|
---|
Category:ANNUAL REPORTS (COMPANY-FINANCIAL)
MONTHYEARML17292B4791998-12-31031 December 1998 Washington Public Power Supply Sys 1998 Annual Rept. with 981215 Ltr ML17292B2121997-12-31031 December 1997 Washington Public Power Supply Sys Annual Rept for 1997. W/980108 Ltr ML17292A6361996-12-31031 December 1996 Washington Public Power Supply Sys Annual Rept for 1996. W/961212 Ltr ML17291B1501995-12-31031 December 1995 Washington Public Power Supply Sys Annual Rept 1995. W/ 951201 Ltr ML17291A6761994-12-31031 December 1994 Washington Public Power Supply Sys 1994 Annual Rept. W/ 950302 Ltr ML17290A9581993-12-31031 December 1993 Washington Public Power Supply Sys Annual Rept,1993. W/940209 Ltr ML17289B1231992-12-31031 December 1992 Washington Public Power Supply Sys 1992 Annual Rept. W/930119 Ltr ML17289A2761991-12-31031 December 1991 Washington Public Power Supply Sys 1991 Annual Rept. W/ 920128 Ltr ML17286A5541990-12-31031 December 1990 WPPSS,1990 Annual Financial Rept. W/910115 Ltr ML17285A9891989-12-31031 December 1989 WPPSS,1989 Annual Rept. W/900129 Ltr ML17289A3961989-06-30030 June 1989 Annual Rept for Wpps 2 for FY89. ML17289A3951988-06-30030 June 1988 Annual Rept for Wpps 2 for FY88. ML17279A7641987-12-31031 December 1987 WPPSS,1987 Annual Rept. W/880108 Ltr ML17289A3941987-06-30030 June 1987 Annual Rept for Wpps 2 for FY87. ML17278B1731986-12-31031 December 1986 Wppss Annual Rept 1986. ML17289A3931986-06-30030 June 1986 Annual Rept for Wpps 2 for FY86. ML17278A6141985-12-31031 December 1985 Wppss 1985 Annual Rept. W/860225 Ltr ML17277B6301984-12-31031 December 1984 1984 Annual Rept. W/850222 Ltr ML17277B3731983-12-31031 December 1983 Annual Financial Rept 1983.W/840410 Ltr ML17276B0711981-12-15015 December 1981 Annual Financial Rept for Yr Ending 810630 ML20098C9101981-09-27027 September 1981 Quarterly Rept ML20049A3561980-12-11011 December 1980 Annual Financial Rept 1980 ML17272A6811979-06-30030 June 1979 Annual Financial Rept for Year Ending 790630 1998-12-31
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML17284A9001999-10-31031 October 1999 Rev 0 to COLR 99-15, WNP-2 Cycle 15,COLR GO2-99-177, LER 99-S01-00:on 990903,failure to Take Compensatory Measure within Required Time Upon Failure of Isolation Zone Microwave Unit,Was Noted.Caused by Personnel Error.Provided Refresher Training on Compensatory Measures.With1999-10-0101 October 1999 LER 99-S01-00:on 990903,failure to Take Compensatory Measure within Required Time Upon Failure of Isolation Zone Microwave Unit,Was Noted.Caused by Personnel Error.Provided Refresher Training on Compensatory Measures.With ML17284A8941999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for WNP-2.With 991012 Ltr ML17284A8801999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for WNP-2.With 990910 Ltr ML17284A8691999-07-31031 July 1999 Monthly Operating Rept for July 1999 for WNP-2.With 990813 Ltr ML17292B7421999-07-20020 July 1999 LER 99-001-00:on 990628,ESF Signal Closed All Eight MSIVs While Plant Was Shutdown.Caused by Failure of Relay RPS-RLY-K10D.Subject Relay Was Replaced & Tested on 990630. with 990720 Ltr ML17292B7271999-06-30030 June 1999 Monthly Operating Rept for June 1999 for WNP-2.With 990707 Ltr ML17292B6961999-05-31031 May 1999 Monthly Operating Repts for May 1999 for WNP-2.With 990608 Ltr ML17292B6641999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for WNP-2.With 990507 Ltr ML17292B6391999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for WNP-2.With 990413 Ltr ML17292B5871999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for WNP-2.With 990311 Ltr ML17292B5571999-01-31031 January 1999 Monthly Operating Rept for Jan 1999 for WNP-2.With 990210 Ltr ML17292B5621999-01-31031 January 1999 Rev 1 to COLR 98-14, WNP-2 Cycle 14 Colr. ML17292B5341999-01-15015 January 1999 Part 21 Rept Re Incorrect Modeling of BWR Lower Plenum Vol in Bison.Defect Applies Only to Reload Fuel Assemblies