ML15279A499: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(4 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML15279A499
| number = ML15279A499
| issue date = 10/08/2015
| issue date = 10/08/2015
| title = Calvert Cliffs Nuclear Power Plant, Units 1 and 2 - October 8, 2015, Public Meeting Regarding the NFPA-805 License Amendment Application
| title = October 8, 2015, Public Meeting Regarding the NFPA-805 License Amendment Application
| author name =  
| author name =  
| author affiliation = Exelon Generation Co, LLC
| author affiliation = Exelon Generation Co, LLC
Line 9: Line 9:
| docket = 05000317, 05000318
| docket = 05000317, 05000318
| license number = DPR-053, DPR-069
| license number = DPR-053, DPR-069
| contact person = Chereskin A N
| contact person = Chereskin A
| document type = Meeting Briefing Package/Handouts, Slides and Viewgraphs
| document type = Meeting Briefing Package/Handouts, Slides and Viewgraphs
| page count = 7
| page count = 7
| project =
| stage = Meeting
}}
}}
=Text=
{{#Wiki_filter:NRC Meeting October 8, 2015 CCNPP NFPA 805 License Amendment Application
Agenda Current Licensing Status:
PRA-3:
Using NRC template for confirmation of RAI status Adding Fire Modeling RAIs to the listing No questions regarding input provided by the NRC.
RG 1.174 limit margin Delta CDF Delta LERF Margins and delta LERF Small margins Significance of the limit Compliant Plant Definition for Cable Spreading Room 2
CCNPP Team Members:
Exelon/CCNPP Representatives Jeff Stone - Exelon Senior FPRA Manager Jim McQuighan - Exelon Manager, NFPA 805 Ron Reynolds/Pat Furio - Exelon Principal Regulatory Engineer Rob Cavedo - Exelon Senior Staff FPRA Engineer Pat Pringle - Exelon Senior PRA analyst Paul Darby - Exelon NFPA 805 Electrical Engineer Usama Farradj - FPRA consultant Tom Daniels - FPRA consultant Mark Graham - FPRA consultant Mark Schairer - Fire modeling consultant Jeff Quinn - NFPA 805 consultant 3
Current Licensing Status CCNPP NFPA 805 Transition Request Submittal          09/24/2013 NRC On-Site Audit and Draft RAIs                      12/12/2014 CCNPP Submittal of last follow-up RAIs responses      08/13/2015 Public Meeting to Discuss FPRA Results                10/08/2015 Submission of Final Results (Attachments C, G, S & W) to be discussed.
NRC Issues Safety Evaluation                          to be discussed.
4
Fire PRA Status: PRA-03 Necessary Fire Modeling is complete.
Total risk quantification results are in.
Total Delta Risk, Risk of Recovery Actions will be evaluated IAW RG 1.174 criteria.
Final Quantification/documentation has begun.
The final results will accompany the response to RAI PRA 3, 19a and 19d.
Attachment C, G, S and W updates will be transmitted with the PRA RAI-3 response.
Methodology for PRA 03 will be the same as post transition, no outstanding items with respect to Fire PRA methodology are expected at the time of issue of the final RAI 03 response.
5
RG 1.174 Delta Risk Criteria.
Discussion of Results:
Total CDF Total LERF delta CDF delta LERF Significance of delta LERF.
Discussion of margin.
Conservatisms in the analysis Defense in depth measures/discussions.
Impact on NRC review Impact if limited to delta LERF 6
ML15049A100: Delta Risk for Cable Spreading Room Potential use of approach in the ML15049A100 (public meeting with NextEra/St. Lucie) for the Calvert Cliffs Cable Spreading Rooms For Control Room abandonment scenarios Address VFDRs associated with Primary Control Station (Aux Shutdown Panel) only For non-abandonment scenarios delta risk would only be applicable to operator actions credited outside the control room (including actions at Primary Control Station) no train separation VFDRs (unless they result in operator actions outside the control room) 7}}

Latest revision as of 05:56, 31 October 2019

October 8, 2015, Public Meeting Regarding the NFPA-805 License Amendment Application
ML15279A499
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 10/08/2015
From:
Exelon Generation Co
To:
Office of Nuclear Reactor Regulation
Chereskin A
References
Download: ML15279A499 (7)


Text

NRC Meeting October 8, 2015 CCNPP NFPA 805 License Amendment Application

Agenda Current Licensing Status:

PRA-3:

Using NRC template for confirmation of RAI status Adding Fire Modeling RAIs to the listing No questions regarding input provided by the NRC.

RG 1.174 limit margin Delta CDF Delta LERF Margins and delta LERF Small margins Significance of the limit Compliant Plant Definition for Cable Spreading Room 2

CCNPP Team Members:

Exelon/CCNPP Representatives Jeff Stone - Exelon Senior FPRA Manager Jim McQuighan - Exelon Manager, NFPA 805 Ron Reynolds/Pat Furio - Exelon Principal Regulatory Engineer Rob Cavedo - Exelon Senior Staff FPRA Engineer Pat Pringle - Exelon Senior PRA analyst Paul Darby - Exelon NFPA 805 Electrical Engineer Usama Farradj - FPRA consultant Tom Daniels - FPRA consultant Mark Graham - FPRA consultant Mark Schairer - Fire modeling consultant Jeff Quinn - NFPA 805 consultant 3

Current Licensing Status CCNPP NFPA 805 Transition Request Submittal 09/24/2013 NRC On-Site Audit and Draft RAIs 12/12/2014 CCNPP Submittal of last follow-up RAIs responses 08/13/2015 Public Meeting to Discuss FPRA Results 10/08/2015 Submission of Final Results (Attachments C, G, S & W) to be discussed.

NRC Issues Safety Evaluation to be discussed.

4

Fire PRA Status: PRA-03 Necessary Fire Modeling is complete.

Total risk quantification results are in.

Total Delta Risk, Risk of Recovery Actions will be evaluated IAW RG 1.174 criteria.

Final Quantification/documentation has begun.

The final results will accompany the response to RAI PRA 3, 19a and 19d.

Attachment C, G, S and W updates will be transmitted with the PRA RAI-3 response.

Methodology for PRA 03 will be the same as post transition, no outstanding items with respect to Fire PRA methodology are expected at the time of issue of the final RAI 03 response.

5

RG 1.174 Delta Risk Criteria.

Discussion of Results:

Total CDF Total LERF delta CDF delta LERF Significance of delta LERF.

Discussion of margin.

Conservatisms in the analysis Defense in depth measures/discussions.

Impact on NRC review Impact if limited to delta LERF 6

ML15049A100: Delta Risk for Cable Spreading Room Potential use of approach in the ML15049A100 (public meeting with NextEra/St. Lucie) for the Calvert Cliffs Cable Spreading Rooms For Control Room abandonment scenarios Address VFDRs associated with Primary Control Station (Aux Shutdown Panel) only For non-abandonment scenarios delta risk would only be applicable to operator actions credited outside the control room (including actions at Primary Control Station) no train separation VFDRs (unless they result in operator actions outside the control room) 7