| | number = ML15176B199 | | | number = ML15176B199 |
| | issue date = 06/25/2015 | | | issue date = 06/25/2015 |
| | title = Joseph M. Farley Nuclear Plant, Units 1 and 2 - Transmittal of U.S. Army Corps of Engineers Flood Hazard Reevaluation Information | | | title = Transmittal of U.S. Army Corps of Engineers Flood Hazard Reevaluation Information |
| | author name = Minarik A J | | | author name = Minarik A |
| | author affiliation = NRC/NRR/JLD | | | author affiliation = NRC/NRR/JLD |
| | addressee name = Pierce C R | | | addressee name = Pierce C |
| | addressee affiliation = Southern Nuclear Operating Co, Inc | | | addressee affiliation = Southern Nuclear Operating Co, Inc |
| | docket = 05000348, 05000364 | | | docket = 05000348, 05000364 |
| | license number = | | | license number = |
| | contact person = Minarik A J, NRR/JLD, 415-6185 | | | contact person = Minarik A, NRR/JLD, 415-6185 |
| | case reference number = TAC MF3037, TAC MF3038 | | | case reference number = TAC MF3037, TAC MF3038 |
| | document type = Letter | | | document type = Letter |
| | page count = 3 | | | page count = 3 |
| | project = TAC:MF3037, TAC:MF3038 | | | project = TAC:MF3037, TAC:MF3038 |
| | | stage = Other |
| }} | | }} |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter: Mr. C. Regulatory Affairs Director Southern Nuclear Operating Co., Inc. P.O. Box 1295, Bin 038 Birmingham, AL 35201-1295 June 25, 2015 SUBJECT: JOSEPH M. FARLEY NUCLEAR PLANT, UNITS 1 AND 2 -TRANSMITTAL OF U.S. ARMY CORPS OF ENGINEERS FLOOD HAZARD REEVALUATION INFORMATION (TAC NOS. MF3037 AND MF3038) | | {{#Wiki_filter:OFFICIAL USE ONLY SECURITY RELATED INFORMATION UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 June 25, 2015 Mr. C. R. Pierce Regulatory Affairs Director Southern Nuclear Operating Co., Inc. |
| | P.O. Box 1295, Bin 038 Birmingham, AL 35201-1295 |
| | |
| | ==SUBJECT:== |
| | JOSEPH M. FARLEY NUCLEAR PLANT, UNITS 1 AND 2 - TRANSMITTAL OF U.S. ARMY CORPS OF ENGINEERS FLOOD HAZARD REEVALUATION INFORMATION (TAC NOS. MF3037 AND MF3038) |
|
| |
|
| ==Dear Mr. Pierce:== | | ==Dear Mr. Pierce:== |
| The purpose of this letter is to transmit the U.S. Army Corps of Engineers (USAGE) portion of the Joseph M. Farley Nuclear Plant, Units 1 and 2 (Farley) flood hazard reevaluation (FHR) associated with the assessment of flood hazards due to flooding in streams and rivers, including potential site flooding due to dam failure. By letter dated September 26, 2013 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML 13274A343), Southern Nuclear Operating Company, Inc. (SNC, the licensee) requested assistance from the U.S. Nuclear Regulatory Commission (NRG) in obtaining information from the USAGE to support SNC's development of a report documenting the FHR in response to the March 12, 2012, request for information (ADAMS Accession No. ML 12073A348). The NRG staff held meetings to discuss the details of the information being provided by USAGE with SNC and the USAGE on the following dates:
| |
| * April 29, 2014 (summary at ADAMS Accession No. ML 14133A039)
| |
| * March 4, 2015 (summary at ADAMS Accession No. ML 15092A 114) These meetings were closed to the public due to the discussion of security-related information. The licensee supplemented its September 26, 2013 letter, requesting details from the USAGE by letters dated May 6, 2014 (ADAMS Accession No. ML 14127A178), and March 13, 2015 (ADAMS Accession No. ML 15084A588) as a result of the discussions at these meetings. By letter dated February 28, 2014 (ADAMS Accession No. ML 14072A486), SNC requested permission to submit its report documenting the FHR 120 days after receipt of the information from the USAGE. The NRG staff held a public meeting on May 16, 2014 to discuss the extension (summary can be found at ADAMS Accession No. ML 14134A031). By letter dated May 21, 2014 (ADAMS Accession No. ML 14141A629), SNC provided a supplement to this request that addressed site-specific