ML17289A395: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:~~~IANNUAL RFPORT OF PUBLIC ELECNIC UTILITIES 01 Exact Legal Name of Respondent Washin ton Public Potfer Su 1 S sten IOENTIF ICATION 02 Financial Reporting Year Ending (Mo, Da, Yr J 6/30/88 03 Previous Name and Date of Change (If name changed during yearJ NA 04 Addr'ess of Principal Business Office at End of Year (Srreer, City, State, Zip Code)3000 Geo.Washin ton Wa P.O.Box 968 Richland WA 99352 05 Name of Contact Person S.B.Gire 07 Address of Contact Person (Srreer, City, Stare, Zip CodeJ P.O.Box 968 Hail Drop 065 Richland WA 99352 06 Title of Contact Person Hanaaer Cor orate Accountin Telephone of Contact Person, Including Area Code (509)372-548009 This Report Is fi)Q An Original (2)0 A Resubmission 10 Date of Report (Mo, Da, YrJ 11 State the Classes of Utility and Other Services Furnished by Respondent During the Year Wholesale electric energy production CE RTIF ICATION The undersigned certifies that he/she has examined the accompanying report;that to the best of his/her knowledge, information, and belief, all statements of fact contained in the accompanying report are true, and the accompanying report is a correct statement of the business and affairs of the above named respondent in respect to each and every matter set forth therein during the calendar or other established fiscal year stated above.01 Name S.B.Gire 02 Title Hana er, Cor orate Accountin 03 Signature 04 Date Signed (Mo, D, YrJ Title 18, U.S.C.1tml, makes It a crime for any person knowingly and willingly to make to any Agency or 0 art-ment of the United States any false, fictitious or fraudulent statements as to any matter within its jurisdiction.
{{#Wiki_filter:~   ~
p pgppp342'si PDR ADOCK P p 8
        ~
~~I This report is mandatory under Public Law 93.275.Failure to respond may result in criminal fines, civil penalties and other sanctions as provided by law.Data reported on EIA 412 are not considered confidential.
I ANNUALRFPORT OF PUBLIC ELECNIC UTILITIES IOENTIF ICATION 01   Exact Legal Name of Respondent                                                           02   Financial Reporting Year Ending (Mo, Da, YrJ Washin ton Public Potfer                Su    1    S  sten                                        6/30/88 03 Previous Name and Date of Change         (If name   changed during yearJ NA 04 Addr'ess of Principal Business Office at End of Year (Srreer, City, State, Zip Code) 3000 Geo. Washin ton               Wa     P.O. Box 968           Richland     WA   99352 05 Name     of Contact Person                                                            06 Title of Contact Person S. B. Gire                                                                               Hanaaer        Cor  orate Accountin 07 Address of Contact Person (Srreer, City, Stare, Zip CodeJ P.O. Box 968           Hail Drop 065             Richland       WA   99352 Telephone of Contact Person, Including               09 This Report Is                                               10 Date of Report Area Code                                                  fi) Q An Original     (2) 0 A Resubmission                     (Mo, Da, YrJ (509) 372-5480 11   State the Classes of   Utility and Other   Services Furnished by Respondent During the Year Wholesale       electric       energy production CE RTIF ICATION The undersigned certifies that he/she has examined the accompanying report; that to the best of his/her knowledge, information, and belief, all statements of fact contained in the accompanying report are true, and the accompanying report is a correct statement of the business and affairs of the above named respondent in respect to each and every matter set forth therein during the calendar or other established fiscal year stated above.
~7 ngton Public Power Supply System This Report Is: II I gAn Osiginei (2)QA Resubmission Date of Report IMo, De, Ys)4/3/89 Report Year Ending (Mo, De, Yrl 6/30/88 PART I: BALANCE SHEET-END OF YEAR i Some of the accounts listed below are defined on page ii.Refer to the Uniform Systems ot Accounts for those other accounts not defined on page ii.Line No.Assets and Other Debits lal UTILITY PLANT Amount Line No.33 Liabilities end Other Csedits lal INVESTMENT OF MUNICIPALITY
01   Name                                                 03 Signature                                                  04 Date Signed S. B. Gire                                                                                                               (Mo, D, YrJ 02 Title Hana er, Cor         orate Accountin Title 18, U.S.C. 1tml, makes It a crime for any person knowingly and willinglyto make to any Agency or 0 art-ment of the United States any false, fictitious or fraudulent statements as to any matter within its jurisdiction.
&SURPLUS Amount 2 Utilit Plant (Less)Accumulated Provision for Depreciation
p pgppp342
&Amortization Electric Other Utility Department (Specifyr J Net Utility Plant (Line 2 less line 4, 5J INVESTMENTS Nonutility Property (Less Accum.Provision for Depreciation and Amortization:
                                  'si PDR       ADOCK P p
S)dvances to Municipality pecial Funds TOTAL Investments (Enter Total of lines 8 rhru 10J 12 CURRENT ANO ACCRUED ASSETS 13 Cash&Working Funds 14 Temporary Cash Investments S3.542.733.826 512.548.5~4 3 030 184 (L 151.8tJ6.75/
8
151.896.757 2.110.4%lo 898 5(8 34 35 36 37 39 40 41 42 43 45 46 47 Investment of Municipality.
Constructive Surplus or Deficit Retained Earninos TOTAL Investment
&Surplus (Enrer Total of lines 34 rhru 36J LONG TERiVI DEBT Bonds Advances from Municioalitv Other Long.Term Debt Unamort.Premium on Long.Term Debt Unamortized Discount on Long Term Debt Debit TOTAL Long.Term Debt (Enter Total of lines 39 rhru 43J CURRENT AND ACCRUED LIABILITIES Warrants Pa able Notes and Accounts Pavable Pavables to Municioalitv 2 237 655 COO 787.928 62.791.6%2 175.651 2o8 744 61" 58 481.6oo 15 Notes&Accounts Receivable (Less Accum.Provision for Uncollected Accounts: S 4g n0 51 Customer Deposits Taxes Accrued Interest Accrued 7 cg 343.7C8 16 Receivables from Municipality 17 Materials&Supplies 1B Prepa ments Misc.Current&Accrued Assets 1.882 371 52 53 I lisc.Current&Accrued Liabilities TOTAL Current&Accrued Liabilities (Enter Total of lines 46 rhru 52J~JI pic%I I c<Dli 267 20 21 TOTAL Current&Accrued Assets (Enter Total of lines 13 rhru 19J DEFERRED DEBITS 54 55 56 57 DEFERRED CREDITS Customer Advances for Construction.
Other Deferred Credits'namortized Gain on Reacauired Debt<1 O'V 22 Unamortized Debt Expense 23 Extraordinary Property Losses 24 Miscellaneous Deferred Debits 25 Unamortized Loss on Reacquired Debt 58 59 TOTAL Deferred Credits (Enter Toral of lines 55 thru 57J~OPERATING RESERVES cop fM 26 27 TOTAL Deferred Debits (Enter Toral of lines 22 rhru 25J TOTAL ASSETS&OTHER DEBITS (Enter Toral of lines 6, 11, 20, 26J 3 26o o42 910 61 63 65 Property Insurance Reserve Injuries and Damages Reserve Pensions and Benefits Reserve Miscellaneous Operatin Reserves TOTAL Operating Reserves (Enter Total of lines 60 rhru 63J TOTAL LIAB.&OTHER CREDITS (Enter Total ol lines 37.44,53,58, and 64I


Nemo of Respondent shington Public Power Supply stem This Report Is: Il)@An Original I2)PA Resubmission Date of Repon IMo,Oa, Yr)4 3 89 Report Year Ending IMo, Oa, Yrl~6 30 88 Line No.10 12 13 14 15 16 17 18 19 20 21 PART II: CONDENSED INCOME STATEMENT FOR THE YEAR Item la)Electric Utilit 0 eratin Income Operating Revenues Operation Expenses Maintenance Expenses Depreciation and Amortization Taxes and Tax Equivalents Contributions and Services TOTAL Electric Operating Expenses (Enter Toral oi lines3rhru 7)Net Operating Income Income from Plant Leased to Others Total Electric Utility Operating Income (Enrer Total oflines9rhru 10J Other Utility Operating Income tUtility Departments Other than Electric)TOTAL Utility Operating Income (Enrer Total of lines 11 rhru 12)Other Income (Explain si nificant amounts in a foornore)Allowance for Funds Used During Construe:ion Gross Income (Enter Toral of lines 13 thru 15)Income Deductions Interest on Long.Term Debt Other Income Deductions (See pg.4J (Explain significanr amounts in a footnote J TOTAL Income Deductions (Enter Toral of lines 18 and 19J Income Before Extraordinary Items (Enter Toral of line 15/ess line 20)Extraordinary Income (See definirion (f J, page ii)Extraordinary Deductions (See definition (fJ.page ii J Net Income (Enter Total of lines 21 plus line 22 less line 23)Amount (a)23 58 636 1"7 920 15 380 270 leis)1 PART III: OPERATION AND MAINTENANCE EXPENSES Line No.Production Exoenses Item lal Ops a thun fol htaintenanee kl Total rdl 10 Steam Power Generation Nuclear Power Generation Hydraulic Power Generation Other Power Generation (Specifyr)
        ~
Purchased Power other Production Expenses-Decomtjssjopjno TOTAL Production Expenses Transmission Expenses Distribution Expenses Customer Accounts Expenses 83 424 997 447 21 639 365 105 3 9 1 997 447 1 Pr]rr 12 13 Sales Expenses Administrative 5 General Expenses TOTAL ELECT.OPERATION 5 MAINT.EXPENSES 33 048 815 117 840 532 1 792 228 34 841 043 23 636': 14l 424 168
                                                                                                                                                                ~
7
              ~
I This report is mandatory under Public Law 93.275. Failure to respond may result in criminal fines, civil penalties and other sanctions                  as provided by law. Data reported on EIA 412 are not considered confidential.
This Report Is:                               Date of Report              Report Year Ending ngton Public Power Supply                    II I gAn Osiginei                            IMo, De, Ys)                 (Mo, De, Yrl System                                                (2) QA Resubmission                              4/3/89                     6/30/88 PART I: BALANCE SHEET END OF YEAR i
Some    of the accounts listed below are defined on  page  ii. Refer to the Uniform Systems ot Accounts for those other accounts not defined on page ii.
Line                                                            Amount          Line                                                         Amount Assets and Other Debits                                                    Liabilities end Other Csedits No.                                                                              No.
lal                                                                            lal 33                INVESTMENT OF UTILITYPLANT                                                          MUNICIPALITY& SURPLUS 2    Utilit Plant                                    S3.542.733.826            34  Investment of Municipality.
(Less) Accumulated Provision        for                                  35  Constructive Surplus or Deficit Depreciation & Amortization                                           36  Retained Earninos Electric                                    512.548.5~4                TOTAL Investment & Surplus Other Utility Department                                        37          (Enrer Total of lines 34 rhru 36J (Specifyr J Net Utility Plant (Line 2 less line 4, 5J    3 030 184 (L                              LONG TERiVI DEBT 39  Bonds                                                2 237 655      COO INVESTMENTS                                              40  Advances from Municioalitv Nonutility Property (Less Accum.                                          41  Other Long.Term Debt Provision for Depreciation and                                        42  Unamort. Premium on Long. Term Debt                          787.928 Amortization: S                    )                                 43    Unamortized Discount on Long Term dvances to Municipality                                                      Debt Debit                                            62.791.6%
pecial Funds                      151.8tJ6.75/              TOTAL Long.Term Debt (Enter Total TOTAL Investments (Enter Total                                                 of lines 39 rhru 43J                            2 175.651 2o8 of lines 8 rhru 10J                              151.896.757      45            CURRENT AND ACCRUED LIABILITIES 12         CURRENT ANO ACCRUED ASSETS                                          46  Warrants Pa able                                              744 61" 13    Cash & Working Funds                                      2.110.4%        47  Notes and Accounts Pavable                                58 481.6oo 14    Temporary Cash Investments                              lo  898 5(8          Pavables to Municioalitv 15    Notes & Accounts Receivable                                              4g  Customer Deposits (Less Accum. Provision for                                           n0  Taxes Accrued                                                    7  cg Uncollected Accounts: S                                                51  Interest Accrued                                              343.7C8 16    Receivables from Municipality                                            52  I lisc. Current & Accrued Liabilities                      ~JI pic%    II 17    Materials & Supplies                                                              TOTAL Current & Accrued Liabilities 1B    Prepa ments                                              1.882 371      53          (Enter Total of lines 46 rhru 52J                  c<    Dli 267 Misc. Current & Accrued Assets TOTAL Current & Accrued Assets                                      54              DEFERRED CREDITS 20            (Enter Total of lines 13 rhru 19J                                55  Customer Advances for Construction.
56  Other Deferred Credits                                        <  1  O'V 21                    DEFERRED DEBITS                                            57                    Gain on Reacauired Debt
                                                                                                                    'namortized 22    Unamortized Debt Expense                                                          TOTAL Deferred Credits (Enter Toral 23    Extraordinary Property Losses                                            58        of lines 55 thru 57J                ~
cop fM 24    Miscellaneous Deferred Debits 25    Unamortized Loss on Reacquired Debt                                       59            OPERATING RESERVES TOTAL Deferred Debits                                                    Property Insurance Reserve 26              (Enter Toral of lines 22 rhru 25J                                61  Injuries and Damages Reserve 27                                                                                    Pensions and Benefits Reserve 63  Miscellaneous Operatin Reserves TOTAL ASSETS & OTHER DEBITS                                                  TOTAL Operating Reserves (Enter Toral of lines 6, 11, 20, 26J          3 26o o42 910                    (Enter Total of lines 60 rhru 63J TOTAL LIAB. & OTHER CREDITS 65        (Enter Total ol lines 37.44,53,58, and 64I


