(4 intermediate revisions by the same user not shown) |
Line 3: |
Line 3: |
| | issue date = 09/21/2016 | | | issue date = 09/21/2016 |
| | title = 2016 Braidwood Initial License Examination, Form Es 201-1 | | | title = 2016 Braidwood Initial License Examination, Form Es 201-1 |
| | author name = Walton R K | | | author name = Walton R |
| | author affiliation = NRC/RGN-III/DRS/OLB | | | author affiliation = NRC/RGN-III/DRS/OLB |
| | addressee name = | | | addressee name = |
Line 16: |
Line 16: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:ES-201 Examination Preparation Checklist Form ES-201-1 Facility: __Braidwood______ Date of Examination: Sept 6 - 15, 2016 Developed by: Written: Facility X NRC // Operating Facility X NRC Target Date* Task Description (Reference) Chief Examiner's Initials -180 1. Examination administration date confirmed (C.1.a; C.2.a and b) RKW -150 2. NRC examiners and facility contact assigned (C.1.d; C.2.e) RKW -150 3. Facility contact briefed on security and other requirements (C.2.c) RKW 8/20/2015 -150 4. Corporate notification letter sent (C.2.d) RKW 8/20/2015 [-120] 5. Reference material due (C.1.e; C.3.c; Attachment 3) N/A {-90} 6. Integrated examination outline(s) due, including Forms ES-201-2, ES-201-3, ES-301-1, ES-301-2, ES-301-5, ES-D-1, ES-401-1/2, ES-401N-1/2, ES-401-3, ES-401N-3, ES-401-4, and ES-401N-4, as applicable (C.1.e and f; C.3.d) RKW 5/9/2016 {-85} 7. Examination outline(s) reviewed by NRC and feedback provided to facility licensee (C.2.h; C.3.e) RKW 5/11/2016 {-60} 8. Proposed examinations (including written, walk-through JPMs, and scenarios, as applicable), supporting documentation (including Forms ES-301-3, ES-301-4, ES-301-5, ES-301-6, and ES-401-6, ES-401N-6, and any Form ES-201-2, ES-201-3, ES-301-1, or ES-301-2 updates), and reference materials due (C.1.e, f, g and h; C.3.d) RKW 6/1/2016 -45 9. Written exam and operating test reviews completed. (C.3.f) RKW 6/21/2016 -30 10. Preliminary license applications (NRC Form 398's) due (C.1.l; C.2.g; ES-202) RKW 7/29/2016 -21 11. Examination approved by NRC supervisor for facility licensee review (C.2.h; C.3.f) RKW 6/21/2016 -21 12. Examinations reviewed with facility licensee (C.1.j; C.2.f and h; C.3.g) RKW 7/25/2016 -14 13. Final license applications due and Form ES-201-4 prepared (C.1.l; C.2.i; ES-202) RKW 8/15/2016 -14 14. Written examinations and operating tests approved by NRC supervisor (C.2.i; C.3.h) RKW 8/15/2016 -7 15. Facility licensee management queried regarding the licensee's views on the examination. (C.2 j) RKW -7 16. Final applications reviewed; 1 or 2 (if >10) applications audited to confirm qualifications / eligibility; and examination approval and waiver letters sent (C.2.i; Attachment 5; ES-202, C.2.e; ES-204) RKW 7/29/16 -7 17. Proctoring/written exam administration guidelines reviewed with facility licensee (C.3.k) RKW | | {{#Wiki_filter:ES-201 Examination Preparation Checklist Form ES-201-1 Facility: __Braidwood______ Date of Examination: Sept 6 - 15, 2016 Developed by: Written: Facility X NRC // Operating Facility X NRC Chief Target Task Description (Reference) Examiners Date* |
| -7 18. Approved scenarios, job performance measures, and questions distributed to NRC examiners (C.3.i) RKW | | Initials |
