ML17276B518: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(One intermediate revision by the same user not shown) | |||
Line 3: | Line 3: | ||
| issue date = 12/28/2017 | | issue date = 12/28/2017 | ||
| title = APR1400 P4 Chapter 18 ACRS Memo | | title = APR1400 P4 Chapter 18 ACRS Memo | ||
| author name = Akstulewicz F | | author name = Akstulewicz F | ||
| author affiliation = NRC/NRO/DNRL/LB2 | | author affiliation = NRC/NRO/DNRL/LB2 | ||
| addressee name = Veil A | | addressee name = Veil A | ||
| addressee affiliation = NRC/ACRS | | addressee affiliation = NRC/ACRS | ||
| docket = 05200046 | | docket = 05200046 | ||
Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:December 28, 2017 | {{#Wiki_filter:December 28, 2017 MEMORANDUM TO: Andrea Veil, Executive Director Advisory Committee on Reactor Safeguards FROM: Frank M. Akstulewicz, Director /RA/ | ||
Division of New Reactor Licensing Office of New Reactors | |||
MEMORANDUM TO: | |||
FROM: | |||
/RA/ | |||
==SUBJECT:== | ==SUBJECT:== | ||
ADVANCED POWER REACTOR 1400 DESIGN CERTIFICATION APPLICATION - SAFETY EVALUATION WITH NO OPEN ITEMS FOR CHAPTER 18, | ADVANCED POWER REACTOR 1400 DESIGN CERTIFICATION APPLICATION - SAFETY EVALUATION WITH NO OPEN ITEMS FOR CHAPTER 18, HUMAN FACTORS ENGINEERING By letter dated December 23, 2014, Korea Electric Power Corporation (KEPCO) and Korea Hydro & Nuclear Power Co (KHNP), Ltd. submitted an application for a design certification of the Advanced Power Reactor 1400 (APR1400) Standard Design. On March 10, 2017, KHNP submitted a subsequent letter transmitting Revision 1 to the APR1400 design certification application. | ||
Based on our review of the application, the staff is providing the Advisory Committee on Reactor Safeguards (ACRS) its safety evaluation (SE) with no open items for Chapter 18, Human Factors Engineering (Agencywide Documents Access and Management System (ADAMS) | |||
By letter dated December 23, 2014, Korea Electric Power Corporation (KEPCO) and Korea Hydro & Nuclear Power Co (KHNP), Ltd. submitted an application for a design certification of the Advanced Power Reactor 1400 (APR1400) Standard Design. On March 10, 2017, KHNP submitted a subsequent letter transmitting Revision 1 to the APR1400 design certification application. | Accession No. ML17276B714). Unless otherwise stated in the SE, the staffs review was based on Revision 1 of the application. The SE is being provided to support a meeting of the Subcommittee of the ACRS scheduled for January 24-25, 2018. The ACRS Full Committee meeting will be held after the Subcommittee meeting. | ||
A review of the SE for any information exempt from public disclosure has not yet been performed. The NRC will withhold the SE from public disclosure for ten business days to allow KHNP the opportunity to perform a proprietary and factual content review. Therefore, the staff requests that the ACRS withhold the SE from public disclosure until the information has been released publicly in the Agencywide Documents Access and Management System. | |||
Based on our review of the application, the staff is providing the Advisory Committee on Reactor Safeguards (ACRS) its safety evaluation (SE) with no open items for Chapter 18, | The staff will inform the ACRS immediately if KHNP requests that any of the information in the SE be withheld from public disclosure. | ||
Docket No.: 52-046 CONTACTS: Cayetano Santos, NRO/DNRL/LB2 301-415-7270 William R. Ward, NRO/DNRL/LB2 301-415-7038 | |||
A review of the SE for any information exempt from public disclosure has not yet been performed. The NRC will withhold the SE from public disclosure for ten business days to allow KHNP the opportunity to perform a proprietary and factual content review. Therefore, the staff requests that the ACRS withhold the SE from public disclosure until the information has been released publicly in the Agencywide Documents Access and Management System. | |||
The staff will inform the ACRS immediately if KHNP requests that any of the information in the SE be withheld from public disclosure. | |||
Docket No.: | |||
CONTACTS: Cayetano Santos, NRO/DNRL/LB2 301-415-7270 William R. Ward, NRO/DNRL/LB2 301-415-7038 | |||
PKG: | PKG: ML17276B327 MEMO: ML17276B518 SER: ML17276B518 *via email NRO-002 OFFICE DNRL/LB2: PM DNRL/ LB2: LA* DNRL/ LB2: PM DNRL/LB2 BC DNRL: D NAME CSantos CSmith WWard MMcCoppin FAkstulewicz DATE 12/05/2017 12/12/2017 12/22/2017 12/18/2017 12/28/2017}} |
Latest revision as of 15:16, 29 October 2019
ML17276B518 | |
Person / Time | |
---|---|
Site: | 05200046 |
Issue date: | 12/28/2017 |
From: | Frank Akstulewicz NRC/NRO/DNRL/LB2 |
To: | Andrea Veil Advisory Committee on Reactor Safeguards |
Santos C | |
Shared Package | |
ML17276B327 | List: |
References | |
Download: ML17276B518 (2) | |
Text
December 28, 2017 MEMORANDUM TO: Andrea Veil, Executive Director Advisory Committee on Reactor Safeguards FROM: Frank M. Akstulewicz, Director /RA/
Division of New Reactor Licensing Office of New Reactors
SUBJECT:
ADVANCED POWER REACTOR 1400 DESIGN CERTIFICATION APPLICATION - SAFETY EVALUATION WITH NO OPEN ITEMS FOR CHAPTER 18, HUMAN FACTORS ENGINEERING By letter dated December 23, 2014, Korea Electric Power Corporation (KEPCO) and Korea Hydro & Nuclear Power Co (KHNP), Ltd. submitted an application for a design certification of the Advanced Power Reactor 1400 (APR1400) Standard Design. On March 10, 2017, KHNP submitted a subsequent letter transmitting Revision 1 to the APR1400 design certification application.
Based on our review of the application, the staff is providing the Advisory Committee on Reactor Safeguards (ACRS) its safety evaluation (SE) with no open items for Chapter 18, Human Factors Engineering (Agencywide Documents Access and Management System (ADAMS)
Accession No. ML17276B714). Unless otherwise stated in the SE, the staffs review was based on Revision 1 of the application. The SE is being provided to support a meeting of the Subcommittee of the ACRS scheduled for January 24-25, 2018. The ACRS Full Committee meeting will be held after the Subcommittee meeting.
A review of the SE for any information exempt from public disclosure has not yet been performed. The NRC will withhold the SE from public disclosure for ten business days to allow KHNP the opportunity to perform a proprietary and factual content review. Therefore, the staff requests that the ACRS withhold the SE from public disclosure until the information has been released publicly in the Agencywide Documents Access and Management System.
The staff will inform the ACRS immediately if KHNP requests that any of the information in the SE be withheld from public disclosure.
Docket No.: 52-046 CONTACTS: Cayetano Santos, NRO/DNRL/LB2 301-415-7270 William R. Ward, NRO/DNRL/LB2 301-415-7038
PKG: ML17276B327 MEMO: ML17276B518 SER: ML17276B518 *via email NRO-002 OFFICE DNRL/LB2: PM DNRL/ LB2: LA* DNRL/ LB2: PM DNRL/LB2 BC DNRL: D NAME CSantos CSmith WWard MMcCoppin FAkstulewicz DATE 12/05/2017 12/12/2017 12/22/2017 12/18/2017 12/28/2017