| issue date = 10/22/2015
| issue date = 10/22/2015
| title = Fort Calhoun Station - NRC Security Baseline Inspection Report 05000285/2015404
| title = Fort Calhoun Station - NRC Security Baseline Inspection Report 05000285/2015404
| author name = Haire M S
| author name = Haire M
| author affiliation = NRC/RGN-IV/DRS/PSB-1
| author affiliation = NRC/RGN-IV/DRS/PSB-1
| addressee name = Cortopassi L
| addressee name = Cortopassi L
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:" " October 22, 2015  
{{#Wiki_filter:ber 22, 2015


Lou Cortopassi, Vice President
==SUBJECT:==
 
FORT CALHOUN STATION - NRC SECURITY BASELINE INSPECTION REPORT 05000285/2015404
and Chief Nuclear Officer Omaha Public Power District Fort Calhoun Station FC-2-4 P.O. Box 550
 
Fort Calhoun, NE 68023-0550
 
SUBJECT: FORT CALHOUN STATION - NRC SECURITY BASELINE INSPECTION REPORT 05000285/2015404


==Dear Mr. Cortopassi:==
==Dear Mr. Cortopassi:==
Line 33: Line 28:
The NRC inspectors did not identify any findings or violations of more than minor significance.
The NRC inspectors did not identify any findings or violations of more than minor significance.


In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withhol ding," of the NRC's "Rules of Practice and Procedure," a copy of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding, of the NRC's Rules of Practice and Procedure, a copy of this letter will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
 
However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAMS. If you choose to provide a response and Security-Related Information is necessary to provide an acceptable response, please mark your entire response "Security-Related Information - Withhold from Public Disclosure under 10 CFR 2.390" in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1).
 
In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for
 
your response.
 
Sincerely,/RA/
Mark S. Haire, Chief Plant Support Branch 1 Division of Reactor Safety
 
Docket No. 50-285 License No. DPR-40
 
Nonpublic
 
===Enclosure:===
Inspection Report 05000285/2015404
 
===w/Attachment:===
Supplemental Information
 
cc w/enclosure:
 
Mr. Dennis A. Bakalar Manager, Site Security Omaha Public Power District
 
Fort Calhoun Station


Mail Stop FC-2-1  
However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAMS. If you choose to provide a response and Security-Related Information is necessary to provide an acceptable response, please mark your entire response Security-Related Information - Withhold from Public Disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1).


9610 Power Lane Blair, NE 68008
In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.


cc w/o encl: Electronic Distribution
Sincerely,
/RA/
Mark S. Haire, Chief Plant Support Branch 1 Division of Reactor Safety Docket No. 50-285 License No. DPR-40 Nonpublic Enclosure:
Inspection Report 05000285/2015404 w/Attachment: Supplemental Information cc w/enclosure:
Mr. Dennis A. Bakalar Manager, Site Security Omaha Public Power District Fort Calhoun Station Mail Stop FC-2-1 9610 Power Lane Blair, NE 68008 cc w/o encl: Electronic Distribution ML15295A137 SUNSI Review ADAMS  Publicly Available Keyword: NRC-002 By: MHaire  Yes No  Non-Publicly Available MD 3.4 Non-Public A.3 SUNSI Review ADAMS  Publicly Available Keyword: RGN-002 By: MHaire  Yes No  Non-Publicly Available SUNSI Review Complete OFFICE SPSI:PSB1 PSI:PSB1 C:PSB1 C:DRP/B C:PSB1 NAME JLarsen MBrooks MHaire GMiller MHaire SIGNATURE MSH for MSH for MSH for /RA/ RCH for /RA/
DATE 10/22/15 10/22/15 10/22/15 10/22/15 10/22/15 Letter to Lou Cortopassi from Mark S. Haire, dated October 22, 2015 SUBJECT: FORT CALHOUN STATION - NRC SECURITY BASELINE INSPECTION REPORT 05000285/2015404 Electronic distribution by RIV w/enclosure:
Security Specialist/NSIR (Eric.Wharton@nrc.gov)
Security Specialist/NSIR (Niry.Simonian@nrc.gov)
Chief, Security Performance Evaluation Branch/NSIR (Clay.Johnson@nrc.gov)
Security Specialist/NSIR (Douglas.Garner@nrc.gov)
Branch Chief, RI DRS/PSB1 (Anthony.Dimitriadis@nrc.gov)
Branch Chief, RII DRS/PSB1 (Binoy.Desai@nrc.gov)
Branch Chief, RIII DRS/PSB (Steven.Orth@nrc.gov)
Senior Resident Inspector (Max.Schneider@nrc.gov)
FCS Site Administrative Assistant (Janise.Schwee@nrc.gov)
Electronic distribution by RIV w/o enclosure:
Regional Administrator (Marc.Dapas@nrc.gov)
Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)
DRP Director (Troy.Pruett@nrc.gov)
DRP Deputy Director (Ryan.Lantz@nrc.gov)
DRS Director (Anton.Vegel@nrc.gov)
DRS Deputy Director (Jeff.Clark@nrc.gov)
Senior Resident Inspector (Max.Schneider@nrc.gov)
Resident Inspector (Brian.Cummings@nrc.gov)
FCS Site Administrative Assistant (Janise.Schwee@nrc.gov)
Branch Chief, DRP/D (Geoffrey.Miller@nrc.gov)
Senior Project Engineer, DRP (Bob.Hagar@nrc.gov)
Project Engineer, DRP/D (Jan.Tice@nrc.gov)
RIV Public Affairs Officer (Victor.Dricks@nrc.gov)
RIV Public Affairs Officer (Lara.Uselding@nrc.gov)
NRR Project Manager (Fred.Lyon@nrc.gov)
Acting Team Leader, DRS/TSS (Eric.Ruesch@nrc.gov)
RIV RITS Coordinator (Marisa.Herrera@nrc.gov)
RIV Regional Counsel (Karla.Fuller@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)
OEWEB Resource@nrc.gov OEWEB Resource (Sue.Bogle@nrc.gov)
Technical Support Assistant (Loretta.Williams@nrc.gov)
RIV/ETA: OEDO (Cindy.Rosales-Cooper@nrc.gov)
RIV RSLO (Bill.Maier@nrc.gov)
ACES (R4Enforcement.Resource@nrc.gov)
ROPReports
}}
}}

