ML14246A210: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(3 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML14246A210
| number = ML14246A210
| issue date = 08/28/2014
| issue date = 08/28/2014
| title = Palo Verde, Units 1, 2, and 3, Third 6-Month Status Report on the Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Level Instrumentation (Order Number EA-12-05
| title = Third 6-Month Status Report on the Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Level Instrumentation (Order Number EA-12-051)
| author name = Mims D C
| author name = Mims D
| author affiliation = Arizona Public Service Co
| author affiliation = Arizona Public Service Co
| addressee name =  
| addressee name =  
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:EA-12-051 DWIGHT C. MIMS Senior Vice President, Nuclear Regulatory  
{{#Wiki_filter:EA-12-051 DWIGHT C. MIMS Senior Vice President, Nuclear Regulatory & Oversight Palo Verde Nuclear Generating Station 102-06933-DCM/MAM/PJH                                                           P.O. Box 52034 August 28, 2014                                                                 Phoenix, AZ 85072 Mail Station 7605 Tel 623 393 5403 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk 11555 Rockville Pike Rockville, MD 20852
& Oversight Palo Verde Nuclear Generating Station 102-06933-DCM/MAM/PJH P.O. Box 52034 August 28, 2014 Phoenix, AZ 85072 Mail Station 7605 Tel 623 393 5403 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk 11555 Rockville Pike Rockville, MD 20852  


==Dear Sirs:==
==Dear Sirs:==


==Subject:==
==Subject:==
Palo Verde Nuclear Generating Station (PVNGS)Units 1, 2, and 3 Docket Nos. STN 50-528, 50-529, and 50-530 APS Third 6-Month Status Report on the PVNGS Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Level Instrumentation (Order Number EA-12-051)
Palo Verde Nuclear Generating Station (PVNGS)
On March 12, 2012, the Nuclear Regulatory Commission (NRC) issued an order (Reference  
Units 1, 2, and 3 Docket Nos. STN 50-528, 50-529, and 50-530 APS Third 6-Month Status Report on the PVNGS Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Level Instrumentation (Order Number EA-12-051)
: 1) to Arizona Public Service Company (APS). Reference 1 was immediately effective and directed that PVNGS must have a reliable means of remotely monitoring wide-range spent fuel pool (SFP) levels to support effective prioritization of event mitigation and recovery actions in the event of a beyond-design-basis external event. Specific requirements are outlined in Attachment 2 of Reference 1.Reference 1 required submission of an initial status report 60 days following issuance of the final interim staff guidance and an overall integrated plan (OIP) pursuant to Section IV, Condition C. Reference 2 provided the APS initial status report regarding reliable SFP level instrumentation.
On March 12, 2012, the Nuclear Regulatory Commission (NRC) issued an order (Reference 1) to Arizona Public Service Company (APS). Reference 1 was immediately effective and directed that PVNGS must have a reliable means of remotely monitoring wide-range spent fuel pool (SFP) levels to support effective prioritization of event mitigation and recovery actions in the event of a beyond-design-basis external event. Specific requirements are outlined in Attachment 2 of Reference 1.
In Reference 3, APS provided the PVNGS OIP.After reviewing the PVNGS OIP for SFP Level Instrumentation, the NRC issued a request for additional information RA T) to APS (Reference 4). On July 11, 2013, APS provided a response to the NRC RAI regarding the PVNGS OIP for SFP Level Instrumentation (Reference 5).Reference 1 also requires submission of a status report at 6-month intervals following submittal of the OIP. NEI 12-02, Industry Guidance for Compliance with NRC Order EA-12-051, To Modify Licenses with Regard to Reliable Spent Fuel Pool Instrumentation, Revision 1, provides direction regarding the content of the status reports.Reference 6 provided the APS First 6-Month status report on the PVNGS OIP for SFP Level Instrumentation pursuant to Section IV, Condition C.2, of Reference 1.Reference 8 provided the APS Second 6-Month status report.A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway -Comanche Peek -Diablo Canyon -Palo Verde -Wolf Creek 102-06933-DCM/MAM/PJH ATTN: Document Control Desk U.S. Nuclear Regulatory Commission APS Third 6-Month Status Report on the Overall Integrated Plan for Spent Fuel Pool Level Instrumentation Page 2 The NRC issued the Interim Staff Evaluation and RAI on the PVNGS OIP on October 29, 2013 (Reference 7).The enciosure to this letter provides the Third 6-Month status report on the PVNGS OIP for SFP level instrumentation.
Reference 1 required submission of an initial status report 60 days following issuance of the final interim staff guidance and an overall integrated plan (OIP) pursuant to Section IV, Condition C. Reference 2 provided the APS initial status report regarding reliable SFP level instrumentation. In Reference 3, APS provided the PVNGS OIP.
No commitments are being made to the NRC by this letter.Should you have any questions concerning the content of this letter, please contact Mark McGhee, Department Leader, Regulatory Affairs, at (623) 393-4972.I declare under penalty of perjury that the foregoing is true and correct.Executed on (Date)Sincerely, DCM/MAM/PJH/hsc
After reviewing the PVNGS OIP for SFP Level Instrumentation, the NRC issued a request for additional information RA T) to APS (Reference 4). On July 11, 2013, APS provided a response to the NRC RAI regarding the PVNGS OIP for SFP Level Instrumentation (Reference 5).
Reference 1 also requires submission of a status report at 6-month intervals following submittal of the OIP. NEI 12-02, Industry Guidance for Compliance with NRC Order EA-12-051, To Modify Licenses with Regard to Reliable Spent Fuel Pool Instrumentation, Revision 1, provides direction regarding the content of the status reports.
Reference 6 provided the APS First 6-Month status report on the PVNGS OIP for SFP Level Instrumentation pursuant to Section IV, Condition C.2, of Reference 1.
Reference 8 provided the APS Second 6-Month status report.
A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway -Comanche Peek - Diablo Canyon - Palo Verde - Wolf Creek
 
102-06933-DCM/MAM/PJH ATTN: Document Control Desk U.S. Nuclear Regulatory Commission APS Third 6-Month Status Report on the Overall Integrated Plan for Spent Fuel Pool Level Instrumentation Page 2 The NRC issued the Interim Staff Evaluation and RAI on the PVNGS OIP on October 29, 2013 (Reference 7).
The enciosure to this letter provides the Third 6-Month status report on the PVNGS OIP for SFP level instrumentation.
No commitments are being made to the NRC by this letter.
Should you have any questions concerning the content of this letter, please contact Mark McGhee, Department Leader, Regulatory Affairs, at (623) 393-4972.
I declare under penalty of perjury that the foregoing is true and correct.
Executed on (Date)
Sincerely, DCM/MAM/PJH/hsc


==Enclosure:==
==Enclosure:==
APS Third 6-Month Status Report on the Overall Integrated Plan for Spent Fuel Pool Level Instrumentation cc:    W. M. Dean              NRC Director Office of Nuclear Reactor Regulation M. L. Dapas            NRC Region IV Regional Administrator B. K. Singal            NRC NRR Project Manager for PVNGS M. M. Watford          NRC NRR Project Manager M. A. Brown            NRC Senior Resident Inspector PVNGS L. M. Regner            NRC NRR/JLD/JPMB Project Manager
==References:==
: 1. NRC Order Number EA-12-051, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Level Instrumentation, dated March 12, 2012
: 2. APS Letter 102-06613, Initial Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Level Instrumentation (Order Number EA-12-051), dated October 29, 2012


