ML17172A635: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(7 intermediate revisions by the same user not shown) | |||
Line 5: | Line 5: | ||
| author name = Townsend C | | author name = Townsend C | ||
| author affiliation = Purdue Univ | | author affiliation = Purdue Univ | ||
| addressee name = Montgomery C | | addressee name = Montgomery C | ||
| addressee affiliation = NRC/Document Control Desk, NRC/NRR | | addressee affiliation = NRC/Document Control Desk, NRC/NRR | ||
| docket = 05000182 | | docket = 05000182 | ||
Line 13: | Line 13: | ||
| document type = Letter | | document type = Letter | ||
| page count = 3 | | page count = 3 | ||
| | | project = | ||
| stage = Supplement | |||
}} | }} | ||
=Text= | |||
{{#Wiki_filter:SCHOOL OF NUCLEAR ENGINEERING Cindy Montgomery U.S. NRC One White Flint North 11555 Rockville Pike Rockville, MD 20852 June 21, 2017 | |||
==SUBJECT:== | |||
Supplemental Documentation - Submission of License Amendment Request (ML17061A262), PUR-1, Docket 50-182 | |||
==Dear Ms. Montgomery,== | |||
This letter and attached documents are to support the License Amendment Request for the PUR-1 license, Docket 50-182. The documents enclosed are the Functional Requirements Specification, Cyber Security Plan, and Cyber Security Procedure. The Cyber Security Plan and Cyber Security Procedure primarily apply to the development, design, and testing stage of the PUR-1 I&C replacement project. Cyber needs following licensure are included in Section 7.9 of the initial amendment request submission. The team preparing the Safety Evaluation Report may find these documents useful in their review. | |||
Three attachments to this letter are being withheld from public disclosure under 10 CFR 2.390 due to security related information being shared which may compromise the PUR-1 or the vendor who designed the system. Those documents protected under 10 CFR 2.390 have been duly redacted. The non-redacted versions are marked on all pages. This letter itself does not contain security related sensitive information. The following paragraphs justify the redactions with language taken from Regulatory Issue Summary 2005-31. | |||
In the Functional Requirements Specification, Redactions 1-17 are withheld as the identify the exact locations of radioactive material, inventory of radionuclides, information on inventories of enriched uranium above 6% U-235, and the form of the U-235. Redactions 18 and 19 are withheld as they contain information on specific or predicted failures in the design of structures or equipment. Redactions 20-23 are withheld as they contain security information which could reasonably be expected to be useful to potential adversaries as vulnerability locations. | |||
The Cyber Security Plan and Cyber Security Procedure are withheld as they contain information which could reasonably be expected to be useful means of determining the method by which information is moved to and from the new control console (non-secure to secure system). These movements and their procedures could be useful to potential adversaries as vulnerability locations. | |||
School of Nuclear Engineering Nuclear Engineering Building | |||
* 400 Central Drive | |||
* West Lafayette, IN 47907-2017 (765) 494-5739 | |||
* Fax: (765) 494-9570 | |||
* https://engineering.purdue.edu/NE | |||
Finally, the wiring diagrams, including PUR1-HDD-001-16 is withheld under 10 CFR 2.390 as it gives detailed design of safety significant wiring. | |||
The PUR-1 Reactor Protection System is designed to initiate a scram on the indication of any value in excess of those prescribed in the Technical Specifications. The magnet power circuitry passes through relays in series which will remove a closed contact point thereby opening the circuit and causing the control rods to fall into the core under the force of gravity. | |||
Drawing PUR1-HDD-001-16 shows the magnet power circuitry. The current runs from the magnet power supply (an Acopian current supply) through the following units and returns to the current supply. | |||
: 1. Magnet Power Supply | |||
: 2. Pool top radiation area monitor | |||
: 3. Reactor Operator Console Radiation Area Monitor | |||
: 4. Water Make-up Radiation Area Monitor | |||
