ML16040A363: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(6 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 02/09/2016
| issue date = 02/09/2016
| title = Pacific Gas and Electric Company Response to Foe Letter to Commission
| title = Pacific Gas and Electric Company Response to Foe Letter to Commission
| author name = Repka D A
| author name = Repka D
| author affiliation = Pacific Gas & Electric Co, Winston & Strawn, LLP
| author affiliation = Pacific Gas & Electric Co, Winston & Strawn, LLP
| addressee name = Baran J M, Burns S G, Ostendorff W C, Svinicki K L
| addressee name = Baran J, Burns S, Ostendorff W, Svinicki K
| addressee affiliation = NRC/Chairman, NRC/OCM
| addressee affiliation = NRC/Chairman, NRC/OCM
| docket = 05000275, 05000323
| docket = 05000275, 05000323
Line 13: Line 13:
| document type = Legal-Correspondence/Miscellaneous
| document type = Legal-Correspondence/Miscellaneous
| page count = 3
| page count = 3
| revision = 0
}}
}}
=Text=
{{#Wiki_filter:February 9, 2016 By Electronic Information Exchange U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Rockville, MD 20851 Re:    Diablo Canyon Power Plant, Docket Nos. 50-275, 50-323 Response to Friends of the Earth letter dated January 14, 2016
==Dear Commissioners:==
On January 14, 2016, Friends of the Earth (FOE) filed a letter on this docket asserting that an NRC Staff inspection report from November 2015 is an important and directly relevant action with respect to FOEs pending claim that there is a de facto license amendment proceeding for the Diablo Canyon Power Plant (Diablo Canyon) and that FOE is entitled to a hearing.1 FOEs description of the inspection report in its letter to the Commission is inaccurate and its claims regarding the relevance of the report to FOEs hearing request are mistaken.
Pacific Gas and Electric Company (PG&E) is therefore providing information to correct FOEs inaccurate and misleading description of the inspection report and to demonstrate the lack of relevance of the report to FOEs hearing request.
The Inspection Finding Several years ago, PG&E self-initiated a Licensing Basis Verification Project (LBVP) in order to ensure a clear understanding of the Diablo Canyon licensing basis and strong regulatory compliance. The program is designed to review and evaluate the design, procedures, documentation, licensing history, and requirements for Diablo Canyon across a range of plant systems. Through the LBVP, PG&E reviewed the seismic evaluation for replacement steam generators and reactor vessel heads previously installed at Diablo Canyon. This seismic evaluation included an assessment of the design and licensing basis Hosgri Earthquake (HE) fault. There was a separate evaluation for the loading due to a loss of coolant accident (LOCA).
The LBVP identified that the evaluation for the replacement vessel heads and steam generators also should have included a very low probability event of an earthquake on the Hosgri fault and a LOCA at the same time. Given the lack of a simultaneous HE and LOCA evaluation 1
FOE filed an appeal of the Licensing Board decision, LBP-15-27, denying FOEs request for hearing on October 23, 2015. PG&E and the NRC Staff filed briefs opposing the appeal on November 17, 2015. The appeal remains pending before the Commission.
for that equipment, PG&E completed an operability assessment that was accepted by the NRC.
The operability assessment shows the equipment can withstand the combined stress loads in such an extremely unlikely event.
PG&E is in the process of updating the stress analysis for the equipment. The method PG&E is using to combine the seismic and LOCA loading is referred to as the Square Root of the Sum of the Squares or SRSS. The SRSS method is a load combination methodology that is widely used in the industry.
Prior to 2013 the SRSS method was not clearly described in the Diablo Canyon licensing basis for this specific application. PG&E applied the NRCs Section 50.59 process in 2013 and concluded that it could use the SRSS method at Diablo Canyon for the limited issue described above. The Section 50.59 process allows a licensee to make updates to its licensing basis, without seeking prior NRC approval, if the Section 50.59 evaluation demonstrates that prior approval for the change is not needed.
In the November 2015 inspection report, the NRC Staff determined that PG&E did not adequately document its 2013 Section 50.59 evaluation in which PG&E found that prior NRC approval was not required to update the licensing basis to use the SRSS methodology. The NRC Staff classified the violation of 10 C.F.R. § 50.59 as a Green non-cited violation (NCV)  a Severity Level IV violation of very low-safety significance. As a corrective action for the violation, PG&E subsequently revised the Section 50.59 documentation on the use of the SRSS methodology.
FOEs Claims FOEs claim that the inspection finding demonstrates that PG&E, in connection with FOEs hearing request on seismic issues, has somehow mischaracterized the seismic design and licensing bases for Diablo Canyon is simply incorrect. And FOEs claim that the inspection finding demonstrates that there is a de facto license amendment on which they are entitled to a hearing is also incorrect. The inspection finding in fact demonstrates that the HE is part of the seismic design and licensing bases for Diablo Canyon. If it were not, a calculation of HE plus LOCA loads would not be necessary. The inspection report further demonstrates that the NRC Staffs oversight function is operating as intended. As the Commission has previously stated, NRC oversight matters are not licensing matters and do not involve hearing rights.2 FOE asserts in its letter that the inspection finding demonstrates that the Hosgri earthquake, at least not entirely, has not been reviewed and accepted by the NRC. But the inspection finding demonstrates no such thing. As the inspection report shows, the design and licensing bases included the simultaneous HE and LOCA as identified by the LBVP. Therefore, the inspection report confirms the accuracy of PG&Es conclusion that the HE is part of the licensing basis for the plant. The only issue in the inspection finding was a failure to clearly document the conclusion that the SRSS methodology could be used for the replacement vessel 2
