| title = Notification of North Anna Power Station - Component Design Bases Inspection - U.S. Nuclear Regulatory Commission Inspection Report 05000338/2015007 and 05000339/2015007 | | title = Notification of North Anna Power Station - Component Design Bases Inspection - U.S. Nuclear Regulatory Commission Inspection Report 05000338/2015007 and 05000339/2015007 | ||
| author name = Bartley J | | author name = Bartley J | ||
| author affiliation = NRC/RGN-II/DRS/EB1 | | author affiliation = NRC/RGN-II/DRS/EB1 | ||
| addressee name = Heacock D | | addressee name = Heacock D | ||
| addressee affiliation = Virginia Electric & Power Co (VEPCO) | | addressee affiliation = Virginia Electric & Power Co (VEPCO) | ||
| docket = 05000338, 05000339 | | docket = 05000338, 05000339 | ||
Line 14: | Line 14: | ||
| page count = 5 | | page count = 5 | ||
}} | }} | ||
See also: [[ | See also: [[see also::IR 05000338/2015007]] | ||
=Text= | =Text= | ||
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA | {{#Wiki_filter:UNITED STATES | ||
NUCLEAR REGULATORY COMMISSION | |||
REGION II | |||
Virginia Electric and Power Company | 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 | ||
Innsbrook Technical Center | ATLANTA, GEORGIA 30303-1257 | ||
5000 Dominion Boulevard | April 16, 2015 | ||
Glen Allen, VA 23060-6711 | Mr. David A. Heacock | ||
INSPECTION REPORT 05000338/2015007 AND 05000339/2015007 | President and Chief Nuclear Officer | ||
Dear Mr. Heacock: | Virginia Electric and Power Company | ||
Region II staff will conduct a component design bases inspection (CDBI) at your North Anna | Innsbrook Technical Center | ||
Power Station during the weeks of July 20 - 24, August 3 - 7, and August 17 - 21, 2015. | 5000 Dominion Boulevard | ||
Geoffrey Ottenberg, a Senior Reactor Inspector from the | Glen Allen, VA 23060-6711 | ||
SUBJECT: NOTIFICATION OF NORTH ANNA POWER STATION - COMPONENT DESIGN | |||
The inspection will evaluate the capability of risk-significant /low-margin components to function | BASES INSPECTION - U.S. NUCLEAR REGULATORY COMMISSION | ||
as designed and to support proper system operation. | INSPECTION REPORT 05000338/2015007 AND 05000339/2015007 | ||
your staff, arrangements for an information-gathering site visit and the three-week onsite | Dear Mr. Heacock: | ||
inspection. | The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC) | ||
Region II staff will conduct a component design bases inspection (CDBI) at your North Anna | |||
Inspector, will be conducting all preparation activities associated with the inspection. | Power Station during the weeks of July 20 - 24, August 3 - 7, and August 17 - 21, 2015. | ||
addition, Mr. George MacDonald, a Region II Senior Reactor Analyst, will support Mr. Ottenberg | Geoffrey Ottenberg, a Senior Reactor Inspector from the NRCs Region II Office, will lead the | ||
during the information-gathering visit to review probabilistic risk assessment data and identify risk-significant components, which will be examined during the inspection. | inspection team. This inspection will be conducted in accordance with Inspection Procedure | ||
The Enclosure lists documents that will be needed prior to the information-gathering visit. | 71111.21, Component Design Bases Inspection, issued November 29, 2013. | ||
Please provide the referenced information to the Region II Office by June 15, 2015. | The inspection will evaluate the capability of risk-significant /low-margin components to function | ||
as designed and to support proper system operation. The inspection will also include a review | |||
of selected operator actions, operating experience, and modifications. | |||
During a telephone conversation on April 7, 2015, the staff confirmed with Mr. J. Leberstien of | |||
your staff, arrangements for an information-gathering site visit and the three-week onsite | |||
inspection. The schedule is as follows: | |||
* Information-gathering visit: Week of June 29 - July 3, 2015 | |||
* Onsite weeks: July 20 - 24, August 3 - 7, and August 17 - 21, 2015 | |||
The purpose of the information-gathering visit is to meet with members of your staff to identify | |||
risk-significant components and operator actions. Information and documentation needed to | |||
support the inspection will also be identified. Mr. Geoffrey Ottenberg, a Senior Reactor | |||
Inspector, will be conducting all preparation activities associated with the inspection. In | |||
addition, Mr. George MacDonald, a Region II Senior Reactor Analyst, will support Mr. Ottenberg | |||
during the information-gathering visit to review probabilistic risk assessment data and identify | |||
risk-significant components, which will be examined during the inspection. | |||
The Enclosure lists documents that will be needed prior to the information-gathering visit. | |||
Please provide the referenced information to the Region II Office by June 15, 2015. | |||
ML15107A022 | D. Heacock 2 | ||
Additional documents may be requested during the information-gathering visit. The inspectors | |||
hyperlinked to facilitate ease of use. | will try to minimize your administrative burden by specifically identifying only those documents | ||
required for inspection preparation. The additional information will need to be available to the | |||
1. From your most recent probabilistic safety analysis (PSA) excluding external events and fires: | team in the Region II office prior to the inspection teams preparation week of July 13, 2015. | ||
During the information-gathering trip, Mr. Ottenberg will also discuss the following inspection | |||
support administrative details: (1) availability of knowledgeable plant engineering and licensing | |||
personnel to serve as points of contact during the inspection, (2) method of tracking inspector | |||
6. List of components with low-design margins (i.e., pumps closest to the design limit for flow or pressure, diesel generator close to design-required output, heat exchangers close to | requests during the inspection, (3) licensee computer access, (4) working space, | ||
rated design heat removal, and motor-operated valve risk-margin rankings, etc.). | (5) arrangements for site access, and (6) other applicable information. | ||
failures/vulnerabilities (as communicated by NRC Generic Communications, Industry | In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its | ||
Communications, 10 CFR Part 21 Notifications, etc.) since July 1, 2012. | Enclosure will be available electronically for public inspection in the NRC Public Document | ||
9. List and brief description of common-cause component failures that have occurred | Room or from the Publicly Available Records (PARS) component of NRC's Agencywide | ||
Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC | |||
website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | |||
available) of your plans to address the issue(s). | Thank you for your cooperation in this matter. If you have any questions, regarding the | ||
2 | information requested or the inspection, please contact Mr. Ottenberg at 404-997-4658 or | ||
Functionality Assessments for Conditions Adverse to Quality or Safety, issued | contact me at 404-997-4607. | ||
12. | Sincerely, | ||
/RA/ | |||
Jonathan Bartley, Chief | |||
13. Copy of Updated Final Safety Analysis Report. | Engineering Branch 1 | ||
Division of Reactor Safety | |||
15. | Docket Nos: 50-338, 50-339 | ||
License Nos: NPF-4, NPF-7 | |||
16. | Enclosure: | ||
Information Request for North Anna Power | |||
18. | Station, Component Design Bases Inspection | ||
cc: Distribution via Listserv | |||
19. | |||
ML15107A022 x SUNSI REVIEW COMPLETE FORM 665 ATTACHED | |||
21. | OFFICE RII:DRS RII:DRS | ||
SIGNATURE GKO JHB1 | |||
NAME G. Ottenberg J. Bartley | |||
23. | DATE 4/16/2015 4/16/2015 | ||
E-MAIL COPY? YES NO YES NO | |||
24. | |||
25. | INFORMATION REQUEST FOR NORTH ANNA POWER STATION | ||
26. Copy of any self-assessments performed in preparation for this inspection. | COMPONENT DESIGN BASES INSPECTION | ||
Please provide the information electronically in .pdf files, Excel, or other searchable format on | |||
28. | CDROM (or FTP site, Sharepoint, etc.). The CDROM (or website) should be indexed and | ||
hyperlinked to facilitate ease of use. | |||
29. Contact information for a person to discuss PSA information prior to and during the information-gathering trip. | 1. From your most recent probabilistic safety analysis (PSA) excluding external events and | ||
fires: | |||
a. Two risk rankings of components from your site-specific PSA: one sorted by Risk | |||
Achievement Worth (RAW), and the other sorted by Birnbaum Importance | |||
b. A list of the top 500 cutsets | |||
2. From your most recent PSA including external events and fires: | |||
a. Two risk rankings of components from your site-specific PSA: one sorted by RAW, | |||
and the other sorted by Birnbaum Importance | |||
b. A list of the top 500 cutsets | |||
3. Risk ranking of operator actions from your site-specific PSA sorted by RAW. Provide | |||
human reliability worksheets for these items. | |||
4. List of time-critical operator actions with a brief description of each action. | |||
5. List of Emergency and Abnormal Operating Procedures revised (significant) since | |||
July 1, 2012, with a brief description of each revision. | |||
6. List of components with low-design margins (i.e., pumps closest to the design limit for flow | |||
or pressure, diesel generator close to design-required output, heat exchangers close to | |||
rated design heat removal, and motor-operated valve risk-margin rankings, etc.). | |||
7. List of station-operating experience evaluations/reviews performed, and documented in the | |||
stations corrective action program, for industry events and safety-related equipment | |||
failures/vulnerabilities (as communicated by NRC Generic Communications, Industry | |||
Communications, 10 CFR Part 21 Notifications, etc.) since July 1, 2012. | |||
8. List and brief description of safety-related structures, systems, or components (SSCs) | |||
design modifications implemented since July 1, 2012. | |||
9. List and brief description of common-cause component failures that have occurred | |||
since July 1, 2012. | |||
10. List of equipment on the sites Station Equipment Reliability Issues List, including a | |||
description of the reason(s) why each component is on that list, and summaries (if | |||
available) of your plans to address the issue(s). | |||
Enclosure | |||
2 | |||
11. List and brief description of equipment currently in degraded or nonconforming status as | |||
described in NRC Inspection Manual Chapter 0326, Operability Determinations and | |||
Functionality Assessments for Conditions Adverse to Quality or Safety, issued | |||
January 31, 2014. | |||
12. List and reason for equipment classified in maintenance rule (a)(1) status from | |||
July 1, 2012, to present. | |||
13. Copy of Updated Final Safety Analysis Report. | |||
14. Copy of Technical Specification(s). | |||
15. Copy of Technical Specifications Bases. | |||
16. Copy of Technical Requirements Manual(s). | |||
17. List and brief description of Root Cause Evaluations performed since July 1, 2012. | |||
18. Corrective Action Program Procedure(s). | |||
19. Copy of Operability Determination procedure(s). | |||
20. One-line diagram of electrical plant. (Electronic and full size - hard copy week | |||
of June 29 - July 3, 2015) | |||
21. Index and legend for electrical plant one-line diagrams. | |||
22. Piping and instrumentation diagrams (P&IDs) for safety-related systems. (Electronic | |||
and 1/2 size - hard copy week of June 29 - July 3, 2015) | |||
23. Index and Legend for P&IDs. | |||
24. Copies of corrective action documents (i.e. CRs) associated with findings from previous | |||
CDBI. (If applicable) | |||
25. Index (procedure number, title, and current revision) of station Emergency Operating | |||
Procedures, Abnormal Operating Procedures, and Annunciator Response Procedures. | |||
26. Copy of any self-assessments performed in preparation for this inspection. | |||
27. List of any condition reports generated in preparation for this inspection. | |||
28. Copies of condition reports generated from previous CDBI (2012). | |||
29. Contact information for a person to discuss PSA information prior to and during the | |||
information-gathering trip. (Name, title, phone number, and e-mail address) | |||
}} | }} |
Latest revision as of 13:55, 31 October 2019
ML15107A022 | |
Person / Time | |
---|---|
Site: | North Anna |
Issue date: | 04/16/2015 |
From: | Bartley J NRC/RGN-II/DRS/EB1 |
To: | Heacock D Virginia Electric & Power Co (VEPCO) |
References | |
IR 2015007 | |
Download: ML15107A022 (5) | |
See also: IR 05000338/2015007
Text
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION II
245 PEACHTREE CENTER AVENUE NE, SUITE 1200
ATLANTA, GEORGIA 30303-1257
April 16, 2015
Mr. David A. Heacock
President and Chief Nuclear Officer
Virginia Electric and Power Company
Innsbrook Technical Center
5000 Dominion Boulevard
Glen Allen, VA 23060-6711
SUBJECT: NOTIFICATION OF NORTH ANNA POWER STATION - COMPONENT DESIGN
BASES INSPECTION - U.S. NUCLEAR REGULATORY COMMISSION
INSPECTION REPORT 05000338/2015007 AND 05000339/2015007
Dear Mr. Heacock:
The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC)
Region II staff will conduct a component design bases inspection (CDBI) at your North Anna
Power Station during the weeks of July 20 - 24, August 3 - 7, and August 17 - 21, 2015.
Geoffrey Ottenberg, a Senior Reactor Inspector from the NRCs Region II Office, will lead the
inspection team. This inspection will be conducted in accordance with Inspection Procedure 71111.21, Component Design Bases Inspection, issued November 29, 2013.
The inspection will evaluate the capability of risk-significant /low-margin components to function
as designed and to support proper system operation. The inspection will also include a review
of selected operator actions, operating experience, and modifications.
During a telephone conversation on April 7, 2015, the staff confirmed with Mr. J. Leberstien of
your staff, arrangements for an information-gathering site visit and the three-week onsite
inspection. The schedule is as follows:
- Information-gathering visit: Week of June 29 - July 3, 2015
- Onsite weeks: July 20 - 24, August 3 - 7, and August 17 - 21, 2015
The purpose of the information-gathering visit is to meet with members of your staff to identify
risk-significant components and operator actions. Information and documentation needed to
support the inspection will also be identified. Mr. Geoffrey Ottenberg, a Senior Reactor
Inspector, will be conducting all preparation activities associated with the inspection. In
addition, Mr. George MacDonald, a Region II Senior Reactor Analyst, will support Mr. Ottenberg
during the information-gathering visit to review probabilistic risk assessment data and identify
risk-significant components, which will be examined during the inspection.
The Enclosure lists documents that will be needed prior to the information-gathering visit.
Please provide the referenced information to the Region II Office by June 15, 2015.
D. Heacock 2
Additional documents may be requested during the information-gathering visit. The inspectors
will try to minimize your administrative burden by specifically identifying only those documents
required for inspection preparation. The additional information will need to be available to the
team in the Region II office prior to the inspection teams preparation week of July 13, 2015.
During the information-gathering trip, Mr. Ottenberg will also discuss the following inspection
support administrative details: (1) availability of knowledgeable plant engineering and licensing
personnel to serve as points of contact during the inspection, (2) method of tracking inspector
requests during the inspection, (3) licensee computer access, (4) working space,
(5) arrangements for site access, and (6) other applicable information.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its
Enclosure will be available electronically for public inspection in the NRC Public Document
Room or from the Publicly Available Records (PARS) component of NRC's Agencywide
Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC
website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Thank you for your cooperation in this matter. If you have any questions, regarding the
information requested or the inspection, please contact Mr. Ottenberg at 404-997-4658 or
contact me at 404-997-4607.
