ML16084A915: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(5 intermediate revisions by the same user not shown) | |||
Line 2: | Line 2: | ||
| number = ML16084A915 | | number = ML16084A915 | ||
| issue date = 03/24/2016 | | issue date = 03/24/2016 | ||
| title = | | title = Notification of Licensed Operator Initial Examination (05000280/2016301 and 05000281/2016301) | ||
| author name = Guthrie E | | author name = Guthrie E | ||
| author affiliation = NRC/RGN-II/DRS | | author affiliation = NRC/RGN-II/DRS | ||
| addressee name = Heacock D | | addressee name = Heacock D | ||
| addressee affiliation = Virginia Electric & Power Co (VEPCO) | | addressee affiliation = Virginia Electric & Power Co (VEPCO) | ||
| docket = 05000280, 05000281 | | docket = 05000280, 05000281 | ||
Line 14: | Line 14: | ||
| page count = 4 | | page count = 4 | ||
}} | }} | ||
See also: [[ | See also: [[see also::IR 05000280/2016301]] | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:UNITED STATES | ||
Virginia Electric & Power Company | NUCLEAR REGULATORY COMMISSION | ||
5000 Dominion Blvd. | REGION II | ||
Glen Allen, VA 23060-6711 | 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 | ||
ATLANTA, GEORGIA 30303-1257 | |||
March 24, 2016 | |||
Exam Writer, Mr. Mike Meyer, Exam Writer, and Mr. Bruno Caballero, Senior Operations | Mr. David A. Heacock | ||
Engineer, arrangements were made for the administration of licensing examinations at Surry Power Station. | Virginia Electric & Power Company | ||
5000 Dominion Blvd. | |||
As agreed during the telephone conversation, your staff will prepare both the operating test and | Glen Allen, VA 23060-6711 | ||
written examination based on the guidelines in Revision 10 of NUREG-1021, "Operator | SUBJECT: SURRY POWER STATION - NOTIFICATION OF LICENSED OPERATOR | ||
Licensing Examination Standards for Power Reactors." | INITIAL EXAMINATION (05000280/2016301 AND 05000281/2016301) | ||
To meet the above schedule, it will be necessary for your staff to furnish the operating test outline and the supporting reference materials identified in Attachment 3 to ES-201 by May 3, 2016. | Dear Mr. Heacock | ||
The written examination will be due by May 16, 2016, and the operating test will be due by | During a telephone conversation on March 10, 2016, between Mr. Richard Philpot, Initial | ||
June 21, 2016. | License Training & Simulator Supervisor, Mr. Paul Orrison, Lead Exam Writer, Mr. Kevin LaBatt, | ||
(10 CFR 55.40(b)(3)), an authorized representative of the facility licensee shall approve the | Exam Writer, Mr. Mike Meyer, Exam Writer, and Mr. Bruno Caballero, Senior Operations | ||
outline, examination, and test before they are submitted to the NRC for review and approval. | Engineer, arrangements were made for the administration of licensing examinations at Surry | ||
We request that any personal, proprietary, sensitive unclassified, or safeguards information in your response be contained in a separate enclosure and appropriately marked. | Power Station. The on-site preparatory week is scheduled for the week of August 22, 2016. | ||
receiving the required examination and reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled. | The operating test is scheduled to be administered during the week of September 19, 2016. | ||
The written examination is scheduled to be administered the week of September 26, 2016. | |||
As agreed during the telephone conversation, your staff will prepare both the operating test and | |||
written examination based on the guidelines in Revision 10 of NUREG-1021, "Operator | |||
Licensing Examination Standards for Power Reactors." The U.S. Nuclear Regulatory | |||
Commission (NRC) regional office will discuss with your staff any changes that might be | |||
necessary before the examinations are administered. Your staff has also agreed to make | |||
copies of all examination materials that are necessary for administering the examination. | |||
To meet the above schedule, it will be necessary for your staff to furnish the operating test | |||
outline and the supporting reference materials identified in Attachment 3 to ES-201 by May 3, | |||
2016. Mr. Caballero provided a written examination outline to your staff in November, 2015. | |||
The written examination will be due by May 16, 2016, and the operating test will be due by | |||
June 21, 2016. Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations | |||
(10 CFR 55.40(b)(3)), an authorized representative of the facility licensee shall approve the | |||
outline, examination, and test before they are submitted to the NRC for review and approval. | |||
All materials shall be complete and ready-to-use. | |||
We request that any personal, proprietary, sensitive unclassified, or safeguards information in | |||
your response be contained in a separate enclosure and appropriately marked. Any delay in | |||
receiving the required examination and reference materials, or the submittal of inadequate or | |||
incomplete materials, may cause the examinations to be rescheduled. | |||
