| issue date = 04/21/2016
| issue date = 04/21/2016
| title = Independent Spent Fuel Storage Installation, H.B. Robinson, Unit 2 and Independent Spent Fuel Storage, and Shearon, Unit 1 - Transmittal of Physical Security Plan, Revision 8
| title = Independent Spent Fuel Storage Installation, H.B. Robinson, Unit 2 and Independent Spent Fuel Storage, and Shearon, Unit 1 - Transmittal of Physical Security Plan, Revision 8
| author name = Nolan M C
| author name = Nolan M
| author affiliation = Duke Energy Progress, Inc
| author affiliation = Duke Energy Progress, Inc
| addressee name =  
| addressee name =  
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:(,DUKE April 21, 2016 RA-16-0018 SAFEGUARDS INFORMATION When separated, this page is decontrolled.
{{#Wiki_filter:M. Christopher Nolan
ATTN: Document Control Desk D,irector, Division of Spent Fuel Management Office of Nuclear Material Safety and Safeguards U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 BRUNSWICK STEAM ELECTRIC PLANT, UNITS 1-AND 2 DOCKET NOS. 50-325, 50-324 / LICENSE NOS. DPR-71, DPR-62 BRUNSWICK INDEPENDENT SPENT FUEL STORAGE INSTALLATION DOCKET NO. 72-6 H.B. ROBINSON STEAM ELECTRIC PLANT, UNIT 2 DOCKET NO. 50-261 I LICENSE NO. DPR-23 . H.B. ROBINSON INDEPENDENT SPENT FUEL STORAGE INSTALLATION DOCKET NO. 72-3 /"LICENSE NO. SNM-2502 H.B. ROBINSON INDEPENDENT SPENT FUEL STORAGE INSTALLATION DOCKET NO. 72-60 SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1 DOCKET NO. 50-400 I LICENSE NO. NPF-63 M. Christopher Nolan 526 South Church Street Charlotte, NC 28202 Mailing Address: Mail Code EC2ZF /P.O. Box 1006 Charlotte, NC 28201-1006 704-382-7426 10 CFR 5a°.4 10 CFR 50.54(p) 10 CFR 72.44(e) 10 CFR 72.186(b)
(,DUKE                                 SAFEGUARDS INFORMATION 526 South Church Street
~;ENERGY Charlotte, NC 28202 When separated, this page is decontrolled.
Mailing Address:
Mail Code EC2ZF /P.O. Box 1006 Charlotte, NC 28201-1006 704-382-7426 10 CFR 5a°.4 10 CFR 50.54(p) 10 CFR 72.44(e) 10 CFR 72.186(b)
April 21, 2016 RA-16-0018 ATTN: Document Control Desk D,irector, Division of Spent Fuel Management Office of Nuclear Material Safety and Safeguards U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 BRUNSWICK STEAM ELECTRIC PLANT, UNITS 1-AND 2 DOCKET NOS. 50-325, 50-324 / LICENSE NOS. DPR-71, DPR-62 BRUNSWICK INDEPENDENT SPENT FUEL STORAGE INSTALLATION DOCKET NO. 72-6 H.B. ROBINSON STEAM ELECTRIC PLANT, UNIT 2 DOCKET NO. 50-261 I LICENSE NO. DPR-23
    . H.B. ROBINSON INDEPENDENT SPENT FUEL STORAGE INSTALLATION DOCKET NO. 72-3 /"LICENSE NO. SNM-2502 H.B. ROBINSON INDEPENDENT SPENT FUEL STORAGE INSTALLATION DOCKET NO. 72-60 SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1 DOCKET NO. 50-400 I LICENSE NO. NPF-63


==SUBJECT:==
==SUBJECT:==
TRANSMITTAL OF DUKE ENERGY PROGRESS PHYSICAL SECURITY PLAN, REVISION 8 In accordance with 10 CFR 50.4(b)(4)(iii), 10 CFR 50.54(p)(2) and 10 CFR 72.44(e), Duke Energy Progress provides notification that the Duke Energy Progress -Brunswick, Robinson and Harris Nu.clear Plants Physical Security Plan, Security Training and Qualification Plan, Safeguards Contingency Plan and Independent Spent Fuel Storage Installation Security Program has been revised. The effective date of implementation for Revision 8 is February 25, 2016. *An evaluation of the plan revision in accordance with 10 CFR 50.54(p)(2) and 10 CFR 72.44(e) has determined that the changes incorporated do not decrease the overall level of physical *. protection programs and security performance objectives and. requirements as SAFEGUARDS INFORMATION When separated, this page is decontrolled.
TRANSMITTAL OF DUKE ENERGY PROGRESS PHYSICAL SECURITY PLAN, REVISION 8 In accordance with 10 CFR 50.4(b)(4)(iii), 10 CFR 50.54(p)(2) and 10 CFR 72.44(e), Duke Energy Progress provides notification that the Duke Energy Progress - Brunswick, Robinson and Harris Nu.clear Plants Physical Security Plan, Security Training and Qualification Plan, Safeguards Contingency Plan and Independent Spent Fuel Storage Installation Security Program has been revised. The effective date of implementation for Revision 8 is February 25, 2016.
    *An evaluation of the plan revision in accordance with 10 CFR 50.54(p)(2) and 10 CFR 72.44(e) has determined that the changes incorporated do not decrease the overall level of physical
  *. protection programs and security organiz~tion performance objectives and. requirements as SAFEGUARDS INFORMATION When separated, this page is decontrolled.
 
