ML17018A123: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(8 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 01/17/2017
| issue date = 01/17/2017
| title = Management Directive 8.3 Evaluation for Palo Verde Unit 3 Emergency Diesel Generator Failure
| title = Management Directive 8.3 Evaluation for Palo Verde Unit 3 Emergency Diesel Generator Failure
| author name = Miller G B
| author name = Miller G
| author affiliation = NRC/RGN-IV/DRP/RPB-D
| author affiliation = NRC/RGN-IV/DRP/RPB-D
| addressee name = Kennedy K M
| addressee name = Kennedy K
| addressee affiliation = NRC/RGN-IV/ORA
| addressee affiliation = NRC/RGN-IV/ORA
| docket = 05000528, 05000529, 05000530
| docket = 05000528, 05000529, 05000530
| license number = NPF-041, NPF-051, NPF-704
| license number = NPF-041, NPF-051, NPF-704
| contact person = Miller G B
| contact person = Miller G
| document report number = MD 8.3
| document report number = MD 8.3
| document type = Management Directive, Memoranda
| document type = Management Directive, Memoranda
| page count = 5
| page count = 5
| revision = 0
}}
}}
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 1600 E. LAMAR BLVD ARLINGTON, TX 76011-4511 January 17, 2017 MEMORANDUM TO:                Kriss M. Kennedy, Regional Administrator THRU:                          Troy W. Pruett, Director        /RA/
Division of Reactor Projects FROM:                          Geoffrey B. Miller, Chief /RA/
Project Branch D
==SUBJECT:==
MANAGEMENT DIRECTIVE 8.3 EVALUATION FOR PALO VERDE UNIT 3 EMERGENCY DIESEL GENERATOR FAILURE Pursuant to Regional Office Policy Guide 0801, Management Directive 8.3 and Inspection Manual Chapter 0309 Reactive Team Inspection Decisions, Implementation, and Documentation for Power Reactors, the enclosed table provides the Management Directive 8.3 evaluation for determining that a Special Inspection Team inspection will be conducted at Palo Verde for the catastrophic failure of the Unit 3 emergency diesel generator.
Concur with Recommendation:                    /RA/                        1/17/17 Kriss M. Kennedy                      Date Regional Administrator
==Enclosures:==
MD 8.3 Decision Documentation Form (Deterministic and Risk Criteria Analyzed)
CONTACT: Geoffrey B. Miller 817-200-1173
ML17018A123 SUNSI Review                ADAMS              Publicly Available      Non-Sensitive Keyword:
By: JLD                        Yes            Non-Publicly Available  Sensitive    MD 3.4/A.7 No OFFICE        RIV:SPE:DRP    SRA:DRS/PSB2      C:DRP/D      D:DRS      D:DRP NAME          JDixon          DLoveless        GMiller      AVegel    TPruett SIGNATURE      /RA Geoff      /RA/              /RA/        /RA/      /RA/
Miller for/
DATE          12/27/16        1/5/17            1/9/17      1/9/17    1/10/17}}

Latest revision as of 10:23, 30 October 2019

Management Directive 8.3 Evaluation for Palo Verde Unit 3 Emergency Diesel Generator Failure
ML17018A123
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 01/17/2017
From: Geoffrey Miller
NRC/RGN-IV/DRP/RPB-D
To: Kennedy K
Region 4 Administrator
Miller G
References
MD 8.3
Download: ML17018A123 (5)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 1600 E. LAMAR BLVD ARLINGTON, TX 76011-4511 January 17, 2017 MEMORANDUM TO: Kriss M. Kennedy, Regional Administrator THRU: Troy W. Pruett, Director /RA/

Division of Reactor Projects FROM: Geoffrey B. Miller, Chief /RA/

Project Branch D

SUBJECT:

MANAGEMENT DIRECTIVE 8.3 EVALUATION FOR PALO VERDE UNIT 3 EMERGENCY DIESEL GENERATOR FAILURE Pursuant to Regional Office Policy Guide 0801, Management Directive 8.3 and Inspection Manual Chapter 0309 Reactive Team Inspection Decisions, Implementation, and Documentation for Power Reactors, the enclosed table provides the Management Directive 8.3 evaluation for determining that a Special Inspection Team inspection will be conducted at Palo Verde for the catastrophic failure of the Unit 3 emergency diesel generator.

Concur with Recommendation: /RA/ 1/17/17 Kriss M. Kennedy Date Regional Administrator

Enclosures:

MD 8.3 Decision Documentation Form (Deterministic and Risk Criteria Analyzed)

CONTACT: Geoffrey B. Miller 817-200-1173

ML17018A123 SUNSI Review ADAMS Publicly Available Non-Sensitive Keyword:

By: JLD Yes Non-Publicly Available Sensitive MD 3.4/A.7 No OFFICE RIV:SPE:DRP SRA:DRS/PSB2 C:DRP/D D:DRS D:DRP NAME JDixon DLoveless GMiller AVegel TPruett SIGNATURE /RA Geoff /RA/ /RA/ /RA/ /RA/

Miller for/

DATE 12/27/16 1/5/17 1/9/17 1/9/17 1/10/17