| | title = Grand Gulf - 2014-10 - Draft Written Exam Comments | | | title = 2014-10 - Draft Written Exam Comments |
| | author name = Gaddy V G | | | author name = Gaddy V |
| | author affiliation = NRC/RGN-IV/DRS/OB | | | author affiliation = NRC/RGN-IV/DRS/OB |
| | addressee name = | | | addressee name = |
Line 16: |
Line 16: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:Exam Review Comments Following Validation NOTE: There was no ES-401-9 form filled out because this exam was authored by the NRC. The following comments were made on the changes made by Grand Gulf following validation with the licensed operators. All the comments were resolved prior to making the exam final. Question 4 - One could argue none of the distractors are correct since none of the listed conditions will "directly" result in a turbine trip and reactor scram. Level 8 is the scram and level 9 is the turbine trip. Recommend - Change stem to read "With the plant at full power, which of the following plant conditions-"? | | {{#Wiki_filter:Exam Review Comments Following Validation NOTE: There was no ES-401-9 form filled out because this exam was authored by the NRC. |
| Question 32 - The question asks if TS 3.5.2 is met. The stem does not provide information regarding the status of the other ECCS systems. Second, we don't expect the students to have the tech spec titles memorized by number. Recommend - Change the last line of the stem to read, "If all the other ECCS systems are operable, is TS 3.5.2, ECCS Shutdown, met?" Question 41 - Edit. Change the first line of the stem to read, "The plant has experienced a transient and the following conditions currently exist:" Question 48 - The stem asks two questions but the distractors only provide one answer. Recommend - Change the stem to ask only one question (the one that matches the distractors). Question 59 - Stem wording is awkward. | | The following comments were made on the changes made by Grand Gulf following validation with the licensed operators. All the comments were resolved prior to making the exam final. |
| Recommend - Change the stem to read "What is required before the RHR system will initiate in the containment spray mode when using the Manual CTMT Spray pushbutton?" Question 70 - This question tests on TS below "the line" making it an SRO question. Recommend - Replace the question. Question 79 - We don't expect the applicants to have the various EOP graphs memorized. Recommend - Provide the RPVST curve as a reference. Question 87 - This is an RO question since it is a systems question (i.e. the procedure selection is not required to correctly answer the question). | | Question 4 - One could argue none of the distractors are correct since none of the listed conditions will directly result in a turbine trip and reactor scram. Level 8 is the scram and level 9 is the turbine trip. |
| Recommendation - Revise the question so the procedure selection is necessary to correctly answer the question. Question 92 - Distractors C(2) and D(2) don't make sense. Recommendation - Change distractor C(2) to match A(2) and change distractor D(2) to match B(2). Question 93 - This is another RO systems question. | | Recommend - Change stem to read With the plant at full power, which of the following plant conditions? |
| Recommendation - Change the latter part of the stem to read "The SRO should FIRST direct the crew actions in accordance with: A. ARI 04-1-02-1H13-P870-6A-A5, FW HTR 6B LVL HI-HI B. ONEP 05-1-02-1-1, Reactor Scram C. ONEP 05-1-02-V-5, Loss of Feedwater Heating D. One other procedure distractor}} | | Question 32 - The question asks if TS 3.5.2 is met. The stem does not provide information regarding the status of the other ECCS systems. Second, we dont expect the students to have the tech spec titles memorized by number. |
| | Recommend - Change the last line of the stem to read, If all the other ECCS systems are operable, is TS 3.5.2, ECCS Shutdown, met? |
| | Question 41 - Edit. Change the first line of the stem to read, The plant has experienced a transient and the following conditions currently exist: |
| | Question 48 - The stem asks two questions but the distractors only provide one answer. |
| | Recommend - Change the stem to ask only one question (the one that matches the distractors). |
| | Question 59 - Stem wording is awkward. |
| | Recommend - Change the stem to read What is required before the RHR system will initiate in the containment spray mode when using the Manual CTMT Spray pushbutton? |
| | Question 70 - This question tests on TS below the line making it an SRO question. |
| | Recommend - Replace the question. |
| | Question 79 - We dont expect the applicants to have the various EOP graphs memorized. |
| | Recommend - Provide the RPVST curve as a reference. |
| | Question 87 - This is an RO question since it is a systems question (i.e. the procedure selection is not required to correctly answer the question). |
| | |
| | Recommendation - Revise the question so the procedure selection is necessary to correctly answer the question. |
| | Question 92 - Distractors C(2) and D(2) dont make sense. |
| | Recommendation - Change distractor C(2) to match A(2) and change distractor D(2) to match B(2). |
| | Question 93 - This is another RO systems question. |
| | Recommendation - Change the latter part of the stem to read The SRO should FIRST direct the crew actions in accordance with: |
| | A. ARI 04-1-02-1H13-P870-6A-A5, FW HTR 6B LVL HI-HI B. ONEP 05-1-02-1-1, Reactor Scram C. ONEP 05-1-02-V-5, Loss of Feedwater Heating D. One other procedure distractor}} |
|
---|
Category:License-Operator
MONTHYEARIR 05000416/20243022024-03-21021 March 2024 Notification of NRC Initial Operator Licensing Exam 05000416/2024302 IR 05000416/20233012024-02-26026 February 2024 NRC Examination Report 05000416-2023301 ML24043A0732024-01-29029 January 2024 2024-01 Post Examination Comments IR 05000416/20243012024-01-16016 January 2024 NRC Initial Operator Licensing Examination Approval 05000416/2024301 ML23130A2732023-05-10010 May 2023 and Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23102A1482023-04-12012 April 2023 Notification of NRC Initial Operator Licensing Examination 05000416/2024301 ML22342B2592022-10-14014 October 2022 10 Post Examination Analysis ML22342B2602022-10-14014 October 2022 10 Public Forms ML22075A3442022-03-16016 March 2022 Response to Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations ML21342A2702021-12-0808 December 2021 GG-2022-10 Corp Notification Ltr - Cco, Grand Gulf Nuclear Station - Notification of NRC Initial Operator Licensing Examination 05000416/2022301 ML21349A1562021-10-25025 October 2021 GG-2021-10 Public Forms ML21333A2532021-10-25025 October 2021 GG-2021-10 Post Exam Analysis ML21280A0732021-10-0707 October 2021 NRC Initial Operator Licensing Examination Approval 05000416/2021301 ML21106A1512021-04-16016 April 2021 and Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2021-01, Preparation and Scheduling of Operator Licensing Examinations ML21106A2842021-04-14014 April 2021 Generic Fundamentals Examination Results March 2021 ML21041A5352021-02-11011 February 2021 Notification of NRC Initial Operator Licensing Examination 05000416/2021301 ML20072L2192020-03-12012 March 2020 Response to Regulatory Issue Summary 2020-01, Preparation and Scheduling of Operator Licensing Examinations ML20069C2262020-03-0909 March 2020 Notification of NRC Initial Operator Licensing Examination 05000416/2020302 ML20058H6262020-02-10010 February 2020 GG-2020-02 Draft Outline Comments ML20058J8112020-02-10010 February 2020 GG-2020-02 Public Forms ML20058H6242020-02-10010 February 2020 GG-2020-02 Final Written Examination ML20058H6112020-02-10010 February 2020 GG-2020-02 Draft Operating Test Comments ML20058H6212020-02-10010 February 2020 GG-2020-02 Final Operating Test ML20058H6222020-02-10010 February 2020 GG-2020-02 Final Outlines ML20058H6182020-02-10010 February 2020 GG-2020-02 Draft Written Examination ML20058H6142020-02-10010 February 2020 GG-2020-02 Draft Operating Test ML20058H6152020-02-10010 February 2020 GG-2020-02 Draft Outlines ML20058H6172020-02-10010 February 2020 GG-2020-02 Draft Written Examination Comments ML20058J8102020-02-10010 February 2020 GG-2020-02 Post Examination Analysis ML19135A6642019-05-15015 May 2019 Units 2 & 3; River Bend, and Waterford 3 - Response to RIS 2019-02, Preparation and Scheduling of Operator Licensing Examinations ML19128A1582019-05-0808 May 2019 Notification of NRC Initial Operator Licensing Examination 05000416/2020301 ML19045A3732019-02-12012 February 2019 March 2019 GFE Cover Letter Riv ML19011A3712019-01-10010 January 