SAFEGUARDS INFORMATION When separated, this page is decontrolled.
SAFEGUARDS INFORMATION When separated, this page is decontrolled.
U.S. Nuclear Regulatory Commission RA-16-0018 Page2 described in paragraphs (b) through (k) and (m) through (q) of 10 CFR 73.55 and 10 CFR . 72.212(b)(9).
U.S. Nuclear Regulatory Commission RA-16-0018 Page2 described in paragraphs (b) through (k) and (m) through (q) of 10 CFR 73.55 and 10 CFR
This letter includes two enclosures which contain Safeguards Information as defined in 10 CFR 73.2 and must be protected from unauthorized disClosurei il'J accordance with 10 CFR 73.21. Enclosure 1 contains a summary description of the Physical Security Plan revision changes. Enclosure 2 contains a copy of the Duke Energy Progress -Brunswick, Robinson and Harris Nuclear Plants Physical Security Plan, Security Training and Qualification Plan, Safeguards Contingency Plan and Independent Spent Fuel Storage Installation Security Program. *
. 72.212(b)(9).
* There are no new regulatory commitments made in this submittal.
This letter includes two enclosures which contain Safeguards Information as defined in 10 CFR 73.2 and must be protected from unauthorized disClosurei il'J accordance with 10 CFR 73.21. Enclosure 1 contains a summary description of the Physical Security Plan revision changes. Enclosure 2 contains a copy of the Duke Energy Progress - Brunswick, Robinson and Harris Nuclear Plants Physical Security Plan, Security Training and Qualification Plan, Safeguards Contingency Plan and Independent Spent Fuel Storage Installation Security Program.                                                             *
Should there be any questions regarding this submittal, please contact Art Zaremba at (980} 373-2062.
* There are no new regulatory commitments made in this submittal. Should there be any questions regarding this submittal, please contact Art Zaremba at (980} 373-2062.
* Sincerely, M. Christopher Nolan, Director Nuclear Regulatory Affairs  
* Sincerely, M. Christopher Nolan, Director Nuclear Regulatory Affairs


==Enclosures:==
==Enclosures:==
: 1.
: 1.
* Summary Description of Changes [SAFEGUARDS INFORMATION]
* Summary Description of Changes [SAFEGUARDS INFORMATION]
: 2. Copy of Duke Energy Progress -Brunswick, Robinson and Harris Nuclear Plants Physical Security Plan, Security Training and Qualification Plan, Safeguards Contingency Plan and. Independent Spent Fuel Storage Installation Security Program (composite)
: 2. Copy of Duke Energy Progress - Brunswick, Robinson and Harris Nuclear Plants Physical Security Plan, Security Training and Qualification Plan, Safeguards Contingency Plan and. Independent Spent Fuel Storage Installation Security Program (composite) [SAFEGUARDS INFORMATION]                               .
[SAFEGUARDS INFORMATION] . SAFEGUARDS INFORMATION When separated, this page is decontrolled  
SAFEGUARDS INFORMATION When separated, this page is decontrolled.
..
 
SAFEGUARDS INFORMATION.
SAFEGUARDS INFORMATION.
When separated, this page is decontrolled.
When separated, this page is decontrolled.
U.S. Nuclear Regulatory Commission RA-16-0018 Page 3 xc: (w/ enclosures)
U.S. Nuclear Regulatory Commission RA-16-0018 Page 3 xc: (w/ enclosures) [SAFEGUARDS INFORMATION]
[SAFEGUARDS INFORMATION]
C. Haney U.S. Nuclear Regulatory Commission - Region II Marquis One Tower 245 Peachtree Center Ave., NE Suite 1200 Atlanta, Georgia 30303-1257 xc: (w/o enclosures)
C. Haney U.S. Nuclear Regulatory Commission  
M.C. Barillas, Project Manager (SHNPP)
-Region II Marquis One Tower 245 Peachtree Center Ave., NE Suite 1200 Atlanta, Georgia 30303-1257 xc: (w/o enclosures)
, U. S. Nuclear Regulatory Commission One White Flint North, Mail Stop 8 G9A 11555 Rockville Pike
M.C. Barillas, Project Manager (SHNPP) , U. S. Nuclear Regulatory Commission One White Flint North, Mail Stop 8 G9A 11555 Rockville Pike , Rockville, MD 20852-2738_
, Rockville, MD 20852-2738_
AL. Hon, Project Manager (BSEP) U. S. Nuclear Regulatory Commission . One White Flint North, Mail Stop 8 G9A 11555 Rockville Pike Rockville, MD 20852-2738 D.J. Galvin, Project Manager (HBRSEP, Unit 2) U.S. NuclearRegulatory Commission One White Flint North, Mail Stop 8G9A 11555 Rockville Pike . Rockville, MD 20852-2738 M.P. Catts NRG Senior Resident Inspector Brunswick Steam Electric Plant, Unit Nos. 1 and 2 K.M. Ellis NRG Senior Resident Inspector H.B. Robinson Steam Electric Plant, Unit No. 2 J.D. Austin NRG Senior Resident Inspector Shearon Harris Nuclear Power Plant, Unit 1 SAFEGUARDS INFORMATION When separated, this page is decontrolled.
AL. Hon, Project Manager (BSEP)
U. S. Nuclear Regulatory Commission
  . One White Flint North, Mail Stop 8 G9A 11555 Rockville Pike Rockville, MD 20852-2738 D.J. Galvin, Project Manager (HBRSEP, Unit 2)
U.S. NuclearRegulatory Commission One White Flint North, Mail Stop 8G9A 11555 Rockville Pike
  . Rockville, MD 20852-2738 M.P. Catts NRG Senior Resident Inspector Brunswick Steam Electric Plant, Unit Nos. 1 and 2 K.M. Ellis NRG Senior Resident Inspector H.B. Robinson Steam Electric Plant, Unit No. 2 J.D. Austin NRG Senior Resident Inspector Shearon Harris Nuclear Power Plant, Unit 1 SAFEGUARDS INFORMATION When separated, this page is decontrolled.
 
SAFEGUARDS INFORMATION When separated, this page is.decontrolled.
SAFEGUARDS INFORMATION When separated, this page is.decontrolled.
U.S. Nuclear Regulatory Commission RA-16-0018 Page4 bxc: (w/o enclosures)
U.S. Nuclear Regulatory Commission RA-16-0018 Page4 bxc: (w/o enclosures)
ET O'Neil T.W. King M.C. Nolan A.H. Zaremba T.J . .Y\fadsworth J.L. Vaughan ELL . File: (Corporate)
ET O'Neil T.W. King M.C. Nolan A.H. Zaremba T.J . .Y\fadsworth J.L. Vaughan ELL .
J.M Remick R. Hightower C. Caudell (For RNP Licensing/Nuclear Records) A.K. Brittain L. Grzeck W.R. Murray (For BNP Licensing/Nuclear Records) L. Faulk J. Caves C. Magher (For HNP Licensing/Nuclear Records) . SAFEGUARDS INFORMATION When separated, this page is decontrolled.
File: (Corporate)
J.M Remick R. Hightower C. Caudell (For RNP Licensing/Nuclear Records)
A.K. Brittain L. Grzeck W.R. Murray (For BNP Licensing/Nuclear Records)
L. Faulk J. Caves C. Magher (For HNP Licensing/Nuclear Records) .
SAFEGUARDS INFORMATION When separated, this page is decontrolled.
 
SAFEGUARDS INFORMATION When separated, this page is decontrolled.
SAFEGUARDS INFORMATION When separated, this page is decontrolled.
U.S. Nuclear Regulatory Commission RA-1ff-0018 Enclosure 1 Summary Description of Changes SAFEGUARDS INFORMATION When separated, this page is decontrolled.
U.S. Nuclear Regulatory Commission RA-1ff-0018 Enclosure 1 Summary Description of Changes SAFEGUARDS INFORMATION When separated, this page is decontrolled.
(,DUKE April 21, 2016 RA-16-0018 SAFEGUARDS INFORMATION When separated, this page is decontrolled.
 
ATTN: Document Control Desk D,irector, Division of Spent Fuel Management Office of Nuclear Material Safety and Safeguards U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 BRUNSWICK STEAM ELECTRIC PLANT, UNITS 1-AND 2 DOCKET NOS. 50-325, 50-324 / LICENSE NOS. DPR-71, DPR-62 BRUNSWICK INDEPENDENT SPENT FUEL STORAGE INSTALLATION DOCKET NO. 72-6 H.B. ROBINSON STEAM ELECTRIC PLANT, UNIT 2 DOCKET NO. 50-261 I LICENSE NO. DPR-23 . H.B. ROBINSON INDEPENDENT SPENT FUEL STORAGE INSTALLATION DOCKET NO. 72-3 /"LICENSE NO. SNM-2502 H.B. ROBINSON INDEPENDENT SPENT FUEL STORAGE INSTALLATION DOCKET NO. 72-60 SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1 DOCKET NO. 50-400 I LICENSE NO. NPF-63 M. Christopher Nolan 526 South Church Street Charlotte, NC 28202 Mailing Address: Mail Code EC2ZF /P.O. Box 1006 Charlotte, NC 28201-1006 704-382-7426 10 CFR 5a°.4 10 CFR 50.54(p) 10 CFR 72.44(e) 10 CFR 72.186(b)
M. Christopher Nolan
(,DUKE                                 SAFEGUARDS INFORMATION 526 South Church Street
~;ENERGY Charlotte, NC 28202 When separated, this page is decontrolled.
Mailing Address:
Mail Code EC2ZF /P.O. Box 1006 Charlotte, NC 28201-1006 704-382-7426 10 CFR 5a°.4 10 CFR 50.54(p) 10 CFR 72.44(e) 10 CFR 72.186(b)
April 21, 2016 RA-16-0018 ATTN: Document Control Desk D,irector, Division of Spent Fuel Management Office of Nuclear Material Safety and Safeguards U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 BRUNSWICK STEAM ELECTRIC PLANT, UNITS 1-AND 2 DOCKET NOS. 50-325, 50-324 / LICENSE NOS. DPR-71, DPR-62 BRUNSWICK INDEPENDENT SPENT FUEL STORAGE INSTALLATION DOCKET NO. 72-6 H.B. ROBINSON STEAM ELECTRIC PLANT, UNIT 2 DOCKET NO. 50-261 I LICENSE NO. DPR-23
    . H.B. ROBINSON INDEPENDENT SPENT FUEL STORAGE INSTALLATION DOCKET NO. 72-3 /"LICENSE NO. SNM-2502 H.B. ROBINSON INDEPENDENT SPENT FUEL STORAGE INSTALLATION DOCKET NO. 72-60 SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1 DOCKET NO. 50-400 I LICENSE NO. NPF-63


==SUBJECT:==
==SUBJECT:==
TRANSMITTAL OF DUKE ENERGY PROGRESS PHYSICAL SECURITY PLAN, REVISION 8 In accordance with 10 CFR 50.4(b)(4)(iii), 10 CFR 50.54(p)(2) and 10 CFR 72.44(e), Duke Energy Progress provides notification that the Duke Energy Progress -Brunswick, Robinson and Harris Nu.clear Plants Physical Security Plan, Security Training and Qualification Plan, Safeguards Contingency Plan and Independent Spent Fuel Storage Installation Security Program has been revised. The effective date of implementation for Revision 8 is February 25, 2016. *An evaluation of the plan revision in accordance with 10 CFR 50.54(p)(2) and 10 CFR 72.44(e) has determined that the changes incorporated do not decrease the overall level of physical *. protection programs and security performance objectives and. requirements as SAFEGUARDS INFORMATION When separated, this page is decontrolled.
TRANSMITTAL OF DUKE ENERGY PROGRESS PHYSICAL SECURITY PLAN, REVISION 8 In accordance with 10 CFR 50.4(b)(4)(iii), 10 CFR 50.54(p)(2) and 10 CFR 72.44(e), Duke Energy Progress provides notification that the Duke Energy Progress - Brunswick, Robinson and Harris Nu.clear Plants Physical Security Plan, Security Training and Qualification Plan, Safeguards Contingency Plan and Independent Spent Fuel Storage Installation Security Program has been revised. The effective date of implementation for Revision 8 is February 25, 2016.
    *An evaluation of the plan revision in accordance with 10 CFR 50.54(p)(2) and 10 CFR 72.44(e) has determined that the changes incorporated do not decrease the overall level of physical
  *. protection programs and security organiz~tion performance objectives and. requirements as SAFEGUARDS INFORMATION When separated, this page is decontrolled.
 
SAFEGUARDS INFORMATION When separated, this page is decontrolled.
SAFEGUARDS INFORMATION When separated, this page is decontrolled.
U.S. Nuclear Regulatory Commission RA-16-0018 Page2 described in paragraphs (b) through (k) and (m) through (q) of 10 CFR 73.55 and 10 CFR . 72.212(b)(9).
U.S. Nuclear Regulatory Commission RA-16-0018 Page2 described in paragraphs (b) through (k) and (m) through (q) of 10 CFR 73.55 and 10 CFR
This letter includes two enclosures which contain Safeguards Information as defined in 10 CFR 73.2 and must be protected from unauthorized disClosurei il'J accordance with 10 CFR 73.21. Enclosure 1 contains a summary description of the Physical Security Plan revision changes. Enclosure 2 contains a copy of the Duke Energy Progress -Brunswick, Robinson and Harris Nuclear Plants Physical Security Plan, Security Training and Qualification Plan, Safeguards Contingency Plan and Independent Spent Fuel Storage Installation Security Program. *
. 72.212(b)(9).
* There are no new regulatory commitments made in this submittal.
This letter includes two enclosures which contain Safeguards Information as defined in 10 CFR 73.2 and must be protected from unauthorized disClosurei il'J accordance with 10 CFR 73.21. Enclosure 1 contains a summary description of the Physical Security Plan revision changes. Enclosure 2 contains a copy of the Duke Energy Progress - Brunswick, Robinson and Harris Nuclear Plants Physical Security Plan, Security Training and Qualification Plan, Safeguards Contingency Plan and Independent Spent Fuel Storage Installation Security Program.                                                             *
Should there be any questions regarding this submittal, please contact Art Zaremba at (980} 373-2062.
* There are no new regulatory commitments made in this submittal. Should there be any questions regarding this submittal, please contact Art Zaremba at (980} 373-2062.
* Sincerely, M. Christopher Nolan, Director Nuclear Regulatory Affairs  
* Sincerely, M. Christopher Nolan, Director Nuclear Regulatory Affairs


==Enclosures:==
==Enclosures:==
: 1.
: 1.
* Summary Description of Changes [SAFEGUARDS INFORMATION]
* Summary Description of Changes [SAFEGUARDS INFORMATION]
: 2. Copy of Duke Energy Progress -Brunswick, Robinson and Harris Nuclear Plants Physical Security Plan, Security Training and Qualification Plan, Safeguards Contingency Plan and. Independent Spent Fuel Storage Installation Security Program (composite)
: 2. Copy of Duke Energy Progress - Brunswick, Robinson and Harris Nuclear Plants Physical Security Plan, Security Training and Qualification Plan, Safeguards Contingency Plan and. Independent Spent Fuel Storage Installation Security Program (composite) [SAFEGUARDS INFORMATION]                               .
[SAFEGUARDS INFORMATION] . SAFEGUARDS INFORMATION When separated, this page is decontrolled  
SAFEGUARDS INFORMATION When separated, this page is decontrolled.
..
 
SAFEGUARDS INFORMATION.
SAFEGUARDS INFORMATION.
When separated, this page is decontrolled.
When separated, this page is decontrolled.
U.S. Nuclear Regulatory Commission RA-16-0018 Page 3 xc: (w/ enclosures)
U.S. Nuclear Regulatory Commission RA-16-0018 Page 3 xc: (w/ enclosures) [SAFEGUARDS INFORMATION]
[SAFEGUARDS INFORMATION]
C. Haney U.S. Nuclear Regulatory Commission - Region II Marquis One Tower 245 Peachtree Center Ave., NE Suite 1200 Atlanta, Georgia 30303-1257 xc: (w/o enclosures)
C. Haney U.S. Nuclear Regulatory Commission  
M.C. Barillas, Project Manager (SHNPP)
-Region II Marquis One Tower 245 Peachtree Center Ave., NE Suite 1200 Atlanta, Georgia 30303-1257 xc: (w/o enclosures)
, U. S. Nuclear Regulatory Commission One White Flint North, Mail Stop 8 G9A 11555 Rockville Pike
M.C. Barillas, Project Manager (SHNPP) , U. S. Nuclear Regulatory Commission One White Flint North, Mail Stop 8 G9A 11555 Rockville Pike , Rockville, MD 20852-2738_
, Rockville, MD 20852-2738_
AL. Hon, Project Manager (BSEP) U. S. Nuclear Regulatory Commission . One White Flint North, Mail Stop 8 G9A 11555 Rockville Pike Rockville, MD 20852-2738 D.J. Galvin, Project Manager (HBRSEP, Unit 2) U.S. NuclearRegulatory Commission One White Flint North, Mail Stop 8G9A 11555 Rockville Pike . Rockville, MD 20852-2738 M.P. Catts NRG Senior Resident Inspector Brunswick Steam Electric Plant, Unit Nos. 1 and 2 K.M. Ellis NRG Senior Resident Inspector H.B. Robinson Steam Electric Plant, Unit No. 2 J.D. Austin NRG Senior Resident Inspector Shearon Harris Nuclear Power Plant, Unit 1 SAFEGUARDS INFORMATION When separated, this page is decontrolled.
AL. Hon, Project Manager (BSEP)
U. S. Nuclear Regulatory Commission
  . One White Flint North, Mail Stop 8 G9A 11555 Rockville Pike Rockville, MD 20852-2738 D.J. Galvin, Project Manager (HBRSEP, Unit 2)
U.S. NuclearRegulatory Commission One White Flint North, Mail Stop 8G9A 11555 Rockville Pike
  . Rockville, MD 20852-2738 M.P. Catts NRG Senior Resident Inspector Brunswick Steam Electric Plant, Unit Nos. 1 and 2 K.M. Ellis NRG Senior Resident Inspector H.B. Robinson Steam Electric Plant, Unit No. 2 J.D. Austin NRG Senior Resident Inspector Shearon Harris Nuclear Power Plant, Unit 1 SAFEGUARDS INFORMATION When separated, this page is decontrolled.
 
SAFEGUARDS INFORMATION When separated, this page is.decontrolled.
SAFEGUARDS INFORMATION When separated, this page is.decontrolled.
U.S. Nuclear Regulatory Commission RA-16-0018 Page4 bxc: (w/o enclosures)
U.S. Nuclear Regulatory Commission RA-16-0018 Page4 bxc: (w/o enclosures)
ET O'Neil T.W. King M.C. Nolan A.H. Zaremba T.J . .Y\fadsworth J.L. Vaughan ELL . File: (Corporate)
ET O'Neil T.W. King M.C. Nolan A.H. Zaremba T.J . .Y\fadsworth J.L. Vaughan ELL .
J.M Remick R. Hightower C. Caudell (For RNP Licensing/Nuclear Records) A.K. Brittain L. Grzeck W.R. Murray (For BNP Licensing/Nuclear Records) L. Faulk J. Caves C. Magher (For HNP Licensing/Nuclear Records) . SAFEGUARDS INFORMATION When separated, this page is decontrolled.
File: (Corporate)
J.M Remick R. Hightower C. Caudell (For RNP Licensing/Nuclear Records)
A.K. Brittain L. Grzeck W.R. Murray (For BNP Licensing/Nuclear Records)
L. Faulk J. Caves C. Magher (For HNP Licensing/Nuclear Records) .
SAFEGUARDS INFORMATION When separated, this page is decontrolled.
 
SAFEGUARDS INFORMATION When separated, this page is decontrolled.
SAFEGUARDS INFORMATION When separated, this page is decontrolled.
U.S. Nuclear Regulatory Commission RA-1ff-0018 Enclosure 1 Summary Description of Changes SAFEGUARDS INFORMATION When separated, this page is decontrolled.}}
U.S. Nuclear Regulatory Commission RA-1ff-0018 Enclosure 1 Summary Description of Changes SAFEGUARDS INFORMATION When separated, this page is decontrolled.}}

Latest revision as of 21:17, 30 October 2019

Independent Spent Fuel Storage Installation, H.B. Robinson, Unit 2 and Independent Spent Fuel Storage, and Shearon, Unit 1 - Transmittal of Physical Security Plan, Revision 8
ML16116A226
Person / Time
Site: Harris, Brunswick, Robinson, 07200006, 07200003, 07200060  Duke Energy icon.png
Issue date: 04/21/2016
From: Nolan M
Duke Energy Progress
To:
Document Control Desk, Division of Spent Fuel Management, Office of Nuclear Reactor Regulation
References
RA-16-0018
Download: ML16116A226 (5)


Text

M. Christopher Nolan

(,DUKE SAFEGUARDS INFORMATION 526 South Church Street

~;ENERGY Charlotte, NC 28202 When separated, this page is decontrolled.

Mailing Address:

Mail Code EC2ZF /P.O. Box 1006 Charlotte, NC 28201-1006 704-382-7426 10 CFR 5a°.4 10 CFR 50.54(p) 10 CFR 72.44(e) 10 CFR 72.186(b)

April 21, 2016 RA-16-0018 ATTN: Document Control Desk D,irector, Division of Spent Fuel Management Office of Nuclear Material Safety and Safeguards U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 BRUNSWICK STEAM ELECTRIC PLANT, UNITS 1-AND 2 DOCKET NOS. 50-325, 50-324 / LICENSE NOS. DPR-71, DPR-62 BRUNSWICK INDEPENDENT SPENT FUEL STORAGE INSTALLATION DOCKET NO. 72-6 H.B. ROBINSON STEAM ELECTRIC PLANT, UNIT 2 DOCKET NO. 50-261 I LICENSE NO. DPR-23

. H.B. ROBINSON INDEPENDENT SPENT FUEL STORAGE INSTALLATION DOCKET NO. 72-3 /"LICENSE NO. SNM-2502 H.B. ROBINSON INDEPENDENT SPENT FUEL STORAGE INSTALLATION DOCKET NO. 72-60 SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1 DOCKET NO. 50-400 I LICENSE NO. NPF-63

SUBJECT:

TRANSMITTAL OF DUKE ENERGY PROGRESS PHYSICAL SECURITY PLAN, REVISION 8 In accordance with 10 CFR 50.4(b)(4)(iii), 10 CFR 50.54(p)(2) and 10 CFR 72.44(e), Duke Energy Progress provides notification that the Duke Energy Progress - Brunswick, Robinson and Harris Nu.clear Plants Physical Security Plan, Security Training and Qualification Plan, Safeguards Contingency Plan and Independent Spent Fuel Storage Installation Security Program has been revised. The effective date of implementation for Revision 8 is February 25, 2016.

  • An evaluation of the plan revision in accordance with 10 CFR 50.54(p)(2) and 10 CFR 72.44(e) has determined that the changes incorporated do not decrease the overall level of physical
  • . protection programs and security organiz~tion performance objectives and. requirements as SAFEGUARDS INFORMATION When separated, this page is decontrolled.

SAFEGUARDS INFORMATION When separated, this page is decontrolled.

U.S. Nuclear Regulatory Commission RA-16-0018 Page2 described in paragraphs (b) through (k) and (m) through (q) of 10 CFR 73.55 and 10 CFR

. 72.212(b)(9).

This letter includes two enclosures which contain Safeguards Information as defined in 10 CFR 73.2 and must be protected from unauthorized disClosurei il'J accordance with 10 CFR 73.21. Enclosure 1 contains a summary description of the Physical Security Plan revision changes. Enclosure 2 contains a copy of the Duke Energy Progress - Brunswick, Robinson and Harris Nuclear Plants Physical Security Plan, Security Training and Qualification Plan, Safeguards Contingency Plan and Independent Spent Fuel Storage Installation Security Program. *

  • There are no new regulatory commitments made in this submittal. Should there be any questions regarding this submittal, please contact Art Zaremba at (980} 373-2062.
  • Sincerely, M. Christopher Nolan, Director Nuclear Regulatory Affairs

Enclosures:

1.
  • Summary Description of Changes [SAFEGUARDS INFORMATION]
2. Copy of Duke Energy Progress - Brunswick, Robinson and Harris Nuclear Plants Physical Security Plan, Security Training and Qualification Plan, Safeguards Contingency Plan and. Independent Spent Fuel Storage Installation Security Program (composite) [SAFEGUARDS INFORMATION] .

SAFEGUARDS INFORMATION When separated, this page is decontrolled.

SAFEGUARDS INFORMATION.

When separated, this page is decontrolled.

U.S. Nuclear Regulatory Commission RA-16-0018 Page 3 xc: (w/ enclosures) [SAFEGUARDS INFORMATION]

C. Haney U.S. Nuclear Regulatory Commission - Region II Marquis One Tower 245 Peachtree Center Ave., NE Suite 1200 Atlanta, Georgia 30303-1257 xc: (w/o enclosures)

M.C. Barillas, Project Manager (SHNPP)

, U. S. Nuclear Regulatory Commission One White Flint North, Mail Stop 8 G9A 11555 Rockville Pike

, Rockville, MD 20852-2738_

AL. Hon, Project Manager (BSEP)

U. S. Nuclear Regulatory Commission

. One White Flint North, Mail Stop 8 G9A 11555 Rockville Pike Rockville, MD 20852-2738 D.J. Galvin, Project Manager (HBRSEP, Unit 2)

U.S. NuclearRegulatory Commission One White Flint North, Mail Stop 8G9A 11555 Rockville Pike

. Rockville, MD 20852-2738 M.P. Catts NRG Senior Resident Inspector Brunswick Steam Electric Plant, Unit Nos. 1 and 2 K.M. Ellis NRG Senior Resident Inspector H.B. Robinson Steam Electric Plant, Unit No. 2 J.D. Austin NRG Senior Resident Inspector Shearon Harris Nuclear Power Plant, Unit 1 SAFEGUARDS INFORMATION When separated, this page is decontrolled.

SAFEGUARDS INFORMATION When separated, this page is.decontrolled.

U.S. Nuclear Regulatory Commission RA-16-0018 Page4 bxc: (w/o enclosures)

ET O'Neil T.W. King M.C. Nolan A.H. Zaremba T.J . .Y\fadsworth J.L. Vaughan ELL .

File: (Corporate)

J.M Remick R. Hightower C. Caudell (For RNP Licensing/Nuclear Records)

A.K. Brittain L. Grzeck W.R. Murray (For BNP Licensing/Nuclear Records)

L. Faulk J. Caves C. Magher (For HNP Licensing/Nuclear Records) .

SAFEGUARDS INFORMATION When separated, this page is decontrolled.

SAFEGUARDS INFORMATION When separated, this page is decontrolled.

U.S. Nuclear Regulatory Commission RA-1ff-0018 Enclosure 1 Summary Description of Changes SAFEGUARDS INFORMATION When separated, this page is decontrolled.

M. Christopher Nolan

(,DUKE SAFEGUARDS INFORMATION 526 South Church Street

~;ENERGY Charlotte, NC 28202 When separated, this page is decontrolled.

Mailing Address:

Mail Code EC2ZF /P.O. Box 1006 Charlotte, NC 28201-1006 704-382-7426 10 CFR 5a°.4 10 CFR 50.54(p) 10 CFR 72.44(e) 10 CFR 72.186(b)

April 21, 2016 RA-16-0018 ATTN: Document Control Desk D,irector, Division of Spent Fuel Management Office of Nuclear Material Safety and Safeguards U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 BRUNSWICK STEAM ELECTRIC PLANT, UNITS 1-AND 2 DOCKET NOS. 50-325, 50-324 / LICENSE NOS. DPR-71, DPR-62 BRUNSWICK INDEPENDENT SPENT FUEL STORAGE INSTALLATION DOCKET NO. 72-6 H.B. ROBINSON STEAM ELECTRIC PLANT, UNIT 2 DOCKET NO. 50-261 I LICENSE NO. DPR-23

. H.B. ROBINSON INDEPENDENT SPENT FUEL STORAGE INSTALLATION DOCKET NO. 72-3 /"LICENSE NO. SNM-2502 H.B. ROBINSON INDEPENDENT SPENT FUEL STORAGE INSTALLATION DOCKET NO. 72-60 SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1 DOCKET NO. 50-400 I LICENSE NO. NPF-63

SUBJECT:

TRANSMITTAL OF DUKE ENERGY PROGRESS PHYSICAL SECURITY PLAN, REVISION 8 In accordance with 10 CFR 50.4(b)(4)(iii), 10 CFR 50.54(p)(2) and 10 CFR 72.44(e), Duke Energy Progress provides notification that the Duke Energy Progress - Brunswick, Robinson and Harris Nu.clear Plants Physical Security Plan, Security Training and Qualification Plan, Safeguards Contingency Plan and Independent Spent Fuel Storage Installation Security Program has been revised. The effective date of implementation for Revision 8 is February 25, 2016.

