ML15079A320: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(6 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 03/06/2015
| issue date = 03/06/2015
| title = 2015 Point Beach Nuclear Plant Initial License Examination Administered Admin Jpms RO
| title = 2015 Point Beach Nuclear Plant Initial License Examination Administered Admin Jpms RO
| author name = McNeil D R
| author name = Mcneil D
| author affiliation = NRC/RGN-III/DRS/OLB
| author affiliation = NRC/RGN-III/DRS/OLB
| addressee name =  
| addressee name =  
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:JOB PERFORMANCE MEASURE JPM Page 1 of 9 TR-AA-230-1003-F10, Revision 2 JPM TITLE: PERFORM SHUTDOWN MARGIN CALCULATION FOR AN OPERATING REACTOR   JPM NUMBER: PBN JPM P000.002d.COT REV. 4   TASK NUMBER(S) / TASK TITLE(S): P000.002.COT / PERFORM SHUTDOWN MARGIN CALCULATION FOR AN OPERATING REACTOR   K/A NUMBERS: 003 AK1.07  003 AK3.04 2.1.25  K/A VALUE: 3.1/3.9 3.8/4.1 3.9/4.2   Justification (FOR K/A VALUES <3.0):   TASK APPLICABILITY:   RO   SRO     STA     Non-Lic   SRO CERT   OTHER:       APPLICABLE METHOD OF TESTING: Simulate/Walkthrough:   Perform: X   EVALUATION LOCATION: In-Plant:   Control Room:           Simulator: X Other: X         Lab:       Time for Completion: 20 Minutes Time Critical: NO     Alternate Path [NRC]: N/A   Alternate Path [INPO]: N/A       Developed by: Jeffrey Hinze         Instructor/Developer Date     Reviewed by: Andrew Zommers         Instructor (Instructional Review) Date Validated by: Jeff Baugniet         SME (Technical Review) Date Approved by: Randy Amundson         Training Supervision   Date Approved by: Tom Larson         Training Program Owner Date PBN JPM P000.002d.COT, Perform Shutdown Margin Calculation for an Operating Reactor, Rev. 4 JPM Page 2 of 9 TR-AA-230-1003-F10, Revision 2  I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues.
{{#Wiki_filter:JPM JOB PERFORMANCE MEASURE                                   Page 1 of 9 JPM TITLE:               PERFORM SHUTDOWN MARGIN CALCULATION FOR AN OPERATING REACTOR JPM NUMBER:               PBN JPM P000.002d.COT                           REV. 4 TASK NUMBER(S) /         P000.002.COT / PERFORM SHUTDOWN MARGIN CALCULATION TASK TITLE(S):            FOR AN OPERATING REACTOR 003 AK1.07                                      3.1/3.9 K/A NUMBERS:             003 AK3.04                 K/A VALUE:         3.8/4.1 2.1.25                                          3.9/4.2 Justification (FOR K/A VALUES <3.0):
TASK APPLICABILITY:
RO           SRO             STA           Non-Lic     SRO CERT               OTHER:
APPLICABLE METHOD OF TESTING:                 Simulate/Walkthrough:             Perform:   X EVALUATION LOCATION:             In-Plant:                     Control Room:
Simulator:     X             Other:               X Lab:
Time for Completion:           20     Minutes         Time Critical:           NO Alternate Path [NRC]:                   N/A Alternate Path [INPO]:                 N/A Developed by:                             Jeffrey Hinze Instructor/Developer                               Date Reviewed by:                         Andrew Zommers Instructor (Instructional Review)                         Date Validated by:                             Jeff Baugniet SME (Technical Review)                               Date Approved by:                         Randy Amundson Training Supervision                               Date Approved by:                             Tom Larson Training Program Owner                               Date TR-AA-230-1003-F10, Revision 2
 
PBN JPM P000.002d.COT, Perform Shutdown Margin                         JPM Calculation for an Operating Reactor, Rev. 4                   Page 2 of 9 I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.
INITIAL CONDITIONS: Unit 1 had been operating at 100% power. Rod H-2 in Shutdown Bank "A" has dropped to the bottom of the core. The crew is responding in accordance with AOP-6A, "Dropped Rod". Assume today's date and time is current.
INITIAL CONDITIONS:
INITIATING CUES: OS1 has directed you to calculate the required shutdown margin in accordance with PBF-2513, Shutdown Margin for an Operating Reactor, per Step 9 of AOP-6A. The following Unit 1 conditions currently exist: Boron Concentration - 1125 ppm Rx Power - 90% Tave - 572 F Tref - 573 F Control Bank D @ 180 steps All other banks @ 228 steps JOB PERFORMANCE MEASURE  JPM Page 3 of 9  TR-AA-230-1003-F10, Revision 2 JPM PERFORMANCE INFORMATION  Start Time:    NOTE:  When providing "Evaluator Cues" to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinee's actions warrant receiving the information (i.e., the examinee looks or asks for the indication). NOTE: Critical steps are marked with a "Y" below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.
* Unit 1 had been operating at 100% power.
Performance Step: 1 Critical  N  Verify TAVG within 1.5&deg;F of TREF. Standard: Verify TAVG within 1.5&deg;F of TREF based on initial conditions given and circle YES on PBF-2513. Performance:  SATISFACTORY        UNSATISFACTORY      Comments:     
* Rod H-2 in Shutdown Bank "A" has dropped to the bottom of the core.
* The crew is responding in accordance with AOP-6A, "Dropped Rod".
* Assume todays date and time is current.
INITIATING CUES:
* OS1 has directed you to calculate the required shutdown margin in accordance with PBF-2513, Shutdown Margin for an Operating Reactor, per Step 9 of AOP-6A.
The following Unit 1 conditions currently exist:
* Boron Concentration - 1125 ppm
* Rx Power - 90%
* Tave - 572 &deg;F
* Tref - 573 &deg;F
* Control Bank D @ 180 steps
* All other banks @ 228 steps TR-AA-230-1003-F10, Revision 2


JOB PERFORMANCE MEASURE JPM Page 4 of 9 TR-AA-230-1003-F10, Revision 2 Performance Step: 2 Critical  Y  Obtain Core Burn-Up from ROD 1.1. Standard: Core burn-up determined to be 2120 +/- 30 MWD/MTU (2090-2150). Evaluator Note: Core burn-up determined to be 2120 MWD/MTU and recorded on PBF-2513. From ROD 1.1, examinee will have 1930 MWD/MTU five days ago and will need to add 190 MWD/MTU (5 Days
JPM JOB PERFORMANCE MEASURE                                   Page 3 of 9 JPM PERFORMANCE INFORMATION Start Time:
* 38 MWD/MTU/Day)  Evaluator Cue: Provide examinee with a copy of Unit 1 ROD book. Performance: SATISFACTORY       UNSATISFACTORY      Comments:      Performance Step: 3 Critical   N Obtain Nominal EOL Burn-Up from ROD1.1. Standard: EOL burn-up determined to be 18874 MWD/MTU and recorded on PBF-2513. Performance: SATISFACTORY       UNSATISFACTORY       Comments:    
NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).
NOTE: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.
Performance Step: 1       Verify TAVG within 1.5&deg;F of TREF.
Critical N Standard:                  Verify TAVG within 1.5&deg;F of TREF based on initial conditions given and circle YES on PBF-2513.
Performance:               SATISFACTORY               UNSATISFACTORY Comments:
TR-AA-230-1003-F10, Revision 2


JOB PERFORMANCE MEASURE JPM Page 5 of TR-AA-230-1003-F10, Revision 2 Performance Step: 4 Critical  N  Calculate % Burn-Up. Standard: Calculate % burn-up to be 11.23% + 0.16% (11.07-11.39) and record on PBF-2513. Performance: SATISFACTORY       UNSATISFACTORY       Comments:       Performance Step: 5 Critical  N  Obtain Reactor Power Level (%). Standard: Record 90% on PBF-2513. Performance: SATISFACTORY _____ UNSATISFACTORY _____   Comments:
JPM JOB PERFORMANCE MEASURE                           Page 4 of 9 Performance Step: 2        Obtain Core Burn-Up from ROD 1.1.
Performance Step: 6 Critical  N  Obtain Control Rod Position   Standard: Bank C and D control rod position determined to be 228 and 180 steps and recorded on PBF-2513. Evaluator Cue: If asked Bank C is at 228 steps per initial conditions. Performance: SATISFACTORY _____ UNSATISFACTORY _____    Comments:       
Critical Y Standard:                  Core burn-up determined to be 2120 +/- 30 MWD/MTU (2090-2150).
Evaluator Note:            Core burn-up determined to be 2120 MWD/MTU and recorded on PBF-2513. From ROD 1.1, examinee will have 1930 MWD/MTU five days ago and will need to add 190 MWD/MTU (5 Days
* 38 MWD/MTU/Day)
Evaluator Cue:            Provide examinee with a copy of Unit 1 ROD book.
Performance:              SATISFACTORY              UNSATISFACTORY Comments:
Performance Step: 3        Obtain Nominal EOL Burn-Up from ROD1.1.
Critical N Standard:                  EOL burn-up determined to be 18874 MWD/MTU and recorded on PBF-2513.
Performance:              SATISFACTORY              UNSATISFACTORY Comments:
TR-AA-230-1003-F10, Revision 2
 
