Line 3: Line 3:
| issue date = 09/21/2016
| issue date = 09/21/2016
| title = 2016 Braidwood Initial License Examination, Form Es 201-1
| title = 2016 Braidwood Initial License Examination, Form Es 201-1
| author name = Walton R K
| author name = Walton R
| author affiliation = NRC/RGN-III/DRS/OLB
| author affiliation = NRC/RGN-III/DRS/OLB
| addressee name =  
| addressee name =  
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:ES-201 Examination Preparation Checklist Form ES-201-1   Facility: __Braidwood______                                                   Date of Examination:
{{#Wiki_filter:ES-201                               Examination Preparation Checklist                                         Form ES-201-1 Facility: __Braidwood______                                           Date of Examination: Sept 6 - 15, 2016 Developed by: Written:       Facility     X         NRC             // Operating     Facility X           NRC Chief Target                                       Task Description (Reference)                                       Examiners Date*
Sept 6 - 15, 2016 Developed by: Written
Initials
: Facility   X NRC       // Operating Facility   X   NRC           Target Date* Task Description (Reference)
      -180       1. Examination administration date confirmed (C.1.a; C.2.a and b)                             RKW
Chief Examiner's Initials -180 1. Examination administration date confirmed (C.1.a; C.2.a and b)
      -150       2. NRC examiners and facility contact assigned (C.1.d; C.2.e)                                 RKW
RKW  -150 2. NRC examiners and facility contact assigned (C.1.d; C.2.e)
      -150       3. Facility contact briefed on security and other requirements (C.2.c)                       RKW 8/20/2015
RKW -150 3. Facility contact briefed on security and other requirements (C.2.c)
      -150       4. Corporate notification letter sent (C.2.d)                                                 RKW 8/20/2015
RKW 8/20/2015
[-120]       5. Reference material due (C.1.e; C.3.c; Attachment 3)                                       N/A
-150 4. Corporate notification letter sent (C.2.d)
{-90}       6. Integrated examination outline(s) due, including Forms ES-201-2, ES-201-3, ES-301-1,       RKW ES-301-2, ES-301-5, ES-D-1, ES-401-1/2, ES-401N-1/2, ES-401-3, ES-401N-3, ES-401-4, and ES-401N-4, as applicable (C.1.e and f; C.3.d)                               5/9/2016
RKW 8/20/2015
{-85}       7. Examination outline(s) reviewed by NRC and feedback provided to facility licensee         RKW (C.2.h; C.3.e)                                                                             5/11/2016
[-120] 5. Reference material due (C.1.e; C.3.c; Attachment 3)
{-60}       8. Proposed examinations (including written, walk-through JPMs, and scenarios, as             RKW applicable), supporting documentation (including Forms ES-301-3, ES-301-4, ES-301-5, ES-301-6, and ES-401-6, ES-401N-6, and any Form ES-201-2, ES-201-3,                 6/1/2016 ES-301-1, or ES-301-2 updates), and reference materials due (C.1.e, f, g and h; C.3.d)
N/A {-90} 6. Integrated examination outline(s) due, including Forms ES
      -45       9. Written exam and operating test reviews completed. (C.3.f)                                 RKW 6/21/2016
-201-2, ES-201-3, ES-301-1, ES-301-2, ES-301-5, ES-D-1, ES-401-1/2, ES-401N-1/2, ES-401-3, ES-401N-3, ES-401-4, and ES-401N-4, as applicable (C.1.e and f; C.3.d)
      -30       10. Preliminary license applications (NRC Form 398's) due (C.1.l; C.2.g; ES-202)               RKW 7/29/2016
RKW 5/9/2016 {-85} 7. Examination outline(s) reviewed by NRC and feedback provided to facility licensee (C.2.h; C.3.e)
      -21       11. Examination approved by NRC supervisor for facility licensee review (C.2.h; C.3.f)         RKW 6/21/2016
RKW 5/11/2016
      -21       12. Examinations reviewed with facility licensee (C.1.j; C.2.f and h; C.3.g)                   RKW 7/25/2016
{-60} 8. Proposed examinations (including written, walk
      -14       13. Final license applications due and Form ES-201-4 prepared (C.1.l; C.2.i; ES-202)           RKW 8/15/2016
-through JPMs, and scenarios, as applicable), supporting documentation (including Forms ES
      -14       14. Written examinations and operating tests approved by NRC supervisor (C.2.i;               RKW C.3.h)                                                                                   8/15/2016
-301-3, ES-301-4, ES-301-5, ES-301-6, and ES
        -7       15. Facility licensee management queried regarding the licensees views on the               RKW examination. (C.2 j)
-401-6, ES-401N-6, and any Form ES
        -7       16. Final applications reviewed; 1 or 2 (if >10) applications audited to confirm             RKW qualifications / eligibility; and examination approval and waiver letters sent (C.2.i; Attachment 5; ES-202, C.2.e; ES-204)                                                     7/29/16
-201-2, ES-201-3, ES-301-1, or ES-301-2 updates), and reference materials due (C.1.e, f, g and h; C.3.d) RKW 6/1/2016 -45 9. Written exam and operating test reviews completed. (C.3.f)
        -7       17. Proctoring/written exam administration guidelines reviewed with facility licensee         RKW (C.3.k)
RKW 6/21/2016
 
-30 10. Preliminary license applications (NRC Form 398's) due (C.1.l; C.2.g; ES
    -7         18. Approved scenarios, job performance measures, and questions distributed to NRC RKW examiners (C.3.i)
-202) RKW 7/29/2016
* Target dates are generally based on facility-prepared examinations and are keyed to the examination date identified in the corporate notification letter. They are for planning purposes and may be adjusted on a case-by-case basis in coordination with the facility licensee.
-21 11. Examination approved by NRC supervisor for facility licensee review (C.2.h; C.3.f)
[Applies only] {Does not apply} to examinations prepared by the NRC.}}
RKW 6/21/2016
-21 12. Examinations reviewed with facility licensee (C.1.j; C.2.f and h; C.3.g)
RKW 7/25/2016
-14 13. Final license applications due and Form ES
-201-4 prepared (C.1.l; C.2.i; ES
-202) RKW 8/15/2016
-14 14. Written examinations and operating tests approved by NRC supervisor (C.2.i; C.3.h) RKW 8/15/2016
-7 15. Facility licensee management queried regarding the licensee's views on the examination. (C.2 j)
RKW -7 16. Final applications reviewed; 1 or 2 (if >10) applications audited to confirm qualifications / eligibility; and examination approval and waiver letters sent (C.2.i; Attachment 5; ES
-202, C.2.e; ES
-204) RKW 7/29/16 -7 17. Proctoring/written exam administration guidelines reviewed with facility licensee (C.3.k) RKW 
-7 18. Approved scenarios, job performance measures, and questions distributed to NRC examiners (C.3.i)
RKW
* Target dates are generally based on facility
-prepared examinations and are keyed to the examination date identified in the corporate notification letter. They are for planning purposes and may be adjusted on a case
-by-case basis in coordination with the facility licensee.
[Applies only] {Does not apply} to examinations prepared by the NRC.}}

Latest revision as of 13:32, 30 October 2019

2016 Braidwood Initial License Examination, Form Es 201-1
ML16307A345
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 09/21/2016
From: Walton R
NRC/RGN-III/DRS/OLB
To:
Shared Package
ML16306A152 List:
References
Download: ML16307A345 (2)


Text

ES-201 Examination Preparation Checklist Form ES-201-1 Facility: __Braidwood______ Date of Examination: Sept 6 - 15, 2016 Developed by: Written: Facility X NRC // Operating Facility X NRC Chief Target Task Description (Reference) Examiners Date*

Initials

-180 1. Examination administration date confirmed (C.1.a; C.2.a and b) RKW

-150 2. NRC examiners and facility contact assigned (C.1.d; C.2.e) RKW

-150 3. Facility contact briefed on security and other requirements (C.2.c) RKW 8/20/2015

-150 4. Corporate notification letter sent (C.2.d) RKW 8/20/2015

[-120] 5. Reference material due (C.1.e; C.3.c; Attachment 3) N/A

{-90} 6. Integrated examination outline(s) due, including Forms ES-201-2, ES-201-3, ES-301-1, RKW ES-301-2, ES-301-5, ES-D-1, ES-401-1/2, ES-401N-1/2, ES-401-3, ES-401N-3, ES-401-4, and ES-401N-4, as applicable (C.1.e and f; C.3.d) 5/9/2016

{-85} 7. Examination outline(s) reviewed by NRC and feedback provided to facility licensee RKW (C.2.h; C.3.e) 5/11/2016

{-60} 8. Proposed examinations (including written, walk-through JPMs, and scenarios, as RKW applicable), supporting documentation (including Forms ES-301-3, ES-301-4, ES-301-5, ES-301-6, and ES-401-6, ES-401N-6, and any Form ES-201-2, ES-201-3, 6/1/2016 ES-301-1, or ES-301-2 updates), and reference materials due (C.1.e, f, g and h; C.3.d)

-45 9. Written exam and operating test reviews completed. (C.3.f) RKW 6/21/2016

-30 10. Preliminary license applications (NRC Form 398's) due (C.1.l; C.2.g; ES-202) RKW 7/29/2016

-21 11. Examination approved by NRC supervisor for facility licensee review (C.2.h; C.3.f) RKW 6/21/2016

-21 12. Examinations reviewed with facility licensee (C.1.j; C.2.f and h; C.3.g) RKW 7/25/2016

-14 13. Final license applications due and Form ES-201-4 prepared (C.1.l; C.2.i; ES-202) RKW 8/15/2016

-14 14. Written examinations and operating tests approved by NRC supervisor (C.2.i; RKW C.3.h) 8/15/2016

-7 15. Facility licensee management queried regarding the licensees views on the RKW examination. (C.2 j)

-7 16. Final applications reviewed; 1 or 2 (if >10) applications audited to confirm RKW qualifications / eligibility; and examination approval and waiver letters sent (C.2.i; Attachment 5; ES-202, C.2.e; ES-204) 7/29/16

-7 17. Proctoring/written exam administration guidelines reviewed with facility licensee RKW (C.3.k)

-7 18. Approved scenarios, job performance measures, and questions distributed to NRC RKW examiners (C.3.i)

  • Target dates are generally based on facility-prepared examinations and are keyed to the examination date identified in the corporate notification letter. They are for planning purposes and may be adjusted on a case-by-case basis in coordination with the facility licensee.

[Applies only] {Does not apply} to examinations prepared by the NRC.