| * Target dates are generally based on facility-prepared examinations and are keyed to the examination date identified in the corporate notification letter. They are for planning purposes and may be adjusted on a case-by-case basis in coordination with the facility licensee. [Applies only] {Does not apply} to examinations prepared by the NRC.}} | | -180 1. Examination administration date confirmed (C.1.a; C.2.a and b) RKW |
| | -150 2. NRC examiners and facility contact assigned (C.1.d; C.2.e) RKW |
| | -150 3. Facility contact briefed on security and other requirements (C.2.c) RKW 8/20/2015 |
| | -150 4. Corporate notification letter sent (C.2.d) RKW 8/20/2015 |
| | [-120] 5. Reference material due (C.1.e; C.3.c; Attachment 3) N/A |
| | {-90} 6. Integrated examination outline(s) due, including Forms ES-201-2, ES-201-3, ES-301-1, RKW ES-301-2, ES-301-5, ES-D-1, ES-401-1/2, ES-401N-1/2, ES-401-3, ES-401N-3, ES-401-4, and ES-401N-4, as applicable (C.1.e and f; C.3.d) 5/9/2016 |
| | {-85} 7. Examination outline(s) reviewed by NRC and feedback provided to facility licensee RKW (C.2.h; C.3.e) 5/11/2016 |
| | {-60} 8. Proposed examinations (including written, walk-through JPMs, and scenarios, as RKW applicable), supporting documentation (including Forms ES-301-3, ES-301-4, ES-301-5, ES-301-6, and ES-401-6, ES-401N-6, and any Form ES-201-2, ES-201-3, 6/1/2016 ES-301-1, or ES-301-2 updates), and reference materials due (C.1.e, f, g and h; C.3.d) |
| | -45 9. Written exam and operating test reviews completed. (C.3.f) RKW 6/21/2016 |
| | -30 10. Preliminary license applications (NRC Form 398's) due (C.1.l; C.2.g; ES-202) RKW 7/29/2016 |
| | -21 11. Examination approved by NRC supervisor for facility licensee review (C.2.h; C.3.f) RKW 6/21/2016 |
| | -21 12. Examinations reviewed with facility licensee (C.1.j; C.2.f and h; C.3.g) RKW 7/25/2016 |
| | -14 13. Final license applications due and Form ES-201-4 prepared (C.1.l; C.2.i; ES-202) RKW 8/15/2016 |
| | -14 14. Written examinations and operating tests approved by NRC supervisor (C.2.i; RKW C.3.h) 8/15/2016 |
| | -7 15. Facility licensee management queried regarding the licensees views on the RKW examination. (C.2 j) |
| | -7 16. Final applications reviewed; 1 or 2 (if >10) applications audited to confirm RKW qualifications / eligibility; and examination approval and waiver letters sent (C.2.i; Attachment 5; ES-202, C.2.e; ES-204) 7/29/16 |
| | -7 17. Proctoring/written exam administration guidelines reviewed with facility licensee RKW (C.3.k) |
| | |
| | -7 18. Approved scenarios, job performance measures, and questions distributed to NRC RKW examiners (C.3.i) |
| | * Target dates are generally based on facility-prepared examinations and are keyed to the examination date identified in the corporate notification letter. They are for planning purposes and may be adjusted on a case-by-case basis in coordination with the facility licensee. |
| | [Applies only] {Does not apply} to examinations prepared by the NRC.}} |
|
---|
Category:License-Operator
