| issue date = 02/16/2016
| issue date = 02/16/2016
| title = Supplement to Request for Approval of Pilgrim Relief Request (PRR)-52, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(2) Pressure Testing of Mechanical Joints as a Result of Performance of a Repair/Replacement Activity and Use of
| title = Supplement to Request for Approval of Pilgrim Relief Request (PRR)-52, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(2) Pressure Testing of Mechanical Joints as a Result of Performance of a Repair/Replacement Activity and Use of
| author name = Perkins E P
| author name = Perkins E
| author affiliation = Entergy Nuclear Operations, Inc
| author affiliation = Entergy Nuclear Operations, Inc
| addressee name =  
| addressee name =  
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:En tei-g Entergy Nuclear Operations, Inc.Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth.
{{#Wiki_filter:Entergy Nuclear Operations, Inc.
MA 02360 February 16, 2016 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001
En tei-g                                                          Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth. MA 02360 February 16, 2016 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001


==SUBJECT:==
==SUBJECT:==
Supplement to Request for Approval of Pilgrim Relief Request (PRR)-52,"Proposed Alternative in Accordance with 10 CFR 50.55a(z)(2)
Supplement to Request for Approval of Pilgrim Relief Request (PRR)-52, "Proposed Alternative in Accordance with 10 CFR 50.55a(z)(2) Pressure Testing of Mechanical Joints as a Result of Performance of a Repair/Replacement Activity and Use of Code Case N-795" Pilgrim Nuclear Power Station Docket No.: 50-293 Renewed License No.: DPR-35
Pressure Testing of Mechanical Joints as a Result of Performance of a Repair/Replacement Activity and Use of Code Case N-795" Pilgrim Nuclear Power Station Docket No.: 50-293 Renewed License No.: DPR-35  


==REFERENCE:==
==REFERENCE:==
Entergy Letter to NRC, Request for Approval of Pilgrim Relief Request (PRR)-
52, "Proposed Alternative in Accordance with 10 CFR 50.55a(z)(2) Pressure Testing of Mechanical Joints as a Result of Performance of a Repair/Replacement Activity and Use of Code Case N-795," dated October 21, 2015 (2.15.074)
LETTER NUMBER: 2.16.011


Entergy Letter to NRC, Request for Approval of Pilgrim Relief Request (PRR)-52, "Proposed Alternative in Accordance with 10 CFR 50.55a(z)(2)
==Dear Sir or Madam:==
Pressure Testing of Mechanical Joints as a Result of Performance of a Repair/Replacement Activity and Use of Code Case N-795," dated October 21, 2015 (2.15.074)
 
LETTER NUMBER: 2.16.011
The referenced letter requested an alternative to specific portions of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code, Section XI, "Rules for In-service inspection of Nuclear Power Plant Components," pursuant to 10 Code of Federal Regulations (CFR) 50.55a(z)(2). This is a request for alternative on the basis that compliance with the specified requirements as described in this request would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety. However, the stated basis in the first paragraph of the referenced letter was that "the proposed alternative provides an acceptable level of quality and safety" which corresponds to a request for alternative pursuant to 10 Code of Federal Regulations (CFR) 50.55a(z)(1).
This letter updates the basis for the request for alternative submitted in the first paragraph of the referenced letter as follows:
Pursuant to 10 Code of Federal Regulations (CFR) 50.55a(z)(2), Pilgrim Nuclear Power Station (PNPS) hereby requests an alternative to specific portions of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code, Section Xl, "Rules for In-service Inspection of Nuclear Power Plant Components," on the basis that compliance with the specified requirements as described in this request would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety.
If you have questions concerning this letter, please contact me at 508-830-8323.
                                                                                            /iJP1/2~1
 
Entergy Nuclear Operations, Inc.                      Letter No. 2.16.011 Pilgrim Nuclear Power Station                                      Page 2 There are no new commitments included in this letter.
Sincerely, Everett (Chip) P. Per Ins,-Jr.
Manager, Regulatory Assurance EPP/mw cc:     Mr. Daniel H. Dorman Regional Administrator, Region I U.S. Nuclear Regulatory Commission 2100 Renaissance Blvd., Suite 100 King of Prussia, PA 19406-2713 Ms. Booma Venkataraman, Project Manager Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission
        *Mail Stop O-8C2A Washington, DC 20555 NRC Senior Resident Inspector Pilgrim Nuclear Power Station


