IR 05000250/2014405: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(2 intermediate revisions by the same user not shown) | |||
Line 3: | Line 3: | ||
| issue date = 07/11/2014 | | issue date = 07/11/2014 | ||
| title = Material Control and Accounting Inspection Report 05000250/2014405 and 05000251/2014405 | | title = Material Control and Accounting Inspection Report 05000250/2014405 and 05000251/2014405 | ||
| author name = Rich D | | author name = Rich D | ||
| author affiliation = NRC/RGN-II/DRP/RPB3 | | author affiliation = NRC/RGN-II/DRP/RPB3 | ||
| addressee name = Nazar M | | addressee name = Nazar M | ||
| addressee affiliation = Florida Power & Light Co | | addressee affiliation = Florida Power & Light Co | ||
| docket = 05000250, 05000251 | | docket = 05000250, 05000251 | ||
Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION uly 11, 2014 | ||
SUBJECT: TURKEY POINT NUCLEAR PLANT - NRC MATERIAL CONTROL AND ACCOUNTING (MC&A) INSPECTION REPORT 05000250/2014405 AND | ==SUBJECT:== | ||
TURKEY POINT NUCLEAR PLANT - NRC MATERIAL CONTROL AND ACCOUNTING (MC&A) INSPECTION REPORT 05000250/2014405 AND 05000251/2014405 | |||
05000251/2014405 | |||
==Dear Mr. Nazar:== | ==Dear Mr. Nazar:== | ||
On June 6, 2014, the US Nuclear Regulatory Commission (NRC) completed a security inspection at your Turkey Point Units 3 and 4. The enclosed inspection report documents the inspection results, which were discussed on July 2, 2014, with Mr. Kiley and other members of your staff. The material enclosed contains security related information as defined by 10 CFR 2.390(d)(1) and should be withheld from public disclosure. | On June 6, 2014, the US Nuclear Regulatory Commission (NRC) completed a security inspection at your Turkey Point Units 3 and 4. The enclosed inspection report documents the inspection results, which were discussed on July 2, 2014, with Mr. Kiley and other members of your staff. The material enclosed contains security related information as defined by 10 CFR 2.390(d)(1) and should be withheld from public disclosure. | ||
The inspection examined activities conducted under your license, as they relate to material control and accountability, to confirm compliance with the | The inspection examined activities conducted under your license, as they relate to material control and accountability, to confirm compliance with the commissions rules and regulations and the conditions of your license. Within these areas, the inspection consisted of selected examination of procedures and records, observations of activities, and interviews with personnel. The NRC inspectors did not identify any findings or violations of more than minor significance. | ||
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, | In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, the material enclosed herewith contains security related information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. | ||
of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, the material enclosed herewith contains security related information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. | |||
Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAMS. If you choose to provide a response and security related information is necessary to provide an acceptable response, please mark your entire response | Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAMS. If you choose to provide a response and security related information is necessary to provide an acceptable response, please mark your entire response Security Related Information - Withhold from Public Disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response. | ||
Sincerely, | Sincerely, | ||
/RA/ Daniel W. Rich, Chief Reactor Projects Branch 3 Division of Reactor Projects | /RA/ | ||
Daniel W. Rich, Chief Reactor Projects Branch 3 Division of Reactor Projects Docket Nos.: 50-250, 50-251 License Nos.: DPR-31, DPR-41 Enclosure: Inspection Report 05000250/2014405 and 05000251/2014405 w/Attachment: Supplemental Information (Security Related Information) | |||
Docket Nos.: 50-250, 50-251 License Nos.: DPR-31, DPR-41 Enclosure: Inspection Report 05000250/2014405 and 05000251/2014405 w/Attachment: Supplemental Information (Security Related Information) | cc w/encl: See page 3 cc w/o encl distribution via ListServ _________________________ SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRP RII:DRP RII:DRP RII:DRP RII:DRP SIGNATURE Via email Via email MJR /RA/ MJR /RA for/ DWR /RA/ | ||
cc w/encl: See page 3 cc w/o encl distribution via ListServ | NAME THoeg MEndress MRiches SSandal DRich DATE 7/10/2014 7/10/2014 7/10/2014 7/10/2014 7/11/2014 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO cc w/Encls: | ||
Mano Nazar NextEra Energy P. O. Box 14000 Juno Beach, FL 33408-0420 Michael Kiley - Site VP Turkey Point Nuclear Generating Station Florida Power & Light Company 9760 SW 344th Street Florida City, FL 33035 Don Grissette General Manager Organizational Support Florida Power & Light Co. | |||
_________________________ SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRP RII:DRP RII:DRP RII:DRP RII:DRP SIGNATURE Via email Via email MJR /RA/ MJR /RA for/ DWR /RA/ NAME THoeg MEndress MRiches SSandal DRich DATE 7/10/2014 7/10/2014 7/10/2014 7/10/2014 7/11/2014 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO cc w/Encls: | |||
Mano Nazar NextEra Energy P. O. Box 14000 Juno Beach, FL 33408-0420 Michael Kiley - Site VP | |||
Turkey Point Nuclear Generating Station | |||
Florida Power & Light Company | |||
9760 SW 344th Street Florida City, FL 33035 | |||
Don Grissette General Manager Organizational Support | |||
Florida Power & Light Co | |||
P. O. Box 14000 Juno Beach, FL 33408-0420 Anthony Silakoski Nuclear Fleet Security Florida Power & Light Compay 700 Universe Boulevard Juno Beach, FL 33408-0420 Timothy Eck, Site Security Manager Turkey Point Nuclear Generating Station Florida Power & Light Company 9760 SW 344th Street Florida City, FL 33035 Robert J. Tomonto, Licensing Manager Turkey Point Nuclear Plant Florida Power & Light Company 9760 SW 344th Street Florida City, FL 33035 Timothy Eck, Site Security Manager Turkey Point Nuclear Generating Station Florida Power & Light Company 9760 SW 344th Street Florida City, FL 33035 Letter to Mano Nazar from Daniel W. Rich dated July 11, 2014. | |||
05000251/2014405 Distribution: | SUBJECT: TURKEY POINT NUCLEAR PLANT - NRC MATERIAL CONTROL AND ACCOUNTING (MC&A) INSPECTION REPORT 05000250/2014405 AND 05000251/2014405 Distribution: | ||
RidsNrrPMTurkeyPoint Resource L. Douglas, RII D. Gamberoni, RII B. Westreich, NSIR E. McNiel, NSIR RIDSNRRDIRS OE Mail PUBLIC | RidsNrrPMTurkeyPoint Resource L. Douglas, RII D. Gamberoni, RII B. Westreich, NSIR E. McNiel, NSIR RIDSNRRDIRS OE Mail PUBLIC | ||
}} | }} |
Latest revision as of 02:30, 4 November 2019
ML14192B324 | |
Person / Time | |
---|---|
Site: | Turkey Point |
Issue date: | 07/11/2014 |
From: | Rich D NRC/RGN-II/DRP/RPB3 |
To: | Nazar M Florida Power & Light Co |
References | |
IR-14-405 | |
Download: ML14192B324 (5) | |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION uly 11, 2014
SUBJECT:
TURKEY POINT NUCLEAR PLANT - NRC MATERIAL CONTROL AND ACCOUNTING (MC&A) INSPECTION REPORT 05000250/2014405 AND 05000251/2014405
Dear Mr. Nazar:
On June 6, 2014, the US Nuclear Regulatory Commission (NRC) completed a security inspection at your Turkey Point Units 3 and 4. The enclosed inspection report documents the inspection results, which were discussed on July 2, 2014, with Mr. Kiley and other members of your staff. The material enclosed contains security related information as defined by 10 CFR 2.390(d)(1) and should be withheld from public disclosure.
The inspection examined activities conducted under your license, as they relate to material control and accountability, to confirm compliance with the commissions rules and regulations and the conditions of your license. Within these areas, the inspection consisted of selected examination of procedures and records, observations of activities, and interviews with personnel. The NRC inspectors did not identify any findings or violations of more than minor significance.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, the material enclosed herewith contains security related information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability.
Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAMS. If you choose to provide a response and security related information is necessary to provide an acceptable response, please mark your entire response Security Related Information - Withhold from Public Disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.
Sincerely,
/RA/
Daniel W. Rich, Chief Reactor Projects Branch 3 Division of Reactor Projects Docket Nos.: 50-250, 50-251 License Nos.: DPR-31, DPR-41 Enclosure: Inspection Report 05000250/2014405 and 05000251/2014405 w/Attachment: Supplemental Information (Security Related Information)
cc w/encl: See page 3 cc w/o encl distribution via ListServ _________________________ SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRP RII:DRP RII:DRP RII:DRP RII:DRP SIGNATURE Via email Via email MJR /RA/ MJR /RA for/ DWR /RA/
NAME THoeg MEndress MRiches SSandal DRich DATE 7/10/2014 7/10/2014 7/10/2014 7/10/2014 7/11/2014 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO cc w/Encls:
Mano Nazar NextEra Energy P. O. Box 14000 Juno Beach, FL 33408-0420 Michael Kiley - Site VP Turkey Point Nuclear Generating Station Florida Power & Light Company 9760 SW 344th Street Florida City, FL 33035 Don Grissette General Manager Organizational Support Florida Power & Light Co.
P. O. Box 14000 Juno Beach, FL 33408-0420 Anthony Silakoski Nuclear Fleet Security Florida Power & Light Compay 700 Universe Boulevard Juno Beach, FL 33408-0420 Timothy Eck, Site Security Manager Turkey Point Nuclear Generating Station Florida Power & Light Company 9760 SW 344th Street Florida City, FL 33035 Robert J. Tomonto, Licensing Manager Turkey Point Nuclear Plant Florida Power & Light Company 9760 SW 344th Street Florida City, FL 33035 Timothy Eck, Site Security Manager Turkey Point Nuclear Generating Station Florida Power & Light Company 9760 SW 344th Street Florida City, FL 33035 Letter to Mano Nazar from Daniel W. Rich dated July 11, 2014.
SUBJECT: TURKEY POINT NUCLEAR PLANT - NRC MATERIAL CONTROL AND ACCOUNTING (MC&A) INSPECTION REPORT 05000250/2014405 AND 05000251/2014405 Distribution:
RidsNrrPMTurkeyPoint Resource L. Douglas, RII D. Gamberoni, RII B. Westreich, NSIR E. McNiel, NSIR RIDSNRRDIRS OE Mail PUBLIC