D. Heacock 2 | |||
In order to conduct the requested written examinations and operating tests, it will be necessary | |||
for your staff to provide adequate space and accommodations in accordance with ES-402, and | |||
to make the simulation facility available on the dates noted above. In accordance with ES-302, | |||
your staff should retain the original simulator performance data (e.g., system pressures, | |||
temperatures, and levels) generated during the dynamic operating tests until the examination | |||
results are final. | |||
Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in | |||
effect while the written examinations and operating tests are being administered. | |||
To permit timely NRC review and evaluation, your staff should submit preliminary reactor | |||
operator and senior reactor operator license applications (Office of Management and Budget | |||
(OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024), | |||
and waiver requests (if any) (OMB approval number 3150-0090) at least 30 days before the first | |||
examination date. If the applications are not received at least 30 days before the examination | |||
date, a postponement may be necessary. Signed applications certifying that all training has | |||
been completed should be submitted at least 14 days before the first examination date. | |||
This letter contains information collections that are subject to the Paperwork Reduction Act of | |||
1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of | |||
Management and Budget (OMB) under approval number 3150-0018, which expires on April 30, | |||
2016. The public reporting burden for this collection of information is estimated to average 2500 | |||
hours per response, including the time for reviewing instructions, gathering and maintaining the | |||
data needed, writing the examinations, and completing and reviewing the collection of | |||
information. Send comments on any aspect of this collection of information, including | |||
suggestions for reducing the burden, to the Information and Records Management Branch | |||
(T-6 F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet | |||
electronic mail at infocollectsresource@nrc.gov; and to the Desk Officer, Office of Information | |||
and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, | |||
Washington, DC 20503. | |||
The NRC may neither conduct nor sponsor, and a person is not required to respond to, an | |||
information collection, unless it displays a currently valid OMB control number. | |||
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its | |||
enclosures will be available electronically for public inspection in the NRC Public Document | |||
Room or from the Publicly Available Records (PARS) component of the NRCs document | |||
system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading- | |||
rm/adams.html (the Public Electronic Reading Room). | |||
D. Heacock 3 | |||
Thank you for your cooperation in this matter. Mr. Richard Philpot has been advised of the | |||
policies and guidelines referenced in this letter. If you have any questions regarding the NRC's | |||
examination procedures and guidelines, please contact Mr. Bruno Caballero at (404) 997-4608, | |||
(Internet E-mail: Bruno.Caballero@.nrc.gov), or me at (404) 997-4662, (Internet E-mail: | |||
Eugene.Guthrie@nrc.gov). | |||
Sincerely, | |||
/RA/ | |||
Eugene F. Guthrie, Chief | |||
Operations Branch 2 | |||
Division of Reactor Safety | |||
Docket Nos.: 50-280, 50-281 | |||
License Nos.: DPR-32, DPR-37 | |||
cc: Distribution via Listserv | |||
_________________________ SUNSI REVIEW COMPLETE FORM 665 ATTACHED | |||
OFFICE RII:DRS RII:DRS | |||
SIGNATURE BLC2 EFG | |||
NAME BCABALLERO EGUTHRIE | |||
DATE 3/24/2016 3/24/2016 3/ /2016 3/ /2016 3/ /2016 3/ /2016 3/ /2016 | |||
E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO | |||
}} | }} |
Latest revision as of 21:34, 30 October 2019
ML16084A915 | |
Person / Time | |
---|---|
Site: | Surry |
Issue date: | 03/24/2016 |
From: | Eugene Guthrie Division of Reactor Safety II |
To: | Heacock D Virginia Electric & Power Co (VEPCO) |
References | |
50-280/OL-16, 50-281/OL-16 | |
Download: ML16084A915 (4) | |
See also: IR 05000280/2016301
Text
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION II
245 PEACHTREE CENTER AVENUE NE, SUITE 1200
ATLANTA, GEORGIA 30303-1257
March 24, 2016
Mr. David A. Heacock
Virginia Electric & Power Company
5000 Dominion Blvd.
Glen Allen, VA 23060-6711
SUBJECT: SURRY POWER STATION - NOTIFICATION OF LICENSED OPERATOR
INITIAL EXAMINATION (05000280/2016301 AND 05000281/2016301)
Dear Mr. Heacock
During a telephone conversation on March 10, 2016, between Mr. Richard Philpot, Initial
License Training & Simulator Supervisor, Mr. Paul Orrison, Lead Exam Writer, Mr. Kevin LaBatt,
Exam Writer, Mr. Mike Meyer, Exam Writer, and Mr. Bruno Caballero, Senior Operations
Engineer, arrangements were made for the administration of licensing examinations at Surry
Power Station. The on-site preparatory week is scheduled for the week of August 22, 2016.