Sincerely,
/RA/
Jonathan Bartley, Chief
Engineering Branch 1
Division of Reactor Safety
Docket Nos: 50-338, 50-339
Enclosure:
Information Request for North Anna Power
Station, Component Design Bases Inspection
cc: Distribution via Listserv
ML15107A022 x SUNSI REVIEW COMPLETE FORM 665 ATTACHED
OFFICE RII:DRS RII:DRS
SIGNATURE GKO JHB1
NAME G. Ottenberg J. Bartley
DATE 4/16/2015 4/16/2015
E-MAIL COPY? YES NO YES NO
INFORMATION REQUEST FOR NORTH ANNA POWER STATION
COMPONENT DESIGN BASES INSPECTION
Please provide the information electronically in .pdf files, Excel, or other searchable format on
CDROM (or FTP site, Sharepoint, etc.). The CDROM (or website) should be indexed and
hyperlinked to facilitate ease of use.
1. From your most recent probabilistic safety analysis (PSA) excluding external events and
fires:
a. Two risk rankings of components from your site-specific PSA: one sorted by Risk
Achievement Worth (RAW), and the other sorted by Birnbaum Importance
b. A list of the top 500 cutsets
2. From your most recent PSA including external events and fires:
a. Two risk rankings of components from your site-specific PSA: one sorted by RAW,
and the other sorted by Birnbaum Importance
b. A list of the top 500 cutsets
3. Risk ranking of operator actions from your site-specific PSA sorted by RAW. Provide
human reliability worksheets for these items.
4. List of time-critical operator actions with a brief description of each action.
5. List of Emergency and Abnormal Operating Procedures revised (significant) since
July 1, 2012, with a brief description of each revision.
6. List of components with low-design margins (i.e., pumps closest to the design limit for flow
or pressure, diesel generator close to design-required output, heat exchangers close to
rated design heat removal, and motor-operated valve risk-margin rankings, etc.).
7. List of station-operating experience evaluations/reviews performed, and documented in the
stations corrective action program, for industry events and safety-related equipment
failures/vulnerabilities (as communicated by NRC Generic Communications, Industry
Communications, 10 CFR Part 21 Notifications, etc.) since July 1, 2012.
8. List and brief description of safety-related structures, systems, or components (SSCs)
design modifications implemented since July 1, 2012.
9. List and brief description of common-cause component failures that have occurred
since July 1, 2012.
10. List of equipment on the sites Station Equipment Reliability Issues List, including a
description of the reason(s) why each component is on that list, and summaries (if
available) of your plans to address the issue(s).
Enclosure
2
11. List and brief description of equipment currently in degraded or nonconforming status as
described in NRC Inspection Manual Chapter 0326, Operability Determinations and
Functionality Assessments for Conditions Adverse to Quality or Safety, issued
January 31, 2014.
12. List and reason for equipment classified in maintenance rule (a)(1) status from
July 1, 2012, to present.
13. Copy of Updated Final Safety Analysis Report.
14. Copy of Technical Specification(s).
15. Copy of Technical Specifications Bases.
16. Copy of Technical Requirements Manual(s).
17. List and brief description of Root Cause Evaluations performed since July 1, 2012.
18. Corrective Action Program Procedure(s).
19. Copy of Operability Determination procedure(s).
20. One-line diagram of electrical plant. (Electronic and full size - hard copy week
of June 29 - July 3, 2015)
21. Index and legend for electrical plant one-line diagrams.
22. Piping and instrumentation diagrams (P&IDs) for safety-related systems. (Electronic
and 1/2 size - hard copy week of June 29 - July 3, 2015)
23. Index and Legend for P&IDs.
24. Copies of corrective action documents (i.e. CRs) associated with findings from previous
CDBI. (If applicable)
25. Index (procedure number, title, and current revision) of station Emergency Operating
Procedures, Abnormal Operating Procedures, and Annunciator Response Procedures.
26. Copy of any self-assessments performed in preparation for this inspection.
27. List of any condition reports generated in preparation for this inspection.
28. Copies of condition reports generated from previous CDBI (2012).
29. Contact information for a person to discuss PSA information prior to and during the
information-gathering trip. (Name, title, phone number, and e-mail address)