ML15079A320: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 03/06/2015
| issue date = 03/06/2015
| title = 2015 Point Beach Nuclear Plant Initial License Examination Administered Admin Jpms RO
| title = 2015 Point Beach Nuclear Plant Initial License Examination Administered Admin Jpms RO
| author name = McNeil D R
| author name = Mcneil D
| author affiliation = NRC/RGN-III/DRS/OLB
| author affiliation = NRC/RGN-III/DRS/OLB
| addressee name =  
| addressee name =  
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:JOB PERFORMANCE MEASURE JPM Page 1 of 9 TR-AA-230-1003-F10, Revision 2 JPM TITLE:
{{#Wiki_filter:JPM JOB PERFORMANCE MEASURE                                   Page 1 of 9 JPM TITLE:               PERFORM SHUTDOWN MARGIN CALCULATION FOR AN OPERATING REACTOR JPM NUMBER:               PBN JPM P000.002d.COT                           REV. 4 TASK NUMBER(S) /         P000.002.COT / PERFORM SHUTDOWN MARGIN CALCULATION TASK TITLE(S):            FOR AN OPERATING REACTOR 003 AK1.07                                      3.1/3.9 K/A NUMBERS:             003 AK3.04                 K/A VALUE:         3.8/4.1 2.1.25                                          3.9/4.2 Justification (FOR K/A VALUES <3.0):
PERFORM SHUTDOWN MARGIN CALCULATION FOR AN OPERATING REACTOR JPM NUMBER:
PBN JPM P000.002d.COT REV. 4   TASK NUMBER(S) / TASK TITLE(S):
P000.002.COT / PERFORM SHUTDOWN MARGIN CALCULATION FOR AN OPERATING REACTOR K/A NUMBERS:
003 AK1.07 003 AK3.04 2.1.25  K/A VALUE:
3.1/3.9 3.8/4.1 3.9/4.2   Justification (FOR K/A VALUES <3.0):
TASK APPLICABILITY:
TASK APPLICABILITY:
RO   SRO     STA     Non-Lic   SRO CERT OTHER:       APPLICABLE METHOD OF TESTING:
RO           SRO             STA           Non-Lic     SRO CERT               OTHER:
Simulate/Walkthrough:
APPLICABLE METHOD OF TESTING:                 Simulate/Walkthrough:             Perform:   X EVALUATION LOCATION:             In-Plant:                     Control Room:
Perform: X   EVALUATION LOCATION:
Simulator:     X             Other:               X Lab:
In-Plant:   Control Room:
Time for Completion:           20     Minutes         Time Critical:           NO Alternate Path [NRC]:                   N/A Alternate Path [INPO]:                 N/A Developed by:                             Jeffrey Hinze Instructor/Developer                               Date Reviewed by:                         Andrew Zommers Instructor (Instructional Review)                         Date Validated by:                             Jeff Baugniet SME (Technical Review)                               Date Approved by:                         Randy Amundson Training Supervision                               Date Approved by:                             Tom Larson Training Program Owner                               Date TR-AA-230-1003-F10, Revision 2
Simulator:
 
X Other: X         Lab:       Time for Completion:
PBN JPM P000.002d.COT, Perform Shutdown Margin                         JPM Calculation for an Operating Reactor, Rev. 4                   Page 2 of 9 I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues.
20 Minutes Time Critical:
NO     Alternate Path [NRC]:
N/A   Alternate Path [INPO]:
N/A       Developed by:
Jeffrey Hinze Instructor/Developer Date     Reviewed by:
Andrew Zommers Instructor (Instructional Review)
Date Validated by:
Jeff Baugniet SME (Technical Review)
Date Approved by:
Randy Amundson Training Supervision Date Approved by:
Tom Larson Training Program Owner Date PBN JPM P000.002 d.COT, Perform Shutdown Margin Calculation for an Operating Reactor, Rev.
4 JPM Page 2 of 9 TR-AA-230-1003-F10, Revision 2 I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
 
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.  
 
INITIAL CONDITIONS:
INITIAL CONDITIONS:
Unit 1 had been operating at 100% power.
* Unit 1 had been operating at 100% power.
Rod H-2 in Shutdown Bank "A" has dropped to the bottom of the core.
* Rod H-2 in Shutdown Bank "A" has dropped to the bottom of the core.
The crew is responding in accordance with AOP
* The crew is responding in accordance with AOP-6A, "Dropped Rod".
-6A, "Dropped Rod".
* Assume todays date and time is current.
Assume today's date and time is current.
INITIATING CUES:
INITIATING CUES:
OS1 has directed you to calculate the required shutdown margin in accordance with PBF
* OS1 has directed you to calculate the required shutdown margin in accordance with PBF-2513, Shutdown Margin for an Operating Reactor, per Step 9 of AOP-6A.
-2513, Shutdown Margin for an Operating Reactor, per Step 9 of AOP-6A. The following Unit 1 conditions currently exist:
The following Unit 1 conditions currently exist:
Boron Concentration  
* Boron Concentration - 1125 ppm
- 1125 ppm Rx Power - 90% Tave - 5 72  F Tref - 5 73  F Control Bank D @ 180 steps All other banks @ 22 8 steps JOB PERFORMANCE MEASURE  JPM Page 3 of 9  TR-AA-230-1003-F10, Revision 2 JPM PERFORMANCE INFORMATION Start Time:
* Rx Power - 90%
NOTE:  When providing "Evaluator Cues" to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinee's actions warrant receiving the information (i.e., the examinee looks or asks for the indication).
* Tave - 572 &deg;F
NOTE: Critical steps are marked with a "Y" below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.
* Tref - 573 &deg;F
* Control Bank D @ 180 steps
* All other banks @ 228 steps TR-AA-230-1003-F10, Revision 2


Performance Step:
JPM JOB PERFORMANCE MEASURE                                    Page 3 of 9 JPM PERFORMANCE INFORMATION Start Time:
1 Critical N  Verify TAVG within 1.5&deg;F of TREF. Standard: Verify TAVG within 1.5&deg;F of TREF based on initial conditions given and circle YES on PBF
NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).
-2513. Performance:
NOTE: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.
SATISFACTORY UNSATISFACTORY Comments:    
Performance Step: 1       Verify TAVG within 1.5&deg;F of TREF.
Critical N Standard:                 Verify TAVG within 1.5&deg;F of TREF based on initial conditions given and circle YES on PBF-2513.
Performance:               SATISFACTORY               UNSATISFACTORY Comments:
TR-AA-230-1003-F10, Revision 2


JOB PERFORMANCE MEASURE JPM Page 4 of 9 TR-AA-230-1003-F10, Revision 2 Performance Step:
JPM JOB PERFORMANCE MEASURE                           Page 4 of 9 Performance Step: 2       Obtain Core Burn-Up from ROD 1.1.
2 Critical Y  Obtain Core Burn-Up from ROD 1.1.
Critical Y Standard:                 Core burn-up determined to be 2120 +/- 30 MWD/MTU (2090-2150).
Standard: Core burn-up determined to be 2120 +/- 3 0 MWD/MTU (2090-2150). Evaluator Note:
Evaluator Note:           Core burn-up determined to be 2120 MWD/MTU and recorded on PBF-2513. From ROD 1.1, examinee will have 1930 MWD/MTU five days ago and will need to add 190 MWD/MTU (5 Days
Core burn-up determined to be 2120 MWD/MTU and recorded on PBF-2513. From ROD 1.1, examinee will have 1930 MWD/MTU five days ago and will need to add 190 MWD/MTU (5 Days
* 38 MWD/MTU/Day)
* 3 8 MWD/MTU/Day)
Evaluator Cue:             Provide examinee with a copy of Unit 1 ROD book.
Evaluator Cue:
Performance:               SATISFACTORY             UNSATISFACTORY Comments:
Provide examinee with a copy of Unit 1 ROD book.
Performance Step: 3       Obtain Nominal EOL Burn-Up from ROD1.1.
Performance:
Critical N Standard:                 EOL burn-up determined to be 18874 MWD/MTU and recorded on PBF-2513.
SATISFACTORY UNSATISFACTORY Comments:       Performance Step:
Performance:               SATISFACTORY             UNSATISFACTORY Comments:
3 Critical N  Obtain Nominal EOL Burn-Up from ROD1.1. Standard: EOL burn-up determined to be 18874 MWD/MTU and recorded on PBF-2513. Performance:
TR-AA-230-1003-F10, Revision 2
SATISFACTORY UNSATISFACTORY Comments:    


