ML16307A345: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(4 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 09/21/2016
| issue date = 09/21/2016
| title = 2016 Braidwood Initial License Examination, Form Es 201-1
| title = 2016 Braidwood Initial License Examination, Form Es 201-1
| author name = Walton R K
| author name = Walton R
| author affiliation = NRC/RGN-III/DRS/OLB
| author affiliation = NRC/RGN-III/DRS/OLB
| addressee name =  
| addressee name =  
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:ES-201 Examination Preparation Checklist Form ES-201-1   Facility: __Braidwood______                                                   Date of Examination:   Sept 6 - 15, 2016 Developed by: Written: Facility   X NRC       // Operating Facility   X   NRC           Target Date* Task Description (Reference) Chief Examiner's Initials -180 1. Examination administration date confirmed (C.1.a; C.2.a and b) RKW -150 2. NRC examiners and facility contact assigned (C.1.d; C.2.e) RKW -150 3. Facility contact briefed on security and other requirements (C.2.c) RKW 8/20/2015 -150 4. Corporate notification letter sent (C.2.d) RKW 8/20/2015 [-120] 5. Reference material due (C.1.e; C.3.c; Attachment 3) N/A {-90} 6. Integrated examination outline(s) due, including Forms ES-201-2, ES-201-3, ES-301-1, ES-301-2, ES-301-5, ES-D-1, ES-401-1/2, ES-401N-1/2, ES-401-3, ES-401N-3, ES-401-4, and ES-401N-4, as applicable (C.1.e and f; C.3.d) RKW 5/9/2016 {-85} 7. Examination outline(s) reviewed by NRC and feedback provided to facility licensee (C.2.h; C.3.e) RKW 5/11/2016 {-60} 8. Proposed examinations (including written, walk-through JPMs, and scenarios, as applicable), supporting documentation (including Forms ES-301-3, ES-301-4, ES-301-5, ES-301-6, and ES-401-6, ES-401N-6, and any Form ES-201-2, ES-201-3, ES-301-1, or ES-301-2 updates), and reference materials due (C.1.e, f, g and h; C.3.d) RKW 6/1/2016 -45 9. Written exam and operating test reviews completed. (C.3.f) RKW 6/21/2016 -30 10. Preliminary license applications (NRC Form 398's) due (C.1.l; C.2.g; ES-202) RKW 7/29/2016 -21 11. Examination approved by NRC supervisor for facility licensee review (C.2.h; C.3.f) RKW 6/21/2016 -21 12. Examinations reviewed with facility licensee (C.1.j; C.2.f and h; C.3.g) RKW 7/25/2016 -14 13. Final license applications due and Form ES-201-4 prepared (C.1.l; C.2.i; ES-202) RKW 8/15/2016 -14 14. Written examinations and operating tests approved by NRC supervisor (C.2.i; C.3.h) RKW 8/15/2016 -7 15. Facility licensee management queried regarding the licensee's views on the examination. (C.2 j) RKW -7 16. Final applications reviewed; 1 or 2 (if >10) applications audited to confirm qualifications / eligibility; and examination approval and waiver letters sent (C.2.i; Attachment 5; ES-202, C.2.e; ES-204) RKW 7/29/16 -7 17. Proctoring/written exam administration guidelines reviewed with facility licensee (C.3.k) RKW 
{{#Wiki_filter:ES-201                               Examination Preparation Checklist                                         Form ES-201-1 Facility: __Braidwood______                                           Date of Examination: Sept 6 - 15, 2016 Developed by: Written:       Facility     X         NRC             // Operating     Facility X           NRC Chief Target                                       Task Description (Reference)                                       Examiners Date*
-7 18. Approved scenarios, job performance measures, and questions distributed to NRC examiners (C.3.i) RKW
Initials
* Target dates are generally based on facility-prepared examinations and are keyed to the examination date identified in the corporate notification letter. They are for planning purposes and may be adjusted on a case-by-case basis in coordination with the facility licensee. [Applies only] {Does not apply} to examinations prepared by the NRC.}}
      -180       1. Examination administration date confirmed (C.1.a; C.2.a and b)                             RKW
      -150       2. NRC examiners and facility contact assigned (C.1.d; C.2.e)                                 RKW
      -150       3. Facility contact briefed on security and other requirements (C.2.c)                       RKW 8/20/2015
      -150       4. Corporate notification letter sent (C.2.d)                                                 RKW 8/20/2015
[-120]       5. Reference material due (C.1.e; C.3.c; Attachment 3)                                       N/A
{-90}       6. Integrated examination outline(s) due, including Forms ES-201-2, ES-201-3, ES-301-1,       RKW ES-301-2, ES-301-5, ES-D-1, ES-401-1/2, ES-401N-1/2, ES-401-3, ES-401N-3, ES-401-4, and ES-401N-4, as applicable (C.1.e and f; C.3.d)                               5/9/2016
{-85}       7. Examination outline(s) reviewed by NRC and feedback provided to facility licensee         RKW (C.2.h; C.3.e)                                                                             5/11/2016
{-60}       8. Proposed examinations (including written, walk-through JPMs, and scenarios, as             RKW applicable), supporting documentation (including Forms ES-301-3, ES-301-4, ES-301-5, ES-301-6, and ES-401-6, ES-401N-6, and any Form ES-201-2, ES-201-3,                 6/1/2016 ES-301-1, or ES-301-2 updates), and reference materials due (C.1.e, f, g and h; C.3.d)
      -45       9. Written exam and operating test reviews completed. (C.3.f)                                 RKW 6/21/2016
      -30       10. Preliminary license applications (NRC Form 398's) due (C.1.l; C.2.g; ES-202)               RKW 7/29/2016
      -21       11. Examination approved by NRC supervisor for facility licensee review (C.2.h; C.3.f)         RKW 6/21/2016
      -21       12. Examinations reviewed with facility licensee (C.1.j; C.2.f and h; C.3.g)                   RKW 7/25/2016
      -14       13. Final license applications due and Form ES-201-4 prepared (C.1.l; C.2.i; ES-202)           RKW 8/15/2016
      -14       14. Written examinations and operating tests approved by NRC supervisor (C.2.i;               RKW C.3.h)                                                                                   8/15/2016
        -7       15. Facility licensee management queried regarding the licensees views on the               RKW examination. (C.2 j)
        -7       16. Final applications reviewed; 1 or 2 (if >10) applications audited to confirm             RKW qualifications / eligibility; and examination approval and waiver letters sent (C.2.i; Attachment 5; ES-202, C.2.e; ES-204)                                                     7/29/16
        -7       17. Proctoring/written exam administration guidelines reviewed with facility licensee         RKW (C.3.k)
 
    -7         18. Approved scenarios, job performance measures, and questions distributed to NRC RKW examiners (C.3.i)
* Target dates are generally based on facility-prepared examinations and are keyed to the examination date identified in the corporate notification letter. They are for planning purposes and may be adjusted on a case-by-case basis in coordination with the facility licensee.
[Applies only] {Does not apply} to examinations prepared by the NRC.}}

Latest revision as of 13:32, 30 October 2019

2016 Braidwood Initial License Examination, Form Es 201-1
ML16307A345
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 09/21/2016
From: Walton R
NRC/RGN-III/DRS/OLB
To:
Shared Package
ML16306A152 List:
References
Download: ML16307A345 (2)


Text

ES-201 Examination Preparation Checklist Form ES-201-1 Facility: __Braidwood______ Date of Examination: Sept 6 - 15, 2016 Developed by: Written: Facility X NRC // Operating Facility X NRC Chief Target Task Description (Reference) Examiners Date*

Initials

-180 1. Examination administration date confirmed (C.1.a; C.2.a and b) RKW

-150 2. NRC examiners and facility contact assigned (C.1.d; C.2.e) RKW

-150 3. Facility contact briefed on security and other requirements (C.2.c) RKW 8/20/2015

-150 4. Corporate notification letter sent (C.2.d) RKW 8/20/2015

[-120] 5. Reference material due (C.1.e; C.3.c; Attachment 3) N/A

{-90} 6. Integrated examination outline(s) due, including Forms ES-201-2, ES-201-3, ES-301-1, RKW ES-301-2, ES-301-5, ES-D-1, ES-401-1/2, ES-401N-1/2, ES-401-3, ES-401N-3, ES-401-4, and ES-401N-4, as applicable (C.1.e and f; C.3.d) 5/9/2016

{-85} 7. Examination outline(s) reviewed by NRC and feedback provided to facility licensee RKW (C.2.h; C.3.e) 5/11/2016

{-60} 8. Proposed examinations (including written, walk-through JPMs, and scenarios, as RKW applicable), supporting documentation (including Forms ES-301-3, ES-301-4, ES-301-5, ES-301-6, and ES-401-6, ES-401N-6, and any Form ES-201-2, ES-201-3, 6/1/2016 ES-301-1, or ES-301-2 updates), and reference materials due (C.1.e, f, g and h; C.3.d)

-45 9. Written exam and operating test reviews completed. (C.3.f) RKW 6/21/2016

-30 10. Preliminary license applications (NRC Form 398's) due (C.1.l; C.2.g; ES-202) RKW 7/29/2016

-21 11. Examination approved by NRC supervisor for facility licensee review (C.2.h; C.3.f) RKW 6/21/2016

-21 12. Examinations reviewed with facility licensee (C.1.j; C.2.f and h; C.3.g) RKW 7/25/2016

-14 13. Final license applications due and Form ES-201-4 prepared (C.1.l; C.2.i; ES-202) RKW 8/15/2016

-14 14. Written examinations and operating tests approved by NRC supervisor (C.2.i; RKW C.3.h) 8/15/2016

-7 15. Facility licensee management queried regarding the licensees views on the RKW examination. (C.2 j)

-7 16. Final applications reviewed; 1 or 2 (if >10) applications audited to confirm RKW qualifications / eligibility; and examination approval and waiver letters sent (C.2.i; Attachment 5; ES-202, C.2.e; ES-204) 7/29/16

-7 17. Proctoring/written exam administration guidelines reviewed with facility licensee RKW (C.3.k)

-7 18. Approved scenarios, job performance measures, and questions distributed to NRC RKW examiners (C.3.i)

  • Target dates are generally based on facility-prepared examinations and are keyed to the examination date identified in the corporate notification letter. They are for planning purposes and may be adjusted on a case-by-case basis in coordination with the facility licensee.

[Applies only] {Does not apply} to examinations prepared by the NRC.