Fla. Power & Light Co. (St. Lucie Nuclear Power Plant, Unit 2), CLI-14-11, 80 NRC 167, 175 (2014);
Omaha Public Power Dist. (Fort Calhoun Station, Unit 1), CLI-15-5, 81 NRC 329, 336-37 (2015).
2
heads and steam generators without prior NRC approval. FOE reads far too much into the violation, which in any event has been corrected by revising the Section 50.59 documentation.
With respect to PG&Es adoption of the SRSS methodology, there are no present hearing rights. Inspections identifying violations that must be corrected are not license amendments real or de facto. As the Commission and the Licensing Board below have recognized, plant, procedure, and licensing basis changes adopted under Section 50.59 are not license amendments and do not create hearing rights. If the NRC were ultimately to determine that a change does not meet Section 50.59 criteria for a change without prior approval, the licensee would either need to file a license amendment application or restore compliance without the change. That, however, is not the case for PG&Es adoption of the SRSS methodology for the limited and narrowly-defined evaluation. PG&Es conclusion is that the change met the Section 50.59 criteria for a change without prior approval.
Finally, this low-level inspection finding does not support FOEs broad claim that the Hosgri Earthquake analysis and a reference in the Updated Final Safety Analysis Report to the Shoreline fault as a lesser included case under the HE is a de facto license amendment. On its face, the NRC Staff document is an inspection report that evaluates compliance. It is not a license amendment or a specific approval. In any event, this is the first time that FOE has raised the simultaneous HE and LOCA issue, which was first identified by PG&E in 2011.3 It is simply too late for FOE to now claim that the issue underlying the inspection finding is new information that supports their discredited de facto amendment theory.
Conclusion The issues identified in the inspection report involve a straightforward question of compliance with 10 C.F.R. § 50.59. Even though the NRC Staff determined that a violation should be issued for PG&E not adequately documenting its Section 50.59 evaluation in 2013, the violation is of very low safety-significance and does not challenge the seismic safety of the facility. And, PG&E maintains that prior NRC approval was not in fact required. Likewise, the inspection report does not support FOEs claim that there is a de facto license amendment; the inspection report merely documents the NRC Staffs oversight function. There is no NRC action that would afford FOE hearing rights.
Respectfully submitted,
                                                            /s/ signed electronically by David A. Repka Winston & Strawn LLP 1700 K Street, NW Washington, DC 20006 (202) 282-5726 drepka@winston.com 3
See, e.g., NRC Integrated Inspection Reports 05000275/2014005 and 05000323/2014005, dated January 29, 2015 (ADAMS Accession No. ML15030A083).
3 SF:404290.2
February 9, 2016 By Electronic Information Exchange U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Rockville, MD 20851 Re:    Diablo Canyon Power Plant, Docket Nos. 50-275, 50-323 Response to Friends of the Earth letter dated January 14, 2016
==Dear Commissioners:==
On January 14, 2016, Friends of the Earth (FOE) filed a letter on this docket asserting that an NRC Staff inspection report from November 2015 is an important and directly relevant action with respect to FOEs pending claim that there is a de facto license amendment proceeding for the Diablo Canyon Power Plant (Diablo Canyon) and that FOE is entitled to a hearing.1 FOEs description of the inspection report in its letter to the Commission is inaccurate and its claims regarding the relevance of the report to FOEs hearing request are mistaken.
Pacific Gas and Electric Company (PG&E) is therefore providing information to correct FOEs inaccurate and misleading description of the inspection report and to demonstrate the lack of relevance of the report to FOEs hearing request.
The Inspection Finding Several years ago, PG&E self-initiated a Licensing Basis Verification Project (LBVP) in order to ensure a clear understanding of the Diablo Canyon licensing basis and strong regulatory compliance. The program is designed to review and evaluate the design, procedures, documentation, licensing history, and requirements for Diablo Canyon across a range of plant systems. Through the LBVP, PG&E reviewed the seismic evaluation for replacement steam generators and reactor vessel heads previously installed at Diablo Canyon. This seismic evaluation included an assessment of the design and licensing basis Hosgri Earthquake (HE) fault. There was a separate evaluation for the loading due to a loss of coolant accident (LOCA).
The LBVP identified that the evaluation for the replacement vessel heads and steam generators also should have included a very low probability event of an earthquake on the Hosgri fault and a LOCA at the same time. Given the lack of a simultaneous HE and LOCA evaluation 1
FOE filed an appeal of the Licensing Board decision, LBP-15-27, denying FOEs request for hearing on October 23, 2015. PG&E and the NRC Staff filed briefs opposing the appeal on November 17, 2015. The appeal remains pending before the Commission.
for that equipment, PG&E completed an operability assessment that was accepted by the NRC.