JPM JOB PERFORMANCE MEASURE                                Page 5 of 9 Performance Step: 4       Calculate % Burn-Up.
Critical N Standard:                 Calculate % burn-up to be 11.23% + 0.16% (11.07-11.39) and record on PBF-2513.
Performance:               SATISFACTORY               UNSATISFACTORY Comments:
Performance Step: 5         Obtain Reactor Power Level (%).
Critical N Standard:                   Record 90% on PBF-2513.
Performance:               SATISFACTORY _____ UNSATISFACTORY _____
Comments:
Performance Step: 6         Obtain Control Rod Position Critical N Standard:                   Bank C and D control rod position determined to be 228 and 180 steps and recorded on PBF-2513.
Evaluator Cue:             If asked Bank C is at 228 steps per initial conditions.
Performance:                SATISFACTORY _____ UNSATISFACTORY _____
Comments:
TR-AA-230-1003-F10, Revision 2
 
JPM JOB PERFORMANCE MEASURE                                Page 6 of 9 Performance Step: 7        Obtain Power Defect from ROD 7.
Critical Y Standard:                  Determine power defect to be 1620 pcm + 20 pcm (1600-1640, based on possible min/max reading on graph) and record on PBF-2513.
Performance:               SATISFACTORY _____ UNSATISFACTORY _____
Comments:
Performance Step: 8        Obtain Control Rod Worth (Bank D, C, B, A, S in, at HZP) from Critical Y                  ROD 5.
Standard:                  Determine control rod worth (Bank D, C, B, A, S in, at HZP) to be 6550 pcm and record on PBF-2513.
Performance:                SATISFACTORY _____ UNSATISFACTORY _____
Comments:
Performance Step: 9        Obtain Stuck Rod Worth from ROD 5.
Critical Y Standard:                  Determine stuck rod worth to be 689 pcm and record on PBF-2513.
Performance:                SATISFACTORY _____ UNSATISFACTORY _____
Comments:
TR-AA-230-1003-F10, Revision 2
 
JPM JOB PERFORMANCE MEASURE                                Page 7 of 9 Performance Step: 10        Calculate Stuck Rod Worth minus Control Rod Worth.
Critical Y Standard:                  Calculate stuck rod worth minus control rod worth to be 5861 pcm and record on PBF-2513.
Performance:                SATISFACTORY _____ UNSATISFACTORY _____
Comments:
Performance Step: 11        Obtain Bank Worth to ARO from ROD 3.1, Use Step 2 and Step 6 Critical Y                  data.
Standard:                  Determine bank worth to ARO to be 141 pcm and record on PBF-2513.
Performance:                SATISFACTORY _____ UNSATISFACTORY _____
Comments:
Performance Step: 12        Obtain correct value for dropped rod, stuck rod or no abnormal Critical N                  condition.
Standard:                  Determine dropped rod and enter Stuck Rod Worth from ROD 5 and record 689 pcm on PBF-2513.
Performance:                SATISFACTORY _____ UNSATISFACTORY _____
Comments:
TR-AA-230-1003-F10, Revision 2
 
JPM JOB PERFORMANCE MEASURE                                  Page 8 of 9 Performance Step: 13        Calculate Total Available Control Rod Negative Reactivity by Critical Y                  adding Step 10, 11, 12 and 250 pcm.
Standard:                  Determine Total available control rod negative reactivity to be 4781 pcm and record on PBF-2513.
Performance:                SATISFACTORY _____ UNSATISFACTORY _____
Comments:
Performance Step: 14        Calculates Shut Down Margin by adding Steps 13 and 7.
Critical Y Standard:                  Determine calculated SDM to be 3161 + 20 pcm (3141-3181) and record on PBF-2513.
Performance:                SATISFACTORY _____ UNSATISFACTORY _____
Comments:
Performance Step: 15        Determine the Required Shut Down Margin using TRM 2.1, [COLR]
Critical Y                  Figure 2 using Step 4 data.
Standard:                  Determines required SDM to be -2000 pcm and record on PBF-2513.
Performance:                SATISFACTORY _____ UNSATISFACTORY _____
Comments:
TR-AA-230-1003-F10, Revision 2
 
JPM JOB PERFORMANCE MEASURE                              Page 9 of 9 Performance Step: 16        Determines if calculated Shut Down Margin is more negative than Critical Y                  Required Shut Down Margin.
Standard:                  Determines Calculated SDM is greater than Required SDM AND circles YES on PBF-2513.
Performance:                SATISFACTORY _____ UNSATISFACTORY _____
Comments:
Performance Step: 17        Inform OS1 you calculated the shutdown margin in accordance with Critical N                  PBF-2513, "Shutdown Margin for an Operating Reactor" and shutdown margin is satisfactory.
Standard:                  Inform OS1 that SDM calculation is complete.
Performance:                SATISFACTORY _____ UNSATISFACTORY _____
Comments:
Terminating Cues:        This completes the JPM Stop Time:
TR-AA-230-1003-F10, Revision 2
 
JOB PERFORMANCE MEASURE                                          JPM Page 1 of 8 JPM TITLE:                Calculate and Adjust PPCS Forebay and Pump Bay Alarm Setpoints JPM NUMBER:                PBN JPM P075.005a.COT                                REV. 0 TASK NUMBER(S) /          PBN P075.005.COT Operate the Circulating Water Pumps in different TASK TITLE(S):            combinations K/A NUMBERS:              2.2.14                          K/A VALUE:    3.9/4.3 Justification (FOR K/A VALUES <3.0):
TASK APPLICABILITY:
RO      SRO      STA      Non-Lic      SRO CERT          OTHER:
APPLICABLE METHOD OF TESTING:                    Simulate/Walkthrough:              Perform:   X EVALUATION LOCATION:            In-Plant:                              Control Room:
Simulator:      X                      Other:
Lab:
Time for Completion:      10        Minutes      Time Critical:      NO Alternate Path [NRC]:    NO Alternate Path [INPO]:    NO Developed by:                            Andrew Zommers Instructor/Developer                                Date Reviewed by:                                Jeff Hinze Instructor (Instructional Review)                        Date Validated by:                              Jeff Baugniet SME (Technical Review)                                Date Approved by:                            Randy Amundson Training Supervision                                Date Approved by:                              Tom Larson Training Program Owner                                Date TR-AA-230-1003-F10, Revision 2
 
PBN JPM P075.005a.COT Calculate and Adjust PPCS Forebay and                      JPM Pump Bay Alarm Setpoints, Rev. 0                              Page 2 of 8 I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.
INITIAL CONDITIONS:
* Today's date is 20 November 2014
* Per OI 38, Circulating Water System Operation, we are going to shift Circulating Water Pumps from 2 running per unit down to a single Circulating Water Pump per unit.
* Both 1CW-2 and 2CW-2, Circulating Water Intake valves will remain open.
INITIATING CUES (IF APPLICABLE):
* OS2 has directed you to calculate and adjust the PPCS Forebay and Pump Bay alarm setpoints per PBF-2124, PPCS Forebay and Pump Bay Level Alarm Setpoints.
TR-AA-230-1003-F10, Revision 2


