ML16064A183: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(3 intermediate revisions by the same user not shown) | |||
Line 3: | Line 3: | ||
| issue date = 04/04/2016 | | issue date = 04/04/2016 | ||
| title = Safety Evaluation Report Related to the License Renewal of Grand Gulf Nuclear Station, Unit 1 | | title = Safety Evaluation Report Related to the License Renewal of Grand Gulf Nuclear Station, Unit 1 | ||
| author name = Miller C | | author name = Miller C | ||
| author affiliation = NRC/NRR/DLR | | author affiliation = NRC/NRR/DLR | ||
| addressee name = Mulligan K | | addressee name = Mulligan K | ||
| addressee affiliation = Entergy Operations, Inc | | addressee affiliation = Entergy Operations, Inc | ||
| docket = 05000416 | | docket = 05000416 | ||
Line 15: | Line 15: | ||
| page count = 4 | | page count = 4 | ||
| project = | | project = | ||
| stage = | | stage = Approval | ||
}} | }} | ||
=Text= | =Text= | ||
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 April 4, 2016 | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 April 4, 2016 Mr. Kevin J. Mulligan Vice President, Site Grand Gulf Nuclear Station, Unit 1 Entergy Operations, Inc. | ||
P.O. Box 756 Port Gibson, MS 39150 | |||
Mr. Kevin J. Mulligan Vice President, Site Grand Gulf Nuclear Station, Unit 1 Entergy Operations, Inc. | |||
P.O. Box 756 Port Gibson, MS | |||
==SUBJECT:== | ==SUBJECT:== | ||
SAFETY EVALUATION REPORT RELATED TO THE LICENSE RENEWAL OF GRAND GULF NUCLEAR STATION, UNIT 1 (TAC NO. ME7493) | SAFETY EVALUATION REPORT RELATED TO THE LICENSE RENEWAL OF GRAND GULF NUCLEAR STATION, UNIT 1 (TAC NO. ME7493) | ||
==Dear Mr. Mulligan:== | ==Dear Mr. Mulligan:== | ||
By letter dated October 28, 2011, Entergy Operations, Inc., (or the applicant) submitted a license renewal application (LRA) for Grand Gulf Nuclear Station, Unit 1 (GGNS), pursuant to Title 10 of the Code of Federal Regulations Part 54. The LRA was reviewed by the Nuclear Regulatory Commission (NRC or the staff). The staff determined that the LRA was complete and acceptable for docketing on December 16, 2011. | By letter dated October 28, 2011, Entergy Operations, Inc., (or the applicant) submitted a license renewal application (LRA) for Grand Gulf Nuclear Station, Unit 1 (GGNS), pursuant to Title 10 of the Code of Federal Regulations Part 54. The LRA was reviewed by the Nuclear Regulatory Commission (NRC or the staff). The staff determined that the LRA was complete and acceptable for docketing on December 16, 2011. | ||
The staff has reviewed the GGNS LRA, performed site audits and inspections, issued requests for additional information (RAIs), reviewed the applicants responses to the staffs RAIs and developed a safety evaluation report with open items dated January 31, 2013 (ML13032A194). | |||
The staff has reviewed the GGNS LRA, performed site audits and inspections, issued requests for additional information (RAIs), reviewed the | Since January 31, 2013, the staff closed the open items and developed the enclosed final SER on March 30, 2016 to document its findings associated with the safety review of the LRA and supporting documentation for GGNS. | ||
This SER is scheduled to be discussed with the Advisory Committee on Reactor Safeguards (ACRS) Subcommittee on May 4, 2016 and ACRS Full Committee on October 6, 2016. | |||
This SER is scheduled to be discussed with the Advisory Committee on Reactor Safeguards (ACRS) Subcommittee on May 4, 2016 and ACRS Full Committee on October 6, 2016. | |||
K. Mulligan If you have any questions regarding this matter, please contact the license renewal project manager, Mr. Emmanuel Sayoc, at 301-415-4084 or by e-mail at Emmanuel Sayoc@nrc.gov. | |||
Sincerely, | |||
/RA/ | |||
Christopher G. Miller, Director Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-416 | |||
==Enclosure:== | ==Enclosure:== | ||
As stated cc w/encl: | As stated cc w/encl: Listserv | ||
ML16064A169 (Package), ML16064A183 (Letter), | ML16064A169 (Package), ML16064A183 (Letter), | ||
ML16xxxxxxx (Safety Evaluation Report) *concurrence via e-mail Publicly Available Non-Publicly Sensitive Non-Sensitive A il bl To receive a copy of this document, indicate in the concurrence box C = Copy without attach/encl, E = Copy with attach/encl, N = No copy OFFICE LA:RPB1:DLR Tech Editor (SER)* PM:DLR:RPB1 BC:DLR: RPB1 BC:DLR:RARB (Letter) | |||
NAME IBetts* Tech Edit RRichardson YDiaz-Sanabria DMorey* | |||
DATE 3/ 7 / 16 3/ 21/ 16 3/ 08 / 16 3/24/ 16 3/ 8 / 16 OFFICE BC:DLR:RASB BC:DLR:RERP BC:DE:EMCB BC:DE:EEEB BC:DE:ESGB NAME BWittick* JDanna* MMurphy* JAndersen* GKulesa* | |||
DATE 3/ 7/16 3/ 8 /16 4/ 30/ 12 8/ 12/ 12 8/ 12 /12 OFFICE SLS:DLR BC:DRA:AFPB BC:DSS:SCVB BC:DSS:SBPB BC:DSS:SRXB NAME AHiser* AKlein* RDennig* GCasto* CJackson* | |||
DATE 3/ 30 / 16 10/ 3 /12 9/ 4 /12 8/ 6 /12 7/31/12 OFFICE BC:DE:EVIB D:DE D:DSS D:DRA OGC (NLO) | |||
NAME JMcHale* JLubinski* TMcGinty* RFelts* BMizuno* | |||
DATE 2/ 9 / 16 1/31/ 13 1/30/13 3/22 /16 3/30/16 OFFICE D:DLR NAME CMiller DATE 3/24/ 16 | |||
Letter to K. Mulligan Dated March XX, 2016 | Letter to K. Mulligan Dated March XX, 2016 | ||
==SUBJECT:== | ==SUBJECT:== | ||
SAFETY EVALUATION REPORT RELATED TO THE LICENSE RENEWAL OF GRAND GULF NUCLEAR STATION, UNIT 1 (TAC NO. ME7493) | SAFETY EVALUATION REPORT RELATED TO THE LICENSE RENEWAL OF GRAND GULF NUCLEAR STATION, UNIT 1 (TAC NO. ME7493) | ||
DISTRIBUTION: | |||
DISTRIBUTION | HARD COPY: | ||
DLR RF E-MAIL: | |||
PUBLIC RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource RidsNrrDlrRarb Resource RidsNrrDlrRasb Resource RidsOgcMailCenter RidsNrrPMGrandGulf Resource | |||
--------------------- | |||
RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource RidsNrrDlrRarb Resource RidsNrrDlrRasb Resource | RRichardson ESayoc BMizuno DDrucker JDanna AWang RSmith, RIV BRice, RIV DMcIntyre, OPA | ||
RidsOgcMailCenter | |||
RidsNrrPMGrandGulf Resource --------------------- | |||
RRichardson | |||
ESayoc BMizuno DDrucker | |||
JDanna AWang RSmith, RIV | |||
BRice, RIV DMcIntyre, OPA | |||
Mr. Kevin J. Mulligan Vice President, Site Grand Gulf Nuclear Station, Unit 1 Entergy Operations, Inc. | UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 April 4, 2016 Mr. Kevin J. Mulligan Vice President, Site Grand Gulf Nuclear Station, Unit 1 Entergy Operations, Inc. | ||
P.O. Box 756 Port Gibson, MS | P.O. Box 756 Port Gibson, MS 39150 | ||
==SUBJECT:== | ==SUBJECT:== | ||
SAFETY EVALUATION REPORT RELATED TO THE LICENSE RENEWAL OF GRAND GULF NUCLEAR STATION, UNIT 1 (TAC NO. ME7493) | SAFETY EVALUATION REPORT RELATED TO THE LICENSE RENEWAL OF GRAND GULF NUCLEAR STATION, UNIT 1 (TAC NO. ME7493) | ||
==Dear Mr. Mulligan:== | ==Dear Mr. Mulligan:== | ||
By letter dated October 28, 2011, Entergy Operations, Inc., (or the applicant) submitted a license renewal application (LRA) for Grand Gulf Nuclear Station, Unit 1 (GGNS), pursuant to Title 10 of the Code of Federal Regulations Part 54. The LRA was reviewed by the Nuclear Regulatory Commission (NRC or the staff). The staff determined that the LRA was complete and acceptable for docketing on December 16, 2011. | By letter dated October 28, 2011, Entergy Operations, Inc., (or the applicant) submitted a license renewal application (LRA) for Grand Gulf Nuclear Station, Unit 1 (GGNS), pursuant to Title 10 of the Code of Federal Regulations Part 54. The LRA was reviewed by the Nuclear Regulatory Commission (NRC or the staff). The staff determined that the LRA was complete and acceptable for docketing on December 16, 2011. | ||
The staff has reviewed the GGNS LRA, performed site audits and inspections, issued requests for additional information (RAIs), reviewed the applicants responses to the staffs RAIs and developed a safety evaluation report with open items dated January 31, 2013 (ML13032A194). | |||
