{{#Wiki_filter:"Entergy Entergy Nuclear Operations, Inc.Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360 September 3, 2014 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001 | {{#Wiki_filter:"Entergy Entergy Nuclear Operations, Inc. | ||
Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360 September 3, 2014 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001 | |||
==SUBJECT:== | ==SUBJECT:== | ||
Response to RIS 2014-05 "Preparation and Scheduling of Operator Licensing Examinations" Entergy Nuclear Operations, Inc.Pilgrim Nuclear Power Station Docket No.: 50-293 License No.: DPR-35 LETTER NUMBER: 2.14.058 | Response to RIS 2014-05 "Preparation and Scheduling of Operator Licensing Examinations" Entergy Nuclear Operations, Inc. | ||
Pilgrim Nuclear Power Station Docket No.: 50-293 License No.: DPR-35 LETTER NUMBER: 2.14.058 | |||
==Dear Sir or Madam:== | ==Dear Sir or Madam:== | ||
On April 29, 2014, the NRC issued Regulatory Issue Summary (RIS) 2014-05, "Preparation and Scheduling of Operator Licensing Examinations". | On April 29, 2014, the NRC issued Regulatory Issue Summary (RIS) 2014-05, "Preparation and Scheduling of Operator Licensing Examinations". | ||
This RIS requested information from licensees regarding proposed licensed operator examinations schedules and estimated number of applicants in 5rder to assist the NRC in planning resources. | This RIS requested information from licensees regarding proposed licensed operator examinations schedules and estimated number of applicants in 5rder to assist the NRC in planning resources. Accordingly, the requested information is provided on the enclosed NRC Form 536. | ||
Accordingly, the requested information is provided on the enclosed NRC Form 536.There are no commitments contained in this letter.Please contact me at (508) 830-8323, if there are any questions regarding this subject.Sincerely, Everett P. Perkins, Jr.Manager, Regulatory Assurance EP/fm | There are no commitments contained in this letter. | ||
Please contact me at (508) 830-8323, if there are any questions regarding this subject. | |||
Sincerely, Everett P. Perkins, Jr. | |||
Manager, Regulatory Assurance EP/fm | |||
==Enclosure:== | ==Enclosure:== | ||
Completed NRC Form 536 cc: Mr. William Dean Senior Resident Inspector Regional Administrator, Region 1 Pilgrim Nuclear Power Station U.S. Nuclear Regulatory Commission 2100 Renaissance Boulevard, Suite 100 King of Prussia, PA 19406-2713 | |||
Enclosure to Pilgrim Letter 2.14.058 Completed NRC Form 536 (1 page) | |||
NRC FORM 536 U. S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 0913012014 (09-2011) Estimated burden per response to comply with this voluntary intormation collection request 1 hour. This information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden estimate to the Information Services Branch OPERATOR LICENSING (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by internet e-EXAMINATION DATA mail to tnfoowlects.Resource@nrc.gov, and to the Desk Officer. Office of Information and Regulatory Affairs, NEGB-10202, (3150-0131), Office of Management and Budget Washington, DC 20503. If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection. | |||
NRC FORM 536 U. S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 0913012014 (09-2011) | FACILITY NRC REGION | ||
Estimated burden per response to comply with this voluntary intormation collection request 1 hour. This information collection is used to plan budgets and resources for operator examinations. | /2 5 C k )VC tc5 /A~VP7(Z /~'L~qrJ7/ | ||
Send comments regarding burden estimate to the Information Services Branch OPERATOR LICENSING (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by internet e-EXAMINATION DATA mail to tnfoowlects.Resource@nrc.gov, and to the Desk Officer. Office of Information and Regulatory Affairs, NEGB-10202, (3150-0131), Office of Management and Budget Washington, DC 20503. If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection. | A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 16 CY 17 CY 18 CY 19 ESTIMATED NUMBER OF LICENSEE-PREPARED 0 1 0 I EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 16 CY 17 CY 18 CY 19 NUMBER OF REACTOR 0 5 0 6 OPERATORS NUMBER OF SENIOR REACTOR OPERATORS - INSTANT NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE N/A 2/27/2017 N/A 2/25/2019 ALTERNATE DATE N/A 3/6/2017 N/A 3/4/2019 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 16 CY 17 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 0 0 0 0 0 0 I1 CANDIDATES NRC FORM 536 (09-2011)}} | ||