JOB PERFORMANCE MEASURE JPM Page 6 of 9  TR-AA-230-1003-F10, Revision 2 Performance Step: 7 Critical   Y  Obtain Power Defect from ROD 7. Standard: Determine power defect to be 1620 pcm + 20 pcm (1600-1640, based on possible min/max reading on graph) and record on PBF-2513. Performance: SATISFACTORY _____  UNSATISFACTORY _____    Comments:       Performance Step: 8 Critical  Y  Obtain Control Rod Worth (Bank D, C, B, A, S in, at HZP) from ROD 5. Standard: Determine control rod worth (Bank D, C, B, A, S in, at HZP) to be 6550 pcm and record on PBF-2513. Performance: SATISFACTORY  _____  UNSATISFACTORY  _____    Comments:
JOB PERFORMANCE MEASURE                                   JPM Page 3 of 8 JPM PERFORMANCE INFORMATION Start Time:
Performance Step: 9 Critical  Y  Obtain Stuck Rod Worth from ROD 5. Standard: Determine stuck rod worth to be 689 pcm and record on PBF-2513. Performance: SATISFACTORY _____  UNSATISFACTORY _____    Comments:    
NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).
NOTE: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.
Performance Step: 1          Review 3 notes prior to performing step 1.4 Critical N Standard:                   Review 3 notes prior to performing step 1.4 Performance:                 SATISFACTORY                 UNSATISFACTORY Comments:
Performance Step: 2          1.0 Obtain Lake Michigan Water level information as follows: (cont)
Critical Y                      1.4 RECORD Mean level for Lake Michigan Huron below and SUBTRACT 580.9 feet to correct for plant elevation:
Standard:                   Record the value of 579.21 (Mean Level) and subtract 580.9 for final value of (-1.69)
Evaluator Note:             NOTE: At bottom of column labeled "Michigan Huron Lake Mean" the Mean level for current month will be displayed.
NOTE: 580.9 ft. comes from the sum of 580.2 ft IGLD 1955 (which is plant elevation zero) and 0.7 ft, the delta between IGLD 1955 and IGLD 1985.
NOTE: Corrected mean level is the difference in Lake Michigan level as compared to plant elevation zero.
Performance:                 SATISFACTORY                 UNSATISFACTORY Comments:
TR-AA-230-1003-F10, Revision 2


JOB PERFORMANCE MEASURE JPM Page 7 of 9  TR-AA-230-1003-F10, Revision 2 Performance Step: 10 Critical  Y  Calculate Stuck Rod Worth minus Control Rod Worth. Standard: Calculate stuck rod worth minus control rod worth to be 5861 pcm and record on PBF-2513. Performance:  SATISFACTORY  _____  UNSATISFACTORY  _____    Comments:      Performance Step: 11 Critical  Y  Obtain Bank Worth to ARO from ROD 3.1, Use Step 2 and Step 6 data. Standard: Determine bank worth to ARO to be 141 pcm and record on PBF-2513. Performance: SATISFACTORY _____  UNSATISFACTORY _____    Comments:
JOB PERFORMANCE MEASURE                                     JPM Page 4 of 8 Performance Step: 3          1.0 Obtain Lake Michigan Water level information as follows: (cont)
Performance Step: 12 Critical   N  Obtain correct value for dropped rod, stuck rod or no abnormal condition. Standard: Determine dropped rod and enter Stuck Rod Worth from ROD 5 and record 689 pcm on PBF-2513. Performance: SATISFACTORY _____  UNSATISFACTORY _____    Comments:    
Critical N                      1.5 IF Web Site in step 1.1 used, THEN PRINT a copy of the current months Great Lakes Water Levels in (Feet) IGLD 85 AND ATTACH to this form.
Standard:                   Retain copy, attach to form and initial the step.
Performance:                 SATISFACTORY                 UNSATISFACTORY Comments:
Performance Step: 4          2.0 RECORD the head loss for the CW System configuration from the Critical Y                  table below:__________
Standard:                    Locate and enter the value for 2 intake pipes, 2 CW pumps running (one per unit). Value is (-1.6)
Evaluator Note:              NOTE: Head loss values were calculated assuming CW waterbox valves are fully open and minimal condenser fouling. Throttled waterbox valves or fouled condensers would result in higher observed forebay levels.
NOTE: High Lake water level alarm and High-High Lake water level alarm calculation is a function of CW intake valve alignment, number of cooling water (CW) pumps in service, and the two values used from Table 6-5 Calculation 2014-06279 Time Available To Respond To Rising Lake Level.
Evaluator Cue:              If asked, all waterbox valves are open and thermodynamic testing indicated that waterboxes are not fouled.
Performance:                 SATISFACTORY                 UNSATISFACTORY Comments:
TR-AA-230-1003-F10, Revision 2


JOB PERFORMANCE MEASURE JPM Page 8 of 9  TR-AA-230-1003-F10, Revision 2 Performance Step: 13 Critical  Y  Calculate Total Available Control Rod Negative Reactivity by adding Step 10, 11, 12 and 250 pcm. Standard: Determine Total available control rod negative reactivity to be  4781 pcm and record on PBF-2513. Performance: SATISFACTORY  _____  UNSATISFACTORY  _____    Comments:      Performance Step: 14 Critical   Y Calculates Shut Down Margin by adding Steps 13 and 7. Standard: Determine calculated SDM to be 3161 + 20 pcm (3141-3181) and record on PBF-2513. Performance: SATISFACTORY _____  UNSATISFACTORY _____    Comments:     Performance Step: 15 Critical   Y Determine the Required Shut Down Margin using TRM 2.1, [COLR] Figure 2 using Step 4 data. Standard: Determines required SDM to be -2000 pcm and record on PBF-2513. Performance: SATISFACTORY _____  UNSATISFACTORY _____    Comments:    
JOB PERFORMANCE MEASURE                                     JPM Page 5 of 8 Performance Step: 5          3.0 ADD Steps 1.4 and 2.0 to obtain forebay/pump bay level:
Critical Y                   ________ + _______ = ________
Standard:                   Enter the value from step 1.4 (-1.69) add the value from step 2.0 (-1.6) for a total of (-3.29)
Performance:                 SATISFACTORY                 UNSATISFACTORY Comments:
Performance Step: 6          4.0 CALCULATE Low Alarm Limit #1 level setpoint to be one foot below Critical Y                   forebay level determined in Step 3.0 as follows:
Forebay/pump bay level from Step 3.0 - 1 foot = Forebay/pump bay Low Alarm Limit #1 setpoints Standard:                    Enter the value from step 3.0 (-3.29) and subtract (1) for a total of
(-4.29)
Evaluator Note:                                              CAUTION:
LO and LO-LO level alarms should NOT be set less than -11.0 feet and -11.5 feet, respectively. Forebay level and/or pump bay of less than -11.5 feet is a violation of TLCO 3.7.7 for SW System.
Performance:                 SATISFACTORY                 UNSATISFACTORY Comments:
TR-AA-230-1003-F10, Revision 2


JOB PERFORMANCE MEASURE JPM Page 9 of 9  TR-AA-230-1003-F10, Revision 2 Performance Step: 16 Critical   Y Determines if calculated Shut Down Margin is more negative than Required Shut Down Margin. Standard: Determines Calculated SDM is greater than Required SDM AND circles YES on PBF-2513. Performance: SATISFACTORY _____  UNSATISFACTORY _____    Comments:       Performance Step: 17 Critical   N  Inform OS1 you calculated the shutdown margin in accordance with PBF-2513, "Shutdown Margin for an Operating Reactor" and shutdown margin is satisfactory. Standard: Inform OS1 that SDM calculation is complete. Performance: SATISFACTORY _____  UNSATISFACTORY _____    Comments:     Terminating Cues: This completes the JPM  Stop Time:   
JOB PERFORMANCE MEASURE                                     JPM Page 6 of 8 Performance Step: 7          5.0 CALCULATE Low-Low Alarm Limit #2 setpoint to be 1.5 feet below Critical Y                  forebay level determined in Step 3.0 as follows:
Forebay/pump bay level from Step 3.0 - 1.5 foot = Forebay/pump bay Low Alarm Limit #1 setpoints Standard:                    Enter the value from step 3.0 (-3.29) and subtract (1.5) for a total of
(-4.79)
Performance:                SATISFACTORY                UNSATISFACTORY Comments:
Performance Step: 8          6.0 ENTER the LEAST NEGATIVE value of:
Critical Y                   Step 4.0 of _______ OR -11.0 feet to establish new Lo Alarm Limit #1 level setpoint. __________
Standard:                   Enter the value from step 4.0 (-4.29) and the least negative value of (-
4.29)
Performance:                 SATISFACTORY                 UNSATISFACTORY Comments:
Performance Step: 9          7.0 ENTER the LEAST NEGATIVE value of:
Critical Y                  Step 5.0 of _______ OR -11.5 feet to establish new Lo-Lo Alarm Limit #2 level setpoint. __________
Standard:                   Enter the value from step 4.0 (-4.79) and the least negative value of (-
4.79)
Performance:                 SATISFACTORY                 UNSATISFACTORY Comments:
TR-AA-230-1003-F10, Revision 2