APS Third 6-Month Status Report on the Overall Integrated Plan for Spent Fuel Pool Level Instrumentation cc: W. M. Dean M. L. Dapas B. K. Singal M. M. Watford M. A. Brown L. M. Regner NRC Director Office of Nuclear Reactor Regulation NRC Region IV Regional Administrator NRC NRR Project Manager for PVNGS NRC NRR Project Manager NRC Senior Resident Inspector PVNGS NRC NRR/JLD/JPMB Project Manager
102-06933-DCM/MAM/PJH ATTN: Document Control Desk U.S. Nuclear Regulatory Commission APS Third 6-Month Status Report on the Overall Integrated Plan for Spent Fuel Pool Level Instrumentation Page 3
: 3. APS Letter 102-06669, APS Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Level Instrumentation (Order Number EA-12-051), dated February 28, 2013
: 4. NRC letter, Palo Verde Nuclear Generating Station, Units 1, 2, and 3 - Request for Additional Information Regarding Overail integrated Plan in Response to Order EA-12-051, "Reliable Spent Fuel Pool Instrumentation," dated June 10, 2013
: 5. APS Letter 102-06728, Response to Request for Additional Information for the PVNGS Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Level Instrumentation (Order Number EA-12-051), dated July 11, 2013
: 6. APS Letter 102-06759, APS First 6-Month Status Report on the PVNGS Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Level Instrumentation (Order Number EA-12-051),
dated August 28, 2013
: 7. NRC Letter, Interim Staff Evaluation and Request for Additional information Regarding Order EA-12-051 Reliable Spent Fuel Pool Instrumentation, dated October 29, 2013
: 8. APS Letter 102-06841, APS Second 6-Month Status Report on the PVNGS Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Level Instrumentation (Order Number EA-12-051),
dated February 28, 2014


==References:==
ENCLOSURE APS Third 6-Month Status Report on the Overall Integrated Plan for Spent Fuel Pool Level Instrumentation
: 1. NRC Order Number EA-12-051, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Level Instrumentation, dated March 12, 2012 2. APS Letter 102-06613, Initial Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Level Instrumentation (Order Number EA-12-051), dated October 29, 2012 102-06933-DCM/MAM/PJH ATTN: Document Control Desk U.S. Nuclear Regulatory Commission APS Third 6-Month Status Report on the Overall Integrated Plan for Spent Fuel Pool Level Instrumentation Page 3 3. APS Letter 102-06669, APS Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Level Instrumentation (Order Number EA-12-051), dated February 28, 2013 4. NRC letter, Palo Verde Nuclear Generating Station, Units 1, 2, and 3 -Request for Additional Information Regarding Overail integrated Plan in Response to Order EA-12-051, "Reliable Spent Fuel Pool Instrumentation," dated June 10, 2013 5. APS Letter 102-06728, Response to Request for Additional Information for the PVNGS Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Level Instrumentation (Order Number EA-12-051), dated July 11, 2013 6. APS Letter 102-06759, APS First 6-Month Status Report on the PVNGS Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Level Instrumentation (Order Number EA-12-051), dated August 28, 2013 7. NRC Letter, Interim Staff Evaluation and Request for Additional information Regarding Order EA-12-051 Reliable Spent Fuel Pool Instrumentation, dated October 29, 2013 8. APS Letter 102-06841, APS Second 6-Month Status Report on the PVNGS Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Level Instrumentation (Order Number EA-12-051), dated February 28, 2014 ENCLOSURE APS Third 6-Month Status Report on the Overall Integrated Plan for Spent Fuel Pool Level Instrumentation APS Third 6-Month Status Report on the Overall Integrated Plan for Spent Fuel Pool Level Instrumentation 1 Introduction Arizona Public Service (APS) developed an Overall Integrated Plan (OIP) (Reference 2 in Section 8), documenting the requirements to install reliable spent fuel pool level instrumentation (SFP LI), in response to Reference
 
: 1. This enclosure provides an update of milestone accomplishments since submittal of the OIP, including any changes to the compliance method, schedule, or need for relief or relaxation and the basis for such changes, if any.2 Milestone Accomplishments The following milestone(s) have been completed since the development of the 01P, and are current as of August 10, 2014: Engineering and design work for Palo Verde Nuclear Generating Station (PVNGS)Units 1, 2, and 3 has been completed.
APS Third 6-Month Status Report on the Overall Integrated Plan for Spent Fuel Pool Level Instrumentation 1 Introduction Arizona Public Service (APS) developed an Overall Integrated Plan (OIP) (Reference 2 in Section 8), documenting the requirements to install reliable spent fuel pool level instrumentation (SFP LI), in response to Reference 1. This enclosure provides an update of milestone accomplishments since submittal of the OIP, including any changes to the compliance method, schedule, or need for relief or relaxation and the basis for such changes, if any.
Installation work is ongoing and scheduled for completion in October 2014 for Unit 1 (see the Section 3 Milestone Schedule Status Table for Units 2 & 3).3 Milestone Schedule Status The following table provides an update to the milestone schedule in support of implementation of the OIP. This section provides the activity status of each item and whether the expected completion date has changed. The provided dates are for planning purposes and subject to change as design and implementation details are developed.
2 Milestone Accomplishments The following milestone(s) have been completed since the development of the 01P, and are current as of August 10, 2014:
Additional changes in. target completion dates will be noted in future 6-month status reports.The Milestone Schedule Status Table below lists the design status of the modifications by project identification number and design modification work order (DMWO) package numbers.g t Revised M s Target Activity Target Milestone DCompletion Status Completion Date Date Submit 60 Day Status Report Oct 2012 Completi Submit Overall Integrated Plan Feb 2013 Complete Submit 6 Month Updates: _Update 1 Aug 2013 Complete Aug 2013 Update 2 Feb 2014 Complete Feb 2014 Update 3 Aug 2014 Complete Aug 2014'Update 4 Feb 2015 Not Started Update 5 Aug 2015 Not Started Update 6 Feb 2016 Not Started Update 7 Aug 2016 Not Started 1 APS Third 6-Month Status Report on the Overall Integrated Plan for Spent Fuel Pool Level Instrumentation Target Revised Tilestone Completion Activity Target M tC e Status Completion Date Date Modifications:
Engineering and design work for Palo Verde Nuclear Generating Station (PVNGS)
Modifications Evaluation Feb 2013 Complete Units 1, 2, and 3 Engineering and 4Q2013 Complete 2Q2014 Design Work 1. PC-1631 Spent Fuel Pool Remote Level Instrumentation Apr 2014 Complete (DMWO 4304155)2. PC-1639 Spent Fuel Pool Remote Pool Level Electrical Apr 2014 Complete Power (DMWO 4345889)Receipt of Unit 1 SFP Instruments 2Q2014 Complete Receipt of Unit 2 SFP Instruments 2Q2015 Not Started 4Q2014 Receipt of Unit 3 SFP Instruments 4Q2014 Not Started 4Q2014 Unit 1 Implementation Online Fall 2014 Started Unit 2 Implementation Online Fall 2015 Not Started Unit 3 Implementation Online Spring 2015 Not Started Procedures:
Units 1, 2, and 3 has been completed. Installation work is ongoing and scheduled for completion in October 2014 for Unit 1 (see the Section 3 Milestone Schedule Status Table for Units 2 & 3).
Create Procedures 2  Oct 2014 Started Training: Develop Training Plan Apr 2014 Complete Issue Unit 1 SFP Instruments Procedures
3 Milestone Schedule Status The following table provides an update to the milestone schedule in support of implementation of the OIP. This section provides the activity status of each item and whether the expected completion date has changed. The provided dates are for planning purposes and subject to change as design and implementation details are developed.
& Complete Training 3Q2014 Started Nov 2014 Issue Unit 2 SFP Instruments Procedures
Additional changes in. target completion dates will be noted in future 6-month status reports.
& Complete Training 3Q2015 Not Started Issue Unit 3 SFP Instruments Procedures
The Milestone Schedule Status Table below lists the design status of the modifications by project identification number and design modification work order (DMWO) package numbers.
& Complete Training 1Q2015 Not Started Unit 1 SFP Instruments Operational Nov 20143 Started Unit 2 SFP Instruments Operational Nov 2015" Not Started Unit 3 SFP Instruments Operational May 20153 Not Started Full Site SFP LI Implementation Dec 2015 Not Started Submit Completion Report Apr 2016 Not Started The Third 6-Month update is complete with this submittal.
g t                  Revised Ms Target              Activity          Target Milestone                      DCompletion      Status        Completion Date                                Date Submit 60 Day Status Report               Oct 2012          Completi Submit Overall Integrated Plan             Feb 2013          Complete Submit 6 Month Updates:                _
The milestone schedule dates in Attachment 2 of the Order required updating as described in Section 3.2 Includes maintenance procedures 3 Implementation for Unit 1 is prior to startup from 1R18 (Fall 2014), Unit 2 is prior to startup from 2R19 (Fall 2015), and Unit 3 is prior to startup from 3R18 (Spring 2015).4 Changes to Compliance Method There are no changes to the compliance method as documented in the OIP.2 APS Third 6-Month Status Report on the Overall Integrated Plan for Spent Fuel Pool Level Instrumentation 5 Need for Relief/Relaxation and Basis for the Relief/Relaxation APS expects to comply with the order implementation date and no relief or relaxation is requested at this time.6 Open Items from Overall Integrated Plan and Interim Staff Evaluation The following tables provide a summary of the open items documented in the OIP and the Interim Staff Evaluation (ISE) and the status of each item.Overall Intelrated Plan Open Item Status Oil- Reference 1, Section VII, Arrangement, finalize Complete primary and backup system probe locations for all three SFPs. Probe locations have been finalized.
Update 1                               Aug 2013          Complete        Aug 2013 Update 2                               Feb 2014          Complete          Feb 2014 Update 3                                Aug 2014          Complete        Aug 2014' Update 4                                Feb 2015          Not Started Update 5                                Aug 2015          Not Started Update 6                                Feb 2016          Not Started Update 7                                Aug 2016          Not Started 1
Final locations are selected based on guidance provided in Reference 3.Detailed engineering and design work is documented in DMWO L_ 4304155.Interim Staff Evaluation Requests for Additional Status Information (RAIs)l RAI #1 Complete Please provide the following:
 