Latest revision as of 06:25, 31 October 2019

Fort Calhoun Station - NRC Security Baseline Inspection Report 05000285/2015404
ML15295A137
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 10/22/2015
From: Mark Haire
Plant Support Branch-1
To: Cortopassi L
Omaha Public Power District
References
IR 2015404
Download: ML15295A137 (4)


Text

ber 22, 2015

SUBJECT:

FORT CALHOUN STATION - NRC SECURITY BASELINE INSPECTION REPORT 05000285/2015404

Dear Mr. Cortopassi:

On September 24, 2015, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at the Fort Calhoun Station. The NRC inspectors discussed the results of this inspection with Mr. E. Dean, Plant Manager, and other members of your staff. The inspectors documented the results of this inspection in the enclosed inspection report.

The NRC inspectors did not identify any findings or violations of more than minor significance.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding, of the NRC's Rules of Practice and Procedure, a copy of this letter will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAMS. If you choose to provide a response and Security-Related Information is necessary to provide an acceptable response, please mark your entire response Security-Related Information - Withhold from Public Disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1).

In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.

Sincerely,

/RA/

Mark S. Haire, Chief Plant Support Branch 1 Division of Reactor Safety Docket No. 50-285 License No. DPR-40 Nonpublic Enclosure:

Inspection Report 05000285/2015404 w/Attachment: Supplemental Information cc w/enclosure:

Mr. Dennis A. Bakalar Manager, Site Security Omaha Public Power District Fort Calhoun Station Mail Stop FC-2-1 9610 Power Lane Blair, NE 68008 cc w/o encl: Electronic Distribution ML15295A137 SUNSI Review ADAMS Publicly Available Keyword: NRC-002 By: MHaire Yes No Non-Publicly Available MD 3.4 Non-Public A.3 SUNSI Review ADAMS Publicly Available Keyword: RGN-002 By: MHaire Yes No Non-Publicly Available SUNSI Review Complete OFFICE SPSI:PSB1 PSI:PSB1 C:PSB1 C:DRP/B C:PSB1 NAME JLarsen MBrooks MHaire GMiller MHaire SIGNATURE MSH for MSH for MSH for /RA/ RCH for /RA/

DATE 10/22/15 10/22/15 10/22/15 10/22/15 10/22/15 Letter to Lou Cortopassi from Mark S. Haire, dated October 22, 2015 SUBJECT: FORT CALHOUN STATION - NRC SECURITY BASELINE INSPECTION REPORT 05000285/2015404 Electronic distribution by RIV w/enclosure:

Security Specialist/NSIR (Eric.Wharton@nrc.gov)

Security Specialist/NSIR (Niry.Simonian@nrc.gov)

Chief, Security Performance Evaluation Branch/NSIR (Clay.Johnson@nrc.gov)

Security Specialist/NSIR (Douglas.Garner@nrc.gov)

Branch Chief, RI DRS/PSB1 (Anthony.Dimitriadis@nrc.gov)

Branch Chief, RII DRS/PSB1 (Binoy.Desai@nrc.gov)

Branch Chief, RIII DRS/PSB (Steven.Orth@nrc.gov)

Senior Resident Inspector (Max.Schneider@nrc.gov)

FCS Site Administrative Assistant (Janise.Schwee@nrc.gov)

Electronic distribution by RIV w/o enclosure:

Regional Administrator (Marc.Dapas@nrc.gov)

Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)

DRP Director (Troy.Pruett@nrc.gov)

DRP Deputy Director (Ryan.Lantz@nrc.gov)

DRS Director (Anton.Vegel@nrc.gov)

DRS Deputy Director (Jeff.Clark@nrc.gov)

Senior Resident Inspector (Max.Schneider@nrc.gov)

Resident Inspector (Brian.Cummings@nrc.gov)

FCS Site Administrative Assistant (Janise.Schwee@nrc.gov)

Branch Chief, DRP/D (Geoffrey.Miller@nrc.gov)

Senior Project Engineer, DRP (Bob.Hagar@nrc.gov)

Project Engineer, DRP/D (Jan.Tice@nrc.gov)

RIV Public Affairs Officer (Victor.Dricks@nrc.gov)

RIV Public Affairs Officer (Lara.Uselding@nrc.gov)

NRR Project Manager (Fred.Lyon@nrc.gov)

Acting Team Leader, DRS/TSS (Eric.Ruesch@nrc.gov)

RIV RITS Coordinator (Marisa.Herrera@nrc.gov)

RIV Regional Counsel (Karla.Fuller@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov)

RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)

OEWEB Resource@nrc.gov OEWEB Resource (Sue.Bogle@nrc.gov)

Technical Support Assistant (Loretta.Williams@nrc.gov)

RIV/ETA: OEDO (Cindy.Rosales-Cooper@nrc.gov)

RIV RSLO (Bill.Maier@nrc.gov)

ACES (R4Enforcement.Resource@nrc.gov)

ROPReports