information requested by the NRG staff. Following receipt of this supplement, by letter dated July 17, 2014 (ADAMS Accession No. ML 1417 4A938), the NRG staff approved SNC's request to submit the report documenting the FHR at the Farley site 120 days after receipt of the USAGE information. Enclosures 1, 2, and 3 to this letter contain Security-Related Information. When separated from the enclosures, this letter is DECONTROLLED. In addition, the July 17, 2014, letter states that if the USAGE results show that the design-basis flood levels at the Farley site are exceeded by the flood levels resulting from the FHR, SNG must submit its planned interim actions to address the higher flood level to the NRG within 60 days of receipt of the USAGE information. The enclosures to this letter contain the following: (1) a brief description of the enclosed files; (2) summary tables of the results; and (3) the results of the USAGE FHR developed in accordance with Japan Lessons-Learned Directorate (JLD) interim staff guidance (ISG) JLD-ISG-2013-01, "Interim Staff Guidance For Assessment of Flooding Hazards Due to Dam Failure," Revision 0, dated July 29, 2013 (ADAMS Accession No. ML 13151A153). Enclosure 2 contains the relevant USAGE results at Farley, which SNG needs to consider as part of their flood hazard evaluation report. The USAGE results are based on the guidance JLD-ISG-2013-01 and on the USAGE knowledge of the river system. Enclosure 3 is a DVD containing the results at the river mile locations SNG requested as documented in the September 26, 2013, letter and supplemented by the May 6, 2014, and March 13, 2015, letters. The USAGE results contained in Enclosure 2 are a subset of the information contained in Enclosure 3. If you have any questions, please contact me at (301) 415-6185 or by e-mail at Anthony.Minarik@nrc.gov or Juan Uribe at (301) 415-3809 or by e-mail at Juan.Uribe@nrc.gov. Docket Nos. 50-348 and 50-364
| |
|
| |
|
| ===Enclosures:===
| | The purpose of this letter is to transmit the U.S. Army Corps of Engineers (USAGE) portion of the Joseph M. Farley Nuclear Plant, Units 1 and 2 (Farley) flood hazard reevaluation (FHR) associated with the assessment of flood hazards due to flooding in streams and rivers, including potential site flooding due to dam failure. By letter dated September 26, 2013 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML13274A343), |
| Sincerely,Anth ny . Minarik.e::ger Hazards Management Branch Japan Lessons-Learned Division Office of Nuclear Reactor Regulation 1. Brief Description of Transmitted Documents 2. USAGE FHR plots 3. DVD containing USAGE FHR spreadsheets cc w/o encls: Distribution via Listserv In addition, the July 17, 2014, letter states that if the USAGE results show that the design-basis flood levels at the Farley site are exceeded by the flood levels resulting from the FHR, SNG must submit its planned interim actions to address the higher flood level to the NRG within 60 days of receipt of the USAGE information. The enclosures to this letter contain the following: (1) a brief description of the enclosed files; (2) summary tables of the results; and (3) the results of the USAGE FHR developed in accordance with Japan Lessons-Learned Directorate (JLD) interim staff guidance (ISG) JLD-ISG-2013-01, "Interim Staff Guidance For Assessment of Flooding Hazards Due to Dam Failure," Revision 0, dated July 29, 2013 (ADAMS Accession No. ML 13151A153). Enclosure 2 contains the relevant USAGE results at Farley, which SNG needs to consider as part of their flood hazard evaluation report. The USAGE results are based on the guidance JLD-ISG-2013-01 and on the USAGE knowledge of the river system. Enclosure 3 is a DVD containing the results at the river mile locations SNG requested as documented in the September 26, 2013, letter and supplemented by the May 6, 2014, and March 13, 2015, letters. The USAGE results contained in Enclosure 2 are a subset of the information contained in Enclosure 3. If you have any questions, please contact me at (301) 415-6185 or by e-mail at Anthony.Minarik@nrc.gov or Juan Uribe at (301) 415-3809 or by e-mail at Juan.Uribe@nrc.gov. Docket Nos. 50-348 and 50-364 DISTRIBUTION: PUBLIC (LETTER ONLY) JHMB R/F RidsAcrsAcnw_MailCTR Resource RidsNrrDorlLpl2-1 Resource RidsNrrLASLent Resource RidsNrrPMFarley Resource