APS response has been provided for NRC review in the STARS a) A description of how the other structures in the Alliance website e-portal.vicinity of the SFPs (cask loading pit, transfer canals and gates) shown in Figure 2, "Spent Fuel Pool Geometry and Dimensions" are connected to the SFPs.b) If additional structures, other than the SFPs in each unit, are used for fuel storage, describe in detail their usage, operation, and provide justifications for not installing separate level instrumentation in other structures used for fuel storage.RAI #2 Complete Please provide your plant-specific performance APS response has been provided evaluation result and a brief summary of the proposed for NRC review in the STARS wireless technology that will be used in the primary Alliance website e-portal.and backup measurement systems to address the 3 APS Third 6-Month Status Report on the Overall Integrated Plan for Spent Fuel Pool Level Instrumentation Interim Staff Evaluation Requests for Additional Status Information (RAIs)S criteria summarized in Section 3.1 of NEI 12-02.RAI #3 Complete Please provide the following:
APS Third 6-Month Status Report on the Overall Integrated Plan for Spent Fuel Pool Level Instrumentation Target                          Revised Completion Tilestone      Activity          Target M tC e          Status        Completion Date                            Date Modifications:
APS response has been provided for NRC review in the STARS a) The final locations/placement of the primary and Alliance website e-portal.back-up SFP level sensor.b) Additional information describing how the proposed arrangement of the sensor probe assembly and routing of the cabling between the sensor probe assembly and the electronics in the Auxiliary Building meets the Order requirement to arrange the SFP level instrument channels in a manner that provides reasonable protection of the level indication function against missiles that may result from damage to the structure over the SFP.RAI #4 Complete Please provide the analyses verifying that the seismic APS response has been provided testing of the sensor probe assembly and the for NRC review in the STARS electronics units, and the licensee's analysis of the Alliance website e-portal.combined maximum seismic and hydrodynamic forces on the sensor probe assembly exposed to the potential sloshing effects, show that the SFP instrument design configuration will be maintained during and following the maximum seismic ground motion considered in the design of the SFP structure.
Modifications Evaluation                Feb 2013        Complete Units 1, 2, and 3 Engineering and        4Q2013          Complete          2Q2014 Design Work
RAI #5 Complete For each of the mounting attachments required to APS response has been provided attach SFP Level equipment to plant structures, for NRC review in the STARS please describe the design inputs, and the Alliance website e-portal.methodology that was used to qualify the structural integrity of the affected structures/equipment.
: 1. PC-1631 Spent Fuel Pool Remote Level Instrumentation          Apr 2014         Complete (DMWO 4304155)
RAI #6 Complete Please provide analysis of the maximum expected APS response has been provided radiological conditions (dose rate and total integrated for NRC review in the STARS dose) to which the equipment located within the Alliance website e-portal.control building or AB will be exposed. Also, please 4 APS Third 6-Month Status Report on the Overall Integrated Plan for Spent Fuel Pool Level Instrumentation Interim Staff Evaluation Requests for Additional Status Information (RAIs)1 Status provide documentation indicating the radiological dosage amount that the electronics for this equipment is capable of withstanding.
: 2. PC-1639 Spent Fuel Pool Remote Pool Level Electrical          Apr 2014        Complete Power (DMWO 4345889)
Please discuss the time period over which the analyzed total integrated dose was applied.RAI #7 Complete Please provide information indicating a) the APS response has been provided temperature ratings for all system electronics for NRC review in the STARS (including sensor electronics, system electronics, Alliance website e-portal.transmitter, receiver and display) and whether the ratings are continuous duty ratings; and, b) what will be the maximum expected temperature and relative humidity conditions in the room(s) in which the sensor electronics will be located under BDB conditions in which there will be no ac power available to run Heating Ventilation and Air Conditioning (HVAC) systems.RAI #8 Complete Please provide the following:
Receipt of Unit 1 SFP Instruments          2Q2014          Complete Receipt of Unit 2 SFP Instruments          2Q2015        Not Started        4Q2014 Receipt of Unit 3 SFP Instruments          4Q2014        Not Started        4Q2014 Unit 1 Implementation Online              Fall 2014          Started Unit 2 Implementation Online              Fall 2015      Not Started Unit 3 Implementation Online            Spring 2015      Not Started Procedures:
APS response has been provided for NRC review in the STARS a) information describing the evaluation of the sensor Alliance website e-portal.electronics design, the shock test method, test results, and forces applied to the sensor electronics applicable to its successful tests demonstrating that the testing provides an appropriate means to demonstrate reliability of the sensor electronics under the effects of severe shock.b) information describing the evaluation of the sensor electronics design, the vibration test method, test results, the forces and their frequency ranges and directions applied to the sensor applicable to its successful tests, demonstrating that the testing provides an appropriate means to demonstrate reliability of the sensor electronics under the effects of high vibration.
Create Procedures 2                      Oct 2014          Started Training:
RAI #9 Complete Please provide analysis of the seismic testing results APS response has been provided and show that the instrument performance reliability, for NRC review in the STARS following exposure to simulated seismic conditions Alliance website e-portal.representative of the environment anticipated for the 5 APS Third 6-Month Status Report on the Overall Integrated Plan for Spent Fuel Pool Level Instrumentation Interim Staff Evaluation Requests for Additional Status Information (RAIs)1 SFP structures at Palo Verde, has been adequately demonstrated.
Develop Training Plan                    Apr 2014        Complete Issue Unit 1 SFP Instruments Procedures & Complete Training            3Q2014            Started        Nov 2014 Issue Unit 2 SFP Instruments Procedures & Complete Training            3Q2015        Not Started Issue Unit 3 SFP Instruments Procedures & Complete Training            1Q2015        Not Started Unit 1 SFP Instruments Operational          Nov 20143          Started Unit 2 SFP Instruments Operational          Nov 2015"        Not Started Unit 3 SFP Instruments Operational          May 20153        Not Started Full Site SFP LI Implementation              Dec 2015        Not Started Submit Completion Report                    Apr 2016       Not Started The Third 6-Month update is complete with this submittal. The milestone schedule dates in Attachment 2 of the Order required updating as described in Section 3.
Include information describing the design inputs and methodology used in any analyses of the mountings of electronic equipment onto plant structures, as requested in RAI #5 above.RAI #10 Complete Please provide the NRC staff with the final APS response has been provided configuration of the power supply source for each for NRC review in the STARS channel so that the staff may conclude that the two Alliance website e-portal.channels are independent from a power supply assignment perspective.
2 Includes maintenance procedures 3 Implementation for Unit 1 is prior to startup from 1R18 (Fall 2014), Unit 2 is prior to startup from 2R19 (Fall 2015), and Unit 3 is prior to startup from 3R18 (Spring 2015).
RAI #11 Complete Please provide the following:
4    Changes to Compliance Method There are no changes to the compliance method as documented in the OIP.
APS response has been provided for NRC review in the STARS a) A description of the electrical ac power sources Alliance website e-portal.and capabilities for the primary and backup channels.b) Please provide the results of the calculation depicting the battery backup duty cycle requirements demonstrating that its capacity is sufficient to maintain the level indication function until offsite resource availability is reasonably assured.RAI #12 Complete Please provide the following:
2
APS response has been provided for NRC review in the STARS a) An estimate of the expected instrument channel Alliance website e-portal.accuracy performance under both (a) normal SFP level conditions (approximately Level 1 or higher)and (b) at the BDB conditions (i.e., radiation, temperature, humidity, post-seismic and post-shock conditions) that would be present if the SFP level were at the Level 2 and Level 3 datum points.b) A description of the methodology that will be used for determining the maximum allowed deviation from the instrument channel design accuracy that will be employed under normal operating conditions as an acceptance criterion for a calibration procedure to 6 APS Third 6-Month Status Report on the Overall Integrated Plan for Spent Fuel Pool Level Instrumentation Interim Staff Evaluation Requests for Additional Status Information (RAIs)1 flag to operators and to technicians that the channel requires adjustment to within the normal condition design accuracy.RAI #13 Complete Please provide the following:
 