JOB PERFORMANCE MEASURE JPM Page 5 of 9 TR-AA-230-1003-F10, Revision 2 Performance Step:
JPM JOB PERFORMANCE MEASURE                                 Page 5 of 9 Performance Step: 4       Calculate % Burn-Up.
4 Critical  N  Calculate %
Critical N Standard:                 Calculate % burn-up to be 11.23% + 0.16% (11.07-11.39) and record on PBF-2513.
Burn-U p. Standard: Calculate % burn
Performance:               SATISFACTORY               UNSATISFACTORY Comments:
-up to be 11.23% + 0.16% (11.07-11.39) and record on PBF
Performance Step: 5         Obtain Reactor Power Level (%).
-2513. Performance:
Critical N Standard:                   Record 90% on PBF-2513.
SATISFACTORY UNSATISFACTORY Comments:       Performance Step:
Performance:                SATISFACTORY _____ UNSATISFACTORY _____
5 Critical  N  Obtain Reactor Power Level (%). Standard: Record 90% on PBF
Comments:
-2513. Performance:
Performance Step: 6        Obtain Control Rod Position Critical N Standard:                  Bank C and D control rod position determined to be 228 and 180 steps and recorded on PBF-2513.
SATISFACTORY _____ UNSATISFACTORY _____
Evaluator Cue:              If asked Bank C is at 228 steps per initial conditions.
Performance:               SATISFACTORY _____ UNSATISFACTORY _____
Comments:
Comments:
Performance Step:
TR-AA-230-1003-F10, Revision 2
6 Critical N  Obtain Control R od Position  Standard: Bank C and D control rod position determined to be 228 and 180 steps and recorded on PBF
-2513. Evaluator Cue:
If asked Bank C is at 22 8 steps per initial conditions.
Performance:
SATISFACTORY  _____  UNSATISFACTORY  _____
Comments:     


JOB PERFORMANCE MEASURE JPM Page 6 of 9 TR-AA-230-1003-F10, Revision 2 Performance Step:
JPM JOB PERFORMANCE MEASURE                                 Page 6 of 9 Performance Step: 7         Obtain Power Defect from ROD 7.
7 Critical Y  Obtain Power Defect from R OD 7. Standard: Determine power defect to be 162 0 pcm + 20 pcm (160 0-164 0 , based on possible min/max reading on graph) and record on PBF
Critical Y Standard:                   Determine power defect to be 1620 pcm + 20 pcm (1600-1640, based on possible min/max reading on graph) and record on PBF-2513.
-2513. Performance:
Performance:               SATISFACTORY _____ UNSATISFACTORY _____
SATISFACTORY _____ UNSATISFACTORY _____
Comments:
Comments:       Performance Step:
Performance Step: 8         Obtain Control Rod Worth (Bank D, C, B, A, S in, at HZP) from Critical Y                  ROD 5.
8 Critical Y  Obtain Control R od Worth (Bank D, C, B, A, S in, at HZP) from R OD 5. Standard: Determine control rod worth (Bank D, C, B, A, S in, at HZP) to be 6550 pcm and record on PBF
Standard:                   Determine control rod worth (Bank D, C, B, A, S in, at HZP) to be 6550 pcm and record on PBF-2513.
-2513. Performance:
Performance:               SATISFACTORY _____ UNSATISFACTORY _____
SATISFACTORY _____ UNSATISFACTORY _____   Comments:
Comments:
Performance Step:
Performance Step: 9         Obtain Stuck Rod Worth from ROD 5.
9 Critical Y  Obtain Stuck Rod Worth from R OD 5. Standard: Determine stuck rod worth to be 689 pcm and record on PBF
Critical Y Standard:                   Determine stuck rod worth to be 689 pcm and record on PBF-2513.
-2513. Performance:
Performance:               SATISFACTORY _____ UNSATISFACTORY _____
SATISFACTORY _____ UNSATISFACTORY _____
Comments:
Comments:    
TR-AA-230-1003-F10, Revision 2


JOB PERFORMANCE MEASURE JPM Page 7 of 9 TR-AA-230-1003-F10, Revision 2 Performance Step:
JPM JOB PERFORMANCE MEASURE                                 Page 7 of 9 Performance Step: 10       Calculate Stuck Rod Worth minus Control Rod Worth.
10 Critical  Y  Calculate Stuck R od Worth minus Control R od Worth. Standard: Calculate stuck rod worth minus control rod worth to be 5861 pcm and record on PBF
Critical Y Standard:                   Calculate stuck rod worth minus control rod worth to be 5861 pcm and record on PBF-2513.
-2513. Performance:
Performance:               SATISFACTORY _____ UNSATISFACTORY _____
SATISFACTORY _____ UNSATISFACTORY _____
Comments:
Comments:       Performance Step:
Performance Step: 11       Obtain Bank Worth to ARO from ROD 3.1, Use Step 2 and Step 6 Critical Y                  data.
11 Critical Y  Obtain Bank Worth to ARO from R OD 3.1, Use Step 2 and Step 6 data. Standard: Determine bank worth to ARO to be 141 pcm and record on PBF
Standard:                   Determine bank worth to ARO to be 141 pcm and record on PBF-2513.
-2513. Performance:
Performance:               SATISFACTORY _____ UNSATISFACTORY _____
SATISFACTORY _____ UNSATISFACTORY
Comments:
_____    Comments:
Performance Step: 12       Obtain correct value for dropped rod, stuck rod or no abnormal Critical N                  condition.
Performance Step:
Standard:                   Determine dropped rod and enter Stuck Rod Worth from ROD 5 and record 689 pcm on PBF-2513.
12 Critical N  Obtain correct value for dropped rod, stuck rod or no abnormal condition.
Performance:               SATISFACTORY _____ UNSATISFACTORY _____
Standard: Determine dropped rod and enter Stuck Rod Worth from ROD 5 and record 6 89 pcm on PBF
Comments:
-2513. Performance:
TR-AA-230-1003-F10, Revision 2
SATISFACTORY _____ UNSATISFACTORY _____
Comments:    


JOB PERFORMANCE MEASURE JPM Page 8 of 9 TR-AA-230-1003-F10, Revision 2 Performance Step:
JPM JOB PERFORMANCE MEASURE                                 Page 8 of 9 Performance Step: 13       Calculate Total Available Control Rod Negative Reactivity by Critical Y                  adding Step 10, 11, 12 and 250 pcm.
13 Critical Y  Calculate Total Available Control Rod Negative Reactivity by adding Step 10, 11, 12 and 250 pcm.
Standard:                   Determine Total available control rod negative reactivity to be 4781 pcm and record on PBF-2513.
Standard: Determine Total available control rod negative reactivity to be 4781 pcm and record on PBF
Performance:               SATISFACTORY _____ UNSATISFACTORY _____
-2513. Performance:
Comments:
SATISFACTORY _____ UNSATISFACTORY _____
Performance Step: 14       Calculates Shut Down Margin by adding Steps 13 and 7.
Comments:       Performance Step:
Critical Y Standard:                   Determine calculated SDM to be 3161 + 20 pcm (3141-3181) and record on PBF-2513.
14 Critical Y  Calculates Shut Down Margin by adding Steps 13 and 7.
Performance:               SATISFACTORY _____ UNSATISFACTORY _____
Standard: Determine calculated SDM to be 3 161 + 20 pcm (3141-3181) and record on PBF
Comments:
-2513. Performance:
Performance Step: 15       Determine the Required Shut Down Margin using TRM 2.1, [COLR]
SATISFACTORY _____ UNSATISFACTORY _____
Critical Y                  Figure 2 using Step 4 data.
Comments:     Performance Step:
Standard:                   Determines required SDM to be -2000 pcm and record on PBF-2513.
15 Critical Y  Determine the Required Shut Down Margin using TRM 2.1, [COLR] Figure 2 using Step 4 data.
Performance:               SATISFACTORY _____ UNSATISFACTORY _____
Standard: Determines required SDM to be  
Comments:
-2000 pcm and record on PBF
TR-AA-230-1003-F10, Revision 2
-2513. Performance:
SATISFACTORY _____ UNSATISFACTORY _____
Comments:    


JOB PERFORMANCE MEASURE JPM Page 9 of 9 TR-AA-230-1003-F10, Revision 2 Performance Step:
JPM JOB PERFORMANCE MEASURE                             Page 9 of 9 Performance Step: 16       Determines if calculated Shut Down Margin is more negative than Critical Y                  Required Shut Down Margin.
16 Critical Y  Determines if calculated Shut Down Margin is more negative than Required Shut Down Margin. Standard: Determines Calculated SDM is greater than Required SDM AND circles YES on PBF
Standard:                   Determines Calculated SDM is greater than Required SDM AND circles YES on PBF-2513.
-2513. Performance:
Performance:               SATISFACTORY _____ UNSATISFACTORY _____
SATISFACTORY _____ UNSATISFACTORY _____
Comments:
Comments:       Performance Step:
Performance Step: 17       Inform OS1 you calculated the shutdown margin in accordance with Critical N                  PBF-2513, "Shutdown Margin for an Operating Reactor" and shutdown margin is satisfactory.
17 Critical N  Inform OS 1 you calculated the shutdown margin in accordance with PBF-2513, "Shutdown Margin for an Operating Reactor" and shutdown margin is satisfactory.
Standard:                   Inform OS1 that SDM calculation is complete.
Standard: Inform OS 1 that SDM calculation is complete.
Performance:               SATISFACTORY _____ UNSATISFACTORY _____
Performance:
Comments:
SATISFACTORY _____ UNSATISFACTORY _____
Terminating Cues:       This completes the JPM Stop Time:
Comments:     Terminating Cues:
TR-AA-230-1003-F10, Revision 2
This completes the JPM Stop Time:  


JOB PERFORMANCE MEASURE JPM Page 1 of 8 TR-AA-230-1003-F10, Revision 2  JPM TITLE:
JOB PERFORMANCE MEASURE                                         JPM Page 1 of 8 JPM TITLE:                 Calculate and Adjust PPCS Forebay and Pump Bay Alarm Setpoints JPM NUMBER:               PBN JPM P075.005a.COT                                 REV. 0 TASK NUMBER(S) /           PBN P075.005.COT Operate the Circulating Water Pumps in different TASK TITLE(S):            combinations K/A NUMBERS:               2.2.14                           K/A VALUE:     3.9/4.3 Justification (FOR K/A VALUES <3.0):
Calculate and Adjust PPCS Forebay and Pump Bay Alarm Setpoints JPM NUMBER:
PBN JPM P075.005a.COT REV. 0   TASK NUMBER(S) / TASK TITLE(S):
PBN P075.005.COT Operate the Circulating Water Pumps in different combinations K/A NUMBERS:
2.2.14 K/A VALUE:
3.9/4.3   Justification (FOR K/A VALUES <3.0):
TASK APPLICABILITY:
TASK APPLICABILITY:
RO   SRO   STA   Non-Lic   SRO CERT OTHER:       APPLICABLE METHOD OF TESTING:
RO       SRO       STA       Non-Lic       SRO CERT           OTHER:
Simulate/Walkthrough:
APPLICABLE METHOD OF TESTING:                   Simulate/Walkthrough:               Perform:   X EVALUATION LOCATION:           In-Plant:                             Control Room:
Perform: X   EVALUATION LOCATION:
Simulator:     X                     Other:
In-Plant:   Control Room:
Lab:
Simulator:
Time for Completion:     10         Minutes       Time Critical:     NO Alternate Path [NRC]:     NO Alternate Path [INPO]:   NO Developed by:                           Andrew Zommers Instructor/Developer                               Date Reviewed by:                                 Jeff Hinze Instructor (Instructional Review)                         Date Validated by:                             Jeff Baugniet SME (Technical Review)                               Date Approved by:                           Randy Amundson Training Supervision                               Date Approved by:                               Tom Larson Training Program Owner                               Date TR-AA-230-1003-F10, Revision 2
X Other:           Lab:       Time for Completion:
 
10 Minutes Time Critical:
PBN JPM P075.005a.COT Calculate and Adjust PPCS Forebay and                       JPM Pump Bay Alarm Setpoints, Rev. 0                             Page 2 of 8 I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
NO     Alternate Path [NRC]:
NO   Alternate Path [INPO]:
NO       Developed by:
Andrew Zommers Instructor/Developer Date     Reviewed by:
Jeff Hinze Instructor (Instructional Review)
Date Validated by:
Jeff Baugniet SME (Technical Review)
Date Approved by:
Randy Amundson Training Supervision Date Approved by:
Tom Larson Training Program Owner Date PBN JPM P075.005a.COT Calculate and Adjust PPCS Forebay and Pump Bay Alarm Setpoints, Rev. 0 JPM Page 2 of 8 TR-AA-230-1003-F10, Revision 2  I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.
INITIAL CONDITIONS:
INITIAL CONDITIONS:
Today's date is 20 November 2014 Per OI 38 , Circulating Water System Operation, we are going to shift Circulating Water Pumps from 2 running per unit down to a single Circulating Water Pump per unit.
* Today's date is 20 November 2014
Both 1CW-2 and 2CW-2, Circulating Water Intake valves will remain open.
* Per OI 38, Circulating Water System Operation, we are going to shift Circulating Water Pumps from 2 running per unit down to a single Circulating Water Pump per unit.
INITIATING CUES (IF APPLICABLE):   OS2 has directed you to calculate and adjust the PPCS Forebay and Pump Bay alarm setpoints per PBF-2124 , PPCS Forebay and Pump Bay Level Alarm Setpoints.
* Both 1CW-2 and 2CW-2, Circulating Water Intake valves will remain open.
INITIATING CUES (IF APPLICABLE):
* OS2 has directed you to calculate and adjust the PPCS Forebay and Pump Bay alarm setpoints per PBF-2124, PPCS Forebay and Pump Bay Level Alarm Setpoints.
TR-AA-230-1003-F10, Revision 2


JOB PERFORMANCE MEAS URE JPM Page 3 of 8 TR-AA-230-1003-F10, Revision 2  JPM PERFORMANCE INFORMATION Start Time:
JOB PERFORMANCE MEASURE                                    JPM Page 3 of 8 JPM PERFORMANCE INFORMATION Start Time:
NOTE: When providing "Evaluator Cues" to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinee's actions warrant receiving the information (i.e., the examinee looks or asks for the indication).
NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).
NOTE: Critical steps are marked with a "Y" below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.
NOTE: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.
Performance Step:
Performance Step: 1         Review 3 notes prior to performing step 1.4 Critical N Standard:                    Review 3 notes prior to performing step 1.4 Performance:                SATISFACTORY                  UNSATISFACTORY Comments:
1 Critical   N Review 3 notes prior to performing step
Performance Step: 2          1.0 Obtain Lake Michigan Water level information as follows: (cont)
Critical Y                      1.4 RECORD Mean level for Lake Michigan Huron below and SUBTRACT 580.9 feet to correct for plant elevation:
Standard:                    Record the value of 579.21 (Mean Level) and subtract 580.9 for final value of (-1.69)
Evaluator Note:              NOTE: At bottom of column labeled "Michigan Huron Lake Mean" the Mean level for current month will be displayed.
NOTE: 580.9 ft. comes from the sum of 580.2 ft IGLD 1955 (which is plant elevation zero) and 0.7 ft, the delta between IGLD 1955 and IGLD 1985.
NOTE: Corrected mean level is the difference in Lake Michigan level as compared to plant elevation zero.
Performance:                SATISFACTORY                  UNSATISFACTORY Comments:
TR-AA-230-1003-F10, Revision 2


===1.4 Standard===
JOB PERFORMANCE MEASURE                                    JPM Page 4 of 8 Performance Step: 3          1.0 Obtain Lake Michigan Water level information as follows: (cont)
Review 3 notes prior to performing step 1.4 Performance:
Critical N                      1.5 IF Web Site in step 1.1 used, THEN PRINT a copy of the current months Great Lakes Water Levels in (Feet) IGLD 85 AND ATTACH to this form.
SATISFACTORY UNSATISFACTORY Comments:       Performance Step:
Standard:                    Retain copy, attach to form and initial the step.
2 Critical   Y 1.0 Obtain Lake Michigan Water level information as follows: (cont)
Performance:                 SATISFACTORY                 UNSATISFACTORY Comments:
Performance Step: 4          2.0 RECORD the head loss for the CW System configuration from the Critical Y                   table below:__________
Standard:                    Locate and enter the value for 2 intake pipes, 2 CW pumps running (one per unit). Value is (-1.6)
Evaluator Note:              NOTE: Head loss values were calculated assuming CW waterbox valves are fully open and minimal condenser fouling. Throttled waterbox valves or fouled condensers would result in higher observed forebay levels.
NOTE: High Lake water level alarm and High-High Lake water level alarm calculation is a function of CW intake valve alignment, number of cooling water (CW) pumps in service, and the two values used from Table 6-5 Calculation 2014-06279 Time Available To Respond To Rising Lake Level.
Evaluator Cue:              If asked, all waterbox valves are open and thermodynamic testing indicated that waterboxes are not fouled.
Performance:                SATISFACTORY                  UNSATISFACTORY Comments:
TR-AA-230-1003-F10, Revision 2


===1.4 RECORD===
JOB PERFORMANCE MEASURE                                    JPM Page 5 of 8 Performance Step: 5          3.0 ADD Steps 1.4 and 2.0 to obtain forebay/pump bay level:
Mean level for Lake Michigan Huron below and SUBTRACT 580.9 feet to correct for plant elevation:
Critical Y                  ________ + _______ = ________
Standard: Record the value of 579.21 (Mean Level) and subtract 580.9 for final value of (-1.69)   Evaluator Not e: NOTE: At bottom of column labeled "Michigan Huron Lake Mean" the "Mean" level for current month will be displayed.
Standard:                   Enter the value from step 1.4 (-1.69) add the value from step 2.0 (-1.6) for a total of (-3.29)
NOTE: 580.9 ft. comes from the sum of 580.2 ft IGLD 1955 (which is plant elevation zero) and 0.7 ft, the delta between IGLD 1955 and IGLD 1985. NOTE: Corrected mean level is the difference in Lake Michigan level as compared to plant elevation zero.
Performance:                 SATISFACTORY                 UNSATISFACTORY Comments:
Performance:
Performance Step: 6          4.0 CALCULATE Low Alarm Limit #1 level setpoint to be one foot below Critical Y                  forebay level determined in Step 3.0 as follows:
SATISFACTORY UNSATISFACTORY Comments:
Forebay/pump bay level from Step 3.0 - 1 foot = Forebay/pump bay Low Alarm Limit #1 setpoints Standard:                   Enter the value from step 3.0 (-3.29) and subtract (1) for a total of
JOB PERFORMANCE MEAS URE JPM Page 4 of 8  TR-AA-230-1003-F10, Revision 2 Performance Step:
(-4.29)
3 Critical N  1.0 Obtain Lake Michigan Water level information as follows: (cont) 1.5 IF Web Site in step 1.1 used, THEN PRINT a copy of the current month's Great Lakes Water Levels in (Feet) IGLD 85" AND ATTACH to this form.
Evaluator Note:                                              CAUTION:
Standard: Retain copy, attach to form and initial the step.
LO and LO-LO level alarms should NOT be set less than -11.0 feet and -11.5 feet, respectively. Forebay level and/or pump bay of less than -11.5 feet is a violation of TLCO 3.7.7 for SW System.
Performa nce:  SATISFACTORY UNSATISFACTORY Comments:      Performance Step:
Performance:                 SATISFACTORY                 UNSATISFACTORY Comments:
4 Critical  Y  2.0 RECORD the head loss for the CW System configuration from the table below:__________
TR-AA-230-1003-F10, Revision 2
Standard: Locate and enter the value for 2 intake pipes, 2 CW pumps running (one per unit). Value is (-1.6)   Evaluator Note:
NOTE: Head loss values were calculated assuming CW waterbox valves are fully open and minimal condenser fouling. Throttled waterbox valves or fouled condensers would result in higher observed forebay levels. NOTE: High Lake water level alarm and High
-High Lake water level alarm calculation is a function of CW intake valve alignment, number of cooling water (CW) pumps in service, and the two values used from Table 6-5 Calculation 2014
-06279 "Time Available To Respond To Rising Lake Level".
Evaluator Cue:
If asked, all waterbox valves are open and thermodynamic testing indicated that waterboxes are not fouled.
Performance:
SATISFACTORY UNSATISFACTORY Comments:    


JOB PERFORMANCE MEAS URE JPM Page 5 of 8 TR-AA-230-1003-F10, Revision 2 Performance Step:
JOB PERFORMANCE MEASURE                                    JPM Page 6 of 8 Performance Step: 7          5.0 CALCULATE Low-Low Alarm Limit #2 setpoint to be 1.5 feet below Critical Y                  forebay level determined in Step 3.0 as follows:
5 Critical Y  3.0 ADD Steps 1.4 and 2.0 to obtain forebay/pump bay level
Forebay/pump bay level from Step 3.0 - 1.5 foot = Forebay/pump bay Low Alarm Limit #1 setpoints Standard:                   Enter the value from step 3.0 (-3.29) and subtract (1.5) for a total of
: ________ + _______ = ________
(-4.79)
Standard: Enter the value from step 1.4 (-1.69) add the value from step 2.0 (-1.6) for a total of (-3.29)    Performance:
Performance:                SATISFACTORY                UNSATISFACTORY Comments:
SATISFACTORY        UNSATISFACTORY Comments:      Performance Step:
Performance Step: 8          6.0 ENTER the LEAST NEGATIVE value of:
6 Critical  Y  4.0 CALCULATE Low Alarm Limit #1 level setpoint to be one foot below forebay level determined in Step 3.0 as follows:
Critical Y                  Step 4.0 of _______ OR -11.0 feet to establish new Lo Alarm Limit #1 level setpoint. __________
Forebay/pump bay level from Step 3.0  
Standard:                    Enter the value from step 4.0 (-4.29) and the least negative value of (-
- 1 foot = Forebay/pump bay Low Alarm Limit #1 setpoints Standard: Enter the value from step 3.0 (-3.29) and subtract (1) for a total of
4.29)
(-4.29)   Evaluator Note:
Performance:                SATISFACTORY                UNSATISFACTORY Comments:
CAUTION: LO and LO-LO level alarms should NOT be set less than
Performance Step: 9          7.0 ENTER the LEAST NEGATIVE value of:
-11.0 feet and -11.5 feet, respectively.
Critical Y                  Step 5.0 of _______ OR -11.5 feet to establish new Lo-Lo Alarm Limit #2 level setpoint. __________
Forebay level and/or pump bay of less than
Standard:                    Enter the value from step 4.0 (-4.79) and the least negative value of (-
-11.5 feet is a violation of TLCO 3.7.7 for SW System.
4.79)
Performance:
Performance:                 SATISFACTORY                 UNSATISFACTORY Comments:
SATISFACTORY UNSATISFACTORY Comments:    
TR-AA-230-1003-F10, Revision 2


JOB PERFORMANCE MEAS URE JPM Page 6 of 8 TR-AA-230-1003-F10, Revision 2  Performance Step:
JOB PERFORMANCE MEASURE                                                JPM Page 7 of 8 Performance Step: 10        8.0 ADJUST PPCS Alarm limits to values calculated in steps 6.0, 7.0, Critical N (SEQ-)            and Step 2.0 Table, and RECORD below:
7 Critical Y  5.0 CALCULATE Low
Standard:                                                          LO Alarm      LO-LO      HI Alarm    HI-HI Limit #1 (Step Alarm Limit Limit      Alarm Error!        #2 (Step    Error!      Limit Reference      Error!      Reference  Error!
-Low Alarm Limit #2 setpoint to be 1.5 feet below forebay level determined in Step 3.0 as follows:
source not    Reference  source not  Referenc found.)       source not  found.      e source found.)     Table      not found.
Forebay/pump bay level from Step 3.0  
Table 1L-3586A, Pump Bay Level Alarm  -4.29          -4.79 1L-3586B, Forebay Level Alarm  -4.29          -4.79      -0.8        -0.6 2L-3586A, Pump Bay Level Alarm -4.29          -4.79 2L-3586B, Forebay Level Alarm  -4.29         -4.79      -0.8        -0.6 Evaluator Note:              The Table information is contained in this step, the adjusting of PPCS alarms will be in following steps Evaluator Note:                                                   CAUTION LO and LO LO level alarms should NOT be set less than -11.0 feet and 11.5 feet, respectively. Forebay level and/or pump bay of less than -11.5 feet is a violation of TLCO 3.7.7 for SW System.
- 1.5 foot = Forebay/pump bay Low Alarm Limit #1 setpoints Standard: Enter the value from step 3.0 (-3.29) and subtract (1.5) for a total of
NOTE: While adjusting alarm setpoints in PPCS, a priority alarm may be received.
(-4.79)    Performance:
Performance:                SATISFACTORY                        UNSATISFACTORY Comments:
SATISFACTORY UNSATISFACTORY Comments:      Performance Step:
Performance Step: 11        From a Simulator (Control Room) PPCS workstation, "Pump House" block Critical Y                  either Sim 1 or Sim 2 directory to go to Pump House Drawing Standard:                    Bring up 3192 OR 3692 Pump House Performance:                 SATISFACTORY                       UNSATISFACTORY Comments:
8 Critical Y  6.0 ENTER the LEAST NEGATIVE value of:
TR-AA-230-1003-F10, Revision 2
Step 4.0 of _______ OR
-11.0 feet to establish new Lo Alarm Limit #1 level setpoint. __________
Standard: Enter the value from step 4.0 (-4.29) and the least negative value of (-4.29)    Performance:
SATISFACTORY UNSATISFACTORY Comments:
Performance Step:
9 Critical Y  7.0 ENTER the LEAST NEGATIVE value of:
Step 5.0 of _______ OR -11.5 feet to establish new Lo
-Lo Alarm Limit #2 level setpoint. __________
Standard: Enter the value from step 4.0 (-4.79) and the least negative value of (-4.79)    Performance:
SATISFACTORY UNSATISFACTORY Comments:    


JOB PERFORMANCE MEAS URE JPM Page 7 of 8  TR-AA-230-1003-F10, Revision 2 Performance Step:
JOB PERFORMANCE MEASURE                                          JPM Page 8 of 8 Performance Step: 12        Click on the "Change LEV ALRM LIMITS" button and enter the Low and Critical Y                  High Limits #1 and #2 values for both units.
1 0 Critical  N (SEQ-) 8.0 ADJUST PPCS Alarm limits to values calculated in steps 6.0, 7.0, and Step 2.0 Table, and RECORD below:
Standard:                   Examinee clicks 'Change LEV ALRM LIMITS" button and changes alarms setpoints per limits listed in Step 8.0. (-4.29 for Low Limit #1 and -4.79 for Low Limit #2 and -0.8 for High Limit #1 and -0.6 for High Limit #2)
Standard:  LO Alarm Limit #1 (Step Error! Reference source not found.) LO-LO Alarm Limit #2  (Step Error! Reference source not found.) HI Alarm Limit    Error! Reference source not found. Table HI-HI Alarm Limit Error! Reference source no t found. Table 1L-3586A, Pump Bay Level Alarm
Evaluator Note:             Simulator PPCS will not allow changes to current alarm setpoints.
-4.29 -4.79  1L-3586B, Forebay Level Alarm
Evaluator Cue:               Cue examinee that PPCS alarm setpoints were changed to the values that they gave and PPCS indicates said values.
-4.29 -4.79 -0.8 -0.6 2L-3586A, Pump Bay Level Alarm
Performance:                 SATISFACTORY                     UNSATISFACTORY Comments:
-4.29 -4.79  2L-3586B, Forebay Level Alarm
Performance Step: 13        Examinee makes a report to OS2 that adjustment of PPCS Forebay and Critical N                  Pump Bay Alarm Setpoints is completed and hands signed PBF-2124 back.
-4.29 -4.79 -0.8 -0.6    Evaluator Note:
Standard:                   Examinee communicates completion of PBF-2124.
The Table information is contained in this step, the adjusting of PPCS alarms will be in following steps Evaluator Note:
Evaluator Cue:               Acknowledge communication to OS2.
CAUTION LO and LO LO level alarms should NOT be set less than
Performance:                 SATISFACTORY                     UNSATISFACTORY Comments:
-11.0 feet and  11.5 feet, respectively. Forebay level and/or pump bay of less than -11.5 feet is a violation of TLCO 3.7.7 for SW System.
Terminating Cues:
NOTE: While adjusting alarm setpoints in PPCS, a priority alarm may be received.
This Completes the JPM Stop Time:
Performance:
TR-AA-230-1003-F10, Revision 2
SATISFACTORY UNSATISFACTORY Comments:      Performance Step:
1 1  Critical  Y  From a Simulator (Control Room
) PPCS workstation, "Pump House" block either Sim 1 or Sim 2 directory to go to Pump House Drawing Standard: Bring up 3192 OR 3692 Pump House Performance:
SATISFACTORY UNSATISFACTORY Comments:
JOB PERFORMANCE MEAS URE JPM Page 8 of 8 TR-AA-230-1003-F10, Revision 2 Performance Step: 1 2  Critical  Y  Click on the "Change LEV ALRM LIMITS" button and enter the Low and High Limits #1 and #2 values for both units
. Standard: Examinee clicks 'Change LEV ALRM LIMITS" button and changes alarms setpoints per limits listed in Step 8.0
. (-4.29 for Low Limit #1 and  
-4.79 for Low Limit #2 and -0.8 for High Limit #1 and  
-0.6 for High Limit #2
Evaluator Note:
Simulator PPCS will not allow changes to current alarm setpoints.
Evaluator Cue:
Cue examinee that PPCS alarm setpoints were changed to the values that they gave and PPCS indicates said values.
Performance:
SATISFACTORY UNSATISFACTORY Comments:       Performance Step:
1 3  Critical N  Examinee makes a report to OS2 that adjustment of PPCS Forebay and Pump Bay Alarm Setpoints is completed and hands signed PBF
-2124 back. Standard: Examinee communicates completion of PBF
-2124. Evaluator Cue:
Acknowledge communication to OS2.
Performance:
SATISFACTORY UNSATISFACTORY Comments:     Terminating Cues:
This Completes the JPM Stop Time:  


JOB PERFORMANCE MEASURE JPM Page 1 of 5 TR-AA-230-1003-F10, Revision 2 JPM TITLE:
JPM JOB PERFORMANCE MEASURE                                     Page 1 of 5 JPM TITLE:               DETERMINE A STAY TIME FOR A HIGH RADIATION AREA JPM NUMBER:               PBN JPM P162.006a.AOT                             REV. 2 TASK NUMBER(S) /         PBN P162.006.AOT, COMPLY WITH RADIATION WORK PERMOTS TASK TITLE(S):
DETERMINE A STAY TIME FOR A HIGH RADIATION AREA JPM NUMBER:
GENERIC 2.3.7                                   3.5/3.6 K/A NUMBERS:                                          K/A VALUE:
PBN JPM P162.006 a.AOT REV. 2   TASK NUMBER(S) / TASK TITLE(S):
GENERIC 2.3.12                                  3.2/3.7 Justification (FOR K/A VALUES <3.0):
PBN P162.006.AOT, COMPLY WITH RADIATION WORK PERMOTS K/A NUMBERS:
GENERIC 2.3.7 GENERIC 2.3.12 K/A VALUE:
3.5/3.6 3.2/3.7   Justification (FOR K/A VALUES <3.0):
TASK APPLICABILITY:
TASK APPLICABILITY:
RO     SRO     STA     Non-Lic   SRO CERT OTHER:       APPLICABLE METHOD OF TESTING:
RO           SRO           STA           Non-Lic         SRO CERT             OTHER:
Simulate/Walkthrough:
APPLICABLE METHOD OF TESTING:                 Simulate/Walkthrough:             Perform:   X EVALUATION LOCATION:             In-Plant:                     Control Room:
Perform: X   EVALUATION LOCATION:
Simulator:                   Other:               X Lab:
In-Plant:   Control Room:
Time for Completion:           10     Minutes         Time Critical:           No Alternate Path [NRC]:                   No Alternate Path [INPO]:                   No Developed by:                             Jeffrey Hinze Instructor/Developer                               Date Reviewed by:                         Andrew Zommers Instructor (Instructional Review)                         Date Validated by:                             Jeff Baugniet SME (Technical Review)                               Date Approved by:                         Randy Amundson Training Supervision                               Date Approved by:                               Tom Larson Training Program Owner                               Date TR-AA-230-1003-F10, Revision 2
Simulator:
 
Other: X         Lab:       Time for Completion:
PBN JPM P162.006a.AOT, Determine a Stay Time for a                       JPM High Radiation Area, Rev. 2                           Page 2 of 5 I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues.
10 Minutes Time Critical:
No     Alternate Path [NRC]: No   Alternate Path [INPO]:
No       Developed by:
Jeffrey Hinze Instructor/Developer Date     Reviewed by:
Andrew Zommers Instructor (Instructional Review)
Date Validated by:
Jeff Baugniet SME (Technical Review)
Date Approved by:
Randy Amundson Training Supervision Date Approved by:
Tom Larson Training Program Owner Date PBN JPM P162.006a.AOT, Determine a Stay Time for a High Radiation Area, Rev. 2 JPM Page 2 of 5 TR-AA-230-1003-F10, Revision 2 I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
 
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.  
 
INITIAL CONDITIONS:
INITIAL CONDITIONS:
Reference the attached radiological survey map.
* Reference the attached radiological survey map.
A tag series is required to be hung in the Unit 1 Non
* A tag series is required to be hung in the Unit 1 Non-Regenerative Heat Exchanger Room which is posted as a High Radiation Area (HRA).
-Regenerative Heat Exchanger Room which is posted as a High Radiation Area (HRA).
* The first valve on the tag series is 1CV-371, Letdown Line Containment Isolation valve.
The first valve on the tag series is 1CV
* The remaining valves on the tag series are indicated by unlabeled valve symbols on the survey map.
-371, Letdown Line Containment Isolation valve.
* Radiation Protection (RP) has placed a dose limit of 50mR to perform the entire tag series.
The remaining valves on the tag series are indicated by unlabeled valve symbols on the survey map.
* RP request you stay as far away from 1CV-371 as possible to minimize the dose.
Radiation Protection (RP) has placed a dose limit of 50mR to perform the entire tag series.
RP request you stay as far away from 1CV
-371 as possible to minimize the dose.
INITIATING CUES (IF APPLICABLE):
INITIATING CUES (IF APPLICABLE):
It took you 5 minutes to hang the tag on 1CV
* It took you 5 minutes to hang the tag on 1CV-371 (you were able to hang the tag from arms length).
-371 (you were able to hang the tag from arm's length). Determine the MAXIMUM time (in minutes) that can be spent tagging ALL OTHER valves indicated on the survey map without exceeding the dose limit for this task. Radiation levels of ALL OTHER valves are at general area.
* Determine the MAXIMUM time (in minutes) that can be spent tagging ALL OTHER valves indicated on the survey map without exceeding the dose limit for this task. Radiation levels of ALL OTHER valves are at general area.
Assume the time for access and egress of the room is negligible.
* Assume the time for access and egress of the room is negligible.
TR-AA-230-1003-F10, Revision 2


PBN JPM P162.006a.AOT, Determine a Stay Time for a High Radiation Area, Rev. 2 JPM Page 3 of 5 TR-AA-230-1003-F10, Revision 2 JPM PERFORMANCE INFORMATION Start Time:
PBN JPM P162.006a.AOT, Determine a Stay Time for a                   JPM High Radiation Area, Rev. 2                       Page 3 of 5 JPM PERFORMANCE INFORMATION Start Time:
NOTE: When providing "Evaluator Cues" to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinee's actions warrant receiving the information (i.e., the examinee looks or asks for the indication).
NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).
NOTE: Critical steps are marked with a "Y" below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM. Performance Step: 1 Critical  Y Determine total dose received closing the valve in the HRA (360mR/hr field).
NOTE: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.
Standard: The total dose received to close the first valve is determined to be 30mR. (360mR/hr X 5 min) &#xf7; 60 min/hr = 30 mR Performance: SATISFACTORY UNSATISFACTORY Comments: _____________________________________________________
Performance Step: 1         Determine total dose received closing the valve in the HRA Critical Y                  (360mR/hr field).
 
Standard:                   The total dose received to close the first valve is determined to be 30mR.
Performance Step: 2 Critical  Y Available dose for hanging tags in the General Areas is determined.
(360mR/hr X 5 min) &#xf7; 60 min/hr = 30 mR Performance:               SATISFACTORY             UNSATISFACTORY Comments:                   _____________________________________________________
Standard: Dose available for hanging tags in the General Areas is determined to be 20mR.
Performance Step: 2         Available dose for hanging tags in the General Areas is Critical Y                  determined.
50 mR - 30 mR = 20 mR Performance:
Standard:                   Dose available for hanging tags in the General Areas is determined to be 20mR.
SATISFACTORY UNSATISFACTORY Comments: _____________________________________________________
50 mR - 30 mR = 20 mR Performance:               SATISFACTORY             UNSATISFACTORY Comments:                   _____________________________________________________
 
TR-AA-230-1003-F10, Revision 2
PBN JPM P162.006a.AOT, Determine a Stay Time for a High Radiation Area, Rev. 2 JPM Page 4 of 5  TR-AA-230-1003-F10, Revision 2 Performance Step: 3 Critical  Y Determine maximum time to hang tags in the General Area.
Standard: Maximum time to be spent in the General Area is determined to be 30 minutes.
(20 mR &#xf7; 40 mR/hr) X 60 min/hr = 30 min Performance:
SATISFACTORY UNSATISFACTORY Comments:  _____________________________________________________
 
Terminating Cues:
The Task is complete.


Stop Time:}}
PBN JPM P162.006a.AOT, Determine a Stay Time for a              JPM High Radiation Area, Rev. 2                    Page 4 of 5 Performance Step: 3        Determine maximum time to hang tags in the General Area.
Critical Y Standard:                  Maximum time to be spent in the General Area is determined to be 30 minutes.
(20 mR &#xf7; 40 mR/hr) X 60 min/hr = 30 min Performance:                SATISFACTORY            UNSATISFACTORY Comments:                  _____________________________________________________
Terminating Cues:      The Task is complete.
Stop Time:
TR-AA-230-1003-F10, Revision 2}}

Latest revision as of 14:05, 31 October 2019

2015 Point Beach Nuclear Plant Initial License Examination Administered Admin Jpms RO
ML15079A320
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 03/06/2015
From: Mcneil D
NRC/RGN-III/DRS/OLB
To:
Florida Power & Light Energy Point Beach
Shared Package
ML14328A657 List:
References
Download: ML15079A320 (22)


Text

JPM JOB PERFORMANCE MEASURE Page 1 of 9 JPM TITLE: PERFORM SHUTDOWN MARGIN CALCULATION FOR AN OPERATING REACTOR JPM NUMBER: PBN JPM P000.002d.COT REV. 4 TASK NUMBER(S) / P000.002.COT / PERFORM SHUTDOWN MARGIN CALCULATION TASK TITLE(S): FOR AN OPERATING REACTOR 003 AK1.07 3.1/3.9 K/A NUMBERS: 003 AK3.04 K/A VALUE: 3.8/4.1 2.1.25 3.9/4.2 Justification (FOR K/A VALUES <3.0):

TASK APPLICABILITY:

RO SRO STA Non-Lic SRO CERT OTHER:

APPLICABLE METHOD OF TESTING: Simulate/Walkthrough: Perform: X EVALUATION LOCATION: In-Plant: Control Room:

Simulator: X Other: X Lab:

Time for Completion: 20 Minutes Time Critical: NO Alternate Path [NRC]: N/A Alternate Path [INPO]: N/A Developed by: Jeffrey Hinze Instructor/Developer Date Reviewed by: Andrew Zommers Instructor (Instructional Review) Date Validated by: Jeff Baugniet SME (Technical Review) Date Approved by: Randy Amundson Training Supervision Date Approved by: Tom Larson Training Program Owner Date TR-AA-230-1003-F10, Revision 2

PBN JPM P000.002d.COT, Perform Shutdown Margin JPM Calculation for an Operating Reactor, Rev. 4 Page 2 of 9 I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

  • Unit 1 had been operating at 100% power.
  • Rod H-2 in Shutdown Bank "A" has dropped to the bottom of the core.
  • The crew is responding in accordance with AOP-6A, "Dropped Rod".
  • Assume todays date and time is current.

INITIATING CUES:

The following Unit 1 conditions currently exist:

  • Boron Concentration - 1125 ppm
  • Rx Power - 90%
  • Tave - 572 °F
  • Tref - 573 °F
  • Control Bank D @ 180 steps
  • All other banks @ 228 steps TR-AA-230-1003-F10, Revision 2

JPM JOB PERFORMANCE MEASURE Page 3 of 9 JPM PERFORMANCE INFORMATION Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).

NOTE: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.

Performance Step: 1 Verify TAVG within 1.5°F of TREF.

Critical N Standard: Verify TAVG within 1.5°F of TREF based on initial conditions given and circle YES on PBF-2513.

Performance: SATISFACTORY UNSATISFACTORY Comments:

TR-AA-230-1003-F10, Revision 2

JPM JOB PERFORMANCE MEASURE Page 4 of 9 Performance Step: 2 Obtain Core Burn-Up from ROD 1.1.

Critical Y Standard: Core burn-up determined to be 2120 +/- 30 MWD/MTU (2090-2150).

Evaluator Note: Core burn-up determined to be 2120 MWD/MTU and recorded on PBF-2513. From ROD 1.1, examinee will have 1930 MWD/MTU five days ago and will need to add 190 MWD/MTU (5 Days

  • 38 MWD/MTU/Day)

Evaluator Cue: Provide examinee with a copy of Unit 1 ROD book.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 3 Obtain Nominal EOL Burn-Up from ROD1.1.

Critical N Standard: EOL burn-up determined to be 18874 MWD/MTU and recorded on PBF-2513.

Performance: SATISFACTORY UNSATISFACTORY Comments:

TR-AA-230-1003-F10, Revision 2

JPM JOB PERFORMANCE MEASURE Page 5 of 9 Performance Step: 4 Calculate % Burn-Up.

Critical N Standard: Calculate % burn-up to be 11.23% + 0.16% (11.07-11.39) and record on PBF-2513.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 5 Obtain Reactor Power Level (%).

Critical N Standard: Record 90% on PBF-2513.

Performance: SATISFACTORY _____ UNSATISFACTORY _____

Comments:

Performance Step: 6 Obtain Control Rod Position Critical N Standard: Bank C and D control rod position determined to be 228 and 180 steps and recorded on PBF-2513.

Evaluator Cue: If asked Bank C is at 228 steps per initial conditions.

Performance: SATISFACTORY _____ UNSATISFACTORY _____

Comments:

TR-AA-230-1003-F10, Revision 2

JPM JOB PERFORMANCE MEASURE Page 6 of 9 Performance Step: 7 Obtain Power Defect from ROD 7.

Critical Y Standard: Determine power defect to be 1620 pcm + 20 pcm (1600-1640, based on possible min/max reading on graph) and record on PBF-2513.

Performance: SATISFACTORY _____ UNSATISFACTORY _____

Comments:

Performance Step: 8 Obtain Control Rod Worth (Bank D, C, B, A, S in, at HZP) from Critical Y ROD 5.

Standard: Determine control rod worth (Bank D, C, B, A, S in, at HZP) to be 6550 pcm and record on PBF-2513.

Performance: SATISFACTORY _____ UNSATISFACTORY _____

Comments:

Performance Step: 9 Obtain Stuck Rod Worth from ROD 5.

Critical Y Standard: Determine stuck rod worth to be 689 pcm and record on PBF-2513.

Performance: SATISFACTORY _____ UNSATISFACTORY _____

Comments:

TR-AA-230-1003-F10, Revision 2

JPM JOB PERFORMANCE MEASURE Page 7 of 9 Performance Step: 10 Calculate Stuck Rod Worth minus Control Rod Worth.

Critical Y Standard: Calculate stuck rod worth minus control rod worth to be 5861 pcm and record on PBF-2513.

Performance: SATISFACTORY _____ UNSATISFACTORY _____

Comments:

Performance Step: 11 Obtain Bank Worth to ARO from ROD 3.1, Use Step 2 and Step 6 Critical Y data.

Standard: Determine bank worth to ARO to be 141 pcm and record on PBF-2513.

Performance: SATISFACTORY _____ UNSATISFACTORY _____

Comments:

Performance Step: 12 Obtain correct value for dropped rod, stuck rod or no abnormal Critical N condition.

Standard: Determine dropped rod and enter Stuck Rod Worth from ROD 5 and record 689 pcm on PBF-2513.

Performance: SATISFACTORY _____ UNSATISFACTORY _____

Comments:

TR-AA-230-1003-F10, Revision 2

JPM JOB PERFORMANCE MEASURE Page 8 of 9 Performance Step: 13 Calculate Total Available Control Rod Negative Reactivity by Critical Y adding Step 10, 11, 12 and 250 pcm.

Standard: Determine Total available control rod negative reactivity to be 4781 pcm and record on PBF-2513.

Performance: SATISFACTORY _____ UNSATISFACTORY _____

Comments:

Performance Step: 14 Calculates Shut Down Margin by adding Steps 13 and 7.

Critical Y Standard: Determine calculated SDM to be 3161 + 20 pcm (3141-3181) and record on PBF-2513.

Performance: SATISFACTORY _____ UNSATISFACTORY _____

Comments:

Performance Step: 15 Determine the Required Shut Down Margin using TRM 2.1, [COLR]

Critical Y Figure 2 using Step 4 data.

Standard: Determines required SDM to be -2000 pcm and record on PBF-2513.

Performance: SATISFACTORY _____ UNSATISFACTORY _____

Comments:

TR-AA-230-1003-F10, Revision 2

JPM JOB PERFORMANCE MEASURE Page 9 of 9 Performance Step: 16 Determines if calculated Shut Down Margin is more negative than Critical Y Required Shut Down Margin.

Standard: Determines Calculated SDM is greater than Required SDM AND circles YES on PBF-2513.

Performance: SATISFACTORY _____ UNSATISFACTORY _____

Comments:

Performance Step: 17 Inform OS1 you calculated the shutdown margin in accordance with Critical N PBF-2513, "Shutdown Margin for an Operating Reactor" and shutdown margin is satisfactory.

Standard: Inform OS1 that SDM calculation is complete.

Performance: SATISFACTORY _____ UNSATISFACTORY _____

Comments:

Terminating Cues: This completes the JPM Stop Time:

TR-AA-230-1003-F10, Revision 2

JOB PERFORMANCE MEASURE JPM Page 1 of 8 JPM TITLE: Calculate and Adjust PPCS Forebay and Pump Bay Alarm Setpoints JPM NUMBER: PBN JPM P075.005a.COT REV. 0 TASK NUMBER(S) / PBN P075.005.COT Operate the Circulating Water Pumps in different TASK TITLE(S): combinations K/A NUMBERS: 2.2.14 K/A VALUE: 3.9/4.3 Justification (FOR K/A VALUES <3.0):

TASK APPLICABILITY:

RO SRO STA Non-Lic SRO CERT OTHER:

APPLICABLE METHOD OF TESTING: Simulate/Walkthrough: Perform: X EVALUATION LOCATION: In-Plant: Control Room:

Simulator: X Other:

Lab:

Time for Completion: 10 Minutes Time Critical: NO Alternate Path [NRC]: NO Alternate Path [INPO]: NO Developed by: Andrew Zommers Instructor/Developer Date Reviewed by: Jeff Hinze Instructor (Instructional Review) Date Validated by: Jeff Baugniet SME (Technical Review) Date Approved by: Randy Amundson Training Supervision Date Approved by: Tom Larson Training Program Owner Date TR-AA-230-1003-F10, Revision 2

PBN JPM P075.005a.COT Calculate and Adjust PPCS Forebay and JPM Pump Bay Alarm Setpoints, Rev. 0 Page 2 of 8 I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

  • Today's date is 20 November 2014
  • Per OI 38, Circulating Water System Operation, we are going to shift Circulating Water Pumps from 2 running per unit down to a single Circulating Water Pump per unit.
  • Both 1CW-2 and 2CW-2, Circulating Water Intake valves will remain open.

INITIATING CUES (IF APPLICABLE):

  • OS2 has directed you to calculate and adjust the PPCS Forebay and Pump Bay alarm setpoints per PBF-2124, PPCS Forebay and Pump Bay Level Alarm Setpoints.

TR-AA-230-1003-F10, Revision 2

JOB PERFORMANCE MEASURE JPM Page 3 of 8 JPM PERFORMANCE INFORMATION Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).

NOTE: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.

Performance Step: 1 Review 3 notes prior to performing step 1.4 Critical N Standard: Review 3 notes prior to performing step 1.4 Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 2 1.0 Obtain Lake Michigan Water level information as follows: (cont)

Critical Y 1.4 RECORD Mean level for Lake Michigan Huron below and SUBTRACT 580.9 feet to correct for plant elevation:

Standard: Record the value of 579.21 (Mean Level) and subtract 580.9 for final value of (-1.69)

Evaluator Note: NOTE: At bottom of column labeled "Michigan Huron Lake Mean" the Mean level for current month will be displayed.

NOTE: 580.9 ft. comes from the sum of 580.2 ft IGLD 1955 (which is plant elevation zero) and 0.7 ft, the delta between IGLD 1955 and IGLD 1985.

NOTE: Corrected mean level is the difference in Lake Michigan level as compared to plant elevation zero.

Performance: SATISFACTORY UNSATISFACTORY Comments:

TR-AA-230-1003-F10, Revision 2

JOB PERFORMANCE MEASURE JPM Page 4 of 8 Performance Step: 3 1.0 Obtain Lake Michigan Water level information as follows: (cont)

Critical N 1.5 IF Web Site in step 1.1 used, THEN PRINT a copy of the current months Great Lakes Water Levels in (Feet) IGLD 85 AND ATTACH to this form.

Standard: Retain copy, attach to form and initial the step.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 4 2.0 RECORD the head loss for the CW System configuration from the Critical Y table below:__________

Standard: Locate and enter the value for 2 intake pipes, 2 CW pumps running (one per unit). Value is (-1.6)

Evaluator Note: NOTE: Head loss values were calculated assuming CW waterbox valves are fully open and minimal condenser fouling. Throttled waterbox valves or fouled condensers would result in higher observed forebay levels.

NOTE: High Lake water level alarm and High-High Lake water level alarm calculation is a function of CW intake valve alignment, number of cooling water (CW) pumps in service, and the two values used from Table 6-5 Calculation 2014-06279 Time Available To Respond To Rising Lake Level.

Evaluator Cue: If asked, all waterbox valves are open and thermodynamic testing indicated that waterboxes are not fouled.

Performance: SATISFACTORY UNSATISFACTORY Comments:

TR-AA-230-1003-F10, Revision 2

JOB PERFORMANCE MEASURE JPM Page 5 of 8 Performance Step: 5 3.0 ADD Steps 1.4 and 2.0 to obtain forebay/pump bay level:

Critical Y ________ + _______ = ________

Standard: Enter the value from step 1.4 (-1.69) add the value from step 2.0 (-1.6) for a total of (-3.29)

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 6 4.0 CALCULATE Low Alarm Limit #1 level setpoint to be one foot below Critical Y forebay level determined in Step 3.0 as follows:

Forebay/pump bay level from Step 3.0 - 1 foot = Forebay/pump bay Low Alarm Limit #1 setpoints Standard: Enter the value from step 3.0 (-3.29) and subtract (1) for a total of

(-4.29)

Evaluator Note: CAUTION:

LO and LO-LO level alarms should NOT be set less than -11.0 feet and -11.5 feet, respectively. Forebay level and/or pump bay of less than -11.5 feet is a violation of TLCO 3.7.7 for SW System.

Performance: SATISFACTORY UNSATISFACTORY Comments:

TR-AA-230-1003-F10, Revision 2

JOB PERFORMANCE MEASURE JPM Page 6 of 8 Performance Step: 7 5.0 CALCULATE Low-Low Alarm Limit #2 setpoint to be 1.5 feet below Critical Y forebay level determined in Step 3.0 as follows:

Forebay/pump bay level from Step 3.0 - 1.5 foot = Forebay/pump bay Low Alarm Limit #1 setpoints Standard: Enter the value from step 3.0 (-3.29) and subtract (1.5) for a total of

(-4.79)

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 8 6.0 ENTER the LEAST NEGATIVE value of:

Critical Y Step 4.0 of _______ OR -11.0 feet to establish new Lo Alarm Limit #1 level setpoint. __________

Standard: Enter the value from step 4.0 (-4.29) and the least negative value of (-

4.29)

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 9 7.0 ENTER the LEAST NEGATIVE value of:

Critical Y Step 5.0 of _______ OR -11.5 feet to establish new Lo-Lo Alarm Limit #2 level setpoint. __________

Standard: Enter the value from step 4.0 (-4.79) and the least negative value of (-

4.79)

Performance: SATISFACTORY UNSATISFACTORY Comments:

TR-AA-230-1003-F10, Revision 2

JOB PERFORMANCE MEASURE JPM Page 7 of 8 Performance Step: 10 8.0 ADJUST PPCS Alarm limits to values calculated in steps 6.0, 7.0, Critical N (SEQ-) and Step 2.0 Table, and RECORD below:

Standard: LO Alarm LO-LO HI Alarm HI-HI Limit #1 (Step Alarm Limit Limit Alarm Error! #2 (Step Error! Limit Reference Error! Reference Error!

source not Reference source not Referenc found.) source not found. e source found.) Table not found.

Table 1L-3586A, Pump Bay Level Alarm -4.29 -4.79 1L-3586B, Forebay Level Alarm -4.29 -4.79 -0.8 -0.6 2L-3586A, Pump Bay Level Alarm -4.29 -4.79 2L-3586B, Forebay Level Alarm -4.29 -4.79 -0.8 -0.6 Evaluator Note: The Table information is contained in this step, the adjusting of PPCS alarms will be in following steps Evaluator Note: CAUTION LO and LO LO level alarms should NOT be set less than -11.0 feet and 11.5 feet, respectively. Forebay level and/or pump bay of less than -11.5 feet is a violation of TLCO 3.7.7 for SW System.

NOTE: While adjusting alarm setpoints in PPCS, a priority alarm may be received.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 11 From a Simulator (Control Room) PPCS workstation, "Pump House" block Critical Y either Sim 1 or Sim 2 directory to go to Pump House Drawing Standard: Bring up 3192 OR 3692 Pump House Performance: SATISFACTORY UNSATISFACTORY Comments:

TR-AA-230-1003-F10, Revision 2

JOB PERFORMANCE MEASURE JPM Page 8 of 8 Performance Step: 12 Click on the "Change LEV ALRM LIMITS" button and enter the Low and Critical Y High Limits #1 and #2 values for both units.

Standard: Examinee clicks 'Change LEV ALRM LIMITS" button and changes alarms setpoints per limits listed in Step 8.0. (-4.29 for Low Limit #1 and -4.79 for Low Limit #2 and -0.8 for High Limit #1 and -0.6 for High Limit #2)

Evaluator Note: Simulator PPCS will not allow changes to current alarm setpoints.

Evaluator Cue: Cue examinee that PPCS alarm setpoints were changed to the values that they gave and PPCS indicates said values.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 13 Examinee makes a report to OS2 that adjustment of PPCS Forebay and Critical N Pump Bay Alarm Setpoints is completed and hands signed PBF-2124 back.

Standard: Examinee communicates completion of PBF-2124.

Evaluator Cue: Acknowledge communication to OS2.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Terminating Cues:

This Completes the JPM Stop Time:

TR-AA-230-1003-F10, Revision 2

JPM JOB PERFORMANCE MEASURE Page 1 of 5 JPM TITLE: DETERMINE A STAY TIME FOR A HIGH RADIATION AREA JPM NUMBER: PBN JPM P162.006a.AOT REV. 2 TASK NUMBER(S) / PBN P162.006.AOT, COMPLY WITH RADIATION WORK PERMOTS TASK TITLE(S):

GENERIC 2.3.7 3.5/3.6 K/A NUMBERS: K/A VALUE:

GENERIC 2.3.12 3.2/3.7 Justification (FOR K/A VALUES <3.0):

TASK APPLICABILITY:

RO SRO STA Non-Lic SRO CERT OTHER:

APPLICABLE METHOD OF TESTING: Simulate/Walkthrough: Perform: X EVALUATION LOCATION: In-Plant: Control Room:

Simulator: Other: X Lab:

Time for Completion: 10 Minutes Time Critical: No Alternate Path [NRC]: No Alternate Path [INPO]: No Developed by: Jeffrey Hinze Instructor/Developer Date Reviewed by: Andrew Zommers Instructor (Instructional Review) Date Validated by: Jeff Baugniet SME (Technical Review) Date Approved by: Randy Amundson Training Supervision Date Approved by: Tom Larson Training Program Owner Date TR-AA-230-1003-F10, Revision 2

PBN JPM P162.006a.AOT, Determine a Stay Time for a JPM High Radiation Area, Rev. 2 Page 2 of 5 I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

  • Reference the attached radiological survey map.
  • A tag series is required to be hung in the Unit 1 Non-Regenerative Heat Exchanger Room which is posted as a High Radiation Area (HRA).
  • The first valve on the tag series is 1CV-371, Letdown Line Containment Isolation valve.
  • The remaining valves on the tag series are indicated by unlabeled valve symbols on the survey map.
  • Radiation Protection (RP) has placed a dose limit of 50mR to perform the entire tag series.
  • RP request you stay as far away from 1CV-371 as possible to minimize the dose.

INITIATING CUES (IF APPLICABLE):

  • It took you 5 minutes to hang the tag on 1CV-371 (you were able to hang the tag from arms length).
  • Determine the MAXIMUM time (in minutes) that can be spent tagging ALL OTHER valves indicated on the survey map without exceeding the dose limit for this task. Radiation levels of ALL OTHER valves are at general area.
  • Assume the time for access and egress of the room is negligible.

TR-AA-230-1003-F10, Revision 2

PBN JPM P162.006a.AOT, Determine a Stay Time for a JPM High Radiation Area, Rev. 2 Page 3 of 5 JPM PERFORMANCE INFORMATION Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).

NOTE: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.

Performance Step: 1 Determine total dose received closing the valve in the HRA Critical Y (360mR/hr field).

Standard: The total dose received to close the first valve is determined to be 30mR.

(360mR/hr X 5 min) ÷ 60 min/hr = 30 mR Performance: SATISFACTORY UNSATISFACTORY Comments: _____________________________________________________

Performance Step: 2 Available dose for hanging tags in the General Areas is Critical Y determined.

Standard: Dose available for hanging tags in the General Areas is determined to be 20mR.

50 mR - 30 mR = 20 mR Performance: SATISFACTORY UNSATISFACTORY Comments: _____________________________________________________

TR-AA-230-1003-F10, Revision 2

PBN JPM P162.006a.AOT, Determine a Stay Time for a JPM High Radiation Area, Rev. 2 Page 4 of 5 Performance Step: 3 Determine maximum time to hang tags in the General Area.

Critical Y Standard: Maximum time to be spent in the General Area is determined to be 30 minutes.

(20 mR ÷ 40 mR/hr) X 60 min/hr = 30 min Performance: SATISFACTORY UNSATISFACTORY Comments: _____________________________________________________

Terminating Cues: The Task is complete.

Stop Time:

TR-AA-230-1003-F10, Revision 2