Currently in Operation at WNP-2.BISON Code Model for WNP-2 Has Been Revised to Correct Error ML17292B5331999-01-15015 January 1999 Part 21 Rept Re XL-S96 CPR Correlation for SVEA-96 Fuel. Defect Applies Only to WNP-2,during Cycles 12,13 & 14 Operation.Evaluations of Defect Performed by ABB-CE ML17292B4791998-12-31031 December 1998 Washington Public Power Supply Sys 1998 Annual Rept. with 981215 Ltr ML17292B5351998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for WNP-2.With 990112 Ltr ML17292B5741998-12-31031 December 1998 WNP-2 1998 Annual Operating Rept. with 990225 Ltr ML17284A8231998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for WNP-2.With 981207 Ltr ML17284A8081998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for WNP-2.With 981110 Ltr ML17292B4451998-10-27027 October 1998 LER 98-012-01:on 980715,failure to Comply with Requirements of TS SR 3.8.4.7 Was Noted.Caused by Inadequate Work Practices.Training Session Was Held with Personnel.With 981027 Ltr ML17284A7831998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for WNP-2.With 981007 Ltr ML17284A7491998-09-10010 September 1998 WNP-2 Inservice Insp Summary Rept for Refueling Outage RF13 Spring,1998. ML17284A7561998-09-0303 September 1998 LER 98-013-00:on 980805,ESF Actuations Were Noted Due to Deenergization of Vital Electrical Bus SM-8.Caused by Inadequate Direction in Troubleshooting Plan.Will Conduct Training for Engineering Personnel.With 980903 Ltr ML17284A7571998-09-0202 September 1998 LER 98-014-00:on 980807,completion of TS 3.8.1.F Required Shutdown Due to Inoperability of EDG-2 Was Noted.Caused by Degraded Voltage Regulator for DG-2.Replaced Voltage Regulator & Associated Scrs.With 980902 Ltr ML17284A7551998-09-0202 September 1998 LER 98-015-00:on 980808,discovered Reactor Coolant Pressure Boundary Leak During Shutdown Conditions.Caused by Leakage from Socket Weld (Fwb 63) on Elbow Connection.Failed Piping Connection Was Replaced.With 980902 Ltr ML17284A7681998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for WNP-2.With 980915 Ltr ML17284A7311998-08-17017 August 1998 LER 98-012-00:on 980716,determined That 24-month SR 3.8.4.7 Had Not Been Fulfilled within Specified Frequency.Caused by Inadequate Work Practices.License Requested & Received Enforcement Discretion Re Battery Svc test.W/980817 Ltr ML17284A7261998-07-31031 July 1998 Monthly Operating Rept for July 1998 for WNP-2.W/980810 Ltr ML17284A7121998-07-23023 July 1998 LER 98-006-01:on 980520,discovered Discrepancies in Low Voltage Bus Calculations During Review of 10CFR50,App R Calculations for High Impedance Faults.Caused by Inadequate Work Practices.Implemented Procedural Changes ML17284A6951998-07-17017 July 1998 LER 98-011-00:on 980617,ECCS Pump Room Flooding Was Noted Due to FP Sys Pipe Break.Caused by Inadequate Design of FP Sys.Detailed Review of FP Sys Design Was Conducted. W/980717 Ltr ML17284A6961998-07-15015 July 1998 LER 98-010-00:on 980615,TS Required Shutdown Due to Inoperability of TIP Sys Isolation Valve Was Noted.Caused by Improper Installation of TIP Tubing.Reattached Affected Tubing & Inspected Other TIP tubing.W/980715 Ltr ML17284A6731998-07-0101 July 1998 LER 98-009-00:on 980606,nuclear Steam Supply Shutoff Sys Group 3 & 4 Isolations During Testing Was Noted.Caused by Procedural Deficiency.Counseled Individuals Involved in preparation.W/980701 Ltr ML17284A6751998-06-30030 June 1998 Ro:On 980617,flooding of RB Northeast Stairwell with Consequential Flooding of Two ECCS Pump Rooms.Caused by Inadequate Fire Protection Sys Design.Pumped Out Water from Affected Areas to Point Below Berm Areas of Pump Rooms ML17284A6641998-06-24024 June 1998 LER 98-008-00:on 980531,inadvertent Full Scram During RPV Leak Testing in Mode 4 Was Noted.Caused by Change in Mgt Techniques.Revised Procedures to Take Into Account Addl Water Head in Pressure Sensing lines.W/980624 Ltr ML17284A6651998-06-24024 June 1998 