2024001 and 05000251/2024001 ML24127A1862024-05-0909 May 2024 Request for Withholding Information from Public Disclosure ML24135A0942024-05-0909 May 2024 Periodic Update to the Updated Final Safety Analysis Report L-2024-060, 10 CFR 50.59(d)(2) Evaluation and 10 CFR 50.71(e)(2) Technical Specification Bases Summaries Report2024-05-0909 May 2024 10 CFR 50.59(d)(2) Evaluation and 10 CFR 50.71(e)(2) Technical Specification Bases Summaries Report ML24127A0632024-05-0606 May 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-072, Cycle 33 Core Operating Limits Report2024-05-0101 May 2024 Cycle 33 Core Operating Limits Report IR 05000250/20240102024-05-0101 May 2024 Design Basis Assurance Inspection Programs Inspection Report 05000250/2024010 and 05000251/2024010 and Notice of Violation L-2024-073, Cycle 34 Core Operating Limits Report2024-05-0101 May 2024 Cycle 34 Core Operating Limits Report L-2024-048, Divider Plate Assemblies Bounding Analysis Evaluation for Subsequent License Renewal Commitment Revision2024-04-30030 April 2024 Divider Plate Assemblies Bounding Analysis Evaluation for Subsequent License Renewal Commitment Revision L-2024-069, Radiological Emergency Plan Revision 762024-04-22022 April 2024 Radiological Emergency Plan Revision 76 L-2024-066, Sixth 10-Year Inservice Testing Interval Relief Request No. PR-022024-04-17017 April 2024 Sixth 10-Year Inservice Testing Interval Relief Request No. PR-02 05000250/LER-2024-002, 0 for Turkey Point, Unit 3 - Condition Prohibited by Technical Specifications2024-04-11011 April 2024 0 for Turkey Point, Unit 3 - Condition Prohibited by Technical Specifications ML24096A2142024-04-0505 April 2024 Ltr. to David Hill, Principal Chief, the Muscogee (Creek) Nation, Re., Section 106 Letters for Turkey Point 2024-09-25
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION uly 11, 2014
SUBJECT:
TURKEY POINT NUCLEAR PLANT - NRC MATERIAL CONTROL AND ACCOUNTING (MC&A) INSPECTION REPORT 05000250/2014405 AND 05000251/2014405
Dear Mr. Nazar:
On June 6, 2014, the US Nuclear Regulatory Commission (NRC) completed a security inspection at your Turkey Point Units 3 and 4. The enclosed inspection report documents the inspection results, which were discussed on July 2, 2014, with Mr. Kiley and other members of your staff. The material enclosed contains security related information as defined by 10 CFR 2.390(d)(1) and should be withheld from public disclosure.
The inspection examined activities conducted under your license, as they relate to material control and accountability, to confirm compliance with the commissions rules and regulations and the conditions of your license. Within these areas, the inspection consisted of selected examination of procedures and records, observations of activities, and interviews with personnel. The NRC inspectors did not identify any findings or violations of more than minor significance.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, the material enclosed herewith contains security related information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability.
Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAMS. If you choose to provide a response and security related information is necessary to provide an acceptable response, please mark your entire response Security Related Information - Withhold from Public Disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.
Sincerely,
/RA/
Daniel W. Rich, Chief Reactor Projects Branch 3 Division of Reactor Projects Docket Nos.: 50-250, 50-251 License Nos.: DPR-31, DPR-41 Enclosure: Inspection Report 05000250/2014405 and 05000251/2014405 w/Attachment: Supplemental Information (Security Related Information)
cc w/encl: See page 3 cc w/o encl distribution via ListServ _________________________ SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRP RII:DRP RII:DRP RII:DRP RII:DRP SIGNATURE Via email Via email MJR /RA/ MJR /RA for/ DWR /RA/
NAME THoeg MEndress MRiches SSandal DRich DATE 7/10/2014 7/10/2014 7/10/2014 7/10/2014 7/11/2014 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO cc w/Encls:
Mano Nazar NextEra Energy P. O. Box 14000 Juno Beach, FL 33408-0420 Michael Kiley - Site VP Turkey Point Nuclear Generating Station Florida Power & Light Company 9760 SW 344th Street Florida City, FL 33035 Don Grissette General Manager Organizational Support Florida Power & Light Co.
P. O. Box 14000 Juno Beach, FL 33408-0420 Anthony Silakoski Nuclear Fleet Security Florida Power & Light Compay 700 Universe Boulevard Juno Beach, FL 33408-0420 Timothy Eck, Site Security Manager Turkey Point Nuclear Generating Station Florida Power & Light Company 9760 SW 344th Street Florida City, FL 33035 Robert J. Tomonto, Licensing Manager Turkey Point Nuclear Plant Florida Power & Light Company 9760 SW 344th Street Florida City, FL 33035 Timothy Eck, Site Security Manager Turkey Point Nuclear Generating Station Florida Power & Light Company 9760 SW 344th Street Florida City, FL 33035 Letter to Mano Nazar from Daniel W. Rich dated July 11, 2014.
SUBJECT: TURKEY POINT NUCLEAR PLANT - NRC MATERIAL CONTROL AND ACCOUNTING (MC&A) INSPECTION REPORT 05000250/2014405 AND 05000251/2014405 Distribution:
RidsNrrPMTurkeyPoint Resource L. Douglas, RII D. Gamberoni, RII B. Westreich, NSIR E. McNiel, NSIR RIDSNRRDIRS OE Mail PUBLIC