ML15352A006: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:1 NRR-PMDAPEm Resource From: Schaaf, Robert Sent: Monday, December 14, 2015 3:33 PM To: Beasley, Benjamin Cc: Waters, Michael; Darbali, Samir; Carte, Norbert
{{#Wiki_filter:NRR-PMDAPEm Resource From:                                 Schaaf, Robert Sent:                                 Monday, December 14, 2015 3:33 PM To:                                   Beasley, Benjamin Cc:                                   Waters, Michael; Darbali, Samir; Carte, Norbert


==Subject:==
==Subject:==
NRC Staff Response to TVA Revision to Watts Bar 2 Commitment on Foxboro Spec 200 Hardware InstallationThis e-mail documents the NRC staff's acknowledgement of a revision to a licensing commitment made by the Tennessee Valley Authority (TVA) in support of the NRC staff's review of TVA's application for an operating license for Watts Bar Nuclear Plant (WBN) Unit 2.
NRC Staff Response to TVA Revision to Watts Bar 2 Commitment on Foxboro Spec 200 Hardware Installation This e-mail documents the NRC staffs acknowledgement of a revision to a licensing commitment made by the Tennessee Valley Authority (TVA) in support of the NRC staffs review of TVAs application for an operating license for Watts Bar Nuclear Plant (WBN) Unit 2.
By letter dated December 3, 2015 (ML15337A130), TVA notified the NRC regarding its revision of a licensing commitment regarding the installation of Foxboro Spec 200 hardware. TVA had previously committed to complete the installation of the updated hardware in WBN Unit 2 instrument loops that support WBN Unit 1 operation prior to fuel loading on WBN Unit 2. The NRC staff acknowledged this commitment in its review of the Foxboro Spec 200 hardware documented in NUREG-0847 Supplement 23, "Safety Evaluation Report Related to the Operation of Watts Bar Nuclear Plant, Unit 2," July 2011. TVA's December 3, 2015, letter notified the NRC that the commitment was being revised to complete installation of the Foxboro Spec 200 equipment in the affected WBN Unit 2 instrument loops prior to WBN Unit 2 entering Mode 4.  
By letter dated December 3, 2015 (ML15337A130), TVA notified the NRC regarding its revision of a licensing commitment regarding the installation of Foxboro Spec 200 hardware. TVA had previously committed to complete the installation of the updated hardware in WBN Unit 2 instrument loops that support WBN Unit 1 operation prior to fuel loading on WBN Unit 2. The NRC staff acknowledged this commitment in its review of the Foxboro Spec 200 hardware documented in NUREG-0847 Supplement 23, "Safety Evaluation Report Related to the Operation of Watts Bar Nuclear Plant, Unit 2," July 2011. TVAs December 3, 2015, letter notified the NRC that the commitment was being revised to complete installation of the Foxboro Spec 200 equipment in the affected WBN Unit 2 instrument loops prior to WBN Unit 2 entering Mode 4.
 
NRC staff in the Office of Nuclear Reactor Regulation conducted a brief assessment of the change to the previously acknowledged commitment and determined that there was no objection to the change in the commitment. TVA staff was notified by telephone on December 4, 2015, that the staff acknowledged the revised commitment.
NRC staff in the Office of Nuclear Reactor Regulation conducted a brief assessment of the change to the previously acknowledged commitment and determined that there was no objection to the change in the commitment. TVA staff was notified by telephone on December 4, 2015, that the staff acknowledged the revised commitment.
Robert G. Schaaf Senior Project Manager, Watts Bar/Bellefonte Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop O-8G9A Washington, DC 20555 301-415-6020 (o) Robert.Schaaf@nrc.gov Docket No. 50-390  
Robert G. Schaaf Senior Project Manager, Watts Bar/Bellefonte Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop O-8G9A Washington, DC 20555 301-415-6020 (o)
Robert.Schaaf@nrc.gov Docket No. 50-390 1


Hearing Identifier: NRR_PMDA Email Number: 2567   Mail Envelope Properties   (08aeeea949be4ef3822058ca57a891b9)
Hearing Identifier:     NRR_PMDA Email Number:           2567 Mail Envelope Properties     (08aeeea949be4ef3822058ca57a891b9)