Name of Respondent
This Report Is:                    Date of Repon          Report Year Ending Nemo of Respondent shington Public Power Supply                       Il) @An Original                   IMo,Oa, Yr)           IMo, Oa, Yrl  ~
~'ashington Public Power Supply S'tem This Rcport Is: (1)K(An Original (2)QA Retubmistion PART IV: UTILITY PLANT Date of Rcport IMo ,Da, Yr)4/3/89 Repctt Year Ending (IVk), Da, Yt)6/30/88 a No.Electric Utilit Plant Item (al Balanct)Beginning of Yeac (I)J Additions During Yeat (eJ R eh)em ants During Year Idl Transfers and Adjustments
stem                                              I2) PA Resubmission                  4 3 89                 6 30 88 PART II: CONDENSED INCOME STATEMENT FOR THE YEAR Line                                                            Item                                                        Amount No.                                                             la)                                                            (a)
'el Balance End cf Yeas.3 Electric Plant in Service Intangible Plant Production Plant Steam Production Nuclear Production
Electric Utilit 0 eratin  Income Operating Revenues Operation Expenses Maintenance Expenses                                                                                              23 58    636 Depreciation and Amortization                                                                                    1  "7      920 Taxes and Tax Equivalents Contributions and Services TOTAL Electric Operating Expenses (Enter Toral oi lines3rhru 7)
, Hydraulic Production 4O)S" 4P~.Qrvq (7 r 4)%114 r4 Rl).",q~i%1" 10 12 13 14 15 17 Other Production (Spect'fyr)*
Net Operating Income 10        Income from Plant Leased to Others Total Electric Utility Operating Income (Enrer Total oflines9rhru 10J 12    Other Utility Operating Income tUtility Departments Other than Electric) 13            TOTAL Utility Operating Income (Enrer Total of lines 11 rhru 12) 14    Other Income (Explain si nificant amounts in a foornore)                                                             15 380 270 15    Allowance for Funds Used During Construe:ion 16    Gross Income (Enter Toral of lines 13 thru 15)                                                                        leis)      1 17     Income Deductions 18        Interest on Long. Term Debt 19        Other Income Deductions (See pg. 4J (Explain significanr amounts in a footnote J 20            TOTAL Income Deductions (Enter Toral of lines 18 and 19J 21    Income Before Extraordinary Items (Enter Toral of line 15/ess line 20)
TOTAL Production Plant Transmission Plant Distribution Plant General Plant O 1 TOTAL Electric Plant in Service Electric P(ant Leased to Others Construction Work in Progress-Electric Electric Plant Held for Future Use Electcic Plant Acquisition Adjustments (See deftnifton (e), page ii)TOTAL Electric Plant Plant of Other Utility Depts.(Specify()
Extraordinary Income (See definirion (fJ, page ii)
16 527 794 3.451 013 334 12 373 31 C141 1 Q~Q1 V'C 156 330 15 684 124 2 1%)1.1 g<n 1>Q)P 171 3 542 7 826 26 452 137 15'493.o82 3 26o 250 3 468 705 239 12 373 31 TOTAL Utility Plant 3~Q1 M~7?4 29 850 959 15.255.138) 2 171.769 3.542.733.826 PART V: SALES OF.ELECTRICITY FOR RESALE 1.Report be(ow the information called for concetning sales dur ing year to other electric udiities and cooperatives, and to cities or other public authorities for distribution to ultimate consurn.tss.
Extraordinary Deductions (See definition (fJ. page iiJ Net Income (Enter Total of lines 21 plus line 22 less line 23)
2.For each sale, designate statis:ical classifications in column Ihl as follows: FP, for firm power supplying total system requirements of custon.er or total requirements at a specific poim ol delivery: FP(PI, for firm power supplementing customet s own generation or other purchases:
PART III: OPERATION AND MAINTENANCE EXPENSES Line                                  Item                                  Ops a thun          htaintenanee              Total No.                                    lal                                    fol                    kl                  rdl Production Exoenses Steam Power Generation Nuclear Power Generation                                          83 424                21 639 365              105      3 1 Hydraulic Power Generation Other Power Generation (Specifyr)
0.(or othec power.Irclude in the 0 classifica;ion sales it)vrhich the po'vec delivered carnot be classified under either of the above de(initions.
Purchased  Power other Production Expenses - Decomtjssjopjno                            997 447                                          997 447 TOTAL Production Expenses                                                                                            1 Transmission Expenses                                                                                                  Pr] rr Distribution Expenses 10        Customer Accounts Expenses Sales Expenses 12 13 Administrative 5 General Expenses TOTAL ELECT. OPERATION 5 MAINT. EXPENSES 33 048 815 117 840 532            23 1  792 228 636  ':        34 841 043 14l 424 168
3.For cofumn (e).enter the quan;ities sho.vn on the bills tendered.Line No.Sales Ibtade Tc (Enter name)ral nneville Parer Aden nneville Pnler Ad.)T(n lark County Pl9 r Scatis~rica!Classifi~cation Ihl FP(P)FP(P)FP(P)Pcit.c cf Delivery lSta:e.city, etc.)Icl Ricnland, WA ter zn, N Vancouver, HJ'a I Amcunc c(Voltage Idl 540 kv 69 kv 69 kv so'umber ct Kilcwac cheart Sold (eJ 5,944,781,GB 59,150,228 7 036 G'2 pn<<2Q Annual IIttximum Dcmar.d ISpeeily k)V or kVal (II 1,105,K0 N 39o,792<<~Revenues Amcur.c Per kyvh lln Cents (I)I 1,062,051 1.55 (L."9,462,053 7.'56 PART Vl: PURCHASED POWER I.Repor.below the information called for concerning powet pur~chased for resale during the year.2.For column (d), enter the quantities shown on the bills rendered.3.Report intecchance uansac:ions as net whether the net is a ceceipt or a delivery by tesporden:.
 