==Dear Sir or Madam:==
Entergy Nuclear Operations, Inc.
The referenced letter requested an alternative to specific portions of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code, Section XI, "Rules for In-service inspection of Nuclear Power Plant Components," pursuant to 10 Code of Federal Regulations (CFR) 50.55a(z)(2).
En tei-g                                                           Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth. MA 02360 February 16, 2016 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001
This is a request for alternative on the basis that compliance with the specified requirements as described in this request would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety. However, the stated basis in the first paragraph of the referenced letter was that "the proposed alternative provides an acceptable level of quality and safety" which corresponds to a request for alternative pursuant to 10 Code of Federal Regulations (CFR) 50.55a(z)(1).
This letter updates the basis for the request for alternative submitted in the first paragraph of the referenced letter as follows: Pursuant to 10 Code of Federal Regulations (CFR) 50.55a(z)(2), Pilgrim Nuclear Power Station (PNPS) hereby requests an alternative to specific portions of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code, Section Xl, "Rules for In-service Inspection of Nuclear Power Plant Components," on the basis that compliance with the specified requirements as described in this request would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety.If you have questions concerning this letter, please contact me at 508-830-8323.
/iJP1/2~1 Entergy Nuclear Operations, Inc. Letter No. 2.16.011 Pilgrim Nuclear Power Station Page 2 There are no new commitments included in this letter.Sincerely, Everett (Chip) P. Per Ins,-Jr.Manager, Regulatory Assurance EPP/mw cc: Mr. Daniel H. Dorman Regional Administrator, Region I U.S. Nuclear Regulatory Commission 2100 Renaissance Blvd., Suite 100 King of Prussia, PA 19406-2713 Ms. Booma Venkataraman, Project Manager Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission
*Mail Stop O-8C2A Washington, DC 20555 NRC Senior Resident Inspector Pilgrim Nuclear Power Station En tei-g Entergy Nuclear Operations, Inc.Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth.
MA 02360 February 16, 2016 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001


==SUBJECT:==
==SUBJECT:==
Supplement to Request for Approval of Pilgrim Relief Request (PRR)-52,"Proposed Alternative in Accordance with 10 CFR 50.55a(z)(2)
Supplement to Request for Approval of Pilgrim Relief Request (PRR)-52, "Proposed Alternative in Accordance with 10 CFR 50.55a(z)(2) Pressure Testing of Mechanical Joints as a Result of Performance of a Repair/Replacement Activity and Use of Code Case N-795" Pilgrim Nuclear Power Station Docket No.: 50-293 Renewed License No.: DPR-35
Pressure Testing of Mechanical Joints as a Result of Performance of a Repair/Replacement Activity and Use of Code Case N-795" Pilgrim Nuclear Power Station Docket No.: 50-293 Renewed License No.: DPR-35  


==REFERENCE:==
==REFERENCE:==
Entergy Letter to NRC, Request for Approval of Pilgrim Relief Request (PRR)-
52, "Proposed Alternative in Accordance with 10 CFR 50.55a(z)(2) Pressure Testing of Mechanical Joints as a Result of Performance of a Repair/Replacement Activity and Use of Code Case N-795," dated October 21, 2015 (2.15.074)
LETTER NUMBER: 2.16.011


Entergy Letter to NRC, Request for Approval of Pilgrim Relief Request (PRR)-52, "Proposed Alternative in Accordance with 10 CFR 50.55a(z)(2)
==Dear Sir or Madam:==
Pressure Testing of Mechanical Joints as a Result of Performance of a Repair/Replacement Activity and Use of Code Case N-795," dated October 21, 2015 (2.15.074)
LETTER NUMBER: 2.16.011


==Dear Sir or Madam:==
The referenced letter requested an alternative to specific portions of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code, Section XI, "Rules for In-service inspection of Nuclear Power Plant Components," pursuant to 10 Code of Federal Regulations (CFR) 50.55a(z)(2). This is a request for alternative on the basis that compliance with the specified requirements as described in this request would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety. However, the stated basis in the first paragraph of the referenced letter was that "the proposed alternative provides an acceptable level of quality and safety" which corresponds to a request for alternative pursuant to 10 Code of Federal Regulations (CFR) 50.55a(z)(1).
The referenced letter requested an alternative to specific portions of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code, Section XI, "Rules for In-service inspection of Nuclear Power Plant Components," pursuant to 10 Code of Federal Regulations (CFR) 50.55a(z)(2).
This letter updates the basis for the request for alternative submitted in the first paragraph of the referenced letter as follows:
This is a request for alternative on the basis that compliance with the specified requirements as described in this request would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety. However, the stated basis in the first paragraph of the referenced letter was that "the proposed alternative provides an acceptable level of quality and safety" which corresponds to a request for alternative pursuant to 10 Code of Federal Regulations (CFR) 50.55a(z)(1).
Pursuant to 10 Code of Federal Regulations (CFR) 50.55a(z)(2), Pilgrim Nuclear Power Station (PNPS) hereby requests an alternative to specific portions of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code, Section Xl, "Rules for In-service Inspection of Nuclear Power Plant Components," on the basis that compliance with the specified requirements as described in this request would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety.
This letter updates the basis for the request for alternative submitted in the first paragraph of the referenced letter as follows: Pursuant to 10 Code of Federal Regulations (CFR) 50.55a(z)(2), Pilgrim Nuclear Power Station (PNPS) hereby requests an alternative to specific portions of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code, Section Xl, "Rules for In-service Inspection of Nuclear Power Plant Components," on the basis that compliance with the specified requirements as described in this request would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety.If you have questions concerning this letter, please contact me at 508-830-8323.
If you have questions concerning this letter, please contact me at 508-830-8323.
/iJP1/2~1 Entergy Nuclear Operations, Inc. Letter No. 2.16.011 Pilgrim Nuclear Power Station Page 2 There are no new commitments included in this letter.Sincerely, Everett (Chip) P. Per Ins,-Jr.Manager, Regulatory Assurance EPP/mw cc: Mr. Daniel H. Dorman Regional Administrator, Region I U.S. Nuclear Regulatory Commission 2100 Renaissance Blvd., Suite 100 King of Prussia, PA 19406-2713 Ms. Booma Venkataraman, Project Manager Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission
                                                                                            /iJP1/2~1
*Mail Stop O-8C2A Washington, DC 20555 NRC Senior Resident Inspector Pilgrim Nuclear Power Station}}
 
Entergy Nuclear Operations, Inc.                     Letter No. 2.16.011 Pilgrim Nuclear Power Station                                     Page 2 There are no new commitments included in this letter.
Sincerely, Everett (Chip) P. Per Ins,-Jr.
Manager, Regulatory Assurance EPP/mw cc:     Mr. Daniel H. Dorman Regional Administrator, Region I U.S. Nuclear Regulatory Commission 2100 Renaissance Blvd., Suite 100 King of Prussia, PA 19406-2713 Ms. Booma Venkataraman, Project Manager Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission
        *Mail Stop O-8C2A Washington, DC 20555 NRC Senior Resident Inspector Pilgrim Nuclear Power Station}}

Latest revision as of 23:38, 30 October 2019

Supplement to Request for Approval of Pilgrim Relief Request (PRR)-52, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(2) Pressure Testing of Mechanical Joints as a Result of Performance of a Repair/Replacement Activity and Use of
ML16057A177
Person / Time
Site: Pilgrim
Issue date: 02/16/2016
From: Perkins E
Entergy Nuclear Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
2.16.011, PRR-52
Download: ML16057A177 (2)


Text

Entergy Nuclear Operations, Inc.

En tei-g Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth. MA 02360 February 16, 2016 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001

SUBJECT:

Supplement to Request for Approval of Pilgrim Relief Request (PRR)-52, "Proposed Alternative in Accordance with 10 CFR 50.55a(z)(2) Pressure Testing of Mechanical Joints as a Result of Performance of a Repair/Replacement Activity and Use of Code Case N-795" Pilgrim Nuclear Power Station Docket No.: 50-293 Renewed License No.: DPR-35

REFERENCE:

Entergy Letter to NRC, Request for Approval of Pilgrim Relief Request (PRR)-

52, "Proposed Alternative in Accordance with 10 CFR 50.55a(z)(2) Pressure Testing of Mechanical Joints as a Result of Performance of a Repair/Replacement Activity and Use of Code Case N-795," dated October 21, 2015 (2.15.074)

LETTER NUMBER: 2.16.011

Dear Sir or Madam:

The referenced letter requested an alternative to specific portions of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code,Section XI, "Rules for In-service inspection of Nuclear Power Plant Components," pursuant to 10 Code of Federal Regulations (CFR) 50.55a(z)(2). This is a request for alternative on the basis that compliance with the specified requirements as described in this request would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety. However, the stated basis in the first paragraph of the referenced letter was that "the proposed alternative provides an acceptable level of quality and safety" which corresponds to a request for alternative pursuant to 10 Code of Federal Regulations (CFR) 50.55a(z)(1).