2019 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2019 ML18116A2382018-04-26026 April 2018 Response to NRC Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations. ML18009A9852018-01-0808 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML18061A1652017-12-11011 December 2017 2017-12 Final Outlines ML18061A1722017-12-11011 December 2017 2017-12 Public Forms ML18050A0562017-12-11011 December 2017 2017-12 Post-Exam Analysis ML18050A0542017-12-11011 December 2017 2017-12 Final Written Exams ML18061A1692017-12-11011 December 2017 2017-12 Proposed Outlines ML18061A1712017-12-11011 December 2017 2017-12 Proposed Written Exams ML18050A0552017-12-11011 December 2017 2017-12 Final Operating Tests ML18061A1682017-12-11011 December 2017 2017-12 Proposed Outline Comments ML18061A1662017-12-11011 December 2017 2017-12 Proposed Operating Test Comments ML18061A1672017-12-11011 December 2017 2017-12 Proposed Operating Tests ML18061A1702017-12-11011 December 2017 2017-12 Proposed Written Exam Comments IR 05000416/20173022017-11-30030 November 2017 NRC Initial Operator Licensing Examination Approval 05000416/2017302 ML17135A4262017-05-12012 May 2017 Notification of NRC Initial Operator Licensing Examination 05000416/2017302 GNRO-2017/00031, NRC Form 536 Response to Regulatory Issue Summary 2017-032017-05-0404 May 2017 NRC Form 536 Response to Regulatory Issue Summary 2017-03 ML17013A5482017-01-13013 January 2017 Generic Fundamentals Section of the Written Operator Licensing Examination Scheduled for 2017 2024-03-21
[Table view] Category:Part 55 Examination Related Material
MONTHYEARIR 05000416/20243022024-03-21021 March 2024 Notification of NRC Initial Operator Licensing Exam 05000416/2024302 IR 05000416/20233012024-02-26026 February 2024 NRC Examination Report 05000416-2023301 ML24043A0732024-01-29029 January 2024 2024-01 Post Examination Comments IR 05000416/20243012024-01-16016 January 2024 NRC Initial Operator Licensing Examination Approval 05000416/2024301 ML23130A2732023-05-10010 May 2023 and Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23102A1482023-04-12012 April 2023 Notification of NRC Initial Operator Licensing Examination 05000416/2024301 ML22342B2602022-10-14014 October 2022 10 Public Forms ML22342B2592022-10-14014 October 2022 10 Post Examination Analysis ML22075A3442022-03-16016 March 2022 Response to Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations ML21342A2702021-12-0808 December 2021 GG-2022-10 Corp Notification Ltr - Cco, Grand Gulf Nuclear Station - Notification of NRC Initial Operator Licensing Examination 05000416/2022301 ML21349A1562021-10-25025 October 2021 GG-2021-10 Public Forms ML21333A2532021-10-25025 October 2021 GG-2021-10 Post Exam Analysis ML21280A0732021-10-0707 October 2021 NRC Initial Operator Licensing Examination Approval 05000416/2021301 ML21106A1512021-04-16016 April 2021 and Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2021-01, Preparation and Scheduling of Operator Licensing Examinations ML21041A5352021-02-11011 February 2021 Notification of NRC Initial Operator Licensing Examination 05000416/2021301 ML20072L2192020-03-12012 March 2020 Response to Regulatory Issue Summary 2020-01, Preparation and Scheduling of Operator Licensing Examinations ML20069C2262020-03-0909 March 2020 Notification of NRC Initial Operator Licensing Examination 05000416/2020302 ML20058J8112020-02-10010 February 2020 GG-2020-02 Public Forms ML20058H6262020-02-10010 February 2020 GG-2020-02 Draft Outline Comments ML20058H6212020-02-10010 February 2020 GG-2020-02 Final Operating Test ML20058H6182020-02-10010 February 2020 GG-2020-02 Draft Written Examination ML20058H6172020-02-10010 February 2020 GG-2020-02 Draft Written Examination Comments ML20058H6152020-02-10010 February 2020 GG-2020-02 Draft Outlines ML20058H6242020-02-10010 February 2020 GG-2020-02 Final Written Examination ML20058H6222020-02-10010 February 2020 GG-2020-02 Final Outlines ML20058H6112020-02-10010 February 2020 GG-2020-02 Draft Operating Test Comments ML20058H6142020-02-10010 February 2020 GG-2020-02 Draft Operating Test ML20058J8102020-02-10010 February 2020 GG-2020-02 Post Examination Analysis ML19135A6642019-05-15015 May 2019 Units 2 & 3; River Bend, and Waterford 3 - Response to RIS 2019-02, Preparation and Scheduling of Operator Licensing Examinations