==Subject:==
==Subject:==
NRC Staff Response to TVA Revision to Watts Bar 2 Commitment on Foxboro Spec 200 Hardware Installation Sent Date:   12/14/2015 3:33:22 PM Received Date: 12/14/2015 3:33:00 PM From:   Schaaf, Robert Created By:   Robert.Schaaf@nrc.gov Recipients:     "Waters, Michael" <Michael.Waters@nrc.gov> Tracking Status: None "Darbali, Samir" <Samir.Darbali@nrc.gov> Tracking Status: None "Carte, Norbert" <Norbert.Carte@nrc.gov> Tracking Status: None "Beasley, Benjamin" <Benjamin.Beasley@nrc.gov> Tracking Status: None  
NRC Staff Response to TVA Revision to Watts Bar 2 Commitment on Foxboro Spec 200 Hardware Installation Sent Date:             12/14/2015 3:33:22 PM Received Date:         12/14/2015 3:33:00 PM From:                   Schaaf, Robert Created By:             Robert.Schaaf@nrc.gov Recipients:
"Waters, Michael" <Michael.Waters@nrc.gov>
Tracking Status: None "Darbali, Samir" <Samir.Darbali@nrc.gov>
Tracking Status: None "Carte, Norbert" <Norbert.Carte@nrc.gov>
Tracking Status: None "Beasley, Benjamin" <Benjamin.Beasley@nrc.gov>
Tracking Status: None Post Office:            HQPWMSMRS07.nrc.gov Files                          Size                  Date & Time MESSAGE                        1731                  12/14/2015 3:33:00 PM Options Priority:                      Standard Return Notification:            No Reply Requested:                No Sensitivity:                    Normal Expiration Date:
Recipients Received:


Post Office:  HQPWMSMRS07.nrc.gov Files    Size      Date & Time MESSAGE    1731      12/14/2015 3:33:00 PM Options  Priority:    Standard  Return Notification:    No  Reply Requested:    No  Sensitivity:    Normal  Expiration Date:      Recipients Received:
NRR-PMDAPEm Resource From:                                 Schaaf, Robert Sent:                                 Monday, December 14, 2015 3:33 PM To:                                   Beasley, Benjamin Cc:                                   Waters, Michael; Darbali, Samir; Carte, Norbert
1 NRR-PMDAPEm Resource From: Schaaf, Robert Sent: Monday, December 14, 2015 3:33 PM To: Beasley, Benjamin Cc: Waters, Michael; Darbali, Samir; Carte, Norbert


==Subject:==
==Subject:==
NRC Staff Response to TVA Revision to Watts Bar 2 Commitment on Foxboro Spec 200 Hardware InstallationThis e-mail documents the NRC staff's acknowledgement of a revision to a licensing commitment made by the Tennessee Valley Authority (TVA) in support of the NRC staff's review of TVA's application for an operating license for Watts Bar Nuclear Plant (WBN) Unit 2.
NRC Staff Response to TVA Revision to Watts Bar 2 Commitment on Foxboro Spec 200 Hardware Installation This e-mail documents the NRC staffs acknowledgement of a revision to a licensing commitment made by the Tennessee Valley Authority (TVA) in support of the NRC staffs review of TVAs application for an operating license for Watts Bar Nuclear Plant (WBN) Unit 2.
By letter dated December 3, 2015 (ML15337A130), TVA notified the NRC regarding its revision of a licensing commitment regarding the installation of Foxboro Spec 200 hardware. TVA had previously committed to complete the installation of the updated hardware in WBN Unit 2 instrument loops that support WBN Unit 1 operation prior to fuel loading on WBN Unit 2. The NRC staff acknowledged this commitment in its review of the Foxboro Spec 200 hardware documented in NUREG-0847 Supplement 23, "Safety Evaluation Report Related to the Operation of Watts Bar Nuclear Plant, Unit 2," July 2011. TVA's December 3, 2015, letter notified the NRC that the commitment was being revised to complete installation of the Foxboro Spec 200 equipment in the affected WBN Unit 2 instrument loops prior to WBN Unit 2 entering Mode 4.  
By letter dated December 3, 2015 (ML15337A130), TVA notified the NRC regarding its revision of a licensing commitment regarding the installation of Foxboro Spec 200 hardware. TVA had previously committed to complete the installation of the updated hardware in WBN Unit 2 instrument loops that support WBN Unit 1 operation prior to fuel loading on WBN Unit 2. The NRC staff acknowledged this commitment in its review of the Foxboro Spec 200 hardware documented in NUREG-0847 Supplement 23, "Safety Evaluation Report Related to the Operation of Watts Bar Nuclear Plant, Unit 2," July 2011. TVAs December 3, 2015, letter notified the NRC that the commitment was being revised to complete installation of the Foxboro Spec 200 equipment in the affected WBN Unit 2 instrument loops prior to WBN Unit 2 entering Mode 4.
 
NRC staff in the Office of Nuclear Reactor Regulation conducted a brief assessment of the change to the previously acknowledged commitment and determined that there was no objection to the change in the commitment. TVA staff was notified by telephone on December 4, 2015, that the staff acknowledged the revised commitment.
NRC staff in the Office of Nuclear Reactor Regulation conducted a brief assessment of the change to the previously acknowledged commitment and determined that there was no objection to the change in the commitment. TVA staff was notified by telephone on December 4, 2015, that the staff acknowledged the revised commitment.
Robert G. Schaaf Senior Project Manager, Watts Bar/Bellefonte Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop O-8G9A Washington, DC 20555 301-415-6020 (o) Robert.Schaaf@nrc.gov Docket No. 50-390  
Robert G. Schaaf Senior Project Manager, Watts Bar/Bellefonte Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop O-8G9A Washington, DC 20555 301-415-6020 (o)
Robert.Schaaf@nrc.gov Docket No. 50-390 1


Hearing Identifier: NRR_PMDA Email Number: 2567   Mail Envelope Properties   (08aeeea949be4ef3822058ca57a891b9)
Hearing Identifier:     NRR_PMDA Email Number:           2567 Mail Envelope Properties     (08aeeea949be4ef3822058ca57a891b9)


==Subject:==
==Subject:==
NRC Staff Response to TVA Revision to Watts Bar 2 Commitment on Foxboro Spec 200 Hardware Installation Sent Date:   12/14/2015 3:33:22 PM Received Date: 12/14/2015 3:33:00 PM From:   Schaaf, Robert Created By:   Robert.Schaaf@nrc.gov Recipients:     "Waters, Michael" <Michael.Waters@nrc.gov> Tracking Status: None "Darbali, Samir" <Samir.Darbali@nrc.gov> Tracking Status: None "Carte, Norbert" <Norbert.Carte@nrc.gov> Tracking Status: None "Beasley, Benjamin" <Benjamin.Beasley@nrc.gov> Tracking Status: None  
NRC Staff Response to TVA Revision to Watts Bar 2 Commitment on Foxboro Spec 200 Hardware Installation Sent Date:             12/14/2015 3:33:22 PM Received Date:         12/14/2015 3:33:00 PM From:                   Schaaf, Robert Created By:             Robert.Schaaf@nrc.gov Recipients:
 
"Waters, Michael" <Michael.Waters@nrc.gov>
Post Office:   HQPWMSMRS07.nrc.gov Files     Size     Date & Time MESSAGE   1731     12/14/2015 3:33:00 PM Options Priority:     Standard   Return Notification:   No   Reply Requested:   No   Sensitivity:     Normal Expiration Date:     Recipients Received:}}
Tracking Status: None "Darbali, Samir" <Samir.Darbali@nrc.gov>
Tracking Status: None "Carte, Norbert" <Norbert.Carte@nrc.gov>
Tracking Status: None "Beasley, Benjamin" <Benjamin.Beasley@nrc.gov>
Tracking Status: None Post Office:           HQPWMSMRS07.nrc.gov Files                           Size                   Date & Time MESSAGE                         1731                   12/14/2015 3:33:00 PM Options Priority:                       Standard Return Notification:           No Reply Requested:               No Sensitivity:                   Normal Expiration Date:
Recipients Received:}}

Revision as of 03:02, 31 October 2019

NRC Staff Response to TVA Revision to Watts Bar 2 Commitment on Foxboro Spec 200 Hardware Installation
ML15352A006
Person / Time
Site: Watts Bar Tennessee Valley Authority icon.png
Issue date: 12/14/2015
From: Robert Schaaf
Plant Licensing Branch II
To: Benjamin Beasley
Plant Licensing Branch II
References
Download: ML15352A006 (2)


Text

NRR-PMDAPEm Resource From: Schaaf, Robert Sent: Monday, December 14, 2015 3:33 PM To: Beasley, Benjamin Cc: Waters, Michael; Darbali, Samir; Carte, Norbert

Subject:

NRC Staff Response to TVA Revision to Watts Bar 2 Commitment on Foxboro Spec 200 Hardware Installation This e-mail documents the NRC staffs acknowledgement of a revision to a licensing commitment made by the Tennessee Valley Authority (TVA) in support of the NRC staffs review of TVAs application for an operating license for Watts Bar Nuclear Plant (WBN) Unit 2.

By letter dated December 3, 2015 (ML15337A130), TVA notified the NRC regarding its revision of a licensing commitment regarding the installation of Foxboro Spec 200 hardware. TVA had previously committed to complete the installation of the updated hardware in WBN Unit 2 instrument loops that support WBN Unit 1 operation prior to fuel loading on WBN Unit 2. The NRC staff acknowledged this commitment in its review of the Foxboro Spec 200 hardware documented in NUREG-0847 Supplement 23, "Safety Evaluation Report Related to the Operation of Watts Bar Nuclear Plant, Unit 2," July 2011. TVAs December 3, 2015, letter notified the NRC that the commitment was being revised to complete installation of the Foxboro Spec 200 equipment in the affected WBN Unit 2 instrument loops prior to WBN Unit 2 entering Mode 4.