a) A description of the capability and provisions the proposed level sensing equipment will have to enable periodic testing and calibration, including how this capability enables the equipment to be tested in-situ.b) A description of how such testing and calibration will enable the conduct of regular channel checks of each independent channel against the other, and against any other permanently-installed SFP level instrumentation.
APS Third 6-Month Status Report on the Overall Integrated Plan for Spent Fuel Pool Level Instrumentation 5 Need for Relief/Relaxation and Basis for the Relief/Relaxation APS expects to comply with the order implementation date and no relief or relaxation is requested at this time.
c) A description of how functional checks will be performed, and the frequency at which they will be conducted.
6 Open Items from Overall Integrated Plan and Interim Staff Evaluation The following tables provide a summary of the open items documented in the OIP and the Interim Staff Evaluation (ISE) and the status of each item.
Describe how calibration tests will be performed, and the frequency at which they will be conducted.
Overall Intelrated Plan Open Item                              Status Oil- Reference 1, Section VII, Arrangement, finalize        Complete primary and backup system probe locations for all three SFPs.                                                Probe locations have been finalized. Final locations are selected based on guidance provided in Reference 3.
Provide a discussion as to how these surveillances will be incorporated into the plant surveillance program.d) A description of what preventive maintenance tasks are required to be performed during normal operation, and the planned maximum surveillance interval that is necessary to ensure that the channels are fully conditioned to accurately and reliably perform their functions when needed.APS response has been provided for NRC review in the STARS Alliance website e-portal.RAI #14 Completc For the SFP level instrumentation back up display APS response has been provided please describe the evaluation used to validate that for NRC review in the STARS the display location can be accessed without Alliance website e-portal.unreasonable delay following a BDB event. Include the time available for personnel to access the display as credited in the evaluation, as well as the actual time (e.g., based on walk-throughs) that it will take for personnel to access the display. Additionally, 7 APS Third 6-Month Status Report on the Overall Integrated Plan for Spent Fuel Pool Level Instrumentation Interim Staff Evaluation Requests for Additional Information (RAIs)'Status please include a description of the radiological and enviromnental conditions on the paths personnel might take. Describe whether the display location remains habitable for radiological, heat and humidity, and other environmental conditions following a BDB event. Describe whether personnel are continuously stationed at the display or monitor the display periodically.
Detailed engineering and design work is documented in DMWO L_                                                          4304155.
RAI #15 Complete Please provide a list of the procedures addressing APS response has been provided operation (both normal and abnormal response), for NRC review in the STARS calibration, test, maintenance, and inspection Alliance website e-portal.procedures that will be developed for use of the spent SFP instrumentation.
Interim Staff Evaluation Requests for Additional                        Status Information (RAIs)l RAI #1                                                      Complete Please provide the following:                              APS response has been provided for NRC review in the STARS a) A description of how the other structures in the        Alliance website e-portal.
The licensee is requested to include a brief description of the specific technical objectives to be achieved within each procedure.
vicinity of the SFPs (cask loading pit, transfer canals and gates) shown in Figure 2, "Spent Fuel Pool Geometry and Dimensions" are connected to the SFPs.
RAI #16 Complete Please provide the following:
b) If additional structures, other than the SFPs in each unit, are used for fuel storage, describe in detail their usage, operation, and provide justifications for not installing separate level instrumentation in other structures used for fuel storage.
APS response has been provided for NRC review in the STARS a) Further information describing the maintenance Alliance website e-portal.and testing program the licensee will establish and implement to ensure that regular testing and calibration is performed and verified by inspection and audit to demonstrate conformance with design and system readiness requirements.
RAI #2                                                      Complete Please provide your plant-specific performance              APS response has been provided evaluation result and a brief summary of the proposed      for NRC review in the STARS wireless technology that will be used in the primary        Alliance website e-portal.
Include a description of your plans for ensuring that necessary channel checks, functional tests, periodic calibration, and maintenance will be conducted for the level measurement system and its supporting equipment.
and backup measurement systems to address the 3
b) A description of the in-situ calibration process at the SFP location that will result in the channel calibration being maintained at its design accuracy.An Interim Staff Evaluation with RAIs has been received from the NRC (Reference 4).7 Potential Interim Staff Evaluation Impacts There are no potential impacts to the Interim Staff Evaluation identified at this time.8 APS Third 6-Month Status Report on the Overall Integrated Plan for Spent Fuel Pool Level Instrumentation 8 References The following references support the updates to the Overall Integrated Plan described in this enclosure 1. NRC Order Number EA- 12-051, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Level Instrumentation, dated March 12, 2012 (ML12054A679)
 