The operability assessment shows the equipment can withstand the combined stress loads in such an extremely unlikely event.
PG&E is in the process of updating the stress analysis for the equipment. The method PG&E is using to combine the seismic and LOCA loading is referred to as the Square Root of the Sum of the Squares or SRSS. The SRSS method is a load combination methodology that is widely used in the industry.
Prior to 2013 the SRSS method was not clearly described in the Diablo Canyon licensing basis for this specific application. PG&E applied the NRCs Section 50.59 process in 2013 and concluded that it could use the SRSS method at Diablo Canyon for the limited issue described above. The Section 50.59 process allows a licensee to make updates to its licensing basis, without seeking prior NRC approval, if the Section 50.59 evaluation demonstrates that prior approval for the change is not needed.
In the November 2015 inspection report, the NRC Staff determined that PG&E did not adequately document its 2013 Section 50.59 evaluation in which PG&E found that prior NRC approval was not required to update the licensing basis to use the SRSS methodology. The NRC Staff classified the violation of 10 C.F.R. § 50.59 as a Green non-cited violation (NCV)  a Severity Level IV violation of very low-safety significance. As a corrective action for the violation, PG&E subsequently revised the Section 50.59 documentation on the use of the SRSS methodology.
FOEs Claims FOEs claim that the inspection finding demonstrates that PG&E, in connection with FOEs hearing request on seismic issues, has somehow mischaracterized the seismic design and licensing bases for Diablo Canyon is simply incorrect. And FOEs claim that the inspection finding demonstrates that there is a de facto license amendment on which they are entitled to a hearing is also incorrect. The inspection finding in fact demonstrates that the HE is part of the seismic design and licensing bases for Diablo Canyon. If it were not, a calculation of HE plus LOCA loads would not be necessary. The inspection report further demonstrates that the NRC Staffs oversight function is operating as intended. As the Commission has previously stated, NRC oversight matters are not licensing matters and do not involve hearing rights.2 FOE asserts in its letter that the inspection finding demonstrates that the Hosgri earthquake, at least not entirely, has not been reviewed and accepted by the NRC. But the inspection finding demonstrates no such thing. As the inspection report shows, the design and licensing bases included the simultaneous HE and LOCA as identified by the LBVP. Therefore, the inspection report confirms the accuracy of PG&Es conclusion that the HE is part of the licensing basis for the plant. The only issue in the inspection finding was a failure to clearly document the conclusion that the SRSS methodology could be used for the replacement vessel 2
Fla. Power & Light Co. (St. Lucie Nuclear Power Plant, Unit 2), CLI-14-11, 80 NRC 167, 175 (2014);
Omaha Public Power Dist. (Fort Calhoun Station, Unit 1), CLI-15-5, 81 NRC 329, 336-37 (2015).
2
heads and steam generators without prior NRC approval. FOE reads far too much into the violation, which in any event has been corrected by revising the Section 50.59 documentation.
With respect to PG&Es adoption of the SRSS methodology, there are no present hearing rights. Inspections identifying violations that must be corrected are not license amendments real or de facto. As the Commission and the Licensing Board below have recognized, plant, procedure, and licensing basis changes adopted under Section 50.59 are not license amendments and do not create hearing rights. If the NRC were ultimately to determine that a change does not meet Section 50.59 criteria for a change without prior approval, the licensee would either need to file a license amendment application or restore compliance without the change. That, however, is not the case for PG&Es adoption of the SRSS methodology for the limited and narrowly-defined evaluation. PG&Es conclusion is that the change met the Section 50.59 criteria for a change without prior approval.
Finally, this low-level inspection finding does not support FOEs broad claim that the Hosgri Earthquake analysis and a reference in the Updated Final Safety Analysis Report to the Shoreline fault as a lesser included case under the HE is a de facto license amendment. On its face, the NRC Staff document is an inspection report that evaluates compliance. It is not a license amendment or a specific approval. In any event, this is the first time that FOE has raised the simultaneous HE and LOCA issue, which was first identified by PG&E in 2011.3 It is simply too late for FOE to now claim that the issue underlying the inspection finding is new information that supports their discredited de facto amendment theory.
Conclusion The issues identified in the inspection report involve a straightforward question of compliance with 10 C.F.R. § 50.59. Even though the NRC Staff determined that a violation should be issued for PG&E not adequately documenting its Section 50.59 evaluation in 2013, the violation is of very low safety-significance and does not challenge the seismic safety of the facility. And, PG&E maintains that prior NRC approval was not in fact required. Likewise, the inspection report does not support FOEs claim that there is a de facto license amendment; the inspection report merely documents the NRC Staffs oversight function. There is no NRC action that would afford FOE hearing rights.
Respectfully submitted,
                                                            /s/ signed electronically by David A. Repka Winston & Strawn LLP 1700 K Street, NW Washington, DC 20006 (202) 282-5726 drepka@winston.com 3
See, e.g., NRC Integrated Inspection Reports 05000275/2014005 and 05000323/2014005, dated January 29, 2015 (ADAMS Accession No. ML15030A083).
3 SF:404290.2}}