Indicate such transacticns with an asterisk.)2 3 4 Putchased Ftcm (Enter namel (al Point o(Receipt'State.city, etc.t Amount of Vo))age Icl Number cf Kifcwatchcutt Purchased (dl Annvat Ma)IImum Demand (Speci(y ky/or kVal/el Cost Amount Per kWh lln Cents)(gJ
Name of Respondent                                            This Rcport Is:                                            Date of Rcport                    Repctt Year Ending
~~Rcpoit Yccr Ending IMo, Dc, Yr)Dctc of Rcport IMo, Dc, Yr)This Rcport Is'.ll l@An Original I Q R bmf>>ton c of Rcspondcnt hington Public Power Supply 6 30 88 PART Vl): TAXES, TAX EQUIVALENTS, CONTRIBUTIONS, AND SERVICFS DURING YEAR 1.Report below the information called for on contributions and services to the municipality or other government units by the electric utility and, conversely.
  'ashington                Public      Power Supply              (1) K(An Original                                            IMo,Da, Yr)                      (IVk), Da,  Yt)
by those bodies to the electric utility.Do not include: (a)loans and advances which are subject to repayment or which bear interest, (b)payments in retirement of loans or advances previously made, (c)contributions by the municipality of funds or property which are of the nature of investment in the elecuic utility department.
~
2.Enter in column (c)the total contributions made or received.Show in column (d)amounts included in column (c)which have been accounted for in the respondent's financial statements, i.e.~balance sheet, income account, earned surplus, operating revenues, operating expenses, etc.Show in column (e)amounts which are not accounted for in respondent's financial statements.
S'tem                                                      (2)  QA Retubmistion                                            4/3/89                          6/30/88 PART IV: UTILITYPLANT Balanct)                                                        Transfers a                                                                                                      Additions        R eh)em ants                                      Balance Item                                      Beginning                                                                  and No.                                                                                                       During Yeat        During Year                                    End  cf Yeas of Yeac                                                      Adjustments (al                                                                                            Idl
For those amounts not included in respondent's financial statements, explain in a footnote the reasdn for their omission.3.Report below only taxes that are chargeable to operations of the electric utility department.
                                                                                                                                                                        'el (I)J                  (eJ Electric Utilit Plant Electric Plant in Service Intangible Plant                                                                        S Production Plant Steam Production                                                                                                                                          % 114 r4
Exclude gasoline and other sales taxes which are included in the cost of transportation and materials.
    .3                Nuclear Production                                                                                        "  4P~. Qrvq                      Rl)      .",q ~i%1"
4.Repon as tax equivalents only those amounts which are understood to constitute payments equivalent to or in lieu of amounts which would be paid if the electric utility cepartment were subject to local tax levies.5: For Other (Specify J, use a supplemental page if the lines pro-vided are not sufficient.
                    , Hydraulic Production                                                        4O)                                  (7  r  4)
Amount of Contnbutlon oi Value of Scivicc Inc Item By the Electric Utility to the Municipality r Othe Government Units kwh (t,000'sl Ibf Total lcf Included in Financial Statcmcnts fd1 foot Inc!vdcd in Financial Statcmcnts
Other Production (Spect'fyr)*                            16 527 794                      156 330                                                        15 684 124 TOTAL Production Plant                          3.451 013 334                    26 452 137          15'493.o82              3 26o 250          3 468 705 239 Transmission Plant                                          12 373 31                                                                                      12 373 31 Distribution Plant General Plant                O              1                          C141      1                                2  1%)        1    .     1 10                    TOTAL Electric Plant in Service                  Q  ~Q1          V'                                        g<n   1 >Q)       P 171 Electric P(ant Leased to Others 12          Construction Work in Progress-Electric 13          Electric Plant Held for Future Use 14          Electcic Plant Acquisition Adjustments (See deftnifton (e), page ii) 15                    TOTAL Electric Plant                                C 3 542 7        826 Plant of Other Utility Depts. (Specify()
'fcf Taxes 2 Tax Equivalents 3 Total (Lines 1&2)4 To General Funds of the Municipality 5 Other (Specifyr J 6 TOTAL Contributions (Toral of lines 4 fhru 5)7 Street and Highway Lighting B Municipal Pumping 9 Other Municipal Li ht and Power Other Electric Service Nonelectric Service (Specifyr)
17 TOTAL Utility Plant                              3 ~Q1            M~
: S 2.218 CGS S 2.218.KG S TOTAL Services (Total of lines 7 fhru 12)TOTAL Contributions and Services by the Electric Utility (Tora(of lines 6arN 13)By the Municipality or Other Government Units to the Electric Utility For Operations and Property Maintenance Other (Specify: J 0 TOTAL Contributions (7ofai of lines 15 fhru 11')Office Space Water Engineering Service Legal Service Other Service (Specrfyr) 26 27 TOTAL Services (7ofaf of lines 19 rhru 24)TOTAL Contributions and Services by the Municipality (7ofal of lines 18 arid 25)~Net Contributions and Services by the Electric Utility to the Municipality or Other Government Units (Total of line 14 less line 26J Oate ol Rcport{Mo, Oa, Yrl This Report Is'.(1)DAn Original l2)QA Resubmission Name of Respondent ashington Public Power Supply S ste 4/3/89 PART Vill: LARGE.ELECTRIC GENERATING PLANTS USING FUEL Report Year Ending (Mo, Oa, Yrl 6/30/88 1.Large plants are plants of 25,000 kW or more ol installed capacity (name plate rating).Include gas turbine and internal combustion plants of 10.000 kW and more on this page.Include alto nuclear plants.2.II any plant is equipped with combinations of steam, hydro, internal combustion or gas turbine equipment, report each as a separate plant, However, if a gas turbine unit functions in'a combined cycle operation with a conventional steam unit, include the gas turbine with the steam plam.3.Iridicate with asterisks and footnotes il any plant is leased or operated as a joint facility.4.If net peak demand for 60 minutes is not avagable, give that which is avagable, specifying period in a footnote.=5.If a group of employees attends more than one generating plant, report on fine 10 the approximate average number of employees assignable to each plant.6.If gas is used and purchased on a therm basis, give the Btu ccntent ol the gas and the quantity of fuel burned, converted to h1cf ft (14.73 psia at 60'F).7.The figure entered on line 20 (Fuel)should be consistent with the Line No.Item la/Plant Name: Huclm Plant th.2 Ibf Plant Name: Generating Project/el 1 Kind ot Plant (Steam, Internal Comb., Gas Turb., or Nuclear)2, Year Originally Constructed 3 Year Last Unit Was Installed 4 TOTAL Inst.Capacity (Max.Gen.Name Plate Ratings in kWI 5 Net Peak Demand on Plant{kW for 60 Minutes)6 Plant Hours Connected to Load 7 Net Continuous Plant Capability (kW)B When Not Limited by Condenser Water 9 When Limited by Condenser Water 10 Average Number of Employees 11 Net Ge6hration, Exclusive of Plant Use 12 Cost of Plant Land and Land Rights Struciures and Improvements 5 Equipment Costs 16 TOTAL Cost 17 j Cost per kW of installed Capacity (Line 4)18 j Production Expenses 19 j Operation Supervision and Engineering 20 Fuel 21 (Coolants and Water (Nuclear Plants Only)22 j Steam Expenses 23)Steam from Other Sources 24 Steam Transferred (Cr.)25 Electric Expenses 26 Misc.Steam Power Expenses{or Nuclear)27 Rents 28 J Maintenance Supervision and Engineering 29 Maintenance of Structures" 30 Maintenance of Boiler Plant (or Reactor Plant)31 Maintenance of Electric Plant 32 Maintenance of Misc.Steam Plant (or Nuclear)33 TOTAL Production Expenses jiuclear 1972 1984 C0 pry orat Al 1 1%10 00 q nd.: n q harp 2.872 18 304 48'I 2 1 n-a 11 382 390 1~10 1 4.8%.395 5.146 356 3.89t1 178 103 480 912 Stean<1966 1966 2 1 od 1C C 207.596 21.469 34 Expenses per Net kWh{Mills-2 Places)35 F uel: (Kind)36 Unit:{Coal-Tons of 2,000 Lb.)(Oil-Barrels of 42 Gals.){Gas-Mcf)(Nuclear.indicate) 37 Quantity (Units)of Fuel Burned Average Heat Content of Fuel Burned (Btu per Lb.ot Coal per Gal of Oil or per Cu Ft of Gas)Average Cost of Fuel per Unit, as Delivered F.O.B.Plant During Year 40 Average Cost of Fuel per Unit Burned 41 Average Cost of Fuel Burned per Million Btu 42 Average Cost of Fuel Burned per kWh Net Generation 43 Average Btu per kWh Net Generation Coal 1.4 Gas 40.78 5.26 10,565 Oil Coal Gas Oil This Report Is: (1)QAn Oiiginsl ()QA R ubmission Oats of Rcport IMo, Os, Yr)me of Respondent shisigton Public Power Supply stem'3 89 PART Vill: LARGE.ELECTRIC GENERATING PLANTS USING FUEL (Continued)
7?4      29 850 959          15.255.138)            2 171.769            3.542.733.826 PART V: SALES              OF.          ELECTRICITY FOR RESALE
Rcport Yea<Ending IMo.Oa, Yr)6 8 figures enteied on line 37 (Quantity of Fuel Burned), line 38 IAvg.Heat Con.tent), line 40 IAvg.Cost of Fuel)and line 41 IAvg.Cost of Fuel Burned).B.lf more than one fuel is burned in a pfant, furnish only the composite hest rate for ell fuels burned.9.The items under Cost of Plant, line 12, represent accounts or cornbina.tions of accounts piescribed by the Uniform Sysiern of Accounts.Produc-tion expenses do not include Purchased Power, System Control and Load Oispetching, end Other Expenses classified as"Other Power Supply Ex.penses." IO.For I.C.end G.T.plants, report Operating Expenses (account nos.548 end 549)on line 25"Electric Expenses." and Maintenance (account nos.553 and 554)on Ene 31-Maintenance of Electric Plant," Indicate plants designed for peak load service.Designate with an asteiisk automatically operated plants.ll.If the respondent operates a nuclear power generating plant, attach le)a brief expkrnation accounting for the cost of power generated, including any attribution of excess costs to research snd development expenses: (b)a brief explanation of the fuel ecccun:ing, specifying the accounding methods snd types of cost units under with rescect to the various componems of the fuel cost;and lc)additional information ss may be infoimative concerning the type ol plant, kind of fuel used, and other physical and operating characteristics ol the plant.Isnt Name Plant Name: Plant Name: IA III Item Ial Kind ot Plant Year Constructed Year Last Unit TO~AL Installed Capacity iVet Peak Demand Plant Hours Net Capability Not Limited Limited Employees Net Generation Cost of Plant Line No.10 12 Coal Gas Oil Coal Gas Oil'oal Gas Structures Ecuipment TOTAL Cost per kVI Prcduction Exoenses Oceration Suoervisfon Fuel Coolants Steam Expenses Steam Other Sources Steam Transferred Electric Expenses ihlisc.Expenses Rents Maintenance Supervision Maint.of Structures Maint.'f Boiler Maint.of Electric Plant Maint.ot Misc.Steam AL roduction Expenses O;I.Fuel: (Kind)Unit 15 16 17 16 19 20 21 22 23 24 25 26 27 26 29 31 32 33 34 35 36 Quan!ity Avg.Heat Content 37 Avg.Cost F.O.B.39 Avg.Cost Burned Avg.Cost Btu Avg.Cost kWh Avg.Btu per kWh 40 41 42 Name of Respondent Washington Public Power Supply System This Rcport Is.'l I@An Original l2)PA Resubmission Date ol Rcpon IMo, Da, Yr)al o Rcport Year Ending IMo, Da, Yrl/R PART IX: HYDROELECTRIC GENERATING PLANT STATISTICS (Large Plants)t.Larg plants are hydro planta of 10,000 kvV or more of installed capacity (name plate ratings).2.Indicate by an asterisk and explain in a footnote it any plant is teased, operated under a license from the Federal Energy Regulatory Commission, or operated as a joint facility.If a licensed project, give project number.3.For line 5, if net peak demand for 60 minutes is not available, give that which is available, specifying period.4.For line 10, if a group of employees attends more than one generating plant, report the approximate average number of employees assignable to each plant.Lln No 10'l2 13 14 15 17 18 19 20 21 22 23 25 26 27'28 29 30 31 FERC Licensed Project'No.
: 1. Report be(ow the information called for concetning sales dur                              FP(PI, for firm power supplementing customet s own generation or ing year to other electric udiities and cooperatives, and to cities or                            other purchases: 0. (or othec power. Irclude in the 0 classifica;ion other public authorities for distribution to ultimate consurn.tss.                               sales it) vrhich the po'vec delivered carnot be classified under either
and Plant Name: Kind of Plant (Run ot-River or Storage)Year Originally Constructed Year Last Unit was Installed TOTAL Installed Capacity (Generator Name Plate Ratings.in kW)Net Peak Demand on Plant (Kilowatts tor 60 Minutes).Plant Hours Connected to Load Pl C b'I'(K lowatts)Under the Most Favorable Operating Conditions Under the Most Adverse Operating Conditions Averaae Number of Employees Net Generation.
: 2. For each sale, designate statis:ical classifications in column Ihl                        of the above de(initions.
Exclusive of Plant Use Cost of Plant Land and Land Rights Structures and Improvements Reservoirs, Dams, and Waterways Equipment Costs Roads, Railroads, and Bridces TOTAL Cost (Enrer Toral of lines 14 rhru 17J Cost per kW of Installed Caoacitv Line lo-: line 4J Production Expenses Operation Supervision and Engineering Water for Power Hydraulic Expenses Electric Expenses Misc.Hydraulic Power Generation Expenses Rents Maintenance Supervision and Engineering Maintenance of Structures Maintenance of Reservoirs, Darns, and Watervays Maintenance of Electric Plant Maintenance of Misc.Hydraulic Plant TOTAL Production Expenses(Total of lines 21 rhru 31J xpenses per et k (Mt s-laces)FERC Ltccntad Project No.p 22ttn and Plant Name: Pac':.txd Lake HydroelecWic Proje"t lcd 26 125 31.5CO 5.3SO 31.%9 31 5CO 67.922.593 54.775 47n 993 9 184 216 2.24O 391 419 C63 12 378.439 473.8 9 O55 9 394 1 554 FERC Licensed Project No.and Plant Name: footnote-p.11 Name of Respondent Washington Public Power Supply S stem This Report ls'.lt)@An Original (2)QA Resubmission Date of Report IMo, Oa, Yrl 4/3/89 Report Year Endmg liVe.Oa.Yrl 6/30/88 PART IX: HYDROELECTRIC GENERATING PLANT STATISTICS (Large Plants)(Continued) 5.The items under Cost of Plant represent accounts or combina-tions of accounts prescribed by the Uniform System of Accounts.Under Production Expenses, do not include Purchased Power, System Control, and Load Dispatching, or Other Expenses classified as"Other Power Supply Experses." 6.It any plant is equipped with ccmbinations of steat.~.hydro, in.ternal combustion engine, or gas turbine equipment, report each as a separate plant.FERC Licensed Project No.and Plant Name: FERC Licensed Project No.and Plant Name: FERC Licensed Project No.and Plant Name: FERC Licensed Project No.and Plant Name: Line N o'I Kind of Plant Year Constructed Year Last Unit TOTAL Installed Capacity Net Peak Derrard Plar t Hours Net Caoabilit Y Most Favorable Most Adverse Emclovees Net Gener" tion"'I Cos O'lant Lard Str c:ures I Reservoirs.
as follows: FP, for firm power supplying total system requirements                                  3. For cofumn (e). enter the quan;ities sho.vn on the bills of custon.er or total requirements at a specific poim ol delivery:                               tendered.
Etc.I Equipment Roads, Etc.TOTAL I Cost per kW:::::$Production Expenses Operation Supervision Water for Power Hydraulic Experses Elec;ric Expenses Misc.Expenses Rents Maintenance Su"ervision Maintenance Structures iVlairst.Reservoirs, Etc.Maint.Elecuic Plan: r'riaint.Hydraulic Plant TOTAL Expenses per Net kWh 0 10 12 13 15 16 17 18 10 20 21 22 23 24 25 26 27 28 29 30 31 32 33 Name of Respondent Mashington Public Power Supply Systen, This Report b: (1)(ir)An Original (2)QA Resubfnission Date of Report IMo, Ds, Yr)4/3/89 Report Year Ending IMo, Da, Yrl 6/30/88 PART X: TRANSMISSION LINE STATISTICS 1.Report below information requested concerning each transmis-sion line.Show highest voltages first.If more space is required, use supplemental page using the column headings shown on this page.-'2.'ndicate in column (d)whether the type of supporting structure is: (1!single'pole, wood, or steel;(2)H-frame, wood, or steel poles;(3)tower: or (4)underground construction.
Annual                  Revenues Scatis  ~                                                                        ct        IIttximum Line No.
3.Designate any transmission-line or portion thereof for which the respondent is not the sole owner.If such property is leased from another, give name of lessor.4~Designate in a footnote any transmission line teased to another and give name of lessee.g.F or column (c), if the voltage used is different from operating, report the difference In a footnote.Line No.Designation (Name of Terminal Station)From To'pefetlng Vohage lcl Type of Supporting Structure Dn''tructures of Line Designated lel On Structures of Another Une III LENGTH IPoie Maesl SI?d of Conductor and Material Number of Circuits BPA Manford Sub ta-tion Vant-ge Substation KO kv Ste'.1 23.85 mi 1780 tr01 ,ASS ChL kar 2 conouc tors per pliase Total of 6 lines on tructure.Bonneville Pam Aai nistratIon (A)uins 5 nd NPPSS a s1as tailed.Pack:mod La',e Lars County 69 kv/~Die 2.2 20 2l 22 23 24 25 26 27 28 29 30 31 32 33 34 35 39 40 41 42 43 Fl 0 Name of Respondent This Report Is: Washington Public Power Supply II)KAo<<ig'"ei S stem)2)QA Resubmission PART X): FOOTNOTE OATA Date of Report{Mo, De, Yr)~4/3/89 Report Year Ending IMo, Da, Yr)6 30 88 Page Number.(al Part Number (bJ Line Number (cJ Column Number (dJ Comments 14 b Otrer Inca)e includes: Investrent incan.'R valuation of invest)n nts Accretion of deferred gain on redeTption of revenue bonds Gain on redenption of revenue bonds S 15,694,427 (676,74O)133,FA 229,289$15,380,270 19 Other Incan Muctions inclixh: Arortization of Debt Discount 5 Exp.nse S 2,751,425 projects have no equity and, therefore, no retains earnings.Peer sales and net-billing agrerimts v(ith the project participants allav for ccnpl etc recovery of project costs including.:
Sales Ibtade Tc (Enter name) rica!
debt service;The participants are billed for project costs I(ith an adjustnent to actual at year end.III VIII-Benefits accrued reclassified frcri op ration and I)aintooance categories to administrative and g neral.IV 9 All~tion of Agency Clea ing Account balances vas irplErsent<
Classifi  ~
in fiscal year 19$on a retroactive basis.VIII VIII 11 of e instr ctions The Hanford Generating Pro'e"t, an 860 Nre plant Yflicn utilizes by-product steam fraii the Departnant of Energy's dual-pu."pock He:I Production Reacm.(NPR), vas ccrpleted in 1966 and)as in norlial e~ration through 1985.In January 1987, the t)PR;as shut deEI for safety iriprovesznts.
Pcit.c cf Delivery lSta:e. city, etc.)
In February 1988, the Depart nt of~p'y placed the tPR on standLy status for an undetermined leng J)of tiffs, eliminating the Harford Generating Project's present energy source.Tne Supply System has caipleted a su)dy of alternative pear sources to be us<for contiruaf erergy generation, and further studies are being corducted.
                                                                                                                'umber Amcunc c(
tsuclear Plant t~o.2 S 445,405,761
Voltage Kilcwac cheart Sold Dcmar.d ISpeeily k)V          Amcur.c Per kyvh cation                                                                                      or kVal                           lln Cents ral                      Ihl                    Icl                          Idl                (eJ                  (II                              (I)I nneville Parer Aden                  FP(P)            Ricnland,                WA        540  kv        5,944,781,GB 1,105,K0 (L."9,462,053                          7.'56 nneville Pnler Ad.)T(n                FP(P)           ter zn,               N              69  kv            59,150,228                N lark County Pl9                        FP(P)            Vancouver, HJ'                      69  kv              7 036 G'2          39o,792          1,062,051          1.55 r                                                I                          a      so                        pn    <<2Q
.5,944',781',I
                                                                                                                                                      <<~
$74.92 thrills/Kl<(a)The cost of pcsr~r'is equal to total exp:nses divided by the n t g neration: Total Expenses (pg.3, line 2)tt t Generation (pg.6, liras 11).t'et Cost of Peer e of Respondent ashington Public Power Supply S stem This Report ls: II)i/An Original I2)QA Resubmission PART X): FOOTNOTE DATA Date of Report IMo, Da, Yr)4389 Report Year Ending IMo, Da, Yr)6 3 Page Number faf Pan Number ff J Line Number fel Column Number fd)Comments 7 VIII ll of ins the ctions Nuclear Plant flo.2 (Continued) 8 IX (b)The Fuel Accounting System uses cost principles of the public utility industry as given under t)a Federal Energy Regulatory Cawission (FERC)Chart of Unifom)Acccunts.This includes recording of the accpisition and nanufacturing cost of fuel and the am5zation of the capitalized
PART Vl: PURCHASED                          POWER I. Repor. below the information called for concerning powet pur                    ~
.fuel cost based on heat production.
: 3. Report intecchance uansac:ions as net whether the net is a chased for resale during the year.                                                                ceceipt or a delivery by tesporden:. Indicate such transacticns with
In addition to the ancrtization of.fuel bw'nup, t'w current period nuclear fuel operating expense includes a charge for future spent nuclear fuel storage and disposal to be provided by the Uepart))ant of Energy.This charge is based on a on-mill per kilowatt hour of erergy g neratc4.Packimd Lake Hydroelectric Project is located in Le&#xc3;s County, Washingtcn and in part occupies gover)T)ant lands in the Giffcrd Pinchot National Forest in the Goat Rock section of the Cascade hx)ntains.
: 2. For column (d), enter the quantities shown on the bills                                    an asterisk.
The plant is operat<under a license frcm the Federal Energy Regulatory Camnssion (Project No.P-2244).}}
rendered.
Annvat                        Cost Number cf              Ma)IImum Putchased Ftcm                    Point o(Receipt                      Amount of            Kifcwatchcutt            Demand                                    Per kWh (Enter namel                            city, etc.t    'State.
Vo))age              Purchased            (Speci(y ky/          Amount or kVal                              lln Cents)
Icl                  (dl                    /el                                    (gJ (al
        )
2 3
4
 
