ML14328A722: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(5 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 03/06/2015
| issue date = 03/06/2015
| title = 2015 Point Beach Nuclear Power Plant Initial License Examination Form ES-401-4
| title = 2015 Point Beach Nuclear Power Plant Initial License Examination Form ES-401-4
| author name = McNeil D R
| author name = Mcneil D
| author affiliation = NRC/RGN-III/DRS/OLB
| author affiliation = NRC/RGN-III/DRS/OLB
| addressee name =  
| addressee name =  
Line 14: Line 14:
| page count = 3
| page count = 3
}}
}}
=Text=
{{#Wiki_filter:ES-401                                Record of Rejected K/As                                    Form ES-401-4 Randomly Tier / Group                                                        Reason for Rejection Selected K/A RO Tier 1 /  APE 022AK1.04 Loss of Reactor Coolant Makeup Group 1                    Reason for changing from manual to automatic control of charging flow valve controller PBNP does not have a Charging Flow Valve Controller which has an automatic feature Reselected 022AK1.03 RO Tier 1 /  EPE 038EK1.04 Steam Generator Tube Rupture (SGTR)
Group 1                    Reflux boiling Reflux boiling is not used as a mitigation strategy for SGTR at PBNP Reselected 038EK1.01 RO Tier 1 /  APE 054K2.*  Loss of Main Feedwater (MFW)
Group 1 No K2.* K/A with an RO Importance Rating  2.5 Reselected 054G2.2.36 RO Tier 1 /  EPE 055EK2.*  Loss of Offsite and Onsite Power (Station Blackout)
Group 1 No K2.* K/A with an RO Importance Rating  2.5 Reselected 055G2.4.8 RO Tier 1 /  W/E04EA2.1    LOCA Outside Containment Group 1                    Facility conditions and selection of appropriate procedures during abnormal and emergency operations Determined to be an SRO level question due to selection of procedures while within the EOP network Reselected W/E04EA2.2 RO Tier 1 /  APE 059AK1.05 Accidental Liquid Radioactive-Waste Release Group 2                    The calculation of offsite doses due to a release from the power plant This is not an RO responsibility/job at PBNP Reselected 059AK1.01 RO Tier 1 /  W/E13EA2.1    Steam Generator Overpressure Group 2                    Facility conditions and selection of appropriate procedures during abnormal and emergency operations This is not an RO responsibility at PBNP due to being a Yellow Critical Safety Function Path.
Reselected W/E13EA2.2 RO Tier 2 /  SYS 010A3.01  Pressurizer Pressure Control System (PZR PCS)
Group 1                    PRT temperature and pressure during PORV testing No PORV testing is performed at PBNP which causes a temperature change in the PRT Reselected 010A3.02 RO Tier 2 /  SYS 078K5.*  Instrument Air System (IAS)
Group 1 No K5.* K/A with an RO Importance Rating  2.5 Reselected 078K1.04, see explanation below (061K1.*)
Randomly Tier / Group                                                        Reason for Rejection Selected K/A RO Tier 2 /  SYS 061K1.*  Auxiliary / Emergency Feedwater (AFW) System Group 1 Was not used due to no 078K5.* K/A with an RO Importance Rating  2.5, randomly selected the available K/As within 078 (Instrument Air) which had a K/A  2.5, and then randomly exchanged it with an already selected K/A (i.e., 061K1.*)
Reselected 061K5.05 RO Tier 2 /  SYS103K5.*    Containment System Group 1 No K5.* K/A with an RO Importance Rating  2.5 Reselected 103K3.01, see explanation below (073K3.*)
RO Tier 2 /  SYS 073K3.*  Process Radiation Monitoring (PRM) System Group 1 Was not used due to no 103K5.* K/A with an RO Importance Rating  2.5, randomly selected the available K/As within 103 (Containment) which had a K/A  2.5, and then exchanged it with an already selected K/A (i.e., 073K3.*)
Reselected 073K5.01 RO Tier 2 /  SYS 076K4.01  Service Water System (SWS)
Group 1                    Conditions initiating automatic closure of closed cooling water auxiliary building header supply and return valves The Auxiliary Building at PBNP does not have header supply and return valves with an automatic closure Reselected 076K4.06 RO Tier 2 /  SYS 076K4.06  Service Water System (SWS)