: 2. APS Letter 102-06669, APS Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Level Instrumentation (Order Number EA-12-051), dated February 28, 2013 (ML13070A077)
APS Third 6-Month Status Report on the Overall Integrated Plan for Spent Fuel Pool Level Instrumentation Interim Staff Evaluation Requests for Additional                      Status Information (RAIs)S criteria summarized in Section 3.1 of NEI 12-02.
: 3. NEI 12-02, Industry Guidance for Compliance with NRC Order EA-12-051, "To Modify Licenses with Regard to Reliable Spent Fuel Pool Instrumentation," Revision 1, dated August 2012 4. NRC Letter, Interim Staff Evaluation and Request for Additional Information Regarding Order EA-12-051 Reliable Spent Fuel Pool Instrumentation, dated October 29, 2013 (ML13296A006) 9}}
RAI #3                                                    Complete Please provide the following:                             APS response has been provided for NRC review in the STARS a) The final locations/placement of the primary and        Alliance website e-portal.
back-up SFP level sensor.
b) Additional information describing how the proposed arrangement of the sensor probe assembly and routing of the cabling between the sensor probe assembly and the electronics in the Auxiliary Building meets the Order requirement to arrange the SFP level instrument channels in a manner that provides reasonable protection of the level indication function against missiles that may result from damage to the structure over the SFP.
RAI #4                                                    Complete Please provide the analyses verifying that the seismic    APS response has been provided testing of the sensor probe assembly and the               for NRC review in the STARS electronics units, and the licensee's analysis of the     Alliance website e-portal.
combined maximum seismic and hydrodynamic forces on the sensor probe assembly exposed to the potential sloshing effects, show that the SFP instrument design configuration will be maintained during and following the maximum seismic ground motion considered in the design of the SFP structure.
RAI #5                                                    Complete For each of the mounting attachments required to          APS response has been provided attach SFP Level equipment to plant structures,            for NRC review in the STARS please describe the design inputs, and the                Alliance website e-portal.
methodology that was used to qualify the structural integrity of the affected structures/equipment.
RAI #6                                                    Complete Please provide analysis of the maximum expected            APS response has been provided radiological conditions (dose rate and total integrated    for NRC review in the STARS dose) to which the equipment located within the           Alliance website e-portal.
control building or AB will be exposed. Also, please 4
 
APS Third 6-Month Status Report on the Overall Integrated Plan for Spent Fuel Pool Level Instrumentation Interim Staff Evaluation Requests for Additional                      Status Information (RAIs)1                                Status provide documentation indicating the radiological dosage amount that the electronics for this equipment is capable of withstanding. Please discuss the time period over which the analyzed total integrated dose was applied.
RAI #7                                                    Complete Please provide information indicating a) the               APS response has been provided temperature ratings for all system electronics            for NRC review in the STARS (including sensor electronics, system electronics,         Alliance website e-portal.
transmitter, receiver and display) and whether the ratings are continuous duty ratings; and, b) what will be the maximum expected temperature and relative humidity conditions in the room(s) in which the sensor electronics will be located under BDB conditions in which there will be no ac power available to run Heating Ventilation and Air Conditioning (HVAC) systems.
RAI #8                                                    Complete Please provide the following:                              APS response has been provided for NRC review in the STARS a) information describing the evaluation of the sensor    Alliance website e-portal.
electronics design, the shock test method, test results, and forces applied to the sensor electronics applicable to its successful tests demonstrating that the testing provides an appropriate means to demonstrate reliability of the sensor electronics under the effects of severe shock.
b) information describing the evaluation of the sensor electronics design, the vibration test method, test results, the forces and their frequency ranges and directions applied to the sensor applicable to its successful tests, demonstrating that the testing provides an appropriate means to demonstrate reliability of the sensor electronics under the effects of high vibration.
RAI #9                                                    Complete Please provide analysis of the seismic testing results    APS response has been provided and show that the instrument performance reliability,      for NRC review in the STARS following exposure to simulated seismic conditions        Alliance website e-portal.
representative of the environment anticipated for the 5
 
APS Third 6-Month Status Report on the Overall Integrated Plan for Spent Fuel Pool Level Instrumentation Interim Staff Evaluation Requests for Additional                    Status Information (RAIs) 1 SFP structures at Palo Verde, has been adequately demonstrated. Include information describing the design inputs and methodology used in any analyses of the mountings of electronic equipment onto plant structures, as requested in RAI #5 above.
RAI #10                                                  Complete Please provide the NRC staff with the final              APS response has been provided configuration of the power supply source for each        for NRC review in the STARS channel so that the staff may conclude that the two      Alliance website e-portal.
channels are independent from a power supply assignment perspective.
RAI #11                                                  Complete Please provide the following:                            APS response has been provided for NRC review in the STARS a) A description of the electrical ac power sources      Alliance website e-portal.
and capabilities for the primary and backup channels.
b) Please provide the results of the calculation depicting the battery backup duty cycle requirements demonstrating that its capacity is sufficient to maintain the level indication function until offsite resource availability is reasonably assured.
RAI #12                                                  Complete Please provide the following:                            APS response has been provided for NRC review in the STARS a) An estimate of the expected instrument channel         Alliance website e-portal.
accuracy performance under both (a) normal SFP level conditions (approximately Level 1 or higher) and (b) at the BDB conditions (i.e., radiation, temperature, humidity, post-seismic and post-shock conditions) that would be present if the SFP level were at the Level 2 and Level 3 datum points.
b) A description of the methodology that will be used for determining the maximum allowed deviation from the instrument channel design accuracy that will be employed under normal operating conditions as an acceptance criterion for a calibration procedure to 6
 
APS Third 6-Month Status Report on the Overall Integrated Plan for Spent Fuel Pool Level Instrumentation Interim Staff Evaluation Requests for Additional                    Status Information (RAIs)1 flag to operators and to technicians that the channel requires adjustment to within the normal condition design accuracy.
RAI #13                                                    Complete Please provide the following:                              APS response has been provided for NRC review in the STARS a) A description of the capability and provisions the     Alliance website e-portal.
proposed level sensing equipment will have to enable periodic testing and calibration, including how this capability enables the equipment to be tested in-situ.
b) A description of how such testing and calibration will enable the conduct of regular channel checks of each independent channel against the other, and against any other permanently-installed SFP level instrumentation.
c) A description of how functional checks will be performed, and the frequency at which they will be conducted. Describe how calibration tests will be performed, and the frequency at which they will be conducted. Provide a discussion as to how these surveillances will be incorporated into the plant surveillance program.
d) A description of what preventive maintenance tasks are required to be performed during normal operation, and the planned maximum surveillance interval that is necessary to ensure that the channels are fully conditioned to accurately and reliably perform their functions when needed.
RAI #14                                                    Completc For the SFP level instrumentation back up display          APS response has been provided please describe the evaluation used to validate that      for NRC review in the STARS the display location can be accessed without              Alliance website e-portal.
unreasonable delay following a BDB event. Include the time available for personnel to access the display as credited in the evaluation, as well as the actual time (e.g., based on walk-throughs) that it will take for personnel to access the display. Additionally, 7
 