      ~ ~
c  of Rcspondcnt                                  This Rcport Is'.                             Dctc of Rcport            Rcpoit Yccr Ending hington Public Power Supply                    ll l @An Original                            IMo, Dc, Yr)              IMo, Dc, Yr)
I    Q R bmf>>ton                                                            6 30 88 PART Vl): TAXES, TAX EQUIVALENTS, CONTRIBUTIONS, AND SERVICFS DURING YEAR
: 1. Report below the information called for on contributions and             operating expenses, etc. Show in column (e) amounts which are not services to the municipality or other government units by the electric         accounted for in respondent's financial statements. For those utility and, conversely. by those bodies to the electric utility. Do not        amounts not included in respondent's financial statements, explain include: (a) loans and advances which are subject to repayment or              in a footnote the reasdn for their omission.
which bear interest, (b) payments in retirement of loans or advances              3. Report below only taxes that are chargeable to operations of previously made, (c) contributions by the municipality of funds or              the electric utility department. Exclude gasoline and other sales taxes property which are of the nature of investment in the elecuic utility          which are included in the cost of transportation and materials.
department.                                                                      4. Repon as tax equivalents only those amounts which are
: 2. Enter in column (c) the total contributions made or received.            understood to constitute payments equivalent to or in lieu of Show in column (d) amounts included in column (c) which have                    amounts which would be paid if the electric utility cepartment were been accounted for in the respondent's financial statements, i.e.        ~      subject to local tax levies.
balance sheet, income account, earned surplus, operating revenues,                5: For Other (Specify J, use a supplemental page if the lines pro-vided are not sufficient.
Amount of Contnbutlon oi Value of Scivicc Inc                                                                          kwh                                    Included in        foot Inc!vdcd Item (t,000'sl              Total              Financial          in Financial Statcmcnts          Statcmcnts Ibf                  lcf                  fd1                'fcf By the Electric Utility to the Municipality r Othe Government Units Taxes                                                                        :  S    2.218  CGS    S    2.218.KG      S 2        Tax Equivalents 3        Total (Lines 1 & 2) 4        To General Funds of the Municipality 5          Other (Specifyr J 6           TOTAL Contributions (Toral of lines 4 fhru 5) 7        Street and Highway Lighting B        Municipal Pumping 9          Other Municipal Li ht and Power Other Electric Service Nonelectric Service (Specifyr)
TOTAL Services (Total of lines 7 fhru 12)
TOTAL Contributions and Services by the Electric Utility (Tora( of lines 6arN 13)
By the Municipality or Other Government Units to the Electric Utility For Operations and Property Maintenance Other (Specify: J TOTAL Contributions (7ofai of lines 15 fhru      11')
Office Space 0          Water Engineering Service Legal Service Other Service (Specrfyr)
TOTAL Services (7ofaf of lines 19 rhru 24) 26                TOTAL Contributions and Services by the Municipality (7ofal of lines 18 arid 25)  ~
27      Net Contributions and Services by the Electric Utility to the Municipality or Other Government Units (Total of line 14 less line 26J
 
Name of Respondent                                              This Report Is'.                               Oate ol Rcport            Report Year Ending ashington Public Power Supply                              (1) DAn Original                              {Mo, Oa, Yrl              (Mo, Oa, Yrl S  ste                                                    l2) QA Resubmission                              4/3/89                        6/30/88 PART    Vill:  LARGE. ELECTRIC GENERATING PLANTS USING FUEL
: 1. Large plants are plants of 25,000 kW or more ol installed capacity                4. If net peak demand for 60 minutes is not avagable, give that which is (name plate rating). Include gas turbine and internal combustion plants of         avagable, specifying period in a footnote.
10.000 kW and more on this page. Include alto nuclear plants.                     =
: 5. If a group of employees attends more than one generating plant, report
: 2. II any plant is equipped with combinations of steam, hydro, internal          on fine 10 the approximate average number of employees assignable to each combustion or gas turbine equipment, report each as a separate plant,                plant.
However, if a gas turbine unit functions in'a combined cycle operation with a          6. If gas is used and purchased on a therm basis, give the Btu ccntent ol conventional steam unit, include the gas turbine with the steam plam.              the gas and the quantity of fuel burned, converted to h1cf ft (14.73 psia at
: 3. Iridicate with asterisks and footnotes il any plant is leased or operated    60'F).
as a joint facility.                                                                  7. The figure entered on line 20 (Fuel) should be consistent with the Plant Name:                                Plant Name:
Line No.                                        Item                                    Huclm Plant th. 2                              Generating Project la/                                                            Ibf                                  /el 1    Kind ot Plant (Steam, Internal Comb., Gas Turb., or Nuclear)                             jiuclear                                  Stean<
2, Year Originally Constructed                                                                  1972                                      1966 3 Year Last Unit Was Installed                                                                  1984                                      1966 4    TOTAL Inst. Capacity (Max. Gen. Name Plate Ratings in kWI                                                                              2 5    Net Peak Demand on Plant {kW for 60 Minutes) 6 Plant Hours Connected to Load                                                                C0 7    Net Continuous Plant Capability (kW)                                                             harp B        When Not Limited by Condenser Water 9        When Limited by Condenser Water 10    Average Number of Employees                                                                pry 11    Net Ge6hration, Exclusive of Plant Use                                          orat       Al 12 Cost of Plant Land and Land Rights Struciures and Improvements                                              1   1                                             1  od 5        Equipment Costs                                                              %10             00                                     1C 16              TOTAL Cost                                                          q nd.: n q 17 j            Cost per kW of installed Capacity (Line 4)                                          2.872 18  j Production Expenses 19  j    Operation Supervision and Engineering                                          18 304 48 20          Fuel                                                                              'I 2
21 (        Coolants and Water (Nuclear Plants Only)                                          1 n-a 22 j      Steam Expenses                                                                11 382 390 23 )        Steam from Other Sources 24          Steam Transferred (Cr.)
25          Electric Expenses 26          Misc. Steam Power Expenses {or Nuclear)                                        1      ~10     1 27          Rents 28 J        Maintenance Supervision and Engineering 29          Maintenance of Structures"                                                                                                            C 30          Maintenance of Boiler Plant (or Reactor Plant)                                    4.8%.395 31          Maintenance of Electric Plant                                                    5.146 356                                     207.596 32          Maintenance of Misc. Steam Plant (or Nuclear)                                    3.89t1 178                                     21.469 33          TOTAL Production Expenses                                                    103 480 912 34             Expenses per Net kWh {Mills-2Places)                                             1  .4 35     F uel: (Kind)                                                                 Coal              Gas          Oil        Coal          Gas        Oil 36         Unit: {Coal-Tons of 2,000 Lb.) (Oil-Barrels of 42 Gals.)
{Gas-Mcf) (Nuclear.indicate) 37         Quantity (Units) of Fuel Burned Average Heat Content of Fuel Burned (Btu per Lb. ot Coal per Gal of Oil or per Cu Ft of Gas)
Average Cost of Fuel per Unit, as Delivered F.O.B.
Plant During Year 40         Average Cost of Fuel     per Unit Burned 41         Average Cost of Fuel     Burned per Million Btu                                             40.78 42         Average Cost of Fuel     Burned per kWh Net Generation                                       5.26 43         Average Btu per kWh       Net Generation                                                   10,565
 
me  of Respondent                                          This Report Is:                             Oats of Rcport                Rcport  Yea< Ending shisigton Public Power Supply                            (1) QAn Oiiginsl                           IMo, Os, Yr)                 IMo. Oa, Yr) stem                                                   ( ) QA R ubmission
                '
3 89                 6          8 PART   Vill: LARGE. ELECTRIC GENERATING PLANTS USING FUEL (Continued) figures enteied on line 37 (Quantity of Fuel Burned), line 38 IAvg. Heat Con. and 554) on Ene 31-Maintenance of Electric Plant," Indicate plants designed tent), line 40 IAvg. Cost of Fuel) and line 41 IAvg. Cost of Fuel Burned).       for peak load service. Designate with an asteiisk automatically operated B.lf more than one fuel is burned in a pfant, furnish only the composite     plants.
hest rate for ell fuels burned.                                                     ll. If the respondent operates a nuclear power generating plant, attach
: 9. The items under Cost of Plant, line 12, represent accounts or cornbina. le) a brief expkrnation accounting for the cost of power generated, including tions of accounts piescribed by the Uniform Sysiern of Accounts. Produc-         any attribution of excess costs to research snd development expenses: (b) a tion expenses do not include Purchased Power, System Control and Load           brief explanation of the fuel ecccun:ing, specifying the accounding methods Oispetching, end Other Expenses classified as "Other Power Supply Ex.           snd types of cost units under with rescect to the various componems of the penses."                                                                         fuel cost; and lc) additional information ss may be infoimative concerning IO. For I.C. end G.T. plants, report Operating Expenses (account nos. 548     the type ol plant, kind of fuel used, and other physical and operating end 549) on line 25 "Electric Expenses." and Maintenance (account nos. 553       characteristics ol the plant.
Isnt Name                                  Plant Name:                          Plant Name:
Line IA                                    Item              No.
III                                    Ial Kind ot Plant Year Constructed Year Last Unit TO AL Installed Capacity
                                                                                                                                  ~
iVet Peak Demand Plant Hours Net Capability Not Limited Limited Employees                        10 Net Generation Cost of Plant                    12 Structures Ecuipment                        15 TOTAL                            16 Cost per kVI                    17 Prcduction Exoenses              16 Oceration Suoervisfon            19 Fuel                              20 Coolants                        21 Steam Expenses                  22 Steam Other Sources              23 Steam Transferred                24 Electric Expenses                25 ihlisc. Expenses                26 Rents                            27 Maintenance Supervision          26 Maint. of Structures            29 Maint.'f Boiler Maint. of Electric Plant        31 Maint. ot Misc. Steam            32 AL roduction            33 Expenses                        34 Coal            Gas          Oil          Coal          Gas            Oil    'oal            Gas          O;I  . Fuel: (Kind)                     35 Unit                            36 Quan!ity                        37 Avg. Heat Content Avg. Cost F.O.B.                39 Avg. Cost Burned                40 Avg. Cost Btu                    41 Avg. Cost kWh                    42 Avg. Btu per kWh
 
Name of Respondent                                        This Rcport                                Date  ol Rcpon            Rcport Year Ending Washington Public Power Supply Is.'l I @An Original                          IMo, Da, Yr)              IMo, Da, Yrl System                                                l2) PA Resubmission                                  al  o                      /R PART IX: HYDROELECTRIC GENERATING PLANT STATISTICS (Large Plants)
: t. Larg plants are hydro planta of 10,000 kvV or more of                     3. For line 5, if net peak demand for 60 minutes is not available, installed capacity (name plate ratings).                                     give that which is available, specifying period.
: 2. Indicate by an asterisk and explain in a footnote it any plant is          4. For line 10, if a group of employees attends more than one teased, operated under a license from the Federal Energy Regulatory          generating plant, report the approximate average number of Commission, or operated as a joint facility. If a licensed project, give      employees assignable to each plant.
project number.
FERC Licensed Project'No. and Plant Name:               FERC Ltccntad Project No.                FERC Licensed Project No.
Lln                                                                                                        p 22ttn and Plant Name:                        and Plant Name:
No Pac':.txd Lake HydroelecWic Proje"t Kind of Plant (Run ot-River or Storage)
Year Originally Constructed Year Last Unit was Installed                                                lcd TOTAL Installed Capacity (Generator Name Plate Ratings
          .in kW)                                                                 26 125 Net Peak Demand on Plant (Kilowatts tor 60 Minutes).                    31.5CO Plant Hours Connected to Load                                              5.3SO Pl    C  b'I' (K lowatts)
Under the Most Favorable Operating Conditions                        31.%9 Under the Most Adverse Operating Conditions                          31 5CO 10     Averaae Number of Employees Net Generation. Exclusive of Plant Use                                  67.922.593
  'l2    Cost of Plant 13          Land and Land Rights                                                      54.775 14          Structures and Improvements                                            47n 993 15          Reservoirs, Dams, and Waterways                                      9 184 216 Equipment Costs                                                      2.24O 391 17          Roads, Railroads, and Bridces                                          419 C63 18              TOTAL Cost (Enrer Toral of lines 14 rhru 17J                    12 378.439 19              Cost per kW of Installed Caoacitv Line lo -: line 4J                473.8 20     Production Expenses 21           Operation Supervision and Engineering                                      9 O55 22          Water for Power 23          Hydraulic Expenses                                                        9 394 Electric Expenses 25           Misc. Hydraulic Power Generation Expenses 26           Rents 27           Maintenance Supervision and Engineering
'28           Maintenance of Structures                                                1 29         Maintenance of Reservoirs, Darns, and Watervays 554 30         Maintenance of Electric Plant 31         Maintenance of Misc. Hydraulic Plant TOTAL Production Expenses(Total of lines 21 rhru 31J xpenses per et k      (Mt s-     laces) footnote
: p. 11
 
Name of Respondent                                    This Report ls'.                           Date of Report                  Report Year Endmg Washington Public Power Supply                      lt) @An Original                          IMo, Oa, Yrl                    liVe. Oa. Yrl S stem                                            (2) QA Resubmission                              4/3/89                        6/30/88 PART IX: HYDROELECTRIC GENERATING PLANT STATISTICS (Large Plants) (Continued)
: 5. The items under Cost of Plant represent accounts or combina-        as  "Other Power Supply Experses."
tions of accounts prescribed by the Uniform System of Accounts.                6. It any plant is equipped with ccmbinations of steat. . hydro, in.
                                                                                                                                              ~
Under Production Expenses, do not include Purchased Power,                 ternal combustion engine, or gas turbine equipment, report each as System Control, and Load Dispatching, or Other Expenses classified          a separate plant.
FERC Licensed Project No.             FERC Licensed Project No.             FERC Licensed Project No.                   FERC Licensed Project No.
and Plant Name:                      and Plant Name:                        and Plant Name:                            and Plant Name:         Line N o 'I Kind of Plant Year Constructed Year Last Unit TOTAL Installed Capacity Net Peak Derrard Plar t Hours Net Caoabilit Y Most Favorable Most Adverse                    0 Emclovees                      10 Net Gener" tion
                                                                                                                "'I Cos O'lant                      12 Lard                          13 Str c:ures I  Reservoirs. Etc.               15 I  Equipment                      16 Roads, Etc.                   17 TOTAL                          18 I Cost per kW                    10
:::::$ Production Expenses             20 Operation Supervision          21 Water for Power               22 Hydraulic Experses            23 Elec;ric Expenses             24 Misc. Expenses                25 Rents                          26 Maintenance Su"ervision        27 Maintenance Structures        28 iVlairst. Reservoirs, Etc. 29 Maint. Elecuic Plan:          30 r'riaint. Hydraulic Plant     31 TOTAL                          32 Expenses per Net kWh          33
 
Name of Respondent                                        This Report b:                             Date of Report            Report Year Ending Mashington Public Power Supply                        (1) (ir)An Original                        IMo, Ds, Yr)              IMo, Da, Yrl Systen,                                              (2) QA Resubfnission                            4/3/89                  6/30/88 PART X: TRANSMISSION LINE STATISTICS
: 1. Report below information requested concerning each transmis-          the respondent is not the sole owner. If such property is leased from sion line. Show highest voltages first. If more space is required, use        another, give name of lessor.
supplemental page using the column headings shown on this page.-              4 Designate in a footnote any transmission line teased to another
                                                                                  ~
    '2.'ndicate in column (d) whether the type of supporting structure        and give name of lessee.
is: (1! single 'pole, wood, or steel; (2) H-frame, wood, or steel poles;      g. F or column (c), if the voltage used is different from operating, (3) tower: or (4) underground construction.                                report the difference In a footnote.
: 3. Designate any transmission-line or portion thereof for which Designation                                                          LENGTH IPoie Maesl (Name of Terminal Station)                                                                                SI?d of Type of                                      Conductor    Number Dn              On Line                                                              'pefetlng    Supporting    ''tructures        Structures        and of No.                                                                   Vohage                                                                  Circuits From                            To                            Structure        of Line      of Another      Material Designated          Une lcl                          lel              III BPA  Manford Sub      ta-    Vant-ge Substation          KO kv        Ste'.1          23.85 mi                      1780 tr01 2 conouc tion                                                                                                                    ,ASS    ChL  tors per kar          pliase Total of 6 lines on tructure.                Bonneville Pam Aai nistratIon          (   A) uins 5 nd        NPPSS    a s1as        tailed.
Pack:mod La',e                  Lars    County              69 kv    /~Die              2.2 20 2l 22 23 24 25 26 27 28 29 30 31 32 33 34 35 39 40 41 42 43
 
Fl 0
 
Name  of Respondent                            This Report Is:                         Date of Report          Report Year Ending Washington Public Power Supply II) KAo<<ig'"ei                                        {Mo, De, Yr) ~          IMo, Da, Yr)
S stem                                      )2) QA Resubmission                      4/3/89                  6 30 88 PART X): FOOTNOTE OATA Page        Part  Line   Column                                                    Comments Number      Number Number  Number
  .(al        (bJ    (cJ      (dJ 14        b    Otrer Inca)e includes:
Investrent incan.                                                    S    15,694,427
                                        'R  valuation of invest)n nts                                                  (676,74O)
Accretion of deferred gain          on redeTption of revenue    bonds                                                          133,FA Gain on redenption          of revenue  bonds                                  229,289
                                                                                                              $    15,380,270 19              Other Incan Muctions inclixh:
Arortization of Debt Discount          5 Exp.nse                    S      2,751,425 projects have no equity and, therefore, no retains earnings. Peer sales and net-billing agrerimts v(ith the project participants allav for ccnpl etc recovery of project costs including.: debt service;                              The participants are billed for project costs I(ith an adjustnent to actual at year end.
III                    -Benefits accrued reclassified frcri op ration and I)aintooance categories to VIII                    administrative and g neral.
IV      9              All~tion of           Agency Clea ing Account balances vas irplErsent< in fiscal year 19$ on a retroactive basis.
VIII                    The Hanford Generating Pro'e"t, an 860 Nre plant Yflicn utilizes by-product steam fraii the Departnant of Energy's dual-pu."pock He:I Production Reacm.
(NPR), vas ccrpleted in 1966 and )as in norlial e~ration through 1985. In January 1987, the t)PR;as shut deEI for safety iriprovesznts. In February 1988, the Depart nt of              ~p'y    placed the tPR on standLy status for an undetermined leng J) of tiffs, eliminating the Harford Generating Project's present energy source.                 Tne Supply System has caipleted a su)dy of alternative pear sources to be us< for contiruaf erergy generation, and further studies are being corducted.
VIII    11  of e      tsuclear Plant      t~o. 2 instr ctions (a) The cost of           pcsr~ r 'is  equal  to total    exp:nses divided by the n        t g neration:
Total Expenses (pg. 3, line 2)                                    S     445,405,761 tt t  Generation (pg. 6, liras 11).                                . 5,944',781',I t'et Cost of Peer                                              $74.92 thrills/Kl<
 
e of Respondent                        This Report ls:                Date of Report      Report Year Ending ashington Public Power Supply II) i/An Original                      IMo, Da, Yr)        IMo, Da, Yr)
S  stem                              I2) QA Resubmission              4389                  6 3 PART X): FOOTNOTE DATA Page        Pan    Line  Column                                      Comments Number      Number Number  Number faf        ff J  fel      fd) 7        VIII    ll of the      Nuclear Plant flo. 2 (Continued) ins  ctions (b) The Fuel Accounting System uses cost principles of the public utility industry as given under t)a Federal Energy Regulatory Cawission (FERC)
Chart of Unifom) Acccunts. This includes recording of the accpisition and nanufacturing cost of fuel and the am5zation of the capitalized
                                      . fuel cost based on heat production. In addition to the ancrtization of.
fuel bw'nup, t'w current period nuclear fuel operating expense includes a charge for future spent nuclear fuel storage and disposal to be provided by the Uepart))ant of Energy. This charge is based on a on-mill per kilowatt hour of erergy g neratc4.
8        IX                    Packimd Lake Hydroelectric Project is located in Le&#xc3;s County, Washingtcn and in part occupies gover)T)ant lands in the Giffcrd Pinchot National Forest in the Goat Rock section of the Cascade hx)ntains. The plant is operat< under a license frcm the Federal Energy Regulatory Camnssion (Project   No. P-2244).}}

Revision as of 14:04, 29 October 2019

Annual Rept for Wpps 2 for FY88.
ML17289A395
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 06/30/1988
From: Gire S
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
Shared Package
ML17289A392 List:
References
NUDOCS 9203240342
Download: ML17289A395 (16)


Text

~ ~

~

I ANNUALRFPORT OF PUBLIC ELECNIC UTILITIES IOENTIF ICATION 01 Exact Legal Name of Respondent 02 Financial Reporting Year Ending (Mo, Da, YrJ Washin ton Public Potfer Su 1 S sten 6/30/88 03 Previous Name and Date of Change (If name changed during yearJ NA 04 Addr'ess of Principal Business Office at End of Year (Srreer, City, State, Zip Code) 3000 Geo. Washin ton Wa P.O. Box 968 Richland WA 99352 05 Name of Contact Person 06 Title of Contact Person S. B. Gire Hanaaer Cor orate Accountin 07 Address of Contact Person (Srreer, City, Stare, Zip CodeJ P.O. Box 968 Hail Drop 065 Richland WA 99352 Telephone of Contact Person, Including 09 This Report Is 10 Date of Report Area Code fi) Q An Original (2) 0 A Resubmission (Mo, Da, YrJ (509) 372-5480 11 State the Classes of Utility and Other Services Furnished by Respondent During the Year Wholesale electric energy production CE RTIF ICATION The undersigned certifies that he/she has examined the accompanying report; that to the best of his/her knowledge, information, and belief, all statements of fact contained in the accompanying report are true, and the accompanying report is a correct statement of the business and affairs of the above named respondent in respect to each and every matter set forth therein during the calendar or other established fiscal year stated above.

01 Name 03 Signature 04 Date Signed S. B. Gire (Mo, D, YrJ 02 Title Hana er, Cor orate Accountin Title 18, U.S.C. 1tml, makes It a crime for any person knowingly and willinglyto make to any Agency or 0 art-ment of the United States any false, fictitious or fraudulent statements as to any matter within its jurisdiction.

p pgppp342

'si PDR ADOCK P p

8

~

~

7

~

I This report is mandatory under Public Law 93.275. Failure to respond may result in criminal fines, civil penalties and other sanctions as provided by law. Data reported on EIA 412 are not considered confidential.

This Report Is: Date of Report Report Year Ending ngton Public Power Supply II I gAn Osiginei IMo, De, Ys) (Mo, De, Yrl System (2) QA Resubmission 4/3/89 6/30/88 PART I: BALANCE SHEET END OF YEAR i

Some of the accounts listed below are defined on page ii. Refer to the Uniform Systems ot Accounts for those other accounts not defined on page ii.

Line Amount Line Amount Assets and Other Debits Liabilities end Other Csedits No. No.

lal lal 33 INVESTMENT OF UTILITYPLANT MUNICIPALITY& SURPLUS 2 Utilit Plant S3.542.733.826 34 Investment of Municipality.

(Less) Accumulated Provision for 35 Constructive Surplus or Deficit Depreciation & Amortization 36 Retained Earninos Electric 512.548.5~4 TOTAL Investment & Surplus Other Utility Department 37 (Enrer Total of lines 34 rhru 36J (Specifyr J Net Utility Plant (Line 2 less line 4, 5J 3 030 184 (L LONG TERiVI DEBT 39 Bonds 2 237 655 COO INVESTMENTS 40 Advances from Municioalitv Nonutility Property (Less Accum. 41 Other Long.Term Debt Provision for Depreciation and 42 Unamort. Premium on Long. Term Debt 787.928 Amortization: S ) 43 Unamortized Discount on Long Term dvances to Municipality Debt Debit 62.791.6%

pecial Funds 151.8tJ6.75/ TOTAL Long.Term Debt (Enter Total TOTAL Investments (Enter Total of lines 39 rhru 43J 2 175.651 2o8 of lines 8 rhru 10J 151.896.757 45 CURRENT AND ACCRUED LIABILITIES 12 CURRENT ANO ACCRUED ASSETS 46 Warrants Pa able 744 61" 13 Cash & Working Funds 2.110.4% 47 Notes and Accounts Pavable 58 481.6oo 14 Temporary Cash Investments lo 898 5(8 Pavables to Municioalitv 15 Notes & Accounts Receivable 4g Customer Deposits (Less Accum. Provision for n0 Taxes Accrued 7 cg Uncollected Accounts: S 51 Interest Accrued 343.7C8 16 Receivables from Municipality 52 I lisc. Current & Accrued Liabilities ~JI pic% II 17 Materials & Supplies TOTAL Current & Accrued Liabilities 1B Prepa ments 1.882 371 53 (Enter Total of lines 46 rhru 52J c< Dli 267 Misc. Current & Accrued Assets TOTAL Current & Accrued Assets 54 DEFERRED CREDITS 20 (Enter Total of lines 13 rhru 19J 55 Customer Advances for Construction.

56 Other Deferred Credits < 1 O'V 21 DEFERRED DEBITS 57 Gain on Reacauired Debt

'namortized 22 Unamortized Debt Expense TOTAL Deferred Credits (Enter Toral 23 Extraordinary Property Losses 58 of lines 55 thru 57J ~

cop fM 24 Miscellaneous Deferred Debits 25 Unamortized Loss on Reacquired Debt 59 OPERATING RESERVES TOTAL Deferred Debits Property Insurance Reserve 26 (Enter Toral of lines 22 rhru 25J 61 Injuries and Damages Reserve 27 Pensions and Benefits Reserve 63 Miscellaneous Operatin Reserves TOTAL ASSETS & OTHER DEBITS TOTAL Operating Reserves (Enter Toral of lines 6, 11, 20, 26J 3 26o o42 910 (Enter Total of lines 60 rhru 63J TOTAL LIAB. & OTHER CREDITS 65 (Enter Total ol lines 37.44,53,58, and 64I

This Report Is: Date of Repon Report Year Ending Nemo of Respondent shington Public Power Supply Il) @An Original IMo,Oa, Yr) IMo, Oa, Yrl ~

stem I2) PA Resubmission 4 3 89 6 30 88 PART II: CONDENSED INCOME STATEMENT FOR THE YEAR Line Item Amount No. la) (a)

Electric Utilit 0 eratin Income Operating Revenues Operation Expenses Maintenance Expenses 23 58 636 Depreciation and Amortization 1 "7 920 Taxes and Tax Equivalents Contributions and Services TOTAL Electric Operating Expenses (Enter Toral oi lines3rhru 7)

Net Operating Income 10 Income from Plant Leased to Others Total Electric Utility Operating Income (Enrer Total oflines9rhru 10J 12 Other Utility Operating Income tUtility Departments Other than Electric) 13 TOTAL Utility Operating Income (Enrer Total of lines 11 rhru 12) 14 Other Income (Explain si nificant amounts in a foornore) 15 380 270 15 Allowance for Funds Used During Construe:ion 16 Gross Income (Enter Toral of lines 13 thru 15) leis) 1 17 Income Deductions 18 Interest on Long. Term Debt 19 Other Income Deductions (See pg. 4J (Explain significanr amounts in a footnote J 20 TOTAL Income Deductions (Enter Toral of lines 18 and 19J 21 Income Before Extraordinary Items (Enter Toral of line 15/ess line 20)