Group 1                    Service water train separation Train separation is only achieved by Service Water Pump power supplies at PBNP Reselected 076K4.02 RO Tier 2 /  SYS 029A4.04  Containment Purge System (CPS)
Group 2                    Containment evacuation signal Unable to construct a question with the required level of difficulty Reselected 029A4.01 RO Tier 2 /  SYS 029A4.01  Containment Purge System (CPS)
Group 2                    Containment purge flow rate Purge flow rate of the Containment Purge System is not monitored No further A4.* K/A exist with an RO Importance Rating  2.5, selected 029A3.01 due to A3 not being sampled within Tier 2/Group2 RO Tier 2 /  SYS 041K1.02  Steam Dump System (SDS) and Turbine Bypass Control Group 2                    S/G level Unable to construct a question with the required level of difficulty Reselected 041K1.05 SRO Tier 1 / APE 026G2.2.4 Loss of Component Cooling Water (CCW)
Group 1                    (multi-unit license) Ability to explain the variations in control board/control room layouts, systems, instrumentation, and procedural actions between units at a facility No differences between the units which can be leveraged as a question to the requirements of an SRO level question (meeting the requirements of 10CFR55.43(b))
Reselected 026G2.2.38
Randomly Tier / Group                                                          Reason for Rejection Selected K/A SRO Tier 1 / APE 040AA2.02  Steam Line Rupture Group 1                    Conditions requiring a reactor trip Unable to write a question to the requirements of an SRO level question (meeting the requirements of 10CFR55.43(b))
Reselected 040AA2.04 SRO Tier 1 / APE 036G2.1.25 Fuel Handling Incidents Group 2                    Ability to interpret reference materials, such as graphs, curves, tables, etc Unable to write a question to the requirements of an SRO level question (meeting the requirements of 10CFR55.43(b))
Reselected 036G2.1.31 SRO Tier 1 / APE 036G2.1.31 Fuel Handling Incidents Group 2                    Ability to locate control room switches, controls, and indications, and to determine that they correctly reflect the desired plant lineup.
Unable to write a question to the requirements of an SRO level question (meeting the requirements of 10CFR55.43(b))
Reselected 036G2.1.23 SRO Tier 2 / SYS 007A2.06  Pressurizer Relief Tank/Quench Tank System (PRTS)
Group 1                    Bubble formation in PZR Unable to write a question to the requirements of an SRO level question (meeting the requirements of 10CFR55.43(b))
Reselected 007A2.07 SRO Tier 2 / SYS 007A2.07  Pressurizer Relief Tank/Quench Tank System (PRTS)
Group 1                    Recirculating quench tank There are no procedures at PBNP which accomplish this task. Unable to write a question to the requirements of an SRO level question (meeting the requirements of 10CFR55.43(b))
Reselected 007A2.01 SRO Tier 2 / SYS 011G2.1.31 Pressurizer Level Control System (PZR LCS)
Group 2                    Ability to locate control room switches, controls, and indications, and to determine that they correctly reflect the desired plant lineup Unable to write a question to the requirements of an SRO level question (meeting the requirements of 10CFR55.43(b))
Reselected 011G2.1.32 RO Tier 2 /  SYS 022G2.2.4  Containment Spray System (CSS)
Group 2                    (multi-unit license) Ability to explain the variations in control board/control room layouts, systems, instrumentation, and procedural actions between units at a facility Unable to write a question to meet this K/A due to no major differences between units for this system Reselected 022G2.2.39 RO Tier 2 /  SYS 078K1.04  Instrument Air System (IAS)
Group 1                    Cooling water to compressor Unable to write a question to meet this K/A due only one station air compressor has cooling water supplied to it, and there is a question focused on this in the test already (SRO Tier 1/Group 1, 065A204 -
Typical conditions which could cause a compressor trip (e.g., high temperature)
Reselected 078K1.05}}

Latest revision as of 19:11, 31 October 2019

2015 Point Beach Nuclear Power Plant Initial License Examination Form ES-401-4
ML14328A722
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 03/06/2015
From: Mcneil D
NRC/RGN-III/DRS/OLB
To:
Shared Package
ML14328A659 List:
References
Download: ML14328A722 (3)


Text

ES-401 Record of Rejected K/As Form ES-401-4 Randomly Tier / Group Reason for Rejection Selected K/A RO Tier 1 / APE 022AK1.04 Loss of Reactor Coolant Makeup Group 1 Reason for changing from manual to automatic control of charging flow valve controller PBNP does not have a Charging Flow Valve Controller which has an automatic feature Reselected 022AK1.03 RO Tier 1 / EPE 038EK1.04 Steam Generator Tube Rupture (SGTR)

Group 1 Reflux boiling Reflux boiling is not used as a mitigation strategy for SGTR at PBNP Reselected 038EK1.01 RO Tier 1 / APE 054K2.* Loss of Main Feedwater (MFW)

Group 1 No K2.* K/A with an RO Importance Rating 2.5 Reselected 054G2.2.36 RO Tier 1 / EPE 055EK2.* Loss of Offsite and Onsite Power (Station Blackout)

Group 1 No K2.* K/A with an RO Importance Rating 2.5 Reselected 055G2.4.8 RO Tier 1 / W/E04EA2.1 LOCA Outside Containment Group 1 Facility conditions and selection of appropriate procedures during abnormal and emergency operations Determined to be an SRO level question due to selection of procedures while within the EOP network Reselected W/E04EA2.2 RO Tier 1 / APE 059AK1.05 Accidental Liquid Radioactive-Waste Release Group 2 The calculation of offsite doses due to a release from the power plant This is not an RO responsibility/job at PBNP Reselected 059AK1.01 RO Tier 1 / W/E13EA2.1 Steam Generator Overpressure Group 2 Facility conditions and selection of appropriate procedures during abnormal and emergency operations This is not an RO responsibility at PBNP due to being a Yellow Critical Safety Function Path.

Reselected W/E13EA2.2 RO Tier 2 / SYS 010A3.01 Pressurizer Pressure Control System (PZR PCS)

Group 1 PRT temperature and pressure during PORV testing No PORV testing is performed at PBNP which causes a temperature change in the PRT Reselected 010A3.02 RO Tier 2 / SYS 078K5.* Instrument Air System (IAS)

Group 1 No K5.* K/A with an RO Importance Rating 2.5 Reselected 078K1.04, see explanation below (061K1.*)

Randomly Tier / Group Reason for Rejection Selected K/A RO Tier 2 / SYS 061K1.* Auxiliary / Emergency Feedwater (AFW) System Group 1 Was not used due to no 078K5.* K/A with an RO Importance Rating 2.5, randomly selected the available K/As within 078 (Instrument Air) which had a K/A 2.5, and then randomly exchanged it with an already selected K/A (i.e., 061K1.*)

Reselected 061K5.05 RO Tier 2 / SYS103K5.* Containment System Group 1 No K5.* K/A with an RO Importance Rating 2.5 Reselected 103K3.01, see explanation below (073K3.*)

RO Tier 2 / SYS 073K3.* Process Radiation Monitoring (PRM) System Group 1 Was not used due to no 103K5.* K/A with an RO Importance Rating 2.5, randomly selected the available K/As within 103 (Containment) which had a K/A 2.5, and then exchanged it with an already selected K/A (i.e., 073K3.*)

Reselected 073K5.01 RO Tier 2 / SYS 076K4.01 Service Water System (SWS)