JOB PERFORMANCE MEASURE JPM Page 1 of 8 TR-AA-230-1003-F10, Revision 2  JPM TITLE: Calculate and Adjust PPCS Forebay and Pump Bay Alarm Setpoints  JPM NUMBER:  PBN JPM P075.005a.COT REV. 0   TASK NUMBER(S) / TASK TITLE(S):  PBN P075.005.COT Operate the Circulating Water Pumps in different combinations  K/A NUMBERS:  2.2.14 K/A VALUE:  3.9/4.3  Justification (FOR K/A VALUES <3.0):   TASK APPLICABILITY:    RO  SRO    STA    Non-Lic  SRO CERT  OTHER:        APPLICABLE METHOD OF TESTING: Simulate/Walkthrough:  Perform: X  EVALUATION LOCATION: In-Plant:  Control Room:          Simulator: X  Other:          Lab:       Time for Completion:  10 Minutes Time Critical:  NO     Alternate Path [NRC]: NO   Alternate Path [INPO]: NO        Developed by: Andrew Zommers        Instructor/Developer  Date     Reviewed by: Jeff Hinze        Instructor (Instructional Review) Date Validated  by: Jeff Baugniet        SME (Technical ReviewDate Approved by: Randy Amundson        Training Supervision  Date Approved by: Tom Larson        Training Program Owner  Date PBN JPM P075.005a.COT Calculate and Adjust PPCS Forebay and Pump Bay Alarm Setpoints, Rev. 0 JPM Page 2 of 8  TR-AA-230-1003-F10, Revision 2  I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied. DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED. INITIAL CONDITIONS:  Today's date is 20 November 2014  Per OI 38, Circulating Water System Operation, we are going to shift Circulating Water Pumps from 2 running per unit down to a single Circulating Water Pump per unit. Both 1CW-2 and 2CW-2, Circulating Water Intake valves will remain open. INITIATING CUES (IF APPLICABLE):  OS2 has directed you to calculate and adjust the PPCS Forebay and Pump Bay alarm setpoints per PBF-2124, PPCS Forebay and Pump Bay Level Alarm Setpoints.
JOB PERFORMANCE MEASURE                                               JPM Page 7 of 8 Performance Step: 10        8.0 ADJUST PPCS Alarm limits to values calculated in steps 6.0, 7.0, Critical N (SEQ-)           and Step 2.0 Table, and RECORD below:
JOB PERFORMANCE MEASURE JPM Page 3 of 8 TR-AA-230-1003-F10, Revision 2  JPM PERFORMANCE INFORMATION  Start Time:    NOTE:  When providing "Evaluator Cues" to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinee's actions warrant receiving the information (i.e., the examinee looks or asks for the indication). NOTE: Critical steps are marked with a "Y" below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM. Performance Step: 1 Critical   N  Review 3 notes prior to performing step 1.4   Standard: Review 3 notes prior to performing step 1.4    Performance:  SATISFACTORY        UNSATISFACTORY      Comments:       Performance Step: 2 Critical  Y  1.0 Obtain Lake Michigan Water level information as follows: (cont) 1.4 RECORD Mean level for Lake Michigan Huron below and SUBTRACT 580.9 feet to correct for plant elevation:   Standard: Record the value of 579.21 (Mean Level) and subtract 580.9 for final value of (-1.69)  Evaluator Note: NOTE: At bottom of column labeled "Michigan Huron Lake Mean" the "Mean" level for current month will be displayed. NOTE: 580.9 ft. comes from the sum of 580.2 ft IGLD 1955 (which is plant elevation zero) and 0.7 ft, the delta between IGLD 1955 and IGLD 1985. NOTE: Corrected mean level is the difference in Lake Michigan level as compared to plant elevation zero. Performance: SATISFACTORY       UNSATISFACTORY     Comments:
Standard:                                                         LO Alarm      LO-LO      HI Alarm   HI-HI Limit #1 (Step Alarm Limit Limit       Alarm Error!        #2 (Step    Error!      Limit Reference      Error!     Reference   Error!
JOB PERFORMANCE MEASURE JPM Page 4 of 8  TR-AA-230-1003-F10, Revision 2 Performance Step: 3 Critical  N  1.0 Obtain Lake Michigan Water level information as follows: (cont) 1.5 IF Web Site in step 1.1 used, THEN PRINT a copy of the current month's Great Lakes Water Levels in (Feet) IGLD 85" AND ATTACH to this form. Standard: Retain copy, attach to form and initial the step. Performance: SATISFACTORY       UNSATISFACTORY     Comments:       Performance Step: 4 Critical  Y  2.0 RECORD the head loss for the CW System configuration from the table below:__________  Standard: Locate and enter the value for 2 intake pipes, 2 CW pumps running (one per unit). Value is (-1.6)  Evaluator Note: NOTE: Head loss values were calculated assuming CW waterbox valves are fully open and minimal condenser fouling. Throttled waterbox valves or fouled condensers would result in higher observed forebay levels. NOTE: High Lake water level alarm and High-High Lake water level alarm calculation is a function of CW intake valve alignment, number of cooling water (CW) pumps in service, and the two values used from Table 6-5 Calculation 2014-06279 "Time Available To Respond To Rising Lake Level". Evaluator Cue: If asked, all waterbox valves are open and thermodynamic testing indicated that waterboxes are not fouled. Performance:  SATISFACTORY        UNSATISFACTORY      Comments:     
source not     Reference  source not Referenc found.)       source not found.      e source found.)    Table      not found.
Table 1L-3586A, Pump Bay Level Alarm  -4.29          -4.79 1L-3586B, Forebay Level Alarm  -4.29          -4.79      -0.8        -0.6 2L-3586A, Pump Bay Level Alarm  -4.29          -4.79 2L-3586B, Forebay Level Alarm   -4.29          -4.79       -0.8        -0.6 Evaluator Note:             The Table information is contained in this step, the adjusting of PPCS alarms will be in following steps Evaluator Note:                                                   CAUTION LO and LO LO level alarms should NOT be set less than -11.0 feet and 11.5 feet, respectively. Forebay level and/or pump bay of less than -11.5 feet is a violation of TLCO 3.7.7 for SW System.
NOTE: While adjusting alarm setpoints in PPCS, a priority alarm may be received.
Performance:                 SATISFACTORY                       UNSATISFACTORY Comments:
Performance Step: 11        From a Simulator (Control Room) PPCS workstation, "Pump House" block Critical Y                  either Sim 1 or Sim 2 directory to go to Pump House Drawing Standard:                   Bring up 3192 OR 3692 Pump House Performance:                 SATISFACTORY                       UNSATISFACTORY Comments:
TR-AA-230-1003-F10, Revision 2


JOB PERFORMANCE MEASURE JPM Page 5 of 8 TR-AA-230-1003-F10, Revision 2 Performance Step: 5 Critical   Y 3.0 ADD Steps 1.4 and 2.0 to obtain forebay/pump bay level: ________ + _______ = ________  Standard: Enter the value from step 1.4 (-1.69) add the value from step 2.0 (-1.6) for a total of (-3.29)    Performance:  SATISFACTORY        UNSATISFACTORY      Comments:      Performance Step: 6 Critical  Y  4.0 CALCULATE Low Alarm Limit #1 level setpoint to be one foot below forebay level determined in Step 3.0 as follows: Forebay/pump bay level from Step 3.0 - 1 foot = Forebay/pump bay Low Alarm Limit #1 setpoints  Standard: Enter the value from step 3.0 (-3.29) and subtract (1) for a total of  (-4.29)   Evaluator Note: CAUTION: LO and LO-LO level alarms should NOT be set less than -11.0 feet and -11.5 feet, respectively. Forebay level and/or pump bay of less than -11.5 feet is a violation of TLCO 3.7.7 for SW System. Performance: SATISFACTORY       UNSATISFACTORY     Comments:    
JOB PERFORMANCE MEASURE                                           JPM Page 8 of 8 Performance Step: 12        Click on the "Change LEV ALRM LIMITS" button and enter the Low and Critical Y                   High Limits #1 and #2 values for both units.
Standard:                   Examinee clicks 'Change LEV ALRM LIMITS" button and changes alarms setpoints per limits listed in Step 8.0. (-4.29 for Low Limit #1 and -4.79 for Low Limit #2 and -0.8 for High Limit #1 and -0.6 for High Limit #2)
Evaluator Note:             Simulator PPCS will not allow changes to current alarm setpoints.
Evaluator Cue:               Cue examinee that PPCS alarm setpoints were changed to the values that they gave and PPCS indicates said values.
Performance:                SATISFACTORY                    UNSATISFACTORY Comments:
Performance Step: 13        Examinee makes a report to OS2 that adjustment of PPCS Forebay and Critical N                  Pump Bay Alarm Setpoints is completed and hands signed PBF-2124 back.
Standard:                    Examinee communicates completion of PBF-2124.
Evaluator Cue:              Acknowledge communication to OS2.
Performance:                 SATISFACTORY                     UNSATISFACTORY Comments:
Terminating Cues:
This Completes the JPM Stop Time:
TR-AA-230-1003-F10, Revision 2


JOB PERFORMANCE MEASURE JPM Page 6 of 8  TR-AA-230-1003-F10, Revision 2 Performance Step: 7 Critical  Y  5.0 CALCULATE Low-Low Alarm Limit #2 setpoint to be 1.5 feet below forebay level determined in Step 3.0 as follows: Forebay/pump bay level from Step 3.0 - 1.5 foot = Forebay/pump bay Low Alarm Limit #1 setpoints  Standard: Enter the value from step 3.0 (-3.29) and subtract (1.5) for a total of  (-4.79)    Performance: SATISFACTORY        UNSATISFACTORY      Comments:       Performance Step: 8 Critical  Y  6.0 ENTER the LEAST NEGATIVE value of: Step 4.0 of _______ OR -11.0 feet to establish new Lo Alarm Limit #1 level setpoint. __________  Standard: Enter the value from step 4.0 (-4.29) and the least negative value of (-4.29)    Performance: SATISFACTORY        UNSATISFACTORY      Comments:
JPM JOB PERFORMANCE MEASURE                                     Page 1 of 5 JPM TITLE:                DETERMINE A STAY TIME FOR A HIGH RADIATION AREA JPM NUMBER:              PBN JPM P162.006a.AOT                            REV. 2 TASK NUMBER(S) /          PBN P162.006.AOT, COMPLY WITH RADIATION WORK PERMOTS TASK TITLE(S):
Performance Step: 9 Critical   Y  7.0 ENTER the LEAST NEGATIVE value of: Step 5.0 of _______ OR -11.5 feet to establish new Lo-Lo Alarm Limit #2 level setpoint. __________  Standard: Enter the value from step 4.0 (-4.79) and the least negative value of (-4.79)   Performance: SATISFACTORY        UNSATISFACTORY      Comments:    
GENERIC 2.3.7                                   3.5/3.6 K/A NUMBERS:                                           K/A VALUE:
GENERIC 2.3.12                                  3.2/3.7 Justification (FOR K/A VALUES <3.0):
TASK APPLICABILITY:
RO          SRO            STA          Non-Lic        SRO CERT              OTHER:
APPLICABLE METHOD OF TESTING:                 Simulate/Walkthrough:             Perform:   X EVALUATION LOCATION:             In-Plant:                    Control Room:
Simulator:                   Other:               X Lab:
Time for Completion:           10      Minutes          Time Critical:           No Alternate Path [NRC]:                    No Alternate Path [INPO]:                  No Developed by:                              Jeffrey Hinze Instructor/Developer                                Date Reviewed by:                         Andrew Zommers Instructor (Instructional Review)                         Date Validated by:                              Jeff Baugniet SME (Technical Review)                               Date Approved by:                         Randy Amundson Training Supervision                                Date Approved by:                               Tom Larson Training Program Owner                                Date TR-AA-230-1003-F10, Revision 2


JOB PERFORMANCE MEASURE JPM Page 7 of 8  TR-AA-230-1003-F10, Revision 2 Performance Step: 10 Critical  N (SEQ-) 8.0 ADJUST PPCS Alarm limits to values calculated in steps 6.0, 7.0, and Step 2.0 Table, and RECORD below:  Standard:  LO Alarm Limit #1 (Step Error! Reference source not found.) LO-LO Alarm Limit #2  (Step Error! Reference source not found.) HI Alarm Limit    Error! Reference source not found. Table HI-HI Alarm Limit Error! Reference source not found. Table 1L-3586A, Pump Bay Level Alarm -4.29 -4.79  1L-3586B, Forebay Level Alarm -4.29 -4.79 -0.8 -0.6 2L-3586A, Pump Bay Level Alarm -4.29 -4.79  2L-3586B, Forebay Level Alarm -4.29 -4.79 -0.8 -0.6    Evaluator Note: The Table information is contained in this step, the adjusting of PPCS alarms will be in following steps  Evaluator Note: CAUTION LO and LO LO level alarms should NOT be set less than -11.0 feet and  11.5 feet, respectively. Forebay level and/or pump bay of less than -11.5 feet is a violation of TLCO 3.7.7 for SW System. NOTE: While adjusting alarm setpoints in PPCS, a priority alarm may be received. Performance:  SATISFACTORY        UNSATISFACTORY      Comments:      Performance Step: 11  Critical  Y  From a Simulator (Control Room) PPCS workstation, "Pump House" block either Sim 1 or Sim 2 directory to go to Pump House Drawing  Standard: Bring up 3192 OR 3692 Pump House    Performance:  SATISFACTORY        UNSATISFACTORY      Comments:
PBN JPM P162.006a.AOT, Determine a Stay Time for a                       JPM High Radiation Area, Rev. 2                           Page 2 of 5 I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues.
JOB PERFORMANCE MEASURE JPM Page 8 of 8  TR-AA-230-1003-F10, Revision 2 Performance Step: 12  Critical  Y  Click on the "Change LEV ALRM LIMITS" button and enter the Low and High Limits #1 and #2 values for both units. Standard: Examinee clicks 'Change LEV ALRM LIMITS" button and changes alarms setpoints per limits listed in Step 8.0. (-4.29 for Low Limit #1 and -4.79 for Low Limit #2 and -0.8 for High Limit #1 and -0.6 for High Limit #2)  Evaluator Note: Simulator PPCS will not allow changes to current alarm setpoints. Evaluator Cue: Cue examinee that PPCS alarm setpoints were changed to the values that they gave and PPCS indicates said values. Performance:  SATISFACTORY        UNSATISFACTORY      Comments:      Performance Step: 13  Critical  N  Examinee makes a report to OS2 that adjustment of PPCS Forebay and Pump Bay Alarm Setpoints is completed and hands signed PBF-2124 back. Standard: Examinee communicates completion of PBF-2124. Evaluator Cue: Acknowledge communication to OS2. Performance:  SATISFACTORY        UNSATISFACTORY      Comments:      Terminating Cues:  This Completes the JPM Stop Time:
JOB PERFORMANCE MEASURE  JPM Page 1 of 5  TR-AA-230-1003-F10, Revision 2  JPM TITLE: DETERMINE A STAY TIME FOR A HIGH RADIATION AREA  JPM NUMBER:  PBN JPM P162.006a.AOT REV. 2  TASK NUMBER(S) / TASK TITLE(S): PBN P162.006.AOT, COMPLY WITH RADIATION WORK PERMOTS  K/A NUMBERS: GENERIC 2.3.7 GENERIC 2.3.12 K/A VALUE:  3.5/3.6 3.2/3.7  Justification (FOR K/A VALUES <3.0):  TASK APPLICABILITY:    RO    SRO    STA    Non-Lic    SRO CERT    OTHER:        APPLICABLE METHOD OF TESTING: Simulate/Walkthrough:  Perform: X  EVALUATION LOCATION: In-Plant:  Control Room:          Simulator:  Other: X          Lab:      Time for Completion: 10 Minutes Time Critical:  No      Alternate Path [NRC]: No  Alternate Path [INPO]: No        Developed by: Jeffrey Hinze        Instructor/Developer  Date    Reviewed by: Andrew Zommers        Instructor (Instructional Review)  Date Validated  by: Jeff Baugniet        SME (Technical Review)  Date Approved by: Randy Amundson        Training Supervision  Date Approved by: Tom Larson        Training Program Owner  Date PBN JPM P162.006a.AOT, Determine a Stay Time for a High Radiation Area, Rev. 2 JPM Page 2 of 5 TR-AA-230-1003-F10, Revision 2  I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.
INITIAL CONDITIONS: Reference the attached radiological survey map. A tag series is required to be hung in the Unit 1 Non-Regenerative Heat Exchanger Room which is posted as a High Radiation Area (HRA). The first valve on the tag series is 1CV-371, Letdown Line Containment Isolation valve. The remaining valves on the tag series are indicated by unlabeled valve symbols on the survey map. Radiation Protection (RP) has placed a dose limit of 50mR to perform the entire tag series. RP request you stay as far away from 1CV-371 as possible to minimize the dose. INITIATING CUES (IF APPLICABLE):   It took you 5 minutes to hang the tag on 1CV-371 (you were able to hang the tag from arm's length). Determine the MAXIMUM time (in minutes) that can be spent tagging ALL OTHER valves indicated on the survey map without exceeding the dose limit for this task. Radiation levels of ALL OTHER valves are at general area. Assume the time for access and egress of the room is negligible.
INITIAL CONDITIONS:
* Reference the attached radiological survey map.
* A tag series is required to be hung in the Unit 1 Non-Regenerative Heat Exchanger Room which is posted as a High Radiation Area (HRA).
* The first valve on the tag series is 1CV-371, Letdown Line Containment Isolation valve.
* The remaining valves on the tag series are indicated by unlabeled valve symbols on the survey map.
* Radiation Protection (RP) has placed a dose limit of 50mR to perform the entire tag series.
* RP request you stay as far away from 1CV-371 as possible to minimize the dose.
INITIATING CUES (IF APPLICABLE):
* It took you 5 minutes to hang the tag on 1CV-371 (you were able to hang the tag from arms length).
* Determine the MAXIMUM time (in minutes) that can be spent tagging ALL OTHER valves indicated on the survey map without exceeding the dose limit for this task. Radiation levels of ALL OTHER valves are at general area.
* Assume the time for access and egress of the room is negligible.
TR-AA-230-1003-F10, Revision 2


PBN JPM P162.006a.AOT, Determine a Stay Time for a High Radiation Area, Rev. 2 JPM Page 3 of 5 TR-AA-230-1003-F10, Revision 2  JPM PERFORMANCE INFORMATION Start Time:   NOTE: When providing "Evaluator Cues" to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinee's actions warrant receiving the information (i.e., the examinee looks or asks for the indication). NOTE: Critical steps are marked with a "Y" below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM. Performance Step: 1 Critical  Y Determine total dose received closing the valve in the HRA (360mR/hr field). Standard: The total dose received to close the first valve is determined to be 30mR. (360mR/hr X 5 min) &#xf7; 60 min/hr = 30 mR   Performance: SATISFACTORY       UNSATISFACTORY       Comments: _____________________________________________________
PBN JPM P162.006a.AOT, Determine a Stay Time for a                   JPM High Radiation Area, Rev. 2                       Page 3 of 5 JPM PERFORMANCE INFORMATION Start Time:
Performance Step: 2 Critical  Y Available dose for hanging tags in the General Areas is determined. Standard: Dose available for hanging tags in the General Areas is determined to be 20mR. 50 mR - 30 mR = 20 mR   Performance: SATISFACTORY       UNSATISFACTORY       Comments: _____________________________________________________  
NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).
NOTE: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.
Performance Step: 1         Determine total dose received closing the valve in the HRA Critical Y                  (360mR/hr field).
Standard:                   The total dose received to close the first valve is determined to be 30mR.
(360mR/hr X 5 min) &#xf7; 60 min/hr = 30 mR Performance:               SATISFACTORY             UNSATISFACTORY Comments:                   _____________________________________________________
Performance Step: 2         Available dose for hanging tags in the General Areas is Critical Y                  determined.
Standard:                   Dose available for hanging tags in the General Areas is determined to be 20mR.
50 mR - 30 mR = 20 mR Performance:               SATISFACTORY             UNSATISFACTORY Comments:                   _____________________________________________________
TR-AA-230-1003-F10, Revision 2


PBN JPM P162.006a.AOT, Determine a Stay Time for a High Radiation Area, Rev. 2 JPM Page 4 of 5 TR-AA-230-1003-F10, Revision 2  Performance Step: 3 Critical  Y Determine maximum time to hang tags in the General Area. Standard: Maximum time to be spent in the General Area is determined to be 30 minutes. (20 mR &#xf7; 40 mR/hr) X 60 min/hr = 30 min   Performance: SATISFACTORY       UNSATISFACTORY       Comments: _____________________________________________________
PBN JPM P162.006a.AOT, Determine a Stay Time for a             JPM High Radiation Area, Rev. 2                   Page 4 of 5 Performance Step: 3         Determine maximum time to hang tags in the General Area.
Terminating Cues:   The Task is complete.
Critical Y Standard:                   Maximum time to be spent in the General Area is determined to be 30 minutes.
Stop Time:}}
(20 mR &#xf7; 40 mR/hr) X 60 min/hr = 30 min Performance:               SATISFACTORY           UNSATISFACTORY Comments:                   _____________________________________________________
Terminating Cues:     The Task is complete.
Stop Time:
TR-AA-230-1003-F10, Revision 2}}

Latest revision as of 14:05, 31 October 2019

2015 Point Beach Nuclear Plant Initial License Examination Administered Admin Jpms RO
ML15079A320
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 03/06/2015
From: Mcneil D
NRC/RGN-III/DRS/OLB
To:
Florida Power & Light Energy Point Beach
Shared Package
ML14328A657 List:
References
Download: ML15079A320 (22)


Text

JPM JOB PERFORMANCE MEASURE Page 1 of 9 JPM TITLE: PERFORM SHUTDOWN MARGIN CALCULATION FOR AN OPERATING REACTOR JPM NUMBER: PBN JPM P000.002d.COT REV. 4 TASK NUMBER(S) / P000.002.COT / PERFORM SHUTDOWN MARGIN CALCULATION TASK TITLE(S): FOR AN OPERATING REACTOR 003 AK1.07 3.1/3.9 K/A NUMBERS: 003 AK3.04 K/A VALUE: 3.8/4.1 2.1.25 3.9/4.2 Justification (FOR K/A VALUES <3.0):

TASK APPLICABILITY:

RO SRO STA Non-Lic SRO CERT OTHER:

APPLICABLE METHOD OF TESTING: Simulate/Walkthrough: Perform: X EVALUATION LOCATION: In-Plant: Control Room:

Simulator: X Other: X Lab:

Time for Completion: 20 Minutes Time Critical: NO Alternate Path [NRC]: N/A Alternate Path [INPO]: N/A Developed by: Jeffrey Hinze Instructor/Developer Date Reviewed by: Andrew Zommers Instructor (Instructional Review) Date Validated by: Jeff Baugniet SME (Technical Review) Date Approved by: Randy Amundson Training Supervision Date Approved by: Tom Larson Training Program Owner Date TR-AA-230-1003-F10, Revision 2

PBN JPM P000.002d.COT, Perform Shutdown Margin JPM Calculation for an Operating Reactor, Rev. 4 Page 2 of 9 I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

  • Unit 1 had been operating at 100% power.
  • Rod H-2 in Shutdown Bank "A" has dropped to the bottom of the core.
  • The crew is responding in accordance with AOP-6A, "Dropped Rod".
  • Assume todays date and time is current.

INITIATING CUES:

The following Unit 1 conditions currently exist:

  • Boron Concentration - 1125 ppm
  • Rx Power - 90%
  • Tave - 572 °F
  • Tref - 573 °F
  • Control Bank D @ 180 steps
  • All other banks @ 228 steps TR-AA-230-1003-F10, Revision 2

JPM JOB PERFORMANCE MEASURE Page 3 of 9 JPM PERFORMANCE INFORMATION Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).

NOTE: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.

Performance Step: 1 Verify TAVG within 1.5°F of TREF.

Critical N Standard: Verify TAVG within 1.5°F of TREF based on initial conditions given and circle YES on PBF-2513.

Performance: SATISFACTORY UNSATISFACTORY Comments:

TR-AA-230-1003-F10, Revision 2

JPM JOB PERFORMANCE MEASURE Page 4 of 9 Performance Step: 2 Obtain Core Burn-Up from ROD 1.1.

Critical Y Standard: Core burn-up determined to be 2120 +/- 30 MWD/MTU (2090-2150).

Evaluator Note: Core burn-up determined to be 2120 MWD/MTU and recorded on PBF-2513. From ROD 1.1, examinee will have 1930 MWD/MTU five days ago and will need to add 190 MWD/MTU (5 Days

  • 38 MWD/MTU/Day)

Evaluator Cue: Provide examinee with a copy of Unit 1 ROD book.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 3 Obtain Nominal EOL Burn-Up from ROD1.1.

Critical N Standard: EOL burn-up determined to be 18874 MWD/MTU and recorded on PBF-2513.

Performance: SATISFACTORY UNSATISFACTORY Comments:

TR-AA-230-1003-F10, Revision 2

JPM JOB PERFORMANCE MEASURE Page 5 of 9 Performance Step: 4 Calculate % Burn-Up.

Critical N Standard: Calculate % burn-up to be 11.23% + 0.16% (11.07-11.39) and record on PBF-2513.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 5 Obtain Reactor Power Level (%).

Critical N Standard: Record 90% on PBF-2513.

Performance: SATISFACTORY _____ UNSATISFACTORY _____

Comments:

Performance Step: 6 Obtain Control Rod Position Critical N Standard: Bank C and D control rod position determined to be 228 and 180 steps and recorded on PBF-2513.

Evaluator Cue: If asked Bank C is at 228 steps per initial conditions.

Performance: SATISFACTORY _____ UNSATISFACTORY _____

Comments:

TR-AA-230-1003-F10, Revision 2

JPM JOB PERFORMANCE MEASURE Page 6 of 9 Performance Step: 7 Obtain Power Defect from ROD 7.

Critical Y Standard: Determine power defect to be 1620 pcm + 20 pcm (1600-1640, based on possible min/max reading on graph) and record on PBF-2513.

Performance: SATISFACTORY _____ UNSATISFACTORY _____

Comments:

Performance Step: 8 Obtain Control Rod Worth (Bank D, C, B, A, S in, at HZP) from Critical Y ROD 5.

Standard: Determine control rod worth (Bank D, C, B, A, S in, at HZP) to be 6550 pcm and record on PBF-2513.

Performance: SATISFACTORY _____ UNSATISFACTORY _____

Comments:

Performance Step: 9 Obtain Stuck Rod Worth from ROD 5.

Critical Y Standard: Determine stuck rod worth to be 689 pcm and record on PBF-2513.

Performance: SATISFACTORY _____ UNSATISFACTORY _____

Comments:

TR-AA-230-1003-F10, Revision 2

JPM JOB PERFORMANCE MEASURE Page 7 of 9 Performance Step: 10 Calculate Stuck Rod Worth minus Control Rod Worth.

Critical Y Standard: Calculate stuck rod worth minus control rod worth to be 5861 pcm and record on PBF-2513.

Performance: SATISFACTORY _____ UNSATISFACTORY _____

Comments:

Performance Step: 11 Obtain Bank Worth to ARO from ROD 3.1, Use Step 2 and Step 6 Critical Y data.

Standard: Determine bank worth to ARO to be 141 pcm and record on PBF-2513.

Performance: SATISFACTORY _____ UNSATISFACTORY _____

Comments:

Performance Step: 12 Obtain correct value for dropped rod, stuck rod or no abnormal Critical N condition.

Standard: Determine dropped rod and enter Stuck Rod Worth from ROD 5 and record 689 pcm on PBF-2513.

Performance: SATISFACTORY _____ UNSATISFACTORY _____

Comments:

TR-AA-230-1003-F10, Revision 2

JPM JOB PERFORMANCE MEASURE Page 8 of 9 Performance Step: 13 Calculate Total Available Control Rod Negative Reactivity by Critical Y adding Step 10, 11, 12 and 250 pcm.

Standard: Determine Total available control rod negative reactivity to be 4781 pcm and record on PBF-2513.

Performance: SATISFACTORY _____ UNSATISFACTORY _____

Comments:

Performance Step: 14 Calculates Shut Down Margin by adding Steps 13 and 7.

Critical Y Standard: Determine calculated SDM to be 3161 + 20 pcm (3141-3181) and record on PBF-2513.

Performance: SATISFACTORY _____ UNSATISFACTORY _____

Comments:

Performance Step: 15 Determine the Required Shut Down Margin using TRM 2.1, [COLR]

Critical Y Figure 2 using Step 4 data.

Standard: Determines required SDM to be -2000 pcm and record on PBF-2513.

Performance: SATISFACTORY _____ UNSATISFACTORY _____

Comments:

TR-AA-230-1003-F10, Revision 2

JPM JOB PERFORMANCE MEASURE Page 9 of 9 Performance Step: 16 Determines if calculated Shut Down Margin is more negative than Critical Y Required Shut Down Margin.

Standard: Determines Calculated SDM is greater than Required SDM AND circles YES on PBF-2513.

Performance: SATISFACTORY _____ UNSATISFACTORY _____

Comments:

Performance Step: 17 Inform OS1 you calculated the shutdown margin in accordance with Critical N PBF-2513, "Shutdown Margin for an Operating Reactor" and shutdown margin is satisfactory.

Standard: Inform OS1 that SDM calculation is complete.

Performance: SATISFACTORY _____ UNSATISFACTORY _____

Comments:

Terminating Cues: This completes the JPM Stop Time:

TR-AA-230-1003-F10, Revision 2

JOB PERFORMANCE MEASURE JPM Page 1 of 8 JPM TITLE: Calculate and Adjust PPCS Forebay and Pump Bay Alarm Setpoints JPM NUMBER: PBN JPM P075.005a.COT REV. 0 TASK NUMBER(S) / PBN P075.005.COT Operate the Circulating Water Pumps in different TASK TITLE(S): combinations K/A NUMBERS: 2.2.14 K/A VALUE: 3.9/4.3 Justification (FOR K/A VALUES <3.0):

TASK APPLICABILITY:

RO SRO STA Non-Lic SRO CERT OTHER:

APPLICABLE METHOD OF TESTING: Simulate/Walkthrough: Perform: X EVALUATION LOCATION: In-Plant: Control Room:

Simulator: X Other:

Lab:

Time for Completion: 10 Minutes Time Critical: NO Alternate Path [NRC]: NO Alternate Path [INPO]: NO Developed by: Andrew Zommers Instructor/Developer Date Reviewed by: Jeff Hinze Instructor (Instructional Review) Date Validated by: Jeff Baugniet SME (Technical Review) Date Approved by: Randy Amundson Training Supervision Date Approved by: Tom Larson Training Program Owner Date TR-AA-230-1003-F10, Revision 2

PBN JPM P075.005a.COT Calculate and Adjust PPCS Forebay and JPM Pump Bay Alarm Setpoints, Rev. 0 Page 2 of 8 I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

  • Today's date is 20 November 2014
  • Per OI 38, Circulating Water System Operation, we are going to shift Circulating Water Pumps from 2 running per unit down to a single Circulating Water Pump per unit.
  • Both 1CW-2 and 2CW-2, Circulating Water Intake valves will remain open.

INITIATING CUES (IF APPLICABLE):

  • OS2 has directed you to calculate and adjust the PPCS Forebay and Pump Bay alarm setpoints per PBF-2124, PPCS Forebay and Pump Bay Level Alarm Setpoints.

TR-AA-230-1003-F10, Revision 2

JOB PERFORMANCE MEASURE JPM Page 3 of 8 JPM PERFORMANCE INFORMATION Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).

NOTE: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.

Performance Step: 1 Review 3 notes prior to performing step 1.4 Critical N Standard: Review 3 notes prior to performing step 1.4 Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 2 1.0 Obtain Lake Michigan Water level information as follows: (cont)

Critical Y 1.4 RECORD Mean level for Lake Michigan Huron below and SUBTRACT 580.9 feet to correct for plant elevation:

Standard: Record the value of 579.21 (Mean Level) and subtract 580.9 for final value of (-1.69)

Evaluator Note: NOTE: At bottom of column labeled "Michigan Huron Lake Mean" the Mean level for current month will be displayed.

NOTE: 580.9 ft. comes from the sum of 580.2 ft IGLD 1955 (which is plant elevation zero) and 0.7 ft, the delta between IGLD 1955 and IGLD 1985.

NOTE: Corrected mean level is the difference in Lake Michigan level as compared to plant elevation zero.

Performance: SATISFACTORY UNSATISFACTORY Comments:

TR-AA-230-1003-F10, Revision 2

JOB PERFORMANCE MEASURE JPM Page 4 of 8 Performance Step: 3 1.0 Obtain Lake Michigan Water level information as follows: (cont)

Critical N 1.5 IF Web Site in step 1.1 used, THEN PRINT a copy of the current months Great Lakes Water Levels in (Feet) IGLD 85 AND ATTACH to this form.

Standard: Retain copy, attach to form and initial the step.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 4 2.0 RECORD the head loss for the CW System configuration from the Critical Y table below:__________

Standard: Locate and enter the value for 2 intake pipes, 2 CW pumps running (one per unit). Value is (-1.6)

Evaluator Note: NOTE: Head loss values were calculated assuming CW waterbox valves are fully open and minimal condenser fouling. Throttled waterbox valves or fouled condensers would result in higher observed forebay levels.

NOTE: High Lake water level alarm and High-High Lake water level alarm calculation is a function of CW intake valve alignment, number of cooling water (CW) pumps in service, and the two values used from Table 6-5 Calculation 2014-06279 Time Available To Respond To Rising Lake Level.

Evaluator Cue: If asked, all waterbox valves are open and thermodynamic testing indicated that waterboxes are not fouled.