: 5. Continuous Air Monitor | |||
: 6. Console Key-switch | |||
: 7. Reactor Control System PLC | |||
: 8. Channel 1 (Start-up Channel) Change Rate Trip | |||
: 9. Channel 2 (Log Power Channel) Power Level Trip | |||
: 10. Channel 2 (Log Power Channel) Change Rate Trip | |||
: 11. Channel 2 (Log Power Channel) Loss of Detector High Voltage Loss Trip | |||
: 12. Channel 3 (Linear Power Channel) High Power Trip | |||
: 13. Channel 4 (Safety Channel) High Power Trip | |||
: 14. Manual Scram (Hallway) | |||
: 15. Manual Scram (Operator Console) | |||
: 16. Shim Safety #1 Magnet | |||
: 17. Shim Safety #2 Magnet | |||
: 18. Magnet Power Return Any relay located in items 2-15 may interrupt the circuit and cause magnet power to be lost. | |||
The Channel block diagrams are also included as supplement to this submission. For Channel 1, Drawing PJ0000396 P21 ed.2 shows the fission chambers signal propagating through the DWK 250 and the final provided trip out of the NB28 module. Other binaries are provided (BO1.1-BO1.5) and are all monitored by the PLC. For Channel 2, Drawing PJ0000396 P22 ed.1 shows the compensated ionization chamber signal and the trips associated. These trips again come from a NB28 module. Similar block diagrams for Channel 3 (Drawing PJ0000396 P23 ed. 1) and Channel 4 (Drawing PJ0000396 P24 ed. 1) | |||
I declare under penalty of perjury that the foregoing is true and correct to the best of my knowledge. Executed on June 21, 2017. | |||
School of Nuclear Engineering Nuclear Engineering Building | |||
* 400 Central Drive | |||
* West Lafayette, IN 47907-2017 (765) 494-5739 | |||
* Fax: (765) 494-9570 | |||
* https://engineering.purdue.edu/NE | |||
Sincerely, Clive Townsend PUR-1, Reactor Supervisor School of Nuclear Engineering | |||
==Enclosures:== | |||
PUR-1 Functional Requirements Specifications - Revision 4 (Nonpublic) | |||
PUR-1 Functional Requirements Specifications - Revision 4 - Redacted (Public) | |||
PUR-1 Cyber Security Plan (Nonpublic) | |||
PUR-1 Cyber Security Procedure (Nonpublic) | |||
Drawing PUR1-HDD-001-16 (Nonpublic) | |||
Drawing PJ0000396 P21 Ed.2 (Public) | |||
Drawing PJ0000396 P22 Ed.1 (Public) | |||
Drawing PJ0000396 P23 Ed.1 (Public) | |||
Drawing PJ0000396 P24 Ed.1 (Public) | |||
School of Nuclear Engineering Nuclear Engineering Building | |||
* 400 Central Drive | |||
* West Lafayette, IN 47907-2017 (765) 494-5739 | |||
* Fax: (765) 494-9570 | |||
* https://engineering.purdue.edu/NE}} |
Latest revision as of 01:55, 30 October 2019
ML17172A635 | |
Person / Time | |
---|---|
Site: | Purdue University |
Issue date: | 06/21/2017 |
From: | Townsend C Purdue University Research Reactor |
To: | Cindy Montgomery Document Control Desk, Office of Nuclear Reactor Regulation |
Shared Package | |
ML17172A634 | List: |
References | |
Download: ML17172A635 (3) | |
Text
SCHOOL OF NUCLEAR ENGINEERING Cindy Montgomery U.S. NRC One White Flint North 11555 Rockville Pike Rockville, MD 20852 June 21, 2017
SUBJECT:
Supplemental Documentation - Submission of License Amendment Request (ML17061A262), PUR-1, Docket 50-182
Dear Ms. Montgomery,
This letter and attached documents are to support the License Amendment Request for the PUR-1 license, Docket 50-182. The documents enclosed are the Functional Requirements Specification, Cyber Security Plan, and Cyber Security Procedure. The Cyber Security Plan and Cyber Security Procedure primarily apply to the development, design, and testing stage of the PUR-1 I&C replacement project. Cyber needs following licensure are included in Section 7.9 of the initial amendment request submission. The team preparing the Safety Evaluation Report may find these documents useful in their review.
Three attachments to this letter are being withheld from public disclosure under 10 CFR 2.390 due to security related information being shared which may compromise the PUR-1 or the vendor who designed the system. Those documents protected under 10 CFR 2.390 have been duly redacted. The non-redacted versions are marked on all pages. This letter itself does not contain security related sensitive information. The following paragraphs justify the redactions with language taken from Regulatory Issue Summary 2005-31.
In the Functional Requirements Specification, Redactions 1-17 are withheld as the identify the exact locations of radioactive material, inventory of radionuclides, information on inventories of enriched uranium above 6% U-235, and the form of the U-235. Redactions 18 and 19 are withheld as they contain information on specific or predicted failures in the design of structures or equipment. Redactions 20-23 are withheld as they contain security information which could reasonably be expected to be useful to potential adversaries as vulnerability locations.
The Cyber Security Plan and Cyber Security Procedure are withheld as they contain information which could reasonably be expected to be useful means of determining the method by which information is moved to and from the new control console (non-secure to secure system). These movements and their procedures could be useful to potential adversaries as vulnerability locations.
School of Nuclear Engineering Nuclear Engineering Building
- 400 Central Drive
- West Lafayette, IN 47907-2017 (765) 494-5739
- Fax: (765) 494-9570
Finally, the wiring diagrams, including PUR1-HDD-001-16 is withheld under 10 CFR 2.390 as it gives detailed design of safety significant wiring.
The PUR-1 Reactor Protection System is designed to initiate a scram on the indication of any value in excess of those prescribed in the Technical Specifications. The magnet power circuitry passes through relays in series which will remove a closed contact point thereby opening the circuit and causing the control rods to fall into the core under the force of gravity.
Drawing PUR1-HDD-001-16 shows the magnet power circuitry. The current runs from the magnet power supply (an Acopian current supply) through the following units and returns to the current supply.
- 1. Magnet Power Supply
- 2. Pool top radiation area monitor
- 3. Reactor Operator Console Radiation Area Monitor
- 4. Water Make-up Radiation Area Monitor
- 5. Continuous Air Monitor
- 6. Console Key-switch
- 7. Reactor Control System PLC
- 8. Channel 1 (Start-up Channel) Change Rate Trip
- 9. Channel 2 (Log Power Channel) Power Level Trip
- 10. Channel 2 (Log Power Channel) Change Rate Trip
- 11. Channel 2 (Log Power Channel) Loss of Detector High Voltage Loss Trip
- 12. Channel 3 (Linear Power Channel) High Power Trip
- 13. Channel 4 (Safety Channel) High Power Trip
- 14. Manual Scram (Hallway)
- 15. Manual Scram (Operator Console)
- 16. Shim Safety #1 Magnet
- 17. Shim Safety #2 Magnet
- 18. Magnet Power Return Any relay located in items 2-15 may interrupt the circuit and cause magnet power to be lost.
The Channel block diagrams are also included as supplement to this submission. For Channel 1, Drawing PJ0000396 P21 ed.2 shows the fission chambers signal propagating through the DWK 250 and the final provided trip out of the NB28 module. Other binaries are provided (BO1.1-BO1.5) and are all monitored by the PLC. For Channel 2, Drawing PJ0000396 P22 ed.1 shows the compensated ionization chamber signal and the trips associated. These trips again come from a NB28 module. Similar block diagrams for Channel 3 (Drawing PJ0000396 P23 ed. 1) and Channel 4 (Drawing PJ0000396 P24 ed. 1)
I declare under penalty of perjury that the foregoing is true and correct to the best of my knowledge. Executed on June 21, 2017.
School of Nuclear Engineering Nuclear Engineering Building
- 400 Central Drive
- West Lafayette, IN 47907-2017 (765) 494-5739
- Fax: (765) 494-9570
Sincerely, Clive Townsend PUR-1, Reactor Supervisor School of Nuclear Engineering
Enclosures:
PUR-1 Functional Requirements Specifications - Revision 4 (Nonpublic)
PUR-1 Functional Requirements Specifications - Revision 4 - Redacted (Public)
PUR-1 Cyber Security Plan (Nonpublic)
PUR-1 Cyber Security Procedure (Nonpublic)
Drawing PUR1-HDD-001-16 (Nonpublic)
Drawing PJ0000396 P21 Ed.2 (Public)
Drawing PJ0000396 P22 Ed.1 (Public)
Drawing PJ0000396 P23 Ed.1 (Public)
Drawing PJ0000396 P24 Ed.1 (Public)
School of Nuclear Engineering Nuclear Engineering Building
- 400 Central Drive
- West Lafayette, IN 47907-2017 (765) 494-5739
- Fax: (765) 494-9570