MONTHYEARML23234A2462023-08-25025 August 2023 Confirmation of Initial License Examination ML23191A8442023-07-10010 July 2023 05000456; 05000457 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML22199A1702022-04-0505 April 2022 Ile ES-201-1 Examination Prep Checklist ML22199A1732022-04-0505 April 2022 Ile ES-201-3 Security Agreement-Final ML22199A1742022-04-0505 April 2022 Ile ES-403-1 Written Exam Grading Quality Checklist BW220023, Ile Post-Examination Submittal Letter (03/30/2022)2022-03-30030 March 2022 Ile Post-Examination Submittal Letter (03/30/2022) RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations ML22053A0692022-02-23023 February 2022 Operator Licensing Examination Approval ML22199A2472022-02-22022 February 2022 Ile ES-201-2 NRC-Developed Outline Quality Checklist-Signed ML22199A2532022-02-22022 February 2022 Ile ES-301-5 Transient and Event Checklists ML22199A2302022-02-18018 February 2022 ES-301-6 Competencies Checklists ML22199A2272022-02-18018 February 2022 ES-301-3 and ES-301-4 Op Test Quality Checklists ML22199A2342022-02-18018 February 2022 ES-401-6 Written Exam Quality Checklist ML21224A2432021-08-17017 August 2021 Confirmation of Initial License Examination ML21110A4952021-04-19019 April 2021 GFE Results, March 2021 ML22173A2392020-07-17017 July 2020 Bwd 2020 Ile Outline Comments ML22173A2352020-07-17017 July 2020 Bwd 2020 Ile ES-401-4 Record of Rejected KAs Rev 11 ML22173A2332020-07-17017 July 2020 Bwd 2020 Ile ES-301-7 Operating Test Review Comments ML22173A2292020-07-17017 July 2020 Bwd 2020 Ile Es 201-3 Final ML22173A2302020-07-17017 July 2020 Bwd 2020 Ile Es 403-1 Signed ML22173A2372020-07-17017 July 2020 Bwd 2020 Ile ES-401-9 Written Exam Comments-Final ML22173A2282020-07-17017 July 2020 Bwd 2020 Ile ES-201-1 Rev 11-Final BW200057, Bwd 2020 Ile Post-Exam Package Cover2020-06-27027 June 2020 Bwd 2020 Ile Post-Exam Package Cover ML22173A2432020-06-0909 June 2020 Bwd 2020 Ile Administered RO and SRO Admin JPMs-Final ML22173A2472020-06-0909 June 2020 Bwd 2020 Ile Administered Scenarios-Final ML22173A2462020-06-0909 June 2020 Bwd 2020 Ile Administered System and Inplant JPMs-Final ML22173A2512020-06-0909 June 2020 Bwd 2020 Ile Administered Written Exam with Handout-Final ML20135H2062020-05-14014 May 2020 Operator Licensing Examination Approval ML22173A2582020-03-11011 March 2020 Bwd 2020 Ile Es 401-6 Signed ML22173A2632020-03-11011 March 2020 Bwd 2020 Ile Proposed Simulator Scenarios-Final ML22173A2642020-03-11011 March 2020 Bwd 2020 Ile Proposed Written Exam RO-SRO-Final ML22173A2612020-03-11011 March 2020 Bwd 2020 Ile Proposed RO and SRO Admin JPMs-Final ML22173A2622020-03-11011 March 2020 Bwd 2020 Ile Proposed System and Inplant JPMs-Final ML22173A2572020-03-11011 March 2020 Bwd 2020 Ile ES-301-6 Competencies Checklists ML22173A2562020-03-11011 March 2020 Es 301-4 ML22173A2552020-03-11011 March 2020 Es 301-3 Signed ML22173A2602020-02-20020 February 2020 Bwd 2020 Ile Proposed Written Exam Submittal Letter ML22174A0732019-12-20020 December 2019 Ile ES-D-1s ML22174A0402019-12-20020 December 2019 Ile ES-301-5 Transient and Event Checklists ML22174A0392019-12-20020 December 2019 Ile ES-201-2 Outline Quality Checklist ML22174A0692019-12-20020 December 2019 Ile ES-401-2 and 401-3-Final ML22174A0672019-12-20020 December 2019 Ile RO and SRO ES-301-2 ML22174A0602019-12-20020 December 2019 Ile RO and SRO ES-301-1 BW190114, Ile Outline Submittal Letter2019-12-16016 December 2019 Ile Outline Submittal Letter ML22173A2592019-12-16016 December 2019 Bwd 2020 Ile Proposed Operating Test Submittal Letter ML19329A0482019-11-22022 November 2019 Revised Confirmation of Initial License Examination (Rdb) ML19294A7822019-10-21021 October 2019 Confirmation of Initial License Examination ML19277H0032019-06-19019 June 2019 2019 Braidwood Ile Form ES-301-3 ML19277G9232019-06-19019 June 2019 2019 Braidwood Ile Forms ES-301-6 Rev 1 2023-08-25
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML23234A2462023-08-25025 August 2023 Confirmation of Initial License Examination RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML22199A1732022-04-0505 April 2022 Ile ES-201-3 Security Agreement-Final ML22199A1742022-04-0505 April 2022 Ile ES-403-1 Written Exam Grading Quality Checklist ML22199A1702022-04-0505 April 2022 Ile ES-201-1 Examination Prep Checklist BW220023, Ile Post-Examination Submittal Letter (03/30/2022)2022-03-30030 March 2022 Ile Post-Examination Submittal Letter (03/30/2022) RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations ML22053A0692022-02-23023 February 2022 Operator Licensing Examination Approval ML22199A2532022-02-22022 February 2022 Ile ES-301-5 Transient and Event Checklists ML22199A2472022-02-22022 February 2022 Ile ES-201-2 NRC-Developed Outline Quality Checklist-Signed ML22199A2342022-02-18018 February 2022 ES-401-6 Written Exam Quality Checklist ML22199A2272022-02-18018 February 2022 ES-301-3 and ES-301-4 Op Test Quality Checklists ML22199A2302022-02-18018 February 2022 ES-301-6 Competencies Checklists ML21224A2432021-08-17017 August 2021 Confirmation of Initial License Examination ML22173A2282020-07-17017 July 2020 Bwd 2020 Ile ES-201-1 Rev 11-Final ML22173A2372020-07-17017 July 2020 Bwd 2020 Ile ES-401-9 Written Exam Comments-Final ML22173A2292020-07-17017 July 2020 Bwd 2020 Ile Es 201-3 Final ML22173A2302020-07-17017 July 2020 Bwd 2020 Ile Es 403-1 Signed ML22173A2352020-07-17017 July 2020 Bwd 2020 Ile ES-401-4 Record of Rejected KAs Rev 11 ML22173A2332020-07-17017 July 2020 Bwd 2020 Ile ES-301-7 Operating Test Review Comments ML22173A2392020-07-17017 July 2020 Bwd 2020 Ile Outline Comments BW200057, Bwd 2020 Ile Post-Exam Package Cover2020-06-27027 June 2020 Bwd 2020 Ile Post-Exam Package Cover ML22173A2472020-06-0909 June 2020 Bwd 2020 Ile Administered Scenarios-Final ML22173A2432020-06-0909 June 2020 Bwd 2020 Ile Administered RO and SRO Admin JPMs-Final ML22173A2512020-06-0909 June 2020 Bwd 2020 Ile Administered Written Exam with Handout-Final ML22173A2462020-06-0909 June 2020 Bwd 2020 Ile Administered System and Inplant JPMs-Final ML20135H2062020-05-14014 May 2020 Operator Licensing Examination Approval ML22173A2552020-03-11011 March 2020 Es 301-3 Signed ML22173A2622020-03-11011 March 2020 Bwd 2020 Ile Proposed System and Inplant JPMs-Final ML22173A2572020-03-11011 March 2020 Bwd 2020 Ile ES-301-6 Competencies Checklists ML22173A2562020-03-11011 March 2020 Es 301-4 ML22173A2582020-03-11011 March 2020 Bwd 2020 Ile Es 401-6 Signed ML22173A2612020-03-11011 March 2020 Bwd 2020 Ile Proposed RO and SRO Admin JPMs-Final ML22173A2642020-03-11011 March 2020 Bwd 2020 Ile Proposed Written Exam RO-SRO-Final ML22173A2632020-03-11011 March 2020 Bwd 2020 Ile Proposed Simulator Scenarios-Final ML22173A2602020-02-20020 February 2020 Bwd 2020 Ile Proposed Written Exam Submittal Letter ML22174A0602019-12-20020 December 2019 Ile RO and SRO ES-301-1 ML22174A0402019-12-20020 December 2019 Ile ES-301-5 Transient and Event Checklists ML22174A0732019-12-20020 December 2019 Ile ES-D-1s ML22174A0672019-12-20020 December 2019 Ile RO and SRO ES-301-2 ML22174A0692019-12-20020 December 2019 Ile ES-401-2 and 401-3-Final ML22174A0392019-12-20020 December 2019 Ile ES-201-2 Outline Quality Checklist BW190114, Ile Outline Submittal Letter2019-12-16016 December 2019 Ile Outline Submittal Letter ML22173A2592019-12-16016 December 2019 Bwd 2020 Ile Proposed Operating Test Submittal Letter ML19329A0482019-11-22022 November 2019 Revised Confirmation of Initial License Examination (Rdb) ML19294A7822019-10-21021 October 2019 Confirmation of Initial License Examination ML19275H2952019-06-19019 June 2019 2019 Braidwood Ile Form ES-201-1 ML19275H4122019-06-19019 June 2019 2019 Braidwood Ile Form ES-403-1 ML19275H3712019-06-19019 June 2019 2019 Braidwood Ile Form ES-201-3 ML19277H0032019-06-19019 June 2019 2019 Braidwood Ile Form ES-301-3 2023-08-25
[Table view] |
Text
ES-201 Examination Preparation Checklist Form ES-201-1 Facility: __Braidwood______ Date of Examination: Sept 6 - 15, 2016 Developed by: Written: Facility X NRC // Operating Facility X NRC Chief Target Task Description (Reference) Examiners Date*
Initials
-180 1. Examination administration date confirmed (C.1.a; C.2.a and b) RKW
-150 2. NRC examiners and facility contact assigned (C.1.d; C.2.e) RKW
-150 3. Facility contact briefed on security and other requirements (C.2.c) RKW 8/20/2015
-150 4. Corporate notification letter sent (C.2.d) RKW 8/20/2015
[-120] 5. Reference material due (C.1.e; C.3.c; Attachment 3) N/A
{-90} 6. Integrated examination outline(s) due, including Forms ES-201-2, ES-201-3, ES-301-1, RKW ES-301-2, ES-301-5, ES-D-1, ES-401-1/2, ES-401N-1/2, ES-401-3, ES-401N-3, ES-401-4, and ES-401N-4, as applicable (C.1.e and f; C.3.d) 5/9/2016
{-85} 7. Examination outline(s) reviewed by NRC and feedback provided to facility licensee RKW (C.2.h; C.3.e) 5/11/2016
{-60} 8. Proposed examinations (including written, walk-through JPMs, and scenarios, as RKW applicable), supporting documentation (including Forms ES-301-3, ES-301-4, ES-301-5, ES-301-6, and ES-401-6, ES-401N-6, and any Form ES-201-2, ES-201-3, 6/1/2016 ES-301-1, or ES-301-2 updates), and reference materials due (C.1.e, f, g and h; C.3.d)
-45 9. Written exam and operating test reviews completed. (C.3.f) RKW 6/21/2016
-30 10. Preliminary license applications (NRC Form 398's) due (C.1.l; C.2.g; ES-202) RKW 7/29/2016
-21 11. Examination approved by NRC supervisor for facility licensee review (C.2.h; C.3.f) RKW 6/21/2016
-21 12. Examinations reviewed with facility licensee (C.1.j; C.2.f and h; C.3.g) RKW 7/25/2016
-14 13. Final license applications due and Form ES-201-4 prepared (C.1.l; C.2.i; ES-202) RKW 8/15/2016
-14 14. Written examinations and operating tests approved by NRC supervisor (C.2.i; RKW C.3.h) 8/15/2016
-7 15. Facility licensee management queried regarding the licensees views on the RKW examination. (C.2 j)
-7 16. Final applications reviewed; 1 or 2 (if >10) applications audited to confirm RKW qualifications / eligibility; and examination approval and waiver letters sent (C.2.i; Attachment 5; ES-202, C.2.e; ES-204) 7/29/16
-7 17. Proctoring/written exam administration guidelines reviewed with facility licensee RKW (C.3.k)
-7 18. Approved scenarios, job performance measures, and questions distributed to NRC RKW examiners (C.3.i)
- Target dates are generally based on facility-prepared examinations and are keyed to the examination date identified in the corporate notification letter. They are for planning purposes and may be adjusted on a case-by-case basis in coordination with the facility licensee.
[Applies only] {Does not apply} to examinations prepared by the NRC.