APS Third 6-Month Status Report on the Overall Integrated Plan for Spent Fuel Pool Level Instrumentation Interim Staff Evaluation Requests for Additional Status Information (RAIs)'
please include a description of the radiological and enviromnental conditions on the paths personnel might take. Describe whether the display location remains habitable for radiological, heat and humidity, and other environmental conditions following a BDB event. Describe whether personnel are continuously stationed at the display or monitor the display periodically.
RAI #15                                                  Complete Please provide a list of the procedures addressing        APS response has been provided operation (both normal and abnormal response),            for NRC review in the STARS calibration, test, maintenance, and inspection            Alliance website e-portal.
procedures that will be developed for use of the spent SFP instrumentation. The licensee is requested to include a brief description of the specific technical objectives to be achieved within each procedure.
RAI #16                                                  Complete Please provide the following:                            APS response has been provided for NRC review in the STARS a) Further information describing the maintenance        Alliance website e-portal.
and testing program the licensee will establish and implement to ensure that regular testing and calibration is performed and verified by inspection and audit to demonstrate conformance with design and system readiness requirements. Include a description of your plans for ensuring that necessary channel checks, functional tests, periodic calibration, and maintenance will be conducted for the level measurement system and its supporting equipment.
b) A description of the in-situ calibration process at the SFP location that will result in the channel calibration being maintained at its design accuracy.
An Interim Staff Evaluation with RAIs has been received from the NRC (Reference 4).
7 Potential Interim Staff Evaluation Impacts There are no potential impacts to the Interim Staff Evaluation identified at this time.
8
 
APS Third 6-Month Status Report on the Overall Integrated Plan for Spent Fuel Pool Level Instrumentation 8 References The following references support the updates to the Overall Integrated Plan described in this enclosure
: 1. NRC Order Number EA- 12-051, OrderModifying Licenses with Regard to Reliable Spent Fuel Pool Level Instrumentation,dated March 12, 2012 (ML12054A679)
: 2. APS Letter 102-06669, APS Overall IntegratedPlan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Level Instrumentation(OrderNumber EA-12-051), dated February 28, 2013 (ML13070A077)
: 3. NEI 12-02, Industry Guidancefor Compliance with NRC OrderEA-12-051, "To Modify Licenses with Regard to Reliable Spent Fuel Pool Instrumentation,"
Revision 1, dated August 2012
: 4. NRC Letter, Interim Staff Evaluation and Requestfor Additional Information Regarding Order EA-12-051 Reliable Spent Fuel Pool Instrumentation, dated October 29, 2013 (ML13296A006) 9}}

Latest revision as of 00:47, 4 November 2019

Third 6-Month Status Report on the Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Level Instrumentation (Order Number EA-12-051)
ML14246A210
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 08/28/2014
From: Mims D
Arizona Public Service Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
102-06933-DCM/MAM/PJH, EA-12-051
Download: ML14246A210 (13)


Text

EA-12-051 DWIGHT C. MIMS Senior Vice President, Nuclear Regulatory & Oversight Palo Verde Nuclear Generating Station 102-06933-DCM/MAM/PJH P.O. Box 52034 August 28, 2014 Phoenix, AZ 85072 Mail Station 7605 Tel 623 393 5403 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk 11555 Rockville Pike Rockville, MD 20852

Dear Sirs:

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Units 1, 2, and 3 Docket Nos. STN 50-528, 50-529, and 50-530 APS Third 6-Month Status Report on the PVNGS Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Level Instrumentation (Order Number EA-12-051)

On March 12, 2012, the Nuclear Regulatory Commission (NRC) issued an order (Reference 1) to Arizona Public Service Company (APS). Reference 1 was immediately effective and directed that PVNGS must have a reliable means of remotely monitoring wide-range spent fuel pool (SFP) levels to support effective prioritization of event mitigation and recovery actions in the event of a beyond-design-basis external event. Specific requirements are outlined in Attachment 2 of Reference 1.

Reference 1 required submission of an initial status report 60 days following issuance of the final interim staff guidance and an overall integrated plan (OIP) pursuant to Section IV, Condition C. Reference 2 provided the APS initial status report regarding reliable SFP level instrumentation. In Reference 3, APS provided the PVNGS OIP.

After reviewing the PVNGS OIP for SFP Level Instrumentation, the NRC issued a request for additional information RA T) to APS (Reference 4). On July 11, 2013, APS provided a response to the NRC RAI regarding the PVNGS OIP for SFP Level Instrumentation (Reference 5).

Reference 1 also requires submission of a status report at 6-month intervals following submittal of the OIP. NEI 12-02, Industry Guidance for Compliance with NRC Order EA-12-051, To Modify Licenses with Regard to Reliable Spent Fuel Pool Instrumentation, Revision 1, provides direction regarding the content of the status reports.

Reference 6 provided the APS First 6-Month status report on the PVNGS OIP for SFP Level Instrumentation pursuant to Section IV, Condition C.2, of Reference 1.

Reference 8 provided the APS Second 6-Month status report.

A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway -Comanche Peek - Diablo Canyon - Palo Verde - Wolf Creek

102-06933-DCM/MAM/PJH ATTN: Document Control Desk U.S. Nuclear Regulatory Commission APS Third 6-Month Status Report on the Overall Integrated Plan for Spent Fuel Pool Level Instrumentation Page 2 The NRC issued the Interim Staff Evaluation and RAI on the PVNGS OIP on October 29, 2013 (Reference 7).

The enciosure to this letter provides the Third 6-Month status report on the PVNGS OIP for SFP level instrumentation.

No commitments are being made to the NRC by this letter.

Should you have any questions concerning the content of this letter, please contact Mark McGhee, Department Leader, Regulatory Affairs, at (623) 393-4972.

I declare under penalty of perjury that the foregoing is true and correct.

Executed on (Date)

Sincerely, DCM/MAM/PJH/hsc

Enclosure:

APS Third 6-Month Status Report on the Overall Integrated Plan for Spent Fuel Pool Level Instrumentation cc: W. M. Dean NRC Director Office of Nuclear Reactor Regulation M. L. Dapas NRC Region IV Regional Administrator B. K. Singal NRC NRR Project Manager for PVNGS M. M. Watford NRC NRR Project Manager M. A. Brown NRC Senior Resident Inspector PVNGS L. M. Regner NRC NRR/JLD/JPMB Project Manager

References:

1. NRC Order Number EA-12-051, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Level Instrumentation, dated March 12, 2012
2. APS Letter 102-06613, Initial Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Level Instrumentation (Order Number EA-12-051), dated October 29, 2012

102-06933-DCM/MAM/PJH ATTN: Document Control Desk U.S. Nuclear Regulatory Commission APS Third 6-Month Status Report on the Overall Integrated Plan for Spent Fuel Pool Level Instrumentation Page 3

3. APS Letter 102-06669, APS Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Level Instrumentation (Order Number EA-12-051), dated February 28, 2013
4. NRC letter, Palo Verde Nuclear Generating Station, Units 1, 2, and 3 - Request for Additional Information Regarding Overail integrated Plan in Response to Order EA-12-051, "Reliable Spent Fuel Pool Instrumentation," dated June 10, 2013
5. APS Letter 102-06728, Response to Request for Additional Information for the PVNGS Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Level Instrumentation (Order Number EA-12-051), dated July 11, 2013
6. APS Letter 102-06759, APS First 6-Month Status Report on the PVNGS Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Level Instrumentation (Order Number EA-12-051),

dated August 28, 2013

7. NRC Letter, Interim Staff Evaluation and Request for Additional information Regarding Order EA-12-051 Reliable Spent Fuel Pool Instrumentation, dated October 29, 2013
8. APS Letter 102-06841, APS Second 6-Month Status Report on the PVNGS Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Level Instrumentation (Order Number EA-12-051),

dated February 28, 2014

ENCLOSURE APS Third 6-Month Status Report on the Overall Integrated Plan for Spent Fuel Pool Level Instrumentation

APS Third 6-Month Status Report on the Overall Integrated Plan for Spent Fuel Pool Level Instrumentation 1 Introduction Arizona Public Service (APS) developed an Overall Integrated Plan (OIP) (Reference 2 in Section 8), documenting the requirements to install reliable spent fuel pool level instrumentation (SFP LI), in response to Reference 1. This enclosure provides an update of milestone accomplishments since submittal of the OIP, including any changes to the compliance method, schedule, or need for relief or relaxation and the basis for such changes, if any.

2 Milestone Accomplishments The following milestone(s) have been completed since the development of the 01P, and are current as of August 10, 2014:

Engineering and design work for Palo Verde Nuclear Generating Station (PVNGS)

Units 1, 2, and 3 has been completed. Installation work is ongoing and scheduled for completion in October 2014 for Unit 1 (see the Section 3 Milestone Schedule Status Table for Units 2 & 3).

3 Milestone Schedule Status The following table provides an update to the milestone schedule in support of implementation of the OIP. This section provides the activity status of each item and whether the expected completion date has changed. The provided dates are for planning purposes and subject to change as design and implementation details are developed.

Additional changes in. target completion dates will be noted in future 6-month status reports.

The Milestone Schedule Status Table below lists the design status of the modifications by project identification number and design modification work order (DMWO) package numbers.

g t Revised Ms Target Activity Target Milestone DCompletion Status Completion Date Date Submit 60 Day Status Report Oct 2012 Completi Submit Overall Integrated Plan Feb 2013 Complete Submit 6 Month Updates: _

Update 1 Aug 2013 Complete Aug 2013 Update 2 Feb 2014 Complete Feb 2014 Update 3 Aug 2014 Complete Aug 2014' Update 4 Feb 2015 Not Started Update 5 Aug 2015 Not Started Update 6 Feb 2016 Not Started Update 7 Aug 2016 Not Started 1

APS Third 6-Month Status Report on the Overall Integrated Plan for Spent Fuel Pool Level Instrumentation Target Revised Completion Tilestone Activity Target M tC e Status Completion Date Date Modifications:

Modifications Evaluation Feb 2013 Complete Units 1, 2, and 3 Engineering and 4Q2013 Complete 2Q2014 Design Work

1. PC-1631 Spent Fuel Pool Remote Level Instrumentation Apr 2014 Complete (DMWO 4304155)
2. PC-1639 Spent Fuel Pool Remote Pool Level Electrical Apr 2014 Complete Power (DMWO 4345889)

Receipt of Unit 1 SFP Instruments 2Q2014 Complete Receipt of Unit 2 SFP Instruments 2Q2015 Not Started 4Q2014 Receipt of Unit 3 SFP Instruments 4Q2014 Not Started 4Q2014 Unit 1 Implementation Online Fall 2014 Started Unit 2 Implementation Online Fall 2015 Not Started Unit 3 Implementation Online Spring 2015 Not Started Procedures:

Create Procedures 2 Oct 2014 Started Training:

Develop Training Plan Apr 2014 Complete Issue Unit 1 SFP Instruments Procedures & Complete Training 3Q2014 Started Nov 2014 Issue Unit 2 SFP Instruments Procedures & Complete Training 3Q2015 Not Started Issue Unit 3 SFP Instruments Procedures & Complete Training 1Q2015 Not Started Unit 1 SFP Instruments Operational Nov 20143 Started Unit 2 SFP Instruments Operational Nov 2015" Not Started Unit 3 SFP Instruments Operational May 20153 Not Started Full Site SFP LI Implementation Dec 2015 Not Started Submit Completion Report Apr 2016 Not Started The Third 6-Month update is complete with this submittal. The milestone schedule dates in Attachment 2 of the Order required updating as described in Section 3.

2 Includes maintenance procedures 3 Implementation for Unit 1 is prior to startup from 1R18 (Fall 2014), Unit 2 is prior to startup from 2R19 (Fall 2015), and Unit 3 is prior to startup from 3R18 (Spring 2015).

4 Changes to Compliance Method There are no changes to the compliance method as documented in the OIP.

2

APS Third 6-Month Status Report on the Overall Integrated Plan for Spent Fuel Pool Level Instrumentation 5 Need for Relief/Relaxation and Basis for the Relief/Relaxation APS expects to comply with the order implementation date and no relief or relaxation is requested at this time.

6 Open Items from Overall Integrated Plan and Interim Staff Evaluation The following tables provide a summary of the open items documented in the OIP and the Interim Staff Evaluation (ISE) and the status of each item.

Overall Intelrated Plan Open Item Status Oil- Reference 1,Section VII, Arrangement, finalize Complete primary and backup system probe locations for all three SFPs. Probe locations have been finalized. Final locations are selected based on guidance provided in Reference 3.

Detailed engineering and design work is documented in DMWO L_ 4304155.

Interim Staff Evaluation Requests for Additional Status Information (RAIs)l RAI #1 Complete Please provide the following: APS response has been provided for NRC review in the STARS a) A description of how the other structures in the Alliance website e-portal.

vicinity of the SFPs (cask loading pit, transfer canals and gates) shown in Figure 2, "Spent Fuel Pool Geometry and Dimensions" are connected to the SFPs.

b) If additional structures, other than the SFPs in each unit, are used for fuel storage, describe in detail their usage, operation, and provide justifications for not installing separate level instrumentation in other structures used for fuel storage.

RAI #2 Complete Please provide your plant-specific performance APS response has been provided evaluation result and a brief summary of the proposed for NRC review in the STARS wireless technology that will be used in the primary Alliance website e-portal.

and backup measurement systems to address the 3

APS Third 6-Month Status Report on the Overall Integrated Plan for Spent Fuel Pool Level Instrumentation Interim Staff Evaluation Requests for Additional Status Information (RAIs)S criteria summarized in Section 3.1 of NEI 12-02.

RAI #3 Complete Please provide the following: APS response has been provided for NRC review in the STARS a) The final locations/placement of the primary and Alliance website e-portal.

back-up SFP level sensor.

b) Additional information describing how the proposed arrangement of the sensor probe assembly and routing of the cabling between the sensor probe assembly and the electronics in the Auxiliary Building meets the Order requirement to arrange the SFP level instrument channels in a manner that provides reasonable protection of the level indication function against missiles that may result from damage to the structure over the SFP.

RAI #4 Complete Please provide the analyses verifying that the seismic APS response has been provided testing of the sensor probe assembly and the for NRC review in the STARS electronics units, and the licensee's analysis of the Alliance website e-portal.

combined maximum seismic and hydrodynamic forces on the sensor probe assembly exposed to the potential sloshing effects, show that the SFP instrument design configuration will be maintained during and following the maximum seismic ground motion considered in the design of the SFP structure.

RAI #5 Complete For each of the mounting attachments required to APS response has been provided attach SFP Level equipment to plant structures, for NRC review in the STARS please describe the design inputs, and the Alliance website e-portal.

methodology that was used to qualify the structural integrity of the affected structures/equipment.