LER 98-007-00:on 980530,inadvertent Full Scram & Division 1 ECCS Injection Was Noted.Caused by Failure to Meet Mgt Work Practice Expectation When Encountering Deficient Procedure. Incident Review Board Convened to Review event.W/980624 Ltr ML17284A6631998-06-19019 June 1998 LER 98-006-00:on 980520,discovered Discrepancies in Low Voltage Bus Calculations During Review of App R Calculations for High Impedance Fault Analysis.Caused Indeterminate. Implemented Procedural Changes Involving Operator Action ML17284A6551998-06-0404 June 1998 LER 98-005-00:on 980506,potential for Failure of RHR Sys Valve to Close on Isolation Signal Was Noted.Caused by Design Deficiency.Caution Tag Was Placed on RHR-V-40 Control Switch to Inform Plant Operators of limitation.W/980604 Ltr ML17284A6421998-06-0101 June 1998 LER 98-004-00:on 980502,determined That Primary Containment Penetration Overcurrent Protection Does Not Meet Reg Guide 1.63 Requirements.Caused by Inadequate Design Changes. Installed Addl Fuse in RHR-MO-9 circuit.W/980601 Ltr ML17284A6491998-05-31031 May 1998 Rev 0 to COLR 98-14, WNP-2,Cycle 14 Colr. ML17292B4031998-05-31031 May 1998 Monthly Operating Rept for May 1998 for WNP-2.W/980608 Ltr ML17292B3921998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for WNP-2.W/980513 Ltr ML17292B3291998-04-0909 April 1998 LER 98-003-00:on 980311,WNP-2 Experienced SCRAM Signal as Result of Low Rpv.Caused by Less than post-SCRAM Operational Strategy for Resetting SCRAM Signal in Conditions.Changes in post-SCRAM Operational Strategy implemented.W/980409 Ltr ML17292B3281998-04-0909 April 1998 LER 98-002-00:on 980311,reactor Scram & Plant Transient Occurred,Due to Failed Closed Main Steam Isolation Valve. Caused by Loss of Pneumatic Actuating Supply Pressure. Problem Evaluation Request Written for Failure of MS-V-22D ML17292B3371998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for WNP-2.W/980409 Ltr ML17292B2641998-03-0404 March 1998 Performance Self Assessment,WNP-2. ML17292B2661998-03-0404 March 1998 LER 98-001-00:on 980203,automatic Start of HPCS EDG Was Noted.Caused by Operator Error.Operations Crew Stabilized Plant at Approximately 75% Reactor Power & Investigation of Event Was initiated.W/980304 Ltr ML17292B2911998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for WNP-2.W/980313 Ltr ML17284A7971998-02-17017 February 1998 Rev 28 to Operational QA Program Description, WPPSS-QA-004.With Proposed Rev 29 ML17292B3591998-02-12012 February 1998 WNP-2 Cycle 14 Reload Design Rept. 1999-09-30
[Table view] |
Text
-er r
'c ~
hNNUhL REPORT OF PUBLIC ELECTRIC UTILITIES I DENT I F ICATION OI E~ct LegalNameof Responden~ Washington Public Power 02 Report is for Fiscal Year Ending (Mo, Da, Yr/
Suo l S stem Nuclear Plant No. 2 6/30/86 03 Previous Name and Date of Change (If name changed during yearJ N/A 04 Artdress of Principal Business Office at End of Year (Srreer. City, Srarc', Zip CodeJ 3000 Geor e Washin ton Wa , P. 0. Box 968, Richland, WA - 99352 fs Name of Contact Person 06 Title of Contact Person S. B. Gire Mana er, Cor orate Accountin 07 Address of Contact Person (Srreer, Ciry, Srarc; Zip Code J P. 0. Box 968 Mo 065 Richland, WA 99352 OB Telephone of Conta'ct Person, Including 09 This Report Is 10 Date of Report Area Code (509) 372-548Q It) An Original f2) Hi A Resubmission (Mo, Da, Yr/
6 26/87 11 State the Classes of Utility and Other Services Furnished by Respondent During the Year Wholesale electric energy production I'.ERTI FII.ATIO The undersigned certifies that he/she has examined the accompanying report; that to the best of his/her knowledge, information, and belief, all statements of fact contained in the accompanying report are true, and the accompanying report is a correct statement of the business and affairs of the above named respondent in respect to each and every matter set forth therein during the calendar or other established fiscal year stated above.