NRC staff in the Office of Nuclear Reactor Regulation conducted a brief assessment of the change to the previously acknowledged commitment and determined that there was no objection to the change in the commitment. TVA staff was notified by telephone on December 4, 2015, that the staff acknowledged the revised commitment.

Robert G. Schaaf Senior Project Manager, Watts Bar/Bellefonte Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop O-8G9A Washington, DC 20555 301-415-6020 (o)

Robert.Schaaf@nrc.gov Docket No. 50-390 1

Hearing Identifier: NRR_PMDA Email Number: 2567 Mail Envelope Properties (08aeeea949be4ef3822058ca57a891b9)

Subject:

NRC Staff Response to TVA Revision to Watts Bar 2 Commitment on Foxboro Spec 200 Hardware Installation Sent Date: 12/14/2015 3:33:22 PM Received Date: 12/14/2015 3:33:00 PM From: Schaaf, Robert Created By: Robert.Schaaf@nrc.gov Recipients:

"Waters, Michael" <Michael.Waters@nrc.gov>

Tracking Status: None "Darbali, Samir" <Samir.Darbali@nrc.gov>

Tracking Status: None "Carte, Norbert" <Norbert.Carte@nrc.gov>

Tracking Status: None "Beasley, Benjamin" <Benjamin.Beasley@nrc.gov>

Tracking Status: None Post Office: HQPWMSMRS07.nrc.gov Files Size Date & Time MESSAGE 1731 12/14/2015 3:33:00 PM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received:

NRR-PMDAPEm Resource From: Schaaf, Robert Sent: Monday, December 14, 2015 3:33 PM To: Beasley, Benjamin Cc: Waters, Michael; Darbali, Samir; Carte, Norbert

Subject:

NRC Staff Response to TVA Revision to Watts Bar 2 Commitment on Foxboro Spec 200 Hardware Installation This e-mail documents the NRC staffs acknowledgement of a revision to a licensing commitment made by the Tennessee Valley Authority (TVA) in support of the NRC staffs review of TVAs application for an operating license for Watts Bar Nuclear Plant (WBN) Unit 2.

By letter dated December 3, 2015 (ML15337A130), TVA notified the NRC regarding its revision of a licensing commitment regarding the installation of Foxboro Spec 200 hardware. TVA had previously committed to complete the installation of the updated hardware in WBN Unit 2 instrument loops that support WBN Unit 1 operation prior to fuel loading on WBN Unit 2. The NRC staff acknowledged this commitment in its review of the Foxboro Spec 200 hardware documented in NUREG-0847 Supplement 23, "Safety Evaluation Report Related to the Operation of Watts Bar Nuclear Plant, Unit 2," July 2011. TVAs December 3, 2015, letter notified the NRC that the commitment was being revised to complete installation of the Foxboro Spec 200 equipment in the affected WBN Unit 2 instrument loops prior to WBN Unit 2 entering Mode 4.

NRC staff in the Office of Nuclear Reactor Regulation conducted a brief assessment of the change to the previously acknowledged commitment and determined that there was no objection to the change in the commitment. TVA staff was notified by telephone on December 4, 2015, that the staff acknowledged the revised commitment.

Robert G. Schaaf Senior Project Manager, Watts Bar/Bellefonte Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop O-8G9A Washington, DC 20555 301-415-6020 (o)

Robert.Schaaf@nrc.gov Docket No. 50-390 1

Hearing Identifier: NRR_PMDA Email Number: 2567 Mail Envelope Properties (08aeeea949be4ef3822058ca57a891b9)

Subject:

NRC Staff Response to TVA Revision to Watts Bar 2 Commitment on Foxboro Spec 200 Hardware Installation Sent Date: 12/14/2015 3:33:22 PM Received Date: 12/14/2015 3:33:00 PM From: Schaaf, Robert Created By: Robert.Schaaf@nrc.gov Recipients:

"Waters, Michael" <Michael.Waters@nrc.gov>

Tracking Status: None "Darbali, Samir" <Samir.Darbali@nrc.gov>

Tracking Status: None "Carte, Norbert" <Norbert.Carte@nrc.gov>

Tracking Status: None "Beasley, Benjamin" <Benjamin.Beasley@nrc.gov>

Tracking Status: None Post Office: HQPWMSMRS07.nrc.gov Files Size Date & Time MESSAGE 1731 12/14/2015 3:33:00 PM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received: