ML15209A878: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(3 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML15209A878
| number = ML15209A878
| issue date = 07/31/2015
| issue date = 07/31/2015
| title = Joseph M. Farley Nuclear Plant, Unit 2 - Request for Additional Information (TAC No. MF6207)
| title = Request for Additional Information
| author name = Williams S A
| author name = Williams S
| author affiliation = NRC/NRR/DORL/LPLII-1
| author affiliation = NRC/NRR/DORL/LPLII-1
| addressee name = Pierce C R
| addressee name = Pierce C
| addressee affiliation = Southern Nuclear Operating Co, Inc
| addressee affiliation = Southern Nuclear Operating Co, Inc
| docket = 05000364
| docket = 05000364
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION Mr. C. R. Pierce Regulatory Affairs Director Southern Nuclear Operating Co., Inc. P.O. Box 1295, Bin 038 Birmingham, AL 35201-1295 WASHINGTON, D.C. 20555-0001
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001      .
. Juiy 31, aJ15
Juiy 31, aJ15 Mr. C. R. Pierce Regulatory Affairs Director Southern Nuclear Operating Co., Inc.
P.O. Box 1295, Bin 038 Birmingham, AL 35201-1295


==SUBJECT:==
==SUBJECT:==
JOSEPH M. FARLEY NUCLEAR PLANT, UNIT 2 - REQUEST FOR ADDITIONAL INFORMATION (TAC NO. MF6207)


JOSEPH M. FARLEY NUCLEAR PLANT, UNIT 2 -REQUEST FOR ADDITIONAL INFORMATION (TAC NO. MF6207)
==Dear Mr. Pierce:==


==Dear Mr. Pierce:==
By letter dated May 11, 2015, the Southern Nuclear Operating Company, Inc., (SNC) submitted a steam generator tube inspections report performed during the twenty-third refueling outage (2R23) at the Joseph M. Farley Nuclear Plant, Unit 2.
By letter dated May 11, 2015, the Southern Nuclear Operating  
The U.S. Nuclear Regulatory Commission (NRG) staff has determined that additional information is needed as discussed in the Enclosure. We request that SNC respond within 30 days of the date of this letter. Please note that the NRG staffs review is continuing and further requests for information may be developed.
: Company, Inc., (SNC) submitted a steam generator tube inspections report performed during the twenty-third refueling outage (2R23) at the Joseph M. Farley Nuclear Plant, Unit 2. The U.S. Nuclear Regulatory Commission (NRG) staff has determined that additional information is needed as discussed in the Enclosure.
Sincerely, Shawn Williams, Project Manager Plant Licensing Branch, 11-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-364
We request that SNC respond within 30 days of the date of this letter. Please note that the NRG staffs review is continuing and further requests for information may be developed.
Docket No. 50-364  


==Enclosure:==
==Enclosure:==


Request for Additional Information cc w/encl: Distribution via Listserv Sincerely, Shawn Williams, Project Manager Plant Licensing Branch, 11-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation REQUEST FOR ADDITIONAL INFORMATION JOSEPH M. FARLEY NUCLEAR PLANT. UNIT 2 2015 STEAM GENERATOR INSPECTIONS SOUTHERN NUCLEAR OPERATING
Request for Additional Information cc w/encl: Distribution via Listserv
: COMPANY, INC. DOCKET NO. 50-364 By letter dated May 11, 2015 (Agencywide Documents Access and Management System Accession No. ML 15131A333),
the Southern Nuclear Operating
: Company, lnc.,(SNC) submitted a report of a steam generator tube inspections report performed during the third refueling outage (2R23) at the Joseph M. Farley Nuclear Plant, Unit 2. The NRC staff has reviewed the report and determined that additional information is necessary to complete the review. RAI No. 1 Please discuss the results of the chanriel head inspections.
RAI No. 2 With regards to the steam drum and feedring inspections, it is stated that "there were no structural anomalies."
Was any degradation observed?
RAI No. 3 Please clarify the scope of your bobbin exams and your +PointŽ exams of the U-bend region of rows 1 and 2. Specifically, were all tubes that were not inspected in RFO 21 inspected in RFO 23 or were 50 percent of the tubes. that were not inspected in RFO 21 inspected in RFO 23? Enclosure Mr. C. R. Pierce Regulatory Affairs Director Southern Nuclear Operating Co., Inc. P.O. Box 1295, Bin 038 Birmingham, AL 35201-1295 July 31, 2015
 
==SUBJECT:==
 
JOSEPH M. FARLEY NUCLEAR PLANT, UNIT 2 -REQUEST FOR ADDITIONAL INFORMATION (TAC NO. MF6207)
 
==Dear Mr. Pierce:==
By letter dated May 11, 2015, the Southern Nuclear Operating
: Company, Inc., (SNC) submitted a steam generator tube inspections report performed during the twenty-third refueling outage (2R23) at the Joseph M. Farley Nuclear Plant, Unit 2. The U.S. Nuclear Regulatory Commission (NRC) staff has determined that additional information is needed as discussed in the Enclosure.
We request that SNC respond within 30 days of the date of this letter. Please note that the NRC staff's review is continuing and further requests for information may be developed.
Docket No. 50-364


==Enclosure:==
REQUEST FOR ADDITIONAL INFORMATION JOSEPH M. FARLEY NUCLEAR PLANT. UNIT 2 2015 STEAM GENERATOR INSPECTIONS SOUTHERN NUCLEAR OPERATING COMPANY, INC.
DOCKET NO. 50-364 By letter dated May 11, 2015 (Agencywide Documents Access and Management System Accession No. ML15131A333), the Southern Nuclear Operating Company, lnc.,(SNC) submitted a report of a steam generator tube inspections report performed during the twenty-third refueling outage (2R23) at the Joseph M. Farley Nuclear Plant, Unit 2.
The NRC staff has reviewed the report and determined that additional information is necessary to complete the review.
RAI No. 1 Please discuss the results of the chanriel head inspections.
RAI No. 2 With regards to the steam drum and feedring inspections, it is stated that "there were no structural anomalies." Was any degradation observed?
RAI No. 3 Please clarify the scope of your bobbin exams and your +Point' exams of the U-bend region of rows 1 and 2. Specifically, were all tubes that were not inspected in RFO 21 inspected in RFO 23 or were 50 percent of the tubes. that were not inspected in RFO 21 inspected in RFO 23?
Enclosure


Sincerely,
ML15209A878 OFFICE       LPL2-1/PM       LPL2-1/LA         NRR/DE/ESGB/BC LPL2-1/BC               LPL2-1/PM GKulesa*              RPascarelli NAME         SWilliams       SFigueroa                                                 SWilliams
/RA/ Shawn Williams, Project Manager Plant Licensing Branch, 11-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Request for Additional Information cc w/encl: Distribution via Listserv DISTRIBUTION:
                                                                        <RMartin for)
PUBLIC RidsNrrDorlDpr Resource RidsNrrLASFigueroa Resource AHuynh, NRR LPL2-1 R/F RidsNrrDorllp12-1 Resource RidsNrrDe Resource RidsAcrsAcnw_MailCTR Resource RidsRgn2MailCenter Resource RidsNrrPMFarley Resource ADAMS Accession No.: ML 15209A878 OFFICE LPL2-1/PM LPL2-1/LA NRR/DE/ESGB/BC LPL2-1/BC LPL2-1/PM NAME SWilliams SFigueroa GKulesa*
DATE         07/30/15         07/30/15           07/28/15             07/31/15         07/31/15}}
RPascarelli SWilliams  
<RMartin for) DATE 07/30/15 07/30/15 07/28/15 07/31/15 07/31/15 OFFICIAL RECORD COPY}}

Latest revision as of 08:44, 31 October 2019

Request for Additional Information
ML15209A878
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 07/31/2015
From: Shawn Williams
Plant Licensing Branch II
To: Pierce C
Southern Nuclear Operating Co
williams s
References
TAC MF6207
Download: ML15209A878 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 .

Juiy 31, aJ15 Mr. C. R. Pierce Regulatory Affairs Director Southern Nuclear Operating Co., Inc.

P.O. Box 1295, Bin 038 Birmingham, AL 35201-1295

SUBJECT:

JOSEPH M. FARLEY NUCLEAR PLANT, UNIT 2 - REQUEST FOR ADDITIONAL INFORMATION (TAC NO. MF6207)

Dear Mr. Pierce:

By letter dated May 11, 2015, the Southern Nuclear Operating Company, Inc., (SNC) submitted a steam generator tube inspections report performed during the twenty-third refueling outage (2R23) at the Joseph M. Farley Nuclear Plant, Unit 2.

The U.S. Nuclear Regulatory Commission (NRG) staff has determined that additional information is needed as discussed in the Enclosure. We request that SNC respond within 30 days of the date of this letter. Please note that the NRG staffs review is continuing and further requests for information may be developed.

Sincerely, Shawn Williams, Project Manager Plant Licensing Branch, 11-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-364

Enclosure:

Request for Additional Information cc w/encl: Distribution via Listserv

REQUEST FOR ADDITIONAL INFORMATION JOSEPH M. FARLEY NUCLEAR PLANT. UNIT 2 2015 STEAM GENERATOR INSPECTIONS SOUTHERN NUCLEAR OPERATING COMPANY, INC.

DOCKET NO. 50-364 By letter dated May 11, 2015 (Agencywide Documents Access and Management System Accession No. ML15131A333), the Southern Nuclear Operating Company, lnc.,(SNC) submitted a report of a steam generator tube inspections report performed during the twenty-third refueling outage (2R23) at the Joseph M. Farley Nuclear Plant, Unit 2.

The NRC staff has reviewed the report and determined that additional information is necessary to complete the review.

RAI No. 1 Please discuss the results of the chanriel head inspections.

RAI No. 2 With regards to the steam drum and feedring inspections, it is stated that "there were no structural anomalies." Was any degradation observed?

RAI No. 3 Please clarify the scope of your bobbin exams and your +Point' exams of the U-bend region of rows 1 and 2. Specifically, were all tubes that were not inspected in RFO 21 inspected in RFO 23 or were 50 percent of the tubes. that were not inspected in RFO 21 inspected in RFO 23?

Enclosure

ML15209A878 OFFICE LPL2-1/PM LPL2-1/LA NRR/DE/ESGB/BC LPL2-1/BC LPL2-1/PM GKulesa* RPascarelli NAME SWilliams SFigueroa SWilliams

<RMartin for)

DATE 07/30/15 07/30/15 07/28/15 07/31/15 07/31/15