01 Name 03 04 Date Signed S. B. Gire (Mo, Da, Yr/
02 Title Mana er, Cor . Acct . ~/i ~/e Ttds 1t, U.S.C. 1tet, mskss lt ~ crlms for any ly snd wNlnOIy to msks any Aesncy or ttspsrt msnt or the Unltsd atstss sny tslss, ftedtlous or f u t ststsmsnts os to sny wlthln lts furtsdlctlon.
PDR 2 0275 920304 R OCR OOOO F.tea>Z PDR
C
~
0
~ ~ 0 ~ ~ ~
~ ~ ~
0 ~ ~
~ ~ ~ ~ ~ ~ ~ ~ ~
h, ~ ~ ~
~ o ~ ~
I
~ ~ o I ~ ~
~ L o
~ ~
' ~ ~ ~ ~
~ ~ ~ ~ ~ ~
~ 0 ~ . o.
~ o g
~
'olSKBQH 0 ~ I I I I I' p g ~ e o ~ ~ ~
0;
~ ~
~ 0I ~ ~
I 0 ~ I I '
~
~ I lo
~ ~ III
~ ~ ~ ~ ~ ~
~ ~
o o ~
ol i~
~ ~
%5 ~ ~ I ~ ~
gg 0 KR ~ ~
~ ~ o I~ ~ '
~ ~ ~
~ ~
~ ~ ~ I0 ~ '
~ ~
. ~ ~
C ~
~ ~ ~ ~ ~
~ ~ ~ ~
~ ~ ~
~ ' ~
~ ~ ~ ~ ~
~~~"'Washington Public oese ot hsoois steoon yes. inc,r o Power Supply System Nuclear 6/29/87 6/3$ )86 ART CONOENSEO INCOME STATEMENT O'THE VEAR
~ (A
~~
Electric Utilit O es Income Ooeretin Rewnues S4 1 Operation Expenses oo no e Ltaintensnce Ex 9 2" lil 04 eclat ion and Amort t lors 0 Yaxcs ond Tax Equivitents Conr.t.'ibutions an erv ces
%OTAL Electric Oper'eti Expenses (Enrer Total of lines N a Operating Revenues 196,1 10 Income from Plant Leased to Others Electric Utilit 0 rati Income become Utility Operatin Income lUtility Other Departments Other than Electric)
I ility perat<ng ncome nrer ota o 9 II 170 15 Other Income (Ex (elis si Ificanr amounts in a %%dotnore Allowance for Funds Used Ouri Conrtruction oo no e 7~~
Grow Income (Enter Total of lines 12 tlsisr 151 7 707 5 17 I 0 eduptions ts Interest on Long Term Oeot 1 0 Ot her Income Deductions (Explain.significant amounts <<s ~ %%dotnotel 2 692 88 TOTAL Income Oeductasns (Enter Total of lines ld and 191 7 559 lt (Fnrer Total of k'ne 1d less line 20J Extraordinary Income (See definition ffl. pegeiil Extrsoidhnsry Deductions (See definition ill. page iil Net Income (Enter Total of lines 21 lus line 22 less fine 22J ootno e a.
PARTIII OPERATION AND MAINTENANCE EXPENSES asswtenenee Tore<
Piodvcsion Exoensrs 1 I Sseem Power Genersuon Nvclcsi Powci Geneistion 70 608 4 9 Kydieuhc Powei Generation a Other Powei Generation (Speci(a.l PurctLesed Power Otnei PiodvCr On ExpenSeS e Itlml 10nln 888 000 TOTAI. Production Exoenses ~
714647 21 383 9 0 0 Transmission Expenses Oistriovuon Exoenses 10 Cuwomei Accounts Expenses Sales Exoenses Adininistretive 6 General Expenses 25 4 1 7 13 TOTAL ELECT. OPERATION 6 MAINT. EXPENSES 12 033 524
0
~ I
~ ~ ~ ~
~
~
~ I ~ o 88~~8~m5Rmmmf msslmmml!SNRmmmss mmmm
$ %liiÃKE~KWRSZll ~ 'I I~'
H gg g~Q
~s
,QR gg lE%
e
~ ~ ~
i
~ ~
I ~ ~
E%liiKCS~SRRSMl
%%7iTiRK~
815558~185
~mRIRENNNRmmm smmmE~MRMH855mR
~ ~ 'I I
I~'
~ ~
~ ~ ~
~ ~ ~
~ I s ~ o ~
~
e ~
~ ~ ~ ~ ~ ~
~
~
~ ~
]
~
~ ~ i ~ o'II
~
~ ~ ~
~ I ~ ~
(/Q ~
~ ~ s ~
~ ~
~ l l ~
~ ~
~ ~
~~
~ ~
~ ~
~ ' ~
\ ~ ~ ~ ~
~ 1 ~
~
ll gg o ~ ~
~ ~
~ ~
HR e
0 4
~ ~ ~
~ I o I ~ ~
I~ ~
o ~ ~
~ ~
~ ~
~ ~ ~
~
I o I ' II I I'II II o' o>>4 o
~ ~
gQo ~ ~
I~ ~ ~
RN RQ I ' o RR RRt I
I RQ RR I
KI>>I ~ ~
o '
