IR 05000250/2014403
| ML14267A468 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 09/24/2014 |
| From: | Binoy Desai NRC/RGN-II/DRS/PSB2 |
| To: | Nazar M Nextera Energy |
| Linda K. Gruhler 404-997-4633 | |
| References | |
| IR 2014403 | |
| Download: ML14267A468 (4) | |
Text
September 24, 2014
SUBJECT:
TURKEY POINT NUCLEAR PLANT - U.S. NUCLEAR REGULATORY
COMMISSION SECURITY INSPECTION REPORT 05000250/2014403
AND 05000251/2014403
Dear Mr. Nazar:
On August 28, 2014, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Turkey Point Nuclear Plant, Units 3 and 4. The NRC inspectors discussed the results of this inspection with Mr. M. Kiley, who attended the exit meeting, and other members of your staff. The inspectors documented the inspection results of this inspection in the enclosed inspection report.
No NRC-identified or self-revealing finding was identified during this inspection.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public inspections, exemptions, requests for withholdings, of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room, or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS); accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
However, the material enclosed herein contains Security-Related Information in accordance with 10 CFR 2.390(d)(1), and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the Enclosure will not be made available electronically for public inspection in the NRC Public Document Room, or from the PARS component of NRCs ADAMS. If you choose to provide a response and Security-Related Information is necessary to provide an acceptable response, please mark your entire response Security-Related Information - Withhold from public disclosure under 10 CFR 2.390, in accordance with CFR 2.390(d)(1), and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.
Sincerely,
/RA/
Binoy Desai, Chief Plant Support Branch 2 Division of Reactor Safety
Docket Nos. 50-250 and 50-251 License Nos. DPR-31 and DRP-41
Enclosure:
NRC IR 05000250/2014403 and 05000251/2014403 w/Attachment: Supplementary Information (OUO)
cc: (See page 3)
SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRS/PSB2 RII:DRS/PSB2 RII:DRS/PSB2 RII:DRP/BR3 RII:DRS/PSB2
SIGNATURE KXD via e-mail JHW2 for JPT JHW2 DED BBD
NAME K.Davis J. Tornow J.Wallo D. Dumbacher B.Desai
DATE 9/ 22 /2014 9/ 24 /2014 9/ 24 /2014 9/ 23 /2014 9/ 24 /20104
E-MAIL COPY YES NO YES NO YES NO YES NO YES NO cc:
Anthony Silakoski Nuclear Fleet Security Florida Power & Light Company 700 Universe Bloulevard Juno Beach, FL 334089-0420
Robert J. Tomonto Licensing Manager Turkey Point Nuclear Plant Florida Power & Light Company 9760 SW 344th Street Florida City, FL 33035
Timothy Eck Site Security Manager Turkey Point Nuclear Plant Florida Pwer & Light Company 9760 SW 344th Street Florida City, FL 33035