FACILITY NRC REGION/2 5 C k )VC tc5 /A~VP7(Z /~'L~qrJ7/ | |||
A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 16 CY 17 CY 18 CY 19 ESTIMATED NUMBER OF LICENSEE-PREPARED 0 1 0 I EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 16 CY 17 CY 18 CY 19 NUMBER OF REACTOR 0 5 0 6 OPERATORS NUMBER OF SENIOR REACTOR OPERATORS | |||
-INSTANT NUMBER OF SENIOR REACTOR OPERATORS | |||
-UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS | |||
-LIMITED PROPOSED DATES PRIMARY DATE N/A 2/27/2017 N/A 2/25/2019 ALTERNATE DATE N/A 3/6/2017 N/A 3/4/2019 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 16 CY 17 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 0 0 0 0 0 0 I1 CANDIDATES NRC FORM 536 (09-2011)}} |
Latest revision as of 00:18, 4 November 2019
ML14259A345 | |
Person / Time | |
---|---|
Site: | Pilgrim |
Issue date: | 09/03/2014 |
From: | Perkins E Entergy Nuclear Operations |
To: | Document Control Desk, Office of Nuclear Reactor Regulation |
References | |
2.14.058 | |
Download: ML14259A345 (3) | |
Text
"Entergy Entergy Nuclear Operations, Inc.
Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360 September 3, 2014 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001
SUBJECT:
Response to RIS 2014-05 "Preparation and Scheduling of Operator Licensing Examinations" Entergy Nuclear Operations, Inc.
Pilgrim Nuclear Power Station Docket No.: 50-293 License No.: DPR-35 LETTER NUMBER: 2.14.058
Dear Sir or Madam:
On April 29, 2014, the NRC issued Regulatory Issue Summary (RIS) 2014-05, "Preparation and Scheduling of Operator Licensing Examinations".
This RIS requested information from licensees regarding proposed licensed operator examinations schedules and estimated number of applicants in 5rder to assist the NRC in planning resources. Accordingly, the requested information is provided on the enclosed NRC Form 536.
There are no commitments contained in this letter.
Please contact me at (508) 830-8323, if there are any questions regarding this subject.
Sincerely, Everett P. Perkins, Jr.
Manager, Regulatory Assurance EP/fm
Enclosure:
Completed NRC Form 536 cc: Mr. William Dean Senior Resident Inspector Regional Administrator, Region 1 Pilgrim Nuclear Power Station U.S. Nuclear Regulatory Commission 2100 Renaissance Boulevard, Suite 100 King of Prussia, PA 19406-2713
Enclosure to Pilgrim Letter 2.14.058 Completed NRC Form 536 (1 page)
NRC FORM 536 U. S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 0913012014 (09-2011) Estimated burden per response to comply with this voluntary intormation collection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden estimate to the Information Services Branch OPERATOR LICENSING (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by internet e-EXAMINATION DATA mail to tnfoowlects.Resource@nrc.gov, and to the Desk Officer. Office of Information and Regulatory Affairs, NEGB-10202, (3150-0131), Office of Management and Budget Washington, DC 20503. If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.
FACILITY NRC REGION
/2 5 C k )VC tc5 /A~VP7(Z /~'L~qrJ7/
A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 16 CY 17 CY 18 CY 19 ESTIMATED NUMBER OF LICENSEE-PREPARED 0 1 0 I EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 16 CY 17 CY 18 CY 19 NUMBER OF REACTOR 0 5 0 6 OPERATORS NUMBER OF SENIOR REACTOR OPERATORS - INSTANT NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE N/A 2/27/2017 N/A 2/25/2019 ALTERNATE DATE N/A 3/6/2017 N/A 3/4/2019 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 16 CY 17 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 0 0 0 0 0 0 I1 CANDIDATES NRC FORM 536 (09-2011)