  • An evaluation of the plan revision in accordance with 10 CFR 50.54(p)(2) and 10 CFR 72.44(e) has determined that the changes incorporated do not decrease the overall level of physical
  • . protection programs and security organiz~tion performance objectives and. requirements as SAFEGUARDS INFORMATION When separated, this page is decontrolled.

SAFEGUARDS INFORMATION When separated, this page is decontrolled.

U.S. Nuclear Regulatory Commission RA-16-0018 Page2 described in paragraphs (b) through (k) and (m) through (q) of 10 CFR 73.55 and 10 CFR

. 72.212(b)(9).

This letter includes two enclosures which contain Safeguards Information as defined in 10 CFR 73.2 and must be protected from unauthorized disClosurei il'J accordance with 10 CFR 73.21. Enclosure 1 contains a summary description of the Physical Security Plan revision changes. Enclosure 2 contains a copy of the Duke Energy Progress - Brunswick, Robinson and Harris Nuclear Plants Physical Security Plan, Security Training and Qualification Plan, Safeguards Contingency Plan and Independent Spent Fuel Storage Installation Security Program. *

  • There are no new regulatory commitments made in this submittal. Should there be any questions regarding this submittal, please contact Art Zaremba at (980} 373-2062.
  • Sincerely, M. Christopher Nolan, Director Nuclear Regulatory Affairs

Enclosures:

1.
  • Summary Description of Changes [SAFEGUARDS INFORMATION]
2. Copy of Duke Energy Progress - Brunswick, Robinson and Harris Nuclear Plants Physical Security Plan, Security Training and Qualification Plan, Safeguards Contingency Plan and. Independent Spent Fuel Storage Installation Security Program (composite) [SAFEGUARDS INFORMATION] .

SAFEGUARDS INFORMATION When separated, this page is decontrolled.

SAFEGUARDS INFORMATION.

When separated, this page is decontrolled.

U.S. Nuclear Regulatory Commission RA-16-0018 Page 3 xc: (w/ enclosures) [SAFEGUARDS INFORMATION]

C. Haney U.S. Nuclear Regulatory Commission - Region II Marquis One Tower 245 Peachtree Center Ave., NE Suite 1200 Atlanta, Georgia 30303-1257 xc: (w/o enclosures)

M.C. Barillas, Project Manager (SHNPP)

, U. S. Nuclear Regulatory Commission One White Flint North, Mail Stop 8 G9A 11555 Rockville Pike

, Rockville, MD 20852-2738_

AL. Hon, Project Manager (BSEP)

U. S. Nuclear Regulatory Commission

. One White Flint North, Mail Stop 8 G9A 11555 Rockville Pike Rockville, MD 20852-2738 D.J. Galvin, Project Manager (HBRSEP, Unit 2)

U.S. NuclearRegulatory Commission One White Flint North, Mail Stop 8G9A 11555 Rockville Pike

. Rockville, MD 20852-2738 M.P. Catts NRG Senior Resident Inspector Brunswick Steam Electric Plant, Unit Nos. 1 and 2 K.M. Ellis NRG Senior Resident Inspector H.B. Robinson Steam Electric Plant, Unit No. 2 J.D. Austin NRG Senior Resident Inspector Shearon Harris Nuclear Power Plant, Unit 1 SAFEGUARDS INFORMATION When separated, this page is decontrolled.

SAFEGUARDS INFORMATION When separated, this page is.decontrolled.

U.S. Nuclear Regulatory Commission RA-16-0018 Page4 bxc: (w/o enclosures)

ET O'Neil T.W. King M.C. Nolan A.H. Zaremba T.J . .Y\fadsworth J.L. Vaughan ELL .

File: (Corporate)

J.M Remick R. Hightower C. Caudell (For RNP Licensing/Nuclear Records)

A.K. Brittain L. Grzeck W.R. Murray (For BNP Licensing/Nuclear Records)

L. Faulk J. Caves C. Magher (For HNP Licensing/Nuclear Records) .

SAFEGUARDS INFORMATION When separated, this page is decontrolled.

SAFEGUARDS INFORMATION When separated, this page is decontrolled.

U.S. Nuclear Regulatory Commission RA-1ff-0018 Enclosure 1 Summary Description of Changes SAFEGUARDS INFORMATION When separated, this page is decontrolled.