The staff has reviewed the GGNS LRA, performed site audits and inspections, issued requests for additional information (RAIs), reviewed the | Since January 31, 2013, the staff closed the open items and developed the enclosed final SER on March 30, 2016 to document its findings associated with the safety review of the LRA and supporting documentation for GGNS. | ||
This SER is scheduled to be discussed with the Advisory Committee on Reactor Safeguards (ACRS) Subcommittee on May 4, 2016 and ACRS Full Committee on October 6, 2016. | |||
This SER is scheduled to be discussed with the Advisory Committee on Reactor Safeguards (ACRS) Subcommittee on May 4, 2016 and ACRS Full Committee on October 6, 2016. | |||
K. Mulligan If you have any questions regarding this matter, please contact the license renewal project manager, Mr. Emmanuel Sayoc, at 301-415-4084 or by e-mail at Emmanuel Sayoc@nrc.gov. | |||
Sincerely, | |||
/RA/ | |||
Christopher G. Miller, Director Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-416 | |||
==Enclosure:== | ==Enclosure:== | ||
As stated cc w/encl: | As stated cc w/encl: Listserv | ||
ML16064A169 (Package), ML16064A183 (Letter), | ML16064A169 (Package), ML16064A183 (Letter), | ||
ML16xxxxxxx (Safety Evaluation Report) *concurrence via e-mail Publicly Available Non-Publicly Sensitive Non-Sensitive A il bl To receive a copy of this document, indicate in the concurrence box C = Copy without attach/encl, E = Copy with attach/encl, N = No copy OFFICE LA:RPB1:DLR Tech Editor (SER)* PM:DLR:RPB1 BC:DLR: RPB1 BC:DLR:RARB (Letter) | |||
NAME IBetts* Tech Edit RRichardson YDiaz-Sanabria DMorey* | |||
DATE 3/ 7 / 16 3/ 21/ 16 3/ 08 / 16 3/24/ 16 3/ 8 / 16 OFFICE BC:DLR:RASB BC:DLR:RERP BC:DE:EMCB BC:DE:EEEB BC:DE:ESGB NAME BWittick* JDanna* MMurphy* JAndersen* GKulesa* | |||
DATE 3/ 7/16 3/ 8 /16 4/ 30/ 12 8/ 12/ 12 8/ 12 /12 OFFICE SLS:DLR BC:DRA:AFPB BC:DSS:SCVB BC:DSS:SBPB BC:DSS:SRXB NAME AHiser* AKlein* RDennig* GCasto* CJackson* | |||
DATE 3/ 30 / 16 10/ 3 /12 9/ 4 /12 8/ 6 /12 7/31/12 OFFICE BC:DE:EVIB D:DE D:DSS D:DRA OGC (NLO) | |||
NAME JMcHale* JLubinski* TMcGinty* RFelts* BMizuno* | |||
DATE 2/ 9 / 16 1/31/ 13 1/30/13 3/22 /16 3/30/16 OFFICE D:DLR NAME CMiller DATE 3/24/ 16 | |||
Letter to K. Mulligan Dated March XX, 2016 | Letter to K. Mulligan Dated March XX, 2016 | ||
==SUBJECT:== | ==SUBJECT:== | ||
SAFETY EVALUATION REPORT RELATED TO THE LICENSE RENEWAL OF GRAND GULF NUCLEAR STATION, UNIT 1 (TAC NO. ME7493) | SAFETY EVALUATION REPORT RELATED TO THE LICENSE RENEWAL OF GRAND GULF NUCLEAR STATION, UNIT 1 (TAC NO. ME7493) | ||
DISTRIBUTION: | |||
DISTRIBUTION | HARD COPY: | ||
DLR RF E-MAIL: | |||
PUBLIC RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource RidsNrrDlrRarb Resource RidsNrrDlrRasb Resource RidsOgcMailCenter RidsNrrPMGrandGulf Resource | |||
--------------------- | |||
RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource RidsNrrDlrRarb Resource RidsNrrDlrRasb Resource | RRichardson ESayoc BMizuno DDrucker JDanna AWang RSmith, RIV BRice, RIV DMcIntyre, OPA}} | ||
RidsOgcMailCenter | |||
RidsNrrPMGrandGulf Resource --------------------- | |||
RRichardson | |||
ESayoc BMizuno DDrucker | |||
JDanna AWang RSmith, RIV | |||
BRice, RIV DMcIntyre, OPA}} |
Latest revision as of 22:08, 30 October 2019
ML16064A183 | |
Person / Time | |
---|---|
Site: | Grand Gulf |
Issue date: | 04/04/2016 |
From: | Chris Miller Division of License Renewal |
To: | Kevin Mulligan Entergy Operations |
Richardson R, NRR/DLR, 415-2867 | |
Shared Package | |
ML16064A169 | List: |
References | |
DLR-16-0054 | |
Download: ML16064A183 (4) | |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 April 4, 2016 Mr. Kevin J. Mulligan Vice President, Site Grand Gulf Nuclear Station, Unit 1 Entergy Operations, Inc.
P.O. Box 756 Port Gibson, MS 39150
SUBJECT:
SAFETY EVALUATION REPORT RELATED TO THE LICENSE RENEWAL OF GRAND GULF NUCLEAR STATION, UNIT 1 (TAC NO. ME7493)
Dear Mr. Mulligan:
By letter dated October 28, 2011, Entergy Operations, Inc., (or the applicant) submitted a license renewal application (LRA) for Grand Gulf Nuclear Station, Unit 1 (GGNS), pursuant to Title 10 of the Code of Federal Regulations Part 54. The LRA was reviewed by the Nuclear Regulatory Commission (NRC or the staff). The staff determined that the LRA was complete and acceptable for docketing on December 16, 2011.
The staff has reviewed the GGNS LRA, performed site audits and inspections, issued requests for additional information (RAIs), reviewed the applicants responses to the staffs RAIs and developed a safety evaluation report with open items dated January 31, 2013 (ML13032A194).
Since January 31, 2013, the staff closed the open items and developed the enclosed final SER on March 30, 2016 to document its findings associated with the safety review of the LRA and supporting documentation for GGNS.
This SER is scheduled to be discussed with the Advisory Committee on Reactor Safeguards (ACRS) Subcommittee on May 4, 2016 and ACRS Full Committee on October 6, 2016.
K. Mulligan If you have any questions regarding this matter, please contact the license renewal project manager, Mr. Emmanuel Sayoc, at 301-415-4084 or by e-mail at Emmanuel Sayoc@nrc.gov.
Sincerely,
/RA/
Christopher G. Miller, Director Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-416
Enclosure:
As stated cc w/encl: Listserv
ML16064A169 (Package), ML16064A183 (Letter),
ML16xxxxxxx (Safety Evaluation Report) *concurrence via e-mail Publicly Available Non-Publicly Sensitive Non-Sensitive A il bl To receive a copy of this document, indicate in the concurrence box C = Copy without attach/encl, E = Copy with attach/encl, N = No copy OFFICE LA:RPB1:DLR Tech Editor (SER)* PM:DLR:RPB1 BC:DLR: RPB1 BC:DLR:RARB (Letter)
NAME IBetts* Tech Edit RRichardson YDiaz-Sanabria DMorey*
DATE 3/ 7 / 16 3/ 21/ 16 3/ 08 / 16 3/24/ 16 3/ 8 / 16 OFFICE BC:DLR:RASB BC:DLR:RERP BC:DE:EMCB BC:DE:EEEB BC:DE:ESGB NAME BWittick* JDanna* MMurphy* JAndersen* GKulesa*
DATE 3/ 7/16 3/ 8 /16 4/ 30/ 12 8/ 12/ 12 8/ 12 /12 OFFICE SLS:DLR BC:DRA:AFPB BC:DSS:SCVB BC:DSS:SBPB BC:DSS:SRXB NAME AHiser* AKlein* RDennig* GCasto* CJackson*
DATE 3/ 30 / 16 10/ 3 /12 9/ 4 /12 8/ 6 /12 7/31/12 OFFICE BC:DE:EVIB D:DE D:DSS D:DRA OGC (NLO)
NAME JMcHale* JLubinski* TMcGinty* RFelts* BMizuno*
DATE 2/ 9 / 16 1/31/ 13 1/30/13 3/22 /16 3/30/16 OFFICE D:DLR NAME CMiller DATE 3/24/ 16
Letter to K. Mulligan Dated March XX, 2016
SUBJECT:
SAFETY EVALUATION REPORT RELATED TO THE LICENSE RENEWAL OF GRAND GULF NUCLEAR STATION, UNIT 1 (TAC NO. ME7493)
DISTRIBUTION:
HARD COPY:
DLR RF E-MAIL:
PUBLIC RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource RidsNrrDlrRarb Resource RidsNrrDlrRasb Resource RidsOgcMailCenter RidsNrrPMGrandGulf Resource
RRichardson ESayoc BMizuno DDrucker JDanna AWang RSmith, RIV BRice, RIV DMcIntyre, OPA
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 April 4, 2016 Mr. Kevin J. Mulligan Vice President, Site Grand Gulf Nuclear Station, Unit 1 Entergy Operations, Inc.
P.O. Box 756 Port Gibson, MS 39150
SUBJECT:
SAFETY EVALUATION REPORT RELATED TO THE LICENSE RENEWAL OF GRAND GULF NUCLEAR STATION, UNIT 1 (TAC NO. ME7493)
Dear Mr. Mulligan:
By letter dated October 28, 2011, Entergy Operations, Inc., (or the applicant) submitted a license renewal application (LRA) for Grand Gulf Nuclear Station, Unit 1 (GGNS), pursuant to Title 10 of the Code of Federal Regulations Part 54. The LRA was reviewed by the Nuclear Regulatory Commission (NRC or the staff). The staff determined that the LRA was complete and acceptable for docketing on December 16, 2011.
The staff has reviewed the GGNS LRA, performed site audits and inspections, issued requests for additional information (RAIs), reviewed the applicants responses to the staffs RAIs and developed a safety evaluation report with open items dated January 31, 2013 (ML13032A194).
Since January 31, 2013, the staff closed the open items and developed the enclosed final SER on March 30, 2016 to document its findings associated with the safety review of the LRA and supporting documentation for GGNS.
This SER is scheduled to be discussed with the Advisory Committee on Reactor Safeguards (ACRS) Subcommittee on May 4, 2016 and ACRS Full Committee on October 6, 2016.
K. Mulligan If you have any questions regarding this matter, please contact the license renewal project manager, Mr. Emmanuel Sayoc, at 301-415-4084 or by e-mail at Emmanuel Sayoc@nrc.gov.
Sincerely,
/RA/
Christopher G. Miller, Director Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-416
Enclosure:
As stated cc w/encl: Listserv
ML16064A169 (Package), ML16064A183 (Letter),
ML16xxxxxxx (Safety Evaluation Report) *concurrence via e-mail Publicly Available Non-Publicly Sensitive Non-Sensitive A il bl To receive a copy of this document, indicate in the concurrence box C = Copy without attach/encl, E = Copy with attach/encl, N = No copy OFFICE LA:RPB1:DLR Tech Editor (SER)* PM:DLR:RPB1 BC:DLR: RPB1 BC:DLR:RARB (Letter)
NAME IBetts* Tech Edit RRichardson YDiaz-Sanabria DMorey*
DATE 3/ 7 / 16 3/ 21/ 16 3/ 08 / 16 3/24/ 16 3/ 8 / 16 OFFICE BC:DLR:RASB BC:DLR:RERP BC:DE:EMCB BC:DE:EEEB BC:DE:ESGB NAME BWittick* JDanna* MMurphy* JAndersen* GKulesa*
DATE 3/ 7/16 3/ 8 /16 4/ 30/ 12 8/ 12/ 12 8/ 12 /12 OFFICE SLS:DLR BC:DRA:AFPB BC:DSS:SCVB BC:DSS:SBPB BC:DSS:SRXB NAME AHiser* AKlein* RDennig* GCasto* CJackson*
DATE 3/ 30 / 16 10/ 3 /12 9/ 4 /12 8/ 6 /12 7/31/12 OFFICE BC:DE:EVIB D:DE D:DSS D:DRA OGC (NLO)
NAME JMcHale* JLubinski* TMcGinty* RFelts* BMizuno*
DATE 2/ 9 / 16 1/31/ 13 1/30/13 3/22 /16 3/30/16 OFFICE D:DLR NAME CMiller DATE 3/24/ 16
Letter to K. Mulligan Dated March XX, 2016
SUBJECT:
SAFETY EVALUATION REPORT RELATED TO THE LICENSE RENEWAL OF GRAND GULF NUCLEAR STATION, UNIT 1 (TAC NO. ME7493)
DISTRIBUTION:
HARD COPY:
DLR RF E-MAIL:
PUBLIC RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource RidsNrrDlrRarb Resource RidsNrrDlrRasb Resource RidsOgcMailCenter RidsNrrPMGrandGulf Resource
RRichardson ESayoc BMizuno DDrucker JDanna AWang RSmith, RIV BRice, RIV DMcIntyre, OPA