RN o o I
~ ~
~ ~ ~ ~ ~
I KRW~ I ~
II ~ ~ ~
&88&WHW
~ ~
mam&am WKWWHW gQI SKI CH
~am<~~~~
~~RBKI~~~~
~ ~
~ ~ ~ ~
L ~
~ L Al
~ ~ ~
~ I ~ ~
~ I ~ ~
~ ~ ~ ~ ~ . ~ ~ ~ I~I ~ .. ~ ~ I
~ ~ 0 ~
~ .. ~
~ ~
~ ~ ~
~ ~
~
~ .. ~ ~
0
~
~ ~ ~ ~ ~
~ ~
~ ~
~ ~
M K5
~ ~
~ ~ ~
~ ~ ~
'R
~ . ~
~ ~ ~ ~ ~ ~
I ~ . ~ ~ ~
~ ~ ~ ~
M SH
~ ~
HR ~ ~
SH
!H RI ~ . ~ ~ ~ ~
~ Rl ~ r. ~
/go ~ ~
~I ~ t
~ ~
KH ggr ~ ~
ggI KR RH ~ ' ~ ~
%El
~ ~ ~ ~
~ ~ o ~ ~ ~ ~ ~ 4~ ~
~ ~ ~ ~ ~ ~ ~ ~
~ ~ ~ ~
~ ~
~ ~
~ ~
~ ~
~ ~
~ ~
~ ~ ~
g ~
~ I 0 ~
~ ~ I ~ ~
~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0
~ ~
~ ' 0
+ ~ ~ ~ 0 ~
~ ~
~ ~
~ ~
Q
ReOon Year Ending or(:<<o d r Washington Public Yrl (Mo. Oa. Yr)
(ggo, Og, wer Supply System Nuclear 6/29/87 t2) QA Rrsubrnlmon 6/30/86 PART FOOTNOTE OATA Pe gr Porr LiM Column kuneei kumor r ku~r kumbtr (rl (ol (ol (rtl Plant 8 Equip. In Service $ 3,216,160,700 Less Accum. Depreciation 169,769,941) i
$ 3,046,390,759 )
I Const. Work In Progress 16,230,175 I t*
Nuclear Fuel $ 141,729,364 I Less Accum. Amortization 37,419,415) 104,309,949 General Plant Bldgs. 5 Equip. $ 20,447,324 Less Accum. Depreciation (3,595,128) 16,852,196 Net Otility Plant $ 3,183,783,079 3 II 0 eration Ex enses include: Operation $ 45,974,335 Fuel Burnup 20,468,417 Waste Disposal 4,165,727 Decommissioning'SG 888,000 25,440,053
$ 96,936,532 3 II 14 b Other Income includes: Investment Income $ 21,513,252 Reval., of Investmts. 24,257
$ 21,537,509 3 19 Other Income Deductions includes:
Amort.'f Debt Discount 8 Expense $ 2,692,884 3 II 24 The project has no equity and, therefore, no retained earnin s.
Our net-billing agreements with the project participants all for complete recovery of project costs including debt servic The participants are billed for project costs based on a budgeted amount with an adjustment to actual each. year.
6 VI I I The cost of power is equal to total expenses divided by the net generation:
Total Expenses (Pg. 3, Line 2) $ 421,471,303 Net Generation Pg. 6, Line 11) 4,363,364,000 kw Net Cost of Power 96.59 Hill/kw
Washington Public Power Supply System
~
Date of Report: 6/29/87 Nuclear Plant No. ~ 2 Report Yr. Ending: 6/30/86 Pa e 6 - Part VIII - Line No. 11 - Column No. b The Fuel Accounting System uses cost principles of the public utility industry as given under the Federal Energy Regulatory Commission (FERC)
Chart of Uniform Accounts. This includes recording of the acquisition and manufacturing cost of fuel and the amortization of the capitalized fuel cost based on heat production. In addition to the amortization of fuel burnup, the current period nuclear fuel operating expense includes a charge for future spent nuclear fuel storage and disposal to be pro-vided by the Department of Energy. This charge is based on a one mill per kilowatt hour of energy generated.
Pa e 3 Part III P e 6, Part VIII Benefits accrued reclassified from operation and maintenance categories to administrative and general.