Latest revision as of 00:45, 31 October 2019

Pacific Gas and Electric Company Response to Foe Letter to Commission
ML16040A363
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 02/09/2016
From: Repka D
Pacific Gas & Electric Co, Winston & Strawn, LLP
To: Jeff Baran, Stephen Burns, Ostendorff W, Kristine Svinicki
NRC/Chairman, NRC/OCM
SECY RAS
References
50-275, 50-323, ASLBP 15-941-05-LA-BD01, RAS 50905
Download: ML16040A363 (3)


Text

February 9, 2016 By Electronic Information Exchange U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Rockville, MD 20851 Re: Diablo Canyon Power Plant, Docket Nos. 50-275, 50-323 Response to Friends of the Earth letter dated January 14, 2016

Dear Commissioners:

On January 14, 2016, Friends of the Earth (FOE) filed a letter on this docket asserting that an NRC Staff inspection report from November 2015 is an important and directly relevant action with respect to FOEs pending claim that there is a de facto license amendment proceeding for the Diablo Canyon Power Plant (Diablo Canyon) and that FOE is entitled to a hearing.1 FOEs description of the inspection report in its letter to the Commission is inaccurate and its claims regarding the relevance of the report to FOEs hearing request are mistaken.

Pacific Gas and Electric Company (PG&E) is therefore providing information to correct FOEs inaccurate and misleading description of the inspection report and to demonstrate the lack of relevance of the report to FOEs hearing request.

The Inspection Finding Several years ago, PG&E self-initiated a Licensing Basis Verification Project (LBVP) in order to ensure a clear understanding of the Diablo Canyon licensing basis and strong regulatory compliance. The program is designed to review and evaluate the design, procedures, documentation, licensing history, and requirements for Diablo Canyon across a range of plant systems. Through the LBVP, PG&E reviewed the seismic evaluation for replacement steam generators and reactor vessel heads previously installed at Diablo Canyon. This seismic evaluation included an assessment of the design and licensing basis Hosgri Earthquake (HE) fault. There was a separate evaluation for the loading due to a loss of coolant accident (LOCA).

The LBVP identified that the evaluation for the replacement vessel heads and steam generators also should have included a very low probability event of an earthquake on the Hosgri fault and a LOCA at the same time. Given the lack of a simultaneous HE and LOCA evaluation 1

FOE filed an appeal of the Licensing Board decision, LBP-15-27, denying FOEs request for hearing on October 23, 2015. PG&E and the NRC Staff filed briefs opposing the appeal on November 17, 2015. The appeal remains pending before the Commission.

for that equipment, PG&E completed an operability assessment that was accepted by the NRC.

The operability assessment shows the equipment can withstand the combined stress loads in such an extremely unlikely event.

PG&E is in the process of updating the stress analysis for the equipment. The method PG&E is using to combine the seismic and LOCA loading is referred to as the Square Root of the Sum of the Squares or SRSS. The SRSS method is a load combination methodology that is widely used in the industry.

Prior to 2013 the SRSS method was not clearly described in the Diablo Canyon licensing basis for this specific application. PG&E applied the NRCs Section 50.59 process in 2013 and concluded that it could use the SRSS method at Diablo Canyon for the limited issue described above. The Section 50.59 process allows a licensee to make updates to its licensing basis, without seeking prior NRC approval, if the Section 50.59 evaluation demonstrates that prior approval for the change is not needed.

In the November 2015 inspection report, the NRC Staff determined that PG&E did not adequately document its 2013 Section 50.59 evaluation in which PG&E found that prior NRC approval was not required to update the licensing basis to use the SRSS methodology. The NRC Staff classified the violation of 10 C.F.R. § 50.59 as a Green non-cited violation (NCV) a Severity Level IV violation of very low-safety significance. As a corrective action for the violation, PG&E subsequently revised the Section 50.59 documentation on the use of the SRSS methodology.

FOEs Claims FOEs claim that the inspection finding demonstrates that PG&E, in connection with FOEs hearing request on seismic issues, has somehow mischaracterized the seismic design and licensing bases for Diablo Canyon is simply incorrect. And FOEs claim that the inspection finding demonstrates that there is a de facto license amendment on which they are entitled to a hearing is also incorrect. The inspection finding in fact demonstrates that the HE is part of the seismic design and licensing bases for Diablo Canyon. If it were not, a calculation of HE plus LOCA loads would not be necessary. The inspection report further demonstrates that the NRC Staffs oversight function is operating as intended. As the Commission has previously stated, NRC oversight matters are not licensing matters and do not involve hearing rights.2 FOE asserts in its letter that the inspection finding demonstrates that the Hosgri earthquake, at least not entirely, has not been reviewed and accepted by the NRC. But the inspection finding demonstrates no such thing. As the inspection report shows, the design and licensing bases included the simultaneous HE and LOCA as identified by the LBVP. Therefore, the inspection report confirms the accuracy of PG&Es conclusion that the HE is part of the licensing basis for the plant. The only issue in the inspection finding was a failure to clearly document the conclusion that the SRSS methodology could be used for the replacement vessel 2

Fla. Power & Light Co. (St. Lucie Nuclear Power Plant, Unit 2), CLI-14-11, 80 NRC 167, 175 (2014);

Omaha Public Power Dist. (Fort Calhoun Station, Unit 1), CLI-15-5, 81 NRC 329, 336-37 (2015).

2

heads and steam generators without prior NRC approval. FOE reads far too much into the violation, which in any event has been corrected by revising the Section 50.59 documentation.

With respect to PG&Es adoption of the SRSS methodology, there are no present hearing rights. Inspections identifying violations that must be corrected are not license amendments real or de facto. As the Commission and the Licensing Board below have recognized, plant, procedure, and licensing basis changes adopted under Section 50.59 are not license amendments and do not create hearing rights. If the NRC were ultimately to determine that a change does not meet Section 50.59 criteria for a change without prior approval, the licensee would either need to file a license amendment application or restore compliance without the change. That, however, is not the case for PG&Es adoption of the SRSS methodology for the limited and narrowly-defined evaluation. PG&Es conclusion is that the change met the Section 50.59 criteria for a change without prior approval.

Finally, this low-level inspection finding does not support FOEs broad claim that the Hosgri Earthquake analysis and a reference in the Updated Final Safety Analysis Report to the Shoreline fault as a lesser included case under the HE is a de facto license amendment. On its face, the NRC Staff document is an inspection report that evaluates compliance. It is not a license amendment or a specific approval. In any event, this is the first time that FOE has raised the simultaneous HE and LOCA issue, which was first identified by PG&E in 2011.3 It is simply too late for FOE to now claim that the issue underlying the inspection finding is new information that supports their discredited de facto amendment theory.

Conclusion The issues identified in the inspection report involve a straightforward question of compliance with 10 C.F.R. § 50.59. Even though the NRC Staff determined that a violation should be issued for PG&E not adequately documenting its Section 50.59 evaluation in 2013, the violation is of very low safety-significance and does not challenge the seismic safety of the facility. And, PG&E maintains that prior NRC approval was not in fact required. Likewise, the inspection report does not support FOEs claim that there is a de facto license amendment; the inspection report merely documents the NRC Staffs oversight function. There is no NRC action that would afford FOE hearing rights.

Respectfully submitted,

/s/ signed electronically by David A. Repka Winston & Strawn LLP 1700 K Street, NW Washington, DC 20006 (202) 282-5726 drepka@winston.com 3

See, e.g., NRC Integrated Inspection Reports 05000275/2014005 and 05000323/2014005, dated January 29, 2015 (ADAMS Accession No. ML15030A083).

3 SF:404290.2

February 9, 2016 By Electronic Information Exchange U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Rockville, MD 20851 Re: Diablo Canyon Power Plant, Docket Nos. 50-275, 50-323 Response to Friends of the Earth letter dated January 14, 2016

Dear Commissioners:

On January 14, 2016, Friends of the Earth (FOE) filed a letter on this docket asserting that an NRC Staff inspection report from November 2015 is an important and directly relevant action with respect to FOEs pending claim that there is a de facto license amendment proceeding for the Diablo Canyon Power Plant (Diablo Canyon) and that FOE is entitled to a hearing.1 FOEs description of the inspection report in its letter to the Commission is inaccurate and its claims regarding the relevance of the report to FOEs hearing request are mistaken.

Pacific Gas and Electric Company (PG&E) is therefore providing information to correct FOEs inaccurate and misleading description of the inspection report and to demonstrate the lack of relevance of the report to FOEs hearing request.

The Inspection Finding Several years ago, PG&E self-initiated a Licensing Basis Verification Project (LBVP) in order to ensure a clear understanding of the Diablo Canyon licensing basis and strong regulatory compliance. The program is designed to review and evaluate the design, procedures, documentation, licensing history, and requirements for Diablo Canyon across a range of plant systems. Through the LBVP, PG&E reviewed the seismic evaluation for replacement steam generators and reactor vessel heads previously installed at Diablo Canyon. This seismic evaluation included an assessment of the design and licensing basis Hosgri Earthquake (HE) fault. There was a separate evaluation for the loading due to a loss of coolant accident (LOCA).

The LBVP identified that the evaluation for the replacement vessel heads and steam generators also should have included a very low probability event of an earthquake on the Hosgri fault and a LOCA at the same time. Given the lack of a simultaneous HE and LOCA evaluation 1

FOE filed an appeal of the Licensing Board decision, LBP-15-27, denying FOEs request for hearing on October 23, 2015. PG&E and the NRC Staff filed briefs opposing the appeal on November 17, 2015. The appeal remains pending before the Commission.

for that equipment, PG&E completed an operability assessment that was accepted by the NRC.

The operability assessment shows the equipment can withstand the combined stress loads in such an extremely unlikely event.

PG&E is in the process of updating the stress analysis for the equipment. The method PG&E is using to combine the seismic and LOCA loading is referred to as the Square Root of the Sum of the Squares or SRSS. The SRSS method is a load combination methodology that is widely used in the industry.

Prior to 2013 the SRSS method was not clearly described in the Diablo Canyon licensing basis for this specific application. PG&E applied the NRCs Section 50.59 process in 2013 and concluded that it could use the SRSS method at Diablo Canyon for the limited issue described above. The Section 50.59 process allows a licensee to make updates to its licensing basis, without seeking prior NRC approval, if the Section 50.59 evaluation demonstrates that prior approval for the change is not needed.

In the November 2015 inspection report, the NRC Staff determined that PG&E did not adequately document its 2013 Section 50.59 evaluation in which PG&E found that prior NRC approval was not required to update the licensing basis to use the SRSS methodology. The NRC Staff classified the violation of 10 C.F.R. § 50.59 as a Green non-cited violation (NCV) a Severity Level IV violation of very low-safety significance. As a corrective action for the violation, PG&E subsequently revised the Section 50.59 documentation on the use of the SRSS methodology.

FOEs Claims FOEs claim that the inspection finding demonstrates that PG&E, in connection with FOEs hearing request on seismic issues, has somehow mischaracterized the seismic design and licensing bases for Diablo Canyon is simply incorrect. And FOEs claim that the inspection finding demonstrates that there is a de facto license amendment on which they are entitled to a hearing is also incorrect. The inspection finding in fact demonstrates that the HE is part of the seismic design and licensing bases for Diablo Canyon. If it were not, a calculation of HE plus LOCA loads would not be necessary. The inspection report further demonstrates that the NRC Staffs oversight function is operating as intended. As the Commission has previously stated, NRC oversight matters are not licensing matters and do not involve hearing rights.2 FOE asserts in its letter that the inspection finding demonstrates that the Hosgri earthquake, at least not entirely, has not been reviewed and accepted by the NRC. But the inspection finding demonstrates no such thing. As the inspection report shows, the design and licensing bases included the simultaneous HE and LOCA as identified by the LBVP. Therefore, the inspection report confirms the accuracy of PG&Es conclusion that the HE is part of the licensing basis for the plant. The only issue in the inspection finding was a failure to clearly document the conclusion that the SRSS methodology could be used for the replacement vessel 2

Fla. Power & Light Co. (St. Lucie Nuclear Power Plant, Unit 2), CLI-14-11, 80 NRC 167, 175 (2014);

Omaha Public Power Dist. (Fort Calhoun Station, Unit 1), CLI-15-5, 81 NRC 329, 336-37 (2015).

2

heads and steam generators without prior NRC approval. FOE reads far too much into the violation, which in any event has been corrected by revising the Section 50.59 documentation.

With respect to PG&Es adoption of the SRSS methodology, there are no present hearing rights. Inspections identifying violations that must be corrected are not license amendments real or de facto. As the Commission and the Licensing Board below have recognized, plant, procedure, and licensing basis changes adopted under Section 50.59 are not license amendments and do not create hearing rights. If the NRC were ultimately to determine that a change does not meet Section 50.59 criteria for a change without prior approval, the licensee would either need to file a license amendment application or restore compliance without the change. That, however, is not the case for PG&Es adoption of the SRSS methodology for the limited and narrowly-defined evaluation. PG&Es conclusion is that the change met the Section 50.59 criteria for a change without prior approval.

Finally, this low-level inspection finding does not support FOEs broad claim that the Hosgri Earthquake analysis and a reference in the Updated Final Safety Analysis Report to the Shoreline fault as a lesser included case under the HE is a de facto license amendment. On its face, the NRC Staff document is an inspection report that evaluates compliance. It is not a license amendment or a specific approval. In any event, this is the first time that FOE has raised the simultaneous HE and LOCA issue, which was first identified by PG&E in 2011.3 It is simply too late for FOE to now claim that the issue underlying the inspection finding is new information that supports their discredited de facto amendment theory.

Conclusion The issues identified in the inspection report involve a straightforward question of compliance with 10 C.F.R. § 50.59. Even though the NRC Staff determined that a violation should be issued for PG&E not adequately documenting its Section 50.59 evaluation in 2013, the violation is of very low safety-significance and does not challenge the seismic safety of the facility. And, PG&E maintains that prior NRC approval was not in fact required. Likewise, the inspection report does not support FOEs claim that there is a de facto license amendment; the inspection report merely documents the NRC Staffs oversight function. There is no NRC action that would afford FOE hearing rights.

Respectfully submitted,

/s/ signed electronically by David A. Repka Winston & Strawn LLP 1700 K Street, NW Washington, DC 20006 (202) 282-5726 drepka@winston.com 3

See, e.g., NRC Integrated Inspection Reports 05000275/2014005 and 05000323/2014005, dated January 29, 2015 (ADAMS Accession No. ML15030A083).

3 SF:404290.2