Performance: SATISFACTORY UNSATISFACTORY Comments:

TR-AA-230-1003-F10, Revision 2

JOB PERFORMANCE MEASURE JPM Page 5 of 8 Performance Step: 5 3.0 ADD Steps 1.4 and 2.0 to obtain forebay/pump bay level:

Critical Y ________ + _______ = ________

Standard: Enter the value from step 1.4 (-1.69) add the value from step 2.0 (-1.6) for a total of (-3.29)

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 6 4.0 CALCULATE Low Alarm Limit #1 level setpoint to be one foot below Critical Y forebay level determined in Step 3.0 as follows:

Forebay/pump bay level from Step 3.0 - 1 foot = Forebay/pump bay Low Alarm Limit #1 setpoints Standard: Enter the value from step 3.0 (-3.29) and subtract (1) for a total of

(-4.29)

Evaluator Note: CAUTION:

LO and LO-LO level alarms should NOT be set less than -11.0 feet and -11.5 feet, respectively. Forebay level and/or pump bay of less than -11.5 feet is a violation of TLCO 3.7.7 for SW System.

Performance: SATISFACTORY UNSATISFACTORY Comments:

TR-AA-230-1003-F10, Revision 2

JOB PERFORMANCE MEASURE JPM Page 6 of 8 Performance Step: 7 5.0 CALCULATE Low-Low Alarm Limit #2 setpoint to be 1.5 feet below Critical Y forebay level determined in Step 3.0 as follows:

Forebay/pump bay level from Step 3.0 - 1.5 foot = Forebay/pump bay Low Alarm Limit #1 setpoints Standard: Enter the value from step 3.0 (-3.29) and subtract (1.5) for a total of

(-4.79)

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 8 6.0 ENTER the LEAST NEGATIVE value of:

Critical Y Step 4.0 of _______ OR -11.0 feet to establish new Lo Alarm Limit #1 level setpoint. __________

Standard: Enter the value from step 4.0 (-4.29) and the least negative value of (-

4.29)

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 9 7.0 ENTER the LEAST NEGATIVE value of:

Critical Y Step 5.0 of _______ OR -11.5 feet to establish new Lo-Lo Alarm Limit #2 level setpoint. __________

Standard: Enter the value from step 4.0 (-4.79) and the least negative value of (-

4.79)

Performance: SATISFACTORY UNSATISFACTORY Comments:

TR-AA-230-1003-F10, Revision 2

JOB PERFORMANCE MEASURE JPM Page 7 of 8 Performance Step: 10 8.0 ADJUST PPCS Alarm limits to values calculated in steps 6.0, 7.0, Critical N (SEQ-) and Step 2.0 Table, and RECORD below:

Standard: LO Alarm LO-LO HI Alarm HI-HI Limit #1 (Step Alarm Limit Limit Alarm Error! #2 (Step Error! Limit Reference Error! Reference Error!

source not Reference source not Referenc found.) source not found. e source found.) Table not found.

Table 1L-3586A, Pump Bay Level Alarm -4.29 -4.79 1L-3586B, Forebay Level Alarm -4.29 -4.79 -0.8 -0.6 2L-3586A, Pump Bay Level Alarm -4.29 -4.79 2L-3586B, Forebay Level Alarm -4.29 -4.79 -0.8 -0.6 Evaluator Note: The Table information is contained in this step, the adjusting of PPCS alarms will be in following steps Evaluator Note: CAUTION LO and LO LO level alarms should NOT be set less than -11.0 feet and 11.5 feet, respectively. Forebay level and/or pump bay of less than -11.5 feet is a violation of TLCO 3.7.7 for SW System.

NOTE: While adjusting alarm setpoints in PPCS, a priority alarm may be received.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 11 From a Simulator (Control Room) PPCS workstation, "Pump House" block Critical Y either Sim 1 or Sim 2 directory to go to Pump House Drawing Standard: Bring up 3192 OR 3692 Pump House Performance: SATISFACTORY UNSATISFACTORY Comments:

TR-AA-230-1003-F10, Revision 2

JOB PERFORMANCE MEASURE JPM Page 8 of 8 Performance Step: 12 Click on the "Change LEV ALRM LIMITS" button and enter the Low and Critical Y High Limits #1 and #2 values for both units.

Standard: Examinee clicks 'Change LEV ALRM LIMITS" button and changes alarms setpoints per limits listed in Step 8.0. (-4.29 for Low Limit #1 and -4.79 for Low Limit #2 and -0.8 for High Limit #1 and -0.6 for High Limit #2)

Evaluator Note: Simulator PPCS will not allow changes to current alarm setpoints.

Evaluator Cue: Cue examinee that PPCS alarm setpoints were changed to the values that they gave and PPCS indicates said values.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 13 Examinee makes a report to OS2 that adjustment of PPCS Forebay and Critical N Pump Bay Alarm Setpoints is completed and hands signed PBF-2124 back.

Standard: Examinee communicates completion of PBF-2124.

Evaluator Cue: Acknowledge communication to OS2.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Terminating Cues:

This Completes the JPM Stop Time:

TR-AA-230-1003-F10, Revision 2

JPM JOB PERFORMANCE MEASURE Page 1 of 5 JPM TITLE: DETERMINE A STAY TIME FOR A HIGH RADIATION AREA JPM NUMBER: PBN JPM P162.006a.AOT REV. 2 TASK NUMBER(S) / PBN P162.006.AOT, COMPLY WITH RADIATION WORK PERMOTS TASK TITLE(S):

GENERIC 2.3.7 3.5/3.6 K/A NUMBERS: K/A VALUE:

GENERIC 2.3.12 3.2/3.7 Justification (FOR K/A VALUES <3.0):

TASK APPLICABILITY:

RO SRO STA Non-Lic SRO CERT OTHER:

APPLICABLE METHOD OF TESTING: Simulate/Walkthrough: Perform: X EVALUATION LOCATION: In-Plant: Control Room:

Simulator: Other: X Lab:

Time for Completion: 10 Minutes Time Critical: No Alternate Path [NRC]: No Alternate Path [INPO]: No Developed by: Jeffrey Hinze Instructor/Developer Date Reviewed by: Andrew Zommers Instructor (Instructional Review) Date Validated by: Jeff Baugniet SME (Technical Review) Date Approved by: Randy Amundson Training Supervision Date Approved by: Tom Larson Training Program Owner Date TR-AA-230-1003-F10, Revision 2

PBN JPM P162.006a.AOT, Determine a Stay Time for a JPM High Radiation Area, Rev. 2 Page 2 of 5 I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

  • Reference the attached radiological survey map.
  • A tag series is required to be hung in the Unit 1 Non-Regenerative Heat Exchanger Room which is posted as a High Radiation Area (HRA).
  • The first valve on the tag series is 1CV-371, Letdown Line Containment Isolation valve.
  • The remaining valves on the tag series are indicated by unlabeled valve symbols on the survey map.
  • Radiation Protection (RP) has placed a dose limit of 50mR to perform the entire tag series.
  • RP request you stay as far away from 1CV-371 as possible to minimize the dose.

INITIATING CUES (IF APPLICABLE):

  • It took you 5 minutes to hang the tag on 1CV-371 (you were able to hang the tag from arms length).
  • Determine the MAXIMUM time (in minutes) that can be spent tagging ALL OTHER valves indicated on the survey map without exceeding the dose limit for this task. Radiation levels of ALL OTHER valves are at general area.
  • Assume the time for access and egress of the room is negligible.

TR-AA-230-1003-F10, Revision 2

PBN JPM P162.006a.AOT, Determine a Stay Time for a JPM High Radiation Area, Rev. 2 Page 3 of 5 JPM PERFORMANCE INFORMATION Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).

NOTE: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.

Performance Step: 1 Determine total dose received closing the valve in the HRA Critical Y (360mR/hr field).

Standard: The total dose received to close the first valve is determined to be 30mR.

(360mR/hr X 5 min) ÷ 60 min/hr = 30 mR Performance: SATISFACTORY UNSATISFACTORY Comments: _____________________________________________________

Performance Step: 2 Available dose for hanging tags in the General Areas is Critical Y determined.

Standard: Dose available for hanging tags in the General Areas is determined to be 20mR.

50 mR - 30 mR = 20 mR Performance: SATISFACTORY UNSATISFACTORY Comments: _____________________________________________________

TR-AA-230-1003-F10, Revision 2

PBN JPM P162.006a.AOT, Determine a Stay Time for a JPM High Radiation Area, Rev. 2 Page 4 of 5 Performance Step: 3 Determine maximum time to hang tags in the General Area.

Critical Y Standard: Maximum time to be spent in the General Area is determined to be 30 minutes.

(20 mR ÷ 40 mR/hr) X 60 min/hr = 30 min Performance: SATISFACTORY UNSATISFACTORY Comments: _____________________________________________________

Terminating Cues: The Task is complete.

Stop Time:

TR-AA-230-1003-F10, Revision 2