Group 1 Conditions initiating automatic closure of closed cooling water auxiliary building header supply and return valves The Auxiliary Building at PBNP does not have header supply and return valves with an automatic closure Reselected 076K4.06 RO Tier 2 / SYS 076K4.06 Service Water System (SWS)

Group 1 Service water train separation Train separation is only achieved by Service Water Pump power supplies at PBNP Reselected 076K4.02 RO Tier 2 / SYS 029A4.04 Containment Purge System (CPS)

Group 2 Containment evacuation signal Unable to construct a question with the required level of difficulty Reselected 029A4.01 RO Tier 2 / SYS 029A4.01 Containment Purge System (CPS)

Group 2 Containment purge flow rate Purge flow rate of the Containment Purge System is not monitored No further A4.* K/A exist with an RO Importance Rating 2.5, selected 029A3.01 due to A3 not being sampled within Tier 2/Group2 RO Tier 2 / SYS 041K1.02 Steam Dump System (SDS) and Turbine Bypass Control Group 2 S/G level Unable to construct a question with the required level of difficulty Reselected 041K1.05 SRO Tier 1 / APE 026G2.2.4 Loss of Component Cooling Water (CCW)

Group 1 (multi-unit license) Ability to explain the variations in control board/control room layouts, systems, instrumentation, and procedural actions between units at a facility No differences between the units which can be leveraged as a question to the requirements of an SRO level question (meeting the requirements of 10CFR55.43(b))

Reselected 026G2.2.38

Randomly Tier / Group Reason for Rejection Selected K/A SRO Tier 1 / APE 040AA2.02 Steam Line Rupture Group 1 Conditions requiring a reactor trip Unable to write a question to the requirements of an SRO level question (meeting the requirements of 10CFR55.43(b))

Reselected 040AA2.04 SRO Tier 1 / APE 036G2.1.25 Fuel Handling Incidents Group 2 Ability to interpret reference materials, such as graphs, curves, tables, etc Unable to write a question to the requirements of an SRO level question (meeting the requirements of 10CFR55.43(b))

Reselected 036G2.1.31 SRO Tier 1 / APE 036G2.1.31 Fuel Handling Incidents Group 2 Ability to locate control room switches, controls, and indications, and to determine that they correctly reflect the desired plant lineup.

Unable to write a question to the requirements of an SRO level question (meeting the requirements of 10CFR55.43(b))

Reselected 036G2.1.23 SRO Tier 2 / SYS 007A2.06 Pressurizer Relief Tank/Quench Tank System (PRTS)

Group 1 Bubble formation in PZR Unable to write a question to the requirements of an SRO level question (meeting the requirements of 10CFR55.43(b))

Reselected 007A2.07 SRO Tier 2 / SYS 007A2.07 Pressurizer Relief Tank/Quench Tank System (PRTS)

Group 1 Recirculating quench tank There are no procedures at PBNP which accomplish this task. Unable to write a question to the requirements of an SRO level question (meeting the requirements of 10CFR55.43(b))

Reselected 007A2.01 SRO Tier 2 / SYS 011G2.1.31 Pressurizer Level Control System (PZR LCS)

Group 2 Ability to locate control room switches, controls, and indications, and to determine that they correctly reflect the desired plant lineup Unable to write a question to the requirements of an SRO level question (meeting the requirements of 10CFR55.43(b))

Reselected 011G2.1.32 RO Tier 2 / SYS 022G2.2.4 Containment Spray System (CSS)

Group 2 (multi-unit license) Ability to explain the variations in control board/control room layouts, systems, instrumentation, and procedural actions between units at a facility Unable to write a question to meet this K/A due to no major differences between units for this system Reselected 022G2.2.39 RO Tier 2 / SYS 078K1.04 Instrument Air System (IAS)

Group 1 Cooling water to compressor Unable to write a question to meet this K/A due only one station air compressor has cooling water supplied to it, and there is a question focused on this in the test already (SRO Tier 1/Group 1, 065A204 -

Typical conditions which could cause a compressor trip (e.g., high temperature)

Reselected 078K1.05