This letter updates the basis for the request for alternative submitted in the first paragraph of the referenced letter as follows:

Pursuant to 10 Code of Federal Regulations (CFR) 50.55a(z)(2), Pilgrim Nuclear Power Station (PNPS) hereby requests an alternative to specific portions of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code, Section Xl, "Rules for In-service Inspection of Nuclear Power Plant Components," on the basis that compliance with the specified requirements as described in this request would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety.

If you have questions concerning this letter, please contact me at 508-830-8323.

/iJP1/2~1

Entergy Nuclear Operations, Inc. Letter No. 2.16.011 Pilgrim Nuclear Power Station Page 2 There are no new commitments included in this letter.

Sincerely, Everett (Chip) P. Per Ins,-Jr.

Manager, Regulatory Assurance EPP/mw cc: Mr. Daniel H. Dorman Regional Administrator, Region I U.S. Nuclear Regulatory Commission 2100 Renaissance Blvd., Suite 100 King of Prussia, PA 19406-2713 Ms. Booma Venkataraman, Project Manager Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission

  • Mail Stop O-8C2A Washington, DC 20555 NRC Senior Resident Inspector Pilgrim Nuclear Power Station

Entergy Nuclear Operations, Inc.

En tei-g Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth. MA 02360 February 16, 2016 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001

SUBJECT:

Supplement to Request for Approval of Pilgrim Relief Request (PRR)-52, "Proposed Alternative in Accordance with 10 CFR 50.55a(z)(2) Pressure Testing of Mechanical Joints as a Result of Performance of a Repair/Replacement Activity and Use of Code Case N-795" Pilgrim Nuclear Power Station Docket No.: 50-293 Renewed License No.: DPR-35

REFERENCE:

Entergy Letter to NRC, Request for Approval of Pilgrim Relief Request (PRR)-

52, "Proposed Alternative in Accordance with 10 CFR 50.55a(z)(2) Pressure Testing of Mechanical Joints as a Result of Performance of a Repair/Replacement Activity and Use of Code Case N-795," dated October 21, 2015 (2.15.074)

LETTER NUMBER: 2.16.011

Dear Sir or Madam:

The referenced letter requested an alternative to specific portions of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code,Section XI, "Rules for In-service inspection of Nuclear Power Plant Components," pursuant to 10 Code of Federal Regulations (CFR) 50.55a(z)(2). This is a request for alternative on the basis that compliance with the specified requirements as described in this request would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety. However, the stated basis in the first paragraph of the referenced letter was that "the proposed alternative provides an acceptable level of quality and safety" which corresponds to a request for alternative pursuant to 10 Code of Federal Regulations (CFR) 50.55a(z)(1).

This letter updates the basis for the request for alternative submitted in the first paragraph of the referenced letter as follows:

Pursuant to 10 Code of Federal Regulations (CFR) 50.55a(z)(2), Pilgrim Nuclear Power Station (PNPS) hereby requests an alternative to specific portions of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code, Section Xl, "Rules for In-service Inspection of Nuclear Power Plant Components," on the basis that compliance with the specified requirements as described in this request would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety.

If you have questions concerning this letter, please contact me at 508-830-8323.

/iJP1/2~1

Entergy Nuclear Operations, Inc. Letter No. 2.16.011 Pilgrim Nuclear Power Station Page 2 There are no new commitments included in this letter.

Sincerely, Everett (Chip) P. Per Ins,-Jr.

Manager, Regulatory Assurance EPP/mw cc: Mr. Daniel H. Dorman Regional Administrator, Region I U.S. Nuclear Regulatory Commission 2100 Renaissance Blvd., Suite 100 King of Prussia, PA 19406-2713 Ms. Booma Venkataraman, Project Manager Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission

  • Mail Stop O-8C2A Washington, DC 20555 NRC Senior Resident Inspector Pilgrim Nuclear Power Station