The operating test is scheduled to be administered during the week of September 19, 2016.
The written examination is scheduled to be administered the week of September 26, 2016.
As agreed during the telephone conversation, your staff will prepare both the operating test and
written examination based on the guidelines in Revision 10 of NUREG-1021, "Operator
Licensing Examination Standards for Power Reactors." The U.S. Nuclear Regulatory
Commission (NRC) regional office will discuss with your staff any changes that might be
necessary before the examinations are administered. Your staff has also agreed to make
copies of all examination materials that are necessary for administering the examination.
To meet the above schedule, it will be necessary for your staff to furnish the operating test
outline and the supporting reference materials identified in Attachment 3 to ES-201 by May 3,
2016. Mr. Caballero provided a written examination outline to your staff in November, 2015.
The written examination will be due by May 16, 2016, and the operating test will be due by
June 21, 2016. Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations
(10 CFR 55.40(b)(3)), an authorized representative of the facility licensee shall approve the
outline, examination, and test before they are submitted to the NRC for review and approval.
All materials shall be complete and ready-to-use.
We request that any personal, proprietary, sensitive unclassified, or safeguards information in
your response be contained in a separate enclosure and appropriately marked. Any delay in
receiving the required examination and reference materials, or the submittal of inadequate or
incomplete materials, may cause the examinations to be rescheduled.
D. Heacock 2
In order to conduct the requested written examinations and operating tests, it will be necessary
for your staff to provide adequate space and accommodations in accordance with ES-402, and
to make the simulation facility available on the dates noted above. In accordance with ES-302,
your staff should retain the original simulator performance data (e.g., system pressures,
temperatures, and levels) generated during the dynamic operating tests until the examination
results are final.
Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in
effect while the written examinations and operating tests are being administered.
To permit timely NRC review and evaluation, your staff should submit preliminary reactor
operator and senior reactor operator license applications (Office of Management and Budget
(OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024),
and waiver requests (if any) (OMB approval number 3150-0090) at least 30 days before the first
examination date. If the applications are not received at least 30 days before the examination
date, a postponement may be necessary. Signed applications certifying that all training has
been completed should be submitted at least 14 days before the first examination date.
This letter contains information collections that are subject to the Paperwork Reduction Act of
1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of
Management and Budget (OMB) under approval number 3150-0018, which expires on April 30,
2016. The public reporting burden for this collection of information is estimated to average 2500
hours per response, including the time for reviewing instructions, gathering and maintaining the
data needed, writing the examinations, and completing and reviewing the collection of
information. Send comments on any aspect of this collection of information, including
suggestions for reducing the burden, to the Information and Records Management Branch
(T-6 F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet
electronic mail at infocollectsresource@nrc.gov; and to the Desk Officer, Office of Information
and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget,
Washington, DC 20503.
The NRC may neither conduct nor sponsor, and a person is not required to respond to, an
information collection, unless it displays a currently valid OMB control number.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its
enclosures will be available electronically for public inspection in the NRC Public Document
Room or from the Publicly Available Records (PARS) component of the NRCs document
system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-
rm/adams.html (the Public Electronic Reading Room).
D. Heacock 3
Thank you for your cooperation in this matter. Mr. Richard Philpot has been advised of the
policies and guidelines referenced in this letter. If you have any questions regarding the NRC's
examination procedures and guidelines, please contact Mr. Bruno Caballero at (404) 997-4608,
(Internet E-mail: Bruno.Caballero@.nrc.gov), or me at (404) 997-4662, (Internet E-mail:
Eugene.Guthrie@nrc.gov).
Sincerely,
/RA/
Eugene F. Guthrie, Chief
Operations Branch 2
Division of Reactor Safety
Docket Nos.: 50-280, 50-281
cc: Distribution via Listserv
_________________________ SUNSI REVIEW COMPLETE FORM 665 ATTACHED
OFFICE RII:DRS RII:DRS
SIGNATURE BLC2 EFG
NAME BCABALLERO EGUTHRIE
DATE 3/24/2016 3/24/2016 3/ /2016 3/ /2016 3/ /2016 3/ /2016 3/ /2016
E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO