ML15141A185: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(12 intermediate revisions by the same user not shown) | |||
Line 2: | Line 2: | ||
| number = ML15141A185 | | number = ML15141A185 | ||
| issue date = 07/15/2015 | | issue date = 07/15/2015 | ||
| title = | | title = Request for Withholding Information from Public Disclosure | ||
| author name = Wang A | | author name = Wang A | ||
| author affiliation = NRC/NRR/DORL/LPLIV-2 | | author affiliation = NRC/NRR/DORL/LPLIV-2 | ||
| addressee name = | | addressee name = | ||
Line 9: | Line 9: | ||
| docket = 05000416 | | docket = 05000416 | ||
| license number = NPF-029 | | license number = NPF-029 | ||
| contact person = Wang A | | contact person = Wang A | ||
| case reference number = TAC MF5303 | | case reference number = TAC MF5303 | ||
| document type = Letter, Proprietary Information Review | | document type = Letter, Proprietary Information Review | ||
| page count = 3 | | page count = 3 | ||
| project = TAC:MF5303 | |||
| stage = Withholding Request Acceptance | |||
}} | }} | ||
=Text= | |||
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 July 15, 2015 Vice President, Operations Entergy Operations, Inc. | |||
Grand Gulf Nuclear Station P.O. Box 756 Port Gibson, MS 39150 | |||
==SUBJECT:== | |||
GRAND GULF NUCLEAR STATION, UNIT 1 - REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE (TAC NO. MF5303) | |||
==Dear Sir or Madam:== | |||
By letter dated May 8, 2015, Entergy Operations, Inc. (Entergy, the licensee) submitted an affidavit dated April 27, 2015, executed by Lisa K. Schichlein, GE-Hitachi Nuclear Energy Americas LLC (GEH), requesting that the information contained in the following document be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (10 CFR), Part 2, Section 2.390: | |||
Attachment 2 to GNR0-2015/00031, "Response to Request for Additional Information RAl-3, Proprietary Information" A publicly available version of Attachment 2, designated as Attachment 3 to the letter dated May 8, 2015, is in the Agencywide Documents Access and Management System (Accession No. ML15128A552). | |||
The affidavit stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons: | |||
: a. Information that discloses a process, method, or apparatus, including supporting data and analyses, where prevention of its use by GEH's competitors without license from GEH constitutes a competitive economic advantage over other companies. | |||
: b. Information that, if used by a competitor, would reduce their expenditure of resources or improve their competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing of a similar product. | |||
We have reviewed your application and the material in accordance with the requirements of 10 CFR 2.390 and, on the basis of the statements in the affidavit, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure. | |||
Therefore, Attachment 2 to GNR0-2015/00031, marked as proprietary, will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended. | |||
Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information. | |||
If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the Nuclear Regulatory Commission (NRC). You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure. | |||
If you have any questions, please contact me at 301-415-1445 or via e-mail at Alan.Wang@nrc.gov. | |||
Sincerely, Alan B. Wang, Project Manager Plant Licensing IV-2 and Decommissioning Transition Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-416 cc: Lisa K. Schichlein Senior Project Manager, NPP/Services Licensing Regulatory Affairs GE-Hitachi Nuclear Energy Americas LLC 3901 Castle Hayne Rd. | |||
Wilmington, NC 28401 Additional Distribution via Listserv | |||
ML15141A185 OFFICE NRR/LPL4-2/PM N RR/LPL4-2/LA NRR/DSS/SXRB/BC NRR/LPL4-2/BC NRR/LPL4-2/PM NAME AWang PBlechman CJackson MKhanna AWang DATE 6/2/15 5/26/15 7/9/15 7/13/15 7/15/15 | |||
//}} |
Latest revision as of 11:03, 31 October 2019
ML15141A185 | |
Person / Time | |
---|---|
Site: | Grand Gulf |
Issue date: | 07/15/2015 |
From: | Wang A Plant Licensing Branch IV |
To: | Entergy Operations |
Wang A | |
References | |
TAC MF5303 | |
Download: ML15141A185 (3) | |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 July 15, 2015 Vice President, Operations Entergy Operations, Inc.
Grand Gulf Nuclear Station P.O. Box 756 Port Gibson, MS 39150
SUBJECT:
GRAND GULF NUCLEAR STATION, UNIT 1 - REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE (TAC NO. MF5303)
Dear Sir or Madam:
By letter dated May 8, 2015, Entergy Operations, Inc. (Entergy, the licensee) submitted an affidavit dated April 27, 2015, executed by Lisa K. Schichlein, GE-Hitachi Nuclear Energy Americas LLC (GEH), requesting that the information contained in the following document be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (10 CFR), Part 2, Section 2.390:
Attachment 2 to GNR0-2015/00031, "Response to Request for Additional Information RAl-3, Proprietary Information" A publicly available version of Attachment 2, designated as Attachment 3 to the letter dated May 8, 2015, is in the Agencywide Documents Access and Management System (Accession No. ML15128A552).
The affidavit stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons:
- a. Information that discloses a process, method, or apparatus, including supporting data and analyses, where prevention of its use by GEH's competitors without license from GEH constitutes a competitive economic advantage over other companies.
- b. Information that, if used by a competitor, would reduce their expenditure of resources or improve their competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing of a similar product.
We have reviewed your application and the material in accordance with the requirements of 10 CFR 2.390 and, on the basis of the statements in the affidavit, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure.
Therefore, Attachment 2 to GNR0-2015/00031, marked as proprietary, will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.
Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.
If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the Nuclear Regulatory Commission (NRC). You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.
If you have any questions, please contact me at 301-415-1445 or via e-mail at Alan.Wang@nrc.gov.
Sincerely, Alan B. Wang, Project Manager Plant Licensing IV-2 and Decommissioning Transition Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-416 cc: Lisa K. Schichlein Senior Project Manager, NPP/Services Licensing Regulatory Affairs GE-Hitachi Nuclear Energy Americas LLC 3901 Castle Hayne Rd.
Wilmington, NC 28401 Additional Distribution via Listserv
ML15141A185 OFFICE NRR/LPL4-2/PM N RR/LPL4-2/LA NRR/DSS/SXRB/BC NRR/LPL4-2/BC NRR/LPL4-2/PM NAME AWang PBlechman CJackson MKhanna AWang DATE 6/2/15 5/26/15 7/9/15 7/13/15 7/15/15
//