Extraordinary Income (See definirion (fJ, page ii)

Extraordinary Deductions (See definition (fJ. page iiJ Net Income (Enter Total of lines 21 plus line 22 less line 23)

PART III: OPERATION AND MAINTENANCE EXPENSES Line Item Ops a thun htaintenanee Total No. lal fol kl rdl Production Exoenses Steam Power Generation Nuclear Power Generation 83 424 21 639 365 105 3 9 1 Hydraulic Power Generation Other Power Generation (Specifyr)

Purchased Power other Production Expenses - Decomtjssjopjno 997 447 997 447 TOTAL Production Expenses 1 Transmission Expenses Pr] rr Distribution Expenses 10 Customer Accounts Expenses Sales Expenses 12 13 Administrative 5 General Expenses TOTAL ELECT. OPERATION 5 MAINT. EXPENSES 33 048 815 117 840 532 23 1 792 228 636 ': 34 841 043 14l 424 168

Name of Respondent This Rcport Is: Date of Rcport Repctt Year Ending

'ashington Public Power Supply (1) K(An Original IMo,Da, Yr) (IVk), Da, Yt)

~

S'tem (2) QA Retubmistion 4/3/89 6/30/88 PART IV: UTILITYPLANT Balanct) Transfers a Additions R eh)em ants Balance Item Beginning and No. During Yeat During Year End cf Yeas of Yeac Adjustments (al Idl

'el (I)J (eJ Electric Utilit Plant Electric Plant in Service Intangible Plant S Production Plant Steam Production  % 114 r4

.3 Nuclear Production " 4P~. Qrvq Rl) .",q ~i%1"

, Hydraulic Production 4O) (7 r 4)

Other Production (Spect'fyr)* 16 527 794 156 330 15 684 124 TOTAL Production Plant 3.451 013 334 26 452 137 15'493.o82 3 26o 250 3 468 705 239 Transmission Plant 12 373 31 12 373 31 Distribution Plant General Plant O 1 C141 1 2 1%) 1 . 1 10 TOTAL Electric Plant in Service Q ~Q1 V' g<n 1 >Q) P 171 Electric P(ant Leased to Others 12 Construction Work in Progress-Electric 13 Electric Plant Held for Future Use 14 Electcic Plant Acquisition Adjustments (See deftnifton (e), page ii) 15 TOTAL Electric Plant C 3 542 7 826 Plant of Other Utility Depts. (Specify()

17 TOTAL Utility Plant 3 ~Q1 M~

7?4 29 850 959 15.255.138) 2 171.769 3.542.733.826 PART V: SALES OF. ELECTRICITY FOR RESALE

1. Report be(ow the information called for concetning sales dur FP(PI, for firm power supplementing customet s own generation or ing year to other electric udiities and cooperatives, and to cities or other purchases: 0. (or othec power. Irclude in the 0 classifica;ion other public authorities for distribution to ultimate consurn.tss. sales it) vrhich the po'vec delivered carnot be classified under either
2. For each sale, designate statis:ical classifications in column Ihl of the above de(initions.

as follows: FP, for firm power supplying total system requirements 3. For cofumn (e). enter the quan;ities sho.vn on the bills of custon.er or total requirements at a specific poim ol delivery: tendered.

Annual Revenues Scatis ~ ct IIttximum Line No.

Sales Ibtade Tc (Enter name) rica!

Classifi ~

Pcit.c cf Delivery lSta:e. city, etc.)

'umber Amcunc c(

Voltage Kilcwac cheart Sold Dcmar.d ISpeeily k)V Amcur.c Per kyvh cation or kVal lln Cents ral Ihl Icl Idl (eJ (II (I)I nneville Parer Aden FP(P) Ricnland, WA 540 kv 5,944,781,GB 1,105,K0 (L."9,462,053 7.'56 nneville Pnler Ad.)T(n FP(P) ter zn, N 69 kv 59,150,228 N lark County Pl9 FP(P) Vancouver, HJ' 69 kv 7 036 G'2 39o,792 1,062,051 1.55 r I a so pn <<2Q

<<~

PART Vl: PURCHASED POWER I. Repor. below the information called for concerning powet pur ~

3. Report intecchance uansac:ions as net whether the net is a chased for resale during the year. ceceipt or a delivery by tesporden:. Indicate such transacticns with
2. For column (d), enter the quantities shown on the bills an asterisk.

rendered.

Annvat Cost Number cf Ma)IImum Putchased Ftcm Point o(Receipt Amount of Kifcwatchcutt Demand Per kWh (Enter namel city, etc.t 'State.

Vo))age Purchased (Speci(y ky/ Amount or kVal lln Cents)

Icl (dl /el (gJ (al

)

2 3

4

~ ~

c of Rcspondcnt This Rcport Is'. Dctc of Rcport Rcpoit Yccr Ending hington Public Power Supply ll l @An Original IMo, Dc, Yr) IMo, Dc, Yr)

I Q R bmf>>ton 6 30 88 PART Vl): TAXES, TAX EQUIVALENTS, CONTRIBUTIONS, AND SERVICFS DURING YEAR

1. Report below the information called for on contributions and operating expenses, etc. Show in column (e) amounts which are not services to the municipality or other government units by the electric accounted for in respondent's financial statements. For those utility and, conversely. by those bodies to the electric utility. Do not amounts not included in respondent's financial statements, explain include: (a) loans and advances which are subject to repayment or in a footnote the reasdn for their omission.

which bear interest, (b) payments in retirement of loans or advances 3. Report below only taxes that are chargeable to operations of previously made, (c) contributions by the municipality of funds or the electric utility department. Exclude gasoline and other sales taxes property which are of the nature of investment in the elecuic utility which are included in the cost of transportation and materials.

department. 4. Repon as tax equivalents only those amounts which are

2. Enter in column (c) the total contributions made or received. understood to constitute payments equivalent to or in lieu of Show in column (d) amounts included in column (c) which have amounts which would be paid if the electric utility cepartment were been accounted for in the respondent's financial statements, i.e. ~ subject to local tax levies.

balance sheet, income account, earned surplus, operating revenues, 5: For Other (Specify J, use a supplemental page if the lines pro-vided are not sufficient.

Amount of Contnbutlon oi Value of Scivicc Inc kwh Included in foot Inc!vdcd Item (t,000'sl Total Financial in Financial Statcmcnts Statcmcnts Ibf lcf fd1 'fcf By the Electric Utility to the Municipality r Othe Government Units Taxes  : S 2.218 CGS S 2.218.KG S 2 Tax Equivalents 3 Total (Lines 1 & 2) 4 To General Funds of the Municipality 5 Other (Specifyr J 6 TOTAL Contributions (Toral of lines 4 fhru 5) 7 Street and Highway Lighting B Municipal Pumping 9 Other Municipal Li ht and Power Other Electric Service Nonelectric Service (Specifyr)

TOTAL Services (Total of lines 7 fhru 12)

TOTAL Contributions and Services by the Electric Utility (Tora( of lines 6arN 13)

By the Municipality or Other Government Units to the Electric Utility For Operations and Property Maintenance Other (Specify: J TOTAL Contributions (7ofai of lines 15 fhru 11')

Office Space 0 Water Engineering Service Legal Service Other Service (Specrfyr)

TOTAL Services (7ofaf of lines 19 rhru 24) 26 TOTAL Contributions and Services by the Municipality (7ofal of lines 18 arid 25) ~

27 Net Contributions and Services by the Electric Utility to the Municipality or Other Government Units (Total of line 14 less line 26J

Name of Respondent This Report Is'. Oate ol Rcport Report Year Ending ashington Public Power Supply (1) DAn Original {Mo, Oa, Yrl (Mo, Oa, Yrl S ste l2) QA Resubmission 4/3/89 6/30/88 PART Vill: LARGE. ELECTRIC GENERATING PLANTS USING FUEL

1. Large plants are plants of 25,000 kW or more ol installed capacity 4. If net peak demand for 60 minutes is not avagable, give that which is (name plate rating). Include gas turbine and internal combustion plants of avagable, specifying period in a footnote.

10.000 kW and more on this page. Include alto nuclear plants. =

5. If a group of employees attends more than one generating plant, report
2. II any plant is equipped with combinations of steam, hydro, internal on fine 10 the approximate average number of employees assignable to each combustion or gas turbine equipment, report each as a separate plant, plant.

However, if a gas turbine unit functions in'a combined cycle operation with a 6. If gas is used and purchased on a therm basis, give the Btu ccntent ol conventional steam unit, include the gas turbine with the steam plam. the gas and the quantity of fuel burned, converted to h1cf ft (14.73 psia at

3. Iridicate with asterisks and footnotes il any plant is leased or operated 60'F).

as a joint facility. 7. The figure entered on line 20 (Fuel) should be consistent with the Plant Name: Plant Name:

Line No. Item Huclm Plant th. 2 Generating Project la/ Ibf /el 1 Kind ot Plant (Steam, Internal Comb., Gas Turb., or Nuclear) jiuclear Stean<

2, Year Originally Constructed 1972 1966 3 Year Last Unit Was Installed 1984 1966 4 TOTAL Inst. Capacity (Max. Gen. Name Plate Ratings in kWI 2 5 Net Peak Demand on Plant {kW for 60 Minutes) 6 Plant Hours Connected to Load C0 7 Net Continuous Plant Capability (kW) harp B When Not Limited by Condenser Water 9 When Limited by Condenser Water 10 Average Number of Employees pry 11 Net Ge6hration, Exclusive of Plant Use orat Al 12 Cost of Plant Land and Land Rights Struciures and Improvements 1 1 1 od 5 Equipment Costs %10 00 1C 16 TOTAL Cost q nd.: n q 17 j Cost per kW of installed Capacity (Line 4) 2.872 18 j Production Expenses 19 j Operation Supervision and Engineering 18 304 48 20 Fuel 'I 2

21 ( Coolants and Water (Nuclear Plants Only) 1 n-a 22 j Steam Expenses 11 382 390 23 ) Steam from Other Sources 24 Steam Transferred (Cr.)

25 Electric Expenses 26 Misc. Steam Power Expenses {or Nuclear) 1 ~10 1 27 Rents 28 J Maintenance Supervision and Engineering 29 Maintenance of Structures" C 30 Maintenance of Boiler Plant (or Reactor Plant) 4.8%.395 31 Maintenance of Electric Plant 5.146 356 207.596 32 Maintenance of Misc. Steam Plant (or Nuclear) 3.89t1 178 21.469 33 TOTAL Production Expenses 103 480 912 34 Expenses per Net kWh {Mills-2Places) 1 .4 35 F uel: (Kind) Coal Gas Oil Coal Gas Oil 36 Unit: {Coal-Tons of 2,000 Lb.) (Oil-Barrels of 42 Gals.)

{Gas-Mcf) (Nuclear.indicate) 37 Quantity (Units) of Fuel Burned Average Heat Content of Fuel Burned (Btu per Lb. ot Coal per Gal of Oil or per Cu Ft of Gas)

Average Cost of Fuel per Unit, as Delivered F.O.B.

Plant During Year 40 Average Cost of Fuel per Unit Burned 41 Average Cost of Fuel Burned per Million Btu 40.78 42 Average Cost of Fuel Burned per kWh Net Generation 5.26 43 Average Btu per kWh Net Generation 10,565

me of Respondent This Report Is: Oats of Rcport Rcport Yea< Ending shisigton Public Power Supply (1) QAn Oiiginsl IMo, Os, Yr) IMo. Oa, Yr) stem ( ) QA R ubmission

'

3 89 6 8 PART Vill: LARGE. ELECTRIC GENERATING PLANTS USING FUEL (Continued) figures enteied on line 37 (Quantity of Fuel Burned), line 38 IAvg. Heat Con. and 554) on Ene 31-Maintenance of Electric Plant," Indicate plants designed tent), line 40 IAvg. Cost of Fuel) and line 41 IAvg. Cost of Fuel Burned). for peak load service. Designate with an asteiisk automatically operated B.lf more than one fuel is burned in a pfant, furnish only the composite plants.

hest rate for ell fuels burned. ll. If the respondent operates a nuclear power generating plant, attach

9. The items under Cost of Plant, line 12, represent accounts or cornbina. le) a brief expkrnation accounting for the cost of power generated, including tions of accounts piescribed by the Uniform Sysiern of Accounts. Produc- any attribution of excess costs to research snd development expenses: (b) a tion expenses do not include Purchased Power, System Control and Load brief explanation of the fuel ecccun:ing, specifying the accounding methods Oispetching, end Other Expenses classified as "Other Power Supply Ex. snd types of cost units under with rescect to the various componems of the penses." fuel cost; and lc) additional information ss may be infoimative concerning IO. For I.C. end G.T. plants, report Operating Expenses (account nos. 548 the type ol plant, kind of fuel used, and other physical and operating end 549) on line 25 "Electric Expenses." and Maintenance (account nos. 553 characteristics ol the plant.

Isnt Name Plant Name: Plant Name:

Line IA Item No.

III Ial Kind ot Plant Year Constructed Year Last Unit TO AL Installed Capacity

~

iVet Peak Demand Plant Hours Net Capability Not Limited Limited Employees 10 Net Generation Cost of Plant 12 Structures Ecuipment 15 TOTAL 16 Cost per kVI 17 Prcduction Exoenses 16 Oceration Suoervisfon 19 Fuel 20 Coolants 21 Steam Expenses 22 Steam Other Sources 23 Steam Transferred 24 Electric Expenses 25 ihlisc. Expenses 26 Rents 27 Maintenance Supervision 26 Maint. of Structures 29 Maint.'f Boiler Maint. of Electric Plant 31 Maint. ot Misc. Steam 32 AL roduction 33 Expenses 34 Coal Gas Oil Coal Gas Oil 'oal Gas O;I . Fuel: (Kind) 35 Unit 36 Quan!ity 37 Avg. Heat Content Avg. Cost F.O.B. 39 Avg. Cost Burned 40 Avg. Cost Btu 41 Avg. Cost kWh 42 Avg. Btu per kWh

Name of Respondent This Rcport Date ol Rcpon Rcport Year Ending Washington Public Power Supply Is.'l I @An Original IMo, Da, Yr) IMo, Da, Yrl System l2) PA Resubmission al o /R PART IX: HYDROELECTRIC GENERATING PLANT STATISTICS (Large Plants)

t. Larg plants are hydro planta of 10,000 kvV or more of 3. For line 5, if net peak demand for 60 minutes is not available, installed capacity (name plate ratings). give that which is available, specifying period.
2. Indicate by an asterisk and explain in a footnote it any plant is 4. For line 10, if a group of employees attends more than one teased, operated under a license from the Federal Energy Regulatory generating plant, report the approximate average number of Commission, or operated as a joint facility. If a licensed project, give employees assignable to each plant.

project number.

FERC Licensed Project'No. and Plant Name: FERC Ltccntad Project No. FERC Licensed Project No.

Lln p 22ttn and Plant Name: and Plant Name:

No Pac':.txd Lake HydroelecWic Proje"t Kind of Plant (Run ot-River or Storage)

Year Originally Constructed Year Last Unit was Installed lcd TOTAL Installed Capacity (Generator Name Plate Ratings

.in kW) 26 125 Net Peak Demand on Plant (Kilowatts tor 60 Minutes). 31.5CO Plant Hours Connected to Load 5.3SO Pl C b'I' (K lowatts)

Under the Most Favorable Operating Conditions 31.%9 Under the Most Adverse Operating Conditions 31 5CO 10 Averaae Number of Employees Net Generation. Exclusive of Plant Use 67.922.593

'l2 Cost of Plant 13 Land and Land Rights 54.775 14 Structures and Improvements 47n 993 15 Reservoirs, Dams, and Waterways 9 184 216 Equipment Costs 2.24O 391 17 Roads, Railroads, and Bridces 419 C63 18 TOTAL Cost (Enrer Toral of lines 14 rhru 17J 12 378.439 19 Cost per kW of Installed Caoacitv Line lo -: line 4J 473.8 20 Production Expenses 21 Operation Supervision and Engineering 9 O55 22 Water for Power 23 Hydraulic Expenses 9 394 Electric Expenses 25 Misc. Hydraulic Power Generation Expenses 26 Rents 27 Maintenance Supervision and Engineering

'28 Maintenance of Structures 1 29 Maintenance of Reservoirs, Darns, and Watervays 554 30 Maintenance of Electric Plant 31 Maintenance of Misc. Hydraulic Plant TOTAL Production Expenses(Total of lines 21 rhru 31J xpenses per et k (Mt s- laces) footnote

p. 11

Name of Respondent This Report ls'. Date of Report Report Year Endmg Washington Public Power Supply lt) @An Original IMo, Oa, Yrl liVe. Oa. Yrl S stem (2) QA Resubmission 4/3/89 6/30/88 PART IX: HYDROELECTRIC GENERATING PLANT STATISTICS (Large Plants) (Continued)

5. The items under Cost of Plant represent accounts or combina- as "Other Power Supply Experses."

tions of accounts prescribed by the Uniform System of Accounts. 6. It any plant is equipped with ccmbinations of steat. . hydro, in.

~

Under Production Expenses, do not include Purchased Power, ternal combustion engine, or gas turbine equipment, report each as System Control, and Load Dispatching, or Other Expenses classified a separate plant.

FERC Licensed Project No. FERC Licensed Project No. FERC Licensed Project No. FERC Licensed Project No.

and Plant Name: and Plant Name: and Plant Name: and Plant Name: Line N o 'I Kind of Plant Year Constructed Year Last Unit TOTAL Installed Capacity Net Peak Derrard Plar t Hours Net Caoabilit Y Most Favorable Most Adverse 0 Emclovees 10 Net Gener" tion

"'I Cos O'lant 12 Lard 13 Str c:ures I Reservoirs. Etc. 15 I Equipment 16 Roads, Etc. 17 TOTAL 18 I Cost per kW 10

$ Production Expenses 20 Operation Supervision 21 Water for Power 22 Hydraulic Experses 23 Elec;ric Expenses 24 Misc. Expenses 25 Rents 26 Maintenance Su"ervision 27 Maintenance Structures 28 iVlairst. Reservoirs, Etc. 29 Maint. Elecuic Plan: 30 r'riaint. Hydraulic Plant 31 TOTAL 32 Expenses per Net kWh 33

Name of Respondent This Report b: Date of Report Report Year Ending Mashington Public Power Supply (1) (ir)An Original IMo, Ds, Yr) IMo, Da, Yrl Systen, (2) QA Resubfnission 4/3/89 6/30/88 PART X: TRANSMISSION LINE STATISTICS

1. Report below information requested concerning each transmis- the respondent is not the sole owner. If such property is leased from sion line. Show highest voltages first. If more space is required, use another, give name of lessor.

supplemental page using the column headings shown on this page.- 4 Designate in a footnote any transmission line teased to another

~

'2.'ndicate in column (d) whether the type of supporting structure and give name of lessee.

is: (1! single 'pole, wood, or steel; (2) H-frame, wood, or steel poles; g. F or column (c), if the voltage used is different from operating, (3) tower: or (4) underground construction. report the difference In a footnote.

3. Designate any transmission-line or portion thereof for which Designation LENGTH IPoie Maesl (Name of Terminal Station) SI?d of Type of Conductor Number Dn On Line 'pefetlng Supporting tructures Structures and of No. Vohage Circuits From To Structure of Line of Another Material Designated Une lcl lel III BPA Manford Sub ta- Vant-ge Substation KO kv Ste'.1 23.85 mi 1780 tr01 2 conouc tion ,ASS ChL tors per kar pliase Total of 6 lines on tructure. Bonneville Pam Aai nistratIon ( A) uins 5 nd NPPSS a s1as tailed.

Pack:mod La',e Lars County 69 kv /~Die 2.2 20 2l 22 23 24 25 26 27 28 29 30 31 32 33 34 35 39 40 41 42 43

Fl 0

Name of Respondent This Report Is: Date of Report Report Year Ending Washington Public Power Supply II) KAo<<ig'"ei {Mo, De, Yr) ~ IMo, Da, Yr)

S stem )2) QA Resubmission 4/3/89 6 30 88 PART X): FOOTNOTE OATA Page Part Line Column Comments Number Number Number Number

.(al (bJ (cJ (dJ 14 b Otrer Inca)e includes:

Investrent incan. S 15,694,427

'R valuation of invest)n nts (676,74O)

Accretion of deferred gain on redeTption of revenue bonds 133,FA Gain on redenption of revenue bonds 229,289

$ 15,380,270 19 Other Incan Muctions inclixh:

Arortization of Debt Discount 5 Exp.nse S 2,751,425 projects have no equity and, therefore, no retains earnings. Peer sales and net-billing agrerimts v(ith the project participants allav for ccnpl etc recovery of project costs including.: debt service; The participants are billed for project costs I(ith an adjustnent to actual at year end.

III -Benefits accrued reclassified frcri op ration and I)aintooance categories to VIII administrative and g neral.

IV 9 All~tion of Agency Clea ing Account balances vas irplErsent< in fiscal year 19$ on a retroactive basis.

VIII The Hanford Generating Pro'e"t, an 860 Nre plant Yflicn utilizes by-product steam fraii the Departnant of Energy's dual-pu."pock He:I Production Reacm.

(NPR), vas ccrpleted in 1966 and )as in norlial e~ration through 1985. In January 1987, the t)PR;as shut deEI for safety iriprovesznts. In February 1988, the Depart nt of ~p'y placed the tPR on standLy status for an undetermined leng J) of tiffs, eliminating the Harford Generating Project's present energy source. Tne Supply System has caipleted a su)dy of alternative pear sources to be us< for contiruaf erergy generation, and further studies are being corducted.

VIII 11 of e tsuclear Plant t~o. 2 instr ctions (a) The cost of pcsr~ r 'is equal to total exp:nses divided by the n t g neration:

Total Expenses (pg. 3, line 2) S 445,405,761 tt t Generation (pg. 6, liras 11). . 5,944',781',I t'et Cost of Peer $74.92 thrills/Kl<

e of Respondent This Report ls: Date of Report Report Year Ending ashington Public Power Supply II) i/An Original IMo, Da, Yr) IMo, Da, Yr)

S stem I2) QA Resubmission 4389 6 3 PART X): FOOTNOTE DATA Page Pan Line Column Comments Number Number Number Number faf ff J fel fd) 7 VIII ll of the Nuclear Plant flo. 2 (Continued) ins ctions (b) The Fuel Accounting System uses cost principles of the public utility industry as given under t)a Federal Energy Regulatory Cawission (FERC)

Chart of Unifom) Acccunts. This includes recording of the accpisition and nanufacturing cost of fuel and the am5zation of the capitalized

. fuel cost based on heat production. In addition to the ancrtization of.

fuel bw'nup, t'w current period nuclear fuel operating expense includes a charge for future spent nuclear fuel storage and disposal to be provided by the Uepart))ant of Energy. This charge is based on a on-mill per kilowatt hour of erergy g neratc4.

8 IX Packimd Lake Hydroelectric Project is located in LeÃs County, Washingtcn and in part occupies gover)T)ant lands in the Giffcrd Pinchot National Forest in the Goat Rock section of the Cascade hx)ntains. The plant is operat< under a license frcm the Federal Energy Regulatory Camnssion (Project No. P-2244).