| | Southern Nuclear Operating Company, Inc. (SNC, the licensee) requested assistance from the U.S. Nuclear Regulatory Commission (NRG) in obtaining information from the USAGE to support SNC's development of a report documenting the FHR in response to the March 12, 2012, request for information (ADAMS Accession No. ML12073A348). The NRG staff held meetings to discuss the details of the information being provided by USAGE with SNC and the USAGE on the following dates: |
| | * April 29, 2014 (summary at ADAMS Accession No. ML14133A039) |
| | * March 4, 2015 (summary at ADAMS Accession No. ML15092A114) |
| | These meetings were closed to the public due to the discussion of security-related information. |
| | The licensee supplemented its September 26, 2013 letter, requesting details from the USAGE by letters dated May 6, 2014 (ADAMS Accession No. ML14127A178), and March 13, 2015 (ADAMS Accession No. ML15084A588) as a result of the discussions at these meetings. |
| | By letter dated February 28, 2014 (ADAMS Accession No. ML14072A486), SNC requested permission to submit its report documenting the FHR 120 days after receipt of the information from the USAGE. The NRG staff held a public meeting on May 16, 2014 to discuss the extension (summary can be found at ADAMS Accession No. ML14134A031). By letter dated May 21, 2014 (ADAMS Accession No. ML14141A629), SNC provided a supplement to this request that addressed site-specific information requested by the NRG staff. Following receipt of this supplement, by letter dated July 17, 2014 (ADAMS Accession No. ML14174A938), the NRG staff approved SNC's request to submit the report documenting the FHR at the Farley site 120 days after receipt of the USAGE information. |
| | Enclosures 1, 2, and 3 to this letter contain Security-Related Information. When separated from the enclosures, this letter is DECONTROLLED. |
| | OFFICIAL USE ONLY SECURITY RELATED INFORMATION |
| | |
| | OFFICIAL USE ONLY SECURITY RELATED INFORMATION G. Pierce In addition, the July 17, 2014, letter states that if the USAGE results show that the design-basis flood levels at the Farley site are exceeded by the flood levels resulting from the FHR, SNG must submit its planned interim actions to address the higher flood level to the NRG within 60 days of receipt of the USAGE information. |
| | The enclosures to this letter contain the following: (1) a brief description of the enclosed files; (2) summary tables of the results; and (3) the results of the USAGE FHR developed in accordance with Japan Lessons-Learned Directorate (JLD) interim staff guidance (ISG) |
| | JLD-ISG-2013-01, "Interim Staff Guidance For Assessment of Flooding Hazards Due to Dam Failure," Revision 0, dated July 29, 2013 (ADAMS Accession No. ML13151A153). Enclosure 2 contains the relevant USAGE results at Farley, which SNG needs to consider as part of their flood hazard evaluation report. The USAGE results are based on the guidance JLD-ISG-2013-01 and on the USAGE knowledge of the river system. Enclosure 3 is a DVD containing the results at the river mile locations SNG requested as documented in the September 26, 2013, letter and supplemented by the May 6, 2014, and March 13, 2015, letters. The USAGE results contained in Enclosure 2 are a subset of the information contained in Enclosure 3. |
| | If you have any questions, please contact me at (301) 415-6185 or by e-mail at Anthony.Minarik@nrc.gov or Juan Uribe at (301) 415-3809 or by e-mail at Juan.Uribe@nrc.gov. |
| | Sincerely, Anth ny . Minarik.e::ger Hazards Management Branch Japan Lessons-Learned Division Office of Nuclear Reactor Regulation Docket Nos. 50-348 and 50-364 |
| | |
| | ==Enclosures:== |
| | : 1. Brief Description of Transmitted Documents |
| | : 2. USAGE FHR plots |
| | : 3. DVD containing USAGE FHR spreadsheets cc w/o encls: Distribution via Listserv OFFICIAL USE ONLY SECURITY RELATED INFORMATION |
|
| |
|
| Sincerely,IRA/ Anthony J. Minarik, Project Manager Hazards Management Branch Japan Lessons-Learned Division Office of Nuclear Reactor Regulation RidsNsirDspRsps Resource RidsRgn2MailCenter Resource BHarvey, NRO/DSEA/RHEB CCook, NRO/DSEA/RHEB KMiller, Rll/DRP PNiebaum, Rll/DRP MShams, NRR/JLD SSandal, RIV/DRP KSee, NRO/DSEA/RHEB ACampbell NRO/DSEA AMinarik, NRR/JLD ADAMS Accession Nos.: Pkg: ML 15168A755; Redacted Letter: ML 151768199; OUO-SRI Letter: ML 15168A803; Enclosure 1: ML 15176A237; Enclosure 2: ML 15176A536, ML 15176A545, ML 15176A549 *via e-mail OFFICE NRR/JLD/JHMB/PM NRR/JLD/JHMB/LA NRR/JLD/JHMB/BC NAME AMinarik SLent MShams DATE 06/18/15 06/18/15 06/19/15 OFFICE NRO/DSEA/RHEB/BC* NRR/JLD/JHMB/PM NAME CCook AMinarik DATE 06/24/15 06/25/15 OFFICIAL RECORD COPY}} | | ML13151A153). Enclosure 2 contains the relevant USAGE results at Farley, which SNG needs to consider as part of their flood hazard evaluation report. The USAGE results are based on the guidance JLD-ISG-2013-01 and on the USAGE knowledge of the river system. Enclosure 3 is a DVD containing the results at the river mile locations SNG requested as documented in the September 26, 2013, letter and supplemented by the May 6, 2014, and March 13, 2015, letters. The USAGE results contained in Enclosure 2 are a subset of the information contained in Enclosure 3. |
| | If you have any questions, please contact me at (301) 415-6185 or by e-mail at Anthony.Minarik@nrc.gov or Juan Uribe at (301) 415-3809 or by e-mail at Juan.Uribe@nrc.gov. |
| | Sincerely, IRA/ |
| | Anthony J. Minarik, Project Manager Hazards Management Branch Japan Lessons-Learned Division Office of Nuclear Reactor Regulation Docket Nos. 50-348 and 50-364 DISTRIBUTION: |
| | PUBLIC (LETTER ONLY) RidsNsirDspRsps Resource MShams, NRR/JLD JHMB R/F RidsRgn2MailCenter Resource SSandal, RIV/DRP RidsAcrsAcnw_MailCTR Resource BHarvey, NRO/DSEA/RHEB KSee, NRO/DSEA/RHEB RidsNrrDorlLpl2-1 Resource CCook, NRO/DSEA/RHEB ACampbell NRO/DSEA RidsNrrLASLent Resource KMiller, Rll/DRP AMinarik, NRR/JLD RidsNrrPMFarley Resource PNiebaum, Rll/DRP ADAMS Accession Nos.: Pkg: ML15168A755; Redacted Letter: ML151768199; OUO-SRI Letter: ML15168A803; Enclosure 1: ML15176A237; Enclosure 2: ML15176A536, ML15176A545, ML15176A549 |
| | *via e-mail OFFICE NRR/JLD/JHMB/PM NRR/JLD/JHMB/LA NRR/JLD/JHMB/BC NAME AMinarik SLent MShams DATE 06/18/15 06/18/15 06/19/15 OFFICE NRO/DSEA/RHEB/BC* NRR/JLD/JHMB/PM NAME CCook AMinarik DATE 06/24/15 06/25/15}} |
|
---|
Category:Letter
MONTHYEARNL-24-0320, License Amendment Request Proposing a New Set of Fission Gas Gap Release Fractions for High Burnup Fuel Rods That Exceed the Linear Heat Generation Rate Limit Detailed in Regulatory Guide 1.183, Table 3,.2024-09-27027 September 2024 License Amendment Request Proposing a New Set of Fission Gas Gap Release Fractions for High Burnup Fuel Rods That Exceed the Linear Heat Generation Rate Limit Detailed in Regulatory Guide 1.183, Table 3,. NL-24-0349, Units 1 and 2 - 10 CFR 26.719(c)(1) 30-Day Report Blind Performance Test Results Inconsistent with Sample Provided2024-09-20020 September 2024 Units 1 and 2 - 10 CFR 26.719(c)(1) 30-Day Report Blind Performance Test Results Inconsistent with Sample Provided NL-24-0341, Response to Request for Additional Information Related to the Application to Revise Technical Specifications Regarding Change to Containment Spray Nozzle Test Frequency2024-09-10010 September 2024 Response to Request for Additional Information Related to the Application to Revise Technical Specifications Regarding Change to Containment Spray Nozzle Test Frequency IR 05000348/20244012024-09-10010 September 2024 Security Baseline Inspection Report 05000348-2024401 and 05000364-2024401 ML24247A1102024-09-0505 September 2024 Corporate Notification Letter Aka 210-day Letter NUREG Rev 12 NL-24-0259, License Amendment Request to Revise Technical Specification 3.4.14, Reactor Coolant System Pressure Isolation Valve Leakage, Surveillance Requirement 3.4.14.3 Acceptance Criteria and Miscellaneous Obsolete Changes2024-09-0404 September 2024 License Amendment Request to Revise Technical Specification 3.4.14, Reactor Coolant System Pressure Isolation Valve Leakage, Surveillance Requirement 3.4.14.3 Acceptance Criteria and Miscellaneous Obsolete Changes NL-24-0340, Unit 1 - Inservice Inspection Program Owners Activity Report (OAR-1) for Outage 1 R322024-09-0404 September 2024 Unit 1 - Inservice Inspection Program Owners Activity Report (OAR-1) for Outage 1 R32 ML24242A1332024-08-29029 August 2024 Issuance of Amendment Nos. 250 and 247, Regarding License Amendment Request to Revise Technical Specification 3.6.5, Containment Air Temperature, Actions (EPID L-2024-LLA-0098) - Non-Proprietary ML24240A0812024-08-27027 August 2024 License Amendment Request to Change Technical Specification 3.6.5, Containment Air Temperature Actions - Revised Completion Time ML24233A0022024-08-27027 August 2024 Request for Withholding Information from Public Disclosure for Joseph M. Farley Nuclear Plant, Units 1 and 2, License Amendment Request Supplement to Change Technical Specification 3.6.5, Containment Air Temperature Actions IR 05000348/20240052024-08-26026 August 2024 Updated Inspection Plan for Joseph M. Farley Nuclear Plant, Units 1 and 2 - Report 05000348/2024005 and 05000364/2024005 IR 05000348/20244022024-08-26026 August 2024 Information Request for the Cyber Security Baseline Inspection, Notification to Perform Inspection 05000348/2024402 and 05000364/2024402 ML24226B2112024-08-22022 August 2024 Regulatory Audit Summary in Support of License Amendment Requests to Revise Technical Specification 3.6.5, Containment Air Temperature, Actions NL-24-0321, License Amendment Request to Change Technical Specification 3.6.5, Containment Air Temperature Actions - Supplemental Information2024-08-16016 August 2024 License Amendment Request to Change Technical Specification 3.6.5, Containment Air Temperature Actions - Supplemental Information IR 05000348/20240022024-08-12012 August 2024 – Integrated Inspection Report 05000348-2024002 and 05000364-2024002 and Exercise of Enforcement Discretion ML24215A3772024-08-0707 August 2024 2024 Farley Requal Inspection Corporate Notification Letter ML24201A2032024-08-0101 August 2024 Request for Withholding Information from Public Disclosure for Joseph M. Farley Nuclear Plant, Units 1 and 2, License Amendment Request to Change Technical Specification 3.6.5, Containment Air Temperature Actions ML24200A1392024-07-25025 July 2024 Regulatory Audit in Support of Review of the License Amendment Request to Revise Technical Specification 3.6.5, Containment Air Temperature ML24199A2072024-07-24024 July 2024 TS 3-6-5 LAR - Individual Notice Transmittal Letter and NSHC - Rev 1 (1) - Letter NL-24-0261, 10 CFR 50.46 ECCS Evaluation Model Annual Report for 20232024-07-19019 July 2024 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2023 NL-24-0281, License Amendment Request to Change Technical Specification 3.6.5, Containment Air Temperature Actions2024-07-18018 July 2024 License Amendment Request to Change Technical Specification 3.6.5, Containment Air Temperature Actions NL-24-0227, Proposed Inservice Inspection Alternative GEN-ISI-AL T-2024-03 for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1)2024-07-0303 July 2024 Proposed Inservice Inspection Alternative GEN-ISI-AL T-2024-03 for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) ML24184A0452024-07-0202 July 2024 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML24178A3762024-07-0101 July 2024 Nonacceptance of Requested Licensing Action License Amendment Request to Revise Technical Specification 3.6.5, Containment Air Temperature, Using Risk-Informed Process for Evaluations NL-24-0234, Application to Revise Technical Specifications to Adopt TSTF-589, Eliminate Automatic Diesel Generator Start During Shutdown2024-06-28028 June 2024 Application to Revise Technical Specifications to Adopt TSTF-589, Eliminate Automatic Diesel Generator Start During Shutdown NL-24-0230, License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-500, Revision 2, DC Electrical Rewrite – Update to TSTF-3602024-06-28028 June 2024 License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-500, Revision 2, DC Electrical Rewrite – Update to TSTF-360 NL-24-0143, Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement Activities in2024-06-27027 June 2024 Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement Activities in NL-24-0235, Manual Reactor Trip Due to Loss of Power to the 2A 125 Volt DC Distribution Panel2024-06-19019 June 2024 Manual Reactor Trip Due to Loss of Power to the 2A 125 Volt DC Distribution Panel NL-24-0201, Proposed Inservice Inspection Alternative GEN-ISI-ALT-2024-002 for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1)2024-06-18018 June 2024 Proposed Inservice Inspection Alternative GEN-ISI-ALT-2024-002 for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1) NL-24-0221, Pressurizer Safety Valve Lift Pressure Outside of Technical Specifications Limits Due to Setpoint Drift2024-06-17017 June 2024 Pressurizer Safety Valve Lift Pressure Outside of Technical Specifications Limits Due to Setpoint Drift NL-24-0238, RIPE License Amendment Request to Change Containment Air Temperature Actions, Supplemental Information2024-06-14014 June 2024 RIPE License Amendment Request to Change Containment Air Temperature Actions, Supplemental Information NL-24-0229, Notice of Intent to Pursue Subsequent License Renewal2024-06-0707 June 2024 Notice of Intent to Pursue Subsequent License Renewal ML24149A0492024-06-0404 June 2024 SNC Fleet - Regulatory Audit in Support of Review of the License Amendment Request to Revise TS 1.1, Use and Application Definitions, and Add New Technical Specification 5.5.21 and 5.5.17, Online Monitoring Program, ML24143A0412024-05-28028 May 2024 Supplemental Information Needed for Using the Risk-Informed Process for Evaluation for the LAR to Change Technical Specification 3.6.5, Containment Air Temperature, Actions NL-24-0202, SNC Response to Regulatory Issue Summary 2024-01: Preparation and Scheduling of Operator Licensing Examinations2024-05-24024 May 2024 SNC Response to Regulatory Issue Summary 2024-01: Preparation and Scheduling of Operator Licensing Examinations NL-24-0191, Annual Radiological Environmental Operating Reports for 20232024-05-10010 May 2024 Annual Radiological Environmental Operating Reports for 2023 NL-24-0064, Units 1 & 2 and Hatch Nuclear Plant - Units 1 & 2 License Amendment Request to Revise Technical Specification 1.1 and Add Online Monitoring Program to Technical Specification 5.52024-05-0303 May 2024 Units 1 & 2 and Hatch Nuclear Plant - Units 1 & 2 License Amendment Request to Revise Technical Specification 1.1 and Add Online Monitoring Program to Technical Specification 5.5 NL-24-0188, Cycle 33 Core Operating Limits Report2024-05-0101 May 2024 Cycle 33 Core Operating Limits Report NL-24-0165, Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 20232024-04-25025 April 2024 Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 2023 IR 05000348/20240012024-04-24024 April 2024 Integrated Inspection Report 05000348/2024001 and 05000364/2024001 NL-24-0137, RIPE License Amendment Request to Change Containment Air Temperature Actions2024-04-19019 April 2024 RIPE License Amendment Request to Change Containment Air Temperature Actions IR 05000348/20240102024-04-16016 April 2024 NRC Inspection Report 05000348/2024010 and 05000364/2024010 NL-24-0123, for Manual Reactor Trip Due to Loss of Power to the 2A 125 Volt DC Distribution Panel2024-04-15015 April 2024 for Manual Reactor Trip Due to Loss of Power to the 2A 125 Volt DC Distribution Panel NL-24-0134, Renewed National Pollutant Discharge Elimination System (NPDES) Permit2024-04-12012 April 2024 Renewed National Pollutant Discharge Elimination System (NPDES) Permit IR 05000348/20240112024-04-12012 April 2024 Fire Protection Team Inspection Report 05000348/2024011 and 05000364/2024011 NL-24-0088, Application to Revise Technical Specifications Regarding Change to Containment Spray Nozzle Test Frequency2024-04-0505 April 2024 Application to Revise Technical Specifications Regarding Change to Containment Spray Nozzle Test Frequency NL-24-0115, Response to Request for Additional Information Exemption Requests for Physical.2024-04-0404 April 2024 Response to Request for Additional Information Exemption Requests for Physical. NL-24-0116, Nuclear Property Insurance Coverage as of April 1, 2024 and Licensee Guarantees of Payment of Deferred.2024-03-29029 March 2024 Nuclear Property Insurance Coverage as of April 1, 2024 and Licensee Guarantees of Payment of Deferred. ML24061A1692024-03-22022 March 2024 PM Reassignment Letter Farley March 2024 NL-24-0092, Inservice Inspection Program Owners Activity Report (OAR-1) for Outage 2R292024-03-15015 March 2024 Inservice Inspection Program Owners Activity Report (OAR-1) for Outage 2R29 2024-09-05
[Table view] |
Text
OFFICIAL USE ONLY SECURITY RELATED INFORMATION UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 June 25, 2015 Mr. C. R. Pierce Regulatory Affairs Director Southern Nuclear Operating Co., Inc.
P.O. Box 1295, Bin 038 Birmingham, AL 35201-1295
SUBJECT:
JOSEPH M. FARLEY NUCLEAR PLANT, UNITS 1 AND 2 - TRANSMITTAL OF U.S. ARMY CORPS OF ENGINEERS FLOOD HAZARD REEVALUATION INFORMATION (TAC NOS. MF3037 AND MF3038)
Dear Mr. Pierce:
The purpose of this letter is to transmit the U.S. Army Corps of Engineers (USAGE) portion of the Joseph M. Farley Nuclear Plant, Units 1 and 2 (Farley) flood hazard reevaluation (FHR) associated with the assessment of flood hazards due to flooding in streams and rivers, including potential site flooding due to dam failure. By letter dated September 26, 2013 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML13274A343),
Southern Nuclear Operating Company, Inc. (SNC, the licensee) requested assistance from the U.S. Nuclear Regulatory Commission (NRG) in obtaining information from the USAGE to support SNC's development of a report documenting the FHR in response to the March 12, 2012, request for information (ADAMS Accession No. ML12073A348). The NRG staff held meetings to discuss the details of the information being provided by USAGE with SNC and the USAGE on the following dates:
These meetings were closed to the public due to the discussion of security-related information.
The licensee supplemented its September 26, 2013 letter, requesting details from the USAGE by letters dated May 6, 2014 (ADAMS Accession No. ML14127A178), and March 13, 2015 (ADAMS Accession No. ML15084A588) as a result of the discussions at these meetings.
By letter dated February 28, 2014 (ADAMS Accession No. ML14072A486), SNC requested permission to submit its report documenting the FHR 120 days after receipt of the information from the USAGE. The NRG staff held a public meeting on May 16, 2014 to discuss the extension (summary can be found at ADAMS Accession No. ML14134A031). By letter dated May 21, 2014 (ADAMS Accession No. ML14141A629), SNC provided a supplement to this request that addressed site-specific information requested by the NRG staff. Following receipt of this supplement, by letter dated July 17, 2014 (ADAMS Accession No. ML14174A938), the NRG staff approved SNC's request to submit the report documenting the FHR at the Farley site 120 days after receipt of the USAGE information.
Enclosures 1, 2, and 3 to this letter contain Security-Related Information. When separated from the enclosures, this letter is DECONTROLLED.
OFFICIAL USE ONLY SECURITY RELATED INFORMATION
OFFICIAL USE ONLY SECURITY RELATED INFORMATION G. Pierce In addition, the July 17, 2014, letter states that if the USAGE results show that the design-basis flood levels at the Farley site are exceeded by the flood levels resulting from the FHR, SNG must submit its planned interim actions to address the higher flood level to the NRG within 60 days of receipt of the USAGE information.
The enclosures to this letter contain the following: (1) a brief description of the enclosed files; (2) summary tables of the results; and (3) the results of the USAGE FHR developed in accordance with Japan Lessons-Learned Directorate (JLD) interim staff guidance (ISG)
JLD-ISG-2013-01, "Interim Staff Guidance For Assessment of Flooding Hazards Due to Dam Failure," Revision 0, dated July 29, 2013 (ADAMS Accession No. ML13151A153). Enclosure 2 contains the relevant USAGE results at Farley, which SNG needs to consider as part of their flood hazard evaluation report. The USAGE results are based on the guidance JLD-ISG-2013-01 and on the USAGE knowledge of the river system. Enclosure 3 is a DVD containing the results at the river mile locations SNG requested as documented in the September 26, 2013, letter and supplemented by the May 6, 2014, and March 13, 2015, letters. The USAGE results contained in Enclosure 2 are a subset of the information contained in Enclosure 3.
If you have any questions, please contact me at (301) 415-6185 or by e-mail at Anthony.Minarik@nrc.gov or Juan Uribe at (301) 415-3809 or by e-mail at Juan.Uribe@nrc.gov.
Sincerely, Anth ny . Minarik.e::ger Hazards Management Branch Japan Lessons-Learned Division Office of Nuclear Reactor Regulation Docket Nos. 50-348 and 50-364
Enclosures:
- 1. Brief Description of Transmitted Documents
- 2. USAGE FHR plots
- 3. DVD containing USAGE FHR spreadsheets cc w/o encls: Distribution via Listserv OFFICIAL USE ONLY SECURITY RELATED INFORMATION
ML13151A153). Enclosure 2 contains the relevant USAGE results at Farley, which SNG needs to consider as part of their flood hazard evaluation report. The USAGE results are based on the guidance JLD-ISG-2013-01 and on the USAGE knowledge of the river system. Enclosure 3 is a DVD containing the results at the river mile locations SNG requested as documented in the September 26, 2013, letter and supplemented by the May 6, 2014, and March 13, 2015, letters. The USAGE results contained in Enclosure 2 are a subset of the information contained in Enclosure 3.
If you have any questions, please contact me at (301) 415-6185 or by e-mail at Anthony.Minarik@nrc.gov or Juan Uribe at (301) 415-3809 or by e-mail at Juan.Uribe@nrc.gov.
Sincerely, IRA/
Anthony J. Minarik, Project Manager Hazards Management Branch Japan Lessons-Learned Division Office of Nuclear Reactor Regulation Docket Nos. 50-348 and 50-364 DISTRIBUTION:
PUBLIC (LETTER ONLY) RidsNsirDspRsps Resource MShams, NRR/JLD JHMB R/F RidsRgn2MailCenter Resource SSandal, RIV/DRP RidsAcrsAcnw_MailCTR Resource BHarvey, NRO/DSEA/RHEB KSee, NRO/DSEA/RHEB RidsNrrDorlLpl2-1 Resource CCook, NRO/DSEA/RHEB ACampbell NRO/DSEA RidsNrrLASLent Resource KMiller, Rll/DRP AMinarik, NRR/JLD RidsNrrPMFarley Resource PNiebaum, Rll/DRP ADAMS Accession Nos.: Pkg: ML15168A755; Redacted Letter: ML151768199; OUO-SRI Letter: ML15168A803; Enclosure 1: ML15176A237; Enclosure 2: ML15176A536, ML15176A545, ML15176A549
- via e-mail OFFICE NRR/JLD/JHMB/PM NRR/JLD/JHMB/LA NRR/JLD/JHMB/BC NAME AMinarik SLent MShams DATE 06/18/15 06/18/15 06/19/15 OFFICE NRO/DSEA/RHEB/BC* NRR/JLD/JHMB/PM NAME CCook AMinarik DATE 06/24/15 06/25/15