RAI #6 Complete Please provide analysis of the maximum expected APS response has been provided radiological conditions (dose rate and total integrated for NRC review in the STARS dose) to which the equipment located within the Alliance website e-portal.

control building or AB will be exposed. Also, please 4

APS Third 6-Month Status Report on the Overall Integrated Plan for Spent Fuel Pool Level Instrumentation Interim Staff Evaluation Requests for Additional Status Information (RAIs)1 Status provide documentation indicating the radiological dosage amount that the electronics for this equipment is capable of withstanding. Please discuss the time period over which the analyzed total integrated dose was applied.

RAI #7 Complete Please provide information indicating a) the APS response has been provided temperature ratings for all system electronics for NRC review in the STARS (including sensor electronics, system electronics, Alliance website e-portal.

transmitter, receiver and display) and whether the ratings are continuous duty ratings; and, b) what will be the maximum expected temperature and relative humidity conditions in the room(s) in which the sensor electronics will be located under BDB conditions in which there will be no ac power available to run Heating Ventilation and Air Conditioning (HVAC) systems.

RAI #8 Complete Please provide the following: APS response has been provided for NRC review in the STARS a) information describing the evaluation of the sensor Alliance website e-portal.

electronics design, the shock test method, test results, and forces applied to the sensor electronics applicable to its successful tests demonstrating that the testing provides an appropriate means to demonstrate reliability of the sensor electronics under the effects of severe shock.

b) information describing the evaluation of the sensor electronics design, the vibration test method, test results, the forces and their frequency ranges and directions applied to the sensor applicable to its successful tests, demonstrating that the testing provides an appropriate means to demonstrate reliability of the sensor electronics under the effects of high vibration.

RAI #9 Complete Please provide analysis of the seismic testing results APS response has been provided and show that the instrument performance reliability, for NRC review in the STARS following exposure to simulated seismic conditions Alliance website e-portal.

representative of the environment anticipated for the 5

APS Third 6-Month Status Report on the Overall Integrated Plan for Spent Fuel Pool Level Instrumentation Interim Staff Evaluation Requests for Additional Status Information (RAIs) 1 SFP structures at Palo Verde, has been adequately demonstrated. Include information describing the design inputs and methodology used in any analyses of the mountings of electronic equipment onto plant structures, as requested in RAI #5 above.

RAI #10 Complete Please provide the NRC staff with the final APS response has been provided configuration of the power supply source for each for NRC review in the STARS channel so that the staff may conclude that the two Alliance website e-portal.

channels are independent from a power supply assignment perspective.

RAI #11 Complete Please provide the following: APS response has been provided for NRC review in the STARS a) A description of the electrical ac power sources Alliance website e-portal.

and capabilities for the primary and backup channels.

b) Please provide the results of the calculation depicting the battery backup duty cycle requirements demonstrating that its capacity is sufficient to maintain the level indication function until offsite resource availability is reasonably assured.

RAI #12 Complete Please provide the following: APS response has been provided for NRC review in the STARS a) An estimate of the expected instrument channel Alliance website e-portal.

accuracy performance under both (a) normal SFP level conditions (approximately Level 1 or higher) and (b) at the BDB conditions (i.e., radiation, temperature, humidity, post-seismic and post-shock conditions) that would be present if the SFP level were at the Level 2 and Level 3 datum points.

b) A description of the methodology that will be used for determining the maximum allowed deviation from the instrument channel design accuracy that will be employed under normal operating conditions as an acceptance criterion for a calibration procedure to 6

APS Third 6-Month Status Report on the Overall Integrated Plan for Spent Fuel Pool Level Instrumentation Interim Staff Evaluation Requests for Additional Status Information (RAIs)1 flag to operators and to technicians that the channel requires adjustment to within the normal condition design accuracy.

RAI #13 Complete Please provide the following: APS response has been provided for NRC review in the STARS a) A description of the capability and provisions the Alliance website e-portal.

proposed level sensing equipment will have to enable periodic testing and calibration, including how this capability enables the equipment to be tested in-situ.

b) A description of how such testing and calibration will enable the conduct of regular channel checks of each independent channel against the other, and against any other permanently-installed SFP level instrumentation.

c) A description of how functional checks will be performed, and the frequency at which they will be conducted. Describe how calibration tests will be performed, and the frequency at which they will be conducted. Provide a discussion as to how these surveillances will be incorporated into the plant surveillance program.

d) A description of what preventive maintenance tasks are required to be performed during normal operation, and the planned maximum surveillance interval that is necessary to ensure that the channels are fully conditioned to accurately and reliably perform their functions when needed.

RAI #14 Completc For the SFP level instrumentation back up display APS response has been provided please describe the evaluation used to validate that for NRC review in the STARS the display location can be accessed without Alliance website e-portal.

unreasonable delay following a BDB event. Include the time available for personnel to access the display as credited in the evaluation, as well as the actual time (e.g., based on walk-throughs) that it will take for personnel to access the display. Additionally, 7

APS Third 6-Month Status Report on the Overall Integrated Plan for Spent Fuel Pool Level Instrumentation Interim Staff Evaluation Requests for Additional Status Information (RAIs)'

please include a description of the radiological and enviromnental conditions on the paths personnel might take. Describe whether the display location remains habitable for radiological, heat and humidity, and other environmental conditions following a BDB event. Describe whether personnel are continuously stationed at the display or monitor the display periodically.

RAI #15 Complete Please provide a list of the procedures addressing APS response has been provided operation (both normal and abnormal response), for NRC review in the STARS calibration, test, maintenance, and inspection Alliance website e-portal.

procedures that will be developed for use of the spent SFP instrumentation. The licensee is requested to include a brief description of the specific technical objectives to be achieved within each procedure.

RAI #16 Complete Please provide the following: APS response has been provided for NRC review in the STARS a) Further information describing the maintenance Alliance website e-portal.

and testing program the licensee will establish and implement to ensure that regular testing and calibration is performed and verified by inspection and audit to demonstrate conformance with design and system readiness requirements. Include a description of your plans for ensuring that necessary channel checks, functional tests, periodic calibration, and maintenance will be conducted for the level measurement system and its supporting equipment.

b) A description of the in-situ calibration process at the SFP location that will result in the channel calibration being maintained at its design accuracy.

An Interim Staff Evaluation with RAIs has been received from the NRC (Reference 4).

7 Potential Interim Staff Evaluation Impacts There are no potential impacts to the Interim Staff Evaluation identified at this time.

8

APS Third 6-Month Status Report on the Overall Integrated Plan for Spent Fuel Pool Level Instrumentation 8 References The following references support the updates to the Overall Integrated Plan described in this enclosure

1. NRC Order Number EA- 12-051, OrderModifying Licenses with Regard to Reliable Spent Fuel Pool Level Instrumentation,dated March 12, 2012 (ML12054A679)
2. APS Letter 102-06669, APS Overall IntegratedPlan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Level Instrumentation(OrderNumber EA-12-051), dated February 28, 2013 (ML13070A077)
3. NEI 12-02, Industry Guidancefor Compliance with NRC OrderEA-12-051, "To Modify Licenses with Regard to Reliable Spent Fuel Pool Instrumentation,"

Revision 1, dated August 2012

4. NRC Letter, Interim Staff Evaluation and Requestfor Additional Information Regarding Order EA-12-051 Reliable Spent Fuel Pool Instrumentation, dated October 29, 2013 (ML13296A006) 9