ML19128A1582019-05-0808 May 2019 Notification of NRC Initial Operator Licensing Examination 05000416/2020301 ML18116A2382018-04-26026 April 2018 Response to NRC Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations. ML18009A9852018-01-0808 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML18050A0552017-12-11011 December 2017 2017-12 Final Operating Tests ML18061A1692017-12-11011 December 2017 2017-12 Proposed Outlines ML18061A1682017-12-11011 December 2017 2017-12 Proposed Outline Comments ML18061A1702017-12-11011 December 2017 2017-12 Proposed Written Exam Comments ML18061A1672017-12-11011 December 2017 2017-12 Proposed Operating Tests ML18061A1712017-12-11011 December 2017 2017-12 Proposed Written Exams ML18050A0562017-12-11011 December 2017 2017-12 Post-Exam Analysis ML18050A0542017-12-11011 December 2017 2017-12 Final Written Exams ML18061A1722017-12-11011 December 2017 2017-12 Public Forms ML18061A1652017-12-11011 December 2017 2017-12 Final Outlines ML18061A1662017-12-11011 December 2017 2017-12 Proposed Operating Test Comments ML17135A4262017-05-12012 May 2017 Notification of NRC Initial Operator Licensing Examination 05000416/2017302 GNRO-2017/00031, NRC Form 536 Response to Regulatory Issue Summary 2017-032017-05-0404 May 2017 NRC Form 536 Response to Regulatory Issue Summary 2017-03 ML16291A2602016-10-13013 October 2016 Notification of NRC Initial Operator Licensing Examination 05000416/2017301 ML16272A1472016-09-28028 September 2016 Generic Fundamentals Examination Results Sept 2016 GNRO-2016/00042, NRC Form 536 Response to Regulatory Issue Summary 2016-09, Grand Gulf Nuclear Station, Unit 12016-07-29029 July 2016 NRC Form 536 Response to Regulatory Issue Summary 2016-09, Grand Gulf Nuclear Station, Unit 1 ML15351A0282015-12-17017 December 2015 Generic Fundamentals Section of the Written Operator Licensing Examination Scheduled for 2016 ML16019A3402015-12-14014 December 2015 2015-12 Post Exam Comments 2024-03-21
[Table view] |
Text
Exam Review Comments Following Validation NOTE: There was no ES-401-9 form filled out because this exam was authored by the NRC.
The following comments were made on the changes made by Grand Gulf following validation with the licensed operators. All the comments were resolved prior to making the exam final.
Question 4 - One could argue none of the distractors are correct since none of the listed conditions will directly result in a turbine trip and reactor scram. Level 8 is the scram and level 9 is the turbine trip.
Recommend - Change stem to read With the plant at full power, which of the following plant conditions?
Question 32 - The question asks if TS 3.5.2 is met. The stem does not provide information regarding the status of the other ECCS systems. Second, we dont expect the students to have the tech spec titles memorized by number.
Recommend - Change the last line of the stem to read, If all the other ECCS systems are operable, is TS 3.5.2, ECCS Shutdown, met?
Question 41 - Edit. Change the first line of the stem to read, The plant has experienced a transient and the following conditions currently exist:
Question 48 - The stem asks two questions but the distractors only provide one answer.
Recommend - Change the stem to ask only one question (the one that matches the distractors).
Question 59 - Stem wording is awkward.
Recommend - Change the stem to read What is required before the RHR system will initiate in the containment spray mode when using the Manual CTMT Spray pushbutton?
Question 70 - This question tests on TS below the line making it an SRO question.
Recommend - Replace the question.
Question 79 - We dont expect the applicants to have the various EOP graphs memorized.
Recommend - Provide the RPVST curve as a reference.
Question 87 - This is an RO question since it is a systems question (i.e. the procedure selection is not required to correctly answer the question).
Recommendation - Revise the question so the procedure selection is necessary to correctly answer the question.
Question 92 - Distractors C(2) and D(2) dont make sense.
Recommendation - Change distractor C(2) to match A(2) and change distractor D(2) to match B(2).
Question 93 - This is another RO systems question.
Recommendation - Change the latter part of the stem to read The SRO should FIRST direct the crew actions in accordance with: