|
|
(6 intermediate revisions by the same user not shown) |
Line 2: |
Line 2: |
| | number = ML15243A447 | | | number = ML15243A447 |
| | issue date = 09/10/2015 | | | issue date = 09/10/2015 |
| | title = Salem Master Report - Tables 1 and 2 | | | title = Master Report - Tables 1 and 2 |
| | author name = Quinn-Willingham L M | | | author name = Quinn-Willingham L |
| | author affiliation = NRC/NRO/DSEA/RHMB | | | author affiliation = NRC/NRO/DSEA/RHMB |
| | addressee name = | | | addressee name = |
Line 9: |
Line 9: |
| | docket = 05000272, 05000311 | | | docket = 05000272, 05000311 |
| | license number = | | | license number = |
| | contact person = Quinn-Willingham L M | | | contact person = Quinn-Willingham L |
| | case reference number = TAC MF3790, TAC MF3791 | | | case reference number = TAC MF3790, TAC MF3791 |
| | package number = ML15244B266 | | | package number = ML15244B266 |
Line 19: |
Line 19: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:Salem, Units 1 and 2Table 1. Current Design Basis Flood Hazards for Use in the MSAMechanismStillwater Elevation Waves/ RunupReferenceDesign Basis Hazard ElevationLocal Intense PrecipitationNot included in DBNot included in DBNot included in DBFHRR Section 1.2.1Failure of Dams and Onsite Water Control/Storage StructuresNot included in DBNot included in DBNot included in DBFHRR Section 1.2.3Streams and RiversNot included in DBNot included in DBNot included in DBFHRR Section 1.2.2Storm SurgeAuxiliary Building24.0 ft NAVD886.6 ft30.6 ft NAVD88FHRR Section 1.2.4Service Water Intake Structure24.0 ft NAVD8813.5 ft37.5 ft NAVD88FHRR Section 1.2.4 and Table 3-1SeicheNo Impact on the Site IdentifiedNo Impact on the Site IdentifiedNo Impact on the Site IdentifiedFHRR Section 1.2.5TsunamiNo Impact on the Site IdentifiedNo Impact on the Site IdentifiedNo Impact on the Site IdentifiedFHRR Section 1.2.6Ice-Induced FloodingNo Impact on the Site IdentifiedNo Impact on the Site IdentifiedNo Impact on the Site IdentifiedFHRR Section 1.2.7 Salem, Units 1 and 2Table 1. Current Design Basis Flood Hazards for Use in the MSAMechanismStillwater Elevation Waves/ RunupReferenceDesign Basis Hazard ElevationNote: Reported values are rounded to the nearest one-tenth of a foot.Channel Migrations/DiversionsNo Impact on the SteIdentifiedNo Impact on the Site IdentifiedNo Impact on the Site IdentifiedFHRR Section 1.2.8 Salem, Units 1 and 2Table 2. Reevaluated Flood Hazards for Flood-Causing Mechanisms for Use in the MSAMechanismStillwater Elevation Waves/ RunupReevaluated Hazard ElevationReferenceNote 2: Reevaluated hazard mechanisms bounded by the current design basis (see Table 1) are not included in this table.Note 3: Reported values are rounded to the nearest one-tenth of a foot.Local Intense Precipitation12.2 ft NAVD88Minimal12.2 ft NAVD88FHRR Section 3.1Note 1: The licensee is expected to develop flood event duration parameters and applicable flood associated effects to conduct the MSA. The staff will evaluate the flood event duration parameters (including warning time and period of inundation) and flood associated effects during its review of the MSA. | | {{#Wiki_filter:Salem, Units 1 and 2 Table 1. Current Design Basis Flood Hazards for Use in the MSA Mechanism Stillwater Waves/ Design Basis Reference Elevation Runup Hazard Elevation Local Intense Precipitation Not included Not included Not included FHRR Section 1.2.1 in DB in DB in DB Streams and Rivers Not included Not included Not included FHRR Section 1.2.2 in DB in DB in DB Failure of Dams and Onsite Water Control/Storage Structures Not included Not included Not included FHRR Section 1.2.3 in DB in DB in DB Storm Surge Auxiliary Building 24.0 ft 6.6 ft 30.6 ft FHRR Section 1.2.4 NAVD88 NAVD88 Service Water Intake Structure 24.0 ft 13.5 ft 37.5 ft FHRR Section 1.2.4 and Table 3-1 NAVD88 NAVD88 Seiche No Impact No Impact No Impact FHRR Section 1.2.5 on the Site on the Site on the Site Identified Identified Identified Tsunami No Impact No Impact No Impact FHRR Section 1.2.6 on the Site on the Site on the Site Identified Identified Identified Ice-Induced Flooding No Impact No Impact No Impact FHRR Section 1.2.7 on the Site on the Site on the Site Identified Identified Identified |
| }} | | |
| | Salem, Units 1 and 2 Table 1. Current Design Basis Flood Hazards for Use in the MSA Mechanism Stillwater Waves/ Design Basis Reference Elevation Runup Hazard Elevation Channel Migrations/Diversions No Impact No Impact No Impact FHRR Section 1.2.8 on the Site on the Site on the Site Identified Identified Identified Note 1: Reported values are rounded to the nearest one-tenth of a foot. |
| | Note 2: Based on the NRC staffs independent (deterministic) hazard assessment using present-day regulatory guidance and methodologies of storm surge, the staff concludes that the sites current design basis remains bounded. For this reason, the staff concludes it is appropriate to utilize the current design basis storm surge elevation in conjunction with the mitigating strategies assessment. |
| | |
| | Salem, Units 1 and 2 Table 2. Reevaluated Flood Hazards for Flood-Causing Mechanisms for Use in the MSA Mechanism Stillwater Waves/ Reevaluated Reference Elevation Runup Hazard Elevation Local Intense Precipitation 12.2 ft Minimal 12.2 ft FHRR Section 3.1 NAVD88 NAVD88 Note 1: The licensee is expected to develop flood event duration parameters and applicable flood associated effects to conduct the MSA. The staff will evaluate the flood event duration parameters (including warning time and period of inundation) and flood associated effects during its review of the MSA. |
| | Note 2: Reevaluated hazard mechanisms bounded by the current design basis (see Table 1) are not included in this table. |
| | Note 3: Reported values are rounded to the nearest one-tenth of a foot.}} |
Letter Sequence Other |
---|
|
|
MONTHYEARML14071A4012014-03-11011 March 2014 PSEG Nuclear Llc'S Response to Request for Information Regarding Flooding Aspects of Recommendation 2.1 of Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident - Generating Station Flood Hazard Reevaluation Project stage: Request ML14168A2422014-06-28028 June 2014 Request for Additional Information Regarding Flooding Hazard Reevaluation Project stage: RAI ML15146A2202015-06-0101 June 2015 Nuclear Regulatory Commission Plan for the Audit of PSEG Nuclear Llc'S Flood Hazard Reevaluation Report Submittal Relating to the Near-Term Task Force Recommendation 2.1-Flooding for Salem Nuclear Generating Station, Units 1 and 2 Project stage: Other ML15238B7042015-09-10010 September 2015 Interim Staff Response to Reevaluated Flood Hazards Submitted in Response to 10 CFR 50.54 Information Request - Flood Causing Mechanism Reevaluation Project stage: Other ML15243A4472015-09-10010 September 2015 Master Report - Tables 1 and 2 Project stage: Other 2014-06-28
[Table View] |
Similar Documents at Salem |
---|
Category:Graphics incl Charts and Tables
MONTHYEARLR-N24-0011, Supplemental Information to License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary2024-04-0505 April 2024 Supplemental Information to License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary ML23249A2642023-09-0606 September 2023 Attachment 1: PSEG Site Hourly Meteorological Data (2019 - 2021), Salem/Hope Creek Finalized Hourly Meteorological Data 2020 ML23249A2632023-09-0606 September 2023 Attachment 1: PSEG Site Hourly Meteorological Data (2019 - 2021), Salem/Hope Creek Finalized Hourly Meteorological Data 2019 ML23249A2662023-09-0606 September 2023 Attachment 2: Salem Pavan Input File ML23249A2682023-09-0606 September 2023 Attachment 4: Hope Creek Pavan Input File ML23249A2672023-09-0606 September 2023 Attachment 3: Salem Pavan Output File LR-N23-0050, Attachment 5: Hope Creek Pavan Output File2023-09-0606 September 2023 Attachment 5: Hope Creek Pavan Output File ML23249A2652023-09-0606 September 2023 Attachment 1: PSEG Site Hourly Meteorological Data (2019 - 2021), Salem/Hope Creek Finalized Hourly Meteorological Data 2021 ML17335A1182018-01-25025 January 2018 Documentation of the Completion of Required Actions Taken in Response to the Lessons Learned from the Fukushima Dai Ichi Accident ML17046A2962017-01-30030 January 2017 Revision 29 to Updated Final Safety Analysis Report, Table 3.8-1 Through 3.8-11 LR-N17-0034, Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Table 3.8-1 Through 3.8-112017-01-30030 January 2017 Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Table 3.8-1 Through 3.8-11 LR-N17-0034, Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Table 3A-1 (Deleted)2017-01-30030 January 2017 Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Table 3A-1 (Deleted) LR-N17-0034, Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Table 4.1-1 Through 4.1-32017-01-30030 January 2017 Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Table 4.1-1 Through 4.1-3 ML17046A3072017-01-30030 January 2017 Revision 29 to Updated Final Safety Analysis Report, Table 3A-1 (Deleted) ML17046A3112017-01-30030 January 2017 Revision 29 to Updated Final Safety Analysis Report, Table 4.1-1 Through 4.1-3 LR-N16-0161, Flood Hazards Mitigating Strategies Assessment (MSA) Report Submittal2016-12-30030 December 2016 Flood Hazards Mitigating Strategies Assessment (MSA) Report Submittal ML16056A1392016-03-11011 March 2016 Correction to the U.S. Nuclear Regulatory Commission Analysis of Licensees' Decommissioning Funding Status Reports ML16102A2772016-03-11011 March 2016 Submittal of Annual Incidental Take Report ML15238B7042015-09-10010 September 2015 Interim Staff Response to Reevaluated Flood Hazards Submitted in Response to 10 CFR 50.54 Information Request - Flood Causing Mechanism Reevaluation ML15243A4472015-09-10010 September 2015 Master Report - Tables 1 and 2 ML15030A2952014-09-22022 September 2014 Table 04, Groundwater Measurements and Elevations - First Quarter 2014 ML15030A3012014-09-22022 September 2014 Table 08, Unit 2 Seismic Gap Drain Tritium Analytical Results ML15030A3002014-09-22022 September 2014 Table 07, Unit 1 Seismic Gap Drain Tritium Analytical Results ML15030A2992014-09-22022 September 2014 Table 06B, Groundwater Analytical Results for Well AC ML15030A2982014-09-22022 September 2014 Table 06A, Groundwater Tritium Analytical Results for Well AC ML15030A2472014-09-22022 September 2014 Figure 5, Salem Generating Station Hydrogeologic Cross Section A-A' ML15030A2492014-09-22022 September 2014 Figure 7, Salem Generating Station Hydrogeologic Cross Section C-C' ML15030A2962014-09-22022 September 2014 Table 05, Groundwater Analytical Results (1.22.2003 Through 3.31.2014) ML15030A2942014-09-22022 September 2014 Table 03, Effluent Data Tritium Activity ML15030A2842014-09-22022 September 2014 Table 02, Sample Collection Schedule - First & Second Quarter 2014 ML15030A2832014-09-22022 September 2014 Table 01, Well Construction Details ML15030A2822014-09-22022 September 2014 Figure 16, Salem Unit 2 - Tritium Concentrations in Water Recovered Through Seismic Gap Drain Operation ML15030A2812014-09-22022 September 2014 Figure 15, Salem Unit 1 - Tritium Concentrations in Water Recovered Through Seismic Gap Drain Operation ML15030A2802014-09-22022 September 2014 Figure 14, Historic Tritium Recovered Through Well Field Operation ML15030A2762014-09-22022 September 2014 Figure 11, Station Wind Summary - Q1 2014 ML15030A2482014-09-22022 September 2014 Figure 6, Salem Generating Station Hydrogeologic Cross Section B-B' ML15030A2502014-09-22022 September 2014 Figure 8,Salem Generating Station Hydrogeologic Cross Section D-D' ML15030A2512014-09-22022 September 2014 Figure 9, Salem Generating Station Hydrogeologic Cross Section E-E' ML15030A2752014-09-22022 September 2014 Figure 10, Precipitation Measurements ML13052A6822012-11-28028 November 2012 Kld TR-499, Revision 0, Development of Evacuation Time Estimates, Appendix K-76 Through K-149 LR-N12-0366, Kld TR-499, Revision 0, Development of Evacuation Time Estimates, Appendix K-76 Through K-1492012-11-28028 November 2012 Kld TR-499, Revision 0, Development of Evacuation Time Estimates, Appendix K-76 Through K-149 ML12284A4272012-10-0404 October 2012 PSEG Early Site Permit Application, Calculation of Multiplier Effects for Er Section 10.4 LR-N12-0027, Submittal of RCS Dei Graphs Report2012-03-0202 March 2012 Submittal of RCS Dei Graphs Report ML1030002022010-05-0303 May 2010 1R20 NRC Items of Interest Punchlist ML1029803702010-04-21021 April 2010 Graphs of Salem - Unit 2 Ffdp Exam ML1030002002010-04-20020 April 2010 Document: Nbu Weld Joint Notice #80101382, Salem Unit 1 ML1030001962010-04-11011 April 2010 Document Schedule: Subject: Buried AFW Pipe Schedule LR-N09-0103, Submittal of 2008 Summary of Revised Regulatory Commitments2009-05-0505 May 2009 Submittal of 2008 Summary of Revised Regulatory Commitments ML0805605392008-03-0404 March 2008 Meeting Handout #7 - Graph Supporting Salem FAQ on Grassing Events ML0728203072007-10-11011 October 2007 Electronic Distribtion Initiative Letter, Licensee List, Electronic Distribution Input Information, Division Plant Mailing Lists 2024-04-05
[Table view] |
Text
Salem, Units 1 and 2 Table 1. Current Design Basis Flood Hazards for Use in the MSA Mechanism Stillwater Waves/ Design Basis Reference Elevation Runup Hazard Elevation Local Intense Precipitation Not included Not included Not included FHRR Section 1.2.1 in DB in DB in DB Streams and Rivers Not included Not included Not included FHRR Section 1.2.2 in DB in DB in DB Failure of Dams and Onsite Water Control/Storage Structures Not included Not included Not included FHRR Section 1.2.3 in DB in DB in DB Storm Surge Auxiliary Building 24.0 ft 6.6 ft 30.6 ft FHRR Section 1.2.4 NAVD88 NAVD88 Service Water Intake Structure 24.0 ft 13.5 ft 37.5 ft FHRR Section 1.2.4 and Table 3-1 NAVD88 NAVD88 Seiche No Impact No Impact No Impact FHRR Section 1.2.5 on the Site on the Site on the Site Identified Identified Identified Tsunami No Impact No Impact No Impact FHRR Section 1.2.6 on the Site on the Site on the Site Identified Identified Identified Ice-Induced Flooding No Impact No Impact No Impact FHRR Section 1.2.7 on the Site on the Site on the Site Identified Identified Identified
Salem, Units 1 and 2 Table 1. Current Design Basis Flood Hazards for Use in the MSA Mechanism Stillwater Waves/ Design Basis Reference Elevation Runup Hazard Elevation Channel Migrations/Diversions No Impact No Impact No Impact FHRR Section 1.2.8 on the Site on the Site on the Site Identified Identified Identified Note 1: Reported values are rounded to the nearest one-tenth of a foot.
Note 2: Based on the NRC staffs independent (deterministic) hazard assessment using present-day regulatory guidance and methodologies of storm surge, the staff concludes that the sites current design basis remains bounded. For this reason, the staff concludes it is appropriate to utilize the current design basis storm surge elevation in conjunction with the mitigating strategies assessment.
Salem, Units 1 and 2 Table 2. Reevaluated Flood Hazards for Flood-Causing Mechanisms for Use in the MSA Mechanism Stillwater Waves/ Reevaluated Reference Elevation Runup Hazard Elevation Local Intense Precipitation 12.2 ft Minimal 12.2 ft FHRR Section 3.1 NAVD88 NAVD88 Note 1: The licensee is expected to develop flood event duration parameters and applicable flood associated effects to conduct the MSA. The staff will evaluate the flood event duration parameters (including warning time and period of inundation) and flood associated effects during its review of the MSA.
Note 2: Reevaluated hazard mechanisms bounded by the current design basis (see Table 1) are not included in this table.
Note 3: Reported values are rounded to the nearest one-tenth of a foot.